Gas transmission pipeline · Egypt – Cyprus
Cronos-Port Said Gas Pipeline
Cronos-Port Said Gas Pipeline is a proposed gas transmission pipeline crossing Egypt, Cyprus. The tracker lists 1 tracked segment, 90 km long and 5.11 bcm/y of capacity, starting up in 2027.
Length
90 km
Capacity
5.11 bcm/y
3.8 Mtpa LNG equivalent
Segments tracked
1
Route
Cronos-Port Said Gas Pipeline runs from Egypt – Cyprus. The map draws the tracked route and any LNG terminal within 25 km of it.
Loads about 250 kB of map code and the country outline file.
- From
- Not reported
- To
- Port Said
- Start country
- Cyprus
- End country
- Egypy
- Countries crossed
- Egypt, Cyprus
- Onshore / offshore
- Not reported
- Fuel
- Gas
- Region
- Asia
- Route drawn on map
- 73 km
- GEM pipeline ID
- P7597
- Start year
- 2027
- GEM wiki page
- gem.wiki
Segments
Each row is one row of GEM's pipeline file. Project-level figures repeated on every segment are counted once in the totals above.
| Segment | Status | From → to | Length | Capacity | Diameter | Start | Route from |
|---|---|---|---|---|---|---|---|
| Whole pipeline | Proposed | ? → Port Said | 90 | 5.11 | — | 2027 | GEM's route file |
Connected LNG terminals
Terminals whose coordinates fall within 25 km of this route, or whose name matches the pipeline. Proximity is not proof of a physical connection.
No tracked LNG terminal lies within 25 km of this pipeline's route.
Owners and operators
Stakes as reported by GEM per segment, merged across segments.
Ownership is not reported for this pipeline.
Common questions
Generated from the same tracker fields as the tables above, so the two cannot disagree. Each answer stands on its own.
- Where does Cronos-Port Said Gas Pipeline run?
- Cronos-Port Said Gas Pipeline runs from Cyprus to Egypy, crossing Egypt and Cyprus.
- How long is Cronos-Port Said Gas Pipeline?
- Cronos-Port Said Gas Pipeline is 90 km long.
- How much gas can Cronos-Port Said Gas Pipeline carry?
- Cronos-Port Said Gas Pipeline has a design capacity of 5.11 bcm/y. Where every segment of a project repeats the same figure it is counted once rather than summed.
- Is Cronos-Port Said Gas Pipeline operating?
- Cronos-Port Said Gas Pipeline is proposed, with a reported start year of 2027.
- Who owns Cronos-Port Said Gas Pipeline?
- Ownership of Cronos-Port Said Gas Pipeline is not reported in the current tracker release.