Import terminal · Malaysia
Lahad Datu LNG Terminal
Lahad Datu LNG Terminal is a proposed LNG import terminal in Malaysia. The tracker lists 1 tracked unit with 1.2 Mtpa proposed. It is owned by Green Oscasaba Sdn Bhd and LNG Alliance Pte Ltd.
Operating
—
no units operating
Under construction
—
no units under construction
Proposed
1.2 Mtpa
1.63 bcm/y · 1 unit
At a glance
- Country
- Malaysia
- State / province
- Not reported
- Region
- Not reported
- Import / export
- Import
- Onshore / floating
- Not reported
- Status (rolled up)
- Proposed
- Trains / phases tracked
- 1
- Earliest start year
- Not reported
- Latest start year
- Not reported
- Coordinates
- 5.0242° N, 118.3307° E
- GEM terminal ID
- T100001083710
- GEM wiki page
- gem.wiki
Trains and phases
Each row is one unit as tracked by GEM. Ordered by start year, then proposal year.
| Unit | Status | Capacity (Mtpa) | Capacity (bcm/y) | Start | Proposed | FID | Owner (as reported) |
|---|---|---|---|---|---|---|---|
| Not reported | Proposed | 1.2 | 1.63 | — | — | Not reported | Green Oscasaba Sdn Bhd; LNG Alliance Pte Ltd |
Capacity by status
| Status | Units | Mtpa | bcm/y |
|---|---|---|---|
| Proposed | 1 | 1.2 | 1.63 |
Owners and operators
Stakes as reported by GEM per unit, merged across units. Percentages are omitted where GEM does not give them.
Location
Lahad Datu LNG Terminal at 5.0242° N, 118.3307° E.
Loads about 250 kB of map code and the country outline file.
- Coordinates
- 5.0242° N, 118.3307° E
- Coordinate accuracy (GEM)
- approximate
- Open in OpenStreetMap
- View on map
Connected gas pipelines
Tracked pipelines whose route passes within 25 km of this terminal, or whose name matches it. Proximity is not proof of a physical connection.
No tracked gas pipeline passes within 25 km of this terminal in the current release.
Common questions
Generated from the same tracker fields as the tables above, so the two cannot disagree. Each answer stands on its own.
- Where is Lahad Datu LNG Terminal?
- Lahad Datu LNG Terminal is an LNG import terminal in Malaysia. It is made up of 1 tracked train or phase.
- Is Lahad Datu LNG Terminal operating?
- Lahad Datu LNG Terminal is proposed. Nothing here should be read as a forecast that it will be built.
- How much LNG can Lahad Datu LNG Terminal handle?
- Lahad Datu LNG Terminal has 1.2 Mtpa proposed. Capacity at different statuses is never added together.
- Who owns Lahad Datu LNG Terminal?
- Lahad Datu LNG Terminal is owned by Green Oscasaba Sdn Bhd and LNG Alliance Pte Ltd. Shares are as recorded in the current tracker release.