Gas transmission pipeline · Leviathan platform to Idku LNG terminal
Israel–Egypt Offshore Gas Pipeline
Israel–Egypt Offshore Gas Pipeline is a cancelled gas transmission pipeline crossing Israel, Egypt. The tracker lists 1 tracked segment, 592 km long by route geometry. It runs from Leviathan platform to Idku LNG terminal.
Length
592 km
Measured from the route geometry; GEM does not report a length.
Capacity
Not reported
Segments tracked
1
Route
Israel–Egypt Offshore Gas Pipeline runs from Leviathan platform to Idku LNG terminal. The map draws the tracked route and any LNG terminal within 25 km of it.
Loads about 250 kB of map code and the country outline file.
- From
- Leviathan platform
- To
- Idku LNG terminal
- Start country
- Israel
- End country
- Egypt
- Countries crossed
- Israel, Egypt
- Onshore / offshore
- Not reported
- Fuel
- Gas
- Region
- Asia
- Route drawn on map
- 592 km
- GEM pipeline ID
- P8000
- Start year
- Not reported
- GEM wiki page
- gem.wiki
Segments
Each row is one row of GEM's pipeline file. Project-level figures repeated on every segment are counted once in the totals above.
| Segment | Status | From → to | Length | Capacity | Diameter | Start | Route from |
|---|---|---|---|---|---|---|---|
| Whole pipeline | Cancelled | Leviathan platform → Idku LNG terminal | 592 | Not reported | — | — | GEM's route file |
Connected LNG terminals
Terminals whose coordinates fall within 25 km of this route, or whose name matches the pipeline. Proximity is not proof of a physical connection.
| Terminal | Country | Import / export | Status | Distance | Matched by |
|---|---|---|---|---|---|
| Egyptian LNG Terminal | Egypt | Export | Operating | 0.6 km | route proximity |
| NewMed FLNG Terminal | Israel | Export | Proposed | 2 km | route proximity |
| Hadera FSRU Terminal | Israel | Import | Idle | 19.6 km | route proximity |
| Blue Marlin Offshore Port | United States | Export | Proposed | — | name match |
| Jupiter Offshore Loading Terminal (JOLT) | United States | Export | Cancelled | — | name match |
| Louisiana Offshore Oil Port | United States | Export | Operating | — | name match |
| Texas Crude Offshore Loading Terminal | United States | Export | Cancelled | — | name match |
| UTM Offshore FLNG Terminal | Nigeria | Export | Proposed | — | name match |
| Venezuela Offshore LNG Terminal | Venezuela | Export | Cancelled | — | name match |
Owners and operators
Stakes as reported by GEM per segment, merged across segments.
Ownership is not reported for this pipeline.
Common questions
Generated from the same tracker fields as the tables above, so the two cannot disagree. Each answer stands on its own.
- Where does Israel–Egypt Offshore Gas Pipeline run?
- Israel–Egypt Offshore Gas Pipeline runs from Leviathan platform to Idku LNG terminal, crossing Israel and Egypt.
- How long is Israel–Egypt Offshore Gas Pipeline?
- Israel–Egypt Offshore Gas Pipeline is 592 km long, measured from the mapped route because no length is reported.
- How much gas can Israel–Egypt Offshore Gas Pipeline carry?
- No design capacity is reported for Israel–Egypt Offshore Gas Pipeline. That is an absent figure, not a zero.
- Is Israel–Egypt Offshore Gas Pipeline operating?
- Israel–Egypt Offshore Gas Pipeline is cancelled.
- Who owns Israel–Egypt Offshore Gas Pipeline?
- Ownership of Israel–Egypt Offshore Gas Pipeline is not reported in the current tracker release.
- Does Israel–Egypt Offshore Gas Pipeline serve an LNG terminal?
- Israel–Egypt Offshore Gas Pipeline passes within 25 km of 9 tracked LNG terminals. Proximity is not proof of a physical connection; each match is listed with its distance and how it was made.