Gas transmission pipeline · KS-14 to Kostanay
Aktobe-Kostanay Gas Pipeline
Aktobe-Kostanay Gas Pipeline is an under construction gas transmission pipeline in Kazakhstan. The tracker lists 1 tracked segment, 630 km long and 5 bcm/y of capacity, starting up in 2028. It runs from KS-14 to Kostanay. It is owned by QazaqGaz and UCC Holding.
Length
630 km
Capacity
5 bcm/y
3.7 Mtpa LNG equivalent
Segments tracked
1
Largest diameter 1020 mm (40 in)
Route
Aktobe-Kostanay Gas Pipeline runs from KS-14 to Kostanay. The map draws the tracked route and any LNG terminal within 25 km of it.
Loads about 250 kB of map code and the country outline file.
- From
- KS-14
- To
- Kostanay
- Start country
- Kazakhstan
- End country
- Kazakhstan
- Countries crossed
- Kazakhstan
- Onshore / offshore
- Not reported
- Fuel
- Gas
- Region
- Asia
- Route drawn on map
- 460 km
- GEM pipeline ID
- P6834
- Start year
- 2028
- GEM wiki page
- gem.wiki
Segments
Each row is one row of GEM's pipeline file. Project-level figures repeated on every segment are counted once in the totals above.
| Segment | Status | From → to | Length | Capacity | Diameter | Start | Route from |
|---|---|---|---|---|---|---|---|
| Whole pipeline | Under construction | KS-14 → Kostanay | 630 | 5 | 1020 mm | 2028 | GEM's route file |
Connected LNG terminals
Terminals whose coordinates fall within 25 km of this route, or whose name matches the pipeline. Proximity is not proof of a physical connection.
No tracked LNG terminal lies within 25 km of this pipeline's route.
Owners and operators
Stakes as reported by GEM per segment, merged across segments.
Owners
Parent companies
Common questions
Generated from the same tracker fields as the tables above, so the two cannot disagree. Each answer stands on its own.
- Where does Aktobe-Kostanay Gas Pipeline run?
- Aktobe-Kostanay Gas Pipeline runs from KS-14 to Kostanay, crossing Kazakhstan.
- How long is Aktobe-Kostanay Gas Pipeline?
- Aktobe-Kostanay Gas Pipeline is 630 km long.
- How much gas can Aktobe-Kostanay Gas Pipeline carry?
- Aktobe-Kostanay Gas Pipeline has a design capacity of 5 bcm/y. Where every segment of a project repeats the same figure it is counted once rather than summed.
- Is Aktobe-Kostanay Gas Pipeline operating?
- Aktobe-Kostanay Gas Pipeline is under construction, with a reported start year of 2028.
- Who owns Aktobe-Kostanay Gas Pipeline?
- Aktobe-Kostanay Gas Pipeline is owned by QazaqGaz and UCC Holding, as recorded in the current tracker release.