LNG Atlas

Gas transmission pipeline · Cabo Delgado to Gauteng

African Renaissance Gas Pipeline

African Renaissance Gas Pipeline is a proposed gas transmission pipeline crossing Mozambique, South Africa. The tracker lists 1 tracked segment, 614 km long and 22.48 bcm/y of capacity, starting up in 2026. It runs from Cabo Delgado to Gauteng. Owners include ENH, Profin Consulting, CNPC and 1 more.

Length

614 km

Capacity

22.5 bcm/y

16.5 Mtpa LNG equivalent

Segments tracked

1

Largest diameter 1016 mm (40 in)

Route

African Renaissance Gas Pipeline runs from Cabo Delgado to Gauteng. The map draws the tracked route and any LNG terminal within 25 km of it.

Loads about 250 kB of map code and the country outline file.

From
Cabo Delgado
To
Gauteng
Start country
Mozambique
End country
South Africa
Countries crossed
Mozambique, South Africa
Onshore / offshore
Not reported
Fuel
Gas
Region
Not reported
Route drawn on map
2,466 km
GEM pipeline ID
P2249
Start year
2026
Estimated cost (GEM, US dollars)
$2.8 billion
GEM wiki page
gem.wiki

Segments

Each row is one row of GEM's pipeline file. Project-level figures repeated on every segment are counted once in the totals above.

SegmentStatusFrom → toLengthCapacityDiameterStartRoute from
Whole pipelineProposedCabo Delgado → Gauteng61422.51016 mm2026GEM's route file

Connected LNG terminals

Terminals whose coordinates fall within 25 km of this route, or whose name matches the pipeline. Proximity is not proof of a physical connection.

TerminalCountryImport / exportStatusDistanceMatched by
Rovuma LNG TerminalMozambiqueExportProposed7.5 kmroute proximity
Mozambique LNG TerminalMozambiqueExportShelved9.6 kmroute proximity

Owners and operators

Stakes as reported by GEM per segment, merged across segments.

Common questions

Generated from the same tracker fields as the tables above, so the two cannot disagree. Each answer stands on its own.

Where does African Renaissance Gas Pipeline run?
African Renaissance Gas Pipeline runs from Cabo Delgado to Gauteng, crossing Mozambique and South Africa.
How long is African Renaissance Gas Pipeline?
African Renaissance Gas Pipeline is 614 km long.
How much gas can African Renaissance Gas Pipeline carry?
African Renaissance Gas Pipeline has a design capacity of 22.5 bcm/y. Where every segment of a project repeats the same figure it is counted once rather than summed.
Is African Renaissance Gas Pipeline operating?
African Renaissance Gas Pipeline is proposed, with a reported start year of 2026.
Who owns African Renaissance Gas Pipeline?
African Renaissance Gas Pipeline is owned by CNPC, ENH, Profin Consulting and 1 other, as recorded in the current tracker release.
Does African Renaissance Gas Pipeline serve an LNG terminal?
African Renaissance Gas Pipeline passes within 25 km of 2 tracked LNG terminals. Proximity is not proof of a physical connection; each match is listed with its distance and how it was made.

More gas pipelines in Mozambique

Listed in name order among the 5 pipelines tracked in Mozambique, so projects with the same name sit together. A browse aid, not a claim that they are alike.

Cite this page

Reuse is welcome; please name the page and the tracker release it draws on.

BibTeX
Share this page:XLinkedInFacebookBlueskyRedditEmail