LNG Chain

Gas transmission pipeline · Fier to Split

Ionian Adriatic Gas Pipeline

Ionian Adriatic Gas Pipeline is a proposed gas transmission pipeline crossing Albania, Montenegro, Croatia. The tracker lists 1 tracked segment, 540 km long and 5 bcm/y of capacity, starting up in 2029. It runs from Fier to Split. Owners include Albgaz Sha, BH-Gas doo, Plinacro Ltd and 1 more.

Length

540 km

Capacity

5 bcm/y

3.7 Mtpa LNG equivalent

Segments tracked

1

Largest diameter 800 mm (31 in)

Route

Ionian Adriatic Gas Pipeline runs from Fier to Split. The map draws the tracked route and any LNG terminal within 25 km of it.

Loads about 250 kB of map code and the country outline file.

From
Fier
To
Split
Start country
Albania
End country
Croatia
Countries crossed
Albania, Montenegro, Croatia
Onshore / offshore
Not reported
Fuel
Gas
Region
Europe
Route drawn on map
499 km
GEM pipeline ID
P0702
Start year
2029
GEM wiki page
gem.wiki

Segments

Each row is one row of GEM's pipeline file. Project-level figures repeated on every segment are counted once in the totals above.

SegmentStatusFrom → toLengthCapacityDiameterStartRoute from
Whole pipelineProposedFier → Split5405800 mm2029GEM's route file

Connected LNG terminals

Terminals whose coordinates fall within 25 km of this route, or whose name matches the pipeline. Proximity is not proof of a physical connection.

TerminalCountryImport / exportStatusDistanceMatched by
Bar LNG TerminalMontenegroImportProposed1.1 kmroute proximity
Eagle FSRUAlbaniaImportCancelled8 kmroute proximity
Adriatic LNG TerminalItalyImportOperatingname match

Owners and operators

Stakes as reported by GEM per segment, merged across segments.

Common questions

Generated from the same tracker fields as the tables above, so the two cannot disagree. Each answer stands on its own.

Where does Ionian Adriatic Gas Pipeline run?
Ionian Adriatic Gas Pipeline runs from Fier to Split, crossing Albania, Montenegro and Croatia.
How long is Ionian Adriatic Gas Pipeline?
Ionian Adriatic Gas Pipeline is 540 km long.
How much gas can Ionian Adriatic Gas Pipeline carry?
Ionian Adriatic Gas Pipeline has a design capacity of 5 bcm/y. Where every segment of a project repeats the same figure it is counted once rather than summed.
Is Ionian Adriatic Gas Pipeline operating?
Ionian Adriatic Gas Pipeline is proposed, with a reported start year of 2029.
Who owns Ionian Adriatic Gas Pipeline?
Ionian Adriatic Gas Pipeline is owned by Albgaz Sha, BH-Gas doo, Montenegro Bonus and 1 other, as recorded in the current tracker release.
Does Ionian Adriatic Gas Pipeline serve an LNG terminal?
Ionian Adriatic Gas Pipeline passes within 25 km of 3 tracked LNG terminals. Proximity is not proof of a physical connection; each match is listed with its distance and how it was made.