# LNG Atlas > A directory of the liquefied natural gas value chain: every LNG import and export terminal, gas transmission pipeline and LNG carrier in Global Energy Monitor's Global Gas Infrastructure Tracker, plus a hand-checked list of the firms that supply liquefaction technology, cryogenic containment and the ships. ## What is here - 813 LNG terminals across 156 countries, covering 1206 individual trains and phases - 4246 gas transmission pipelines, 3921 of them with route geometry - 1220 LNG carriers, FSRUs and floating liquefaction vessels - 2503 companies and 65 source-cited supplier firms ## How to read this site - Asset pages open with a templated summary generated from structured fields, never from a language model, so the prose cannot contradict the table below it. - An empty source field is rendered "Not reported". Nothing is estimated or interpolated. - Capacity appears in Mtpa and bcm/y together for terminals, bcm/y for pipelines, and cubic metres for vessels. - Statuses use one nine-value scale: proposed, pre-construction, construction, operating, mothballed, idle, retired, cancelled, shelved. Proposed capacity must never be added to operating capacity. - Chokepoint exposure is an editorial routing model, not vessel tracking. - Supplier entries each cite a public source; firms that could not be sourced are excluded and recorded as excluded. ## Explainers - [How LNG works](https://lngatlas.org/explainer/how-lng-works/): Liquefied natural gas is natural gas chilled to about minus 162 degrees Celsius, at which point it becomes a liquid roughly 600 times smaller than the gas, so it can be shipped where no pipeline runs. - [Liquefaction trains explained](https://lngatlas.org/explainer/liquefaction-trains-explained/): A liquefaction train is one complete, self-contained refrigeration line that chills treated natural gas until it condenses, and a large modern train produces roughly 5 to 8 million tonnes of LNG a year. - [Membrane versus Moss tanks](https://lngatlas.org/explainer/membrane-vs-moss-tanks/): Cargo containment is the system that holds LNG at minus 162 degrees inside a ship, and it comes in two families: membranes, which are thin barriers supported by the hull, and free-standing tanks, which carry their own load. - [FSRU versus onshore regasification](https://lngatlas.org/explainer/fsru-vs-onshore-regas/): An FSRU is a ship that stores LNG and turns it back into gas while moored, doing the job of an onshore import terminal without the onshore construction. - [FLNG explained](https://lngatlas.org/explainer/flng-explained/): Floating liquefaction, or FLNG, is a complete LNG plant built on a ship-shaped hull and moored over or near a gas field, so gas is liquefied at sea and loaded straight onto carriers without any onshore terminal. - [LNG carrier anatomy](https://lngatlas.org/explainer/lng-carrier-anatomy/): An LNG carrier is a ship built around insulated cargo tanks that hold liquefied gas at minus 162 degrees, with an engine able to burn the cargo vapour that inevitably boils off during the voyage. - [Boil-off and reliquefaction](https://lngatlas.org/explainer/boil-off-and-reliquefaction/): Boil-off is the small fraction of an LNG cargo that evaporates each day as heat leaks into the tanks, and it is what keeps the rest of the cargo cold. - [Who builds LNG ships](https://lngatlas.org/explainer/who-builds-lng-ships/): LNG carriers are built by a very small group of shipyards, concentrated in South Korea, China and Japan, because the cargo containment work demands skills and facilities that take years to develop. - [Mtpa, bcm and cubic metres](https://lngatlas.org/explainer/mtpa-bcm-m3-conversions/): LNG capacity is quoted in three incompatible units, and the two conversions that matter are 1 million tonnes a year equals about 1.36 billion cubic metres of gas a year, and 1 cubic metre of liquid equals about 600 cubic metres of gas. - [LNG and maritime chokepoints](https://lngatlas.org/explainer/lng-and-chokepoints/): A maritime chokepoint is a narrow strait or canal that a large share of seaborne trade must pass through, and LNG exposure to them depends entirely on which exporting region supplies which importing market. - [What terminal status actually means](https://lngatlas.org/explainer/lng-terminal-status-explained/): A project status describes how far an LNG terminal or train has progressed, and the gap between proposed and operating is the single most misread number in the industry. - [The physical properties that govern everything](https://lngatlas.org/explainer/lng-physical-properties/): LNG is a colourless, odourless cryogenic liquid at about minus 162 degrees Celsius, roughly 45 per cent as dense as water, which expands about 600 times on returning to gas and burns only as a vapour mixed with air in a narrow range of concentrations. - [Why minus 162 degrees, and what the cold costs](https://lngatlas.org/explainer/why-minus-162-degrees/): Methane has a critical temperature of about minus 82.6 degrees Celsius, above which no pressure will liquefy it, so LNG production means chilling gas below its atmospheric boiling point of about minus 162 degrees at an energy cost of roughly 8 to 12 per cent of the feed. - [Reading a capacity figure without being misled](https://lngatlas.org/explainer/reading-capacity-figures/): An LNG capacity figure is only meaningful alongside three qualifiers — which unit it is in, which project status it describes, and whether it is a design nameplate or actual output — and most disagreements between sources come from one of those being dropped. - [The LNG value chain end to end](https://lngatlas.org/explainer/lng-value-chain/): The LNG value chain is the sequence of production, treatment, liquefaction, shipping, regasification and distribution that moves natural gas between markets no pipeline connects, at an end-to-end energy cost of roughly 10 to 20 per cent of the gas itself. - [LNG against pipeline gas](https://lngatlas.org/explainer/lng-vs-pipeline-gas/): A pipeline delivers gas at lower cost than LNG over land up to roughly two to four thousand kilometres, beyond which liquefaction wins, and across any significant body of deep water LNG usually wins at any distance. - [A short history of LNG](https://lngatlas.org/explainer/history-of-lng/): LNG began as a way of storing gas for winter peaks in the 1940s, became a traded commodity with the Methane Pioneer's Atlantic crossing in 1959 and the first commercial trade from Algeria in 1964, and has grown into a global market reshaped in turn by Qatar, Australia and US shale gas. - [Containment II: Moss spheres and SPB tanks](https://lngatlas.org/explainer/moss-and-spb-tanks/): A free-standing LNG tank is one that supports its own weight and cargo loads rather than transferring them to the ship's hull, the two commercial designs being the Moss spherical tank and IHI's prismatic SPB tank. - [Ship classes: conventional, Q-Flex, Q-Max and small-scale](https://lngatlas.org/explainer/lng-carrier-classes/): LNG carriers fall into recognised size classes running from small-scale vessels under 30,000 cubic metres, through the 174,000 cubic metre conventional standard, to the 266,000 cubic metre Q-Max ships built for Qatar. - [The voyage cycle: laden, ballast, heel and the return](https://lngatlas.org/explainer/lng-voyage-cycle/): The LNG voyage cycle is the round trip of a laden leg carrying cargo and a ballast leg returning empty, with a small heel of LNG retained throughout to keep the tanks cold enough to load again on arrival. - [Chartering: spot, time charter and tolling](https://lngatlas.org/explainer/lng-chartering/): LNG chartering is the hire of a carrier, either for a single voyage at a spot rate or for a period under a time charter at a daily rate, with the charterer directing the vessel and the owner supplying and crewing it. - [Ice-class carriers and the Arctic routes](https://lngatlas.org/explainer/ice-class-lng-carriers/): An ice-class LNG carrier is a vessel strengthened to operate independently in sea ice, the highest commercial grade being Arc7 ships able to break ice astern, built to serve Arctic export projects along the Northern Sea Route. - [Insulation, Invar and holding the cold chain](https://lngatlas.org/explainer/lng-insulation-and-invar/): LNG containment insulation is the layered barrier that limits heat leaking into the cargo, and Invar is a nickel-iron alloy used in one membrane design because it barely contracts when the cargo cools it. - [Reliquefaction, subcooling and when they pay](https://lngatlas.org/explainer/reliquefaction-and-subcooling/): Reliquefaction is the process of cooling boil-off gas back into liquid and returning it to the cargo tanks, and subcooling is the partial version that chills the vapour enough to reduce cargo loss without eliminating it. - [Propulsion I: steam turbines and why they endured](https://lngatlas.org/explainer/lng-propulsion-steam/): Steam turbine propulsion drives an LNG carrier by raising steam in boilers that can burn cargo boil-off gas, fuel oil, or any mixture of the two, and turning a turbine geared to a single propeller shaft. - [Propulsion II: DFDE and TFDE, the dual-fuel era](https://lngatlas.org/explainer/lng-propulsion-dual-fuel/): Dual-fuel diesel electric propulsion uses medium-speed engines burning either boil-off gas or liquid fuel to generate electricity, which drives electric propulsion motors rather than a directly coupled shaft. - [Propulsion III: ME-GI, X-DF and two-stroke gas injection](https://lngatlas.org/explainer/lng-propulsion-two-stroke/): ME-GI and X-DF are the two families of low-speed two-stroke marine engine burning natural gas, differing in whether gas is injected at high pressure late in the cycle or admitted at low pressure and premixed. - [Cooldown, gassing up and the first cargo](https://lngatlas.org/explainer/cooldown-and-gassing-up/): Cooldown is the controlled chilling of warm cargo tanks by spraying LNG into them, and gassing up is the preceding step of replacing inert gas with methane vapour so no carbon dioxide remains to freeze. - [Custody transfer: gauging, and who owns the error](https://lngatlas.org/explainer/custody-transfer-and-gauging/): Custody transfer is the measurement determining how much energy passed between seller and buyer at loading or discharge, calculated from tank level, liquid temperature and density, and a laboratory analysis of the cargo composition. - [Ship-to-ship transfer and floating storage](https://lngatlas.org/explainer/ship-to-ship-transfer/): Ship-to-ship transfer is the movement of LNG directly between two vessels moored alongside one another, used for transshipment, replenishing floating storage, and breaking a full cargo into smaller parcels. - [The ship–shore interface: arms, ESD and compatibility](https://lngatlas.org/explainer/ship-shore-interface/): The ship-shore interface is everything that must be compatible between a vessel and a terminal before LNG can be transferred, from manifold height and spacing to the linked emergency shutdown systems on both sides. - [What freight rates mean and why they swing](https://lngatlas.org/explainer/lng-freight-rates/): An LNG freight rate is the daily cost of hiring a carrier, assessed by shipbrokers for standard routes and vessel types, and it swings violently because fleet supply cannot respond within the time demand changes. - [Crewing and competency on a gas carrier](https://lngatlas.org/explainer/lng-crewing/): Crewing an LNG carrier requires officers holding STCW gas tanker endorsements earned through both training and documented service on gas carriers, a qualification pool that expands more slowly than the fleet it has to staff. - [LNG as marine fuel: bunkering and the supply chain](https://lngatlas.org/explainer/lng-as-marine-fuel/): LNG bunkering is the supply of liquefied natural gas as fuel to ships rather than as cargo, delivered by bunker vessel, road tanker or shore pipeline, and governed by its own codes and standards. - [Feed gas: where it comes from and what is in it](https://lngatlas.org/explainer/lng-feed-gas/): Feed gas is the raw natural gas delivered to a liquefaction plant before treatment, and its composition determines the size and content of the treatment section as well as what co-products the plant can sell. - [Gas treatment: acid gas, mercury, water and heavies](https://lngatlas.org/explainer/lng-gas-treatment/): Gas treatment is the sequence of processes removing carbon dioxide, water, mercury, sulphur compounds and heavy hydrocarbons from feed gas before liquefaction, because each of them would freeze, foul or damage the cold section. - [The refrigeration cycles: C3MR, DMR, AP-X and SMR](https://lngatlas.org/explainer/lng-refrigeration-cycles/): A liquefaction refrigeration cycle is the closed loop of compression, cooling and expansion that removes heat from feed gas, and the commercial processes differ mainly in how many loops they use and what refrigerant is in each. - [Coil-wound and plate-fin heat exchangers](https://lngatlas.org/explainer/lng-heat-exchangers/): The main cryogenic heat exchanger is where feed gas finally condenses, built either as a coil-wound exchanger of tubing spiralled around a core or as a block of brazed aluminium plates and fins. - [Drivers: gas turbines, electric motors and the grid](https://lngatlas.org/explainer/lng-plant-drivers/): A driver is the machine turning a liquefaction plant's refrigerant compressors, either a gas turbine burning part of the feed gas or a large electric motor drawing power from a grid or on-site generation. - [Storage tanks, 9% nickel and high-manganese steel](https://lngatlas.org/explainer/lng-storage-tanks/): An LNG storage tank holds liquid at close to atmospheric pressure in an inner shell of cryogenic alloy, surrounded by insulation and, in the full containment design, an outer concrete wall capable of containing the entire contents. - [Loading jetties and the export terminal layout](https://lngatlas.org/explainer/lng-terminal-layout/): An LNG export terminal is laid out as a sequence from feed gas reception through treatment and liquefaction trains to storage and a marine loading jetty, with separation distances between blocks set by hazard analysis. - [What an import terminal actually does](https://lngatlas.org/explainer/lng-import-terminal/): An LNG import terminal receives cargo from a ship, stores it as a cryogenic liquid, pumps it to pipeline pressure and warms it back into gas for delivery into a grid. - [Vaporiser types: ORV, SCV and ambient air](https://lngatlas.org/explainer/lng-vaporisers/): A vaporiser is the heat exchanger that turns pressurised LNG back into gas at an import terminal, using seawater, burned gas or ambient air as the heat source. - [Send-out, peak shaving and the grid connection](https://lngatlas.org/explainer/lng-send-out/): Send-out is the rate at which an import terminal delivers regasified LNG into a pipeline network, and it is the capacity figure that governs what the terminal can actually do. - [Storage operations: ageing, stratification and rollover](https://lngatlas.org/explainer/lng-storage-operations/): LNG storage operations are the monitoring and filling practices that keep stored LNG mixed and of known composition, preventing the stable density layers whose sudden inversion is called rollover. - [Truck loading, ISO tanks and small-scale distribution](https://lngatlas.org/explainer/small-scale-lng-distribution/): Small-scale LNG distribution moves liquid past the import terminal by road tanker, rail and ISO container to satellite storage plants, industrial users and fuelling stations beyond the pipeline grid. - [Break bulk and island supply chains](https://lngatlas.org/explainer/lng-break-bulk/): Break bulk is the practice of receiving a full LNG cargo at a hub terminal and redistributing it in smaller parcels by small carrier, barge or road to markets too small or too shallow for a conventional ship. - [Why LNG behaves the way it does in an incident](https://lngatlas.org/explainer/lng-behaviour-in-an-incident/): An LNG spill boils rapidly on contact with warmer surroundings, forms a cold vapour cloud that is initially denser than air, and becomes flammable only where that vapour has diluted into a narrow concentration band. - [Rapid phase transition, pool fires and vapour dispersion](https://lngatlas.org/explainer/rapid-phase-transition-and-pool-fires/): A rapid phase transition is a physical explosion caused by LNG vaporising almost instantaneously on contact with water, with no combustion involved, distinct from a pool fire, which is a fire burning above a spreading pool of spilled LNG. - [The IGC Code and what SIGTTO does](https://lngatlas.org/explainer/igc-code-and-sigtto/): The IGC Code is the International Maritime Organization's mandatory code for ships carrying liquefied gases in bulk, and SIGTTO is the industry association whose operational guidance is treated as the practical standard alongside it. - [Terminal siting and exclusion zones](https://lngatlas.org/explainer/exclusion-zones-and-siting/): An exclusion zone is the area around an LNG facility within which development is restricted, calculated from thermal radiation and vapour dispersion modelling of the credible worst-case spill scenarios. - [Methane slip and the emissions argument](https://lngatlas.org/explainer/methane-slip-and-emissions/): Methane slip is unburned methane passing through an engine into the exhaust, and it matters disproportionately for climate impact because methane traps far more heat than the carbon dioxide it would have become. - [Lifecycle emissions: the honest version](https://lngatlas.org/explainer/lng-lifecycle-emissions/): Lifecycle emissions accounting sums greenhouse gas output across production, processing, liquefaction, shipping and regasification through to final combustion, and estimates vary widely mainly because upstream methane leakage is poorly measured. - [Why capacity figures disagree between sources](https://lngatlas.org/explainer/why-capacity-figures-disagree/): LNG capacity figures disagree between sources mainly because of differing unit conventions, differing project statuses included in a total, nameplate against actual output, and how tracker compilers resolve conflicting primary sources. - [Ownership, parents and why they differ](https://lngatlas.org/explainer/ownership-parents-and-why-they-differ/): Ownership, operatorship and parent-company control are three distinct relationships an LNG asset can have with a firm, and a tracker recording all three separately is describing three different kinds of influence, not redundant detail. - [What a tracker can and cannot tell you](https://lngatlas.org/explainer/what-a-tracker-can-and-cannot-tell-you/): An infrastructure tracker like the Global Gas Infrastructure Tracker reports what public sources say about a project at a point in time, which is a different and narrower thing than reporting what is objectively true about the project right now. - [How to cite this site, and what to check first](https://lngatlas.org/explainer/how-to-cite-this-site/): Citing this site correctly means attributing the underlying Global Gas Infrastructure Tracker data to Global Energy Monitor by name and release, while separately attributing any grouping, computation or written explanation original to this site. - [How LNG is actually bought: SPAs, tenders and spot](https://lngatlas.org/explainer/how-lng-is-bought/): LNG is bought and sold through long-term sale and purchase agreements negotiated bilaterally, medium-term supply secured by competitive tender, and single cargoes traded on the spot market at a price agreed close to delivery. - [Oil indexation, slopes and the S-curve](https://lngatlas.org/explainer/oil-indexation-and-price-formulas/): Oil indexation prices LNG as a formula tied to a crude oil marker, typically a percentage slope applied to the oil price plus a constant, with an S-curve variant flattening the formula's response at extreme prices. - [Hub pricing: JKM, TTF and Henry Hub](https://lngatlas.org/explainer/hub-pricing-jkm-ttf-henry-hub/): JKM, TTF and Henry Hub are gas price benchmarks for north-east Asia, north-west Europe and the United States respectively, each reflecting a distinct regional supply and demand balance rather than a single global LNG price. - [Destination clauses and cargo diversion](https://lngatlas.org/explainer/destination-clauses-and-diversion/): A destination clause is a contract term restricting where a purchased LNG cargo may be resold or delivered, historically used by sellers to prevent buyers reselling contracted gas into markets the seller served directly. - [Tolling, offtake and how projects are financed](https://lngatlas.org/explainer/offtake-and-project-financing/): LNG project financing depends on offtake agreements committing buyers to future volumes before construction, structured either as traditional sale contracts where the seller owns and prices the gas, or as tolling agreements where the customer owns the gas and pays only a processing fee. - [Take-or-pay and the shape of the obligation](https://lngatlas.org/explainer/take-or-pay-and-the-obligation/): Take-or-pay is a contract term obliging the buyer to pay for a specified minimum volume of LNG regardless of whether it actually takes delivery of that volume, giving the seller revenue certainty independent of the buyer's actual demand. - [Arbitrage: when a cargo changes ocean](https://lngatlas.org/explainer/lng-arbitrage/): LNG arbitrage is the redirection of a cargo from one regional market to another to capture a price difference, executed only when the destination's netback value exceeds the origin's by more than the cost of shipping there. - [Reading a final investment decision](https://lngatlas.org/explainer/reading-a-final-investment-decision/): A final investment decision is the point at which a project's owners commit the capital and sign the construction contracts to build it, converting a proposal into a funded commitment with binding obligations behind it. ## Blog - [Of 44 LNG units with a revised start date, 42 have slipped](https://lngatlas.org/blog/lng-terminal-start-dates-keep-slipping/): A start year in a project tracker is a plan. Comparing the first plan with the latest one shows how reliable that plan has been, and how much of the picture is missing. - [364 LNG ships are under construction. Here is when they arrive](https://lngatlas.org/blog/364-lng-ships-under-construction/): The order book is the most forward-looking thing in the carrier data. It is also where the tracker is thinnest, so it is worth reading with care. - [Three yards built nearly three in four operating LNG ships](https://lngatlas.org/blog/three-yards-built-most-of-the-fleet/): Building an LNG carrier is the narrowest part of the marine chain. The tracker's June 2026 release shows just how narrow, and where the newest orders are going. - [Who owns the LNG fleet, and why the numbers overlap](https://lngatlas.org/blog/who-owns-the-lng-fleet/): A ranking of fleet owners looks simple until you notice that most ships have more than one name on the deed. Here is how to read it. - [Three narrow links in the LNG chain](https://lngatlas.org/blog/three-narrow-links/): Building an LNG project is mostly ordinary heavy industry. Three steps in it are not, and they are the ones worth watching. - [Why we publish the diff, not just the snapshot](https://lngatlas.org/blog/why-we-publish-the-diff/): A tracker tells you what is true today and quietly forgets what it said last year. The interesting information is in the gap between the two. ## Segment hubs - [Liquefaction](https://lngatlas.org/segments/liquefaction/): the refrigeration process, its heat exchangers and the firms that license and build them - [Containment](https://lngatlas.org/segments/containment/): membrane and free-standing tank systems, and the alloys behind them - [Carriers](https://lngatlas.org/segments/carriers/): shipyards, engines, cargo machinery and fleet owners ## Learn: a seven-track curriculum - [Learn hub](https://lngatlas.org/learn/): all 65 modules, grouped into the tracks below - [LNG fundamentals](https://lngatlas.org/learn/fundamentals/): What liquefied natural gas is, why chilling it to minus 162 degrees is worth the trouble, and how to read the three incompatible units the industry quotes capacity in. - [Producing and liquefying](https://lngatlas.org/learn/liquefaction/): How raw feed gas is cleaned of everything that would freeze, then chilled through a refrigeration cycle until it condenses, and why a handful of firms build the equipment at the cold end. - [Moving LNG by sea](https://lngatlas.org/learn/shipping/): The largest track: containment and insulation, boil-off and reliquefaction, three generations of propulsion, the voyage cycle, cargo operations, chartering and the yards that can build the ships. - [Receiving and regasifying](https://lngatlas.org/learn/regasification/): What an import terminal does with a cargo once it arrives: storage, vaporisation, send-out into the grid, and the floating units that do the same job without the onshore construction. - [Markets, contracts and pricing](https://lngatlas.org/learn/markets/): How cargoes are actually bought and sold: long-term contracts and their price formulas, the spot benchmarks, destination clauses, and what has to be true before a project reaches a final investment decision. - [Safety, regulation and environment](https://lngatlas.org/learn/safety/): How LNG behaves when it escapes, the codes and bodies that govern ships and terminals, and the honest version of the emissions argument including methane slip and upstream leakage. - [Reading the data](https://lngatlas.org/learn/data/): What a tracker can and cannot tell you: what each project status means, why capacity figures disagree between sources, and how to cite this site responsibly. - [Glossary](https://lngatlas.org/glossary/): one page, one anchor per term, cited as `/glossary/#` - [FAQ](https://lngatlas.org/faq/): every explainer's FAQPage questions, grouped by track - [Unit converter](https://lngatlas.org/converter/): Mtpa, bcm/y, cubic metres and MMBtu, with the conversion factors stated ## Rankings (generated, recomputed from the tracker) - [Rankings hub](https://lngatlas.org/rankings/) - [Largest LNG terminals](https://lngatlas.org/rankings/largest-terminals/) - [Longest gas pipelines](https://lngatlas.org/rankings/longest-pipelines/) - [Biggest owners by operating capacity](https://lngatlas.org/rankings/biggest-owners/) - [Countries by LNG capacity](https://lngatlas.org/rankings/country-capacity/) - [Largest operating LNG carriers](https://lngatlas.org/rankings/largest-carriers/) - [Shipyards by operating vessels built](https://lngatlas.org/rankings/shipyards/) - [Biggest fleet owners](https://lngatlas.org/rankings/fleet-owners/) - [Carrier order book by year](https://lngatlas.org/rankings/order-book/) - [Age of the carrier fleet](https://lngatlas.org/rankings/fleet-age/) - [Capacity under construction by planned start year](https://lngatlas.org/rankings/construction-timeline/) - [Operating capacity by start year](https://lngatlas.org/rankings/capacity-by-start-year/): the vintage of today's operating fleet - [Project costs](https://lngatlas.org/rankings/project-costs/): estimated cost per tonne of LNG capacity and the largest pipeline project costs, by status; GEM estimates, not inflation-adjusted - [Cancelled and shelved capacity and pipelines](https://lngatlas.org/rankings/cancelled-and-shelved/): by the year GEM records; proposed and never built - [Biggest pipeline owners by length](https://lngatlas.org/rankings/pipeline-owners/) - [Countries by pipeline length](https://lngatlas.org/rankings/pipeline-country-length/) ## Compare - [Compare hub](https://lngatlas.org/compare/) - [Compare two terminals](https://lngatlas.org/compare/terminals/): interactive tool, any two of the tracked terminals - [FSRU vs onshore import terminals](https://lngatlas.org/compare/fsru-vs-onshore-regasification/) - [Membrane vs Moss containment](https://lngatlas.org/compare/membrane-vs-moss-containment/) - [Propulsion types](https://lngatlas.org/compare/propulsion-types/): steam, DFDE and two-stroke dual fuel - [Pipeline gas vs LNG](https://lngatlas.org/compare/pipeline-vs-lng/) ## Directories - [LNG terminals](https://lngatlas.org/terminals/): filterable by country, status, type and capacity - [Gas pipelines](https://lngatlas.org/pipelines/) - [LNG carriers](https://lngatlas.org/carriers/): fleet and order book - [Countries](https://lngatlas.org/countries/): terminals, pipelines, fleet and import against export balance - [Companies](https://lngatlas.org/companies/): owners, operators, parents and shipyards - [Suppliers](https://lngatlas.org/suppliers/): the curated, source-cited firm list - [By status](https://lngatlas.org/status/) - [World map](https://lngatlas.org/map/) - [Chokepoints](https://lngatlas.org/chokepoints/): tracker terminals ranked by exposure to each named maritime chokepoint - [Low-carbon projects](https://lngatlas.org/low-carbon/): terminals with a carbon capture, hydrogen, ammonia, synthetic LNG or alternative-fuel project recorded; a flag is a yes, a blank is not a no - [What changed](https://lngatlas.org/changes/): differences between tracker releases, our own analysis - [About](https://lngatlas.org/about/) ## Machine-readable - [Chokepoint exposure](https://lngatlas.org/api/chokepoint-exposure.json): terminals and capacity routing through each maritime chokepoint - [Terminals GeoJSON](https://lngatlas.org/api/map/terminals.json) - [Pipelines GeoJSON](https://lngatlas.org/api/map/pipelines.json): routes simplified for display - [Slug index](https://lngatlas.org/api/slug-index.json): names and slugs of every asset, company and supplier - [Full text](https://lngatlas.org/llms-full.txt): every asset summary in one file - [Data downloads](https://lngatlas.org/data/): terminals, terminal units, pipelines and carriers as CSV and JSON, one row per asset, with attribution in every file - [Developer guide](https://lngatlas.org/developers/): every file the site publishes, its fields, example code and the rules for reuse ## Provenance - terminals: Global Gas Infrastructure Tracker, Global Energy Monitor, September 2025 (CC BY 4.0), file GEM-GGIT-LNG-Terminals-2025-09.xlsx - pipelines: Global Gas Infrastructure Tracker, Global Energy Monitor, November 2025 (CC BY 4.0), file GEM-GGIT-Gas-Pipelines-2025-11.xlsx - carriers: Global Gas Infrastructure Tracker, Global Energy Monitor, June 2026 (CC BY 4.0), file GEM LNG Carrier Tracker - June 2026 release.xlsx - Country outlines on maps: Natural Earth, public domain - Methodology: https://lngatlas.org/methodology/ - Data sources and licence: https://lngatlas.org/data-sources/ - Editorial policy, privacy policy, terms of use and contact: https://lngatlas.org/editorial-policy/, https://lngatlas.org/privacy/, https://lngatlas.org/terms/, https://lngatlas.org/contact/ - Data coverage (how many records report each field, including fields wholly empty in the source): https://lngatlas.org/data-coverage/ ## Elsewhere - [World Oil Monitor](https://worldoilmonitor.com/): live WTI and Brent crude prices, EIA fundamentals, the WTI forward curve, global benchmarks, strategic reserves and energy news, from the same author