Gas transmission pipeline · Basrah to Basrah
Artawi GMP EPSCC Gas Pipelines
Artawi GMP EPSCC Gas Pipelines is a proposed gas transmission pipeline in Iraq. The tracker lists 1 tracked segment, 114 km long. It runs from Basrah to Basrah. It is owned by Iraq Ministry of Oil.
Length
114 km
Capacity
Not reported
Segments tracked
1
Largest diameter 660 mm (26 in)
Route
No route geometry is available for this pipeline in the current release, so it is not drawn on the map. Start and end points below are shown where GEM reports them.
- From
- Basrah
- To
- Basrah
- Start country
- Iraq
- End country
- Iraq
- Countries crossed
- Iraq
- Onshore / offshore
- Not reported
- Fuel
- Gas
- Region
- Not reported
- Route drawn on map
- Not reported
- GEM pipeline ID
- P7437
- Start year
- Not reported
- GEM wiki page
- gem.wiki
Segments
Each row is one row of GEM's pipeline file. Project-level figures repeated on every segment are counted once in the totals above.
| Segment | Status | From → to | Length | Capacity | Diameter | Start | Route from |
|---|---|---|---|---|---|---|---|
| Pipeline 2 | Proposed | Basrah → Basrah | 114 | Not reported | 660 mm | — | No route |
Connected LNG terminals
Terminals whose coordinates fall within 25 km of this route, or whose name matches the pipeline. Proximity is not proof of a physical connection.
No tracked LNG terminal lies within 25 km of this pipeline's route.
Owners and operators
Stakes as reported by GEM per segment, merged across segments.
Owners
In the news
Recent headlines that name Artawi GMP EPSCC Gas Pipelines. Matched by name, so it is approximate. Titles and links only; we store no article text.
Common questions
Generated from the same tracker fields as the tables above, so the two cannot disagree. Each answer stands on its own.
- Where does Artawi GMP EPSCC Gas Pipelines run?
- Artawi GMP EPSCC Gas Pipelines runs from Basrah to Basrah, crossing Iraq.
- How long is Artawi GMP EPSCC Gas Pipelines?
- Artawi GMP EPSCC Gas Pipelines is 114 km long.
- How much gas can Artawi GMP EPSCC Gas Pipelines carry?
- No design capacity is reported for Artawi GMP EPSCC Gas Pipelines. That is an absent figure, not a zero.
- Is Artawi GMP EPSCC Gas Pipelines operating?
- Artawi GMP EPSCC Gas Pipelines is proposed.
- Who owns Artawi GMP EPSCC Gas Pipelines?
- Artawi GMP EPSCC Gas Pipelines is owned by Iraq Ministry of Oil, as recorded in the current tracker release.
More gas pipelines in Iraq
Listed in name order among the 52 pipelines tracked in Iraq, so projects with the same name sit together. A browse aid, not a claim that they are alike.
- Badra Oil Field–Wassit PS Gas PipelineWassit to Wassit · 107 km
- Baiji-Al Mushraq Gas PipelineSaladin to Mosul · 211 km
- Baiji-K3-Al Kaem Gas PipelineSaladin to Al Anbar · 431 km
- Al Najibiya PS Gas PipelineBasra to Basra · 4.5 km
- Al-Ahdab-Al-Zubaydia PWR St Gas PipelineWasit to Wasit · 117 km
- Artawi GMP EPSCC Gas PipelinesBasrah to Basrah · 83 km
Cite this page
Reuse is welcome; please name the page and the tracker release it draws on.