LNG Chain

Gas transmission pipeline · Vietnam

Block B–O Mon Gas Pipeline System

Block B–O Mon Gas Pipeline System is a proposed gas transmission pipeline in Vietnam. The tracker lists 1 tracked segment, 431 km long and 18.3 bcm/y of capacity, starting up in 2027. It is owned by PetroVietnam.

Length

431 km

Capacity

18.3 bcm/y

13.5 Mtpa LNG equivalent

Segments tracked

1

Route

Block B–O Mon Gas Pipeline System runs from Vietnam. The map draws the tracked route and any LNG terminal within 25 km of it.

Loads about 250 kB of map code and the country outline file.

From
Not reported
To
Ca Mau
Start country
Vietnam
End country
Vietnam
Countries crossed
Vietnam
Onshore / offshore
Not reported
Fuel
Gas
Region
Asia
Route drawn on map
236 km
GEM pipeline ID
P2699
Start year
2027
GEM wiki page
gem.wiki

Segments

Each row is one row of GEM's pipeline file. Project-level figures repeated on every segment are counted once in the totals above.

SegmentStatusFrom → toLengthCapacityDiameterStartRoute from
Whole pipelineProposed? → Ca Mau43118.32027GEM's route file

Connected LNG terminals

Terminals whose coordinates fall within 25 km of this route, or whose name matches the pipeline. Proximity is not proof of a physical connection.

TerminalCountryImport / exportStatusDistanceMatched by
Ca Mau LNG TerminalVietnamImportProposed12.7 kmroute proximity
Bac Lieu LNG TerminalVietnamImportProposed24.1 kmroute proximity

Owners and operators

Stakes as reported by GEM per segment, merged across segments.

Owners

Parent companies

Common questions

Generated from the same tracker fields as the tables above, so the two cannot disagree. Each answer stands on its own.

Where does Block B–O Mon Gas Pipeline System run?
Block B–O Mon Gas Pipeline System is recorded in Vietnam. Global Energy Monitor reports no start and end points for it.
How long is Block B–O Mon Gas Pipeline System?
Block B–O Mon Gas Pipeline System is 431 km long.
How much gas can Block B–O Mon Gas Pipeline System carry?
Block B–O Mon Gas Pipeline System has a design capacity of 18.3 bcm/y. Where every segment of a project repeats the same figure it is counted once rather than summed.
Is Block B–O Mon Gas Pipeline System operating?
Block B–O Mon Gas Pipeline System is proposed, with a reported start year of 2027.
Who owns Block B–O Mon Gas Pipeline System?
Block B–O Mon Gas Pipeline System is owned by PetroVietnam, as recorded in the current tracker release.
Does Block B–O Mon Gas Pipeline System serve an LNG terminal?
Block B–O Mon Gas Pipeline System passes within 25 km of 2 tracked LNG terminals. Proximity is not proof of a physical connection; each match is listed with its distance and how it was made.