LNG Atlas

Gas transmission pipeline · Türkiye – Cyprus

Cyprus-Turkey Gas Pipeline

Cyprus-Turkey Gas Pipeline is a cancelled gas transmission pipeline crossing Türkiye, Cyprus. The tracker lists 1 tracked segment, 80 km long and 3.1 bcm/y of capacity, starting up in 2025.

Length

80 km

Capacity

3.1 bcm/y

2.3 Mtpa LNG equivalent

Segments tracked

1

Largest diameter 610 mm (24 in)

Route

Cyprus-Turkey Gas Pipeline runs from Türkiye – Cyprus. The map draws the tracked route and any LNG terminal within 25 km of it.

Loads about 250 kB of map code and the country outline file.

From
Mersin Province
To
Not reported
Start country
Türkiye
End country
Cyprus
Countries crossed
Türkiye, Cyprus
Onshore / offshore
Not reported
Fuel
Gas
Region
Not reported
Route drawn on map
91 km
GEM pipeline ID
P1324
Start year
2025
Estimated cost (GEM, US dollars)
$338 million
Cancelled (year GEM records)
2025
GEM wiki page
gem.wiki

Segments

Each row is one row of GEM's pipeline file. Project-level figures repeated on every segment are counted once in the totals above.

SegmentStatusFrom → toLengthCapacityDiameterStartRoute from
Anamur-North CyprusCancelledMersin Province → ?803.1610 mm2025GEM's route file

Connected LNG terminals

Terminals whose coordinates fall within 25 km of this route, or whose name matches the pipeline. Proximity is not proof of a physical connection.

TerminalCountryImport / exportStatusDistanceMatched by
Cyprus FSRUCyprusImportUnder construction—name match
Cyprus LNG TerminalCyprusExportCancelled—name match
Hoegh Cyprus FSRUCyprusImportCancelled—name match

Owners and operators

Stakes as reported by GEM per segment, merged across segments.

Ownership is not reported for this pipeline.

Common questions

Generated from the same tracker fields as the tables above, so the two cannot disagree. Each answer stands on its own.

Where does Cyprus-Turkey Gas Pipeline run?
Cyprus-Turkey Gas Pipeline runs from Türkiye to Cyprus, crossing Türkiye and Cyprus.
How long is Cyprus-Turkey Gas Pipeline?
Cyprus-Turkey Gas Pipeline is 80 km long.
How much gas can Cyprus-Turkey Gas Pipeline carry?
Cyprus-Turkey Gas Pipeline has a design capacity of 3.1 bcm/y. Where every segment of a project repeats the same figure it is counted once rather than summed.
Is Cyprus-Turkey Gas Pipeline operating?
Cyprus-Turkey Gas Pipeline is cancelled, with a reported start year of 2025.
Who owns Cyprus-Turkey Gas Pipeline?
Ownership of Cyprus-Turkey Gas Pipeline is not reported in the current tracker release.
Does Cyprus-Turkey Gas Pipeline serve an LNG terminal?
Cyprus-Turkey Gas Pipeline passes within 25 km of 3 tracked LNG terminals. Proximity is not proof of a physical connection; each match is listed with its distance and how it was made.

More gas pipelines in Türkiye

Listed in name order among the 29 pipelines tracked in Türkiye, so projects with the same name sit together. A browse aid, not a claim that they are alike.

Cite this page

Reuse is welcome; please name the page and the tracker release it draws on.

BibTeX
Share this page:XLinkedInFacebookBlueskyRedditEmail