Bolsherechenskaya-Tarskaya Gas Pipeline

Bolsherechenskaya-Tarskaya Gas Pipeline is a proposed gas transmission pipeline in Russia. The tracker lists 1 tracked segment, 94 km long, starting up in 2025. It runs from Omsk Oblast to Omsk Oblast. It is owned by Gazprom PJSC.

Length

94 km

Capacity

Not reported

Segments tracked

1

Largest diameter 8255 mm (325 in)

Route

Bolsherechenskaya-Tarskaya Gas Pipeline runs from Omsk Oblast to Omsk Oblast. The map draws the tracked route and any LNG terminal within 25 km of it.

Loads about 250 kB of map code and the country outline file.

From
Omsk Oblast
To
Omsk Oblast
Start country
Russia
End country
Russia
Countries crossed
Russia
Onshore / offshore
Not reported
Fuel
Gas
Region
Not reported
Route drawn on map
92 km
GEM pipeline ID
P3981
Start year
2025
GEM wiki page
gem.wiki

Segments

Each row is one row of GEM's pipeline file. Project-level figures repeated on every segment are counted once in the totals above.

SegmentStatusFrom → toLengthCapacityDiameterStartRoute from
Whole pipelineProposedOmsk Oblast → Omsk Oblast94Not reported8255 mm2025GEM's route file

Connected LNG terminals

Terminals whose coordinates fall within 25 km of this route, or whose name matches the pipeline. Proximity is not proof of a physical connection.

No tracked LNG terminal lies within 25 km of this pipeline's route.

Owners and operators

Stakes as reported by GEM per segment, merged across segments.

Owners

Parent companies

Common questions

Generated from the same tracker fields as the tables above, so the two cannot disagree. Each answer stands on its own.

Where does Bolsherechenskaya-Tarskaya Gas Pipeline run?
Bolsherechenskaya-Tarskaya Gas Pipeline runs from Omsk Oblast to Omsk Oblast, crossing Russia.
How long is Bolsherechenskaya-Tarskaya Gas Pipeline?
Bolsherechenskaya-Tarskaya Gas Pipeline is 94 km long.
How much gas can Bolsherechenskaya-Tarskaya Gas Pipeline carry?
No design capacity is reported for Bolsherechenskaya-Tarskaya Gas Pipeline. That is an absent figure, not a zero.
Is Bolsherechenskaya-Tarskaya Gas Pipeline operating?
Bolsherechenskaya-Tarskaya Gas Pipeline is proposed, with a reported start year of 2025.
Who owns Bolsherechenskaya-Tarskaya Gas Pipeline?
Bolsherechenskaya-Tarskaya Gas Pipeline is owned by Gazprom PJSC, as recorded in the current tracker release.

More gas pipelines in Russia

Listed in name order among the 266 pipelines tracked in Russia, so projects with the same name sit together. A browse aid, not a claim that they are alike.

Cite this page

Reuse is welcome; please name the page and the tracker release it draws on.

BibTeX
Share this page:XLinkedInFacebookBlueskyRedditEmail