LNG Chain

Gas transmission pipeline · Hanggin to Huanghua

CNOOC Coal Gasification Transmission Pipeline

CNOOC Coal Gasification Transmission Pipeline is a proposed gas transmission pipeline in China. The tracker lists 1 tracked segment, 1,022 km long and 20 bcm/y of capacity, starting up in 2022. It runs from Hanggin to Huanghua. It is owned by National Pipe Network Group North China Natural Gas Pipeline Co Ltd.

Length

1,022 km

Capacity

20 bcm/y

14.7 Mtpa LNG equivalent

Segments tracked

1

Largest diameter 1016 mm (40 in)

Route

CNOOC Coal Gasification Transmission Pipeline runs from Hanggin to Huanghua. The map draws the tracked route and any LNG terminal within 25 km of it.

Loads about 250 kB of map code and the country outline file.

From
Hanggin
To
Huanghua
Start country
China
End country
China
Countries crossed
China
Onshore / offshore
Not reported
Fuel
Gas
Region
Asia
Route drawn on map
940 km
GEM pipeline ID
P4923
Start year
2022
GEM wiki page
gem.wiki

Segments

Each row is one row of GEM's pipeline file. Project-level figures repeated on every segment are counted once in the totals above.

SegmentStatusFrom → toLengthCapacityDiameterStartRoute from
Whole pipelineProposedHanggin → Huanghua1,022201016 mm2022GEM's route file

Connected LNG terminals

Terminals whose coordinates fall within 25 km of this route, or whose name matches the pipeline. Proximity is not proof of a physical connection.

TerminalCountryImport / exportStatusDistanceMatched by
Tianjin LNG Terminal (PipeChina)ChinaImportOperating8.3 kmroute proximity
Tianjin LNG Terminal (Sinopec)ChinaImportOperating19.4 kmroute proximity
Tianjin LNG Terminal (Beijing Gas Group)ChinaImportOperating20.1 kmroute proximity

Owners and operators

Stakes as reported by GEM per segment, merged across segments.

Common questions

Generated from the same tracker fields as the tables above, so the two cannot disagree. Each answer stands on its own.

Where does CNOOC Coal Gasification Transmission Pipeline run?
CNOOC Coal Gasification Transmission Pipeline runs from Hanggin to Huanghua, crossing China.
How long is CNOOC Coal Gasification Transmission Pipeline?
CNOOC Coal Gasification Transmission Pipeline is 1,022 km long.
How much gas can CNOOC Coal Gasification Transmission Pipeline carry?
CNOOC Coal Gasification Transmission Pipeline has a design capacity of 20 bcm/y. Where every segment of a project repeats the same figure it is counted once rather than summed.
Is CNOOC Coal Gasification Transmission Pipeline operating?
CNOOC Coal Gasification Transmission Pipeline is proposed, with a reported start year of 2022.
Who owns CNOOC Coal Gasification Transmission Pipeline?
CNOOC Coal Gasification Transmission Pipeline is owned by National Pipe Network Group North China Natural Gas Pipeline Co Ltd, as recorded in the current tracker release.
Does CNOOC Coal Gasification Transmission Pipeline serve an LNG terminal?
CNOOC Coal Gasification Transmission Pipeline passes within 25 km of 3 tracked LNG terminals. Proximity is not proof of a physical connection; each match is listed with its distance and how it was made.