Gas transmission pipeline · North Macedonia
Gostivar-Kicevo Gas Pipeline
Gostivar-Kicevo Gas Pipeline is a proposed gas transmission pipeline in North Macedonia. The tracker lists 1 tracked segment, 35 km long, starting up in 2027.
Length
35 km
Capacity
Not reported
Segments tracked
1
Largest diameter 12700 mm (500 in)
Route
No route geometry is available for this pipeline in the current release, so it is not drawn on the map. Start and end points below are shown where GEM reports them.
- From
- Not reported
- To
- Not reported
- Start country
- North Macedonia
- End country
- North Macedonia
- Countries crossed
- North Macedonia
- Onshore / offshore
- Not reported
- Fuel
- Gas
- Region
- Not reported
- Route drawn on map
- Not reported
- GEM pipeline ID
- P5546
- Start year
- 2027
- GEM wiki page
- gem.wiki
Segments
Each row is one row of GEM's pipeline file. Project-level figures repeated on every segment are counted once in the totals above.
| Segment | Status | From → to | Length | Capacity | Diameter | Start | Route from |
|---|---|---|---|---|---|---|---|
| Whole pipeline | Proposed | Not reported | 35 | Not reported | 12700 mm | 2027 | No route |
Connected LNG terminals
Terminals whose coordinates fall within 25 km of this route, or whose name matches the pipeline. Proximity is not proof of a physical connection.
No tracked LNG terminal lies within 25 km of this pipeline's route.
Owners and operators
Stakes as reported by GEM per segment, merged across segments.
Ownership is not reported for this pipeline.
In the news
Recent headlines that name Gostivar-Kicevo Gas Pipeline. Matched by name, so it is approximate. Titles and links only; we store no article text.
Common questions
Generated from the same tracker fields as the tables above, so the two cannot disagree. Each answer stands on its own.
- Where does Gostivar-Kicevo Gas Pipeline run?
- Gostivar-Kicevo Gas Pipeline is recorded in North Macedonia. Global Energy Monitor reports no start and end points for it.
- How long is Gostivar-Kicevo Gas Pipeline?
- Gostivar-Kicevo Gas Pipeline is 35 km long.
- How much gas can Gostivar-Kicevo Gas Pipeline carry?
- No design capacity is reported for Gostivar-Kicevo Gas Pipeline. That is an absent figure, not a zero.
- Is Gostivar-Kicevo Gas Pipeline operating?
- Gostivar-Kicevo Gas Pipeline is proposed, with a reported start year of 2027.
- Who owns Gostivar-Kicevo Gas Pipeline?
- Ownership of Gostivar-Kicevo Gas Pipeline is not reported in the current tracker release.
More gas pipelines in North Macedonia
Listed in name order among the 13 pipelines tracked in North Macedonia, so projects with the same name sit together. A browse aid, not a claim that they are alike.