{"dataset":"LNG terminal units (trains and phases)","release":"September 2025","attribution":"Data: Global Gas Infrastructure Tracker, Global Energy Monitor, September 2025","licence":"CC BY 4.0","licence_url":"https://creativecommons.org/licenses/by/4.0/","note":"An empty or null value means the tracker does not report the field; it is not zero. Capacity is kept per status and never totalled.","count":1206,"rows":[{"terminal_slug":"acwa-lng-terminal-bd","terminal_name":"ACWA LNG Terminal","country":"Bangladesh","country_iso":"BD","unit_name":null,"status":"cancelled","facility_type":"import","floating_type":"unknown","capacity_mtpa":null,"capacity_bcm_y":null,"start_year":null,"planned_start_year":null,"original_planned_start_year":null,"fid_year":null,"construction_year":null,"shelved_year":2021,"cancelled_year":2023,"stop_year":2023,"estimated_cost_usd":500000000,"estimated_cost_original":500000000,"estimated_cost_currency":"USD","power_stations_supplied":"ACWA LNG power station","floating_vessel_name":null,"ccs_project":null,"hydrogen_project":null,"ammonia_project":null,"synthetic_lng_project":null,"retrofit_proposed":null,"url":"https://lngatlas.org/terminal/acwa-lng-terminal-bd/","data_source":"Data: Global Gas Infrastructure Tracker, Global Energy Monitor, September 2025"},{"terminal_slug":"agp-lng-terminal-us","terminal_name":"AGP LNG Terminal","country":"United States","country_iso":"US","unit_name":null,"status":"proposed","facility_type":"export","floating_type":"floating","capacity_mtpa":7.2,"capacity_bcm_y":9.8,"start_year":null,"planned_start_year":null,"original_planned_start_year":2028,"fid_year":2025,"construction_year":null,"shelved_year":null,"cancelled_year":null,"stop_year":null,"estimated_cost_usd":7000000000,"estimated_cost_original":7000000000,"estimated_cost_currency":"USD","power_stations_supplied":null,"floating_vessel_name":null,"ccs_project":null,"hydrogen_project":true,"ammonia_project":null,"synthetic_lng_project":null,"retrofit_proposed":null,"url":"https://lngatlas.org/terminal/agp-lng-terminal-us/","data_source":"Data: Global Gas Infrastructure Tracker, Global Energy Monitor, September 2025"},{"terminal_slug":"amigo-flng-terminal-mx","terminal_name":"AMIGO FLNG Terminal","country":"Mexico","country_iso":"MX","unit_name":"T1","status":"proposed","facility_type":"export","floating_type":"flng","capacity_mtpa":4.2,"capacity_bcm_y":5.71,"start_year":null,"planned_start_year":2028,"original_planned_start_year":2027,"fid_year":2025,"construction_year":null,"shelved_year":null,"cancelled_year":null,"stop_year":null,"estimated_cost_usd":null,"estimated_cost_original":null,"estimated_cost_currency":null,"power_stations_supplied":null,"floating_vessel_name":null,"ccs_project":null,"hydrogen_project":null,"ammonia_project":null,"synthetic_lng_project":null,"retrofit_proposed":null,"url":"https://lngatlas.org/terminal/amigo-flng-terminal-mx/","data_source":"Data: Global Gas Infrastructure Tracker, Global Energy Monitor, September 2025"},{"terminal_slug":"amigo-flng-terminal-mx","terminal_name":"AMIGO FLNG Terminal","country":"Mexico","country_iso":"MX","unit_name":"T2","status":"proposed","facility_type":"export","floating_type":"flng","capacity_mtpa":3.6,"capacity_bcm_y":4.9,"start_year":null,"planned_start_year":null,"original_planned_start_year":2028,"fid_year":null,"construction_year":null,"shelved_year":null,"cancelled_year":null,"stop_year":null,"estimated_cost_usd":null,"estimated_cost_original":null,"estimated_cost_currency":null,"power_stations_supplied":null,"floating_vessel_name":null,"ccs_project":null,"hydrogen_project":null,"ammonia_project":null,"synthetic_lng_project":null,"retrofit_proposed":null,"url":"https://lngatlas.org/terminal/amigo-flng-terminal-mx/","data_source":"Data: Global Gas Infrastructure Tracker, Global Energy Monitor, September 2025"},{"terminal_slug":"amns-suvali-lng-terminal-in","terminal_name":"AMNS Suvali LNG Terminal","country":"India","country_iso":"IN","unit_name":null,"status":"proposed","facility_type":"import","floating_type":"unknown","capacity_mtpa":5,"capacity_bcm_y":6.8,"start_year":null,"planned_start_year":null,"original_planned_start_year":null,"fid_year":null,"construction_year":null,"shelved_year":null,"cancelled_year":null,"stop_year":null,"estimated_cost_usd":1950000000,"estimated_cost_original":1950000000,"estimated_cost_currency":"USD","power_stations_supplied":null,"floating_vessel_name":null,"ccs_project":null,"hydrogen_project":null,"ammonia_project":null,"synthetic_lng_project":null,"retrofit_proposed":null,"url":"https://lngatlas.org/terminal/amns-suvali-lng-terminal-in/","data_source":"Data: Global Gas Infrastructure Tracker, Global Energy Monitor, September 2025"},{"terminal_slug":"abadi-lng-terminal-id","terminal_name":"Abadi LNG Terminal","country":"Indonesia","country_iso":"ID","unit_name":null,"status":"proposed","facility_type":"export","floating_type":"unknown","capacity_mtpa":9.5,"capacity_bcm_y":12.93,"start_year":null,"planned_start_year":null,"original_planned_start_year":2030,"fid_year":2027,"construction_year":null,"shelved_year":null,"cancelled_year":null,"stop_year":null,"estimated_cost_usd":20000000000,"estimated_cost_original":20000000000,"estimated_cost_currency":"USD","power_stations_supplied":null,"floating_vessel_name":null,"ccs_project":true,"hydrogen_project":null,"ammonia_project":null,"synthetic_lng_project":null,"retrofit_proposed":null,"url":"https://lngatlas.org/terminal/abadi-lng-terminal-id/","data_source":"Data: Global Gas Infrastructure Tracker, Global Energy Monitor, September 2025"},{"terminal_slug":"abbot-point-lng-terminal-au","terminal_name":"Abbot Point LNG Terminal","country":"Australia","country_iso":"AU","unit_name":"T1-T4","status":"cancelled","facility_type":"export","floating_type":"floating","capacity_mtpa":2,"capacity_bcm_y":2.72,"start_year":null,"planned_start_year":null,"original_planned_start_year":null,"fid_year":null,"construction_year":null,"shelved_year":2020,"cancelled_year":2022,"stop_year":2022,"estimated_cost_usd":null,"estimated_cost_original":null,"estimated_cost_currency":null,"power_stations_supplied":null,"floating_vessel_name":null,"ccs_project":null,"hydrogen_project":null,"ammonia_project":null,"synthetic_lng_project":null,"retrofit_proposed":null,"url":"https://lngatlas.org/terminal/abbot-point-lng-terminal-au/","data_source":"Data: Global Gas Infrastructure Tracker, Global Energy Monitor, September 2025"},{"terminal_slug":"acajutla-fsru-sv","terminal_name":"Acajutla FSRU","country":"El Salvador","country_iso":"SV","unit_name":null,"status":"operating","facility_type":"import","floating_type":"fsru","capacity_mtpa":2.15,"capacity_bcm_y":2.93,"start_year":2022,"planned_start_year":null,"original_planned_start_year":2021,"fid_year":null,"construction_year":2019,"shelved_year":null,"cancelled_year":null,"stop_year":null,"estimated_cost_usd":null,"estimated_cost_original":null,"estimated_cost_currency":null,"power_stations_supplied":"Pacífico Acajutla power station","floating_vessel_name":"BW Tatiana","ccs_project":null,"hydrogen_project":null,"ammonia_project":null,"synthetic_lng_project":null,"retrofit_proposed":null,"url":"https://lngatlas.org/terminal/acajutla-fsru-sv/","data_source":"Data: Global Gas Infrastructure Tracker, Global Energy Monitor, September 2025"},{"terminal_slug":"ace-gas-nigeria-flng-terminal-ng","terminal_name":"Ace Gas Nigeria FLNG Terminal","country":"Nigeria","country_iso":"NG","unit_name":null,"status":"proposed","facility_type":"export","floating_type":"flng","capacity_mtpa":3,"capacity_bcm_y":4.08,"start_year":null,"planned_start_year":null,"original_planned_start_year":null,"fid_year":null,"construction_year":null,"shelved_year":null,"cancelled_year":null,"stop_year":null,"estimated_cost_usd":null,"estimated_cost_original":null,"estimated_cost_currency":null,"power_stations_supplied":null,"floating_vessel_name":null,"ccs_project":null,"hydrogen_project":null,"ammonia_project":null,"synthetic_lng_project":null,"retrofit_proposed":null,"url":"https://lngatlas.org/terminal/ace-gas-nigeria-flng-terminal-ng/","data_source":"Data: Global Gas Infrastructure Tracker, Global Energy Monitor, September 2025"},{"terminal_slug":"aceh-nias-lng-terminal-id","terminal_name":"Aceh-Nias LNG Terminal","country":"Indonesia","country_iso":"ID","unit_name":null,"status":"cancelled","facility_type":"import","floating_type":"unknown","capacity_mtpa":null,"capacity_bcm_y":null,"start_year":null,"planned_start_year":null,"original_planned_start_year":null,"fid_year":null,"construction_year":null,"shelved_year":2022,"cancelled_year":2024,"stop_year":2024,"estimated_cost_usd":null,"estimated_cost_original":null,"estimated_cost_currency":null,"power_stations_supplied":null,"floating_vessel_name":null,"ccs_project":null,"hydrogen_project":null,"ammonia_project":null,"synthetic_lng_project":null,"retrofit_proposed":null,"url":"https://lngatlas.org/terminal/aceh-nias-lng-terminal-id/","data_source":"Data: Global Gas Infrastructure Tracker, Global Energy Monitor, September 2025"},{"terminal_slug":"adria-lng-terminal-hr","terminal_name":"Adria LNG Terminal","country":"Croatia","country_iso":"HR","unit_name":null,"status":"cancelled","facility_type":"import","floating_type":"unknown","capacity_mtpa":7,"capacity_bcm_y":9.52,"start_year":null,"planned_start_year":null,"original_planned_start_year":2014,"fid_year":2013,"construction_year":null,"shelved_year":2015,"cancelled_year":2017,"stop_year":2017,"estimated_cost_usd":null,"estimated_cost_original":null,"estimated_cost_currency":null,"power_stations_supplied":null,"floating_vessel_name":null,"ccs_project":null,"hydrogen_project":null,"ammonia_project":null,"synthetic_lng_project":null,"retrofit_proposed":null,"url":"https://lngatlas.org/terminal/adria-lng-terminal-hr/","data_source":"Data: Global Gas Infrastructure Tracker, Global Energy Monitor, September 2025"},{"terminal_slug":"adriatic-lng-terminal-it","terminal_name":"Adriatic LNG Terminal","country":"Italy","country_iso":"IT","unit_name":null,"status":"operating","facility_type":"import","floating_type":"unknown","capacity_mtpa":7.06,"capacity_bcm_y":9.61,"start_year":2009,"planned_start_year":null,"original_planned_start_year":null,"fid_year":null,"construction_year":null,"shelved_year":null,"cancelled_year":null,"stop_year":null,"estimated_cost_usd":null,"estimated_cost_original":null,"estimated_cost_currency":null,"power_stations_supplied":null,"floating_vessel_name":null,"ccs_project":null,"hydrogen_project":null,"ammonia_project":null,"synthetic_lng_project":null,"retrofit_proposed":null,"url":"https://lngatlas.org/terminal/adriatic-lng-terminal-it/","data_source":"Data: Global Gas Infrastructure Tracker, Global Energy Monitor, September 2025"},{"terminal_slug":"adriatic-lng-terminal-it","terminal_name":"Adriatic LNG Terminal","country":"Italy","country_iso":"IT","unit_name":"Capacity Expansion","status":"proposed","facility_type":"import","floating_type":"unknown","capacity_mtpa":0.59,"capacity_bcm_y":0.8,"start_year":null,"planned_start_year":null,"original_planned_start_year":2026,"fid_year":null,"construction_year":null,"shelved_year":null,"cancelled_year":null,"stop_year":null,"estimated_cost_usd":null,"estimated_cost_original":null,"estimated_cost_currency":null,"power_stations_supplied":null,"floating_vessel_name":null,"ccs_project":null,"hydrogen_project":null,"ammonia_project":null,"synthetic_lng_project":null,"retrofit_proposed":null,"url":"https://lngatlas.org/terminal/adriatic-lng-terminal-it/","data_source":"Data: Global Gas Infrastructure Tracker, Global Energy Monitor, September 2025"},{"terminal_slug":"aguirre-gasport-fsru-pr","terminal_name":"Aguirre GasPort FSRU","country":"United States","country_iso":"US","unit_name":null,"status":"cancelled","facility_type":"import","floating_type":"fsru","capacity_mtpa":3.8,"capacity_bcm_y":5.17,"start_year":null,"planned_start_year":null,"original_planned_start_year":null,"fid_year":null,"construction_year":null,"shelved_year":null,"cancelled_year":2019,"stop_year":2019,"estimated_cost_usd":null,"estimated_cost_original":null,"estimated_cost_currency":null,"power_stations_supplied":null,"floating_vessel_name":null,"ccs_project":null,"hydrogen_project":null,"ammonia_project":null,"synthetic_lng_project":null,"retrofit_proposed":null,"url":"https://lngatlas.org/terminal/aguirre-gasport-fsru-pr/","data_source":"Data: Global Gas Infrastructure Tracker, Global Energy Monitor, September 2025"},{"terminal_slug":"ahlone-lng-terminal-mm","terminal_name":"Ahlone LNG Terminal","country":"Myanmar","country_iso":"MM","unit_name":null,"status":"cancelled","facility_type":"import","floating_type":"unknown","capacity_mtpa":null,"capacity_bcm_y":null,"start_year":null,"planned_start_year":null,"original_planned_start_year":2024,"fid_year":null,"construction_year":null,"shelved_year":2022,"cancelled_year":2024,"stop_year":2024,"estimated_cost_usd":null,"estimated_cost_original":null,"estimated_cost_currency":null,"power_stations_supplied":"Ahlone CCPP","floating_vessel_name":null,"ccs_project":null,"hydrogen_project":null,"ammonia_project":null,"synthetic_lng_project":null,"retrofit_proposed":null,"url":"https://lngatlas.org/terminal/ahlone-lng-terminal-mm/","data_source":"Data: Global Gas Infrastructure Tracker, Global Energy Monitor, September 2025"},{"terminal_slug":"ain-sokhna-fsru-eg","terminal_name":"Ain Sokhna FSRU","country":"Egypt","country_iso":"EG","unit_name":"Hoegh Galleon","status":"operating","facility_type":"import","floating_type":"fsru","capacity_mtpa":4.2,"capacity_bcm_y":5.71,"start_year":2015,"planned_start_year":null,"original_planned_start_year":null,"fid_year":null,"construction_year":null,"shelved_year":null,"cancelled_year":null,"stop_year":2018,"estimated_cost_usd":null,"estimated_cost_original":null,"estimated_cost_currency":null,"power_stations_supplied":null,"floating_vessel_name":"Hoegh Galleon, Energos Power, Energos Eskimo, Hoegh Gandria, Ertugrul Gazi","ccs_project":null,"hydrogen_project":null,"ammonia_project":null,"synthetic_lng_project":null,"retrofit_proposed":null,"url":"https://lngatlas.org/terminal/ain-sokhna-fsru-eg/","data_source":"Data: Global Gas Infrastructure Tracker, Global Energy Monitor, September 2025"},{"terminal_slug":"ain-sokhna-fsru-eg","terminal_name":"Ain Sokhna FSRU","country":"Egypt","country_iso":"EG","unit_name":"Energos Eskimo","status":"operating","facility_type":"import","floating_type":"fsru","capacity_mtpa":3.8,"capacity_bcm_y":5.17,"start_year":2025,"planned_start_year":null,"original_planned_start_year":null,"fid_year":null,"construction_year":null,"shelved_year":null,"cancelled_year":null,"stop_year":null,"estimated_cost_usd":null,"estimated_cost_original":null,"estimated_cost_currency":null,"power_stations_supplied":null,"floating_vessel_name":"Hoegh Galleon, Energos Power, Energos Eskimo, Hoegh Gandria, Ertugrul Gazi","ccs_project":null,"hydrogen_project":null,"ammonia_project":null,"synthetic_lng_project":null,"retrofit_proposed":null,"url":"https://lngatlas.org/terminal/ain-sokhna-fsru-eg/","data_source":"Data: Global Gas Infrastructure Tracker, Global Energy Monitor, September 2025"},{"terminal_slug":"ain-sokhna-fsru-eg","terminal_name":"Ain Sokhna FSRU","country":"Egypt","country_iso":"EG","unit_name":"Energos Power","status":"operating","facility_type":"import","floating_type":"fsru","capacity_mtpa":5.51,"capacity_bcm_y":7.5,"start_year":2025,"planned_start_year":null,"original_planned_start_year":null,"fid_year":null,"construction_year":null,"shelved_year":null,"cancelled_year":null,"stop_year":null,"estimated_cost_usd":null,"estimated_cost_original":null,"estimated_cost_currency":null,"power_stations_supplied":null,"floating_vessel_name":"Hoegh Galleon, Energos Power, Energos Eskimo, Hoegh Gandria, Ertugrul Gazi","ccs_project":null,"hydrogen_project":null,"ammonia_project":null,"synthetic_lng_project":null,"retrofit_proposed":null,"url":"https://lngatlas.org/terminal/ain-sokhna-fsru-eg/","data_source":"Data: Global Gas Infrastructure Tracker, Global Energy Monitor, September 2025"},{"terminal_slug":"ain-sokhna-fsru-eg","terminal_name":"Ain Sokhna FSRU","country":"Egypt","country_iso":"EG","unit_name":"Ertugrul Gazi","status":"proposed","facility_type":"import","floating_type":"fsru","capacity_mtpa":4.1,"capacity_bcm_y":5.58,"start_year":null,"planned_start_year":null,"original_planned_start_year":2025,"fid_year":null,"construction_year":null,"shelved_year":null,"cancelled_year":null,"stop_year":null,"estimated_cost_usd":null,"estimated_cost_original":null,"estimated_cost_currency":null,"power_stations_supplied":null,"floating_vessel_name":"Hoegh Galleon, Energos Power, Energos Eskimo, Hoegh Gandria, Ertugrul Gazi","ccs_project":null,"hydrogen_project":null,"ammonia_project":null,"synthetic_lng_project":null,"retrofit_proposed":null,"url":"https://lngatlas.org/terminal/ain-sokhna-fsru-eg/","data_source":"Data: Global Gas Infrastructure Tracker, Global Energy Monitor, September 2025"},{"terminal_slug":"ain-sokhna-fsru-eg","terminal_name":"Ain Sokhna FSRU","country":"Egypt","country_iso":"EG","unit_name":"Hoegh Gandria","status":"proposed","facility_type":"import","floating_type":"fsru","capacity_mtpa":7.67,"capacity_bcm_y":10.44,"start_year":null,"planned_start_year":null,"original_planned_start_year":2026,"fid_year":null,"construction_year":null,"shelved_year":null,"cancelled_year":null,"stop_year":null,"estimated_cost_usd":null,"estimated_cost_original":null,"estimated_cost_currency":null,"power_stations_supplied":null,"floating_vessel_name":"Hoegh Galleon, Energos Power, Energos Eskimo, Hoegh Gandria, Ertugrul Gazi","ccs_project":null,"hydrogen_project":null,"ammonia_project":null,"synthetic_lng_project":null,"retrofit_proposed":null,"url":"https://lngatlas.org/terminal/ain-sokhna-fsru-eg/","data_source":"Data: Global Gas Infrastructure Tracker, Global Energy Monitor, September 2025"},{"terminal_slug":"akita-lng-terminal-jp","terminal_name":"Akita LNG Terminal","country":"Japan","country_iso":"JP","unit_name":null,"status":"operating","facility_type":"import","floating_type":"unknown","capacity_mtpa":0.6,"capacity_bcm_y":0.82,"start_year":2015,"planned_start_year":null,"original_planned_start_year":null,"fid_year":null,"construction_year":null,"shelved_year":null,"cancelled_year":null,"stop_year":null,"estimated_cost_usd":null,"estimated_cost_original":null,"estimated_cost_currency":null,"power_stations_supplied":null,"floating_vessel_name":null,"ccs_project":null,"hydrogen_project":null,"ammonia_project":null,"synthetic_lng_project":null,"retrofit_proposed":null,"url":"https://lngatlas.org/terminal/akita-lng-terminal-jp/","data_source":"Data: Global Gas Infrastructure Tracker, Global Energy Monitor, September 2025"},{"terminal_slug":"akonikien-lng-terminal-gq","terminal_name":"Akonikien LNG Terminal","country":"Equatorial Guinea","country_iso":"GQ","unit_name":null,"status":"shelved","facility_type":"import","floating_type":"unknown","capacity_mtpa":null,"capacity_bcm_y":null,"start_year":null,"planned_start_year":null,"original_planned_start_year":2020,"fid_year":null,"construction_year":2019,"shelved_year":2022,"cancelled_year":null,"stop_year":null,"estimated_cost_usd":null,"estimated_cost_original":null,"estimated_cost_currency":null,"power_stations_supplied":null,"floating_vessel_name":null,"ccs_project":null,"hydrogen_project":null,"ammonia_project":null,"synthetic_lng_project":null,"retrofit_proposed":null,"url":"https://lngatlas.org/terminal/akonikien-lng-terminal-gq/","data_source":"Data: Global Gas Infrastructure Tracker, Global Energy Monitor, September 2025"},{"terminal_slug":"al-zour-lng-terminal-kw","terminal_name":"Al Zour LNG Terminal","country":"Kuwait","country_iso":"KW","unit_name":"Import Terminal","status":"operating","facility_type":"import","floating_type":"unknown","capacity_mtpa":22,"capacity_bcm_y":29.93,"start_year":2022,"planned_start_year":null,"original_planned_start_year":null,"fid_year":null,"construction_year":2016,"shelved_year":null,"cancelled_year":null,"stop_year":null,"estimated_cost_usd":3000000000,"estimated_cost_original":3000000000,"estimated_cost_currency":"USD","power_stations_supplied":null,"floating_vessel_name":null,"ccs_project":null,"hydrogen_project":null,"ammonia_project":null,"synthetic_lng_project":null,"retrofit_proposed":null,"url":"https://lngatlas.org/terminal/al-zour-lng-terminal-kw/","data_source":"Data: Global Gas Infrastructure Tracker, Global Energy Monitor, September 2025"},{"terminal_slug":"al-faw-fsru-terminal-iq","terminal_name":"Al-Faw FSRU Terminal","country":"Iraq","country_iso":"IQ","unit_name":null,"status":"proposed","facility_type":"import","floating_type":"fsru","capacity_mtpa":7.67,"capacity_bcm_y":10.44,"start_year":null,"planned_start_year":null,"original_planned_start_year":2026,"fid_year":null,"construction_year":null,"shelved_year":null,"cancelled_year":null,"stop_year":null,"estimated_cost_usd":null,"estimated_cost_original":null,"estimated_cost_currency":null,"power_stations_supplied":null,"floating_vessel_name":null,"ccs_project":null,"hydrogen_project":null,"ammonia_project":null,"synthetic_lng_project":null,"retrofit_proposed":null,"url":"https://lngatlas.org/terminal/al-faw-fsru-terminal-iq/","data_source":"Data: Global Gas Infrastructure Tracker, Global Energy Monitor, September 2025"},{"terminal_slug":"alaska-japan-lng-terminal-us","terminal_name":"Alaska Japan LNG Terminal","country":"United States","country_iso":"US","unit_name":null,"status":"cancelled","facility_type":"export","floating_type":"unknown","capacity_mtpa":1,"capacity_bcm_y":1.36,"start_year":null,"planned_start_year":null,"original_planned_start_year":2021,"fid_year":null,"construction_year":null,"shelved_year":null,"cancelled_year":2017,"stop_year":2017,"estimated_cost_usd":null,"estimated_cost_original":null,"estimated_cost_currency":null,"power_stations_supplied":null,"floating_vessel_name":null,"ccs_project":null,"hydrogen_project":null,"ammonia_project":null,"synthetic_lng_project":null,"retrofit_proposed":null,"url":"https://lngatlas.org/terminal/alaska-japan-lng-terminal-us/","data_source":"Data: Global Gas Infrastructure Tracker, Global Energy Monitor, September 2025"},{"terminal_slug":"alaska-lng-terminal-us","terminal_name":"Alaska LNG Terminal","country":"United States","country_iso":"US","unit_name":"T1","status":"proposed","facility_type":"export","floating_type":"unknown","capacity_mtpa":6.7,"capacity_bcm_y":9.12,"start_year":null,"planned_start_year":2031,"original_planned_start_year":2024,"fid_year":2025,"construction_year":null,"shelved_year":null,"cancelled_year":null,"stop_year":null,"estimated_cost_usd":null,"estimated_cost_original":null,"estimated_cost_currency":null,"power_stations_supplied":null,"floating_vessel_name":null,"ccs_project":null,"hydrogen_project":null,"ammonia_project":null,"synthetic_lng_project":null,"retrofit_proposed":null,"url":"https://lngatlas.org/terminal/alaska-lng-terminal-us/","data_source":"Data: Global Gas Infrastructure Tracker, Global Energy Monitor, September 2025"},{"terminal_slug":"alaska-lng-terminal-us","terminal_name":"Alaska LNG Terminal","country":"United States","country_iso":"US","unit_name":"T2","status":"proposed","facility_type":"export","floating_type":"unknown","capacity_mtpa":6.7,"capacity_bcm_y":9.12,"start_year":null,"planned_start_year":2031,"original_planned_start_year":2024,"fid_year":2025,"construction_year":null,"shelved_year":null,"cancelled_year":null,"stop_year":null,"estimated_cost_usd":null,"estimated_cost_original":null,"estimated_cost_currency":null,"power_stations_supplied":null,"floating_vessel_name":null,"ccs_project":null,"hydrogen_project":null,"ammonia_project":null,"synthetic_lng_project":null,"retrofit_proposed":null,"url":"https://lngatlas.org/terminal/alaska-lng-terminal-us/","data_source":"Data: Global Gas Infrastructure Tracker, Global Energy Monitor, September 2025"},{"terminal_slug":"alaska-lng-terminal-us","terminal_name":"Alaska LNG Terminal","country":"United States","country_iso":"US","unit_name":"T3","status":"proposed","facility_type":"export","floating_type":"unknown","capacity_mtpa":6.7,"capacity_bcm_y":9.12,"start_year":null,"planned_start_year":2031,"original_planned_start_year":2024,"fid_year":2025,"construction_year":null,"shelved_year":null,"cancelled_year":null,"stop_year":null,"estimated_cost_usd":null,"estimated_cost_original":null,"estimated_cost_currency":null,"power_stations_supplied":null,"floating_vessel_name":null,"ccs_project":null,"hydrogen_project":null,"ammonia_project":null,"synthetic_lng_project":null,"retrofit_proposed":null,"url":"https://lngatlas.org/terminal/alaska-lng-terminal-us/","data_source":"Data: Global Gas Infrastructure Tracker, Global Energy Monitor, September 2025"},{"terminal_slug":"alexandroupolis-fsru-gr","terminal_name":"Alexandroupolis FSRU","country":"Greece","country_iso":"GR","unit_name":null,"status":"operating","facility_type":"import","floating_type":"fsru","capacity_mtpa":4.04,"capacity_bcm_y":5.5,"start_year":2024,"planned_start_year":null,"original_planned_start_year":2023,"fid_year":2022,"construction_year":2022,"shelved_year":null,"cancelled_year":null,"stop_year":2025,"estimated_cost_usd":392400000,"estimated_cost_original":360000000,"estimated_cost_currency":"EUR","power_stations_supplied":null,"floating_vessel_name":null,"ccs_project":null,"hydrogen_project":null,"ammonia_project":null,"synthetic_lng_project":null,"retrofit_proposed":null,"url":"https://lngatlas.org/terminal/alexandroupolis-fsru-gr/","data_source":"Data: Global Gas Infrastructure Tracker, Global Energy Monitor, September 2025"},{"terminal_slug":"altamira-lng-terminal-mx","terminal_name":"Altamira LNG Terminal","country":"Mexico","country_iso":"MX","unit_name":null,"status":"operating","facility_type":"import","floating_type":"unknown","capacity_mtpa":5.7,"capacity_bcm_y":7.76,"start_year":2006,"planned_start_year":null,"original_planned_start_year":null,"fid_year":null,"construction_year":null,"shelved_year":null,"cancelled_year":null,"stop_year":null,"estimated_cost_usd":null,"estimated_cost_original":null,"estimated_cost_currency":null,"power_stations_supplied":"Altamira V power station","floating_vessel_name":null,"ccs_project":null,"hydrogen_project":null,"ammonia_project":null,"synthetic_lng_project":null,"retrofit_proposed":null,"url":"https://lngatlas.org/terminal/altamira-lng-terminal-mx/","data_source":"Data: Global Gas Infrastructure Tracker, Global Energy Monitor, September 2025"},{"terminal_slug":"alturas-lng-terminal-us","terminal_name":"Alturas LNG Terminal","country":"United States","country_iso":"US","unit_name":null,"status":"cancelled","facility_type":"export","floating_type":"unknown","capacity_mtpa":1.5,"capacity_bcm_y":2.04,"start_year":null,"planned_start_year":null,"original_planned_start_year":2016,"fid_year":null,"construction_year":null,"shelved_year":2016,"cancelled_year":2018,"stop_year":2018,"estimated_cost_usd":null,"estimated_cost_original":null,"estimated_cost_currency":null,"power_stations_supplied":null,"floating_vessel_name":null,"ccs_project":null,"hydrogen_project":null,"ammonia_project":null,"synthetic_lng_project":null,"retrofit_proposed":null,"url":"https://lngatlas.org/terminal/alturas-lng-terminal-us/","data_source":"Data: Global Gas Infrastructure Tracker, Global Energy Monitor, September 2025"},{"terminal_slug":"american-coast-lng-terminal-us","terminal_name":"American Coast LNG Terminal","country":"United States","country_iso":"US","unit_name":"Phase 1","status":"cancelled","facility_type":"export","floating_type":"unknown","capacity_mtpa":8,"capacity_bcm_y":10.88,"start_year":null,"planned_start_year":null,"original_planned_start_year":2022,"fid_year":null,"construction_year":null,"shelved_year":2016,"cancelled_year":2018,"stop_year":2018,"estimated_cost_usd":null,"estimated_cost_original":null,"estimated_cost_currency":null,"power_stations_supplied":null,"floating_vessel_name":null,"ccs_project":null,"hydrogen_project":null,"ammonia_project":null,"synthetic_lng_project":null,"retrofit_proposed":null,"url":"https://lngatlas.org/terminal/american-coast-lng-terminal-us/","data_source":"Data: Global Gas Infrastructure Tracker, Global Energy Monitor, September 2025"},{"terminal_slug":"american-coast-lng-terminal-us","terminal_name":"American Coast LNG Terminal","country":"United States","country_iso":"US","unit_name":"Phase 2","status":"cancelled","facility_type":"export","floating_type":"unknown","capacity_mtpa":null,"capacity_bcm_y":null,"start_year":null,"planned_start_year":null,"original_planned_start_year":2024,"fid_year":null,"construction_year":null,"shelved_year":2016,"cancelled_year":2018,"stop_year":2018,"estimated_cost_usd":null,"estimated_cost_original":null,"estimated_cost_currency":null,"power_stations_supplied":null,"floating_vessel_name":null,"ccs_project":null,"hydrogen_project":null,"ammonia_project":null,"synthetic_lng_project":null,"retrofit_proposed":null,"url":"https://lngatlas.org/terminal/american-coast-lng-terminal-us/","data_source":"Data: Global Gas Infrastructure Tracker, Global Energy Monitor, September 2025"},{"terminal_slug":"sawgrass-lng-terminal-us","terminal_name":"American LNG Hialeah Terminal","country":"United States","country_iso":"US","unit_name":null,"status":"operating","facility_type":"export","floating_type":"unknown","capacity_mtpa":0.08,"capacity_bcm_y":0.11,"start_year":2016,"planned_start_year":null,"original_planned_start_year":null,"fid_year":null,"construction_year":null,"shelved_year":null,"cancelled_year":null,"stop_year":null,"estimated_cost_usd":null,"estimated_cost_original":null,"estimated_cost_currency":null,"power_stations_supplied":null,"floating_vessel_name":null,"ccs_project":null,"hydrogen_project":null,"ammonia_project":null,"synthetic_lng_project":null,"retrofit_proposed":null,"url":"https://lngatlas.org/terminal/sawgrass-lng-terminal-us/","data_source":"Data: Global Gas Infrastructure Tracker, Global Energy Monitor, September 2025"},{"terminal_slug":"american-lng-titusville-terminal-us","terminal_name":"American LNG Titusville Terminal","country":"United States","country_iso":"US","unit_name":null,"status":"cancelled","facility_type":"export","floating_type":"unknown","capacity_mtpa":0.61,"capacity_bcm_y":0.83,"start_year":null,"planned_start_year":null,"original_planned_start_year":null,"fid_year":null,"construction_year":null,"shelved_year":2019,"cancelled_year":2021,"stop_year":2021,"estimated_cost_usd":null,"estimated_cost_original":null,"estimated_cost_currency":null,"power_stations_supplied":null,"floating_vessel_name":null,"ccs_project":null,"hydrogen_project":null,"ammonia_project":null,"synthetic_lng_project":null,"retrofit_proposed":null,"url":"https://lngatlas.org/terminal/american-lng-titusville-terminal-us/","data_source":"Data: Global Gas Infrastructure Tracker, Global Energy Monitor, September 2025"},{"terminal_slug":"amurang-fsru-id","terminal_name":"Amurang FSRU","country":"Indonesia","country_iso":"ID","unit_name":null,"status":"mothballed","facility_type":"import","floating_type":"fsru","capacity_mtpa":0.1,"capacity_bcm_y":0.14,"start_year":2020,"planned_start_year":null,"original_planned_start_year":null,"fid_year":null,"construction_year":2017,"shelved_year":null,"cancelled_year":null,"stop_year":2024,"estimated_cost_usd":null,"estimated_cost_original":null,"estimated_cost_currency":null,"power_stations_supplied":null,"floating_vessel_name":null,"ccs_project":null,"hydrogen_project":null,"ammonia_project":null,"synthetic_lng_project":null,"retrofit_proposed":null,"url":"https://lngatlas.org/terminal/amurang-fsru-id/","data_source":"Data: Global Gas Infrastructure Tracker, Global Energy Monitor, September 2025"},{"terminal_slug":"andes-energy-lng-terminal-co","terminal_name":"Andes Energy Terminal","country":"Colombia","country_iso":"CO","unit_name":null,"status":"proposed","facility_type":"import","floating_type":"floating","capacity_mtpa":null,"capacity_bcm_y":null,"start_year":null,"planned_start_year":null,"original_planned_start_year":null,"fid_year":null,"construction_year":null,"shelved_year":null,"cancelled_year":null,"stop_year":null,"estimated_cost_usd":null,"estimated_cost_original":null,"estimated_cost_currency":null,"power_stations_supplied":"Andes Energy power station","floating_vessel_name":null,"ccs_project":null,"hydrogen_project":null,"ammonia_project":null,"synthetic_lng_project":null,"retrofit_proposed":null,"url":"https://lngatlas.org/terminal/andes-energy-lng-terminal-co/","data_source":"Data: Global Gas Infrastructure Tracker, Global Energy Monitor, September 2025"},{"terminal_slug":"andres-lng-terminal-do","terminal_name":"Andrés LNG Terminal","country":"Dominican Republic","country_iso":"DO","unit_name":null,"status":"operating","facility_type":"import","floating_type":"unknown","capacity_mtpa":1.9,"capacity_bcm_y":2.59,"start_year":2003,"planned_start_year":null,"original_planned_start_year":null,"fid_year":null,"construction_year":null,"shelved_year":null,"cancelled_year":null,"stop_year":null,"estimated_cost_usd":400000000,"estimated_cost_original":400000000,"estimated_cost_currency":"USD","power_stations_supplied":"Andrés power station, Los Mina power station, Quisqueya 1 & 2 power stations, San Pedro de Macoris power station","floating_vessel_name":null,"ccs_project":null,"hydrogen_project":null,"ammonia_project":null,"synthetic_lng_project":null,"retrofit_proposed":null,"url":"https://lngatlas.org/terminal/andres-lng-terminal-do/","data_source":"Data: Global Gas Infrastructure Tracker, Global Energy Monitor, September 2025"},{"terminal_slug":"angola-lng-terminal-ao","terminal_name":"Angola LNG Terminal","country":"Angola","country_iso":"AO","unit_name":null,"status":"operating","facility_type":"export","floating_type":"unknown","capacity_mtpa":5.2,"capacity_bcm_y":7.07,"start_year":2013,"planned_start_year":null,"original_planned_start_year":null,"fid_year":2008,"construction_year":null,"shelved_year":null,"cancelled_year":null,"stop_year":null,"estimated_cost_usd":12000000000,"estimated_cost_original":12000000000,"estimated_cost_currency":"USD","power_stations_supplied":null,"floating_vessel_name":null,"ccs_project":null,"hydrogen_project":null,"ammonia_project":null,"synthetic_lng_project":null,"retrofit_proposed":null,"url":"https://lngatlas.org/terminal/angola-lng-terminal-ao/","data_source":"Data: Global Gas Infrastructure Tracker, Global Energy Monitor, September 2025"},{"terminal_slug":"annova-lng-terminal-us","terminal_name":"Annova LNG Terminal","country":"United States","country_iso":"US","unit_name":"T1-T6","status":"cancelled","facility_type":"export","floating_type":"unknown","capacity_mtpa":6.5,"capacity_bcm_y":8.84,"start_year":null,"planned_start_year":null,"original_planned_start_year":2025,"fid_year":2020,"construction_year":null,"shelved_year":null,"cancelled_year":2021,"stop_year":2021,"estimated_cost_usd":3000000000,"estimated_cost_original":3000000000,"estimated_cost_currency":"USD","power_stations_supplied":null,"floating_vessel_name":null,"ccs_project":null,"hydrogen_project":null,"ammonia_project":null,"synthetic_lng_project":null,"retrofit_proposed":null,"url":"https://lngatlas.org/terminal/annova-lng-terminal-us/","data_source":"Data: Global Gas Infrastructure Tracker, Global Energy Monitor, September 2025"},{"terminal_slug":"antigua-power-lng-terminal-ag","terminal_name":"Antigua Power LNG Terminal","country":"Antigua And Barbuda","country_iso":"AG","unit_name":null,"status":"construction","facility_type":"import","floating_type":"unknown","capacity_mtpa":null,"capacity_bcm_y":null,"start_year":null,"planned_start_year":2024,"original_planned_start_year":2023,"fid_year":2021,"construction_year":2023,"shelved_year":null,"cancelled_year":null,"stop_year":null,"estimated_cost_usd":50000000,"estimated_cost_original":50000000,"estimated_cost_currency":"USD","power_stations_supplied":"Antigua Power power station","floating_vessel_name":null,"ccs_project":null,"hydrogen_project":null,"ammonia_project":null,"synthetic_lng_project":null,"retrofit_proposed":null,"url":"https://lngatlas.org/terminal/antigua-power-lng-terminal-ag/","data_source":"Data: Global Gas Infrastructure Tracker, Global Energy Monitor, September 2025"},{"terminal_slug":"aqaba-jordan-fsru-jo","terminal_name":"Aqaba Jordan FSRU","country":"Jordan","country_iso":"JO","unit_name":null,"status":"operating","facility_type":"import","floating_type":"fsru","capacity_mtpa":3.8,"capacity_bcm_y":5.17,"start_year":2015,"planned_start_year":null,"original_planned_start_year":null,"fid_year":null,"construction_year":null,"shelved_year":null,"cancelled_year":null,"stop_year":null,"estimated_cost_usd":null,"estimated_cost_original":null,"estimated_cost_currency":null,"power_stations_supplied":null,"floating_vessel_name":"Energos Eskimo FSRU (previously Golar Eskimo FSRU)","ccs_project":null,"hydrogen_project":null,"ammonia_project":null,"synthetic_lng_project":null,"retrofit_proposed":null,"url":"https://lngatlas.org/terminal/aqaba-jordan-fsru-jo/","data_source":"Data: Global Gas Infrastructure Tracker, Global Energy Monitor, September 2025"},{"terminal_slug":"arctic-lng-1-terminal-ru","terminal_name":"Arctic LNG 1 Terminal","country":"Russia","country_iso":"RU","unit_name":null,"status":"proposed","facility_type":"export","floating_type":"unknown","capacity_mtpa":19.8,"capacity_bcm_y":26.94,"start_year":null,"planned_start_year":null,"original_planned_start_year":2027,"fid_year":null,"construction_year":null,"shelved_year":null,"cancelled_year":null,"stop_year":null,"estimated_cost_usd":null,"estimated_cost_original":null,"estimated_cost_currency":null,"power_stations_supplied":null,"floating_vessel_name":null,"ccs_project":null,"hydrogen_project":null,"ammonia_project":null,"synthetic_lng_project":null,"retrofit_proposed":null,"url":"https://lngatlas.org/terminal/arctic-lng-1-terminal-ru/","data_source":"Data: Global Gas Infrastructure Tracker, Global Energy Monitor, September 2025"},{"terminal_slug":"arctic-lng-2-terminal-ru","terminal_name":"Arctic LNG 2 Terminal","country":"Russia","country_iso":"RU","unit_name":"T1","status":"idle","facility_type":"export","floating_type":"unknown","capacity_mtpa":6.6,"capacity_bcm_y":8.98,"start_year":2023,"planned_start_year":null,"original_planned_start_year":null,"fid_year":2019,"construction_year":2021,"shelved_year":null,"cancelled_year":null,"stop_year":2025,"estimated_cost_usd":8333333333,"estimated_cost_original":8333333333,"estimated_cost_currency":"USD","power_stations_supplied":null,"floating_vessel_name":null,"ccs_project":null,"hydrogen_project":null,"ammonia_project":null,"synthetic_lng_project":null,"retrofit_proposed":null,"url":"https://lngatlas.org/terminal/arctic-lng-2-terminal-ru/","data_source":"Data: Global Gas Infrastructure Tracker, Global Energy Monitor, September 2025"},{"terminal_slug":"arctic-lng-2-terminal-ru","terminal_name":"Arctic LNG 2 Terminal","country":"Russia","country_iso":"RU","unit_name":"T2","status":"operating","facility_type":"export","floating_type":"unknown","capacity_mtpa":6.6,"capacity_bcm_y":8.98,"start_year":2025,"planned_start_year":null,"original_planned_start_year":2024,"fid_year":2019,"construction_year":2022,"shelved_year":null,"cancelled_year":null,"stop_year":null,"estimated_cost_usd":8333333333,"estimated_cost_original":8333333333,"estimated_cost_currency":"USD","power_stations_supplied":null,"floating_vessel_name":null,"ccs_project":null,"hydrogen_project":null,"ammonia_project":null,"synthetic_lng_project":null,"retrofit_proposed":null,"url":"https://lngatlas.org/terminal/arctic-lng-2-terminal-ru/","data_source":"Data: Global Gas Infrastructure Tracker, Global Energy Monitor, September 2025"},{"terminal_slug":"arctic-lng-2-terminal-ru","terminal_name":"Arctic LNG 2 Terminal","country":"Russia","country_iso":"RU","unit_name":"T3","status":"construction","facility_type":"export","floating_type":"unknown","capacity_mtpa":6.6,"capacity_bcm_y":8.98,"start_year":null,"planned_start_year":null,"original_planned_start_year":2025,"fid_year":2019,"construction_year":null,"shelved_year":null,"cancelled_year":null,"stop_year":null,"estimated_cost_usd":8333333333,"estimated_cost_original":8333333333,"estimated_cost_currency":"USD","power_stations_supplied":null,"floating_vessel_name":null,"ccs_project":null,"hydrogen_project":null,"ammonia_project":null,"synthetic_lng_project":null,"retrofit_proposed":null,"url":"https://lngatlas.org/terminal/arctic-lng-2-terminal-ru/","data_source":"Data: Global Gas Infrastructure Tracker, Global Energy Monitor, September 2025"},{"terminal_slug":"arctic-lng-3-terminal-ru","terminal_name":"Arctic LNG 3 Terminal","country":"Russia","country_iso":"RU","unit_name":null,"status":"shelved","facility_type":"export","floating_type":"unknown","capacity_mtpa":19.8,"capacity_bcm_y":26.94,"start_year":null,"planned_start_year":null,"original_planned_start_year":2032,"fid_year":null,"construction_year":2030,"shelved_year":2025,"cancelled_year":null,"stop_year":null,"estimated_cost_usd":null,"estimated_cost_original":null,"estimated_cost_currency":null,"power_stations_supplied":null,"floating_vessel_name":null,"ccs_project":null,"hydrogen_project":null,"ammonia_project":null,"synthetic_lng_project":null,"retrofit_proposed":null,"url":"https://lngatlas.org/terminal/arctic-lng-3-terminal-ru/","data_source":"Data: Global Gas Infrastructure Tracker, Global Energy Monitor, September 2025"},{"terminal_slug":"argent-lng-terminal-us","terminal_name":"Argent LNG Terminal","country":"United States","country_iso":"US","unit_name":"Phase 1","status":"proposed","facility_type":"export","floating_type":"unknown","capacity_mtpa":10,"capacity_bcm_y":13.61,"start_year":null,"planned_start_year":2030,"original_planned_start_year":2029,"fid_year":null,"construction_year":2027,"shelved_year":null,"cancelled_year":null,"stop_year":null,"estimated_cost_usd":10000000000,"estimated_cost_original":10000000000,"estimated_cost_currency":"USD","power_stations_supplied":null,"floating_vessel_name":null,"ccs_project":null,"hydrogen_project":null,"ammonia_project":null,"synthetic_lng_project":null,"retrofit_proposed":null,"url":"https://lngatlas.org/terminal/argent-lng-terminal-us/","data_source":"Data: Global Gas Infrastructure Tracker, Global Energy Monitor, September 2025"},{"terminal_slug":"argent-lng-terminal-us","terminal_name":"Argent LNG Terminal","country":"United States","country_iso":"US","unit_name":"Phase 2","status":"proposed","facility_type":"export","floating_type":"unknown","capacity_mtpa":10,"capacity_bcm_y":13.61,"start_year":null,"planned_start_year":null,"original_planned_start_year":null,"fid_year":null,"construction_year":null,"shelved_year":null,"cancelled_year":null,"stop_year":null,"estimated_cost_usd":null,"estimated_cost_original":null,"estimated_cost_currency":null,"power_stations_supplied":null,"floating_vessel_name":null,"ccs_project":null,"hydrogen_project":null,"ammonia_project":null,"synthetic_lng_project":null,"retrofit_proposed":null,"url":"https://lngatlas.org/terminal/argent-lng-terminal-us/","data_source":"Data: Global Gas Infrastructure Tracker, Global Energy Monitor, September 2025"},{"terminal_slug":"argentina-lng-terminal-ar","terminal_name":"Argentina LNG Terminal","country":"Argentina","country_iso":"AR","unit_name":"Phase 1.1  (Golar Hilli Episeyo FLNG)","status":"proposed","facility_type":"export","floating_type":"floating","capacity_mtpa":2.45,"capacity_bcm_y":3.33,"start_year":null,"planned_start_year":null,"original_planned_start_year":2027,"fid_year":2025,"construction_year":null,"shelved_year":null,"cancelled_year":null,"stop_year":null,"estimated_cost_usd":3439000000,"estimated_cost_original":3439000000,"estimated_cost_currency":"USD","power_stations_supplied":null,"floating_vessel_name":"Golar Hilli Episeyo FLNG, Golar MK II FLNG","ccs_project":null,"hydrogen_project":null,"ammonia_project":null,"synthetic_lng_project":null,"retrofit_proposed":null,"url":"https://lngatlas.org/terminal/argentina-lng-terminal-ar/","data_source":"Data: Global Gas Infrastructure Tracker, Global Energy Monitor, September 2025"},{"terminal_slug":"argentina-lng-terminal-ar","terminal_name":"Argentina LNG Terminal","country":"Argentina","country_iso":"AR","unit_name":"Phase 1.2  (Golar MK II FLNG)","status":"proposed","facility_type":"export","floating_type":"floating","capacity_mtpa":3.5,"capacity_bcm_y":4.76,"start_year":null,"planned_start_year":null,"original_planned_start_year":2028,"fid_year":2025,"construction_year":null,"shelved_year":null,"cancelled_year":null,"stop_year":null,"estimated_cost_usd":3439000000,"estimated_cost_original":3439000000,"estimated_cost_currency":"USD","power_stations_supplied":null,"floating_vessel_name":"Golar Hilli Episeyo FLNG, Golar MK II FLNG","ccs_project":null,"hydrogen_project":null,"ammonia_project":null,"synthetic_lng_project":null,"retrofit_proposed":null,"url":"https://lngatlas.org/terminal/argentina-lng-terminal-ar/","data_source":"Data: Global Gas Infrastructure Tracker, Global Energy Monitor, September 2025"},{"terminal_slug":"argentina-lng-terminal-ar","terminal_name":"Argentina LNG Terminal","country":"Argentina","country_iso":"AR","unit_name":"Phase 2","status":"proposed","facility_type":"export","floating_type":"floating","capacity_mtpa":10,"capacity_bcm_y":13.61,"start_year":null,"planned_start_year":2028,"original_planned_start_year":2027,"fid_year":2025,"construction_year":null,"shelved_year":null,"cancelled_year":null,"stop_year":null,"estimated_cost_usd":30000000000,"estimated_cost_original":30000000000,"estimated_cost_currency":"USD","power_stations_supplied":null,"floating_vessel_name":"Golar Hilli Episeyo FLNG, Golar MK II FLNG","ccs_project":null,"hydrogen_project":null,"ammonia_project":null,"synthetic_lng_project":null,"retrofit_proposed":null,"url":"https://lngatlas.org/terminal/argentina-lng-terminal-ar/","data_source":"Data: Global Gas Infrastructure Tracker, Global Energy Monitor, September 2025"},{"terminal_slug":"argentina-lng-terminal-ar","terminal_name":"Argentina LNG Terminal","country":"Argentina","country_iso":"AR","unit_name":"Phase 3","status":"proposed","facility_type":"export","floating_type":"floating","capacity_mtpa":12,"capacity_bcm_y":16.33,"start_year":null,"planned_start_year":null,"original_planned_start_year":2029,"fid_year":2025,"construction_year":null,"shelved_year":null,"cancelled_year":null,"stop_year":null,"estimated_cost_usd":null,"estimated_cost_original":null,"estimated_cost_currency":null,"power_stations_supplied":null,"floating_vessel_name":"Golar Hilli Episeyo FLNG, Golar MK II FLNG","ccs_project":null,"hydrogen_project":null,"ammonia_project":null,"synthetic_lng_project":null,"retrofit_proposed":null,"url":"https://lngatlas.org/terminal/argentina-lng-terminal-ar/","data_source":"Data: Global Gas Infrastructure Tracker, Global Energy Monitor, September 2025"},{"terminal_slug":"argo-fsru-gr","terminal_name":"Argo FSRU","country":"Greece","country_iso":"GR","unit_name":null,"status":"proposed","facility_type":"import","floating_type":"fsru","capacity_mtpa":3.38,"capacity_bcm_y":4.6,"start_year":null,"planned_start_year":null,"original_planned_start_year":2025,"fid_year":null,"construction_year":null,"shelved_year":null,"cancelled_year":null,"stop_year":null,"estimated_cost_usd":246885000,"estimated_cost_original":226500000,"estimated_cost_currency":"EUR","power_stations_supplied":null,"floating_vessel_name":null,"ccs_project":null,"hydrogen_project":null,"ammonia_project":null,"synthetic_lng_project":null,"retrofit_proposed":null,"url":"https://lngatlas.org/terminal/argo-fsru-gr/","data_source":"Data: Global Gas Infrastructure Tracker, Global Energy Monitor, September 2025"},{"terminal_slug":"arkhangelsk-lng-terminal-ru","terminal_name":"Arkhangelsk LNG Terminal","country":"Russia","country_iso":"RU","unit_name":"Phase I","status":"proposed","facility_type":"export","floating_type":"unknown","capacity_mtpa":0.08,"capacity_bcm_y":0.11,"start_year":null,"planned_start_year":null,"original_planned_start_year":2026,"fid_year":null,"construction_year":null,"shelved_year":null,"cancelled_year":null,"stop_year":null,"estimated_cost_usd":56000000,"estimated_cost_original":4000000000,"estimated_cost_currency":"RUB","power_stations_supplied":null,"floating_vessel_name":null,"ccs_project":null,"hydrogen_project":null,"ammonia_project":null,"synthetic_lng_project":null,"retrofit_proposed":null,"url":"https://lngatlas.org/terminal/arkhangelsk-lng-terminal-ru/","data_source":"Data: Global Gas Infrastructure Tracker, Global Energy Monitor, September 2025"},{"terminal_slug":"arkhangelsk-lng-terminal-ru","terminal_name":"Arkhangelsk LNG Terminal","country":"Russia","country_iso":"RU","unit_name":"Phase II","status":"proposed","facility_type":"export","floating_type":"unknown","capacity_mtpa":0.08,"capacity_bcm_y":0.11,"start_year":null,"planned_start_year":null,"original_planned_start_year":2028,"fid_year":null,"construction_year":null,"shelved_year":null,"cancelled_year":null,"stop_year":null,"estimated_cost_usd":56000000,"estimated_cost_original":4000000000,"estimated_cost_currency":"RUB","power_stations_supplied":null,"floating_vessel_name":null,"ccs_project":null,"hydrogen_project":null,"ammonia_project":null,"synthetic_lng_project":null,"retrofit_proposed":null,"url":"https://lngatlas.org/terminal/arkhangelsk-lng-terminal-ru/","data_source":"Data: Global Gas Infrastructure Tracker, Global Energy Monitor, September 2025"},{"terminal_slug":"arrow-energy-lng-terminal-au","terminal_name":"Arrow Energy LNG Terminal","country":"Australia","country_iso":"AU","unit_name":"T1-T4","status":"cancelled","facility_type":"export","floating_type":"unknown","capacity_mtpa":18,"capacity_bcm_y":24.49,"start_year":null,"planned_start_year":null,"original_planned_start_year":null,"fid_year":null,"construction_year":null,"shelved_year":null,"cancelled_year":2015,"stop_year":2015,"estimated_cost_usd":10896000000,"estimated_cost_original":15000000000,"estimated_cost_currency":"AUD","power_stations_supplied":null,"floating_vessel_name":null,"ccs_project":null,"hydrogen_project":null,"ammonia_project":null,"synthetic_lng_project":null,"retrofit_proposed":null,"url":"https://lngatlas.org/terminal/arrow-energy-lng-terminal-au/","data_source":"Data: Global Gas Infrastructure Tracker, Global Energy Monitor, September 2025"},{"terminal_slug":"aruba-lng-terminal-aw","terminal_name":"Aruba LNG Terminal","country":"Aruba","country_iso":"AW","unit_name":null,"status":"proposed","facility_type":"import","floating_type":"unknown","capacity_mtpa":null,"capacity_bcm_y":null,"start_year":null,"planned_start_year":null,"original_planned_start_year":2024,"fid_year":null,"construction_year":null,"shelved_year":null,"cancelled_year":null,"stop_year":null,"estimated_cost_usd":100000000,"estimated_cost_original":100000000,"estimated_cost_currency":"USD","power_stations_supplied":"RECIP (Balashi) power plant","floating_vessel_name":null,"ccs_project":null,"hydrogen_project":null,"ammonia_project":null,"synthetic_lng_project":null,"retrofit_proposed":null,"url":"https://lngatlas.org/terminal/aruba-lng-terminal-aw/","data_source":"Data: Global Gas Infrastructure Tracker, Global Energy Monitor, September 2025"},{"terminal_slug":"arun-lng-terminal-id","terminal_name":"Arun LNG Terminal","country":"Indonesia","country_iso":"ID","unit_name":"T1","status":"retired","facility_type":"export","floating_type":"unknown","capacity_mtpa":3,"capacity_bcm_y":4.08,"start_year":1978,"planned_start_year":null,"original_planned_start_year":null,"fid_year":null,"construction_year":null,"shelved_year":null,"cancelled_year":null,"stop_year":null,"estimated_cost_usd":null,"estimated_cost_original":null,"estimated_cost_currency":null,"power_stations_supplied":null,"floating_vessel_name":null,"ccs_project":null,"hydrogen_project":null,"ammonia_project":null,"synthetic_lng_project":null,"retrofit_proposed":null,"url":"https://lngatlas.org/terminal/arun-lng-terminal-id/","data_source":"Data: Global Gas Infrastructure Tracker, Global Energy Monitor, September 2025"},{"terminal_slug":"arun-lng-terminal-id","terminal_name":"Arun LNG Terminal","country":"Indonesia","country_iso":"ID","unit_name":"T2","status":"retired","facility_type":"export","floating_type":"unknown","capacity_mtpa":2.9,"capacity_bcm_y":3.95,"start_year":1978,"planned_start_year":null,"original_planned_start_year":null,"fid_year":null,"construction_year":null,"shelved_year":null,"cancelled_year":null,"stop_year":2012,"estimated_cost_usd":null,"estimated_cost_original":null,"estimated_cost_currency":null,"power_stations_supplied":null,"floating_vessel_name":null,"ccs_project":null,"hydrogen_project":null,"ammonia_project":null,"synthetic_lng_project":null,"retrofit_proposed":null,"url":"https://lngatlas.org/terminal/arun-lng-terminal-id/","data_source":"Data: Global Gas Infrastructure Tracker, Global Energy Monitor, September 2025"},{"terminal_slug":"arun-lng-terminal-id","terminal_name":"Arun LNG Terminal","country":"Indonesia","country_iso":"ID","unit_name":"T3","status":"retired","facility_type":"export","floating_type":"unknown","capacity_mtpa":2.9,"capacity_bcm_y":3.95,"start_year":1978,"planned_start_year":null,"original_planned_start_year":null,"fid_year":null,"construction_year":null,"shelved_year":null,"cancelled_year":null,"stop_year":2013,"estimated_cost_usd":null,"estimated_cost_original":null,"estimated_cost_currency":null,"power_stations_supplied":null,"floating_vessel_name":null,"ccs_project":null,"hydrogen_project":null,"ammonia_project":null,"synthetic_lng_project":null,"retrofit_proposed":null,"url":"https://lngatlas.org/terminal/arun-lng-terminal-id/","data_source":"Data: Global Gas Infrastructure Tracker, Global Energy Monitor, September 2025"},{"terminal_slug":"arun-lng-terminal-id","terminal_name":"Arun LNG Terminal","country":"Indonesia","country_iso":"ID","unit_name":"T4","status":"retired","facility_type":"export","floating_type":"unknown","capacity_mtpa":3.5,"capacity_bcm_y":4.76,"start_year":1983,"planned_start_year":null,"original_planned_start_year":null,"fid_year":null,"construction_year":null,"shelved_year":null,"cancelled_year":null,"stop_year":2013,"estimated_cost_usd":null,"estimated_cost_original":null,"estimated_cost_currency":null,"power_stations_supplied":null,"floating_vessel_name":null,"ccs_project":null,"hydrogen_project":null,"ammonia_project":null,"synthetic_lng_project":null,"retrofit_proposed":null,"url":"https://lngatlas.org/terminal/arun-lng-terminal-id/","data_source":"Data: Global Gas Infrastructure Tracker, Global Energy Monitor, September 2025"},{"terminal_slug":"arun-lng-terminal-id","terminal_name":"Arun LNG Terminal","country":"Indonesia","country_iso":"ID","unit_name":"T5","status":"retired","facility_type":"export","floating_type":"unknown","capacity_mtpa":3.5,"capacity_bcm_y":4.76,"start_year":1984,"planned_start_year":null,"original_planned_start_year":null,"fid_year":null,"construction_year":null,"shelved_year":null,"cancelled_year":null,"stop_year":2013,"estimated_cost_usd":null,"estimated_cost_original":null,"estimated_cost_currency":null,"power_stations_supplied":null,"floating_vessel_name":null,"ccs_project":null,"hydrogen_project":null,"ammonia_project":null,"synthetic_lng_project":null,"retrofit_proposed":null,"url":"https://lngatlas.org/terminal/arun-lng-terminal-id/","data_source":"Data: Global Gas Infrastructure Tracker, Global Energy Monitor, September 2025"},{"terminal_slug":"arun-lng-terminal-id","terminal_name":"Arun LNG Terminal","country":"Indonesia","country_iso":"ID","unit_name":"T6","status":"retired","facility_type":"export","floating_type":"unknown","capacity_mtpa":3.5,"capacity_bcm_y":4.76,"start_year":1986,"planned_start_year":null,"original_planned_start_year":null,"fid_year":null,"construction_year":null,"shelved_year":null,"cancelled_year":null,"stop_year":null,"estimated_cost_usd":null,"estimated_cost_original":null,"estimated_cost_currency":null,"power_stations_supplied":null,"floating_vessel_name":null,"ccs_project":null,"hydrogen_project":null,"ammonia_project":null,"synthetic_lng_project":null,"retrofit_proposed":null,"url":"https://lngatlas.org/terminal/arun-lng-terminal-id/","data_source":"Data: Global Gas Infrastructure Tracker, Global Energy Monitor, September 2025"},{"terminal_slug":"arun-lng-terminal-id","terminal_name":"Arun LNG Terminal","country":"Indonesia","country_iso":"ID","unit_name":"Import Terminal","status":"operating","facility_type":"import","floating_type":"unknown","capacity_mtpa":3,"capacity_bcm_y":4.08,"start_year":2015,"planned_start_year":null,"original_planned_start_year":null,"fid_year":null,"construction_year":2013,"shelved_year":null,"cancelled_year":null,"stop_year":null,"estimated_cost_usd":null,"estimated_cost_original":null,"estimated_cost_currency":null,"power_stations_supplied":null,"floating_vessel_name":null,"ccs_project":null,"hydrogen_project":null,"ammonia_project":null,"synthetic_lng_project":null,"retrofit_proposed":null,"url":"https://lngatlas.org/terminal/arun-lng-terminal-id/","data_source":"Data: Global Gas Infrastructure Tracker, Global Energy Monitor, September 2025"},{"terminal_slug":"arzew-bethioua-lng-terminal-dz","terminal_name":"Arzew-Bethioua LNG Terminal","country":"Algeria","country_iso":"DZ","unit_name":"GL4Z","status":"retired","facility_type":"export","floating_type":"unknown","capacity_mtpa":0.9,"capacity_bcm_y":1.22,"start_year":1964,"planned_start_year":null,"original_planned_start_year":null,"fid_year":null,"construction_year":null,"shelved_year":null,"cancelled_year":null,"stop_year":2010,"estimated_cost_usd":null,"estimated_cost_original":null,"estimated_cost_currency":null,"power_stations_supplied":null,"floating_vessel_name":null,"ccs_project":null,"hydrogen_project":null,"ammonia_project":null,"synthetic_lng_project":null,"retrofit_proposed":null,"url":"https://lngatlas.org/terminal/arzew-bethioua-lng-terminal-dz/","data_source":"Data: Global Gas Infrastructure Tracker, Global Energy Monitor, September 2025"},{"terminal_slug":"arzew-bethioua-lng-terminal-dz","terminal_name":"Arzew-Bethioua LNG Terminal","country":"Algeria","country_iso":"DZ","unit_name":"GL1Z","status":"operating","facility_type":"export","floating_type":"unknown","capacity_mtpa":7.9,"capacity_bcm_y":10.75,"start_year":1978,"planned_start_year":null,"original_planned_start_year":null,"fid_year":null,"construction_year":null,"shelved_year":null,"cancelled_year":null,"stop_year":null,"estimated_cost_usd":null,"estimated_cost_original":null,"estimated_cost_currency":null,"power_stations_supplied":null,"floating_vessel_name":null,"ccs_project":null,"hydrogen_project":null,"ammonia_project":null,"synthetic_lng_project":null,"retrofit_proposed":null,"url":"https://lngatlas.org/terminal/arzew-bethioua-lng-terminal-dz/","data_source":"Data: Global Gas Infrastructure Tracker, Global Energy Monitor, September 2025"},{"terminal_slug":"arzew-bethioua-lng-terminal-dz","terminal_name":"Arzew-Bethioua LNG Terminal","country":"Algeria","country_iso":"DZ","unit_name":"GL2Z","status":"operating","facility_type":"export","floating_type":"unknown","capacity_mtpa":8.2,"capacity_bcm_y":11.16,"start_year":1981,"planned_start_year":null,"original_planned_start_year":null,"fid_year":null,"construction_year":null,"shelved_year":null,"cancelled_year":null,"stop_year":null,"estimated_cost_usd":null,"estimated_cost_original":null,"estimated_cost_currency":null,"power_stations_supplied":null,"floating_vessel_name":null,"ccs_project":null,"hydrogen_project":null,"ammonia_project":null,"synthetic_lng_project":null,"retrofit_proposed":null,"url":"https://lngatlas.org/terminal/arzew-bethioua-lng-terminal-dz/","data_source":"Data: Global Gas Infrastructure Tracker, Global Energy Monitor, September 2025"},{"terminal_slug":"arzew-bethioua-lng-terminal-dz","terminal_name":"Arzew-Bethioua LNG Terminal","country":"Algeria","country_iso":"DZ","unit_name":"GL3Z","status":"operating","facility_type":"export","floating_type":"unknown","capacity_mtpa":4.7,"capacity_bcm_y":6.39,"start_year":2014,"planned_start_year":null,"original_planned_start_year":2013,"fid_year":null,"construction_year":null,"shelved_year":null,"cancelled_year":null,"stop_year":null,"estimated_cost_usd":3052000000,"estimated_cost_original":2800000000,"estimated_cost_currency":"EUR","power_stations_supplied":null,"floating_vessel_name":null,"ccs_project":null,"hydrogen_project":null,"ammonia_project":null,"synthetic_lng_project":null,"retrofit_proposed":null,"url":"https://lngatlas.org/terminal/arzew-bethioua-lng-terminal-dz/","data_source":"Data: Global Gas Infrastructure Tracker, Global Energy Monitor, September 2025"},{"terminal_slug":"atimonan-lng-terminal-ph","terminal_name":"Atimonan LNG Terminal","country":"Philippines","country_iso":"PH","unit_name":null,"status":"cancelled","facility_type":"import","floating_type":"unknown","capacity_mtpa":null,"capacity_bcm_y":null,"start_year":null,"planned_start_year":null,"original_planned_start_year":2026,"fid_year":null,"construction_year":null,"shelved_year":null,"cancelled_year":2025,"stop_year":2025,"estimated_cost_usd":null,"estimated_cost_original":null,"estimated_cost_currency":null,"power_stations_supplied":"Atimonan power station","floating_vessel_name":null,"ccs_project":null,"hydrogen_project":null,"ammonia_project":null,"synthetic_lng_project":null,"retrofit_proposed":null,"url":"https://lngatlas.org/terminal/atimonan-lng-terminal-ph/","data_source":"Data: Global Gas Infrastructure Tracker, Global Energy Monitor, September 2025"},{"terminal_slug":"atlantic-coast-lng-terminal-ca","terminal_name":"Atlantic Coast LNG Terminal","country":"Canada","country_iso":"CA","unit_name":null,"status":"cancelled","facility_type":"export","floating_type":"floating","capacity_mtpa":16,"capacity_bcm_y":21.77,"start_year":null,"planned_start_year":2024,"original_planned_start_year":2017,"fid_year":null,"construction_year":2017,"shelved_year":2018,"cancelled_year":2020,"stop_year":2020,"estimated_cost_usd":null,"estimated_cost_original":null,"estimated_cost_currency":null,"power_stations_supplied":null,"floating_vessel_name":null,"ccs_project":null,"hydrogen_project":null,"ammonia_project":null,"synthetic_lng_project":null,"retrofit_proposed":null,"url":"https://lngatlas.org/terminal/atlantic-coast-lng-terminal-ca/","data_source":"Data: Global Gas Infrastructure Tracker, Global Energy Monitor, September 2025"},{"terminal_slug":"atlantic-lng-terminal-tt","terminal_name":"Atlantic LNG Terminal","country":"Trinidad and Tobago","country_iso":"TT","unit_name":"T1","status":"mothballed","facility_type":"export","floating_type":"unknown","capacity_mtpa":3.3,"capacity_bcm_y":4.49,"start_year":1999,"planned_start_year":null,"original_planned_start_year":null,"fid_year":null,"construction_year":null,"shelved_year":null,"cancelled_year":null,"stop_year":2020,"estimated_cost_usd":1000000000,"estimated_cost_original":1000000000,"estimated_cost_currency":"USD","power_stations_supplied":null,"floating_vessel_name":null,"ccs_project":null,"hydrogen_project":null,"ammonia_project":null,"synthetic_lng_project":null,"retrofit_proposed":null,"url":"https://lngatlas.org/terminal/atlantic-lng-terminal-tt/","data_source":"Data: Global Gas Infrastructure Tracker, Global Energy Monitor, September 2025"},{"terminal_slug":"atlantic-lng-terminal-tt","terminal_name":"Atlantic LNG Terminal","country":"Trinidad and Tobago","country_iso":"TT","unit_name":"T2","status":"operating","facility_type":"export","floating_type":"unknown","capacity_mtpa":3.4,"capacity_bcm_y":4.63,"start_year":2002,"planned_start_year":null,"original_planned_start_year":null,"fid_year":null,"construction_year":null,"shelved_year":null,"cancelled_year":null,"stop_year":null,"estimated_cost_usd":550000000,"estimated_cost_original":550000000,"estimated_cost_currency":"USD","power_stations_supplied":null,"floating_vessel_name":null,"ccs_project":null,"hydrogen_project":null,"ammonia_project":null,"synthetic_lng_project":null,"retrofit_proposed":null,"url":"https://lngatlas.org/terminal/atlantic-lng-terminal-tt/","data_source":"Data: Global Gas Infrastructure Tracker, Global Energy Monitor, September 2025"},{"terminal_slug":"atlantic-lng-terminal-tt","terminal_name":"Atlantic LNG Terminal","country":"Trinidad and Tobago","country_iso":"TT","unit_name":"T3","status":"operating","facility_type":"export","floating_type":"unknown","capacity_mtpa":3.4,"capacity_bcm_y":4.63,"start_year":2003,"planned_start_year":null,"original_planned_start_year":null,"fid_year":null,"construction_year":null,"shelved_year":null,"cancelled_year":null,"stop_year":null,"estimated_cost_usd":550000000,"estimated_cost_original":550000000,"estimated_cost_currency":"USD","power_stations_supplied":null,"floating_vessel_name":null,"ccs_project":null,"hydrogen_project":null,"ammonia_project":null,"synthetic_lng_project":null,"retrofit_proposed":null,"url":"https://lngatlas.org/terminal/atlantic-lng-terminal-tt/","data_source":"Data: Global Gas Infrastructure Tracker, Global Energy Monitor, September 2025"},{"terminal_slug":"atlantic-lng-terminal-tt","terminal_name":"Atlantic LNG Terminal","country":"Trinidad and Tobago","country_iso":"TT","unit_name":"T4","status":"operating","facility_type":"export","floating_type":"unknown","capacity_mtpa":5.2,"capacity_bcm_y":7.07,"start_year":2007,"planned_start_year":null,"original_planned_start_year":null,"fid_year":null,"construction_year":null,"shelved_year":null,"cancelled_year":null,"stop_year":null,"estimated_cost_usd":1200000000,"estimated_cost_original":1200000000,"estimated_cost_currency":"USD","power_stations_supplied":null,"floating_vessel_name":null,"ccs_project":null,"hydrogen_project":null,"ammonia_project":null,"synthetic_lng_project":null,"retrofit_proposed":null,"url":"https://lngatlas.org/terminal/atlantic-lng-terminal-tt/","data_source":"Data: Global Gas Infrastructure Tracker, Global Energy Monitor, September 2025"},{"terminal_slug":"atlantic-lng-terminal-tt","terminal_name":"Atlantic LNG Terminal","country":"Trinidad and Tobago","country_iso":"TT","unit_name":"T5","status":"cancelled","facility_type":"export","floating_type":"unknown","capacity_mtpa":null,"capacity_bcm_y":null,"start_year":null,"planned_start_year":null,"original_planned_start_year":null,"fid_year":null,"construction_year":null,"shelved_year":2009,"cancelled_year":2011,"stop_year":2011,"estimated_cost_usd":null,"estimated_cost_original":null,"estimated_cost_currency":null,"power_stations_supplied":null,"floating_vessel_name":null,"ccs_project":null,"hydrogen_project":null,"ammonia_project":null,"synthetic_lng_project":null,"retrofit_proposed":null,"url":"https://lngatlas.org/terminal/atlantic-lng-terminal-tt/","data_source":"Data: Global Gas Infrastructure Tracker, Global Energy Monitor, September 2025"},{"terminal_slug":"aurora-lng-terminal-ca","terminal_name":"Aurora LNG Terminal","country":"Canada","country_iso":"CA","unit_name":"Phase 1 (T1-T2)","status":"cancelled","facility_type":"export","floating_type":"unknown","capacity_mtpa":12,"capacity_bcm_y":16.33,"start_year":null,"planned_start_year":null,"original_planned_start_year":2023,"fid_year":null,"construction_year":null,"shelved_year":null,"cancelled_year":2017,"stop_year":2017,"estimated_cost_usd":null,"estimated_cost_original":null,"estimated_cost_currency":null,"power_stations_supplied":null,"floating_vessel_name":null,"ccs_project":null,"hydrogen_project":null,"ammonia_project":null,"synthetic_lng_project":null,"retrofit_proposed":null,"url":"https://lngatlas.org/terminal/aurora-lng-terminal-ca/","data_source":"Data: Global Gas Infrastructure Tracker, Global Energy Monitor, September 2025"},{"terminal_slug":"aurora-lng-terminal-ca","terminal_name":"Aurora LNG Terminal","country":"Canada","country_iso":"CA","unit_name":"Phase 2 (T3-T4)","status":"cancelled","facility_type":"export","floating_type":"unknown","capacity_mtpa":12,"capacity_bcm_y":16.33,"start_year":null,"planned_start_year":null,"original_planned_start_year":null,"fid_year":null,"construction_year":null,"shelved_year":null,"cancelled_year":2017,"stop_year":2017,"estimated_cost_usd":null,"estimated_cost_original":null,"estimated_cost_currency":null,"power_stations_supplied":null,"floating_vessel_name":null,"ccs_project":null,"hydrogen_project":null,"ammonia_project":null,"synthetic_lng_project":null,"retrofit_proposed":null,"url":"https://lngatlas.org/terminal/aurora-lng-terminal-ca/","data_source":"Data: Global Gas Infrastructure Tracker, Global Energy Monitor, September 2025"},{"terminal_slug":"aurora-spassk-dalny-lng-terminal-ru","terminal_name":"Aurora Spassk-Dalny LNG Terminal","country":"Russia","country_iso":"RU","unit_name":"Train 1","status":"proposed","facility_type":"export","floating_type":"unknown","capacity_mtpa":0.02,"capacity_bcm_y":0.03,"start_year":null,"planned_start_year":null,"original_planned_start_year":null,"fid_year":null,"construction_year":null,"shelved_year":null,"cancelled_year":null,"stop_year":null,"estimated_cost_usd":null,"estimated_cost_original":null,"estimated_cost_currency":null,"power_stations_supplied":null,"floating_vessel_name":null,"ccs_project":null,"hydrogen_project":null,"ammonia_project":null,"synthetic_lng_project":null,"retrofit_proposed":null,"url":"https://lngatlas.org/terminal/aurora-spassk-dalny-lng-terminal-ru/","data_source":"Data: Global Gas Infrastructure Tracker, Global Energy Monitor, September 2025"},{"terminal_slug":"aurora-spassk-dalny-lng-terminal-ru","terminal_name":"Aurora Spassk-Dalny LNG Terminal","country":"Russia","country_iso":"RU","unit_name":"Train 2","status":"proposed","facility_type":"export","floating_type":"unknown","capacity_mtpa":0.02,"capacity_bcm_y":0.03,"start_year":null,"planned_start_year":null,"original_planned_start_year":null,"fid_year":null,"construction_year":null,"shelved_year":null,"cancelled_year":null,"stop_year":null,"estimated_cost_usd":null,"estimated_cost_original":null,"estimated_cost_currency":null,"power_stations_supplied":null,"floating_vessel_name":null,"ccs_project":null,"hydrogen_project":null,"ammonia_project":null,"synthetic_lng_project":null,"retrofit_proposed":null,"url":"https://lngatlas.org/terminal/aurora-spassk-dalny-lng-terminal-ru/","data_source":"Data: Global Gas Infrastructure Tracker, Global Energy Monitor, September 2025"},{"terminal_slug":"australasia-probolinggo-fsru-id","terminal_name":"Australasia Probolinggo FSRU","country":"Indonesia","country_iso":"ID","unit_name":null,"status":"cancelled","facility_type":"import","floating_type":"fsru","capacity_mtpa":3,"capacity_bcm_y":4.08,"start_year":null,"planned_start_year":null,"original_planned_start_year":null,"fid_year":null,"construction_year":null,"shelved_year":null,"cancelled_year":2021,"stop_year":2021,"estimated_cost_usd":null,"estimated_cost_original":null,"estimated_cost_currency":null,"power_stations_supplied":null,"floating_vessel_name":null,"ccs_project":null,"hydrogen_project":null,"ammonia_project":null,"synthetic_lng_project":null,"retrofit_proposed":null,"url":"https://lngatlas.org/terminal/australasia-probolinggo-fsru-id/","data_source":"Data: Global Gas Infrastructure Tracker, Global Energy Monitor, September 2025"},{"terminal_slug":"australia-pacific-lng-terminal-au","terminal_name":"Australia Pacific LNG Terminal","country":"Australia","country_iso":"AU","unit_name":"T1","status":"operating","facility_type":"export","floating_type":"unknown","capacity_mtpa":4.5,"capacity_bcm_y":6.12,"start_year":2016,"planned_start_year":null,"original_planned_start_year":null,"fid_year":null,"construction_year":null,"shelved_year":null,"cancelled_year":null,"stop_year":null,"estimated_cost_usd":14000000000,"estimated_cost_original":14000000000,"estimated_cost_currency":"USD","power_stations_supplied":null,"floating_vessel_name":null,"ccs_project":null,"hydrogen_project":null,"ammonia_project":null,"synthetic_lng_project":null,"retrofit_proposed":null,"url":"https://lngatlas.org/terminal/australia-pacific-lng-terminal-au/","data_source":"Data: Global Gas Infrastructure Tracker, Global Energy Monitor, September 2025"},{"terminal_slug":"australia-pacific-lng-terminal-au","terminal_name":"Australia Pacific LNG Terminal","country":"Australia","country_iso":"AU","unit_name":"T2","status":"operating","facility_type":"export","floating_type":"unknown","capacity_mtpa":4.5,"capacity_bcm_y":6.12,"start_year":2016,"planned_start_year":null,"original_planned_start_year":null,"fid_year":null,"construction_year":null,"shelved_year":null,"cancelled_year":null,"stop_year":null,"estimated_cost_usd":6000000000,"estimated_cost_original":6000000000,"estimated_cost_currency":"USD","power_stations_supplied":null,"floating_vessel_name":null,"ccs_project":null,"hydrogen_project":null,"ammonia_project":null,"synthetic_lng_project":null,"retrofit_proposed":null,"url":"https://lngatlas.org/terminal/australia-pacific-lng-terminal-au/","data_source":"Data: Global Gas Infrastructure Tracker, Global Energy Monitor, September 2025"},{"terminal_slug":"avocet-flng-terminal-us","terminal_name":"Avocet FLNG Terminal","country":"United States","country_iso":"US","unit_name":null,"status":"cancelled","facility_type":"export","floating_type":"flng","capacity_mtpa":8,"capacity_bcm_y":10.88,"start_year":null,"planned_start_year":null,"original_planned_start_year":null,"fid_year":null,"construction_year":null,"shelved_year":2018,"cancelled_year":2020,"stop_year":2020,"estimated_cost_usd":null,"estimated_cost_original":null,"estimated_cost_currency":null,"power_stations_supplied":null,"floating_vessel_name":null,"ccs_project":null,"hydrogen_project":null,"ammonia_project":null,"synthetic_lng_project":null,"retrofit_proposed":null,"url":"https://lngatlas.org/terminal/avocet-flng-terminal-us/","data_source":"Data: Global Gas Infrastructure Tracker, Global Energy Monitor, September 2025"},{"terminal_slug":"bpcl-mangalore-lng-terminal-in","terminal_name":"BPCL Mangalore LNG Terminal","country":"India","country_iso":"IN","unit_name":null,"status":"cancelled","facility_type":"import","floating_type":"unknown","capacity_mtpa":5,"capacity_bcm_y":6.8,"start_year":null,"planned_start_year":null,"original_planned_start_year":null,"fid_year":null,"construction_year":null,"shelved_year":null,"cancelled_year":2015,"stop_year":2015,"estimated_cost_usd":null,"estimated_cost_original":null,"estimated_cost_currency":null,"power_stations_supplied":null,"floating_vessel_name":null,"ccs_project":null,"hydrogen_project":null,"ammonia_project":null,"synthetic_lng_project":null,"retrofit_proposed":null,"url":"https://lngatlas.org/terminal/bpcl-mangalore-lng-terminal-in/","data_source":"Data: Global Gas Infrastructure Tracker, Global Energy Monitor, September 2025"},{"terminal_slug":"bac-lieu-lng-terminal-vn","terminal_name":"Bac Lieu LNG Terminal","country":"Vietnam","country_iso":"VN","unit_name":null,"status":"proposed","facility_type":"import","floating_type":"unknown","capacity_mtpa":2,"capacity_bcm_y":2.72,"start_year":null,"planned_start_year":2027,"original_planned_start_year":2023,"fid_year":null,"construction_year":2024,"shelved_year":null,"cancelled_year":null,"stop_year":null,"estimated_cost_usd":null,"estimated_cost_original":null,"estimated_cost_currency":null,"power_stations_supplied":"Bac Lieu Project Power Station","floating_vessel_name":null,"ccs_project":null,"hydrogen_project":null,"ammonia_project":null,"synthetic_lng_project":null,"retrofit_proposed":null,"url":"https://lngatlas.org/terminal/bac-lieu-lng-terminal-vn/","data_source":"Data: Global Gas Infrastructure Tracker, Global Energy Monitor, September 2025"},{"terminal_slug":"bahia-blanca-gasport-fsru-ar","terminal_name":"Bahia Blanca GasPort FSRU","country":"Argentina","country_iso":"AR","unit_name":null,"status":"idle","facility_type":"import","floating_type":"fsru","capacity_mtpa":3.8,"capacity_bcm_y":5.17,"start_year":2008,"planned_start_year":null,"original_planned_start_year":null,"fid_year":null,"construction_year":null,"shelved_year":null,"cancelled_year":null,"stop_year":2024,"estimated_cost_usd":null,"estimated_cost_original":null,"estimated_cost_currency":null,"power_stations_supplied":null,"floating_vessel_name":"Excelerate Excelsior","ccs_project":null,"hydrogen_project":null,"ammonia_project":null,"synthetic_lng_project":null,"retrofit_proposed":null,"url":"https://lngatlas.org/terminal/bahia-blanca-gasport-fsru-ar/","data_source":"Data: Global Gas Infrastructure Tracker, Global Energy Monitor, September 2025"},{"terminal_slug":"bahia-fsru-br","terminal_name":"Bahia FSRU","country":"Brazil","country_iso":"BR","unit_name":null,"status":"operating","facility_type":"import","floating_type":"fsru","capacity_mtpa":5.6,"capacity_bcm_y":7.62,"start_year":2014,"planned_start_year":null,"original_planned_start_year":null,"fid_year":null,"construction_year":null,"shelved_year":null,"cancelled_year":null,"stop_year":null,"estimated_cost_usd":null,"estimated_cost_original":null,"estimated_cost_currency":null,"power_stations_supplied":null,"floating_vessel_name":"Excelerate Sequoia","ccs_project":null,"hydrogen_project":null,"ammonia_project":null,"synthetic_lng_project":null,"retrofit_proposed":null,"url":"https://lngatlas.org/terminal/bahia-fsru-br/","data_source":"Data: Global Gas Infrastructure Tracker, Global Energy Monitor, September 2025"},{"terminal_slug":"bahrain-hidd-flng-terminal-bh","terminal_name":"Bahrain Hidd FLNG Terminal","country":"Bahrain","country_iso":"BH","unit_name":null,"status":"operating","facility_type":"import","floating_type":"flng","capacity_mtpa":6,"capacity_bcm_y":8.16,"start_year":2019,"planned_start_year":null,"original_planned_start_year":null,"fid_year":null,"construction_year":2017,"shelved_year":null,"cancelled_year":null,"stop_year":2020,"estimated_cost_usd":991000000,"estimated_cost_original":991000000,"estimated_cost_currency":"USD","power_stations_supplied":null,"floating_vessel_name":null,"ccs_project":null,"hydrogen_project":null,"ammonia_project":null,"synthetic_lng_project":null,"retrofit_proposed":null,"url":"https://lngatlas.org/terminal/bahrain-hidd-flng-terminal-bh/","data_source":"Data: Global Gas Infrastructure Tracker, Global Energy Monitor, September 2025"},{"terminal_slug":"bahia-blanca-flng-terminal-ar","terminal_name":"Bahía Blanca FLNG Terminal","country":"Argentina","country_iso":"AR","unit_name":null,"status":"mothballed","facility_type":"export","floating_type":"flng","capacity_mtpa":0.5,"capacity_bcm_y":0.68,"start_year":2019,"planned_start_year":null,"original_planned_start_year":null,"fid_year":null,"construction_year":null,"shelved_year":null,"cancelled_year":null,"stop_year":2020,"estimated_cost_usd":null,"estimated_cost_original":null,"estimated_cost_currency":null,"power_stations_supplied":null,"floating_vessel_name":"Exmar Tango","ccs_project":null,"hydrogen_project":null,"ammonia_project":null,"synthetic_lng_project":null,"retrofit_proposed":null,"url":"https://lngatlas.org/terminal/bahia-blanca-flng-terminal-ar/","data_source":"Data: Global Gas Infrastructure Tracker, Global Energy Monitor, September 2025"},{"terminal_slug":"ballena-fsru-co","terminal_name":"Ballena FSRU","country":"Colombia","country_iso":"CO","unit_name":null,"status":"proposed","facility_type":"import","floating_type":"fsru","capacity_mtpa":1.99,"capacity_bcm_y":2.71,"start_year":null,"planned_start_year":null,"original_planned_start_year":2027,"fid_year":null,"construction_year":null,"shelved_year":null,"cancelled_year":null,"stop_year":null,"estimated_cost_usd":null,"estimated_cost_original":null,"estimated_cost_currency":null,"power_stations_supplied":null,"floating_vessel_name":null,"ccs_project":null,"hydrogen_project":null,"ammonia_project":null,"synthetic_lng_project":null,"retrofit_proposed":null,"url":"https://lngatlas.org/terminal/ballena-fsru-co/","data_source":"Data: Global Gas Infrastructure Tracker, Global Energy Monitor, September 2025"},{"terminal_slug":"bangka-belitung-pontianak-fsru-id","terminal_name":"Bangka Belitung-Pontianak FSRU","country":"Indonesia","country_iso":"ID","unit_name":null,"status":"cancelled","facility_type":"import","floating_type":"fsru","capacity_mtpa":null,"capacity_bcm_y":null,"start_year":null,"planned_start_year":null,"original_planned_start_year":null,"fid_year":null,"construction_year":null,"shelved_year":2021,"cancelled_year":2023,"stop_year":2023,"estimated_cost_usd":null,"estimated_cost_original":null,"estimated_cost_currency":null,"power_stations_supplied":null,"floating_vessel_name":null,"ccs_project":null,"hydrogen_project":null,"ammonia_project":null,"synthetic_lng_project":null,"retrofit_proposed":null,"url":"https://lngatlas.org/terminal/bangka-belitung-pontianak-fsru-id/","data_source":"Data: Global Gas Infrastructure Tracker, Global Energy Monitor, September 2025"},{"terminal_slug":"bar-lng-terminal-me","terminal_name":"Bar LNG Terminal","country":"Montenegro","country_iso":"ME","unit_name":null,"status":"proposed","facility_type":"import","floating_type":"floating","capacity_mtpa":0.4,"capacity_bcm_y":0.54,"start_year":null,"planned_start_year":null,"original_planned_start_year":2025,"fid_year":2023,"construction_year":null,"shelved_year":null,"cancelled_year":null,"stop_year":null,"estimated_cost_usd":272500000,"estimated_cost_original":250000000,"estimated_cost_currency":"EUR","power_stations_supplied":"Bar gas power station","floating_vessel_name":null,"ccs_project":null,"hydrogen_project":null,"ammonia_project":true,"synthetic_lng_project":null,"retrofit_proposed":null,"url":"https://lngatlas.org/terminal/bar-lng-terminal-me/","data_source":"Data: Global Gas Infrastructure Tracker, Global Energy Monitor, September 2025"},{"terminal_slug":"barca-lng-terminal-us","terminal_name":"Barca LNG Terminal","country":"United States","country_iso":"US","unit_name":null,"status":"cancelled","facility_type":"export","floating_type":"unknown","capacity_mtpa":12.26,"capacity_bcm_y":16.68,"start_year":null,"planned_start_year":null,"original_planned_start_year":null,"fid_year":null,"construction_year":null,"shelved_year":2015,"cancelled_year":2017,"stop_year":2017,"estimated_cost_usd":null,"estimated_cost_original":null,"estimated_cost_currency":null,"power_stations_supplied":null,"floating_vessel_name":null,"ccs_project":null,"hydrogen_project":null,"ammonia_project":null,"synthetic_lng_project":null,"retrofit_proposed":null,"url":"https://lngatlas.org/terminal/barca-lng-terminal-us/","data_source":"Data: Global Gas Infrastructure Tracker, Global Energy Monitor, September 2025"},{"terminal_slug":"barcelona-lng-terminal-es","terminal_name":"Barcelona LNG Terminal","country":"Spain","country_iso":"ES","unit_name":null,"status":"operating","facility_type":"import","floating_type":"unknown","capacity_mtpa":12.6,"capacity_bcm_y":17.14,"start_year":1969,"planned_start_year":null,"original_planned_start_year":null,"fid_year":null,"construction_year":null,"shelved_year":null,"cancelled_year":null,"stop_year":null,"estimated_cost_usd":null,"estimated_cost_original":null,"estimated_cost_currency":null,"power_stations_supplied":null,"floating_vessel_name":null,"ccs_project":null,"hydrogen_project":null,"ammonia_project":null,"synthetic_lng_project":null,"retrofit_proposed":null,"url":"https://lngatlas.org/terminal/barcelona-lng-terminal-es/","data_source":"Data: Global Gas Infrastructure Tracker, Global Energy Monitor, September 2025"},{"terminal_slug":"bataan-manila-lng-terminal-ph","terminal_name":"Bataan-Manila LNG Terminal","country":"Philippines","country_iso":"PH","unit_name":null,"status":"cancelled","facility_type":"import","floating_type":"unknown","capacity_mtpa":null,"capacity_bcm_y":null,"start_year":null,"planned_start_year":null,"original_planned_start_year":2020,"fid_year":null,"construction_year":null,"shelved_year":2018,"cancelled_year":2020,"stop_year":2020,"estimated_cost_usd":2400000000,"estimated_cost_original":2400000000,"estimated_cost_currency":"USD","power_stations_supplied":null,"floating_vessel_name":null,"ccs_project":null,"hydrogen_project":null,"ammonia_project":null,"synthetic_lng_project":null,"retrofit_proposed":null,"url":"https://lngatlas.org/terminal/bataan-manila-lng-terminal-ph/","data_source":"Data: Global Gas Infrastructure Tracker, Global Energy Monitor, September 2025"},{"terminal_slug":"batam-lng-terminal-id","terminal_name":"Batam LNG Terminal","country":"Indonesia","country_iso":"ID","unit_name":null,"status":"cancelled","facility_type":"import","floating_type":"unknown","capacity_mtpa":1,"capacity_bcm_y":1.36,"start_year":null,"planned_start_year":null,"original_planned_start_year":2022,"fid_year":null,"construction_year":null,"shelved_year":2020,"cancelled_year":2022,"stop_year":2022,"estimated_cost_usd":null,"estimated_cost_original":null,"estimated_cost_currency":null,"power_stations_supplied":null,"floating_vessel_name":null,"ccs_project":null,"hydrogen_project":null,"ammonia_project":null,"synthetic_lng_project":null,"retrofit_proposed":null,"url":"https://lngatlas.org/terminal/batam-lng-terminal-id/","data_source":"Data: Global Gas Infrastructure Tracker, Global Energy Monitor, September 2025"},{"terminal_slug":"batangas-clean-energy-lng-terminal-ph","terminal_name":"Batangas Clean Energy LNG Terminal","country":"Philippines","country_iso":"PH","unit_name":null,"status":"proposed","facility_type":"import","floating_type":"unknown","capacity_mtpa":3,"capacity_bcm_y":4.08,"start_year":null,"planned_start_year":2027,"original_planned_start_year":2025,"fid_year":null,"construction_year":null,"shelved_year":null,"cancelled_year":null,"stop_year":null,"estimated_cost_usd":1485000000,"estimated_cost_original":82500000000,"estimated_cost_currency":"PHP","power_stations_supplied":"Batangas Clean Energy power station","floating_vessel_name":null,"ccs_project":null,"hydrogen_project":null,"ammonia_project":null,"synthetic_lng_project":null,"retrofit_proposed":null,"url":"https://lngatlas.org/terminal/batangas-clean-energy-lng-terminal-ph/","data_source":"Data: Global Gas Infrastructure Tracker, Global Energy Monitor, September 2025"},{"terminal_slug":"battery-rock-lng-terminal-us","terminal_name":"Battery Rock LNG Terminal","country":"United States","country_iso":"US","unit_name":null,"status":"cancelled","facility_type":"import","floating_type":"unknown","capacity_mtpa":6.4,"capacity_bcm_y":8.71,"start_year":null,"planned_start_year":null,"original_planned_start_year":null,"fid_year":null,"construction_year":null,"shelved_year":null,"cancelled_year":2007,"stop_year":2007,"estimated_cost_usd":null,"estimated_cost_original":null,"estimated_cost_currency":null,"power_stations_supplied":null,"floating_vessel_name":null,"ccs_project":null,"hydrogen_project":null,"ammonia_project":null,"synthetic_lng_project":null,"retrofit_proposed":null,"url":"https://lngatlas.org/terminal/battery-rock-lng-terminal-us/","data_source":"Data: Global Gas Infrastructure Tracker, Global Energy Monitor, September 2025"},{"terminal_slug":"bay-crossing-lng-terminal-us","terminal_name":"Bay Crossing LNG Terminal","country":"United States","country_iso":"US","unit_name":null,"status":"cancelled","facility_type":"import","floating_type":"unknown","capacity_mtpa":9.6,"capacity_bcm_y":13.06,"start_year":null,"planned_start_year":null,"original_planned_start_year":null,"fid_year":null,"construction_year":null,"shelved_year":2006,"cancelled_year":2008,"stop_year":2008,"estimated_cost_usd":null,"estimated_cost_original":null,"estimated_cost_currency":null,"power_stations_supplied":null,"floating_vessel_name":null,"ccs_project":null,"hydrogen_project":null,"ammonia_project":null,"synthetic_lng_project":null,"retrofit_proposed":null,"url":"https://lngatlas.org/terminal/bay-crossing-lng-terminal-us/","data_source":"Data: Global Gas Infrastructure Tracker, Global Energy Monitor, September 2025"},{"terminal_slug":"beacon-port-lng-terminal-us","terminal_name":"Beacon Port LNG Terminal","country":"United States","country_iso":"US","unit_name":null,"status":"cancelled","facility_type":"import","floating_type":"unknown","capacity_mtpa":11.5,"capacity_bcm_y":15.65,"start_year":null,"planned_start_year":null,"original_planned_start_year":null,"fid_year":null,"construction_year":null,"shelved_year":null,"cancelled_year":2006,"stop_year":2006,"estimated_cost_usd":null,"estimated_cost_original":null,"estimated_cost_currency":null,"power_stations_supplied":null,"floating_vessel_name":null,"ccs_project":null,"hydrogen_project":null,"ammonia_project":null,"synthetic_lng_project":null,"retrofit_proposed":null,"url":"https://lngatlas.org/terminal/beacon-port-lng-terminal-us/","data_source":"Data: Global Gas Infrastructure Tracker, Global Energy Monitor, September 2025"},{"terminal_slug":"bear-head-lng-terminal-ca","terminal_name":"Bear Head LNG Terminal","country":"Canada","country_iso":"CA","unit_name":"T1-T4","status":"cancelled","facility_type":"export","floating_type":"unknown","capacity_mtpa":12,"capacity_bcm_y":16.33,"start_year":null,"planned_start_year":null,"original_planned_start_year":2027,"fid_year":null,"construction_year":null,"shelved_year":null,"cancelled_year":2023,"stop_year":2023,"estimated_cost_usd":null,"estimated_cost_original":null,"estimated_cost_currency":null,"power_stations_supplied":null,"floating_vessel_name":null,"ccs_project":null,"hydrogen_project":true,"ammonia_project":true,"synthetic_lng_project":null,"retrofit_proposed":null,"url":"https://lngatlas.org/terminal/bear-head-lng-terminal-ca/","data_source":"Data: Global Gas Infrastructure Tracker, Global Energy Monitor, September 2025"},{"terminal_slug":"beddawi-fsru-lb","terminal_name":"Beddawi FSRU","country":"Lebanon","country_iso":"LB","unit_name":null,"status":"cancelled","facility_type":"import","floating_type":"fsru","capacity_mtpa":3.5,"capacity_bcm_y":4.76,"start_year":null,"planned_start_year":null,"original_planned_start_year":null,"fid_year":null,"construction_year":null,"shelved_year":2022,"cancelled_year":2024,"stop_year":2024,"estimated_cost_usd":null,"estimated_cost_original":null,"estimated_cost_currency":null,"power_stations_supplied":null,"floating_vessel_name":null,"ccs_project":null,"hydrogen_project":null,"ammonia_project":null,"synthetic_lng_project":null,"retrofit_proposed":null,"url":"https://lngatlas.org/terminal/beddawi-fsru-lb/","data_source":"Data: Global Gas Infrastructure Tracker, Global Energy Monitor, September 2025"},{"terminal_slug":"beihai-lng-terminal-petrochina-cn","terminal_name":"Beihai LNG Terminal (PetroChina)","country":"China","country_iso":"CN","unit_name":null,"status":"cancelled","facility_type":"import","floating_type":"unknown","capacity_mtpa":null,"capacity_bcm_y":null,"start_year":null,"planned_start_year":null,"original_planned_start_year":null,"fid_year":null,"construction_year":null,"shelved_year":2021,"cancelled_year":null,"stop_year":null,"estimated_cost_usd":null,"estimated_cost_original":null,"estimated_cost_currency":null,"power_stations_supplied":null,"floating_vessel_name":null,"ccs_project":null,"hydrogen_project":null,"ammonia_project":null,"synthetic_lng_project":null,"retrofit_proposed":null,"url":"https://lngatlas.org/terminal/beihai-lng-terminal-petrochina-cn/","data_source":"Data: Global Gas Infrastructure Tracker, Global Energy Monitor, September 2025"},{"terminal_slug":"ben-tre-fsru-vn","terminal_name":"Ben Tre FSRU","country":"Vietnam","country_iso":"VN","unit_name":null,"status":"cancelled","facility_type":"import","floating_type":"fsru","capacity_mtpa":null,"capacity_bcm_y":null,"start_year":null,"planned_start_year":null,"original_planned_start_year":null,"fid_year":null,"construction_year":null,"shelved_year":2023,"cancelled_year":2025,"stop_year":2025,"estimated_cost_usd":null,"estimated_cost_original":null,"estimated_cost_currency":null,"power_stations_supplied":"Ben Tre power project","floating_vessel_name":null,"ccs_project":null,"hydrogen_project":null,"ammonia_project":null,"synthetic_lng_project":null,"retrofit_proposed":null,"url":"https://lngatlas.org/terminal/ben-tre-fsru-vn/","data_source":"Data: Global Gas Infrastructure Tracker, Global Energy Monitor, September 2025"},{"terminal_slug":"benin-fsru-bj","terminal_name":"Benin FSRU","country":"Benin","country_iso":"BJ","unit_name":null,"status":"cancelled","facility_type":"import","floating_type":"fsru","capacity_mtpa":0.5,"capacity_bcm_y":0.68,"start_year":null,"planned_start_year":null,"original_planned_start_year":2021,"fid_year":null,"construction_year":null,"shelved_year":2021,"cancelled_year":2024,"stop_year":2024,"estimated_cost_usd":null,"estimated_cost_original":null,"estimated_cost_currency":null,"power_stations_supplied":null,"floating_vessel_name":null,"ccs_project":null,"hydrogen_project":null,"ammonia_project":null,"synthetic_lng_project":null,"retrofit_proposed":null,"url":"https://lngatlas.org/terminal/benin-fsru-bj/","data_source":"Data: Global Gas Infrastructure Tracker, Global Energy Monitor, September 2025"},{"terminal_slug":"bienville-fsru-us","terminal_name":"Bienville FSRU","country":"United States","country_iso":"US","unit_name":null,"status":"cancelled","facility_type":"import","floating_type":"fsru","capacity_mtpa":10.7,"capacity_bcm_y":14.56,"start_year":null,"planned_start_year":null,"original_planned_start_year":null,"fid_year":null,"construction_year":null,"shelved_year":null,"cancelled_year":2010,"stop_year":2010,"estimated_cost_usd":null,"estimated_cost_original":null,"estimated_cost_currency":null,"power_stations_supplied":null,"floating_vessel_name":null,"ccs_project":null,"hydrogen_project":null,"ammonia_project":null,"synthetic_lng_project":null,"retrofit_proposed":null,"url":"https://lngatlas.org/terminal/bienville-fsru-us/","data_source":"Data: Global Gas Infrastructure Tracker, Global Energy Monitor, September 2025"},{"terminal_slug":"bilbao-lng-terminal-es","terminal_name":"Bilbao LNG Terminal","country":"Spain","country_iso":"ES","unit_name":null,"status":"operating","facility_type":"import","floating_type":"unknown","capacity_mtpa":5.1,"capacity_bcm_y":6.94,"start_year":2003,"planned_start_year":null,"original_planned_start_year":null,"fid_year":null,"construction_year":null,"shelved_year":null,"cancelled_year":null,"stop_year":null,"estimated_cost_usd":null,"estimated_cost_original":null,"estimated_cost_currency":null,"power_stations_supplied":null,"floating_vessel_name":null,"ccs_project":null,"hydrogen_project":null,"ammonia_project":null,"synthetic_lng_project":null,"retrofit_proposed":null,"url":"https://lngatlas.org/terminal/bilbao-lng-terminal-es/","data_source":"Data: Global Gas Infrastructure Tracker, Global Energy Monitor, September 2025"},{"terminal_slug":"binzhou-changlian-lng-terminal-cn","terminal_name":"Binzhou Changlian LNG Terminal","country":"China","country_iso":"CN","unit_name":null,"status":"cancelled","facility_type":"import","floating_type":"unknown","capacity_mtpa":2,"capacity_bcm_y":2.72,"start_year":null,"planned_start_year":null,"original_planned_start_year":null,"fid_year":null,"construction_year":null,"shelved_year":2018,"cancelled_year":2020,"stop_year":2020,"estimated_cost_usd":720000000,"estimated_cost_original":4500000000,"estimated_cost_currency":"RMB","power_stations_supplied":null,"floating_vessel_name":null,"ccs_project":null,"hydrogen_project":null,"ammonia_project":null,"synthetic_lng_project":null,"retrofit_proposed":null,"url":"https://lngatlas.org/terminal/binzhou-changlian-lng-terminal-cn/","data_source":"Data: Global Gas Infrastructure Tracker, Global Energy Monitor, September 2025"},{"terminal_slug":"birallah-lng-hub-mr","terminal_name":"BirAllah LNG Hub","country":"Mauritania","country_iso":"MR","unit_name":null,"status":"proposed","facility_type":"export","floating_type":"unknown","capacity_mtpa":10,"capacity_bcm_y":13.61,"start_year":null,"planned_start_year":null,"original_planned_start_year":2030,"fid_year":2025,"construction_year":null,"shelved_year":null,"cancelled_year":null,"stop_year":null,"estimated_cost_usd":null,"estimated_cost_original":null,"estimated_cost_currency":null,"power_stations_supplied":null,"floating_vessel_name":null,"ccs_project":null,"hydrogen_project":null,"ammonia_project":null,"synthetic_lng_project":null,"retrofit_proposed":null,"url":"https://lngatlas.org/terminal/birallah-lng-hub-mr/","data_source":"Data: Global Gas Infrastructure Tracker, Global Energy Monitor, September 2025"},{"terminal_slug":"black-sea-lng-terminal-ro","terminal_name":"Black Sea LNG Terminal","country":"Romania","country_iso":"RO","unit_name":"Export Facility","status":"proposed","facility_type":"export","floating_type":"unknown","capacity_mtpa":null,"capacity_bcm_y":null,"start_year":null,"planned_start_year":null,"original_planned_start_year":null,"fid_year":null,"construction_year":null,"shelved_year":null,"cancelled_year":null,"stop_year":null,"estimated_cost_usd":null,"estimated_cost_original":null,"estimated_cost_currency":null,"power_stations_supplied":null,"floating_vessel_name":null,"ccs_project":null,"hydrogen_project":null,"ammonia_project":null,"synthetic_lng_project":null,"retrofit_proposed":null,"url":"https://lngatlas.org/terminal/black-sea-lng-terminal-ro/","data_source":"Data: Global Gas Infrastructure Tracker, Global Energy Monitor, September 2025"},{"terminal_slug":"black-sea-lng-terminal-ro","terminal_name":"Black Sea LNG Terminal","country":"Romania","country_iso":"RO","unit_name":"Import Facility","status":"proposed","facility_type":"import","floating_type":"unknown","capacity_mtpa":null,"capacity_bcm_y":null,"start_year":null,"planned_start_year":null,"original_planned_start_year":null,"fid_year":null,"construction_year":null,"shelved_year":null,"cancelled_year":null,"stop_year":null,"estimated_cost_usd":null,"estimated_cost_original":null,"estimated_cost_currency":null,"power_stations_supplied":null,"floating_vessel_name":null,"ccs_project":null,"hydrogen_project":null,"ammonia_project":null,"synthetic_lng_project":null,"retrofit_proposed":null,"url":"https://lngatlas.org/terminal/black-sea-lng-terminal-ro/","data_source":"Data: Global Gas Infrastructure Tracker, Global Energy Monitor, September 2025"},{"terminal_slug":"bojonegara-lng-terminal-id","terminal_name":"Bojonegara LNG Terminal","country":"Indonesia","country_iso":"ID","unit_name":null,"status":"cancelled","facility_type":"import","floating_type":"unknown","capacity_mtpa":7,"capacity_bcm_y":9.52,"start_year":null,"planned_start_year":null,"original_planned_start_year":null,"fid_year":null,"construction_year":null,"shelved_year":null,"cancelled_year":2018,"stop_year":2018,"estimated_cost_usd":null,"estimated_cost_original":null,"estimated_cost_currency":null,"power_stations_supplied":null,"floating_vessel_name":null,"ccs_project":null,"hydrogen_project":null,"ammonia_project":null,"synthetic_lng_project":null,"retrofit_proposed":null,"url":"https://lngatlas.org/terminal/bojonegara-lng-terminal-id/","data_source":"Data: Global Gas Infrastructure Tracker, Global Energy Monitor, September 2025"},{"terminal_slug":"bonaparte-flng-terminal-au","terminal_name":"Bonaparte FLNG Terminal","country":"Australia","country_iso":"AU","unit_name":null,"status":"cancelled","facility_type":"export","floating_type":"flng","capacity_mtpa":2,"capacity_bcm_y":2.72,"start_year":null,"planned_start_year":null,"original_planned_start_year":null,"fid_year":null,"construction_year":null,"shelved_year":2016,"cancelled_year":2018,"stop_year":2024,"estimated_cost_usd":null,"estimated_cost_original":null,"estimated_cost_currency":null,"power_stations_supplied":null,"floating_vessel_name":null,"ccs_project":null,"hydrogen_project":null,"ammonia_project":null,"synthetic_lng_project":null,"retrofit_proposed":null,"url":"https://lngatlas.org/terminal/bonaparte-flng-terminal-au/","data_source":"Data: Global Gas Infrastructure Tracker, Global Energy Monitor, September 2025"},{"terminal_slug":"bontang-lng-terminal-id","terminal_name":"Bontang LNG Terminal","country":"Indonesia","country_iso":"ID","unit_name":"A","status":"retired","facility_type":"export","floating_type":"unknown","capacity_mtpa":2.7,"capacity_bcm_y":3.67,"start_year":1977,"planned_start_year":null,"original_planned_start_year":null,"fid_year":null,"construction_year":null,"shelved_year":null,"cancelled_year":null,"stop_year":null,"estimated_cost_usd":null,"estimated_cost_original":null,"estimated_cost_currency":null,"power_stations_supplied":null,"floating_vessel_name":null,"ccs_project":null,"hydrogen_project":null,"ammonia_project":null,"synthetic_lng_project":null,"retrofit_proposed":null,"url":"https://lngatlas.org/terminal/bontang-lng-terminal-id/","data_source":"Data: Global Gas Infrastructure Tracker, Global Energy Monitor, September 2025"},{"terminal_slug":"bontang-lng-terminal-id","terminal_name":"Bontang LNG Terminal","country":"Indonesia","country_iso":"ID","unit_name":"B","status":"retired","facility_type":"export","floating_type":"unknown","capacity_mtpa":2.7,"capacity_bcm_y":3.67,"start_year":1977,"planned_start_year":null,"original_planned_start_year":null,"fid_year":null,"construction_year":null,"shelved_year":null,"cancelled_year":null,"stop_year":null,"estimated_cost_usd":null,"estimated_cost_original":null,"estimated_cost_currency":null,"power_stations_supplied":null,"floating_vessel_name":null,"ccs_project":null,"hydrogen_project":null,"ammonia_project":null,"synthetic_lng_project":null,"retrofit_proposed":null,"url":"https://lngatlas.org/terminal/bontang-lng-terminal-id/","data_source":"Data: Global Gas Infrastructure Tracker, Global Energy Monitor, September 2025"},{"terminal_slug":"bontang-lng-terminal-id","terminal_name":"Bontang LNG Terminal","country":"Indonesia","country_iso":"ID","unit_name":"C","status":"retired","facility_type":"export","floating_type":"unknown","capacity_mtpa":2.7,"capacity_bcm_y":3.67,"start_year":1980,"planned_start_year":null,"original_planned_start_year":null,"fid_year":null,"construction_year":null,"shelved_year":null,"cancelled_year":null,"stop_year":null,"estimated_cost_usd":null,"estimated_cost_original":null,"estimated_cost_currency":null,"power_stations_supplied":null,"floating_vessel_name":null,"ccs_project":null,"hydrogen_project":null,"ammonia_project":null,"synthetic_lng_project":null,"retrofit_proposed":null,"url":"https://lngatlas.org/terminal/bontang-lng-terminal-id/","data_source":"Data: Global Gas Infrastructure Tracker, Global Energy Monitor, September 2025"},{"terminal_slug":"bontang-lng-terminal-id","terminal_name":"Bontang LNG Terminal","country":"Indonesia","country_iso":"ID","unit_name":"D","status":"retired","facility_type":"export","floating_type":"unknown","capacity_mtpa":2.7,"capacity_bcm_y":3.67,"start_year":1980,"planned_start_year":null,"original_planned_start_year":null,"fid_year":null,"construction_year":null,"shelved_year":null,"cancelled_year":null,"stop_year":null,"estimated_cost_usd":null,"estimated_cost_original":null,"estimated_cost_currency":null,"power_stations_supplied":null,"floating_vessel_name":null,"ccs_project":null,"hydrogen_project":null,"ammonia_project":null,"synthetic_lng_project":null,"retrofit_proposed":null,"url":"https://lngatlas.org/terminal/bontang-lng-terminal-id/","data_source":"Data: Global Gas Infrastructure Tracker, Global Energy Monitor, September 2025"},{"terminal_slug":"bontang-lng-terminal-id","terminal_name":"Bontang LNG Terminal","country":"Indonesia","country_iso":"ID","unit_name":"E","status":"idle","facility_type":"export","floating_type":"unknown","capacity_mtpa":2.8,"capacity_bcm_y":3.81,"start_year":1990,"planned_start_year":null,"original_planned_start_year":null,"fid_year":null,"construction_year":null,"shelved_year":null,"cancelled_year":null,"stop_year":null,"estimated_cost_usd":null,"estimated_cost_original":null,"estimated_cost_currency":null,"power_stations_supplied":null,"floating_vessel_name":null,"ccs_project":null,"hydrogen_project":null,"ammonia_project":null,"synthetic_lng_project":null,"retrofit_proposed":null,"url":"https://lngatlas.org/terminal/bontang-lng-terminal-id/","data_source":"Data: Global Gas Infrastructure Tracker, Global Energy Monitor, September 2025"},{"terminal_slug":"bontang-lng-terminal-id","terminal_name":"Bontang LNG Terminal","country":"Indonesia","country_iso":"ID","unit_name":"F","status":"idle","facility_type":"export","floating_type":"unknown","capacity_mtpa":2.8,"capacity_bcm_y":3.81,"start_year":1994,"planned_start_year":null,"original_planned_start_year":null,"fid_year":null,"construction_year":null,"shelved_year":null,"cancelled_year":null,"stop_year":null,"estimated_cost_usd":null,"estimated_cost_original":null,"estimated_cost_currency":null,"power_stations_supplied":null,"floating_vessel_name":null,"ccs_project":null,"hydrogen_project":null,"ammonia_project":null,"synthetic_lng_project":null,"retrofit_proposed":null,"url":"https://lngatlas.org/terminal/bontang-lng-terminal-id/","data_source":"Data: Global Gas Infrastructure Tracker, Global Energy Monitor, September 2025"},{"terminal_slug":"bontang-lng-terminal-id","terminal_name":"Bontang LNG Terminal","country":"Indonesia","country_iso":"ID","unit_name":"G","status":"operating","facility_type":"export","floating_type":"unknown","capacity_mtpa":2.8,"capacity_bcm_y":3.81,"start_year":1998,"planned_start_year":null,"original_planned_start_year":null,"fid_year":null,"construction_year":null,"shelved_year":null,"cancelled_year":null,"stop_year":null,"estimated_cost_usd":null,"estimated_cost_original":null,"estimated_cost_currency":null,"power_stations_supplied":null,"floating_vessel_name":null,"ccs_project":null,"hydrogen_project":null,"ammonia_project":null,"synthetic_lng_project":null,"retrofit_proposed":null,"url":"https://lngatlas.org/terminal/bontang-lng-terminal-id/","data_source":"Data: Global Gas Infrastructure Tracker, Global Energy Monitor, September 2025"},{"terminal_slug":"bontang-lng-terminal-id","terminal_name":"Bontang LNG Terminal","country":"Indonesia","country_iso":"ID","unit_name":"H","status":"operating","facility_type":"export","floating_type":"unknown","capacity_mtpa":2.95,"capacity_bcm_y":4.01,"start_year":1998,"planned_start_year":null,"original_planned_start_year":null,"fid_year":null,"construction_year":null,"shelved_year":null,"cancelled_year":null,"stop_year":null,"estimated_cost_usd":null,"estimated_cost_original":null,"estimated_cost_currency":null,"power_stations_supplied":null,"floating_vessel_name":null,"ccs_project":null,"hydrogen_project":null,"ammonia_project":null,"synthetic_lng_project":null,"retrofit_proposed":null,"url":"https://lngatlas.org/terminal/bontang-lng-terminal-id/","data_source":"Data: Global Gas Infrastructure Tracker, Global Energy Monitor, September 2025"},{"terminal_slug":"bontang-lng-terminal-id","terminal_name":"Bontang LNG Terminal","country":"Indonesia","country_iso":"ID","unit_name":"I","status":"cancelled","facility_type":"export","floating_type":"unknown","capacity_mtpa":2.95,"capacity_bcm_y":4.01,"start_year":null,"planned_start_year":null,"original_planned_start_year":2004,"fid_year":null,"construction_year":null,"shelved_year":2007,"cancelled_year":2009,"stop_year":2009,"estimated_cost_usd":null,"estimated_cost_original":null,"estimated_cost_currency":null,"power_stations_supplied":null,"floating_vessel_name":null,"ccs_project":null,"hydrogen_project":null,"ammonia_project":null,"synthetic_lng_project":null,"retrofit_proposed":null,"url":"https://lngatlas.org/terminal/bontang-lng-terminal-id/","data_source":"Data: Global Gas Infrastructure Tracker, Global Energy Monitor, September 2025"},{"terminal_slug":"boryeong-lng-terminal-kr","terminal_name":"Boryeong LNG Terminal","country":"South Korea","country_iso":"KR","unit_name":null,"status":"operating","facility_type":"import","floating_type":"unknown","capacity_mtpa":10.8,"capacity_bcm_y":14.69,"start_year":2016,"planned_start_year":null,"original_planned_start_year":null,"fid_year":null,"construction_year":null,"shelved_year":null,"cancelled_year":null,"stop_year":null,"estimated_cost_usd":607200000,"estimated_cost_original":759000000000,"estimated_cost_currency":"KRW","power_stations_supplied":null,"floating_vessel_name":null,"ccs_project":null,"hydrogen_project":null,"ammonia_project":null,"synthetic_lng_project":null,"retrofit_proposed":null,"url":"https://lngatlas.org/terminal/boryeong-lng-terminal-kr/","data_source":"Data: Global Gas Infrastructure Tracker, Global Energy Monitor, September 2025"},{"terminal_slug":"botswana-lng-terminal-bw","terminal_name":"Botswana LNG Terminal","country":"Botswana","country_iso":"BW","unit_name":"Phase 1","status":"proposed","facility_type":"export","floating_type":"unknown","capacity_mtpa":0.07,"capacity_bcm_y":0.1,"start_year":null,"planned_start_year":null,"original_planned_start_year":2026,"fid_year":null,"construction_year":null,"shelved_year":null,"cancelled_year":null,"stop_year":null,"estimated_cost_usd":null,"estimated_cost_original":null,"estimated_cost_currency":null,"power_stations_supplied":null,"floating_vessel_name":null,"ccs_project":null,"hydrogen_project":null,"ammonia_project":null,"synthetic_lng_project":null,"retrofit_proposed":null,"url":"https://lngatlas.org/terminal/botswana-lng-terminal-bw/","data_source":"Data: Global Gas Infrastructure Tracker, Global Energy Monitor, September 2025"},{"terminal_slug":"botswana-lng-terminal-bw","terminal_name":"Botswana LNG Terminal","country":"Botswana","country_iso":"BW","unit_name":"Phase 2","status":"proposed","facility_type":"export","floating_type":"unknown","capacity_mtpa":0.29,"capacity_bcm_y":0.39,"start_year":null,"planned_start_year":null,"original_planned_start_year":2028,"fid_year":null,"construction_year":null,"shelved_year":null,"cancelled_year":null,"stop_year":null,"estimated_cost_usd":null,"estimated_cost_original":null,"estimated_cost_currency":null,"power_stations_supplied":null,"floating_vessel_name":null,"ccs_project":null,"hydrogen_project":null,"ammonia_project":null,"synthetic_lng_project":null,"retrofit_proposed":null,"url":"https://lngatlas.org/terminal/botswana-lng-terminal-bw/","data_source":"Data: Global Gas Infrastructure Tracker, Global Energy Monitor, September 2025"},{"terminal_slug":"botum-sakor-lng-terminal-kh","terminal_name":"Botum Sakor LNG Terminal","country":"Cambodia","country_iso":"KH","unit_name":null,"status":"proposed","facility_type":"import","floating_type":"unknown","capacity_mtpa":1.1,"capacity_bcm_y":1.5,"start_year":null,"planned_start_year":null,"original_planned_start_year":null,"fid_year":null,"construction_year":null,"shelved_year":null,"cancelled_year":null,"stop_year":null,"estimated_cost_usd":1342000000,"estimated_cost_original":1342000000,"estimated_cost_currency":"USD","power_stations_supplied":"Botum Sakor power station","floating_vessel_name":null,"ccs_project":null,"hydrogen_project":null,"ammonia_project":null,"synthetic_lng_project":null,"retrofit_proposed":null,"url":"https://lngatlas.org/terminal/botum-sakor-lng-terminal-kh/","data_source":"Data: Global Gas Infrastructure Tracker, Global Energy Monitor, September 2025"},{"terminal_slug":"boudji-flng-terminal-ga","terminal_name":"Boudji FLNG Terminal","country":"Gabon","country_iso":"GA","unit_name":null,"status":"cancelled","facility_type":"export","floating_type":"flng","capacity_mtpa":null,"capacity_bcm_y":null,"start_year":null,"planned_start_year":null,"original_planned_start_year":null,"fid_year":null,"construction_year":null,"shelved_year":2022,"cancelled_year":2024,"stop_year":2024,"estimated_cost_usd":null,"estimated_cost_original":null,"estimated_cost_currency":null,"power_stations_supplied":null,"floating_vessel_name":null,"ccs_project":null,"hydrogen_project":null,"ammonia_project":null,"synthetic_lng_project":null,"retrofit_proposed":null,"url":"https://lngatlas.org/terminal/boudji-flng-terminal-ga/","data_source":"Data: Global Gas Infrastructure Tracker, Global Energy Monitor, September 2025"},{"terminal_slug":"bradwood-landing-lng-terminal-us","terminal_name":"Bradwood Landing LNG Terminal","country":"United States","country_iso":"US","unit_name":null,"status":"cancelled","facility_type":"import","floating_type":"unknown","capacity_mtpa":null,"capacity_bcm_y":null,"start_year":null,"planned_start_year":null,"original_planned_start_year":null,"fid_year":null,"construction_year":null,"shelved_year":null,"cancelled_year":2010,"stop_year":2010,"estimated_cost_usd":null,"estimated_cost_original":null,"estimated_cost_currency":null,"power_stations_supplied":null,"floating_vessel_name":null,"ccs_project":null,"hydrogen_project":null,"ammonia_project":null,"synthetic_lng_project":null,"retrofit_proposed":null,"url":"https://lngatlas.org/terminal/bradwood-landing-lng-terminal-us/","data_source":"Data: Global Gas Infrastructure Tracker, Global Energy Monitor, September 2025"},{"terminal_slug":"brass-lng-terminal-ng","terminal_name":"Brass LNG Terminal","country":"Nigeria","country_iso":"NG","unit_name":"T1","status":"shelved","facility_type":"export","floating_type":"unknown","capacity_mtpa":5,"capacity_bcm_y":6.8,"start_year":null,"planned_start_year":null,"original_planned_start_year":null,"fid_year":null,"construction_year":null,"shelved_year":2019,"cancelled_year":null,"stop_year":null,"estimated_cost_usd":null,"estimated_cost_original":null,"estimated_cost_currency":null,"power_stations_supplied":null,"floating_vessel_name":null,"ccs_project":null,"hydrogen_project":null,"ammonia_project":null,"synthetic_lng_project":null,"retrofit_proposed":null,"url":"https://lngatlas.org/terminal/brass-lng-terminal-ng/","data_source":"Data: Global Gas Infrastructure Tracker, Global Energy Monitor, September 2025"},{"terminal_slug":"brass-lng-terminal-ng","terminal_name":"Brass LNG Terminal","country":"Nigeria","country_iso":"NG","unit_name":"T2","status":"shelved","facility_type":"export","floating_type":"unknown","capacity_mtpa":5,"capacity_bcm_y":6.8,"start_year":null,"planned_start_year":null,"original_planned_start_year":null,"fid_year":null,"construction_year":null,"shelved_year":2019,"cancelled_year":null,"stop_year":null,"estimated_cost_usd":null,"estimated_cost_original":null,"estimated_cost_currency":null,"power_stations_supplied":null,"floating_vessel_name":null,"ccs_project":null,"hydrogen_project":null,"ammonia_project":null,"synthetic_lng_project":null,"retrofit_proposed":null,"url":"https://lngatlas.org/terminal/brass-lng-terminal-ng/","data_source":"Data: Global Gas Infrastructure Tracker, Global Energy Monitor, September 2025"},{"terminal_slug":"brindisi-lng-terminal-it","terminal_name":"Brindisi LNG Terminal","country":"Italy","country_iso":"IT","unit_name":null,"status":"cancelled","facility_type":"import","floating_type":"unknown","capacity_mtpa":6,"capacity_bcm_y":8.16,"start_year":null,"planned_start_year":null,"original_planned_start_year":null,"fid_year":null,"construction_year":null,"shelved_year":2012,"cancelled_year":2014,"stop_year":2014,"estimated_cost_usd":null,"estimated_cost_original":null,"estimated_cost_currency":null,"power_stations_supplied":null,"floating_vessel_name":null,"ccs_project":null,"hydrogen_project":null,"ammonia_project":null,"synthetic_lng_project":null,"retrofit_proposed":null,"url":"https://lngatlas.org/terminal/brindisi-lng-terminal-it/","data_source":"Data: Global Gas Infrastructure Tracker, Global Energy Monitor, September 2025"},{"terminal_slug":"broadwater-fsru-us","terminal_name":"Broadwater FSRU","country":"United States","country_iso":"US","unit_name":null,"status":"cancelled","facility_type":"import","floating_type":"fsru","capacity_mtpa":8,"capacity_bcm_y":10.88,"start_year":null,"planned_start_year":null,"original_planned_start_year":null,"fid_year":null,"construction_year":null,"shelved_year":null,"cancelled_year":2008,"stop_year":2008,"estimated_cost_usd":null,"estimated_cost_original":null,"estimated_cost_currency":null,"power_stations_supplied":null,"floating_vessel_name":null,"ccs_project":null,"hydrogen_project":null,"ammonia_project":null,"synthetic_lng_project":null,"retrofit_proposed":null,"url":"https://lngatlas.org/terminal/broadwater-fsru-us/","data_source":"Data: Global Gas Infrastructure Tracker, Global Energy Monitor, September 2025"},{"terminal_slug":"browse-flng-terminal-au","terminal_name":"Browse FLNG Terminal","country":"Australia","country_iso":"AU","unit_name":"T1","status":"proposed","facility_type":"export","floating_type":"flng","capacity_mtpa":5.7,"capacity_bcm_y":7.76,"start_year":null,"planned_start_year":null,"original_planned_start_year":2023,"fid_year":null,"construction_year":null,"shelved_year":null,"cancelled_year":null,"stop_year":null,"estimated_cost_usd":10250000000,"estimated_cost_original":10250000000,"estimated_cost_currency":"USD","power_stations_supplied":null,"floating_vessel_name":null,"ccs_project":null,"hydrogen_project":null,"ammonia_project":null,"synthetic_lng_project":null,"retrofit_proposed":null,"url":"https://lngatlas.org/terminal/browse-flng-terminal-au/","data_source":"Data: Global Gas Infrastructure Tracker, Global Energy Monitor, September 2025"},{"terminal_slug":"browse-flng-terminal-au","terminal_name":"Browse FLNG Terminal","country":"Australia","country_iso":"AU","unit_name":"T2","status":"proposed","facility_type":"export","floating_type":"flng","capacity_mtpa":5.7,"capacity_bcm_y":7.76,"start_year":null,"planned_start_year":null,"original_planned_start_year":2023,"fid_year":null,"construction_year":null,"shelved_year":null,"cancelled_year":null,"stop_year":null,"estimated_cost_usd":10250000000,"estimated_cost_original":10250000000,"estimated_cost_currency":"USD","power_stations_supplied":null,"floating_vessel_name":null,"ccs_project":null,"hydrogen_project":null,"ammonia_project":null,"synthetic_lng_project":null,"retrofit_proposed":null,"url":"https://lngatlas.org/terminal/browse-flng-terminal-au/","data_source":"Data: Global Gas Infrastructure Tracker, Global Energy Monitor, September 2025"},{"terminal_slug":"brunei-lng-terminal-bn","terminal_name":"Brunei LNG Terminal","country":"Brunei","country_iso":"BN","unit_name":"T1-T5","status":"operating","facility_type":"export","floating_type":"unknown","capacity_mtpa":7.2,"capacity_bcm_y":9.8,"start_year":1973,"planned_start_year":null,"original_planned_start_year":null,"fid_year":null,"construction_year":null,"shelved_year":null,"cancelled_year":null,"stop_year":null,"estimated_cost_usd":null,"estimated_cost_original":null,"estimated_cost_currency":null,"power_stations_supplied":null,"floating_vessel_name":null,"ccs_project":null,"hydrogen_project":null,"ammonia_project":null,"synthetic_lng_project":null,"retrofit_proposed":null,"url":"https://lngatlas.org/terminal/brunei-lng-terminal-bn/","data_source":"Data: Global Gas Infrastructure Tracker, Global Energy Monitor, September 2025"},{"terminal_slug":"brunnsviksholme-lng-terminal-se","terminal_name":"Brunnsviksholme LNG Terminal","country":"Sweden","country_iso":"SE","unit_name":null,"status":"operating","facility_type":"import","floating_type":"unknown","capacity_mtpa":0.4,"capacity_bcm_y":0.54,"start_year":2011,"planned_start_year":null,"original_planned_start_year":null,"fid_year":null,"construction_year":2009,"shelved_year":null,"cancelled_year":null,"stop_year":null,"estimated_cost_usd":26950000,"estimated_cost_original":275000000,"estimated_cost_currency":"SWE","power_stations_supplied":null,"floating_vessel_name":null,"ccs_project":null,"hydrogen_project":null,"ammonia_project":null,"synthetic_lng_project":null,"retrofit_proposed":null,"url":"https://lngatlas.org/terminal/brunnsviksholme-lng-terminal-se/","data_source":"Data: Global Gas Infrastructure Tracker, Global Energy Monitor, September 2025"},{"terminal_slug":"brunsbuttel-fsru-de","terminal_name":"Brunsbüttel FSRU","country":"Germany","country_iso":"DE","unit_name":null,"status":"operating","facility_type":"import","floating_type":"fsru","capacity_mtpa":3.67,"capacity_bcm_y":4.99,"start_year":2023,"planned_start_year":null,"original_planned_start_year":2022,"fid_year":null,"construction_year":2022,"shelved_year":null,"cancelled_year":null,"stop_year":null,"estimated_cost_usd":1090000000,"estimated_cost_original":1000000000,"estimated_cost_currency":"EUR","power_stations_supplied":null,"floating_vessel_name":"Höegh Gannet","ccs_project":null,"hydrogen_project":true,"ammonia_project":true,"synthetic_lng_project":null,"retrofit_proposed":null,"url":"https://lngatlas.org/terminal/brunsbuttel-fsru-de/","data_source":"Data: Global Gas Infrastructure Tracker, Global Energy Monitor, September 2025"},{"terminal_slug":"brunsbuttel-fsru-de","terminal_name":"Brunsbüttel FSRU","country":"Germany","country_iso":"DE","unit_name":"Ammonia Import Terminal Phase 1","status":"proposed","facility_type":"import","floating_type":"fsru","capacity_mtpa":0.3,"capacity_bcm_y":0.41,"start_year":null,"planned_start_year":null,"original_planned_start_year":2026,"fid_year":null,"construction_year":null,"shelved_year":null,"cancelled_year":null,"stop_year":null,"estimated_cost_usd":null,"estimated_cost_original":null,"estimated_cost_currency":null,"power_stations_supplied":null,"floating_vessel_name":"Höegh Gannet","ccs_project":null,"hydrogen_project":true,"ammonia_project":true,"synthetic_lng_project":null,"retrofit_proposed":null,"url":"https://lngatlas.org/terminal/brunsbuttel-fsru-de/","data_source":"Data: Global Gas Infrastructure Tracker, Global Energy Monitor, September 2025"},{"terminal_slug":"brunsbuttel-fsru-de","terminal_name":"Brunsbüttel FSRU","country":"Germany","country_iso":"DE","unit_name":"Ammonia Import Terminal Phase 2","status":"proposed","facility_type":"import","floating_type":"fsru","capacity_mtpa":2,"capacity_bcm_y":2.72,"start_year":null,"planned_start_year":null,"original_planned_start_year":null,"fid_year":null,"construction_year":null,"shelved_year":null,"cancelled_year":null,"stop_year":null,"estimated_cost_usd":null,"estimated_cost_original":null,"estimated_cost_currency":null,"power_stations_supplied":null,"floating_vessel_name":"Höegh Gannet","ccs_project":null,"hydrogen_project":true,"ammonia_project":true,"synthetic_lng_project":null,"retrofit_proposed":null,"url":"https://lngatlas.org/terminal/brunsbuttel-fsru-de/","data_source":"Data: Global Gas Infrastructure Tracker, Global Energy Monitor, September 2025"},{"terminal_slug":"brunsbuttel-lng-terminal-de","terminal_name":"Brunsbüttel LNG Terminal","country":"Germany","country_iso":"DE","unit_name":null,"status":"construction","facility_type":"import","floating_type":"unknown","capacity_mtpa":7.35,"capacity_bcm_y":10,"start_year":null,"planned_start_year":2027,"original_planned_start_year":2022,"fid_year":2024,"construction_year":2024,"shelved_year":null,"cancelled_year":null,"stop_year":null,"estimated_cost_usd":1635000000,"estimated_cost_original":1500000000,"estimated_cost_currency":"EUR","power_stations_supplied":null,"floating_vessel_name":null,"ccs_project":null,"hydrogen_project":true,"ammonia_project":null,"synthetic_lng_project":null,"retrofit_proposed":true,"url":"https://lngatlas.org/terminal/brunsbuttel-lng-terminal-de/","data_source":"Data: Global Gas Infrastructure Tracker, Global Energy Monitor, September 2025"},{"terminal_slug":"regasificadora-del-pacifico-lng-terminal-co","terminal_name":"Buenaventura FSRU","country":"Colombia","country_iso":"CO","unit_name":null,"status":"proposed","facility_type":"import","floating_type":"fsru","capacity_mtpa":0.46,"capacity_bcm_y":0.63,"start_year":null,"planned_start_year":null,"original_planned_start_year":2026,"fid_year":null,"construction_year":null,"shelved_year":null,"cancelled_year":null,"stop_year":null,"estimated_cost_usd":null,"estimated_cost_original":null,"estimated_cost_currency":null,"power_stations_supplied":null,"floating_vessel_name":null,"ccs_project":null,"hydrogen_project":null,"ammonia_project":null,"synthetic_lng_project":null,"retrofit_proposed":null,"url":"https://lngatlas.org/terminal/regasificadora-del-pacifico-lng-terminal-co/","data_source":"Data: Global Gas Infrastructure Tracker, Global Energy Monitor, September 2025"},{"terminal_slug":"buru-flng-terminal-au","terminal_name":"Buru FLNG Terminal","country":"Australia","country_iso":"AU","unit_name":null,"status":"proposed","facility_type":"export","floating_type":"flng","capacity_mtpa":null,"capacity_bcm_y":null,"start_year":null,"planned_start_year":null,"original_planned_start_year":null,"fid_year":null,"construction_year":null,"shelved_year":null,"cancelled_year":null,"stop_year":null,"estimated_cost_usd":null,"estimated_cost_original":null,"estimated_cost_currency":null,"power_stations_supplied":null,"floating_vessel_name":null,"ccs_project":null,"hydrogen_project":null,"ammonia_project":null,"synthetic_lng_project":null,"retrofit_proposed":null,"url":"https://lngatlas.org/terminal/buru-flng-terminal-au/","data_source":"Data: Global Gas Infrastructure Tracker, Global Energy Monitor, September 2025"},{"terminal_slug":"ce-flng-terminal-us","terminal_name":"CE FLNG Terminal","country":"United States","country_iso":"US","unit_name":"T1-T2","status":"cancelled","facility_type":"export","floating_type":"flng","capacity_mtpa":8,"capacity_bcm_y":10.88,"start_year":null,"planned_start_year":null,"original_planned_start_year":2026,"fid_year":null,"construction_year":null,"shelved_year":2022,"cancelled_year":2023,"stop_year":2023,"estimated_cost_usd":8000000000,"estimated_cost_original":8000000000,"estimated_cost_currency":"USD","power_stations_supplied":null,"floating_vessel_name":null,"ccs_project":null,"hydrogen_project":null,"ammonia_project":null,"synthetic_lng_project":null,"retrofit_proposed":null,"url":"https://lngatlas.org/terminal/ce-flng-terminal-us/","data_source":"Data: Global Gas Infrastructure Tracker, Global Energy Monitor, September 2025"},{"terminal_slug":"cp2-lng-terminal-us","terminal_name":"CP2 LNG Terminal","country":"United States","country_iso":"US","unit_name":"Phase 1 (Blocks 1-9)","status":"construction","facility_type":"export","floating_type":"unknown","capacity_mtpa":10,"capacity_bcm_y":13.61,"start_year":null,"planned_start_year":2027,"original_planned_start_year":2026,"fid_year":2025,"construction_year":2025,"shelved_year":null,"cancelled_year":null,"stop_year":null,"estimated_cost_usd":null,"estimated_cost_original":null,"estimated_cost_currency":null,"power_stations_supplied":null,"floating_vessel_name":null,"ccs_project":true,"hydrogen_project":null,"ammonia_project":null,"synthetic_lng_project":null,"retrofit_proposed":null,"url":"https://lngatlas.org/terminal/cp2-lng-terminal-us/","data_source":"Data: Global Gas Infrastructure Tracker, Global Energy Monitor, September 2025"},{"terminal_slug":"cp2-lng-terminal-us","terminal_name":"CP2 LNG Terminal","country":"United States","country_iso":"US","unit_name":"Phase 2 (Blocks 10-18)","status":"proposed","facility_type":"export","floating_type":"unknown","capacity_mtpa":10,"capacity_bcm_y":13.61,"start_year":null,"planned_start_year":2030,"original_planned_start_year":2027,"fid_year":2026,"construction_year":null,"shelved_year":null,"cancelled_year":null,"stop_year":null,"estimated_cost_usd":null,"estimated_cost_original":null,"estimated_cost_currency":null,"power_stations_supplied":null,"floating_vessel_name":null,"ccs_project":true,"hydrogen_project":null,"ammonia_project":null,"synthetic_lng_project":null,"retrofit_proposed":null,"url":"https://lngatlas.org/terminal/cp2-lng-terminal-us/","data_source":"Data: Global Gas Infrastructure Tracker, Global Energy Monitor, September 2025"},{"terminal_slug":"ca-mau-lng-terminal-vn","terminal_name":"Ca Mau LNG Terminal","country":"Vietnam","country_iso":"VN","unit_name":null,"status":"proposed","facility_type":"import","floating_type":"unknown","capacity_mtpa":1,"capacity_bcm_y":1.36,"start_year":null,"planned_start_year":null,"original_planned_start_year":2026,"fid_year":null,"construction_year":null,"shelved_year":null,"cancelled_year":null,"stop_year":null,"estimated_cost_usd":null,"estimated_cost_original":null,"estimated_cost_currency":null,"power_stations_supplied":"Ca Mau power station","floating_vessel_name":null,"ccs_project":null,"hydrogen_project":null,"ammonia_project":null,"synthetic_lng_project":null,"retrofit_proposed":null,"url":"https://lngatlas.org/terminal/ca-mau-lng-terminal-vn/","data_source":"Data: Global Gas Infrastructure Tracker, Global Energy Monitor, September 2025"},{"terminal_slug":"ca-na-lng-terminal-vn","terminal_name":"Ca Na LNG Terminal","country":"Vietnam","country_iso":"VN","unit_name":null,"status":"proposed","facility_type":"import","floating_type":"unknown","capacity_mtpa":null,"capacity_bcm_y":null,"start_year":null,"planned_start_year":null,"original_planned_start_year":2024,"fid_year":null,"construction_year":null,"shelved_year":2023,"cancelled_year":null,"stop_year":null,"estimated_cost_usd":null,"estimated_cost_original":null,"estimated_cost_currency":null,"power_stations_supplied":"Ca Na power station","floating_vessel_name":null,"ccs_project":null,"hydrogen_project":null,"ammonia_project":null,"synthetic_lng_project":null,"retrofit_proposed":null,"url":"https://lngatlas.org/terminal/ca-na-lng-terminal-vn/","data_source":"Data: Global Gas Infrastructure Tracker, Global Energy Monitor, September 2025"},{"terminal_slug":"cacouna-lng-terminal-ca","terminal_name":"Cacouna LNG Terminal","country":"Canada","country_iso":"CA","unit_name":null,"status":"cancelled","facility_type":"import","floating_type":"unknown","capacity_mtpa":3.8,"capacity_bcm_y":5.17,"start_year":null,"planned_start_year":null,"original_planned_start_year":null,"fid_year":null,"construction_year":null,"shelved_year":null,"cancelled_year":2008,"stop_year":2008,"estimated_cost_usd":660000000,"estimated_cost_original":660000000,"estimated_cost_currency":"USD","power_stations_supplied":null,"floating_vessel_name":null,"ccs_project":null,"hydrogen_project":null,"ammonia_project":null,"synthetic_lng_project":null,"retrofit_proposed":null,"url":"https://lngatlas.org/terminal/cacouna-lng-terminal-ca/","data_source":"Data: Global Gas Infrastructure Tracker, Global Energy Monitor, September 2025"},{"terminal_slug":"cai-mep-lng-terminal-vn","terminal_name":"Cai Mep LNG Terminal","country":"Vietnam","country_iso":"VN","unit_name":null,"status":"operating","facility_type":"import","floating_type":"unknown","capacity_mtpa":3,"capacity_bcm_y":4.08,"start_year":2025,"planned_start_year":2024,"original_planned_start_year":2021,"fid_year":null,"construction_year":null,"shelved_year":null,"cancelled_year":null,"stop_year":null,"estimated_cost_usd":500000000,"estimated_cost_original":500000000,"estimated_cost_currency":"USD","power_stations_supplied":"Hiep Phuoc power station","floating_vessel_name":null,"ccs_project":null,"hydrogen_project":null,"ammonia_project":null,"synthetic_lng_project":null,"retrofit_proposed":null,"url":"https://lngatlas.org/terminal/cai-mep-lng-terminal-vn/","data_source":"Data: Global Gas Infrastructure Tracker, Global Energy Monitor, September 2025"},{"terminal_slug":"calais-lng-terminal-us","terminal_name":"Calais LNG Terminal","country":"United States","country_iso":"US","unit_name":null,"status":"cancelled","facility_type":"import","floating_type":"unknown","capacity_mtpa":7.6,"capacity_bcm_y":10.34,"start_year":null,"planned_start_year":null,"original_planned_start_year":null,"fid_year":null,"construction_year":null,"shelved_year":2010,"cancelled_year":2012,"stop_year":2012,"estimated_cost_usd":null,"estimated_cost_original":null,"estimated_cost_currency":null,"power_stations_supplied":null,"floating_vessel_name":null,"ccs_project":null,"hydrogen_project":null,"ammonia_project":null,"synthetic_lng_project":null,"retrofit_proposed":null,"url":"https://lngatlas.org/terminal/calais-lng-terminal-us/","data_source":"Data: Global Gas Infrastructure Tracker, Global Energy Monitor, September 2025"},{"terminal_slug":"calcasieu-pass-lng-terminal-us","terminal_name":"Calcasieu Pass LNG Terminal","country":"United States","country_iso":"US","unit_name":"T1-T18","status":"operating","facility_type":"export","floating_type":"unknown","capacity_mtpa":10,"capacity_bcm_y":13.61,"start_year":2022,"planned_start_year":null,"original_planned_start_year":2021,"fid_year":null,"construction_year":2020,"shelved_year":null,"cancelled_year":null,"stop_year":null,"estimated_cost_usd":7100000000,"estimated_cost_original":7100000000,"estimated_cost_currency":"USD","power_stations_supplied":null,"floating_vessel_name":null,"ccs_project":true,"hydrogen_project":null,"ammonia_project":null,"synthetic_lng_project":null,"retrofit_proposed":null,"url":"https://lngatlas.org/terminal/calcasieu-pass-lng-terminal-us/","data_source":"Data: Global Gas Infrastructure Tracker, Global Energy Monitor, September 2025"},{"terminal_slug":"calhoun-lng-terminal-us","terminal_name":"Calhoun LNG Terminal","country":"United States","country_iso":"US","unit_name":null,"status":"cancelled","facility_type":"import","floating_type":"unknown","capacity_mtpa":7.2,"capacity_bcm_y":9.8,"start_year":null,"planned_start_year":null,"original_planned_start_year":null,"fid_year":null,"construction_year":null,"shelved_year":null,"cancelled_year":2012,"stop_year":2012,"estimated_cost_usd":null,"estimated_cost_original":null,"estimated_cost_currency":null,"power_stations_supplied":null,"floating_vessel_name":null,"ccs_project":null,"hydrogen_project":null,"ammonia_project":null,"synthetic_lng_project":null,"retrofit_proposed":null,"url":"https://lngatlas.org/terminal/calhoun-lng-terminal-us/","data_source":"Data: Global Gas Infrastructure Tracker, Global Energy Monitor, September 2025"},{"terminal_slug":"calypso-lng-terminal-us","terminal_name":"Calypso LNG Terminal","country":"United States","country_iso":"US","unit_name":null,"status":"cancelled","facility_type":"import","floating_type":"unknown","capacity_mtpa":8,"capacity_bcm_y":10.88,"start_year":null,"planned_start_year":null,"original_planned_start_year":null,"fid_year":null,"construction_year":null,"shelved_year":null,"cancelled_year":2009,"stop_year":2009,"estimated_cost_usd":null,"estimated_cost_original":null,"estimated_cost_currency":null,"power_stations_supplied":null,"floating_vessel_name":null,"ccs_project":null,"hydrogen_project":null,"ammonia_project":null,"synthetic_lng_project":null,"retrofit_proposed":null,"url":"https://lngatlas.org/terminal/calypso-lng-terminal-us/","data_source":"Data: Global Gas Infrastructure Tracker, Global Energy Monitor, September 2025"},{"terminal_slug":"cambodia-lng-project-kh","terminal_name":"Cambodia LNG Project","country":"Cambodia","country_iso":"KH","unit_name":"Phase 2","status":"cancelled","facility_type":"import","floating_type":"floating","capacity_mtpa":0.6,"capacity_bcm_y":0.82,"start_year":null,"planned_start_year":null,"original_planned_start_year":2021,"fid_year":null,"construction_year":null,"shelved_year":2023,"cancelled_year":2025,"stop_year":2025,"estimated_cost_usd":null,"estimated_cost_original":null,"estimated_cost_currency":null,"power_stations_supplied":null,"floating_vessel_name":null,"ccs_project":null,"hydrogen_project":null,"ammonia_project":null,"synthetic_lng_project":null,"retrofit_proposed":null,"url":"https://lngatlas.org/terminal/cambodia-lng-project-kh/","data_source":"Data: Global Gas Infrastructure Tracker, Global Energy Monitor, September 2025"},{"terminal_slug":"cambodia-lng-project-kh","terminal_name":"Cambodia LNG Project","country":"Cambodia","country_iso":"KH","unit_name":"Phase 3","status":"cancelled","facility_type":"import","floating_type":"floating","capacity_mtpa":3,"capacity_bcm_y":4.08,"start_year":null,"planned_start_year":null,"original_planned_start_year":2024,"fid_year":null,"construction_year":null,"shelved_year":2023,"cancelled_year":2025,"stop_year":2025,"estimated_cost_usd":null,"estimated_cost_original":null,"estimated_cost_currency":null,"power_stations_supplied":null,"floating_vessel_name":null,"ccs_project":null,"hydrogen_project":null,"ammonia_project":null,"synthetic_lng_project":null,"retrofit_proposed":null,"url":"https://lngatlas.org/terminal/cambodia-lng-project-kh/","data_source":"Data: Global Gas Infrastructure Tracker, Global Energy Monitor, September 2025"},{"terminal_slug":"cameron-lng-terminal-us","terminal_name":"Cameron LNG Terminal","country":"United States","country_iso":"US","unit_name":"Import Terminal","status":"mothballed","facility_type":"import","floating_type":"unknown","capacity_mtpa":11.4,"capacity_bcm_y":15.51,"start_year":2009,"planned_start_year":null,"original_planned_start_year":null,"fid_year":null,"construction_year":2005,"shelved_year":null,"cancelled_year":null,"stop_year":null,"estimated_cost_usd":null,"estimated_cost_original":null,"estimated_cost_currency":null,"power_stations_supplied":null,"floating_vessel_name":null,"ccs_project":null,"hydrogen_project":null,"ammonia_project":null,"synthetic_lng_project":null,"retrofit_proposed":null,"url":"https://lngatlas.org/terminal/cameron-lng-terminal-us/","data_source":"Data: Global Gas Infrastructure Tracker, Global Energy Monitor, September 2025"},{"terminal_slug":"cameron-lng-terminal-us","terminal_name":"Cameron LNG Terminal","country":"United States","country_iso":"US","unit_name":"Export Terminal T1","status":"operating","facility_type":"export","floating_type":"unknown","capacity_mtpa":4.5,"capacity_bcm_y":6.12,"start_year":2019,"planned_start_year":null,"original_planned_start_year":null,"fid_year":null,"construction_year":2014,"shelved_year":null,"cancelled_year":null,"stop_year":null,"estimated_cost_usd":3333333333,"estimated_cost_original":3333333333,"estimated_cost_currency":"USD","power_stations_supplied":null,"floating_vessel_name":null,"ccs_project":null,"hydrogen_project":null,"ammonia_project":null,"synthetic_lng_project":true,"retrofit_proposed":null,"url":"https://lngatlas.org/terminal/cameron-lng-terminal-us/","data_source":"Data: Global Gas Infrastructure Tracker, Global Energy Monitor, September 2025"},{"terminal_slug":"cameron-lng-terminal-us","terminal_name":"Cameron LNG Terminal","country":"United States","country_iso":"US","unit_name":"Export Terminal T2","status":"operating","facility_type":"export","floating_type":"unknown","capacity_mtpa":4.5,"capacity_bcm_y":6.12,"start_year":2020,"planned_start_year":null,"original_planned_start_year":null,"fid_year":null,"construction_year":2014,"shelved_year":null,"cancelled_year":null,"stop_year":null,"estimated_cost_usd":3333333333,"estimated_cost_original":3333333333,"estimated_cost_currency":"USD","power_stations_supplied":null,"floating_vessel_name":null,"ccs_project":null,"hydrogen_project":null,"ammonia_project":null,"synthetic_lng_project":true,"retrofit_proposed":null,"url":"https://lngatlas.org/terminal/cameron-lng-terminal-us/","data_source":"Data: Global Gas Infrastructure Tracker, Global Energy Monitor, September 2025"},{"terminal_slug":"cameron-lng-terminal-us","terminal_name":"Cameron LNG Terminal","country":"United States","country_iso":"US","unit_name":"Export Terminal T3","status":"operating","facility_type":"export","floating_type":"unknown","capacity_mtpa":4.5,"capacity_bcm_y":6.12,"start_year":2020,"planned_start_year":null,"original_planned_start_year":null,"fid_year":null,"construction_year":2014,"shelved_year":null,"cancelled_year":null,"stop_year":null,"estimated_cost_usd":3333333333,"estimated_cost_original":3333333333,"estimated_cost_currency":"USD","power_stations_supplied":null,"floating_vessel_name":null,"ccs_project":null,"hydrogen_project":null,"ammonia_project":null,"synthetic_lng_project":true,"retrofit_proposed":null,"url":"https://lngatlas.org/terminal/cameron-lng-terminal-us/","data_source":"Data: Global Gas Infrastructure Tracker, Global Energy Monitor, September 2025"},{"terminal_slug":"cameron-lng-terminal-us","terminal_name":"Cameron LNG Terminal","country":"United States","country_iso":"US","unit_name":"Debottlenecking (T1-T3)","status":"proposed","facility_type":"export","floating_type":"unknown","capacity_mtpa":0.68,"capacity_bcm_y":0.93,"start_year":null,"planned_start_year":null,"original_planned_start_year":null,"fid_year":2023,"construction_year":null,"shelved_year":null,"cancelled_year":null,"stop_year":null,"estimated_cost_usd":null,"estimated_cost_original":null,"estimated_cost_currency":null,"power_stations_supplied":null,"floating_vessel_name":null,"ccs_project":null,"hydrogen_project":null,"ammonia_project":null,"synthetic_lng_project":true,"retrofit_proposed":null,"url":"https://lngatlas.org/terminal/cameron-lng-terminal-us/","data_source":"Data: Global Gas Infrastructure Tracker, Global Energy Monitor, September 2025"},{"terminal_slug":"cameron-lng-terminal-us","terminal_name":"Cameron LNG Terminal","country":"United States","country_iso":"US","unit_name":"Export Terminal T4","status":"proposed","facility_type":"export","floating_type":"unknown","capacity_mtpa":6.75,"capacity_bcm_y":9.18,"start_year":null,"planned_start_year":2027,"original_planned_start_year":2026,"fid_year":2022,"construction_year":null,"shelved_year":null,"cancelled_year":null,"stop_year":null,"estimated_cost_usd":null,"estimated_cost_original":null,"estimated_cost_currency":null,"power_stations_supplied":null,"floating_vessel_name":null,"ccs_project":null,"hydrogen_project":null,"ammonia_project":null,"synthetic_lng_project":true,"retrofit_proposed":null,"url":"https://lngatlas.org/terminal/cameron-lng-terminal-us/","data_source":"Data: Global Gas Infrastructure Tracker, Global Energy Monitor, September 2025"},{"terminal_slug":"cameron-lng-terminal-us","terminal_name":"Cameron LNG Terminal","country":"United States","country_iso":"US","unit_name":"Export Terminal T5","status":"cancelled","facility_type":"export","floating_type":"unknown","capacity_mtpa":5,"capacity_bcm_y":6.8,"start_year":null,"planned_start_year":null,"original_planned_start_year":2026,"fid_year":2021,"construction_year":null,"shelved_year":null,"cancelled_year":2022,"stop_year":2022,"estimated_cost_usd":null,"estimated_cost_original":null,"estimated_cost_currency":null,"power_stations_supplied":null,"floating_vessel_name":null,"ccs_project":null,"hydrogen_project":null,"ammonia_project":null,"synthetic_lng_project":null,"retrofit_proposed":null,"url":"https://lngatlas.org/terminal/cameron-lng-terminal-us/","data_source":"Data: Global Gas Infrastructure Tracker, Global Energy Monitor, September 2025"},{"terminal_slug":"cameroon-flng-terminal-cm","terminal_name":"Cameroon FLNG Terminal","country":"Cameroon","country_iso":"CM","unit_name":"T1","status":"operating","facility_type":"export","floating_type":"flng","capacity_mtpa":0.6,"capacity_bcm_y":0.82,"start_year":2018,"planned_start_year":null,"original_planned_start_year":null,"fid_year":2015,"construction_year":null,"shelved_year":null,"cancelled_year":null,"stop_year":null,"estimated_cost_usd":300000000,"estimated_cost_original":300000000,"estimated_cost_currency":"USD","power_stations_supplied":null,"floating_vessel_name":"Hilli Episeyo","ccs_project":null,"hydrogen_project":null,"ammonia_project":null,"synthetic_lng_project":null,"retrofit_proposed":null,"url":"https://lngatlas.org/terminal/cameroon-flng-terminal-cm/","data_source":"Data: Global Gas Infrastructure Tracker, Global Energy Monitor, September 2025"},{"terminal_slug":"cameroon-flng-terminal-cm","terminal_name":"Cameroon FLNG Terminal","country":"Cameroon","country_iso":"CM","unit_name":"T2","status":"operating","facility_type":"export","floating_type":"flng","capacity_mtpa":0.6,"capacity_bcm_y":0.82,"start_year":2018,"planned_start_year":null,"original_planned_start_year":null,"fid_year":2015,"construction_year":null,"shelved_year":null,"cancelled_year":null,"stop_year":null,"estimated_cost_usd":300000000,"estimated_cost_original":300000000,"estimated_cost_currency":"USD","power_stations_supplied":null,"floating_vessel_name":"Hilli Episeyo","ccs_project":null,"hydrogen_project":null,"ammonia_project":null,"synthetic_lng_project":null,"retrofit_proposed":null,"url":"https://lngatlas.org/terminal/cameroon-flng-terminal-cm/","data_source":"Data: Global Gas Infrastructure Tracker, Global Energy Monitor, September 2025"},{"terminal_slug":"cameroon-flng-terminal-cm","terminal_name":"Cameroon FLNG Terminal","country":"Cameroon","country_iso":"CM","unit_name":"T3","status":"operating","facility_type":"export","floating_type":"flng","capacity_mtpa":0.6,"capacity_bcm_y":0.82,"start_year":2018,"planned_start_year":null,"original_planned_start_year":null,"fid_year":2015,"construction_year":null,"shelved_year":null,"cancelled_year":null,"stop_year":null,"estimated_cost_usd":300000000,"estimated_cost_original":300000000,"estimated_cost_currency":"USD","power_stations_supplied":null,"floating_vessel_name":"Hilli Episeyo","ccs_project":null,"hydrogen_project":null,"ammonia_project":null,"synthetic_lng_project":null,"retrofit_proposed":null,"url":"https://lngatlas.org/terminal/cameroon-flng-terminal-cm/","data_source":"Data: Global Gas Infrastructure Tracker, Global Energy Monitor, September 2025"},{"terminal_slug":"cameroon-flng-terminal-cm","terminal_name":"Cameroon FLNG Terminal","country":"Cameroon","country_iso":"CM","unit_name":"T4","status":"operating","facility_type":"export","floating_type":"flng","capacity_mtpa":0.6,"capacity_bcm_y":0.82,"start_year":2018,"planned_start_year":null,"original_planned_start_year":null,"fid_year":2015,"construction_year":null,"shelved_year":null,"cancelled_year":null,"stop_year":null,"estimated_cost_usd":300000000,"estimated_cost_original":300000000,"estimated_cost_currency":"USD","power_stations_supplied":null,"floating_vessel_name":"Hilli Episeyo","ccs_project":null,"hydrogen_project":null,"ammonia_project":null,"synthetic_lng_project":null,"retrofit_proposed":null,"url":"https://lngatlas.org/terminal/cameroon-flng-terminal-cm/","data_source":"Data: Global Gas Infrastructure Tracker, Global Energy Monitor, September 2025"},{"terminal_slug":"cameroon-lng-terminal-cm","terminal_name":"Cameroon LNG Terminal","country":"Cameroon","country_iso":"CM","unit_name":null,"status":"cancelled","facility_type":"export","floating_type":"unknown","capacity_mtpa":3.5,"capacity_bcm_y":4.76,"start_year":null,"planned_start_year":null,"original_planned_start_year":null,"fid_year":null,"construction_year":null,"shelved_year":2016,"cancelled_year":2020,"stop_year":2020,"estimated_cost_usd":5000000000,"estimated_cost_original":5000000000,"estimated_cost_currency":"USD","power_stations_supplied":null,"floating_vessel_name":null,"ccs_project":null,"hydrogen_project":null,"ammonia_project":null,"synthetic_lng_project":null,"retrofit_proposed":null,"url":"https://lngatlas.org/terminal/cameroon-lng-terminal-cm/","data_source":"Data: Global Gas Infrastructure Tracker, Global Energy Monitor, September 2025"},{"terminal_slug":"canatxx-lng-terminal-gb","terminal_name":"Canatxx LNG Terminal","country":"United Kingdom","country_iso":"GB","unit_name":null,"status":"cancelled","facility_type":"import","floating_type":"unknown","capacity_mtpa":10,"capacity_bcm_y":13.61,"start_year":null,"planned_start_year":null,"original_planned_start_year":null,"fid_year":null,"construction_year":null,"shelved_year":2015,"cancelled_year":2017,"stop_year":2017,"estimated_cost_usd":675000000,"estimated_cost_original":675000000,"estimated_cost_currency":"USD","power_stations_supplied":null,"floating_vessel_name":null,"ccs_project":null,"hydrogen_project":null,"ammonia_project":null,"synthetic_lng_project":null,"retrofit_proposed":null,"url":"https://lngatlas.org/terminal/canatxx-lng-terminal-gb/","data_source":"Data: Global Gas Infrastructure Tracker, Global Energy Monitor, September 2025"},{"terminal_slug":"cangzhou-lng-terminal-cn","terminal_name":"Cangzhou LNG Terminal","country":"China","country_iso":"CN","unit_name":null,"status":"shelved","facility_type":"import","floating_type":"unknown","capacity_mtpa":3,"capacity_bcm_y":4.08,"start_year":null,"planned_start_year":null,"original_planned_start_year":2025,"fid_year":null,"construction_year":null,"shelved_year":2024,"cancelled_year":null,"stop_year":null,"estimated_cost_usd":null,"estimated_cost_original":null,"estimated_cost_currency":null,"power_stations_supplied":null,"floating_vessel_name":null,"ccs_project":null,"hydrogen_project":null,"ammonia_project":null,"synthetic_lng_project":null,"retrofit_proposed":null,"url":"https://lngatlas.org/terminal/cangzhou-lng-terminal-cn/","data_source":"Data: Global Gas Infrastructure Tracker, Global Energy Monitor, September 2025"},{"terminal_slug":"canvey-lng-terminal-gb","terminal_name":"Canvey LNG Terminal","country":"United Kingdom","country_iso":"GB","unit_name":null,"status":"cancelled","facility_type":"import","floating_type":"unknown","capacity_mtpa":4,"capacity_bcm_y":5.44,"start_year":null,"planned_start_year":null,"original_planned_start_year":null,"fid_year":null,"construction_year":null,"shelved_year":2007,"cancelled_year":2009,"stop_year":2009,"estimated_cost_usd":null,"estimated_cost_original":null,"estimated_cost_currency":null,"power_stations_supplied":null,"floating_vessel_name":null,"ccs_project":null,"hydrogen_project":null,"ammonia_project":null,"synthetic_lng_project":null,"retrofit_proposed":null,"url":"https://lngatlas.org/terminal/canvey-lng-terminal-gb/","data_source":"Data: Global Gas Infrastructure Tracker, Global Energy Monitor, September 2025"},{"terminal_slug":"caofeidian-fsru-cn","terminal_name":"Caofeidian FSRU","country":"China","country_iso":"CN","unit_name":null,"status":"cancelled","facility_type":"import","floating_type":"fsru","capacity_mtpa":3,"capacity_bcm_y":4.08,"start_year":null,"planned_start_year":null,"original_planned_start_year":null,"fid_year":null,"construction_year":null,"shelved_year":2019,"cancelled_year":2021,"stop_year":2021,"estimated_cost_usd":null,"estimated_cost_original":null,"estimated_cost_currency":null,"power_stations_supplied":null,"floating_vessel_name":null,"ccs_project":null,"hydrogen_project":null,"ammonia_project":null,"synthetic_lng_project":null,"retrofit_proposed":null,"url":"https://lngatlas.org/terminal/caofeidian-fsru-cn/","data_source":"Data: Global Gas Infrastructure Tracker, Global Energy Monitor, September 2025"},{"terminal_slug":"caofeidian-lng-terminal-beijing-energy-cn","terminal_name":"Caofeidian LNG Terminal (Beijing Energy)","country":"China","country_iso":"CN","unit_name":null,"status":"cancelled","facility_type":"import","floating_type":"unknown","capacity_mtpa":null,"capacity_bcm_y":null,"start_year":null,"planned_start_year":null,"original_planned_start_year":null,"fid_year":null,"construction_year":null,"shelved_year":2019,"cancelled_year":2021,"stop_year":2021,"estimated_cost_usd":null,"estimated_cost_original":null,"estimated_cost_currency":null,"power_stations_supplied":null,"floating_vessel_name":null,"ccs_project":null,"hydrogen_project":null,"ammonia_project":null,"synthetic_lng_project":null,"retrofit_proposed":null,"url":"https://lngatlas.org/terminal/caofeidian-lng-terminal-beijing-energy-cn/","data_source":"Data: Global Gas Infrastructure Tracker, Global Energy Monitor, September 2025"},{"terminal_slug":"cap-lopez-flng-terminal-ga","terminal_name":"Cap Lopez FLNG Terminal","country":"Gabon","country_iso":"GA","unit_name":null,"status":"construction","facility_type":"export","floating_type":"flng","capacity_mtpa":0.7,"capacity_bcm_y":0.95,"start_year":null,"planned_start_year":2027,"original_planned_start_year":2026,"fid_year":2023,"construction_year":2024,"shelved_year":null,"cancelled_year":null,"stop_year":null,"estimated_cost_usd":1000000000,"estimated_cost_original":1000000000,"estimated_cost_currency":"USD","power_stations_supplied":null,"floating_vessel_name":"FSU LNG Cap Lopez, Bran6 Barge","ccs_project":null,"hydrogen_project":null,"ammonia_project":null,"synthetic_lng_project":null,"retrofit_proposed":null,"url":"https://lngatlas.org/terminal/cap-lopez-flng-terminal-ga/","data_source":"Data: Global Gas Infrastructure Tracker, Global Energy Monitor, September 2025"},{"terminal_slug":"caribe-lng-terminal-co","terminal_name":"Caribe LNG FSU","country":"Colombia","country_iso":"CO","unit_name":null,"status":"proposed","facility_type":"import","floating_type":"floating","capacity_mtpa":null,"capacity_bcm_y":null,"start_year":null,"planned_start_year":null,"original_planned_start_year":2026,"fid_year":null,"construction_year":null,"shelved_year":null,"cancelled_year":null,"stop_year":null,"estimated_cost_usd":null,"estimated_cost_original":null,"estimated_cost_currency":null,"power_stations_supplied":null,"floating_vessel_name":null,"ccs_project":null,"hydrogen_project":null,"ammonia_project":null,"synthetic_lng_project":null,"retrofit_proposed":null,"url":"https://lngatlas.org/terminal/caribe-lng-terminal-co/","data_source":"Data: Global Gas Infrastructure Tracker, Global Energy Monitor, September 2025"},{"terminal_slug":"cartagena-fsru-colombia-co","terminal_name":"Cartagena FSRU (Colombia)","country":"Colombia","country_iso":"CO","unit_name":null,"status":"operating","facility_type":"import","floating_type":"fsru","capacity_mtpa":3.45,"capacity_bcm_y":4.69,"start_year":2016,"planned_start_year":null,"original_planned_start_year":null,"fid_year":null,"construction_year":null,"shelved_year":null,"cancelled_year":null,"stop_year":null,"estimated_cost_usd":null,"estimated_cost_original":null,"estimated_cost_currency":null,"power_stations_supplied":"Termobarranquilla power station, Termocandelaria power station, Termo Flores power station","floating_vessel_name":"Höegh Grace","ccs_project":null,"hydrogen_project":null,"ammonia_project":null,"synthetic_lng_project":null,"retrofit_proposed":null,"url":"https://lngatlas.org/terminal/cartagena-fsru-colombia-co/","data_source":"Data: Global Gas Infrastructure Tracker, Global Energy Monitor, September 2025"},{"terminal_slug":"cartagena-fsru-colombia-co","terminal_name":"Cartagena FSRU (Colombia)","country":"Colombia","country_iso":"CO","unit_name":"2023 Expansion","status":"proposed","facility_type":"import","floating_type":"fsru","capacity_mtpa":0.19,"capacity_bcm_y":0.26,"start_year":null,"planned_start_year":2025,"original_planned_start_year":2023,"fid_year":null,"construction_year":null,"shelved_year":null,"cancelled_year":null,"stop_year":null,"estimated_cost_usd":null,"estimated_cost_original":null,"estimated_cost_currency":null,"power_stations_supplied":"Termobarranquilla power station, Termocandelaria power station, Termo Flores power station","floating_vessel_name":"Höegh Grace","ccs_project":null,"hydrogen_project":null,"ammonia_project":null,"synthetic_lng_project":null,"retrofit_proposed":null,"url":"https://lngatlas.org/terminal/cartagena-fsru-colombia-co/","data_source":"Data: Global Gas Infrastructure Tracker, Global Energy Monitor, September 2025"},{"terminal_slug":"cartagena-fsru-colombia-co","terminal_name":"Cartagena FSRU (Colombia)","country":"Colombia","country_iso":"CO","unit_name":"2026 Expansion","status":"proposed","facility_type":"import","floating_type":"fsru","capacity_mtpa":0.44,"capacity_bcm_y":0.6,"start_year":null,"planned_start_year":2027,"original_planned_start_year":2026,"fid_year":null,"construction_year":null,"shelved_year":null,"cancelled_year":null,"stop_year":null,"estimated_cost_usd":null,"estimated_cost_original":null,"estimated_cost_currency":null,"power_stations_supplied":"Termobarranquilla power station, Termocandelaria power station, Termo Flores power station","floating_vessel_name":"Höegh Grace","ccs_project":null,"hydrogen_project":null,"ammonia_project":null,"synthetic_lng_project":null,"retrofit_proposed":null,"url":"https://lngatlas.org/terminal/cartagena-fsru-colombia-co/","data_source":"Data: Global Gas Infrastructure Tracker, Global Energy Monitor, September 2025"},{"terminal_slug":"cartagena-lng-terminal-spain-es","terminal_name":"Cartagena LNG Terminal (Spain)","country":"Spain","country_iso":"ES","unit_name":null,"status":"operating","facility_type":"import","floating_type":"unknown","capacity_mtpa":8.7,"capacity_bcm_y":11.84,"start_year":1989,"planned_start_year":null,"original_planned_start_year":null,"fid_year":null,"construction_year":null,"shelved_year":null,"cancelled_year":null,"stop_year":null,"estimated_cost_usd":null,"estimated_cost_original":null,"estimated_cost_currency":null,"power_stations_supplied":null,"floating_vessel_name":null,"ccs_project":null,"hydrogen_project":null,"ammonia_project":null,"synthetic_lng_project":null,"retrofit_proposed":null,"url":"https://lngatlas.org/terminal/cartagena-lng-terminal-spain-es/","data_source":"Data: Global Gas Infrastructure Tracker, Global Energy Monitor, September 2025"},{"terminal_slug":"cash-maple-flng-terminal-au","terminal_name":"Cash Maple FLNG Terminal","country":"Australia","country_iso":"AU","unit_name":null,"status":"cancelled","facility_type":"export","floating_type":"flng","capacity_mtpa":2,"capacity_bcm_y":2.72,"start_year":null,"planned_start_year":null,"original_planned_start_year":null,"fid_year":null,"construction_year":null,"shelved_year":null,"cancelled_year":null,"stop_year":null,"estimated_cost_usd":null,"estimated_cost_original":null,"estimated_cost_currency":null,"power_stations_supplied":null,"floating_vessel_name":null,"ccs_project":null,"hydrogen_project":null,"ammonia_project":null,"synthetic_lng_project":null,"retrofit_proposed":null,"url":"https://lngatlas.org/terminal/cash-maple-flng-terminal-au/","data_source":"Data: Global Gas Infrastructure Tracker, Global Energy Monitor, September 2025"},{"terminal_slug":"casotte-landing-lng-terminal-us","terminal_name":"Casotte Landing LNG Terminal","country":"United States","country_iso":"US","unit_name":null,"status":"cancelled","facility_type":"import","floating_type":"unknown","capacity_mtpa":10,"capacity_bcm_y":13.61,"start_year":null,"planned_start_year":null,"original_planned_start_year":null,"fid_year":null,"construction_year":null,"shelved_year":null,"cancelled_year":2009,"stop_year":2009,"estimated_cost_usd":null,"estimated_cost_original":null,"estimated_cost_currency":null,"power_stations_supplied":null,"floating_vessel_name":null,"ccs_project":null,"hydrogen_project":null,"ammonia_project":null,"synthetic_lng_project":null,"retrofit_proposed":null,"url":"https://lngatlas.org/terminal/casotte-landing-lng-terminal-us/","data_source":"Data: Global Gas Infrastructure Tracker, Global Energy Monitor, September 2025"},{"terminal_slug":"cat-hai-fsru-vn","terminal_name":"Cat Hai FSRU","country":"Vietnam","country_iso":"VN","unit_name":null,"status":"cancelled","facility_type":"import","floating_type":"fsru","capacity_mtpa":3,"capacity_bcm_y":4.08,"start_year":null,"planned_start_year":null,"original_planned_start_year":2030,"fid_year":null,"construction_year":null,"shelved_year":2023,"cancelled_year":null,"stop_year":null,"estimated_cost_usd":null,"estimated_cost_original":null,"estimated_cost_currency":null,"power_stations_supplied":null,"floating_vessel_name":null,"ccs_project":null,"hydrogen_project":null,"ammonia_project":null,"synthetic_lng_project":null,"retrofit_proposed":null,"url":"https://lngatlas.org/terminal/cat-hai-fsru-vn/","data_source":"Data: Global Gas Infrastructure Tracker, Global Energy Monitor, September 2025"},{"terminal_slug":"cedar-flng-terminal-ca","terminal_name":"Cedar FLNG Terminal","country":"Canada","country_iso":"CA","unit_name":null,"status":"construction","facility_type":"export","floating_type":"flng","capacity_mtpa":3.3,"capacity_bcm_y":4.49,"start_year":null,"planned_start_year":2028,"original_planned_start_year":2029,"fid_year":2024,"construction_year":2024,"shelved_year":null,"cancelled_year":null,"stop_year":null,"estimated_cost_usd":4000000000,"estimated_cost_original":4000000000,"estimated_cost_currency":"USD","power_stations_supplied":null,"floating_vessel_name":null,"ccs_project":null,"hydrogen_project":null,"ammonia_project":null,"synthetic_lng_project":null,"retrofit_proposed":null,"url":"https://lngatlas.org/terminal/cedar-flng-terminal-ca/","data_source":"Data: Global Gas Infrastructure Tracker, Global Energy Monitor, September 2025"},{"terminal_slug":"central-java-fsru-id","terminal_name":"Central Java FSRU","country":"Indonesia","country_iso":"ID","unit_name":null,"status":"cancelled","facility_type":"import","floating_type":"fsru","capacity_mtpa":1.4,"capacity_bcm_y":1.9,"start_year":null,"planned_start_year":null,"original_planned_start_year":null,"fid_year":null,"construction_year":null,"shelved_year":2022,"cancelled_year":2024,"stop_year":2024,"estimated_cost_usd":null,"estimated_cost_original":null,"estimated_cost_currency":null,"power_stations_supplied":null,"floating_vessel_name":null,"ccs_project":null,"hydrogen_project":null,"ammonia_project":null,"synthetic_lng_project":null,"retrofit_proposed":null,"url":"https://lngatlas.org/terminal/central-java-fsru-id/","data_source":"Data: Global Gas Infrastructure Tracker, Global Energy Monitor, September 2025"},{"terminal_slug":"chan-may-lng-terminal-vn","terminal_name":"Chan May LNG Terminal","country":"Vietnam","country_iso":"VN","unit_name":null,"status":"cancelled","facility_type":"import","floating_type":"unknown","capacity_mtpa":null,"capacity_bcm_y":null,"start_year":null,"planned_start_year":null,"original_planned_start_year":2024,"fid_year":null,"construction_year":null,"shelved_year":2022,"cancelled_year":2024,"stop_year":2024,"estimated_cost_usd":null,"estimated_cost_original":null,"estimated_cost_currency":null,"power_stations_supplied":null,"floating_vessel_name":null,"ccs_project":null,"hydrogen_project":null,"ammonia_project":null,"synthetic_lng_project":null,"retrofit_proposed":null,"url":"https://lngatlas.org/terminal/chan-may-lng-terminal-vn/","data_source":"Data: Global Gas Infrastructure Tracker, Global Energy Monitor, September 2025"},{"terminal_slug":"chana-lng-terminal-th","terminal_name":"Chana LNG Terminal","country":"Thailand","country_iso":"TH","unit_name":null,"status":"cancelled","facility_type":"import","floating_type":"unknown","capacity_mtpa":null,"capacity_bcm_y":null,"start_year":null,"planned_start_year":null,"original_planned_start_year":2027,"fid_year":null,"construction_year":null,"shelved_year":2023,"cancelled_year":null,"stop_year":null,"estimated_cost_usd":null,"estimated_cost_original":null,"estimated_cost_currency":null,"power_stations_supplied":null,"floating_vessel_name":null,"ccs_project":null,"hydrogen_project":null,"ammonia_project":null,"synthetic_lng_project":null,"retrofit_proposed":null,"url":"https://lngatlas.org/terminal/chana-lng-terminal-th/","data_source":"Data: Global Gas Infrastructure Tracker, Global Energy Monitor, September 2025"},{"terminal_slug":"chaozhou-lng-terminal-huafeng-cn","terminal_name":"Chaozhou LNG Terminal (Huafeng)","country":"China","country_iso":"CN","unit_name":"Expansion","status":"shelved","facility_type":"import","floating_type":"unknown","capacity_mtpa":2,"capacity_bcm_y":2.72,"start_year":null,"planned_start_year":null,"original_planned_start_year":null,"fid_year":null,"construction_year":null,"shelved_year":2021,"cancelled_year":null,"stop_year":null,"estimated_cost_usd":320000000,"estimated_cost_original":2000000000,"estimated_cost_currency":"RMB","power_stations_supplied":"From Canada","floating_vessel_name":null,"ccs_project":null,"hydrogen_project":null,"ammonia_project":null,"synthetic_lng_project":null,"retrofit_proposed":null,"url":"https://lngatlas.org/terminal/chaozhou-lng-terminal-huafeng-cn/","data_source":"Data: Global Gas Infrastructure Tracker, Global Energy Monitor, September 2025"},{"terminal_slug":"chaozhou-lng-terminal-huafeng-cn","terminal_name":"Chaozhou LNG Terminal (Huafeng)","country":"China","country_iso":"CN","unit_name":"Phase 1","status":"shelved","facility_type":"import","floating_type":"unknown","capacity_mtpa":1,"capacity_bcm_y":1.36,"start_year":null,"planned_start_year":null,"original_planned_start_year":2022,"fid_year":null,"construction_year":2016,"shelved_year":2024,"cancelled_year":null,"stop_year":null,"estimated_cost_usd":432000000,"estimated_cost_original":2700000000,"estimated_cost_currency":"RMB","power_stations_supplied":"From Canada","floating_vessel_name":null,"ccs_project":null,"hydrogen_project":null,"ammonia_project":null,"synthetic_lng_project":null,"retrofit_proposed":null,"url":"https://lngatlas.org/terminal/chaozhou-lng-terminal-huafeng-cn/","data_source":"Data: Global Gas Infrastructure Tracker, Global Energy Monitor, September 2025"},{"terminal_slug":"chaozhou-lng-terminal-huaying-cn","terminal_name":"Chaozhou LNG Terminal (Huaying)","country":"China","country_iso":"CN","unit_name":"Phase 1","status":"operating","facility_type":"import","floating_type":"unknown","capacity_mtpa":6,"capacity_bcm_y":8.16,"start_year":2024,"planned_start_year":null,"original_planned_start_year":null,"fid_year":null,"construction_year":2020,"shelved_year":null,"cancelled_year":null,"stop_year":null,"estimated_cost_usd":1183840000,"estimated_cost_original":7399000000,"estimated_cost_currency":"RMB","power_stations_supplied":null,"floating_vessel_name":null,"ccs_project":null,"hydrogen_project":null,"ammonia_project":null,"synthetic_lng_project":null,"retrofit_proposed":null,"url":"https://lngatlas.org/terminal/chaozhou-lng-terminal-huaying-cn/","data_source":"Data: Global Gas Infrastructure Tracker, Global Energy Monitor, September 2025"},{"terminal_slug":"chaozhou-lng-terminal-huaying-cn","terminal_name":"Chaozhou LNG Terminal (Huaying)","country":"China","country_iso":"CN","unit_name":"Phase 2","status":"proposed","facility_type":"import","floating_type":"unknown","capacity_mtpa":6,"capacity_bcm_y":8.16,"start_year":null,"planned_start_year":null,"original_planned_start_year":null,"fid_year":null,"construction_year":null,"shelved_year":null,"cancelled_year":null,"stop_year":null,"estimated_cost_usd":640000000,"estimated_cost_original":4000000000,"estimated_cost_currency":"RMB","power_stations_supplied":null,"floating_vessel_name":null,"ccs_project":null,"hydrogen_project":null,"ammonia_project":null,"synthetic_lng_project":null,"retrofit_proposed":null,"url":"https://lngatlas.org/terminal/chaozhou-lng-terminal-huaying-cn/","data_source":"Data: Global Gas Infrastructure Tracker, Global Energy Monitor, September 2025"},{"terminal_slug":"chengmai-lng-terminal-cn","terminal_name":"Chengmai LNG Terminal","country":"China","country_iso":"CN","unit_name":null,"status":"cancelled","facility_type":"import","floating_type":"unknown","capacity_mtpa":12,"capacity_bcm_y":16.33,"start_year":null,"planned_start_year":null,"original_planned_start_year":null,"fid_year":null,"construction_year":null,"shelved_year":2016,"cancelled_year":2018,"stop_year":2018,"estimated_cost_usd":1440000000,"estimated_cost_original":9000000000,"estimated_cost_currency":"RMB","power_stations_supplied":null,"floating_vessel_name":null,"ccs_project":null,"hydrogen_project":null,"ammonia_project":null,"synthetic_lng_project":null,"retrofit_proposed":null,"url":"https://lngatlas.org/terminal/chengmai-lng-terminal-cn/","data_source":"Data: Global Gas Infrastructure Tracker, Global Energy Monitor, September 2025"},{"terminal_slug":"chernomorsky-lng-terminal-ru","terminal_name":"Chernomorsky LNG Terminal","country":"Russia","country_iso":"RU","unit_name":null,"status":"shelved","facility_type":"export","floating_type":"unknown","capacity_mtpa":1.5,"capacity_bcm_y":2.04,"start_year":null,"planned_start_year":null,"original_planned_start_year":2025,"fid_year":null,"construction_year":null,"shelved_year":2024,"cancelled_year":null,"stop_year":null,"estimated_cost_usd":2000000000,"estimated_cost_original":2000000000,"estimated_cost_currency":"USD","power_stations_supplied":null,"floating_vessel_name":null,"ccs_project":null,"hydrogen_project":null,"ammonia_project":null,"synthetic_lng_project":null,"retrofit_proposed":null,"url":"https://lngatlas.org/terminal/chernomorsky-lng-terminal-ru/","data_source":"Data: Global Gas Infrastructure Tracker, Global Energy Monitor, September 2025"},{"terminal_slug":"chhara-lng-terminal-in","terminal_name":"Chhara LNG Terminal","country":"India","country_iso":"IN","unit_name":null,"status":"operating","facility_type":"import","floating_type":"unknown","capacity_mtpa":5,"capacity_bcm_y":6.8,"start_year":2025,"planned_start_year":2024,"original_planned_start_year":2023,"fid_year":null,"construction_year":2019,"shelved_year":null,"cancelled_year":null,"stop_year":null,"estimated_cost_usd":617500000,"estimated_cost_original":47500000000,"estimated_cost_currency":"INR","power_stations_supplied":null,"floating_vessel_name":null,"ccs_project":null,"hydrogen_project":null,"ammonia_project":null,"synthetic_lng_project":null,"retrofit_proposed":null,"url":"https://lngatlas.org/terminal/chhara-lng-terminal-in/","data_source":"Data: Global Gas Infrastructure Tracker, Global Energy Monitor, September 2025"},{"terminal_slug":"chita-kyodo-lng-terminal-jp","terminal_name":"Chita Kyodo LNG Terminal","country":"Japan","country_iso":"JP","unit_name":null,"status":"operating","facility_type":"import","floating_type":"unknown","capacity_mtpa":7.5,"capacity_bcm_y":10.2,"start_year":1977,"planned_start_year":null,"original_planned_start_year":null,"fid_year":null,"construction_year":null,"shelved_year":null,"cancelled_year":null,"stop_year":null,"estimated_cost_usd":null,"estimated_cost_original":null,"estimated_cost_currency":null,"power_stations_supplied":null,"floating_vessel_name":null,"ccs_project":null,"hydrogen_project":null,"ammonia_project":null,"synthetic_lng_project":null,"retrofit_proposed":null,"url":"https://lngatlas.org/terminal/chita-kyodo-lng-terminal-jp/","data_source":"Data: Global Gas Infrastructure Tracker, Global Energy Monitor, September 2025"},{"terminal_slug":"chita-lng-terminal-jp","terminal_name":"Chita LNG Terminal","country":"Japan","country_iso":"JP","unit_name":null,"status":"operating","facility_type":"import","floating_type":"unknown","capacity_mtpa":10.9,"capacity_bcm_y":14.83,"start_year":1977,"planned_start_year":null,"original_planned_start_year":null,"fid_year":null,"construction_year":null,"shelved_year":null,"cancelled_year":null,"stop_year":null,"estimated_cost_usd":null,"estimated_cost_original":null,"estimated_cost_currency":null,"power_stations_supplied":null,"floating_vessel_name":null,"ccs_project":null,"hydrogen_project":null,"ammonia_project":null,"synthetic_lng_project":null,"retrofit_proposed":null,"url":"https://lngatlas.org/terminal/chita-lng-terminal-jp/","data_source":"Data: Global Gas Infrastructure Tracker, Global Energy Monitor, September 2025"},{"terminal_slug":"chita-midorihama-lng-terminal-jp","terminal_name":"Chita Midorihama LNG Terminal","country":"Japan","country_iso":"JP","unit_name":null,"status":"operating","facility_type":"import","floating_type":"unknown","capacity_mtpa":7.7,"capacity_bcm_y":10.48,"start_year":2001,"planned_start_year":null,"original_planned_start_year":null,"fid_year":null,"construction_year":null,"shelved_year":null,"cancelled_year":null,"stop_year":null,"estimated_cost_usd":null,"estimated_cost_original":null,"estimated_cost_currency":null,"power_stations_supplied":null,"floating_vessel_name":null,"ccs_project":null,"hydrogen_project":null,"ammonia_project":null,"synthetic_lng_project":null,"retrofit_proposed":null,"url":"https://lngatlas.org/terminal/chita-midorihama-lng-terminal-jp/","data_source":"Data: Global Gas Infrastructure Tracker, Global Energy Monitor, September 2025"},{"terminal_slug":"choguko-electric-lng-terminal-jp","terminal_name":"Choguko Electric LNG Terminal","country":"Japan","country_iso":"JP","unit_name":null,"status":"operating","facility_type":"import","floating_type":"unknown","capacity_mtpa":4.3,"capacity_bcm_y":5.85,"start_year":2006,"planned_start_year":null,"original_planned_start_year":null,"fid_year":null,"construction_year":null,"shelved_year":null,"cancelled_year":null,"stop_year":null,"estimated_cost_usd":null,"estimated_cost_original":null,"estimated_cost_currency":null,"power_stations_supplied":null,"floating_vessel_name":null,"ccs_project":null,"hydrogen_project":null,"ammonia_project":null,"synthetic_lng_project":null,"retrofit_proposed":null,"url":"https://lngatlas.org/terminal/choguko-electric-lng-terminal-jp/","data_source":"Data: Global Gas Infrastructure Tracker, Global Energy Monitor, September 2025"},{"terminal_slug":"chuanbi-island-lng-terminal-cn","terminal_name":"Chuanbi Island LNG Terminal","country":"China","country_iso":"CN","unit_name":null,"status":"cancelled","facility_type":"import","floating_type":"unknown","capacity_mtpa":3,"capacity_bcm_y":4.08,"start_year":null,"planned_start_year":null,"original_planned_start_year":null,"fid_year":null,"construction_year":null,"shelved_year":2020,"cancelled_year":2022,"stop_year":2022,"estimated_cost_usd":800000000,"estimated_cost_original":5000000000,"estimated_cost_currency":"RMB","power_stations_supplied":null,"floating_vessel_name":null,"ccs_project":null,"hydrogen_project":null,"ammonia_project":null,"synthetic_lng_project":null,"retrofit_proposed":null,"url":"https://lngatlas.org/terminal/chuanbi-island-lng-terminal-cn/","data_source":"Data: Global Gas Infrastructure Tracker, Global Energy Monitor, September 2025"},{"terminal_slug":"cienaga-fsru-co","terminal_name":"Ciénaga FSRU","country":"Colombia","country_iso":"CO","unit_name":null,"status":"proposed","facility_type":"import","floating_type":"fsru","capacity_mtpa":3.07,"capacity_bcm_y":4.18,"start_year":null,"planned_start_year":null,"original_planned_start_year":2027,"fid_year":null,"construction_year":null,"shelved_year":null,"cancelled_year":null,"stop_year":null,"estimated_cost_usd":60000000,"estimated_cost_original":60000000,"estimated_cost_currency":"USD","power_stations_supplied":null,"floating_vessel_name":null,"ccs_project":null,"hydrogen_project":null,"ammonia_project":null,"synthetic_lng_project":null,"retrofit_proposed":null,"url":"https://lngatlas.org/terminal/cienaga-fsru-co/","data_source":"Data: Global Gas Infrastructure Tracker, Global Energy Monitor, September 2025"},{"terminal_slug":"clifton-pier-lng-terminal-bs","terminal_name":"Clifton Pier LNG Terminal","country":"Bahamas","country_iso":"BS","unit_name":null,"status":"proposed","facility_type":"import","floating_type":"unknown","capacity_mtpa":null,"capacity_bcm_y":null,"start_year":null,"planned_start_year":null,"original_planned_start_year":2025,"fid_year":null,"construction_year":null,"shelved_year":null,"cancelled_year":null,"stop_year":null,"estimated_cost_usd":200000000,"estimated_cost_original":200000000,"estimated_cost_currency":"USD","power_stations_supplied":"Clifton Pier power station","floating_vessel_name":null,"ccs_project":null,"hydrogen_project":null,"ammonia_project":null,"synthetic_lng_project":null,"retrofit_proposed":null,"url":"https://lngatlas.org/terminal/clifton-pier-lng-terminal-bs/","data_source":"Data: Global Gas Infrastructure Tracker, Global Energy Monitor, September 2025"},{"terminal_slug":"coastal-bend-lng-terminal-us","terminal_name":"Coastal Bend LNG Terminal","country":"United States","country_iso":"US","unit_name":"T1-T5","status":"proposed","facility_type":"export","floating_type":"unknown","capacity_mtpa":22.5,"capacity_bcm_y":30.61,"start_year":null,"planned_start_year":null,"original_planned_start_year":null,"fid_year":null,"construction_year":null,"shelved_year":null,"cancelled_year":null,"stop_year":null,"estimated_cost_usd":null,"estimated_cost_original":null,"estimated_cost_currency":null,"power_stations_supplied":null,"floating_vessel_name":null,"ccs_project":true,"hydrogen_project":null,"ammonia_project":null,"synthetic_lng_project":null,"retrofit_proposed":null,"url":"https://lngatlas.org/terminal/coastal-bend-lng-terminal-us/","data_source":"Data: Global Gas Infrastructure Tracker, Global Energy Monitor, September 2025"},{"terminal_slug":"coatzacoalcos-ii-lng-terminal-mx","terminal_name":"Coatzacoalcos II LNG Terminal","country":"Mexico","country_iso":"MX","unit_name":null,"status":"proposed","facility_type":"export","floating_type":"unknown","capacity_mtpa":0,"capacity_bcm_y":0,"start_year":null,"planned_start_year":null,"original_planned_start_year":null,"fid_year":null,"construction_year":null,"shelved_year":null,"cancelled_year":null,"stop_year":null,"estimated_cost_usd":450000000,"estimated_cost_original":450000000,"estimated_cost_currency":"USD","power_stations_supplied":null,"floating_vessel_name":null,"ccs_project":null,"hydrogen_project":null,"ammonia_project":null,"synthetic_lng_project":null,"retrofit_proposed":null,"url":"https://lngatlas.org/terminal/coatzacoalcos-ii-lng-terminal-mx/","data_source":"Data: Global Gas Infrastructure Tracker, Global Energy Monitor, September 2025"},{"terminal_slug":"coatzacoalcos-lng-terminal-cfe-mx","terminal_name":"Coatzacoalcos LNG Terminal (CFE)","country":"Mexico","country_iso":"MX","unit_name":null,"status":"shelved","facility_type":"export","floating_type":"unknown","capacity_mtpa":4.6,"capacity_bcm_y":6.26,"start_year":null,"planned_start_year":null,"original_planned_start_year":null,"fid_year":null,"construction_year":null,"shelved_year":2025,"cancelled_year":null,"stop_year":null,"estimated_cost_usd":4500000000,"estimated_cost_original":4500000000,"estimated_cost_currency":"USD","power_stations_supplied":null,"floating_vessel_name":null,"ccs_project":null,"hydrogen_project":null,"ammonia_project":null,"synthetic_lng_project":null,"retrofit_proposed":null,"url":"https://lngatlas.org/terminal/coatzacoalcos-lng-terminal-cfe-mx/","data_source":"Data: Global Gas Infrastructure Tracker, Global Energy Monitor, September 2025"},{"terminal_slug":"coega-fsru-za","terminal_name":"Coega FSRU","country":"South Africa","country_iso":"ZA","unit_name":null,"status":"cancelled","facility_type":"import","floating_type":"fsru","capacity_mtpa":null,"capacity_bcm_y":null,"start_year":null,"planned_start_year":null,"original_planned_start_year":null,"fid_year":null,"construction_year":null,"shelved_year":2021,"cancelled_year":2024,"stop_year":2024,"estimated_cost_usd":null,"estimated_cost_original":null,"estimated_cost_currency":null,"power_stations_supplied":null,"floating_vessel_name":null,"ccs_project":null,"hydrogen_project":null,"ammonia_project":null,"synthetic_lng_project":null,"retrofit_proposed":null,"url":"https://lngatlas.org/terminal/coega-fsru-za/","data_source":"Data: Global Gas Infrastructure Tracker, Global Energy Monitor, September 2025"},{"terminal_slug":"colbun-flng-terminal-cl","terminal_name":"Colbun FLNG Terminal","country":"Chile","country_iso":"CL","unit_name":null,"status":"cancelled","facility_type":"import","floating_type":"flng","capacity_mtpa":1.5,"capacity_bcm_y":2.04,"start_year":null,"planned_start_year":null,"original_planned_start_year":null,"fid_year":null,"construction_year":null,"shelved_year":2016,"cancelled_year":2018,"stop_year":2018,"estimated_cost_usd":null,"estimated_cost_original":null,"estimated_cost_currency":null,"power_stations_supplied":null,"floating_vessel_name":null,"ccs_project":null,"hydrogen_project":null,"ammonia_project":null,"synthetic_lng_project":null,"retrofit_proposed":null,"url":"https://lngatlas.org/terminal/colbun-flng-terminal-cl/","data_source":"Data: Global Gas Infrastructure Tracker, Global Energy Monitor, September 2025"},{"terminal_slug":"colombia-flng-terminal-co","terminal_name":"Colombia FLNG Terminal","country":"Colombia","country_iso":"CO","unit_name":null,"status":"cancelled","facility_type":"export","floating_type":"flng","capacity_mtpa":0.5,"capacity_bcm_y":0.68,"start_year":null,"planned_start_year":null,"original_planned_start_year":null,"fid_year":null,"construction_year":null,"shelved_year":2015,"cancelled_year":2017,"stop_year":2017,"estimated_cost_usd":null,"estimated_cost_original":null,"estimated_cost_currency":null,"power_stations_supplied":null,"floating_vessel_name":null,"ccs_project":null,"hydrogen_project":null,"ammonia_project":null,"synthetic_lng_project":null,"retrofit_proposed":null,"url":"https://lngatlas.org/terminal/colombia-flng-terminal-co/","data_source":"Data: Global Gas Infrastructure Tracker, Global Energy Monitor, September 2025"},{"terminal_slug":"commonwealth-lng-terminal-us","terminal_name":"Commonwealth LNG Terminal","country":"United States","country_iso":"US","unit_name":"T1","status":"proposed","facility_type":"export","floating_type":"unknown","capacity_mtpa":null,"capacity_bcm_y":null,"start_year":null,"planned_start_year":2031,"original_planned_start_year":2021,"fid_year":2025,"construction_year":null,"shelved_year":null,"cancelled_year":null,"stop_year":null,"estimated_cost_usd":null,"estimated_cost_original":null,"estimated_cost_currency":null,"power_stations_supplied":null,"floating_vessel_name":null,"ccs_project":true,"hydrogen_project":null,"ammonia_project":null,"synthetic_lng_project":null,"retrofit_proposed":null,"url":"https://lngatlas.org/terminal/commonwealth-lng-terminal-us/","data_source":"Data: Global Gas Infrastructure Tracker, Global Energy Monitor, September 2025"},{"terminal_slug":"commonwealth-lng-terminal-us","terminal_name":"Commonwealth LNG Terminal","country":"United States","country_iso":"US","unit_name":"T2","status":"proposed","facility_type":"export","floating_type":"unknown","capacity_mtpa":null,"capacity_bcm_y":null,"start_year":null,"planned_start_year":2031,"original_planned_start_year":2021,"fid_year":2025,"construction_year":null,"shelved_year":null,"cancelled_year":null,"stop_year":null,"estimated_cost_usd":null,"estimated_cost_original":null,"estimated_cost_currency":null,"power_stations_supplied":null,"floating_vessel_name":null,"ccs_project":true,"hydrogen_project":null,"ammonia_project":null,"synthetic_lng_project":null,"retrofit_proposed":null,"url":"https://lngatlas.org/terminal/commonwealth-lng-terminal-us/","data_source":"Data: Global Gas Infrastructure Tracker, Global Energy Monitor, September 2025"},{"terminal_slug":"commonwealth-lng-terminal-us","terminal_name":"Commonwealth LNG Terminal","country":"United States","country_iso":"US","unit_name":"T3","status":"proposed","facility_type":"export","floating_type":"unknown","capacity_mtpa":null,"capacity_bcm_y":null,"start_year":null,"planned_start_year":2031,"original_planned_start_year":2021,"fid_year":2025,"construction_year":null,"shelved_year":null,"cancelled_year":null,"stop_year":null,"estimated_cost_usd":null,"estimated_cost_original":null,"estimated_cost_currency":null,"power_stations_supplied":null,"floating_vessel_name":null,"ccs_project":true,"hydrogen_project":null,"ammonia_project":null,"synthetic_lng_project":null,"retrofit_proposed":null,"url":"https://lngatlas.org/terminal/commonwealth-lng-terminal-us/","data_source":"Data: Global Gas Infrastructure Tracker, Global Energy Monitor, September 2025"},{"terminal_slug":"commonwealth-lng-terminal-us","terminal_name":"Commonwealth LNG Terminal","country":"United States","country_iso":"US","unit_name":"T4","status":"proposed","facility_type":"export","floating_type":"unknown","capacity_mtpa":null,"capacity_bcm_y":null,"start_year":null,"planned_start_year":2031,"original_planned_start_year":2021,"fid_year":2025,"construction_year":null,"shelved_year":null,"cancelled_year":null,"stop_year":null,"estimated_cost_usd":null,"estimated_cost_original":null,"estimated_cost_currency":null,"power_stations_supplied":null,"floating_vessel_name":null,"ccs_project":true,"hydrogen_project":null,"ammonia_project":null,"synthetic_lng_project":null,"retrofit_proposed":null,"url":"https://lngatlas.org/terminal/commonwealth-lng-terminal-us/","data_source":"Data: Global Gas Infrastructure Tracker, Global Energy Monitor, September 2025"},{"terminal_slug":"commonwealth-lng-terminal-us","terminal_name":"Commonwealth LNG Terminal","country":"United States","country_iso":"US","unit_name":"T5","status":"proposed","facility_type":"export","floating_type":"unknown","capacity_mtpa":null,"capacity_bcm_y":null,"start_year":null,"planned_start_year":2031,"original_planned_start_year":2021,"fid_year":2025,"construction_year":null,"shelved_year":null,"cancelled_year":null,"stop_year":null,"estimated_cost_usd":null,"estimated_cost_original":null,"estimated_cost_currency":null,"power_stations_supplied":null,"floating_vessel_name":null,"ccs_project":true,"hydrogen_project":null,"ammonia_project":null,"synthetic_lng_project":null,"retrofit_proposed":null,"url":"https://lngatlas.org/terminal/commonwealth-lng-terminal-us/","data_source":"Data: Global Gas Infrastructure Tracker, Global Energy Monitor, September 2025"},{"terminal_slug":"commonwealth-lng-terminal-us","terminal_name":"Commonwealth LNG Terminal","country":"United States","country_iso":"US","unit_name":"T6","status":"proposed","facility_type":"export","floating_type":"unknown","capacity_mtpa":null,"capacity_bcm_y":null,"start_year":null,"planned_start_year":2031,"original_planned_start_year":2021,"fid_year":2025,"construction_year":null,"shelved_year":null,"cancelled_year":null,"stop_year":null,"estimated_cost_usd":null,"estimated_cost_original":null,"estimated_cost_currency":null,"power_stations_supplied":null,"floating_vessel_name":null,"ccs_project":true,"hydrogen_project":null,"ammonia_project":null,"synthetic_lng_project":null,"retrofit_proposed":null,"url":"https://lngatlas.org/terminal/commonwealth-lng-terminal-us/","data_source":"Data: Global Gas Infrastructure Tracker, Global Energy Monitor, September 2025"},{"terminal_slug":"compass-port-lng-terminal-us","terminal_name":"Compass Port LNG Terminal","country":"United States","country_iso":"US","unit_name":null,"status":"cancelled","facility_type":"import","floating_type":"floating","capacity_mtpa":8,"capacity_bcm_y":10.88,"start_year":null,"planned_start_year":null,"original_planned_start_year":null,"fid_year":null,"construction_year":null,"shelved_year":null,"cancelled_year":2006,"stop_year":2006,"estimated_cost_usd":null,"estimated_cost_original":null,"estimated_cost_currency":null,"power_stations_supplied":null,"floating_vessel_name":null,"ccs_project":null,"hydrogen_project":null,"ammonia_project":null,"synthetic_lng_project":null,"retrofit_proposed":null,"url":"https://lngatlas.org/terminal/compass-port-lng-terminal-us/","data_source":"Data: Global Gas Infrastructure Tracker, Global Energy Monitor, September 2025"},{"terminal_slug":"congo-flng-terminal-cg","terminal_name":"Congo FLNG Terminal","country":"Republic of the Congo","country_iso":"CG","unit_name":null,"status":"operating","facility_type":"export","floating_type":"flng","capacity_mtpa":0.6,"capacity_bcm_y":0.82,"start_year":2023,"planned_start_year":null,"original_planned_start_year":null,"fid_year":2022,"construction_year":2023,"shelved_year":null,"cancelled_year":null,"stop_year":null,"estimated_cost_usd":1000000000,"estimated_cost_original":1000000000,"estimated_cost_currency":"USD","power_stations_supplied":null,"floating_vessel_name":"Tango FLNG","ccs_project":null,"hydrogen_project":null,"ammonia_project":null,"synthetic_lng_project":null,"retrofit_proposed":null,"url":"https://lngatlas.org/terminal/congo-flng-terminal-cg/","data_source":"Data: Global Gas Infrastructure Tracker, Global Energy Monitor, September 2025"},{"terminal_slug":"constanta-lng-terminal-ro","terminal_name":"Constanta LNG Terminal","country":"Romania","country_iso":"RO","unit_name":null,"status":"cancelled","facility_type":"import","floating_type":"unknown","capacity_mtpa":6,"capacity_bcm_y":8.16,"start_year":null,"planned_start_year":null,"original_planned_start_year":2027,"fid_year":null,"construction_year":null,"shelved_year":2021,"cancelled_year":2023,"stop_year":2023,"estimated_cost_usd":3106500000,"estimated_cost_original":2850000000,"estimated_cost_currency":"EUR","power_stations_supplied":null,"floating_vessel_name":null,"ccs_project":null,"hydrogen_project":null,"ammonia_project":null,"synthetic_lng_project":null,"retrofit_proposed":null,"url":"https://lngatlas.org/terminal/constanta-lng-terminal-ro/","data_source":"Data: Global Gas Infrastructure Tracker, Global Energy Monitor, September 2025"},{"terminal_slug":"coral-north-flng-terminal-mz","terminal_name":"Coral North FLNG Terminal","country":"Mozambique","country_iso":"MZ","unit_name":null,"status":"proposed","facility_type":"export","floating_type":"flng","capacity_mtpa":3.4,"capacity_bcm_y":4.63,"start_year":null,"planned_start_year":2028,"original_planned_start_year":2027,"fid_year":2025,"construction_year":null,"shelved_year":null,"cancelled_year":null,"stop_year":null,"estimated_cost_usd":7200000000,"estimated_cost_original":7200000000,"estimated_cost_currency":"USD","power_stations_supplied":null,"floating_vessel_name":null,"ccs_project":null,"hydrogen_project":null,"ammonia_project":null,"synthetic_lng_project":null,"retrofit_proposed":null,"url":"https://lngatlas.org/terminal/coral-north-flng-terminal-mz/","data_source":"Data: Global Gas Infrastructure Tracker, Global Energy Monitor, September 2025"},{"terminal_slug":"coral-south-flng-terminal-mz","terminal_name":"Coral South FLNG Terminal","country":"Mozambique","country_iso":"MZ","unit_name":null,"status":"operating","facility_type":"export","floating_type":"flng","capacity_mtpa":3.4,"capacity_bcm_y":4.63,"start_year":2022,"planned_start_year":null,"original_planned_start_year":null,"fid_year":2017,"construction_year":2018,"shelved_year":null,"cancelled_year":null,"stop_year":null,"estimated_cost_usd":7000000000,"estimated_cost_original":7000000000,"estimated_cost_currency":"USD","power_stations_supplied":null,"floating_vessel_name":null,"ccs_project":null,"hydrogen_project":null,"ammonia_project":null,"synthetic_lng_project":null,"retrofit_proposed":null,"url":"https://lngatlas.org/terminal/coral-south-flng-terminal-mz/","data_source":"Data: Global Gas Infrastructure Tracker, Global Energy Monitor, September 2025"},{"terminal_slug":"corpus-christi-lng-terminal-us","terminal_name":"Corpus Christi LNG Terminal","country":"United States","country_iso":"US","unit_name":"Stage 1 T01","status":"operating","facility_type":"export","floating_type":"unknown","capacity_mtpa":5,"capacity_bcm_y":6.8,"start_year":2018,"planned_start_year":null,"original_planned_start_year":null,"fid_year":null,"construction_year":null,"shelved_year":null,"cancelled_year":null,"stop_year":null,"estimated_cost_usd":5166666667,"estimated_cost_original":5166666667,"estimated_cost_currency":"USD","power_stations_supplied":null,"floating_vessel_name":null,"ccs_project":null,"hydrogen_project":null,"ammonia_project":null,"synthetic_lng_project":null,"retrofit_proposed":null,"url":"https://lngatlas.org/terminal/corpus-christi-lng-terminal-us/","data_source":"Data: Global Gas Infrastructure Tracker, Global Energy Monitor, September 2025"},{"terminal_slug":"corpus-christi-lng-terminal-us","terminal_name":"Corpus Christi LNG Terminal","country":"United States","country_iso":"US","unit_name":"Stage 1 T02","status":"operating","facility_type":"export","floating_type":"unknown","capacity_mtpa":5,"capacity_bcm_y":6.8,"start_year":2019,"planned_start_year":null,"original_planned_start_year":null,"fid_year":null,"construction_year":null,"shelved_year":null,"cancelled_year":null,"stop_year":null,"estimated_cost_usd":5166666667,"estimated_cost_original":5166666667,"estimated_cost_currency":"USD","power_stations_supplied":null,"floating_vessel_name":null,"ccs_project":null,"hydrogen_project":null,"ammonia_project":null,"synthetic_lng_project":null,"retrofit_proposed":null,"url":"https://lngatlas.org/terminal/corpus-christi-lng-terminal-us/","data_source":"Data: Global Gas Infrastructure Tracker, Global Energy Monitor, September 2025"},{"terminal_slug":"corpus-christi-lng-terminal-us","terminal_name":"Corpus Christi LNG Terminal","country":"United States","country_iso":"US","unit_name":"Stage 2 T03","status":"operating","facility_type":"export","floating_type":"unknown","capacity_mtpa":5,"capacity_bcm_y":6.8,"start_year":2021,"planned_start_year":null,"original_planned_start_year":null,"fid_year":null,"construction_year":null,"shelved_year":null,"cancelled_year":null,"stop_year":null,"estimated_cost_usd":5166666667,"estimated_cost_original":5166666667,"estimated_cost_currency":"USD","power_stations_supplied":null,"floating_vessel_name":null,"ccs_project":null,"hydrogen_project":null,"ammonia_project":null,"synthetic_lng_project":null,"retrofit_proposed":null,"url":"https://lngatlas.org/terminal/corpus-christi-lng-terminal-us/","data_source":"Data: Global Gas Infrastructure Tracker, Global Energy Monitor, September 2025"},{"terminal_slug":"corpus-christi-lng-terminal-us","terminal_name":"Corpus Christi LNG Terminal","country":"United States","country_iso":"US","unit_name":"Stage 3 (T04-T10)","status":"construction","facility_type":"export","floating_type":"unknown","capacity_mtpa":10,"capacity_bcm_y":13.61,"start_year":null,"planned_start_year":2025,"original_planned_start_year":2024,"fid_year":2022,"construction_year":2022,"shelved_year":null,"cancelled_year":null,"stop_year":null,"estimated_cost_usd":8000000000,"estimated_cost_original":8000000000,"estimated_cost_currency":"USD","power_stations_supplied":null,"floating_vessel_name":null,"ccs_project":null,"hydrogen_project":null,"ammonia_project":null,"synthetic_lng_project":null,"retrofit_proposed":null,"url":"https://lngatlas.org/terminal/corpus-christi-lng-terminal-us/","data_source":"Data: Global Gas Infrastructure Tracker, Global Energy Monitor, September 2025"},{"terminal_slug":"corpus-christi-lng-terminal-us","terminal_name":"Corpus Christi LNG Terminal","country":"United States","country_iso":"US","unit_name":"Stage 3 (T11-T12) Expansion","status":"proposed","facility_type":"export","floating_type":"unknown","capacity_mtpa":3.28,"capacity_bcm_y":4.46,"start_year":null,"planned_start_year":2031,"original_planned_start_year":2028,"fid_year":2025,"construction_year":null,"shelved_year":null,"cancelled_year":null,"stop_year":null,"estimated_cost_usd":null,"estimated_cost_original":null,"estimated_cost_currency":null,"power_stations_supplied":null,"floating_vessel_name":null,"ccs_project":null,"hydrogen_project":null,"ammonia_project":null,"synthetic_lng_project":null,"retrofit_proposed":null,"url":"https://lngatlas.org/terminal/corpus-christi-lng-terminal-us/","data_source":"Data: Global Gas Infrastructure Tracker, Global Energy Monitor, September 2025"},{"terminal_slug":"corpus-christi-lng-terminal-us","terminal_name":"Corpus Christi LNG Terminal","country":"United States","country_iso":"US","unit_name":"Stage 4 (T13-16) Expansion","status":"proposed","facility_type":"export","floating_type":"unknown","capacity_mtpa":24,"capacity_bcm_y":32.65,"start_year":null,"planned_start_year":null,"original_planned_start_year":2035,"fid_year":null,"construction_year":null,"shelved_year":null,"cancelled_year":null,"stop_year":null,"estimated_cost_usd":null,"estimated_cost_original":null,"estimated_cost_currency":null,"power_stations_supplied":null,"floating_vessel_name":null,"ccs_project":null,"hydrogen_project":null,"ammonia_project":null,"synthetic_lng_project":null,"retrofit_proposed":null,"url":"https://lngatlas.org/terminal/corpus-christi-lng-terminal-us/","data_source":"Data: Global Gas Infrastructure Tracker, Global Energy Monitor, September 2025"},{"terminal_slug":"cosan-fsru-br","terminal_name":"Cosan FSRU","country":"Brazil","country_iso":"BR","unit_name":null,"status":"operating","facility_type":"import","floating_type":"fsru","capacity_mtpa":3.7,"capacity_bcm_y":5.03,"start_year":2024,"planned_start_year":null,"original_planned_start_year":null,"fid_year":null,"construction_year":2021,"shelved_year":null,"cancelled_year":null,"stop_year":null,"estimated_cost_usd":null,"estimated_cost_original":null,"estimated_cost_currency":null,"power_stations_supplied":null,"floating_vessel_name":"Höegh Giant","ccs_project":null,"hydrogen_project":null,"ammonia_project":null,"synthetic_lng_project":null,"retrofit_proposed":null,"url":"https://lngatlas.org/terminal/cosan-fsru-br/","data_source":"Data: Global Gas Infrastructure Tracker, Global Energy Monitor, September 2025"},{"terminal_slug":"costa-azul-lng-terminal-mx","terminal_name":"Costa Azul LNG Terminal","country":"Mexico","country_iso":"MX","unit_name":"Import Terminal","status":"operating","facility_type":"import","floating_type":"unknown","capacity_mtpa":7.6,"capacity_bcm_y":10.34,"start_year":2008,"planned_start_year":null,"original_planned_start_year":null,"fid_year":null,"construction_year":null,"shelved_year":null,"cancelled_year":null,"stop_year":null,"estimated_cost_usd":null,"estimated_cost_original":null,"estimated_cost_currency":null,"power_stations_supplied":null,"floating_vessel_name":null,"ccs_project":null,"hydrogen_project":null,"ammonia_project":null,"synthetic_lng_project":null,"retrofit_proposed":null,"url":"https://lngatlas.org/terminal/costa-azul-lng-terminal-mx/","data_source":"Data: Global Gas Infrastructure Tracker, Global Energy Monitor, September 2025"},{"terminal_slug":"costa-azul-lng-terminal-mx","terminal_name":"Costa Azul LNG Terminal","country":"Mexico","country_iso":"MX","unit_name":"Export Terminal Phase 1","status":"construction","facility_type":"export","floating_type":"unknown","capacity_mtpa":3.25,"capacity_bcm_y":4.42,"start_year":null,"planned_start_year":null,"original_planned_start_year":2026,"fid_year":2020,"construction_year":2020,"shelved_year":null,"cancelled_year":null,"stop_year":null,"estimated_cost_usd":null,"estimated_cost_original":null,"estimated_cost_currency":null,"power_stations_supplied":null,"floating_vessel_name":null,"ccs_project":null,"hydrogen_project":null,"ammonia_project":null,"synthetic_lng_project":null,"retrofit_proposed":null,"url":"https://lngatlas.org/terminal/costa-azul-lng-terminal-mx/","data_source":"Data: Global Gas Infrastructure Tracker, Global Energy Monitor, September 2025"},{"terminal_slug":"costa-azul-lng-terminal-mx","terminal_name":"Costa Azul LNG Terminal","country":"Mexico","country_iso":"MX","unit_name":"Export Terminal Phase 2","status":"proposed","facility_type":"export","floating_type":"unknown","capacity_mtpa":12,"capacity_bcm_y":16.33,"start_year":null,"planned_start_year":null,"original_planned_start_year":null,"fid_year":2028,"construction_year":null,"shelved_year":null,"cancelled_year":null,"stop_year":null,"estimated_cost_usd":null,"estimated_cost_original":null,"estimated_cost_currency":null,"power_stations_supplied":null,"floating_vessel_name":null,"ccs_project":null,"hydrogen_project":null,"ammonia_project":null,"synthetic_lng_project":null,"retrofit_proposed":null,"url":"https://lngatlas.org/terminal/costa-azul-lng-terminal-mx/","data_source":"Data: Global Gas Infrastructure Tracker, Global Energy Monitor, September 2025"},{"terminal_slug":"costa-norte-lng-terminal-pa","terminal_name":"Costa Norte LNG Terminal","country":"Panama","country_iso":"PA","unit_name":null,"status":"operating","facility_type":"import","floating_type":"unknown","capacity_mtpa":1.5,"capacity_bcm_y":2.04,"start_year":2018,"planned_start_year":null,"original_planned_start_year":null,"fid_year":null,"construction_year":null,"shelved_year":null,"cancelled_year":null,"stop_year":null,"estimated_cost_usd":null,"estimated_cost_original":null,"estimated_cost_currency":null,"power_stations_supplied":"AES Colón power station, Gatún power station","floating_vessel_name":null,"ccs_project":null,"hydrogen_project":null,"ammonia_project":null,"synthetic_lng_project":null,"retrofit_proposed":null,"url":"https://lngatlas.org/terminal/costa-norte-lng-terminal-pa/","data_source":"Data: Global Gas Infrastructure Tracker, Global Energy Monitor, September 2025"},{"terminal_slug":"cotonou-fsru-bj","terminal_name":"Cotonou FSRU","country":"Benin","country_iso":"BJ","unit_name":null,"status":"cancelled","facility_type":"import","floating_type":"fsru","capacity_mtpa":null,"capacity_bcm_y":null,"start_year":null,"planned_start_year":null,"original_planned_start_year":null,"fid_year":null,"construction_year":null,"shelved_year":2017,"cancelled_year":2019,"stop_year":2019,"estimated_cost_usd":null,"estimated_cost_original":null,"estimated_cost_currency":null,"power_stations_supplied":null,"floating_vessel_name":null,"ccs_project":null,"hydrogen_project":null,"ammonia_project":null,"synthetic_lng_project":null,"retrofit_proposed":null,"url":"https://lngatlas.org/terminal/cotonou-fsru-bj/","data_source":"Data: Global Gas Infrastructure Tracker, Global Energy Monitor, September 2025"},{"terminal_slug":"cove-point-lng-terminal-us","terminal_name":"Cove Point LNG Terminal","country":"United States","country_iso":"US","unit_name":"Export Terminal","status":"operating","facility_type":"export","floating_type":"unknown","capacity_mtpa":5.25,"capacity_bcm_y":7.14,"start_year":1972,"planned_start_year":null,"original_planned_start_year":null,"fid_year":null,"construction_year":null,"shelved_year":null,"cancelled_year":null,"stop_year":1979,"estimated_cost_usd":4000000000,"estimated_cost_original":4000000000,"estimated_cost_currency":"USD","power_stations_supplied":null,"floating_vessel_name":null,"ccs_project":null,"hydrogen_project":null,"ammonia_project":null,"synthetic_lng_project":null,"retrofit_proposed":null,"url":"https://lngatlas.org/terminal/cove-point-lng-terminal-us/","data_source":"Data: Global Gas Infrastructure Tracker, Global Energy Monitor, September 2025"},{"terminal_slug":"cove-point-lng-terminal-us","terminal_name":"Cove Point LNG Terminal","country":"United States","country_iso":"US","unit_name":"Import Terminal","status":"operating","facility_type":"import","floating_type":"unknown","capacity_mtpa":7.9,"capacity_bcm_y":10.75,"start_year":1978,"planned_start_year":null,"original_planned_start_year":null,"fid_year":null,"construction_year":null,"shelved_year":null,"cancelled_year":null,"stop_year":null,"estimated_cost_usd":null,"estimated_cost_original":null,"estimated_cost_currency":null,"power_stations_supplied":null,"floating_vessel_name":null,"ccs_project":null,"hydrogen_project":null,"ammonia_project":null,"synthetic_lng_project":null,"retrofit_proposed":null,"url":"https://lngatlas.org/terminal/cove-point-lng-terminal-us/","data_source":"Data: Global Gas Infrastructure Tracker, Global Energy Monitor, September 2025"},{"terminal_slug":"cove-point-lng-terminal-us","terminal_name":"Cove Point LNG Terminal","country":"United States","country_iso":"US","unit_name":"Import Terminal (Expansion)","status":"operating","facility_type":"import","floating_type":"unknown","capacity_mtpa":5.8,"capacity_bcm_y":7.89,"start_year":2018,"planned_start_year":null,"original_planned_start_year":null,"fid_year":null,"construction_year":null,"shelved_year":null,"cancelled_year":null,"stop_year":null,"estimated_cost_usd":null,"estimated_cost_original":null,"estimated_cost_currency":null,"power_stations_supplied":null,"floating_vessel_name":null,"ccs_project":null,"hydrogen_project":null,"ammonia_project":null,"synthetic_lng_project":null,"retrofit_proposed":null,"url":"https://lngatlas.org/terminal/cove-point-lng-terminal-us/","data_source":"Data: Global Gas Infrastructure Tracker, Global Energy Monitor, September 2025"},{"terminal_slug":"covenas-fsru-co","terminal_name":"Coveñas FSRU","country":"Colombia","country_iso":"CO","unit_name":"Phase 1","status":"proposed","facility_type":"import","floating_type":"fsru","capacity_mtpa":1,"capacity_bcm_y":1.36,"start_year":null,"planned_start_year":null,"original_planned_start_year":2027,"fid_year":null,"construction_year":null,"shelved_year":null,"cancelled_year":null,"stop_year":null,"estimated_cost_usd":null,"estimated_cost_original":null,"estimated_cost_currency":null,"power_stations_supplied":null,"floating_vessel_name":null,"ccs_project":null,"hydrogen_project":null,"ammonia_project":null,"synthetic_lng_project":null,"retrofit_proposed":null,"url":"https://lngatlas.org/terminal/covenas-fsru-co/","data_source":"Data: Global Gas Infrastructure Tracker, Global Energy Monitor, September 2025"},{"terminal_slug":"covenas-fsru-co","terminal_name":"Coveñas FSRU","country":"Colombia","country_iso":"CO","unit_name":"Phase 2","status":"proposed","facility_type":"import","floating_type":"fsru","capacity_mtpa":3.07,"capacity_bcm_y":4.18,"start_year":null,"planned_start_year":null,"original_planned_start_year":2029,"fid_year":null,"construction_year":null,"shelved_year":null,"cancelled_year":null,"stop_year":null,"estimated_cost_usd":null,"estimated_cost_original":null,"estimated_cost_currency":null,"power_stations_supplied":null,"floating_vessel_name":null,"ccs_project":null,"hydrogen_project":null,"ammonia_project":null,"synthetic_lng_project":null,"retrofit_proposed":null,"url":"https://lngatlas.org/terminal/covenas-fsru-co/","data_source":"Data: Global Gas Infrastructure Tracker, Global Energy Monitor, September 2025"},{"terminal_slug":"creole-trail-lng-terminal-us","terminal_name":"Creole Trail LNG Terminal","country":"United States","country_iso":"US","unit_name":null,"status":"cancelled","facility_type":"import","floating_type":"unknown","capacity_mtpa":27,"capacity_bcm_y":36.73,"start_year":null,"planned_start_year":null,"original_planned_start_year":null,"fid_year":null,"construction_year":null,"shelved_year":2017,"cancelled_year":2019,"stop_year":2019,"estimated_cost_usd":null,"estimated_cost_original":null,"estimated_cost_currency":null,"power_stations_supplied":null,"floating_vessel_name":null,"ccs_project":null,"hydrogen_project":null,"ammonia_project":null,"synthetic_lng_project":null,"retrofit_proposed":null,"url":"https://lngatlas.org/terminal/creole-trail-lng-terminal-us/","data_source":"Data: Global Gas Infrastructure Tracker, Global Energy Monitor, September 2025"},{"terminal_slug":"crib-point-fsru-terminal-au","terminal_name":"Crib Point FSRU Terminal","country":"Australia","country_iso":"AU","unit_name":null,"status":"cancelled","facility_type":"import","floating_type":"fsru","capacity_mtpa":1.75,"capacity_bcm_y":2.38,"start_year":null,"planned_start_year":null,"original_planned_start_year":2022,"fid_year":null,"construction_year":null,"shelved_year":null,"cancelled_year":2021,"stop_year":2021,"estimated_cost_usd":181600000,"estimated_cost_original":250000000,"estimated_cost_currency":"AUD","power_stations_supplied":null,"floating_vessel_name":null,"ccs_project":null,"hydrogen_project":null,"ammonia_project":null,"synthetic_lng_project":null,"retrofit_proposed":null,"url":"https://lngatlas.org/terminal/crib-point-fsru-terminal-au/","data_source":"Data: Global Gas Infrastructure Tracker, Global Energy Monitor, September 2025"},{"terminal_slug":"crimea-lng-terminal-ua","terminal_name":"Crimea LNG Terminal","country":"Ukraine","country_iso":"UA","unit_name":null,"status":"cancelled","facility_type":"export","floating_type":"unknown","capacity_mtpa":null,"capacity_bcm_y":null,"start_year":null,"planned_start_year":null,"original_planned_start_year":null,"fid_year":null,"construction_year":null,"shelved_year":null,"cancelled_year":2022,"stop_year":2022,"estimated_cost_usd":null,"estimated_cost_original":null,"estimated_cost_currency":null,"power_stations_supplied":null,"floating_vessel_name":null,"ccs_project":null,"hydrogen_project":null,"ammonia_project":null,"synthetic_lng_project":null,"retrofit_proposed":null,"url":"https://lngatlas.org/terminal/crimea-lng-terminal-ua/","data_source":"Data: Global Gas Infrastructure Tracker, Global Energy Monitor, September 2025"},{"terminal_slug":"crown-kakinada-lng-terminal-in","terminal_name":"Crown Kakinada LNG Terminal","country":"India","country_iso":"IN","unit_name":null,"status":"proposed","facility_type":"import","floating_type":"unknown","capacity_mtpa":7.2,"capacity_bcm_y":9.8,"start_year":null,"planned_start_year":null,"original_planned_start_year":2028,"fid_year":2025,"construction_year":null,"shelved_year":null,"cancelled_year":null,"stop_year":null,"estimated_cost_usd":1000000000,"estimated_cost_original":1000000000,"estimated_cost_currency":"USD","power_stations_supplied":null,"floating_vessel_name":null,"ccs_project":null,"hydrogen_project":null,"ammonia_project":null,"synthetic_lng_project":null,"retrofit_proposed":null,"url":"https://lngatlas.org/terminal/crown-kakinada-lng-terminal-in/","data_source":"Data: Global Gas Infrastructure Tracker, Global Energy Monitor, September 2025"},{"terminal_slug":"crown-landing-lng-terminal-us","terminal_name":"Crown Landing LNG Terminal","country":"United States","country_iso":"US","unit_name":null,"status":"cancelled","facility_type":"import","floating_type":"unknown","capacity_mtpa":11,"capacity_bcm_y":14.97,"start_year":null,"planned_start_year":null,"original_planned_start_year":null,"fid_year":null,"construction_year":null,"shelved_year":2014,"cancelled_year":2016,"stop_year":2016,"estimated_cost_usd":null,"estimated_cost_original":null,"estimated_cost_currency":null,"power_stations_supplied":null,"floating_vessel_name":null,"ccs_project":null,"hydrogen_project":null,"ammonia_project":null,"synthetic_lng_project":null,"retrofit_proposed":null,"url":"https://lngatlas.org/terminal/crown-landing-lng-terminal-us/","data_source":"Data: Global Gas Infrastructure Tracker, Global Energy Monitor, September 2025"},{"terminal_slug":"cyprus-fsru-cy","terminal_name":"Cyprus FSRU","country":"Cyprus","country_iso":"CY","unit_name":null,"status":"construction","facility_type":"import","floating_type":"fsru","capacity_mtpa":2,"capacity_bcm_y":2.72,"start_year":null,"planned_start_year":2026,"original_planned_start_year":2021,"fid_year":null,"construction_year":2020,"shelved_year":null,"cancelled_year":null,"stop_year":null,"estimated_cost_usd":590780000,"estimated_cost_original":542000000,"estimated_cost_currency":"EUR","power_stations_supplied":"Vasilikos power station","floating_vessel_name":"Etyfa Prometheas (previously Galea) FSRU","ccs_project":null,"hydrogen_project":null,"ammonia_project":null,"synthetic_lng_project":null,"retrofit_proposed":null,"url":"https://lngatlas.org/terminal/cyprus-fsru-cy/","data_source":"Data: Global Gas Infrastructure Tracker, Global Energy Monitor, September 2025"},{"terminal_slug":"cyprus-lng-terminal-cy","terminal_name":"Cyprus LNG Terminal","country":"Cyprus","country_iso":"CY","unit_name":"T1 through T3/T8","status":"cancelled","facility_type":"export","floating_type":"unknown","capacity_mtpa":5,"capacity_bcm_y":6.8,"start_year":null,"planned_start_year":null,"original_planned_start_year":null,"fid_year":null,"construction_year":null,"shelved_year":2017,"cancelled_year":2019,"stop_year":2019,"estimated_cost_usd":6000000000,"estimated_cost_original":6000000000,"estimated_cost_currency":"USD","power_stations_supplied":null,"floating_vessel_name":null,"ccs_project":null,"hydrogen_project":null,"ammonia_project":null,"synthetic_lng_project":null,"retrofit_proposed":null,"url":"https://lngatlas.org/terminal/cyprus-lng-terminal-cy/","data_source":"Data: Global Gas Infrastructure Tracker, Global Energy Monitor, September 2025"},{"terminal_slug":"dabhol-lng-terminal-in","terminal_name":"Dabhol LNG Terminal","country":"India","country_iso":"IN","unit_name":null,"status":"operating","facility_type":"import","floating_type":"unknown","capacity_mtpa":5,"capacity_bcm_y":6.8,"start_year":2013,"planned_start_year":null,"original_planned_start_year":null,"fid_year":null,"construction_year":null,"shelved_year":null,"cancelled_year":null,"stop_year":null,"estimated_cost_usd":null,"estimated_cost_original":null,"estimated_cost_currency":null,"power_stations_supplied":"Ratnagiri Combined Cycle power plant","floating_vessel_name":null,"ccs_project":null,"hydrogen_project":null,"ammonia_project":null,"synthetic_lng_project":null,"retrofit_proposed":null,"url":"https://lngatlas.org/terminal/dabhol-lng-terminal-in/","data_source":"Data: Global Gas Infrastructure Tracker, Global Energy Monitor, September 2025"},{"terminal_slug":"dabhol-lng-terminal-in","terminal_name":"Dabhol LNG Terminal","country":"India","country_iso":"IN","unit_name":"Breakwater","status":"operating","facility_type":"import","floating_type":"unknown","capacity_mtpa":null,"capacity_bcm_y":null,"start_year":2025,"planned_start_year":null,"original_planned_start_year":2024,"fid_year":null,"construction_year":2020,"shelved_year":null,"cancelled_year":null,"stop_year":null,"estimated_cost_usd":null,"estimated_cost_original":null,"estimated_cost_currency":null,"power_stations_supplied":"Ratnagiri Combined Cycle power plant","floating_vessel_name":null,"ccs_project":null,"hydrogen_project":null,"ammonia_project":null,"synthetic_lng_project":null,"retrofit_proposed":null,"url":"https://lngatlas.org/terminal/dabhol-lng-terminal-in/","data_source":"Data: Global Gas Infrastructure Tracker, Global Energy Monitor, September 2025"},{"terminal_slug":"dabhol-lng-terminal-in","terminal_name":"Dabhol LNG Terminal","country":"India","country_iso":"IN","unit_name":"Expansion","status":"proposed","facility_type":"import","floating_type":"unknown","capacity_mtpa":7.5,"capacity_bcm_y":10.2,"start_year":null,"planned_start_year":2031,"original_planned_start_year":2030,"fid_year":null,"construction_year":null,"shelved_year":null,"cancelled_year":null,"stop_year":null,"estimated_cost_usd":null,"estimated_cost_original":null,"estimated_cost_currency":null,"power_stations_supplied":"Ratnagiri Combined Cycle power plant","floating_vessel_name":null,"ccs_project":null,"hydrogen_project":null,"ammonia_project":null,"synthetic_lng_project":null,"retrofit_proposed":null,"url":"https://lngatlas.org/terminal/dabhol-lng-terminal-in/","data_source":"Data: Global Gas Infrastructure Tracker, Global Energy Monitor, September 2025"},{"terminal_slug":"daewoo-gas-lng-terminal-pk","terminal_name":"Daewoo Gas LNG Terminal","country":"Pakistan","country_iso":"PK","unit_name":null,"status":"shelved","facility_type":"import","floating_type":"unknown","capacity_mtpa":2.5,"capacity_bcm_y":3.4,"start_year":null,"planned_start_year":null,"original_planned_start_year":null,"fid_year":null,"construction_year":null,"shelved_year":2024,"cancelled_year":null,"stop_year":null,"estimated_cost_usd":350000000,"estimated_cost_original":350000000,"estimated_cost_currency":"USD","power_stations_supplied":null,"floating_vessel_name":null,"ccs_project":null,"hydrogen_project":null,"ammonia_project":null,"synthetic_lng_project":null,"retrofit_proposed":null,"url":"https://lngatlas.org/terminal/daewoo-gas-lng-terminal-pk/","data_source":"Data: Global Gas Infrastructure Tracker, Global Energy Monitor, September 2025"},{"terminal_slug":"dahej-lng-terminal-in","terminal_name":"Dahej LNG Terminal","country":"India","country_iso":"IN","unit_name":null,"status":"operating","facility_type":"import","floating_type":"unknown","capacity_mtpa":15,"capacity_bcm_y":20.41,"start_year":2004,"planned_start_year":null,"original_planned_start_year":null,"fid_year":null,"construction_year":null,"shelved_year":null,"cancelled_year":null,"stop_year":null,"estimated_cost_usd":null,"estimated_cost_original":null,"estimated_cost_currency":null,"power_stations_supplied":null,"floating_vessel_name":null,"ccs_project":null,"hydrogen_project":null,"ammonia_project":null,"synthetic_lng_project":null,"retrofit_proposed":null,"url":"https://lngatlas.org/terminal/dahej-lng-terminal-in/","data_source":"Data: Global Gas Infrastructure Tracker, Global Energy Monitor, September 2025"},{"terminal_slug":"dahej-lng-terminal-in","terminal_name":"Dahej LNG Terminal","country":"India","country_iso":"IN","unit_name":"Phase 1 Expansion","status":"operating","facility_type":"import","floating_type":"unknown","capacity_mtpa":2.5,"capacity_bcm_y":3.4,"start_year":2019,"planned_start_year":null,"original_planned_start_year":null,"fid_year":null,"construction_year":null,"shelved_year":null,"cancelled_year":null,"stop_year":null,"estimated_cost_usd":null,"estimated_cost_original":null,"estimated_cost_currency":null,"power_stations_supplied":null,"floating_vessel_name":null,"ccs_project":null,"hydrogen_project":null,"ammonia_project":null,"synthetic_lng_project":null,"retrofit_proposed":null,"url":"https://lngatlas.org/terminal/dahej-lng-terminal-in/","data_source":"Data: Global Gas Infrastructure Tracker, Global Energy Monitor, September 2025"},{"terminal_slug":"dahej-lng-terminal-in","terminal_name":"Dahej LNG Terminal","country":"India","country_iso":"IN","unit_name":"Phase 2 Expansion","status":"construction","facility_type":"import","floating_type":"unknown","capacity_mtpa":5,"capacity_bcm_y":6.8,"start_year":null,"planned_start_year":null,"original_planned_start_year":2025,"fid_year":null,"construction_year":2022,"shelved_year":null,"cancelled_year":null,"stop_year":null,"estimated_cost_usd":null,"estimated_cost_original":null,"estimated_cost_currency":null,"power_stations_supplied":null,"floating_vessel_name":null,"ccs_project":null,"hydrogen_project":null,"ammonia_project":null,"synthetic_lng_project":null,"retrofit_proposed":null,"url":"https://lngatlas.org/terminal/dahej-lng-terminal-in/","data_source":"Data: Global Gas Infrastructure Tracker, Global Energy Monitor, September 2025"},{"terminal_slug":"dakhla-lng-terminal-eh","terminal_name":"Dakhla LNG Terminal","country":"Western Sahara","country_iso":"EH","unit_name":null,"status":"proposed","facility_type":"import","floating_type":"unknown","capacity_mtpa":null,"capacity_bcm_y":null,"start_year":null,"planned_start_year":null,"original_planned_start_year":2030,"fid_year":null,"construction_year":null,"shelved_year":null,"cancelled_year":null,"stop_year":null,"estimated_cost_usd":null,"estimated_cost_original":null,"estimated_cost_currency":null,"power_stations_supplied":null,"floating_vessel_name":null,"ccs_project":null,"hydrogen_project":null,"ammonia_project":null,"synthetic_lng_project":null,"retrofit_proposed":null,"url":"https://lngatlas.org/terminal/dakhla-lng-terminal-eh/","data_source":"Data: Global Gas Infrastructure Tracker, Global Energy Monitor, September 2025"},{"terminal_slug":"dalian-lng-terminal-cn","terminal_name":"Dalian LNG Terminal","country":"China","country_iso":"CN","unit_name":"Phase 1","status":"operating","facility_type":"import","floating_type":"unknown","capacity_mtpa":3,"capacity_bcm_y":4.08,"start_year":2011,"planned_start_year":null,"original_planned_start_year":null,"fid_year":null,"construction_year":2008,"shelved_year":null,"cancelled_year":null,"stop_year":null,"estimated_cost_usd":1440000000,"estimated_cost_original":9000000000,"estimated_cost_currency":"RMB","power_stations_supplied":null,"floating_vessel_name":null,"ccs_project":null,"hydrogen_project":null,"ammonia_project":null,"synthetic_lng_project":null,"retrofit_proposed":null,"url":"https://lngatlas.org/terminal/dalian-lng-terminal-cn/","data_source":"Data: Global Gas Infrastructure Tracker, Global Energy Monitor, September 2025"},{"terminal_slug":"dalian-lng-terminal-cn","terminal_name":"Dalian LNG Terminal","country":"China","country_iso":"CN","unit_name":"Phase 2","status":"operating","facility_type":"import","floating_type":"unknown","capacity_mtpa":3,"capacity_bcm_y":4.08,"start_year":2016,"planned_start_year":null,"original_planned_start_year":null,"fid_year":null,"construction_year":2014,"shelved_year":null,"cancelled_year":null,"stop_year":null,"estimated_cost_usd":43520000,"estimated_cost_original":272000000,"estimated_cost_currency":"RMB","power_stations_supplied":null,"floating_vessel_name":null,"ccs_project":null,"hydrogen_project":null,"ammonia_project":null,"synthetic_lng_project":null,"retrofit_proposed":null,"url":"https://lngatlas.org/terminal/dalian-lng-terminal-cn/","data_source":"Data: Global Gas Infrastructure Tracker, Global Energy Monitor, September 2025"},{"terminal_slug":"damaiyu-lng-terminal-cn","terminal_name":"Damaiyu LNG Terminal","country":"China","country_iso":"CN","unit_name":null,"status":"construction","facility_type":"import","floating_type":"unknown","capacity_mtpa":2,"capacity_bcm_y":2.72,"start_year":null,"planned_start_year":2024,"original_planned_start_year":2023,"fid_year":null,"construction_year":2021,"shelved_year":null,"cancelled_year":null,"stop_year":null,"estimated_cost_usd":656000000,"estimated_cost_original":4100000000,"estimated_cost_currency":"RMB","power_stations_supplied":null,"floating_vessel_name":null,"ccs_project":null,"hydrogen_project":null,"ammonia_project":null,"synthetic_lng_project":null,"retrofit_proposed":null,"url":"https://lngatlas.org/terminal/damaiyu-lng-terminal-cn/","data_source":"Data: Global Gas Infrastructure Tracker, Global Energy Monitor, September 2025"},{"terminal_slug":"damietta-segas-lng-terminal-eg","terminal_name":"Damietta SEGAS LNG Terminal","country":"Egypt","country_iso":"EG","unit_name":"T1","status":"operating","facility_type":"export","floating_type":"unknown","capacity_mtpa":5,"capacity_bcm_y":6.8,"start_year":2005,"planned_start_year":null,"original_planned_start_year":null,"fid_year":null,"construction_year":null,"shelved_year":null,"cancelled_year":null,"stop_year":2012,"estimated_cost_usd":1300000000,"estimated_cost_original":1300000000,"estimated_cost_currency":"USD","power_stations_supplied":null,"floating_vessel_name":null,"ccs_project":null,"hydrogen_project":null,"ammonia_project":null,"synthetic_lng_project":null,"retrofit_proposed":null,"url":"https://lngatlas.org/terminal/damietta-segas-lng-terminal-eg/","data_source":"Data: Global Gas Infrastructure Tracker, Global Energy Monitor, September 2025"},{"terminal_slug":"damietta-segas-lng-terminal-eg","terminal_name":"Damietta SEGAS LNG Terminal","country":"Egypt","country_iso":"EG","unit_name":"T2","status":"shelved","facility_type":"export","floating_type":"unknown","capacity_mtpa":5,"capacity_bcm_y":6.8,"start_year":null,"planned_start_year":null,"original_planned_start_year":null,"fid_year":2008,"construction_year":null,"shelved_year":2009,"cancelled_year":null,"stop_year":null,"estimated_cost_usd":null,"estimated_cost_original":null,"estimated_cost_currency":null,"power_stations_supplied":null,"floating_vessel_name":null,"ccs_project":null,"hydrogen_project":null,"ammonia_project":null,"synthetic_lng_project":null,"retrofit_proposed":null,"url":"https://lngatlas.org/terminal/damietta-segas-lng-terminal-eg/","data_source":"Data: Global Gas Infrastructure Tracker, Global Energy Monitor, September 2025"},{"terminal_slug":"danang-lng-terminal-vn","terminal_name":"Danang LNG Terminal","country":"Vietnam","country_iso":"VN","unit_name":null,"status":"proposed","facility_type":"import","floating_type":"unknown","capacity_mtpa":null,"capacity_bcm_y":null,"start_year":null,"planned_start_year":null,"original_planned_start_year":null,"fid_year":null,"construction_year":null,"shelved_year":null,"cancelled_year":null,"stop_year":null,"estimated_cost_usd":null,"estimated_cost_original":null,"estimated_cost_currency":null,"power_stations_supplied":null,"floating_vessel_name":null,"ccs_project":null,"hydrogen_project":null,"ammonia_project":null,"synthetic_lng_project":null,"retrofit_proposed":null,"url":"https://lngatlas.org/terminal/danang-lng-terminal-vn/","data_source":"Data: Global Gas Infrastructure Tracker, Global Energy Monitor, September 2025"},{"terminal_slug":"dandong-lng-terminal-cn","terminal_name":"Dandong LNG Terminal","country":"China","country_iso":"CN","unit_name":null,"status":"cancelled","facility_type":"import","floating_type":"unknown","capacity_mtpa":null,"capacity_bcm_y":null,"start_year":null,"planned_start_year":null,"original_planned_start_year":null,"fid_year":null,"construction_year":null,"shelved_year":2023,"cancelled_year":2025,"stop_year":2025,"estimated_cost_usd":null,"estimated_cost_original":null,"estimated_cost_currency":null,"power_stations_supplied":null,"floating_vessel_name":null,"ccs_project":null,"hydrogen_project":null,"ammonia_project":null,"synthetic_lng_project":null,"retrofit_proposed":null,"url":"https://lngatlas.org/terminal/dandong-lng-terminal-cn/","data_source":"Data: Global Gas Infrastructure Tracker, Global Energy Monitor, September 2025"},{"terminal_slug":"darwin-lng-terminal-au","terminal_name":"Darwin LNG Terminal","country":"Australia","country_iso":"AU","unit_name":"T1","status":"idle","facility_type":"export","floating_type":"unknown","capacity_mtpa":3.7,"capacity_bcm_y":5.03,"start_year":2006,"planned_start_year":null,"original_planned_start_year":2025,"fid_year":2003,"construction_year":2003,"shelved_year":null,"cancelled_year":null,"stop_year":2023,"estimated_cost_usd":1600000000,"estimated_cost_original":1600000000,"estimated_cost_currency":"USD","power_stations_supplied":null,"floating_vessel_name":null,"ccs_project":true,"hydrogen_project":null,"ammonia_project":null,"synthetic_lng_project":null,"retrofit_proposed":null,"url":"https://lngatlas.org/terminal/darwin-lng-terminal-au/","data_source":"Data: Global Gas Infrastructure Tracker, Global Energy Monitor, September 2025"},{"terminal_slug":"darwin-lng-terminal-au","terminal_name":"Darwin LNG Terminal","country":"Australia","country_iso":"AU","unit_name":"T2","status":"proposed","facility_type":"export","floating_type":"unknown","capacity_mtpa":6,"capacity_bcm_y":8.16,"start_year":null,"planned_start_year":null,"original_planned_start_year":null,"fid_year":null,"construction_year":null,"shelved_year":2023,"cancelled_year":null,"stop_year":null,"estimated_cost_usd":null,"estimated_cost_original":null,"estimated_cost_currency":null,"power_stations_supplied":null,"floating_vessel_name":null,"ccs_project":true,"hydrogen_project":null,"ammonia_project":null,"synthetic_lng_project":null,"retrofit_proposed":null,"url":"https://lngatlas.org/terminal/darwin-lng-terminal-au/","data_source":"Data: Global Gas Infrastructure Tracker, Global Energy Monitor, September 2025"},{"terminal_slug":"das-island-lng-terminal-ae","terminal_name":"Das Island LNG Terminal","country":"United Arab Emirates","country_iso":"AE","unit_name":"T1","status":"operating","facility_type":"export","floating_type":"unknown","capacity_mtpa":1.7,"capacity_bcm_y":2.31,"start_year":1977,"planned_start_year":null,"original_planned_start_year":null,"fid_year":null,"construction_year":null,"shelved_year":null,"cancelled_year":null,"stop_year":null,"estimated_cost_usd":null,"estimated_cost_original":null,"estimated_cost_currency":null,"power_stations_supplied":null,"floating_vessel_name":null,"ccs_project":null,"hydrogen_project":null,"ammonia_project":null,"synthetic_lng_project":null,"retrofit_proposed":null,"url":"https://lngatlas.org/terminal/das-island-lng-terminal-ae/","data_source":"Data: Global Gas Infrastructure Tracker, Global Energy Monitor, September 2025"},{"terminal_slug":"das-island-lng-terminal-ae","terminal_name":"Das Island LNG Terminal","country":"United Arab Emirates","country_iso":"AE","unit_name":"T2","status":"operating","facility_type":"export","floating_type":"unknown","capacity_mtpa":1.7,"capacity_bcm_y":2.31,"start_year":1977,"planned_start_year":null,"original_planned_start_year":null,"fid_year":null,"construction_year":null,"shelved_year":null,"cancelled_year":null,"stop_year":null,"estimated_cost_usd":null,"estimated_cost_original":null,"estimated_cost_currency":null,"power_stations_supplied":null,"floating_vessel_name":null,"ccs_project":null,"hydrogen_project":null,"ammonia_project":null,"synthetic_lng_project":null,"retrofit_proposed":null,"url":"https://lngatlas.org/terminal/das-island-lng-terminal-ae/","data_source":"Data: Global Gas Infrastructure Tracker, Global Energy Monitor, September 2025"},{"terminal_slug":"das-island-lng-terminal-ae","terminal_name":"Das Island LNG Terminal","country":"United Arab Emirates","country_iso":"AE","unit_name":"T3","status":"operating","facility_type":"export","floating_type":"unknown","capacity_mtpa":2.6,"capacity_bcm_y":3.54,"start_year":1994,"planned_start_year":null,"original_planned_start_year":null,"fid_year":null,"construction_year":null,"shelved_year":null,"cancelled_year":null,"stop_year":null,"estimated_cost_usd":null,"estimated_cost_original":null,"estimated_cost_currency":null,"power_stations_supplied":null,"floating_vessel_name":null,"ccs_project":null,"hydrogen_project":null,"ammonia_project":null,"synthetic_lng_project":null,"retrofit_proposed":null,"url":"https://lngatlas.org/terminal/das-island-lng-terminal-ae/","data_source":"Data: Global Gas Infrastructure Tracker, Global Energy Monitor, September 2025"},{"terminal_slug":"das-island-lng-terminal-ae","terminal_name":"Das Island LNG Terminal","country":"United Arab Emirates","country_iso":"AE","unit_name":"Debottlenecking project","status":"cancelled","facility_type":"unknown","floating_type":"unknown","capacity_mtpa":0.9,"capacity_bcm_y":1.22,"start_year":null,"planned_start_year":null,"original_planned_start_year":2028,"fid_year":2025,"construction_year":null,"shelved_year":null,"cancelled_year":2024,"stop_year":2024,"estimated_cost_usd":1200000000,"estimated_cost_original":1200000000,"estimated_cost_currency":"USD","power_stations_supplied":null,"floating_vessel_name":null,"ccs_project":null,"hydrogen_project":null,"ammonia_project":null,"synthetic_lng_project":null,"retrofit_proposed":null,"url":"https://lngatlas.org/terminal/das-island-lng-terminal-ae/","data_source":"Data: Global Gas Infrastructure Tracker, Global Energy Monitor, September 2025"},{"terminal_slug":"deir-ammar-fsru-lb","terminal_name":"Deir Ammar FSRU","country":"Lebanon","country_iso":"LB","unit_name":null,"status":"proposed","facility_type":"import","floating_type":"fsru","capacity_mtpa":null,"capacity_bcm_y":null,"start_year":null,"planned_start_year":null,"original_planned_start_year":null,"fid_year":null,"construction_year":null,"shelved_year":null,"cancelled_year":null,"stop_year":null,"estimated_cost_usd":null,"estimated_cost_original":null,"estimated_cost_currency":null,"power_stations_supplied":"Deir Ammar Power Plant","floating_vessel_name":null,"ccs_project":null,"hydrogen_project":null,"ammonia_project":null,"synthetic_lng_project":null,"retrofit_proposed":null,"url":"https://lngatlas.org/terminal/deir-ammar-fsru-lb/","data_source":"Data: Global Gas Infrastructure Tracker, Global Energy Monitor, September 2025"},{"terminal_slug":"delfin-flng-terminal-us","terminal_name":"Delfin FLNG Terminal","country":"United States","country_iso":"US","unit_name":"T1-T3","status":"proposed","facility_type":"export","floating_type":"flng","capacity_mtpa":13.2,"capacity_bcm_y":17.96,"start_year":null,"planned_start_year":2030,"original_planned_start_year":2026,"fid_year":2025,"construction_year":null,"shelved_year":null,"cancelled_year":null,"stop_year":null,"estimated_cost_usd":4300000000,"estimated_cost_original":4300000000,"estimated_cost_currency":"USD","power_stations_supplied":null,"floating_vessel_name":null,"ccs_project":null,"hydrogen_project":null,"ammonia_project":null,"synthetic_lng_project":null,"retrofit_proposed":null,"url":"https://lngatlas.org/terminal/delfin-flng-terminal-us/","data_source":"Data: Global Gas Infrastructure Tracker, Global Energy Monitor, September 2025"},{"terminal_slug":"delimara-fsru-mt","terminal_name":"Delimara FSRU","country":"Malta","country_iso":"MT","unit_name":null,"status":"operating","facility_type":"import","floating_type":"fsru","capacity_mtpa":0.5,"capacity_bcm_y":0.68,"start_year":2017,"planned_start_year":null,"original_planned_start_year":null,"fid_year":null,"construction_year":2014,"shelved_year":null,"cancelled_year":null,"stop_year":null,"estimated_cost_usd":null,"estimated_cost_original":null,"estimated_cost_currency":null,"power_stations_supplied":"Delimara power station","floating_vessel_name":"Armada LNG Mediterrana","ccs_project":null,"hydrogen_project":null,"ammonia_project":null,"synthetic_lng_project":null,"retrofit_proposed":null,"url":"https://lngatlas.org/terminal/delimara-fsru-mt/","data_source":"Data: Global Gas Infrastructure Tracker, Global Energy Monitor, September 2025"},{"terminal_slug":"delta-caribe-oriental-terminal-ve","terminal_name":"Delta Caribe Oriental Terminal","country":"Venezuela","country_iso":"VE","unit_name":"T1","status":"cancelled","facility_type":"export","floating_type":"unknown","capacity_mtpa":4.7,"capacity_bcm_y":6.39,"start_year":null,"planned_start_year":null,"original_planned_start_year":null,"fid_year":null,"construction_year":null,"shelved_year":2013,"cancelled_year":2015,"stop_year":2015,"estimated_cost_usd":null,"estimated_cost_original":null,"estimated_cost_currency":null,"power_stations_supplied":null,"floating_vessel_name":null,"ccs_project":null,"hydrogen_project":null,"ammonia_project":null,"synthetic_lng_project":null,"retrofit_proposed":null,"url":"https://lngatlas.org/terminal/delta-caribe-oriental-terminal-ve/","data_source":"Data: Global Gas Infrastructure Tracker, Global Energy Monitor, September 2025"},{"terminal_slug":"delta-caribe-oriental-terminal-ve","terminal_name":"Delta Caribe Oriental Terminal","country":"Venezuela","country_iso":"VE","unit_name":"T2","status":"cancelled","facility_type":"export","floating_type":"unknown","capacity_mtpa":4.7,"capacity_bcm_y":6.39,"start_year":null,"planned_start_year":null,"original_planned_start_year":null,"fid_year":null,"construction_year":null,"shelved_year":2013,"cancelled_year":2015,"stop_year":2015,"estimated_cost_usd":null,"estimated_cost_original":null,"estimated_cost_currency":null,"power_stations_supplied":null,"floating_vessel_name":null,"ccs_project":null,"hydrogen_project":null,"ammonia_project":null,"synthetic_lng_project":null,"retrofit_proposed":null,"url":"https://lngatlas.org/terminal/delta-caribe-oriental-terminal-ve/","data_source":"Data: Global Gas Infrastructure Tracker, Global Energy Monitor, September 2025"},{"terminal_slug":"delta-lng-terminal-us","terminal_name":"Delta LNG Terminal","country":"United States","country_iso":"US","unit_name":"Phase 1 (T1–T18)","status":"cancelled","facility_type":"export","floating_type":"unknown","capacity_mtpa":11.3,"capacity_bcm_y":15.37,"start_year":null,"planned_start_year":null,"original_planned_start_year":2024,"fid_year":null,"construction_year":null,"shelved_year":null,"cancelled_year":2025,"stop_year":2025,"estimated_cost_usd":null,"estimated_cost_original":null,"estimated_cost_currency":null,"power_stations_supplied":null,"floating_vessel_name":null,"ccs_project":true,"hydrogen_project":null,"ammonia_project":null,"synthetic_lng_project":null,"retrofit_proposed":null,"url":"https://lngatlas.org/terminal/delta-lng-terminal-us/","data_source":"Data: Global Gas Infrastructure Tracker, Global Energy Monitor, September 2025"},{"terminal_slug":"delta-lng-terminal-us","terminal_name":"Delta LNG Terminal","country":"United States","country_iso":"US","unit_name":"Phase 2 (T19–T36)","status":"cancelled","facility_type":"export","floating_type":"unknown","capacity_mtpa":11.3,"capacity_bcm_y":15.37,"start_year":null,"planned_start_year":null,"original_planned_start_year":2025,"fid_year":null,"construction_year":null,"shelved_year":null,"cancelled_year":2025,"stop_year":2025,"estimated_cost_usd":null,"estimated_cost_original":null,"estimated_cost_currency":null,"power_stations_supplied":null,"floating_vessel_name":null,"ccs_project":true,"hydrogen_project":null,"ammonia_project":null,"synthetic_lng_project":null,"retrofit_proposed":null,"url":"https://lngatlas.org/terminal/delta-lng-terminal-us/","data_source":"Data: Global Gas Infrastructure Tracker, Global Energy Monitor, September 2025"},{"terminal_slug":"dhamra-lng-terminal-in","terminal_name":"Dhamra LNG Terminal","country":"India","country_iso":"IN","unit_name":null,"status":"operating","facility_type":"import","floating_type":"unknown","capacity_mtpa":5,"capacity_bcm_y":6.8,"start_year":2023,"planned_start_year":null,"original_planned_start_year":2022,"fid_year":null,"construction_year":2017,"shelved_year":null,"cancelled_year":null,"stop_year":null,"estimated_cost_usd":null,"estimated_cost_original":null,"estimated_cost_currency":null,"power_stations_supplied":null,"floating_vessel_name":null,"ccs_project":null,"hydrogen_project":null,"ammonia_project":null,"synthetic_lng_project":null,"retrofit_proposed":null,"url":"https://lngatlas.org/terminal/dhamra-lng-terminal-in/","data_source":"Data: Global Gas Infrastructure Tracker, Global Energy Monitor, September 2025"},{"terminal_slug":"digha-fsru-in","terminal_name":"Digha FSRU","country":"India","country_iso":"IN","unit_name":null,"status":"cancelled","facility_type":"import","floating_type":"fsru","capacity_mtpa":3,"capacity_bcm_y":4.08,"start_year":null,"planned_start_year":null,"original_planned_start_year":2020,"fid_year":null,"construction_year":null,"shelved_year":2021,"cancelled_year":2023,"stop_year":2023,"estimated_cost_usd":null,"estimated_cost_original":null,"estimated_cost_currency":null,"power_stations_supplied":null,"floating_vessel_name":null,"ccs_project":null,"hydrogen_project":null,"ammonia_project":null,"synthetic_lng_project":null,"retrofit_proposed":null,"url":"https://lngatlas.org/terminal/digha-fsru-in/","data_source":"Data: Global Gas Infrastructure Tracker, Global Energy Monitor, September 2025"},{"terminal_slug":"dioriga-fsru-gr","terminal_name":"Dioriga FSRU","country":"Greece","country_iso":"GR","unit_name":null,"status":"proposed","facility_type":"import","floating_type":"fsru","capacity_mtpa":1.91,"capacity_bcm_y":2.6,"start_year":null,"planned_start_year":null,"original_planned_start_year":2023,"fid_year":2022,"construction_year":null,"shelved_year":null,"cancelled_year":null,"stop_year":null,"estimated_cost_usd":327000000,"estimated_cost_original":300000000,"estimated_cost_currency":"EUR","power_stations_supplied":null,"floating_vessel_name":null,"ccs_project":null,"hydrogen_project":true,"ammonia_project":null,"synthetic_lng_project":null,"retrofit_proposed":true,"url":"https://lngatlas.org/terminal/dioriga-fsru-gr/","data_source":"Data: Global Gas Infrastructure Tracker, Global Energy Monitor, September 2025"},{"terminal_slug":"discovery-lng-terminal-ca","terminal_name":"Discovery LNG Terminal","country":"Canada","country_iso":"CA","unit_name":"T1-T4","status":"cancelled","facility_type":"export","floating_type":"unknown","capacity_mtpa":20,"capacity_bcm_y":27.21,"start_year":null,"planned_start_year":2030,"original_planned_start_year":2021,"fid_year":null,"construction_year":null,"shelved_year":2017,"cancelled_year":2019,"stop_year":2019,"estimated_cost_usd":null,"estimated_cost_original":null,"estimated_cost_currency":null,"power_stations_supplied":null,"floating_vessel_name":null,"ccs_project":null,"hydrogen_project":null,"ammonia_project":null,"synthetic_lng_project":null,"retrofit_proposed":null,"url":"https://lngatlas.org/terminal/discovery-lng-terminal-ca/","data_source":"Data: Global Gas Infrastructure Tracker, Global Energy Monitor, September 2025"},{"terminal_slug":"dislub-maranhao-fsru-br","terminal_name":"Dislub Maranhão FSRU","country":"Brazil","country_iso":"BR","unit_name":null,"status":"shelved","facility_type":"import","floating_type":"fsru","capacity_mtpa":3.22,"capacity_bcm_y":4.38,"start_year":null,"planned_start_year":null,"original_planned_start_year":null,"fid_year":null,"construction_year":null,"shelved_year":2025,"cancelled_year":null,"stop_year":null,"estimated_cost_usd":null,"estimated_cost_original":null,"estimated_cost_currency":null,"power_stations_supplied":null,"floating_vessel_name":null,"ccs_project":null,"hydrogen_project":null,"ammonia_project":null,"synthetic_lng_project":null,"retrofit_proposed":null,"url":"https://lngatlas.org/terminal/dislub-maranhao-fsru-br/","data_source":"Data: Global Gas Infrastructure Tracker, Global Energy Monitor, September 2025"},{"terminal_slug":"djibouti-flng-terminal-dj","terminal_name":"Djibouti FLNG Terminal","country":"Djibouti","country_iso":"DJ","unit_name":"T1","status":"cancelled","facility_type":"export","floating_type":"flng","capacity_mtpa":3,"capacity_bcm_y":4.08,"start_year":null,"planned_start_year":2025,"original_planned_start_year":2018,"fid_year":null,"construction_year":2016,"shelved_year":2022,"cancelled_year":2025,"stop_year":2025,"estimated_cost_usd":2900000000,"estimated_cost_original":2900000000,"estimated_cost_currency":"USD","power_stations_supplied":null,"floating_vessel_name":null,"ccs_project":null,"hydrogen_project":null,"ammonia_project":null,"synthetic_lng_project":null,"retrofit_proposed":null,"url":"https://lngatlas.org/terminal/djibouti-flng-terminal-dj/","data_source":"Data: Global Gas Infrastructure Tracker, Global Energy Monitor, September 2025"},{"terminal_slug":"djibouti-flng-terminal-dj","terminal_name":"Djibouti FLNG Terminal","country":"Djibouti","country_iso":"DJ","unit_name":"T2","status":"cancelled","facility_type":"export","floating_type":"flng","capacity_mtpa":3,"capacity_bcm_y":4.08,"start_year":null,"planned_start_year":2025,"original_planned_start_year":2018,"fid_year":null,"construction_year":2016,"shelved_year":2022,"cancelled_year":2025,"stop_year":2025,"estimated_cost_usd":550000000,"estimated_cost_original":550000000,"estimated_cost_currency":"USD","power_stations_supplied":null,"floating_vessel_name":null,"ccs_project":null,"hydrogen_project":null,"ammonia_project":null,"synthetic_lng_project":null,"retrofit_proposed":null,"url":"https://lngatlas.org/terminal/djibouti-flng-terminal-dj/","data_source":"Data: Global Gas Infrastructure Tracker, Global Energy Monitor, September 2025"},{"terminal_slug":"djibouti-flng-terminal-dj","terminal_name":"Djibouti FLNG Terminal","country":"Djibouti","country_iso":"DJ","unit_name":"T3","status":"cancelled","facility_type":"export","floating_type":"flng","capacity_mtpa":4,"capacity_bcm_y":5.44,"start_year":null,"planned_start_year":2025,"original_planned_start_year":2018,"fid_year":null,"construction_year":2016,"shelved_year":2022,"cancelled_year":2025,"stop_year":2025,"estimated_cost_usd":550000000,"estimated_cost_original":550000000,"estimated_cost_currency":"USD","power_stations_supplied":null,"floating_vessel_name":null,"ccs_project":null,"hydrogen_project":null,"ammonia_project":null,"synthetic_lng_project":null,"retrofit_proposed":null,"url":"https://lngatlas.org/terminal/djibouti-flng-terminal-dj/","data_source":"Data: Global Gas Infrastructure Tracker, Global Energy Monitor, September 2025"},{"terminal_slug":"dock-sud-lng-terminal-ar","terminal_name":"Dock Sud LNG Terminal","country":"Argentina","country_iso":"AR","unit_name":null,"status":"cancelled","facility_type":"import","floating_type":"unknown","capacity_mtpa":null,"capacity_bcm_y":null,"start_year":null,"planned_start_year":null,"original_planned_start_year":null,"fid_year":null,"construction_year":null,"shelved_year":null,"cancelled_year":null,"stop_year":null,"estimated_cost_usd":null,"estimated_cost_original":null,"estimated_cost_currency":null,"power_stations_supplied":null,"floating_vessel_name":null,"ccs_project":null,"hydrogen_project":null,"ammonia_project":null,"synthetic_lng_project":null,"retrofit_proposed":null,"url":"https://lngatlas.org/terminal/dock-sud-lng-terminal-ar/","data_source":"Data: Global Gas Infrastructure Tracker, Global Energy Monitor, September 2025"},{"terminal_slug":"donggi-senoro-lng-terminal-id","terminal_name":"Donggi-Senoro LNG Terminal","country":"Indonesia","country_iso":"ID","unit_name":null,"status":"operating","facility_type":"export","floating_type":"unknown","capacity_mtpa":2,"capacity_bcm_y":2.72,"start_year":2015,"planned_start_year":null,"original_planned_start_year":null,"fid_year":null,"construction_year":null,"shelved_year":null,"cancelled_year":null,"stop_year":null,"estimated_cost_usd":2900000000,"estimated_cost_original":2900000000,"estimated_cost_currency":"USD","power_stations_supplied":null,"floating_vessel_name":null,"ccs_project":null,"hydrogen_project":null,"ammonia_project":null,"synthetic_lng_project":null,"retrofit_proposed":null,"url":"https://lngatlas.org/terminal/donggi-senoro-lng-terminal-id/","data_source":"Data: Global Gas Infrastructure Tracker, Global Energy Monitor, September 2025"},{"terminal_slug":"dongying-fsru-cn","terminal_name":"Dongying FSRU","country":"China","country_iso":"CN","unit_name":null,"status":"cancelled","facility_type":"import","floating_type":"fsru","capacity_mtpa":null,"capacity_bcm_y":null,"start_year":null,"planned_start_year":null,"original_planned_start_year":null,"fid_year":null,"construction_year":null,"shelved_year":2021,"cancelled_year":null,"stop_year":null,"estimated_cost_usd":null,"estimated_cost_original":null,"estimated_cost_currency":null,"power_stations_supplied":null,"floating_vessel_name":null,"ccs_project":null,"hydrogen_project":null,"ammonia_project":null,"synthetic_lng_project":null,"retrofit_proposed":null,"url":"https://lngatlas.org/terminal/dongying-fsru-cn/","data_source":"Data: Global Gas Infrastructure Tracker, Global Energy Monitor, September 2025"},{"terminal_slug":"dongying-lng-terminal-cn","terminal_name":"Dongying LNG Terminal","country":"China","country_iso":"CN","unit_name":"Dongying LNG Terminal (China Huadian)","status":"cancelled","facility_type":"import","floating_type":"unknown","capacity_mtpa":null,"capacity_bcm_y":null,"start_year":null,"planned_start_year":null,"original_planned_start_year":null,"fid_year":null,"construction_year":null,"shelved_year":2016,"cancelled_year":2018,"stop_year":2018,"estimated_cost_usd":1120000000,"estimated_cost_original":7000000000,"estimated_cost_currency":"RMB","power_stations_supplied":null,"floating_vessel_name":null,"ccs_project":null,"hydrogen_project":null,"ammonia_project":null,"synthetic_lng_project":null,"retrofit_proposed":null,"url":"https://lngatlas.org/terminal/dongying-lng-terminal-cn/","data_source":"Data: Global Gas Infrastructure Tracker, Global Energy Monitor, September 2025"},{"terminal_slug":"dongying-lng-terminal-cn","terminal_name":"Dongying LNG Terminal","country":"China","country_iso":"CN","unit_name":"Dongying LNG Terminal (China Raiway Gallon)","status":"cancelled","facility_type":"import","floating_type":"unknown","capacity_mtpa":3,"capacity_bcm_y":4.08,"start_year":null,"planned_start_year":null,"original_planned_start_year":null,"fid_year":null,"construction_year":null,"shelved_year":2020,"cancelled_year":2022,"stop_year":2022,"estimated_cost_usd":800000000,"estimated_cost_original":5000000000,"estimated_cost_currency":"RMB","power_stations_supplied":null,"floating_vessel_name":null,"ccs_project":null,"hydrogen_project":null,"ammonia_project":null,"synthetic_lng_project":null,"retrofit_proposed":null,"url":"https://lngatlas.org/terminal/dongying-lng-terminal-cn/","data_source":"Data: Global Gas Infrastructure Tracker, Global Energy Monitor, September 2025"},{"terminal_slug":"dongying-lng-terminal-cn","terminal_name":"Dongying LNG Terminal","country":"China","country_iso":"CN","unit_name":"Dongying LNG Terminal (Hainuo Port)","status":"cancelled","facility_type":"import","floating_type":"unknown","capacity_mtpa":2,"capacity_bcm_y":2.72,"start_year":null,"planned_start_year":null,"original_planned_start_year":null,"fid_year":null,"construction_year":null,"shelved_year":2021,"cancelled_year":2023,"stop_year":2023,"estimated_cost_usd":960000000,"estimated_cost_original":6000000000,"estimated_cost_currency":"RMB","power_stations_supplied":null,"floating_vessel_name":null,"ccs_project":null,"hydrogen_project":null,"ammonia_project":null,"synthetic_lng_project":null,"retrofit_proposed":null,"url":"https://lngatlas.org/terminal/dongying-lng-terminal-cn/","data_source":"Data: Global Gas Infrastructure Tracker, Global Energy Monitor, September 2025"},{"terminal_slug":"douglas-channel-lng-terminal-ca","terminal_name":"Douglas Channel LNG Terminal","country":"Canada","country_iso":"CA","unit_name":null,"status":"cancelled","facility_type":"export","floating_type":"unknown","capacity_mtpa":0.55,"capacity_bcm_y":0.75,"start_year":null,"planned_start_year":null,"original_planned_start_year":null,"fid_year":null,"construction_year":null,"shelved_year":2016,"cancelled_year":2018,"stop_year":2018,"estimated_cost_usd":null,"estimated_cost_original":null,"estimated_cost_currency":null,"power_stations_supplied":null,"floating_vessel_name":null,"ccs_project":null,"hydrogen_project":null,"ammonia_project":null,"synthetic_lng_project":null,"retrofit_proposed":null,"url":"https://lngatlas.org/terminal/douglas-channel-lng-terminal-ca/","data_source":"Data: Global Gas Infrastructure Tracker, Global Energy Monitor, September 2025"},{"terminal_slug":"downeast-lng-terminal-us","terminal_name":"Downeast LNG Terminal","country":"United States","country_iso":"US","unit_name":"Export","status":"cancelled","facility_type":"export","floating_type":"unknown","capacity_mtpa":3,"capacity_bcm_y":4.08,"start_year":null,"planned_start_year":null,"original_planned_start_year":null,"fid_year":null,"construction_year":null,"shelved_year":null,"cancelled_year":2016,"stop_year":2016,"estimated_cost_usd":null,"estimated_cost_original":null,"estimated_cost_currency":null,"power_stations_supplied":null,"floating_vessel_name":null,"ccs_project":null,"hydrogen_project":null,"ammonia_project":null,"synthetic_lng_project":null,"retrofit_proposed":null,"url":"https://lngatlas.org/terminal/downeast-lng-terminal-us/","data_source":"Data: Global Gas Infrastructure Tracker, Global Energy Monitor, September 2025"},{"terminal_slug":"downeast-lng-terminal-us","terminal_name":"Downeast LNG Terminal","country":"United States","country_iso":"US","unit_name":"Import","status":"cancelled","facility_type":"import","floating_type":"unknown","capacity_mtpa":3,"capacity_bcm_y":4.08,"start_year":null,"planned_start_year":null,"original_planned_start_year":null,"fid_year":null,"construction_year":null,"shelved_year":null,"cancelled_year":2016,"stop_year":2016,"estimated_cost_usd":null,"estimated_cost_original":null,"estimated_cost_currency":null,"power_stations_supplied":null,"floating_vessel_name":null,"ccs_project":null,"hydrogen_project":null,"ammonia_project":null,"synthetic_lng_project":null,"retrofit_proposed":null,"url":"https://lngatlas.org/terminal/downeast-lng-terminal-us/","data_source":"Data: Global Gas Infrastructure Tracker, Global Energy Monitor, September 2025"},{"terminal_slug":"dragon-lng-terminal-gb","terminal_name":"Dragon LNG Terminal","country":"United Kingdom","country_iso":"GB","unit_name":null,"status":"operating","facility_type":"import","floating_type":"unknown","capacity_mtpa":4.4,"capacity_bcm_y":5.99,"start_year":2009,"planned_start_year":null,"original_planned_start_year":null,"fid_year":null,"construction_year":null,"shelved_year":null,"cancelled_year":null,"stop_year":null,"estimated_cost_usd":null,"estimated_cost_original":null,"estimated_cost_currency":null,"power_stations_supplied":null,"floating_vessel_name":null,"ccs_project":true,"hydrogen_project":null,"ammonia_project":null,"synthetic_lng_project":null,"retrofit_proposed":null,"url":"https://lngatlas.org/terminal/dragon-lng-terminal-gb/","data_source":"Data: Global Gas Infrastructure Tracker, Global Energy Monitor, September 2025"},{"terminal_slug":"dragon-lng-terminal-gb","terminal_name":"Dragon LNG Terminal","country":"United Kingdom","country_iso":"GB","unit_name":"Expansion","status":"operating","facility_type":"import","floating_type":"unknown","capacity_mtpa":1.2,"capacity_bcm_y":1.63,"start_year":2013,"planned_start_year":null,"original_planned_start_year":null,"fid_year":null,"construction_year":null,"shelved_year":null,"cancelled_year":null,"stop_year":null,"estimated_cost_usd":null,"estimated_cost_original":null,"estimated_cost_currency":null,"power_stations_supplied":null,"floating_vessel_name":null,"ccs_project":true,"hydrogen_project":null,"ammonia_project":null,"synthetic_lng_project":null,"retrofit_proposed":null,"url":"https://lngatlas.org/terminal/dragon-lng-terminal-gb/","data_source":"Data: Global Gas Infrastructure Tracker, Global Energy Monitor, September 2025"},{"terminal_slug":"dua-flng-terminal-my","terminal_name":"Dua FLNG Terminal","country":"Malaysia","country_iso":"MY","unit_name":null,"status":"operating","facility_type":"export","floating_type":"flng","capacity_mtpa":1.5,"capacity_bcm_y":2.04,"start_year":2021,"planned_start_year":null,"original_planned_start_year":null,"fid_year":2014,"construction_year":null,"shelved_year":null,"cancelled_year":null,"stop_year":null,"estimated_cost_usd":null,"estimated_cost_original":null,"estimated_cost_currency":null,"power_stations_supplied":null,"floating_vessel_name":null,"ccs_project":null,"hydrogen_project":null,"ammonia_project":null,"synthetic_lng_project":null,"retrofit_proposed":null,"url":"https://lngatlas.org/terminal/dua-flng-terminal-my/","data_source":"Data: Global Gas Infrastructure Tracker, Global Energy Monitor, September 2025"},{"terminal_slug":"mlng-dua-lng-terminal-my","terminal_name":"Dua Malaysia LNG Terminal","country":"Malaysia","country_iso":"MY","unit_name":"T4","status":"operating","facility_type":"export","floating_type":"unknown","capacity_mtpa":3.2,"capacity_bcm_y":4.35,"start_year":1995,"planned_start_year":null,"original_planned_start_year":null,"fid_year":null,"construction_year":null,"shelved_year":null,"cancelled_year":null,"stop_year":null,"estimated_cost_usd":null,"estimated_cost_original":null,"estimated_cost_currency":null,"power_stations_supplied":null,"floating_vessel_name":null,"ccs_project":null,"hydrogen_project":null,"ammonia_project":null,"synthetic_lng_project":null,"retrofit_proposed":null,"url":"https://lngatlas.org/terminal/mlng-dua-lng-terminal-my/","data_source":"Data: Global Gas Infrastructure Tracker, Global Energy Monitor, September 2025"},{"terminal_slug":"mlng-dua-lng-terminal-my","terminal_name":"Dua Malaysia LNG Terminal","country":"Malaysia","country_iso":"MY","unit_name":"T5","status":"operating","facility_type":"export","floating_type":"unknown","capacity_mtpa":3.2,"capacity_bcm_y":4.35,"start_year":1995,"planned_start_year":null,"original_planned_start_year":null,"fid_year":null,"construction_year":null,"shelved_year":null,"cancelled_year":null,"stop_year":null,"estimated_cost_usd":null,"estimated_cost_original":null,"estimated_cost_currency":null,"power_stations_supplied":null,"floating_vessel_name":null,"ccs_project":null,"hydrogen_project":null,"ammonia_project":null,"synthetic_lng_project":null,"retrofit_proposed":null,"url":"https://lngatlas.org/terminal/mlng-dua-lng-terminal-my/","data_source":"Data: Global Gas Infrastructure Tracker, Global Energy Monitor, September 2025"},{"terminal_slug":"mlng-dua-lng-terminal-my","terminal_name":"Dua Malaysia LNG Terminal","country":"Malaysia","country_iso":"MY","unit_name":"T6","status":"operating","facility_type":"export","floating_type":"unknown","capacity_mtpa":3.2,"capacity_bcm_y":4.35,"start_year":1995,"planned_start_year":null,"original_planned_start_year":null,"fid_year":null,"construction_year":null,"shelved_year":null,"cancelled_year":null,"stop_year":null,"estimated_cost_usd":null,"estimated_cost_original":null,"estimated_cost_currency":null,"power_stations_supplied":null,"floating_vessel_name":null,"ccs_project":null,"hydrogen_project":null,"ammonia_project":null,"synthetic_lng_project":null,"retrofit_proposed":null,"url":"https://lngatlas.org/terminal/mlng-dua-lng-terminal-my/","data_source":"Data: Global Gas Infrastructure Tracker, Global Energy Monitor, September 2025"},{"terminal_slug":"dunkirk-lng-terminal-fr","terminal_name":"Dunkirk LNG Terminal","country":"France","country_iso":"FR","unit_name":null,"status":"operating","facility_type":"import","floating_type":"unknown","capacity_mtpa":9.55,"capacity_bcm_y":12.99,"start_year":2017,"planned_start_year":null,"original_planned_start_year":null,"fid_year":2011,"construction_year":2011,"shelved_year":null,"cancelled_year":null,"stop_year":null,"estimated_cost_usd":1090000000,"estimated_cost_original":1000000000,"estimated_cost_currency":"EUR","power_stations_supplied":null,"floating_vessel_name":null,"ccs_project":null,"hydrogen_project":true,"ammonia_project":true,"synthetic_lng_project":null,"retrofit_proposed":null,"url":"https://lngatlas.org/terminal/dunkirk-lng-terminal-fr/","data_source":"Data: Global Gas Infrastructure Tracker, Global Energy Monitor, September 2025"},{"terminal_slug":"dunkirk-lng-terminal-fr","terminal_name":"Dunkirk LNG Terminal","country":"France","country_iso":"FR","unit_name":"Debottlenecking","status":"operating","facility_type":"import","floating_type":"unknown","capacity_mtpa":null,"capacity_bcm_y":null,"start_year":2023,"planned_start_year":null,"original_planned_start_year":null,"fid_year":null,"construction_year":null,"shelved_year":null,"cancelled_year":null,"stop_year":null,"estimated_cost_usd":null,"estimated_cost_original":null,"estimated_cost_currency":null,"power_stations_supplied":null,"floating_vessel_name":null,"ccs_project":null,"hydrogen_project":true,"ammonia_project":true,"synthetic_lng_project":null,"retrofit_proposed":null,"url":"https://lngatlas.org/terminal/dunkirk-lng-terminal-fr/","data_source":"Data: Global Gas Infrastructure Tracker, Global Energy Monitor, September 2025"},{"terminal_slug":"dunkirk-lng-terminal-fr","terminal_name":"Dunkirk LNG Terminal","country":"France","country_iso":"FR","unit_name":"Ammonia Import Terminal","status":"proposed","facility_type":"import","floating_type":"unknown","capacity_mtpa":null,"capacity_bcm_y":null,"start_year":null,"planned_start_year":null,"original_planned_start_year":null,"fid_year":null,"construction_year":null,"shelved_year":null,"cancelled_year":null,"stop_year":null,"estimated_cost_usd":null,"estimated_cost_original":null,"estimated_cost_currency":null,"power_stations_supplied":null,"floating_vessel_name":null,"ccs_project":null,"hydrogen_project":true,"ammonia_project":true,"synthetic_lng_project":null,"retrofit_proposed":null,"url":"https://lngatlas.org/terminal/dunkirk-lng-terminal-fr/","data_source":"Data: Global Gas Infrastructure Tracker, Global Energy Monitor, September 2025"},{"terminal_slug":"dortyol-fsru-tr","terminal_name":"Dörtyol FSRU","country":"Türkiye","country_iso":"TR","unit_name":null,"status":"operating","facility_type":"import","floating_type":"fsru","capacity_mtpa":7.5,"capacity_bcm_y":10.2,"start_year":2018,"planned_start_year":null,"original_planned_start_year":null,"fid_year":null,"construction_year":null,"shelved_year":null,"cancelled_year":null,"stop_year":null,"estimated_cost_usd":null,"estimated_cost_original":null,"estimated_cost_currency":null,"power_stations_supplied":null,"floating_vessel_name":"Ertugrul Gazi","ccs_project":null,"hydrogen_project":null,"ammonia_project":null,"synthetic_lng_project":null,"retrofit_proposed":null,"url":"https://lngatlas.org/terminal/dortyol-fsru-tr/","data_source":"Data: Global Gas Infrastructure Tracker, Global Energy Monitor, September 2025"},{"terminal_slug":"eagle-fsru-al","terminal_name":"Eagle FSRU","country":"Albania","country_iso":"AL","unit_name":null,"status":"cancelled","facility_type":"import","floating_type":"fsru","capacity_mtpa":8.1,"capacity_bcm_y":11.02,"start_year":null,"planned_start_year":null,"original_planned_start_year":null,"fid_year":null,"construction_year":null,"shelved_year":2010,"cancelled_year":2012,"stop_year":2012,"estimated_cost_usd":1090000000,"estimated_cost_original":1000000000,"estimated_cost_currency":"EUR","power_stations_supplied":null,"floating_vessel_name":null,"ccs_project":null,"hydrogen_project":null,"ammonia_project":null,"synthetic_lng_project":null,"retrofit_proposed":null,"url":"https://lngatlas.org/terminal/eagle-fsru-al/","data_source":"Data: Global Gas Infrastructure Tracker, Global Energy Monitor, September 2025"},{"terminal_slug":"eagle-lng-terminal-us","terminal_name":"Eagle LNG Terminal","country":"United States","country_iso":"US","unit_name":"Export Terminal (T1-T3)","status":"proposed","facility_type":"export","floating_type":"unknown","capacity_mtpa":null,"capacity_bcm_y":null,"start_year":null,"planned_start_year":2026,"original_planned_start_year":2022,"fid_year":2022,"construction_year":null,"shelved_year":null,"cancelled_year":null,"stop_year":null,"estimated_cost_usd":542000000,"estimated_cost_original":542000000,"estimated_cost_currency":"USD","power_stations_supplied":null,"floating_vessel_name":null,"ccs_project":null,"hydrogen_project":null,"ammonia_project":null,"synthetic_lng_project":null,"retrofit_proposed":null,"url":"https://lngatlas.org/terminal/eagle-lng-terminal-us/","data_source":"Data: Global Gas Infrastructure Tracker, Global Energy Monitor, September 2025"},{"terminal_slug":"eagle-lng-terminal-us","terminal_name":"Eagle LNG Terminal","country":"United States","country_iso":"US","unit_name":"Import Terminal","status":"proposed","facility_type":"import","floating_type":"unknown","capacity_mtpa":null,"capacity_bcm_y":null,"start_year":null,"planned_start_year":null,"original_planned_start_year":2022,"fid_year":2022,"construction_year":null,"shelved_year":null,"cancelled_year":null,"stop_year":null,"estimated_cost_usd":null,"estimated_cost_original":null,"estimated_cost_currency":null,"power_stations_supplied":null,"floating_vessel_name":null,"ccs_project":null,"hydrogen_project":null,"ammonia_project":null,"synthetic_lng_project":null,"retrofit_proposed":null,"url":"https://lngatlas.org/terminal/eagle-lng-terminal-us/","data_source":"Data: Global Gas Infrastructure Tracker, Global Energy Monitor, September 2025"},{"terminal_slug":"eemshaven-fsru-nl","terminal_name":"Eemshaven FSRU","country":"Netherlands","country_iso":"NL","unit_name":null,"status":"operating","facility_type":"import","floating_type":"fsru","capacity_mtpa":5.88,"capacity_bcm_y":8,"start_year":2022,"planned_start_year":null,"original_planned_start_year":null,"fid_year":null,"construction_year":2022,"shelved_year":null,"cancelled_year":null,"stop_year":null,"estimated_cost_usd":545000000,"estimated_cost_original":500000000,"estimated_cost_currency":"EUR","power_stations_supplied":null,"floating_vessel_name":"Eemshaven LNG, Energos Igloo","ccs_project":null,"hydrogen_project":true,"ammonia_project":null,"synthetic_lng_project":null,"retrofit_proposed":null,"url":"https://lngatlas.org/terminal/eemshaven-fsru-nl/","data_source":"Data: Global Gas Infrastructure Tracker, Global Energy Monitor, September 2025"},{"terminal_slug":"eemshaven-fsru-nl","terminal_name":"Eemshaven FSRU","country":"Netherlands","country_iso":"NL","unit_name":"Hydrogen Import Terminal","status":"proposed","facility_type":"import","floating_type":"fsru","capacity_mtpa":null,"capacity_bcm_y":null,"start_year":null,"planned_start_year":null,"original_planned_start_year":null,"fid_year":null,"construction_year":null,"shelved_year":null,"cancelled_year":null,"stop_year":null,"estimated_cost_usd":null,"estimated_cost_original":null,"estimated_cost_currency":null,"power_stations_supplied":null,"floating_vessel_name":"Eemshaven LNG, Energos Igloo","ccs_project":null,"hydrogen_project":true,"ammonia_project":null,"synthetic_lng_project":null,"retrofit_proposed":null,"url":"https://lngatlas.org/terminal/eemshaven-fsru-nl/","data_source":"Data: Global Gas Infrastructure Tracker, Global Energy Monitor, September 2025"},{"terminal_slug":"egyptian-lng-terminal-eg","terminal_name":"Egyptian LNG Terminal","country":"Egypt","country_iso":"EG","unit_name":"T1","status":"operating","facility_type":"export","floating_type":"unknown","capacity_mtpa":3.6,"capacity_bcm_y":4.9,"start_year":2005,"planned_start_year":null,"original_planned_start_year":null,"fid_year":null,"construction_year":null,"shelved_year":null,"cancelled_year":null,"stop_year":null,"estimated_cost_usd":1120000000,"estimated_cost_original":1120000000,"estimated_cost_currency":"USD","power_stations_supplied":null,"floating_vessel_name":null,"ccs_project":null,"hydrogen_project":null,"ammonia_project":null,"synthetic_lng_project":null,"retrofit_proposed":null,"url":"https://lngatlas.org/terminal/egyptian-lng-terminal-eg/","data_source":"Data: Global Gas Infrastructure Tracker, Global Energy Monitor, September 2025"},{"terminal_slug":"egyptian-lng-terminal-eg","terminal_name":"Egyptian LNG Terminal","country":"Egypt","country_iso":"EG","unit_name":"T2","status":"operating","facility_type":"export","floating_type":"unknown","capacity_mtpa":3.6,"capacity_bcm_y":4.9,"start_year":2005,"planned_start_year":null,"original_planned_start_year":null,"fid_year":null,"construction_year":null,"shelved_year":null,"cancelled_year":null,"stop_year":null,"estimated_cost_usd":965000000,"estimated_cost_original":965000000,"estimated_cost_currency":"USD","power_stations_supplied":null,"floating_vessel_name":null,"ccs_project":null,"hydrogen_project":null,"ammonia_project":null,"synthetic_lng_project":null,"retrofit_proposed":null,"url":"https://lngatlas.org/terminal/egyptian-lng-terminal-eg/","data_source":"Data: Global Gas Infrastructure Tracker, Global Energy Monitor, September 2025"},{"terminal_slug":"eilat-flng-terminal-il","terminal_name":"Eilat FLNG Terminal","country":"Israel","country_iso":"IL","unit_name":null,"status":"cancelled","facility_type":"export","floating_type":"flng","capacity_mtpa":5.14,"capacity_bcm_y":6.99,"start_year":null,"planned_start_year":null,"original_planned_start_year":null,"fid_year":null,"construction_year":null,"shelved_year":2014,"cancelled_year":2016,"stop_year":2016,"estimated_cost_usd":6000000000,"estimated_cost_original":6000000000,"estimated_cost_currency":"USD","power_stations_supplied":null,"floating_vessel_name":null,"ccs_project":null,"hydrogen_project":null,"ammonia_project":null,"synthetic_lng_project":null,"retrofit_proposed":null,"url":"https://lngatlas.org/terminal/eilat-flng-terminal-il/","data_source":"Data: Global Gas Infrastructure Tracker, Global Energy Monitor, September 2025"},{"terminal_slug":"el-musel-lng-terminal-es","terminal_name":"El Musel LNG Terminal","country":"Spain","country_iso":"ES","unit_name":null,"status":"operating","facility_type":"import","floating_type":"unknown","capacity_mtpa":5.88,"capacity_bcm_y":8,"start_year":2023,"planned_start_year":null,"original_planned_start_year":2011,"fid_year":null,"construction_year":2012,"shelved_year":null,"cancelled_year":null,"stop_year":2012,"estimated_cost_usd":null,"estimated_cost_original":null,"estimated_cost_currency":null,"power_stations_supplied":null,"floating_vessel_name":null,"ccs_project":null,"hydrogen_project":null,"ammonia_project":null,"synthetic_lng_project":null,"retrofit_proposed":null,"url":"https://lngatlas.org/terminal/el-musel-lng-terminal-es/","data_source":"Data: Global Gas Infrastructure Tracker, Global Energy Monitor, September 2025"},{"terminal_slug":"la-union-fsru-sv","terminal_name":"El Salvador FSRU","country":"El Salvador","country_iso":"SV","unit_name":null,"status":"cancelled","facility_type":"import","floating_type":"fsru","capacity_mtpa":0.5,"capacity_bcm_y":0.68,"start_year":null,"planned_start_year":null,"original_planned_start_year":2016,"fid_year":null,"construction_year":null,"shelved_year":null,"cancelled_year":2014,"stop_year":2014,"estimated_cost_usd":950000000,"estimated_cost_original":950000000,"estimated_cost_currency":"USD","power_stations_supplied":null,"floating_vessel_name":null,"ccs_project":null,"hydrogen_project":null,"ammonia_project":null,"synthetic_lng_project":null,"retrofit_proposed":null,"url":"https://lngatlas.org/terminal/la-union-fsru-sv/","data_source":"Data: Global Gas Infrastructure Tracker, Global Energy Monitor, September 2025"},{"terminal_slug":"el-viajano-altenesol-lng-terminal-co","terminal_name":"El Viajano Altenesol LNG Terminal","country":"Colombia","country_iso":"CO","unit_name":null,"status":"cancelled","facility_type":"import","floating_type":"unknown","capacity_mtpa":null,"capacity_bcm_y":null,"start_year":null,"planned_start_year":null,"original_planned_start_year":null,"fid_year":null,"construction_year":null,"shelved_year":2017,"cancelled_year":2019,"stop_year":2019,"estimated_cost_usd":null,"estimated_cost_original":null,"estimated_cost_currency":null,"power_stations_supplied":null,"floating_vessel_name":null,"ccs_project":null,"hydrogen_project":null,"ammonia_project":null,"synthetic_lng_project":null,"retrofit_proposed":null,"url":"https://lngatlas.org/terminal/el-viajano-altenesol-lng-terminal-co/","data_source":"Data: Global Gas Infrastructure Tracker, Global Energy Monitor, September 2025"},{"terminal_slug":"elba-island-lng-terminal-us","terminal_name":"Elba Island LNG Terminal","country":"United States","country_iso":"US","unit_name":"Import Terminal","status":"retired","facility_type":"import","floating_type":"unknown","capacity_mtpa":12,"capacity_bcm_y":16.33,"start_year":1978,"planned_start_year":null,"original_planned_start_year":null,"fid_year":null,"construction_year":null,"shelved_year":null,"cancelled_year":null,"stop_year":1980,"estimated_cost_usd":null,"estimated_cost_original":null,"estimated_cost_currency":null,"power_stations_supplied":null,"floating_vessel_name":null,"ccs_project":null,"hydrogen_project":null,"ammonia_project":null,"synthetic_lng_project":null,"retrofit_proposed":null,"url":"https://lngatlas.org/terminal/elba-island-lng-terminal-us/","data_source":"Data: Global Gas Infrastructure Tracker, Global Energy Monitor, September 2025"},{"terminal_slug":"elba-island-lng-terminal-us","terminal_name":"Elba Island LNG Terminal","country":"United States","country_iso":"US","unit_name":"T01","status":"operating","facility_type":"export","floating_type":"unknown","capacity_mtpa":0.25,"capacity_bcm_y":0.34,"start_year":2019,"planned_start_year":null,"original_planned_start_year":null,"fid_year":null,"construction_year":null,"shelved_year":null,"cancelled_year":null,"stop_year":null,"estimated_cost_usd":200000000,"estimated_cost_original":200000000,"estimated_cost_currency":"USD","power_stations_supplied":null,"floating_vessel_name":null,"ccs_project":null,"hydrogen_project":null,"ammonia_project":null,"synthetic_lng_project":null,"retrofit_proposed":null,"url":"https://lngatlas.org/terminal/elba-island-lng-terminal-us/","data_source":"Data: Global Gas Infrastructure Tracker, Global Energy Monitor, September 2025"},{"terminal_slug":"elba-island-lng-terminal-us","terminal_name":"Elba Island LNG Terminal","country":"United States","country_iso":"US","unit_name":"T02","status":"operating","facility_type":"export","floating_type":"unknown","capacity_mtpa":0.25,"capacity_bcm_y":0.34,"start_year":2019,"planned_start_year":null,"original_planned_start_year":null,"fid_year":null,"construction_year":null,"shelved_year":null,"cancelled_year":null,"stop_year":null,"estimated_cost_usd":200000000,"estimated_cost_original":200000000,"estimated_cost_currency":"USD","power_stations_supplied":null,"floating_vessel_name":null,"ccs_project":null,"hydrogen_project":null,"ammonia_project":null,"synthetic_lng_project":null,"retrofit_proposed":null,"url":"https://lngatlas.org/terminal/elba-island-lng-terminal-us/","data_source":"Data: Global Gas Infrastructure Tracker, Global Energy Monitor, September 2025"},{"terminal_slug":"elba-island-lng-terminal-us","terminal_name":"Elba Island LNG Terminal","country":"United States","country_iso":"US","unit_name":"T03","status":"operating","facility_type":"export","floating_type":"unknown","capacity_mtpa":0.25,"capacity_bcm_y":0.34,"start_year":2019,"planned_start_year":null,"original_planned_start_year":null,"fid_year":null,"construction_year":null,"shelved_year":null,"cancelled_year":null,"stop_year":null,"estimated_cost_usd":200000000,"estimated_cost_original":200000000,"estimated_cost_currency":"USD","power_stations_supplied":null,"floating_vessel_name":null,"ccs_project":null,"hydrogen_project":null,"ammonia_project":null,"synthetic_lng_project":null,"retrofit_proposed":null,"url":"https://lngatlas.org/terminal/elba-island-lng-terminal-us/","data_source":"Data: Global Gas Infrastructure Tracker, Global Energy Monitor, September 2025"},{"terminal_slug":"elba-island-lng-terminal-us","terminal_name":"Elba Island LNG Terminal","country":"United States","country_iso":"US","unit_name":"T04","status":"operating","facility_type":"export","floating_type":"unknown","capacity_mtpa":0.25,"capacity_bcm_y":0.34,"start_year":2019,"planned_start_year":null,"original_planned_start_year":null,"fid_year":null,"construction_year":null,"shelved_year":null,"cancelled_year":null,"stop_year":null,"estimated_cost_usd":200000000,"estimated_cost_original":200000000,"estimated_cost_currency":"USD","power_stations_supplied":null,"floating_vessel_name":null,"ccs_project":null,"hydrogen_project":null,"ammonia_project":null,"synthetic_lng_project":null,"retrofit_proposed":null,"url":"https://lngatlas.org/terminal/elba-island-lng-terminal-us/","data_source":"Data: Global Gas Infrastructure Tracker, Global Energy Monitor, September 2025"},{"terminal_slug":"elba-island-lng-terminal-us","terminal_name":"Elba Island LNG Terminal","country":"United States","country_iso":"US","unit_name":"T05","status":"operating","facility_type":"export","floating_type":"unknown","capacity_mtpa":0.25,"capacity_bcm_y":0.34,"start_year":2019,"planned_start_year":null,"original_planned_start_year":null,"fid_year":null,"construction_year":null,"shelved_year":null,"cancelled_year":null,"stop_year":null,"estimated_cost_usd":200000000,"estimated_cost_original":200000000,"estimated_cost_currency":"USD","power_stations_supplied":null,"floating_vessel_name":null,"ccs_project":null,"hydrogen_project":null,"ammonia_project":null,"synthetic_lng_project":null,"retrofit_proposed":null,"url":"https://lngatlas.org/terminal/elba-island-lng-terminal-us/","data_source":"Data: Global Gas Infrastructure Tracker, Global Energy Monitor, September 2025"},{"terminal_slug":"elba-island-lng-terminal-us","terminal_name":"Elba Island LNG Terminal","country":"United States","country_iso":"US","unit_name":"T06","status":"operating","facility_type":"export","floating_type":"unknown","capacity_mtpa":0.25,"capacity_bcm_y":0.34,"start_year":2020,"planned_start_year":null,"original_planned_start_year":null,"fid_year":null,"construction_year":null,"shelved_year":null,"cancelled_year":null,"stop_year":null,"estimated_cost_usd":200000000,"estimated_cost_original":200000000,"estimated_cost_currency":"USD","power_stations_supplied":null,"floating_vessel_name":null,"ccs_project":null,"hydrogen_project":null,"ammonia_project":null,"synthetic_lng_project":null,"retrofit_proposed":null,"url":"https://lngatlas.org/terminal/elba-island-lng-terminal-us/","data_source":"Data: Global Gas Infrastructure Tracker, Global Energy Monitor, September 2025"},{"terminal_slug":"elba-island-lng-terminal-us","terminal_name":"Elba Island LNG Terminal","country":"United States","country_iso":"US","unit_name":"T07","status":"operating","facility_type":"export","floating_type":"unknown","capacity_mtpa":0.25,"capacity_bcm_y":0.34,"start_year":2020,"planned_start_year":null,"original_planned_start_year":null,"fid_year":null,"construction_year":null,"shelved_year":null,"cancelled_year":null,"stop_year":null,"estimated_cost_usd":200000000,"estimated_cost_original":200000000,"estimated_cost_currency":"USD","power_stations_supplied":null,"floating_vessel_name":null,"ccs_project":null,"hydrogen_project":null,"ammonia_project":null,"synthetic_lng_project":null,"retrofit_proposed":null,"url":"https://lngatlas.org/terminal/elba-island-lng-terminal-us/","data_source":"Data: Global Gas Infrastructure Tracker, Global Energy Monitor, September 2025"},{"terminal_slug":"elba-island-lng-terminal-us","terminal_name":"Elba Island LNG Terminal","country":"United States","country_iso":"US","unit_name":"T08","status":"operating","facility_type":"export","floating_type":"unknown","capacity_mtpa":0.25,"capacity_bcm_y":0.34,"start_year":2020,"planned_start_year":null,"original_planned_start_year":null,"fid_year":null,"construction_year":null,"shelved_year":null,"cancelled_year":null,"stop_year":null,"estimated_cost_usd":200000000,"estimated_cost_original":200000000,"estimated_cost_currency":"USD","power_stations_supplied":null,"floating_vessel_name":null,"ccs_project":null,"hydrogen_project":null,"ammonia_project":null,"synthetic_lng_project":null,"retrofit_proposed":null,"url":"https://lngatlas.org/terminal/elba-island-lng-terminal-us/","data_source":"Data: Global Gas Infrastructure Tracker, Global Energy Monitor, September 2025"},{"terminal_slug":"elba-island-lng-terminal-us","terminal_name":"Elba Island LNG Terminal","country":"United States","country_iso":"US","unit_name":"T09","status":"operating","facility_type":"export","floating_type":"unknown","capacity_mtpa":0.25,"capacity_bcm_y":0.34,"start_year":2020,"planned_start_year":null,"original_planned_start_year":null,"fid_year":null,"construction_year":null,"shelved_year":null,"cancelled_year":null,"stop_year":null,"estimated_cost_usd":200000000,"estimated_cost_original":200000000,"estimated_cost_currency":"USD","power_stations_supplied":null,"floating_vessel_name":null,"ccs_project":null,"hydrogen_project":null,"ammonia_project":null,"synthetic_lng_project":null,"retrofit_proposed":null,"url":"https://lngatlas.org/terminal/elba-island-lng-terminal-us/","data_source":"Data: Global Gas Infrastructure Tracker, Global Energy Monitor, September 2025"},{"terminal_slug":"elba-island-lng-terminal-us","terminal_name":"Elba Island LNG Terminal","country":"United States","country_iso":"US","unit_name":"T10","status":"operating","facility_type":"export","floating_type":"unknown","capacity_mtpa":0.25,"capacity_bcm_y":0.34,"start_year":2020,"planned_start_year":null,"original_planned_start_year":null,"fid_year":null,"construction_year":null,"shelved_year":null,"cancelled_year":null,"stop_year":null,"estimated_cost_usd":200000000,"estimated_cost_original":200000000,"estimated_cost_currency":"USD","power_stations_supplied":null,"floating_vessel_name":null,"ccs_project":null,"hydrogen_project":null,"ammonia_project":null,"synthetic_lng_project":null,"retrofit_proposed":null,"url":"https://lngatlas.org/terminal/elba-island-lng-terminal-us/","data_source":"Data: Global Gas Infrastructure Tracker, Global Energy Monitor, September 2025"},{"terminal_slug":"elba-island-lng-terminal-us","terminal_name":"Elba Island LNG Terminal","country":"United States","country_iso":"US","unit_name":"Optimization Project","status":"proposed","facility_type":"export","floating_type":"unknown","capacity_mtpa":0.4,"capacity_bcm_y":0.54,"start_year":null,"planned_start_year":null,"original_planned_start_year":2024,"fid_year":null,"construction_year":null,"shelved_year":null,"cancelled_year":null,"stop_year":null,"estimated_cost_usd":null,"estimated_cost_original":null,"estimated_cost_currency":null,"power_stations_supplied":null,"floating_vessel_name":null,"ccs_project":null,"hydrogen_project":null,"ammonia_project":null,"synthetic_lng_project":null,"retrofit_proposed":null,"url":"https://lngatlas.org/terminal/elba-island-lng-terminal-us/","data_source":"Data: Global Gas Infrastructure Tracker, Global Energy Monitor, September 2025"},{"terminal_slug":"energas-fsru-pk","terminal_name":"Energas FSRU","country":"Pakistan","country_iso":"PK","unit_name":null,"status":"proposed","facility_type":"import","floating_type":"fsru","capacity_mtpa":5.75,"capacity_bcm_y":7.82,"start_year":null,"planned_start_year":null,"original_planned_start_year":2022,"fid_year":null,"construction_year":null,"shelved_year":null,"cancelled_year":null,"stop_year":null,"estimated_cost_usd":150000000,"estimated_cost_original":150000000,"estimated_cost_currency":"USD","power_stations_supplied":null,"floating_vessel_name":null,"ccs_project":null,"hydrogen_project":null,"ammonia_project":null,"synthetic_lng_project":null,"retrofit_proposed":null,"url":"https://lngatlas.org/terminal/energas-fsru-pk/","data_source":"Data: Global Gas Infrastructure Tracker, Global Energy Monitor, September 2025"},{"terminal_slug":"energie-saguenay-lng-terminal-ca","terminal_name":"Energie Saguenay LNG Terminal","country":"Canada","country_iso":"CA","unit_name":"T1 & T2","status":"cancelled","facility_type":"export","floating_type":"unknown","capacity_mtpa":11,"capacity_bcm_y":14.97,"start_year":null,"planned_start_year":null,"original_planned_start_year":2025,"fid_year":null,"construction_year":null,"shelved_year":2023,"cancelled_year":2025,"stop_year":2025,"estimated_cost_usd":7200000000,"estimated_cost_original":7200000000,"estimated_cost_currency":"USD","power_stations_supplied":null,"floating_vessel_name":null,"ccs_project":null,"hydrogen_project":null,"ammonia_project":null,"synthetic_lng_project":null,"retrofit_proposed":null,"url":"https://lngatlas.org/terminal/energie-saguenay-lng-terminal-ca/","data_source":"Data: Global Gas Infrastructure Tracker, Global Energy Monitor, September 2025"},{"terminal_slug":"engro-elengy-fsru-pk","terminal_name":"Engro Elengy FSRU","country":"Pakistan","country_iso":"PK","unit_name":null,"status":"operating","facility_type":"import","floating_type":"fsru","capacity_mtpa":4.8,"capacity_bcm_y":6.53,"start_year":2015,"planned_start_year":null,"original_planned_start_year":null,"fid_year":null,"construction_year":2014,"shelved_year":null,"cancelled_year":null,"stop_year":null,"estimated_cost_usd":null,"estimated_cost_original":null,"estimated_cost_currency":null,"power_stations_supplied":null,"floating_vessel_name":"Excelerate Exquisite","ccs_project":null,"hydrogen_project":null,"ammonia_project":null,"synthetic_lng_project":null,"retrofit_proposed":null,"url":"https://lngatlas.org/terminal/engro-elengy-fsru-pk/","data_source":"Data: Global Gas Infrastructure Tracker, Global Energy Monitor, September 2025"},{"terminal_slug":"engro-elengy-fsru-pk","terminal_name":"Engro Elengy FSRU","country":"Pakistan","country_iso":"PK","unit_name":"Expansion (Replacement)","status":"shelved","facility_type":"import","floating_type":"fsru","capacity_mtpa":5.9,"capacity_bcm_y":8.03,"start_year":null,"planned_start_year":null,"original_planned_start_year":2022,"fid_year":null,"construction_year":null,"shelved_year":2023,"cancelled_year":null,"stop_year":null,"estimated_cost_usd":null,"estimated_cost_original":null,"estimated_cost_currency":null,"power_stations_supplied":null,"floating_vessel_name":"Excelerate Exquisite","ccs_project":null,"hydrogen_project":null,"ammonia_project":null,"synthetic_lng_project":null,"retrofit_proposed":null,"url":"https://lngatlas.org/terminal/engro-elengy-fsru-pk/","data_source":"Data: Global Gas Infrastructure Tracker, Global Energy Monitor, September 2025"},{"terminal_slug":"engro-fsru-2-pk","terminal_name":"Engro FSRU 2","country":"Pakistan","country_iso":"PK","unit_name":null,"status":"cancelled","facility_type":"import","floating_type":"fsru","capacity_mtpa":4.5,"capacity_bcm_y":6.12,"start_year":null,"planned_start_year":null,"original_planned_start_year":2021,"fid_year":null,"construction_year":null,"shelved_year":2020,"cancelled_year":2022,"stop_year":2022,"estimated_cost_usd":null,"estimated_cost_original":null,"estimated_cost_currency":null,"power_stations_supplied":null,"floating_vessel_name":null,"ccs_project":null,"hydrogen_project":null,"ammonia_project":null,"synthetic_lng_project":null,"retrofit_proposed":null,"url":"https://lngatlas.org/terminal/engro-fsru-2-pk/","data_source":"Data: Global Gas Infrastructure Tracker, Global Energy Monitor, September 2025"},{"terminal_slug":"eni-congo-flng-ii-terminal-cg","terminal_name":"Eni Congo FLNG II Terminal","country":"Republic of the Congo","country_iso":"CG","unit_name":null,"status":"construction","facility_type":"export","floating_type":"flng","capacity_mtpa":2.4,"capacity_bcm_y":3.27,"start_year":null,"planned_start_year":2026,"original_planned_start_year":2025,"fid_year":2022,"construction_year":2023,"shelved_year":null,"cancelled_year":null,"stop_year":null,"estimated_cost_usd":4000000000,"estimated_cost_original":4000000000,"estimated_cost_currency":"USD","power_stations_supplied":null,"floating_vessel_name":"Nguya FLNG","ccs_project":null,"hydrogen_project":null,"ammonia_project":null,"synthetic_lng_project":null,"retrofit_proposed":null,"url":"https://lngatlas.org/terminal/eni-congo-flng-ii-terminal-cg/","data_source":"Data: Global Gas Infrastructure Tracker, Global Energy Monitor, September 2025"},{"terminal_slug":"ennore-lng-terminal-in","terminal_name":"Ennore LNG Terminal","country":"India","country_iso":"IN","unit_name":null,"status":"operating","facility_type":"import","floating_type":"unknown","capacity_mtpa":5,"capacity_bcm_y":6.8,"start_year":2019,"planned_start_year":null,"original_planned_start_year":null,"fid_year":null,"construction_year":2015,"shelved_year":null,"cancelled_year":null,"stop_year":null,"estimated_cost_usd":null,"estimated_cost_original":null,"estimated_cost_currency":null,"power_stations_supplied":null,"floating_vessel_name":null,"ccs_project":null,"hydrogen_project":null,"ammonia_project":null,"synthetic_lng_project":null,"retrofit_proposed":null,"url":"https://lngatlas.org/terminal/ennore-lng-terminal-in/","data_source":"Data: Global Gas Infrastructure Tracker, Global Energy Monitor, September 2025"},{"terminal_slug":"ennore-lng-terminal-in","terminal_name":"Ennore LNG Terminal","country":"India","country_iso":"IN","unit_name":"Expansion","status":"proposed","facility_type":"import","floating_type":"unknown","capacity_mtpa":5,"capacity_bcm_y":6.8,"start_year":null,"planned_start_year":null,"original_planned_start_year":null,"fid_year":null,"construction_year":null,"shelved_year":null,"cancelled_year":null,"stop_year":null,"estimated_cost_usd":408390000,"estimated_cost_original":408390000,"estimated_cost_currency":"USD","power_stations_supplied":null,"floating_vessel_name":null,"ccs_project":null,"hydrogen_project":null,"ammonia_project":null,"synthetic_lng_project":null,"retrofit_proposed":null,"url":"https://lngatlas.org/terminal/ennore-lng-terminal-in/","data_source":"Data: Global Gas Infrastructure Tracker, Global Energy Monitor, September 2025"},{"terminal_slug":"eos-flng-terminal-us","terminal_name":"Eos FLNG Terminal","country":"United States","country_iso":"US","unit_name":null,"status":"cancelled","facility_type":"export","floating_type":"flng","capacity_mtpa":12.26,"capacity_bcm_y":16.68,"start_year":null,"planned_start_year":null,"original_planned_start_year":null,"fid_year":null,"construction_year":null,"shelved_year":2017,"cancelled_year":2019,"stop_year":2019,"estimated_cost_usd":null,"estimated_cost_original":null,"estimated_cost_currency":null,"power_stations_supplied":null,"floating_vessel_name":null,"ccs_project":null,"hydrogen_project":null,"ammonia_project":null,"synthetic_lng_project":null,"retrofit_proposed":null,"url":"https://lngatlas.org/terminal/eos-flng-terminal-us/","data_source":"Data: Global Gas Infrastructure Tracker, Global Energy Monitor, September 2025"},{"terminal_slug":"equus-flng-terminal-au","terminal_name":"Equus FLNG Terminal","country":"Australia","country_iso":"AU","unit_name":null,"status":"cancelled","facility_type":"export","floating_type":"flng","capacity_mtpa":2,"capacity_bcm_y":2.72,"start_year":null,"planned_start_year":null,"original_planned_start_year":2024,"fid_year":null,"construction_year":null,"shelved_year":2022,"cancelled_year":null,"stop_year":null,"estimated_cost_usd":3500000000,"estimated_cost_original":3500000000,"estimated_cost_currency":"USD","power_stations_supplied":null,"floating_vessel_name":null,"ccs_project":null,"hydrogen_project":null,"ammonia_project":null,"synthetic_lng_project":null,"retrofit_proposed":null,"url":"https://lngatlas.org/terminal/equus-flng-terminal-au/","data_source":"Data: Global Gas Infrastructure Tracker, Global Energy Monitor, September 2025"},{"terminal_slug":"escobar-fsru-ar","terminal_name":"Escobar FSRU","country":"Argentina","country_iso":"AR","unit_name":null,"status":"operating","facility_type":"import","floating_type":"fsru","capacity_mtpa":6.1,"capacity_bcm_y":8.3,"start_year":2011,"planned_start_year":null,"original_planned_start_year":null,"fid_year":null,"construction_year":null,"shelved_year":null,"cancelled_year":null,"stop_year":null,"estimated_cost_usd":null,"estimated_cost_original":null,"estimated_cost_currency":null,"power_stations_supplied":null,"floating_vessel_name":"Excelerate Expedient","ccs_project":null,"hydrogen_project":null,"ammonia_project":null,"synthetic_lng_project":null,"retrofit_proposed":null,"url":"https://lngatlas.org/terminal/escobar-fsru-ar/","data_source":"Data: Global Gas Infrastructure Tracker, Global Energy Monitor, September 2025"},{"terminal_slug":"etinde-flng-terminal-cm","terminal_name":"Etinde FLNG Terminal","country":"Cameroon","country_iso":"CM","unit_name":null,"status":"proposed","facility_type":"export","floating_type":"flng","capacity_mtpa":1.3,"capacity_bcm_y":1.77,"start_year":null,"planned_start_year":null,"original_planned_start_year":null,"fid_year":2024,"construction_year":null,"shelved_year":null,"cancelled_year":null,"stop_year":null,"estimated_cost_usd":500000000,"estimated_cost_original":500000000,"estimated_cost_currency":"USD","power_stations_supplied":null,"floating_vessel_name":null,"ccs_project":null,"hydrogen_project":null,"ammonia_project":null,"synthetic_lng_project":null,"retrofit_proposed":null,"url":"https://lngatlas.org/terminal/etinde-flng-terminal-cm/","data_source":"Data: Global Gas Infrastructure Tracker, Global Energy Monitor, September 2025"},{"terminal_slug":"etki-fsru-tr","terminal_name":"Etki FSRU","country":"Türkiye","country_iso":"TR","unit_name":null,"status":"operating","facility_type":"import","floating_type":"fsru","capacity_mtpa":5.7,"capacity_bcm_y":7.76,"start_year":2016,"planned_start_year":null,"original_planned_start_year":null,"fid_year":null,"construction_year":null,"shelved_year":null,"cancelled_year":null,"stop_year":null,"estimated_cost_usd":null,"estimated_cost_original":null,"estimated_cost_currency":null,"power_stations_supplied":null,"floating_vessel_name":"FSRU Turquoise","ccs_project":null,"hydrogen_project":null,"ammonia_project":null,"synthetic_lng_project":null,"retrofit_proposed":null,"url":"https://lngatlas.org/terminal/etki-fsru-tr/","data_source":"Data: Global Gas Infrastructure Tracker, Global Energy Monitor, September 2025"},{"terminal_slug":"everett-marine-terminal-us","terminal_name":"Everett Marine Terminal","country":"United States","country_iso":"US","unit_name":null,"status":"operating","facility_type":"import","floating_type":"unknown","capacity_mtpa":5.1,"capacity_bcm_y":6.94,"start_year":1971,"planned_start_year":null,"original_planned_start_year":null,"fid_year":null,"construction_year":null,"shelved_year":null,"cancelled_year":null,"stop_year":null,"estimated_cost_usd":null,"estimated_cost_original":null,"estimated_cost_currency":null,"power_stations_supplied":null,"floating_vessel_name":null,"ccs_project":null,"hydrogen_project":null,"ammonia_project":null,"synthetic_lng_project":null,"retrofit_proposed":null,"url":"https://lngatlas.org/terminal/everett-marine-terminal-us/","data_source":"Data: Global Gas Infrastructure Tracker, Global Energy Monitor, September 2025"},{"terminal_slug":"fgen-batangas-fsru-ph","terminal_name":"FGEN Batangas FSRU","country":"Philippines","country_iso":"PH","unit_name":null,"status":"operating","facility_type":"import","floating_type":"fsru","capacity_mtpa":5.3,"capacity_bcm_y":7.21,"start_year":2023,"planned_start_year":null,"original_planned_start_year":2022,"fid_year":null,"construction_year":2021,"shelved_year":null,"cancelled_year":null,"stop_year":null,"estimated_cost_usd":null,"estimated_cost_original":null,"estimated_cost_currency":null,"power_stations_supplied":null,"floating_vessel_name":"BW Batangas FSRU","ccs_project":null,"hydrogen_project":null,"ammonia_project":null,"synthetic_lng_project":null,"retrofit_proposed":null,"url":"https://lngatlas.org/terminal/fgen-batangas-fsru-ph/","data_source":"Data: Global Gas Infrastructure Tracker, Global Energy Monitor, September 2025"},{"terminal_slug":"fgen-batangas-lng-terminal-ph","terminal_name":"FGEN Batangas LNG Terminal","country":"Philippines","country_iso":"PH","unit_name":null,"status":"proposed","facility_type":"import","floating_type":"unknown","capacity_mtpa":5,"capacity_bcm_y":6.8,"start_year":null,"planned_start_year":null,"original_planned_start_year":2023,"fid_year":null,"construction_year":2019,"shelved_year":null,"cancelled_year":null,"stop_year":null,"estimated_cost_usd":1000000000,"estimated_cost_original":1000000000,"estimated_cost_currency":"USD","power_stations_supplied":null,"floating_vessel_name":null,"ccs_project":null,"hydrogen_project":null,"ammonia_project":null,"synthetic_lng_project":null,"retrofit_proposed":null,"url":"https://lngatlas.org/terminal/fgen-batangas-lng-terminal-ph/","data_source":"Data: Global Gas Infrastructure Tracker, Global Energy Monitor, September 2025"},{"terminal_slug":"falconara-marittima-lng-terminal-it","terminal_name":"Falconara Marittima LNG Terminal","country":"Italy","country_iso":"IT","unit_name":null,"status":"cancelled","facility_type":"import","floating_type":"unknown","capacity_mtpa":2.94,"capacity_bcm_y":4,"start_year":null,"planned_start_year":null,"original_planned_start_year":2015,"fid_year":null,"construction_year":null,"shelved_year":2013,"cancelled_year":2015,"stop_year":2015,"estimated_cost_usd":218000000,"estimated_cost_original":200000000,"estimated_cost_currency":"EUR","power_stations_supplied":null,"floating_vessel_name":null,"ccs_project":null,"hydrogen_project":null,"ammonia_project":null,"synthetic_lng_project":null,"retrofit_proposed":null,"url":"https://lngatlas.org/terminal/falconara-marittima-lng-terminal-it/","data_source":"Data: Global Gas Infrastructure Tracker, Global Energy Monitor, September 2025"},{"terminal_slug":"fangchenggang-lng-terminal-cn","terminal_name":"Fangchenggang LNG Terminal","country":"China","country_iso":"CN","unit_name":"Phase I","status":"operating","facility_type":"import","floating_type":"unknown","capacity_mtpa":0.6,"capacity_bcm_y":0.82,"start_year":2019,"planned_start_year":null,"original_planned_start_year":null,"fid_year":null,"construction_year":2018,"shelved_year":null,"cancelled_year":null,"stop_year":null,"estimated_cost_usd":297600000,"estimated_cost_original":1860000000,"estimated_cost_currency":"RMB","power_stations_supplied":null,"floating_vessel_name":null,"ccs_project":null,"hydrogen_project":null,"ammonia_project":null,"synthetic_lng_project":null,"retrofit_proposed":null,"url":"https://lngatlas.org/terminal/fangchenggang-lng-terminal-cn/","data_source":"Data: Global Gas Infrastructure Tracker, Global Energy Monitor, September 2025"},{"terminal_slug":"fangchenggang-lng-terminal-cn","terminal_name":"Fangchenggang LNG Terminal","country":"China","country_iso":"CN","unit_name":"Phase II","status":"shelved","facility_type":"import","floating_type":"unknown","capacity_mtpa":0.4,"capacity_bcm_y":0.54,"start_year":null,"planned_start_year":null,"original_planned_start_year":null,"fid_year":null,"construction_year":null,"shelved_year":null,"cancelled_year":null,"stop_year":null,"estimated_cost_usd":null,"estimated_cost_original":null,"estimated_cost_currency":null,"power_stations_supplied":null,"floating_vessel_name":null,"ccs_project":null,"hydrogen_project":null,"ammonia_project":null,"synthetic_lng_project":null,"retrofit_proposed":null,"url":"https://lngatlas.org/terminal/fangchenggang-lng-terminal-cn/","data_source":"Data: Global Gas Infrastructure Tracker, Global Energy Monitor, September 2025"},{"terminal_slug":"far-east-lng-terminal-ru","terminal_name":"Far East LNG Terminal","country":"Russia","country_iso":"RU","unit_name":"T1","status":"proposed","facility_type":"export","floating_type":"unknown","capacity_mtpa":6.2,"capacity_bcm_y":8.44,"start_year":null,"planned_start_year":null,"original_planned_start_year":2027,"fid_year":2021,"construction_year":null,"shelved_year":2022,"cancelled_year":null,"stop_year":null,"estimated_cost_usd":4200000000,"estimated_cost_original":4200000000,"estimated_cost_currency":"USD","power_stations_supplied":null,"floating_vessel_name":null,"ccs_project":null,"hydrogen_project":null,"ammonia_project":null,"synthetic_lng_project":null,"retrofit_proposed":null,"url":"https://lngatlas.org/terminal/far-east-lng-terminal-ru/","data_source":"Data: Global Gas Infrastructure Tracker, Global Energy Monitor, September 2025"},{"terminal_slug":"far-east-lng-terminal-ru","terminal_name":"Far East LNG Terminal","country":"Russia","country_iso":"RU","unit_name":"T2","status":"proposed","facility_type":"export","floating_type":"unknown","capacity_mtpa":10,"capacity_bcm_y":13.61,"start_year":null,"planned_start_year":null,"original_planned_start_year":2035,"fid_year":2021,"construction_year":null,"shelved_year":2022,"cancelled_year":null,"stop_year":null,"estimated_cost_usd":null,"estimated_cost_original":null,"estimated_cost_currency":null,"power_stations_supplied":null,"floating_vessel_name":null,"ccs_project":null,"hydrogen_project":null,"ammonia_project":null,"synthetic_lng_project":null,"retrofit_proposed":null,"url":"https://lngatlas.org/terminal/far-east-lng-terminal-ru/","data_source":"Data: Global Gas Infrastructure Tracker, Global Energy Monitor, September 2025"},{"terminal_slug":"fermeuse-energy-flng-terminal-ca","terminal_name":"Fermeuse Energy FLNG Terminal","country":"Canada","country_iso":"CA","unit_name":null,"status":"proposed","facility_type":"export","floating_type":"flng","capacity_mtpa":null,"capacity_bcm_y":null,"start_year":null,"planned_start_year":null,"original_planned_start_year":2031,"fid_year":null,"construction_year":null,"shelved_year":null,"cancelled_year":null,"stop_year":null,"estimated_cost_usd":13500000000,"estimated_cost_original":13500000000,"estimated_cost_currency":"USD","power_stations_supplied":null,"floating_vessel_name":null,"ccs_project":null,"hydrogen_project":null,"ammonia_project":null,"synthetic_lng_project":null,"retrofit_proposed":null,"url":"https://lngatlas.org/terminal/fermeuse-energy-flng-terminal-ca/","data_source":"Data: Global Gas Infrastructure Tracker, Global Energy Monitor, September 2025"},{"terminal_slug":"filipinas-lng-gateway-project-fsru-ph","terminal_name":"Filipinas LNG Gateway Project FSRU","country":"Philippines","country_iso":"PH","unit_name":null,"status":"construction","facility_type":"import","floating_type":"fsru","capacity_mtpa":4.4,"capacity_bcm_y":5.99,"start_year":null,"planned_start_year":2028,"original_planned_start_year":2022,"fid_year":null,"construction_year":2025,"shelved_year":null,"cancelled_year":null,"stop_year":null,"estimated_cost_usd":null,"estimated_cost_original":null,"estimated_cost_currency":null,"power_stations_supplied":null,"floating_vessel_name":null,"ccs_project":null,"hydrogen_project":null,"ammonia_project":null,"synthetic_lng_project":null,"retrofit_proposed":null,"url":"https://lngatlas.org/terminal/filipinas-lng-gateway-project-fsru-ph/","data_source":"Data: Global Gas Infrastructure Tracker, Global Energy Monitor, September 2025"},{"terminal_slug":"firebird-lng-terminal-sr","terminal_name":"Firebird LNG Terminal","country":"Suriname","country_iso":"SR","unit_name":null,"status":"proposed","facility_type":"export","floating_type":"unknown","capacity_mtpa":2.7,"capacity_bcm_y":3.67,"start_year":null,"planned_start_year":null,"original_planned_start_year":2026,"fid_year":2024,"construction_year":null,"shelved_year":null,"cancelled_year":null,"stop_year":null,"estimated_cost_usd":5400000000,"estimated_cost_original":5400000000,"estimated_cost_currency":"USD","power_stations_supplied":null,"floating_vessel_name":null,"ccs_project":null,"hydrogen_project":null,"ammonia_project":null,"synthetic_lng_project":null,"retrofit_proposed":null,"url":"https://lngatlas.org/terminal/firebird-lng-terminal-sr/","data_source":"Data: Global Gas Infrastructure Tracker, Global Energy Monitor, September 2025"},{"terminal_slug":"fishermans-landing-lng-terminal-au","terminal_name":"Fishermans Landing LNG Terminal","country":"Australia","country_iso":"AU","unit_name":"T1-T2","status":"cancelled","facility_type":"export","floating_type":"unknown","capacity_mtpa":3.5,"capacity_bcm_y":4.76,"start_year":null,"planned_start_year":null,"original_planned_start_year":null,"fid_year":null,"construction_year":null,"shelved_year":null,"cancelled_year":2017,"stop_year":2017,"estimated_cost_usd":null,"estimated_cost_original":null,"estimated_cost_currency":null,"power_stations_supplied":null,"floating_vessel_name":null,"ccs_project":null,"hydrogen_project":null,"ammonia_project":null,"synthetic_lng_project":null,"retrofit_proposed":null,"url":"https://lngatlas.org/terminal/fishermans-landing-lng-terminal-au/","data_source":"Data: Global Gas Infrastructure Tracker, Global Energy Monitor, September 2025"},{"terminal_slug":"floridian-lng-terminal-us","terminal_name":"Floridian LNG Terminal","country":"United States","country_iso":"US","unit_name":null,"status":"cancelled","facility_type":"export","floating_type":"unknown","capacity_mtpa":0.77,"capacity_bcm_y":1.05,"start_year":null,"planned_start_year":null,"original_planned_start_year":null,"fid_year":null,"construction_year":null,"shelved_year":2017,"cancelled_year":2019,"stop_year":2019,"estimated_cost_usd":null,"estimated_cost_original":null,"estimated_cost_currency":null,"power_stations_supplied":null,"floating_vessel_name":null,"ccs_project":null,"hydrogen_project":null,"ammonia_project":null,"synthetic_lng_project":null,"retrofit_proposed":null,"url":"https://lngatlas.org/terminal/floridian-lng-terminal-us/","data_source":"Data: Global Gas Infrastructure Tracker, Global Energy Monitor, September 2025"},{"terminal_slug":"fortuna-flng-terminal-gq","terminal_name":"Fortuna FLNG Terminal","country":"Equatorial Guinea","country_iso":"GQ","unit_name":"First Proposal","status":"cancelled","facility_type":"export","floating_type":"flng","capacity_mtpa":2.5,"capacity_bcm_y":3.4,"start_year":null,"planned_start_year":2022,"original_planned_start_year":2020,"fid_year":null,"construction_year":null,"shelved_year":null,"cancelled_year":2019,"stop_year":2019,"estimated_cost_usd":2000000000,"estimated_cost_original":2000000000,"estimated_cost_currency":"USD","power_stations_supplied":null,"floating_vessel_name":null,"ccs_project":null,"hydrogen_project":null,"ammonia_project":null,"synthetic_lng_project":null,"retrofit_proposed":null,"url":"https://lngatlas.org/terminal/fortuna-flng-terminal-gq/","data_source":"Data: Global Gas Infrastructure Tracker, Global Energy Monitor, September 2025"},{"terminal_slug":"fortuna-flng-terminal-gq","terminal_name":"Fortuna FLNG Terminal","country":"Equatorial Guinea","country_iso":"GQ","unit_name":"Second Proposal","status":"shelved","facility_type":"export","floating_type":"flng","capacity_mtpa":null,"capacity_bcm_y":null,"start_year":null,"planned_start_year":null,"original_planned_start_year":null,"fid_year":null,"construction_year":null,"shelved_year":2025,"cancelled_year":null,"stop_year":null,"estimated_cost_usd":1500000000,"estimated_cost_original":1500000000,"estimated_cost_currency":"USD","power_stations_supplied":null,"floating_vessel_name":null,"ccs_project":null,"hydrogen_project":null,"ammonia_project":null,"synthetic_lng_project":null,"retrofit_proposed":null,"url":"https://lngatlas.org/terminal/fortuna-flng-terminal-gq/","data_source":"Data: Global Gas Infrastructure Tracker, Global Energy Monitor, September 2025"},{"terminal_slug":"fos-cavaou-lng-terminal-fr","terminal_name":"Fos Cavaou LNG Terminal","country":"France","country_iso":"FR","unit_name":null,"status":"operating","facility_type":"import","floating_type":"unknown","capacity_mtpa":8,"capacity_bcm_y":10.88,"start_year":2010,"planned_start_year":null,"original_planned_start_year":null,"fid_year":null,"construction_year":2005,"shelved_year":null,"cancelled_year":null,"stop_year":null,"estimated_cost_usd":null,"estimated_cost_original":null,"estimated_cost_currency":null,"power_stations_supplied":null,"floating_vessel_name":null,"ccs_project":null,"hydrogen_project":null,"ammonia_project":null,"synthetic_lng_project":null,"retrofit_proposed":null,"url":"https://lngatlas.org/terminal/fos-cavaou-lng-terminal-fr/","data_source":"Data: Global Gas Infrastructure Tracker, Global Energy Monitor, September 2025"},{"terminal_slug":"fos-cavaou-lng-terminal-fr","terminal_name":"Fos Cavaou LNG Terminal","country":"France","country_iso":"FR","unit_name":"Expansion 1 (Debottlenecking)","status":"operating","facility_type":"import","floating_type":"unknown","capacity_mtpa":null,"capacity_bcm_y":null,"start_year":2023,"planned_start_year":null,"original_planned_start_year":null,"fid_year":null,"construction_year":null,"shelved_year":null,"cancelled_year":null,"stop_year":null,"estimated_cost_usd":null,"estimated_cost_original":null,"estimated_cost_currency":null,"power_stations_supplied":null,"floating_vessel_name":null,"ccs_project":null,"hydrogen_project":null,"ammonia_project":null,"synthetic_lng_project":null,"retrofit_proposed":null,"url":"https://lngatlas.org/terminal/fos-cavaou-lng-terminal-fr/","data_source":"Data: Global Gas Infrastructure Tracker, Global Energy Monitor, September 2025"},{"terminal_slug":"fos-cavaou-lng-terminal-fr","terminal_name":"Fos Cavaou LNG Terminal","country":"France","country_iso":"FR","unit_name":"Expansion 2","status":"construction","facility_type":"import","floating_type":"unknown","capacity_mtpa":2,"capacity_bcm_y":2.72,"start_year":null,"planned_start_year":null,"original_planned_start_year":null,"fid_year":null,"construction_year":null,"shelved_year":null,"cancelled_year":null,"stop_year":null,"estimated_cost_usd":null,"estimated_cost_original":null,"estimated_cost_currency":null,"power_stations_supplied":null,"floating_vessel_name":null,"ccs_project":null,"hydrogen_project":null,"ammonia_project":null,"synthetic_lng_project":null,"retrofit_proposed":null,"url":"https://lngatlas.org/terminal/fos-cavaou-lng-terminal-fr/","data_source":"Data: Global Gas Infrastructure Tracker, Global Energy Monitor, September 2025"},{"terminal_slug":"fos-lavera-marseille-lng-terminal-fr","terminal_name":"Fos Lavera Marseille LNG Terminal","country":"France","country_iso":"FR","unit_name":null,"status":"cancelled","facility_type":"import","floating_type":"unknown","capacity_mtpa":5.4,"capacity_bcm_y":7.35,"start_year":null,"planned_start_year":null,"original_planned_start_year":null,"fid_year":null,"construction_year":null,"shelved_year":null,"cancelled_year":2014,"stop_year":2014,"estimated_cost_usd":1300000000,"estimated_cost_original":1300000000,"estimated_cost_currency":"USD","power_stations_supplied":null,"floating_vessel_name":null,"ccs_project":null,"hydrogen_project":null,"ammonia_project":null,"synthetic_lng_project":null,"retrofit_proposed":null,"url":"https://lngatlas.org/terminal/fos-lavera-marseille-lng-terminal-fr/","data_source":"Data: Global Gas Infrastructure Tracker, Global Energy Monitor, September 2025"},{"terminal_slug":"fos-tonkin-lng-terminal-fr","terminal_name":"Fos Tonkin LNG Terminal","country":"France","country_iso":"FR","unit_name":null,"status":"operating","facility_type":"import","floating_type":"unknown","capacity_mtpa":1.2,"capacity_bcm_y":1.63,"start_year":1972,"planned_start_year":null,"original_planned_start_year":null,"fid_year":null,"construction_year":null,"shelved_year":null,"cancelled_year":null,"stop_year":null,"estimated_cost_usd":null,"estimated_cost_original":null,"estimated_cost_currency":null,"power_stations_supplied":null,"floating_vessel_name":null,"ccs_project":null,"hydrogen_project":true,"ammonia_project":true,"synthetic_lng_project":null,"retrofit_proposed":null,"url":"https://lngatlas.org/terminal/fos-tonkin-lng-terminal-fr/","data_source":"Data: Global Gas Infrastructure Tracker, Global Energy Monitor, September 2025"},{"terminal_slug":"fos-tonkin-lng-terminal-fr","terminal_name":"Fos Tonkin LNG Terminal","country":"France","country_iso":"FR","unit_name":"Ammonia Import Terminal","status":"proposed","facility_type":"import","floating_type":"unknown","capacity_mtpa":0.2,"capacity_bcm_y":0.27,"start_year":null,"planned_start_year":null,"original_planned_start_year":2029,"fid_year":null,"construction_year":null,"shelved_year":null,"cancelled_year":null,"stop_year":null,"estimated_cost_usd":null,"estimated_cost_original":null,"estimated_cost_currency":null,"power_stations_supplied":null,"floating_vessel_name":null,"ccs_project":null,"hydrogen_project":true,"ammonia_project":true,"synthetic_lng_project":null,"retrofit_proposed":null,"url":"https://lngatlas.org/terminal/fos-tonkin-lng-terminal-fr/","data_source":"Data: Global Gas Infrastructure Tracker, Global Energy Monitor, September 2025"},{"terminal_slug":"fourchon-lng-terminal-us","terminal_name":"Fourchon LNG Terminal","country":"United States","country_iso":"US","unit_name":"Phase 1","status":"cancelled","facility_type":"export","floating_type":"unknown","capacity_mtpa":2,"capacity_bcm_y":2.72,"start_year":null,"planned_start_year":null,"original_planned_start_year":2021,"fid_year":null,"construction_year":null,"shelved_year":2022,"cancelled_year":2024,"stop_year":2024,"estimated_cost_usd":888000000,"estimated_cost_original":888000000,"estimated_cost_currency":"USD","power_stations_supplied":null,"floating_vessel_name":null,"ccs_project":null,"hydrogen_project":null,"ammonia_project":null,"synthetic_lng_project":null,"retrofit_proposed":null,"url":"https://lngatlas.org/terminal/fourchon-lng-terminal-us/","data_source":"Data: Global Gas Infrastructure Tracker, Global Energy Monitor, September 2025"},{"terminal_slug":"fourchon-lng-terminal-us","terminal_name":"Fourchon LNG Terminal","country":"United States","country_iso":"US","unit_name":"Phase 2","status":"cancelled","facility_type":"export","floating_type":"unknown","capacity_mtpa":3,"capacity_bcm_y":4.08,"start_year":null,"planned_start_year":null,"original_planned_start_year":2023,"fid_year":null,"construction_year":null,"shelved_year":2022,"cancelled_year":2024,"stop_year":2024,"estimated_cost_usd":null,"estimated_cost_original":null,"estimated_cost_currency":null,"power_stations_supplied":null,"floating_vessel_name":null,"ccs_project":null,"hydrogen_project":null,"ammonia_project":null,"synthetic_lng_project":null,"retrofit_proposed":null,"url":"https://lngatlas.org/terminal/fourchon-lng-terminal-us/","data_source":"Data: Global Gas Infrastructure Tracker, Global Energy Monitor, September 2025"},{"terminal_slug":"fredrikstad-lng-terminal-no","terminal_name":"Fredrikstad LNG Terminal","country":"Norway","country_iso":"NO","unit_name":null,"status":"operating","facility_type":"import","floating_type":"unknown","capacity_mtpa":0.1,"capacity_bcm_y":0.14,"start_year":2011,"planned_start_year":null,"original_planned_start_year":null,"fid_year":null,"construction_year":null,"shelved_year":null,"cancelled_year":null,"stop_year":null,"estimated_cost_usd":null,"estimated_cost_original":null,"estimated_cost_currency":null,"power_stations_supplied":null,"floating_vessel_name":null,"ccs_project":null,"hydrogen_project":null,"ammonia_project":null,"synthetic_lng_project":null,"retrofit_proposed":null,"url":"https://lngatlas.org/terminal/fredrikstad-lng-terminal-no/","data_source":"Data: Global Gas Infrastructure Tracker, Global Energy Monitor, September 2025"},{"terminal_slug":"freeport-lng-terminal-us","terminal_name":"Freeport LNG Terminal","country":"United States","country_iso":"US","unit_name":"Import Terminal","status":"operating","facility_type":"import","floating_type":"unknown","capacity_mtpa":13.2,"capacity_bcm_y":17.96,"start_year":2008,"planned_start_year":null,"original_planned_start_year":null,"fid_year":null,"construction_year":null,"shelved_year":null,"cancelled_year":null,"stop_year":null,"estimated_cost_usd":null,"estimated_cost_original":null,"estimated_cost_currency":null,"power_stations_supplied":null,"floating_vessel_name":null,"ccs_project":null,"hydrogen_project":null,"ammonia_project":null,"synthetic_lng_project":null,"retrofit_proposed":null,"url":"https://lngatlas.org/terminal/freeport-lng-terminal-us/","data_source":"Data: Global Gas Infrastructure Tracker, Global Energy Monitor, September 2025"},{"terminal_slug":"freeport-lng-terminal-us","terminal_name":"Freeport LNG Terminal","country":"United States","country_iso":"US","unit_name":"T1","status":"operating","facility_type":"export","floating_type":"unknown","capacity_mtpa":5,"capacity_bcm_y":6.8,"start_year":2019,"planned_start_year":null,"original_planned_start_year":null,"fid_year":null,"construction_year":null,"shelved_year":null,"cancelled_year":null,"stop_year":null,"estimated_cost_usd":4500000000,"estimated_cost_original":4500000000,"estimated_cost_currency":"USD","power_stations_supplied":null,"floating_vessel_name":null,"ccs_project":null,"hydrogen_project":null,"ammonia_project":null,"synthetic_lng_project":null,"retrofit_proposed":null,"url":"https://lngatlas.org/terminal/freeport-lng-terminal-us/","data_source":"Data: Global Gas Infrastructure Tracker, Global Energy Monitor, September 2025"},{"terminal_slug":"freeport-lng-terminal-us","terminal_name":"Freeport LNG Terminal","country":"United States","country_iso":"US","unit_name":"T2","status":"operating","facility_type":"export","floating_type":"unknown","capacity_mtpa":5,"capacity_bcm_y":6.8,"start_year":2019,"planned_start_year":null,"original_planned_start_year":null,"fid_year":null,"construction_year":null,"shelved_year":null,"cancelled_year":null,"stop_year":null,"estimated_cost_usd":4500000000,"estimated_cost_original":4500000000,"estimated_cost_currency":"USD","power_stations_supplied":null,"floating_vessel_name":null,"ccs_project":null,"hydrogen_project":null,"ammonia_project":null,"synthetic_lng_project":null,"retrofit_proposed":null,"url":"https://lngatlas.org/terminal/freeport-lng-terminal-us/","data_source":"Data: Global Gas Infrastructure Tracker, Global Energy Monitor, September 2025"},{"terminal_slug":"freeport-lng-terminal-us","terminal_name":"Freeport LNG Terminal","country":"United States","country_iso":"US","unit_name":"T3","status":"operating","facility_type":"export","floating_type":"unknown","capacity_mtpa":5,"capacity_bcm_y":6.8,"start_year":2020,"planned_start_year":null,"original_planned_start_year":null,"fid_year":null,"construction_year":null,"shelved_year":null,"cancelled_year":null,"stop_year":null,"estimated_cost_usd":4500000000,"estimated_cost_original":4500000000,"estimated_cost_currency":"USD","power_stations_supplied":null,"floating_vessel_name":null,"ccs_project":null,"hydrogen_project":null,"ammonia_project":null,"synthetic_lng_project":null,"retrofit_proposed":null,"url":"https://lngatlas.org/terminal/freeport-lng-terminal-us/","data_source":"Data: Global Gas Infrastructure Tracker, Global Energy Monitor, September 2025"},{"terminal_slug":"freeport-lng-terminal-us","terminal_name":"Freeport LNG Terminal","country":"United States","country_iso":"US","unit_name":"Debottlenecking","status":"operating","facility_type":"export","floating_type":"unknown","capacity_mtpa":1.5,"capacity_bcm_y":2.04,"start_year":2024,"planned_start_year":null,"original_planned_start_year":null,"fid_year":null,"construction_year":2023,"shelved_year":null,"cancelled_year":null,"stop_year":null,"estimated_cost_usd":null,"estimated_cost_original":null,"estimated_cost_currency":null,"power_stations_supplied":null,"floating_vessel_name":null,"ccs_project":null,"hydrogen_project":null,"ammonia_project":null,"synthetic_lng_project":null,"retrofit_proposed":null,"url":"https://lngatlas.org/terminal/freeport-lng-terminal-us/","data_source":"Data: Global Gas Infrastructure Tracker, Global Energy Monitor, September 2025"},{"terminal_slug":"freeport-lng-terminal-us","terminal_name":"Freeport LNG Terminal","country":"United States","country_iso":"US","unit_name":"T4","status":"proposed","facility_type":"export","floating_type":"unknown","capacity_mtpa":5.1,"capacity_bcm_y":6.94,"start_year":null,"planned_start_year":2031,"original_planned_start_year":2026,"fid_year":2023,"construction_year":null,"shelved_year":null,"cancelled_year":null,"stop_year":null,"estimated_cost_usd":null,"estimated_cost_original":null,"estimated_cost_currency":null,"power_stations_supplied":null,"floating_vessel_name":null,"ccs_project":null,"hydrogen_project":null,"ammonia_project":null,"synthetic_lng_project":null,"retrofit_proposed":null,"url":"https://lngatlas.org/terminal/freeport-lng-terminal-us/","data_source":"Data: Global Gas Infrastructure Tracker, Global Energy Monitor, September 2025"},{"terminal_slug":"fujairah-lng-terminal-ae","terminal_name":"Fujairah LNG Terminal","country":"United Arab Emirates","country_iso":"AE","unit_name":"Original Project","status":"cancelled","facility_type":"import","floating_type":"unknown","capacity_mtpa":9,"capacity_bcm_y":12.24,"start_year":null,"planned_start_year":null,"original_planned_start_year":null,"fid_year":null,"construction_year":null,"shelved_year":2016,"cancelled_year":2017,"stop_year":2017,"estimated_cost_usd":null,"estimated_cost_original":null,"estimated_cost_currency":null,"power_stations_supplied":null,"floating_vessel_name":null,"ccs_project":null,"hydrogen_project":null,"ammonia_project":null,"synthetic_lng_project":null,"retrofit_proposed":null,"url":"https://lngatlas.org/terminal/fujairah-lng-terminal-ae/","data_source":"Data: Global Gas Infrastructure Tracker, Global Energy Monitor, September 2025"},{"terminal_slug":"fujairah-lng-terminal-ae","terminal_name":"Fujairah LNG Terminal","country":"United Arab Emirates","country_iso":"AE","unit_name":"Revived Project T1","status":"cancelled","facility_type":"export","floating_type":"unknown","capacity_mtpa":4.8,"capacity_bcm_y":6.53,"start_year":null,"planned_start_year":null,"original_planned_start_year":2027,"fid_year":null,"construction_year":2023,"shelved_year":null,"cancelled_year":2023,"stop_year":2023,"estimated_cost_usd":null,"estimated_cost_original":null,"estimated_cost_currency":null,"power_stations_supplied":null,"floating_vessel_name":null,"ccs_project":null,"hydrogen_project":null,"ammonia_project":null,"synthetic_lng_project":null,"retrofit_proposed":null,"url":"https://lngatlas.org/terminal/fujairah-lng-terminal-ae/","data_source":"Data: Global Gas Infrastructure Tracker, Global Energy Monitor, September 2025"},{"terminal_slug":"fujairah-lng-terminal-ae","terminal_name":"Fujairah LNG Terminal","country":"United Arab Emirates","country_iso":"AE","unit_name":"Revived Project T2","status":"cancelled","facility_type":"export","floating_type":"unknown","capacity_mtpa":4.8,"capacity_bcm_y":6.53,"start_year":null,"planned_start_year":null,"original_planned_start_year":2027,"fid_year":null,"construction_year":2023,"shelved_year":null,"cancelled_year":2023,"stop_year":2023,"estimated_cost_usd":null,"estimated_cost_original":null,"estimated_cost_currency":null,"power_stations_supplied":null,"floating_vessel_name":null,"ccs_project":null,"hydrogen_project":null,"ammonia_project":null,"synthetic_lng_project":null,"retrofit_proposed":null,"url":"https://lngatlas.org/terminal/fujairah-lng-terminal-ae/","data_source":"Data: Global Gas Infrastructure Tracker, Global Energy Monitor, September 2025"},{"terminal_slug":"fujian-lng-terminal-cn","terminal_name":"Fujian LNG Terminal","country":"China","country_iso":"CN","unit_name":"Phase I","status":"operating","facility_type":"import","floating_type":"unknown","capacity_mtpa":2.6,"capacity_bcm_y":3.54,"start_year":2008,"planned_start_year":null,"original_planned_start_year":null,"fid_year":null,"construction_year":2005,"shelved_year":null,"cancelled_year":null,"stop_year":null,"estimated_cost_usd":992000000,"estimated_cost_original":6200000000,"estimated_cost_currency":"RMB","power_stations_supplied":null,"floating_vessel_name":null,"ccs_project":null,"hydrogen_project":null,"ammonia_project":null,"synthetic_lng_project":null,"retrofit_proposed":null,"url":"https://lngatlas.org/terminal/fujian-lng-terminal-cn/","data_source":"Data: Global Gas Infrastructure Tracker, Global Energy Monitor, September 2025"},{"terminal_slug":"fujian-lng-terminal-cn","terminal_name":"Fujian LNG Terminal","country":"China","country_iso":"CN","unit_name":"Phase II (Expansion)","status":"operating","facility_type":"import","floating_type":"unknown","capacity_mtpa":3.7,"capacity_bcm_y":5.03,"start_year":2019,"planned_start_year":null,"original_planned_start_year":null,"fid_year":null,"construction_year":2015,"shelved_year":null,"cancelled_year":null,"stop_year":null,"estimated_cost_usd":null,"estimated_cost_original":null,"estimated_cost_currency":null,"power_stations_supplied":null,"floating_vessel_name":null,"ccs_project":null,"hydrogen_project":null,"ammonia_project":null,"synthetic_lng_project":null,"retrofit_proposed":null,"url":"https://lngatlas.org/terminal/fujian-lng-terminal-cn/","data_source":"Data: Global Gas Infrastructure Tracker, Global Energy Monitor, September 2025"},{"terminal_slug":"fukuoka-lng-terminal-jp","terminal_name":"Fukuoka LNG Terminal","country":"Japan","country_iso":"JP","unit_name":null,"status":"operating","facility_type":"import","floating_type":"unknown","capacity_mtpa":0.65,"capacity_bcm_y":0.88,"start_year":1993,"planned_start_year":null,"original_planned_start_year":null,"fid_year":null,"construction_year":null,"shelved_year":null,"cancelled_year":null,"stop_year":null,"estimated_cost_usd":null,"estimated_cost_original":null,"estimated_cost_currency":null,"power_stations_supplied":null,"floating_vessel_name":null,"ccs_project":null,"hydrogen_project":null,"ammonia_project":null,"synthetic_lng_project":null,"retrofit_proposed":null,"url":"https://lngatlas.org/terminal/fukuoka-lng-terminal-jp/","data_source":"Data: Global Gas Infrastructure Tracker, Global Energy Monitor, September 2025"},{"terminal_slug":"fuqing-lng-terminal-cn","terminal_name":"Fuqing LNG Terminal","country":"China","country_iso":"CN","unit_name":null,"status":"construction","facility_type":"import","floating_type":"unknown","capacity_mtpa":3,"capacity_bcm_y":4.08,"start_year":null,"planned_start_year":null,"original_planned_start_year":null,"fid_year":null,"construction_year":2024,"shelved_year":null,"cancelled_year":null,"stop_year":null,"estimated_cost_usd":623800000,"estimated_cost_original":3898750000,"estimated_cost_currency":"RMB","power_stations_supplied":null,"floating_vessel_name":null,"ccs_project":null,"hydrogen_project":null,"ammonia_project":null,"synthetic_lng_project":null,"retrofit_proposed":null,"url":"https://lngatlas.org/terminal/fuqing-lng-terminal-cn/","data_source":"Data: Global Gas Infrastructure Tracker, Global Energy Monitor, September 2025"},{"terminal_slug":"futtsu-lng-terminal-jp","terminal_name":"Futtsu LNG Terminal","country":"Japan","country_iso":"JP","unit_name":null,"status":"operating","facility_type":"import","floating_type":"unknown","capacity_mtpa":22.9,"capacity_bcm_y":31.16,"start_year":1985,"planned_start_year":null,"original_planned_start_year":null,"fid_year":null,"construction_year":null,"shelved_year":null,"cancelled_year":null,"stop_year":null,"estimated_cost_usd":null,"estimated_cost_original":null,"estimated_cost_currency":null,"power_stations_supplied":null,"floating_vessel_name":null,"ccs_project":null,"hydrogen_project":null,"ammonia_project":null,"synthetic_lng_project":null,"retrofit_proposed":null,"url":"https://lngatlas.org/terminal/futtsu-lng-terminal-jp/","data_source":"Data: Global Gas Infrastructure Tracker, Global Energy Monitor, September 2025"},{"terminal_slug":"g2-lng-terminal-us","terminal_name":"G2 LNG Terminal","country":"United States","country_iso":"US","unit_name":"T1-T10","status":"cancelled","facility_type":"export","floating_type":"unknown","capacity_mtpa":13,"capacity_bcm_y":17.69,"start_year":null,"planned_start_year":null,"original_planned_start_year":2027,"fid_year":null,"construction_year":null,"shelved_year":2017,"cancelled_year":2023,"stop_year":2023,"estimated_cost_usd":15000000000,"estimated_cost_original":15000000000,"estimated_cost_currency":"USD","power_stations_supplied":null,"floating_vessel_name":null,"ccs_project":true,"hydrogen_project":null,"ammonia_project":null,"synthetic_lng_project":null,"retrofit_proposed":null,"url":"https://lngatlas.org/terminal/g2-lng-terminal-us/","data_source":"Data: Global Gas Infrastructure Tracker, Global Energy Monitor, September 2025"},{"terminal_slug":"gail-kakinada-fsru-in","terminal_name":"GAIL Kakinada FSRU","country":"India","country_iso":"IN","unit_name":null,"status":"cancelled","facility_type":"import","floating_type":"fsru","capacity_mtpa":5,"capacity_bcm_y":6.8,"start_year":null,"planned_start_year":null,"original_planned_start_year":null,"fid_year":null,"construction_year":null,"shelved_year":2019,"cancelled_year":2021,"stop_year":2021,"estimated_cost_usd":null,"estimated_cost_original":null,"estimated_cost_currency":null,"power_stations_supplied":null,"floating_vessel_name":null,"ccs_project":null,"hydrogen_project":null,"ammonia_project":null,"synthetic_lng_project":null,"retrofit_proposed":null,"url":"https://lngatlas.org/terminal/gail-kakinada-fsru-in/","data_source":"Data: Global Gas Infrastructure Tracker, Global Energy Monitor, September 2025"},{"terminal_slug":"geil-fsru-pk","terminal_name":"GEIL FSRU","country":"Pakistan","country_iso":"PK","unit_name":null,"status":"cancelled","facility_type":"import","floating_type":"fsru","capacity_mtpa":null,"capacity_bcm_y":null,"start_year":null,"planned_start_year":null,"original_planned_start_year":2017,"fid_year":null,"construction_year":null,"shelved_year":null,"cancelled_year":2022,"stop_year":2022,"estimated_cost_usd":null,"estimated_cost_original":null,"estimated_cost_currency":null,"power_stations_supplied":null,"floating_vessel_name":null,"ccs_project":null,"hydrogen_project":null,"ammonia_project":null,"synthetic_lng_project":null,"retrofit_proposed":null,"url":"https://lngatlas.org/terminal/geil-fsru-pk/","data_source":"Data: Global Gas Infrastructure Tracker, Global Energy Monitor, September 2025"},{"terminal_slug":"gnl-del-plata-fsru-uy","terminal_name":"GNL Del Plata FSRU","country":"Uruguay","country_iso":"UY","unit_name":null,"status":"cancelled","facility_type":"import","floating_type":"fsru","capacity_mtpa":0.1,"capacity_bcm_y":0.14,"start_year":null,"planned_start_year":null,"original_planned_start_year":null,"fid_year":null,"construction_year":null,"shelved_year":2017,"cancelled_year":2019,"stop_year":2019,"estimated_cost_usd":null,"estimated_cost_original":null,"estimated_cost_currency":null,"power_stations_supplied":null,"floating_vessel_name":null,"ccs_project":null,"hydrogen_project":null,"ammonia_project":null,"synthetic_lng_project":null,"retrofit_proposed":null,"url":"https://lngatlas.org/terminal/gnl-del-plata-fsru-uy/","data_source":"Data: Global Gas Infrastructure Tracker, Global Energy Monitor, September 2025"},{"terminal_slug":"galveston-bay-lng-terminal-us","terminal_name":"Galveston Bay LNG Terminal","country":"United States","country_iso":"US","unit_name":"T1-T3","status":"cancelled","facility_type":"export","floating_type":"unknown","capacity_mtpa":5.5,"capacity_bcm_y":7.48,"start_year":null,"planned_start_year":null,"original_planned_start_year":2027,"fid_year":null,"construction_year":2022,"shelved_year":null,"cancelled_year":2021,"stop_year":2021,"estimated_cost_usd":null,"estimated_cost_original":null,"estimated_cost_currency":null,"power_stations_supplied":null,"floating_vessel_name":null,"ccs_project":null,"hydrogen_project":null,"ammonia_project":null,"synthetic_lng_project":null,"retrofit_proposed":null,"url":"https://lngatlas.org/terminal/galveston-bay-lng-terminal-us/","data_source":"Data: Global Gas Infrastructure Tracker, Global Energy Monitor, September 2025"},{"terminal_slug":"gangavaram-lng-terminal-in","terminal_name":"Gangavaram LNG Terminal","country":"India","country_iso":"IN","unit_name":null,"status":"shelved","facility_type":"import","floating_type":"unknown","capacity_mtpa":10,"capacity_bcm_y":13.61,"start_year":null,"planned_start_year":null,"original_planned_start_year":null,"fid_year":null,"construction_year":null,"shelved_year":2024,"cancelled_year":null,"stop_year":null,"estimated_cost_usd":null,"estimated_cost_original":null,"estimated_cost_currency":null,"power_stations_supplied":null,"floating_vessel_name":null,"ccs_project":null,"hydrogen_project":null,"ammonia_project":null,"synthetic_lng_project":null,"retrofit_proposed":null,"url":"https://lngatlas.org/terminal/gangavaram-lng-terminal-in/","data_source":"Data: Global Gas Infrastructure Tracker, Global Energy Monitor, September 2025"},{"terminal_slug":"ganyu-lng-terminal-cn","terminal_name":"Ganyu LNG Terminal","country":"China","country_iso":"CN","unit_name":"Ganyu LNG Terminal","status":"construction","facility_type":"import","floating_type":"unknown","capacity_mtpa":3,"capacity_bcm_y":4.08,"start_year":null,"planned_start_year":null,"original_planned_start_year":2027,"fid_year":null,"construction_year":2023,"shelved_year":null,"cancelled_year":null,"stop_year":null,"estimated_cost_usd":1040000000,"estimated_cost_original":6500000000,"estimated_cost_currency":"RMB","power_stations_supplied":null,"floating_vessel_name":null,"ccs_project":null,"hydrogen_project":null,"ammonia_project":null,"synthetic_lng_project":null,"retrofit_proposed":null,"url":"https://lngatlas.org/terminal/ganyu-lng-terminal-cn/","data_source":"Data: Global Gas Infrastructure Tracker, Global Energy Monitor, September 2025"},{"terminal_slug":"ganyu-lng-terminal-cn","terminal_name":"Ganyu LNG Terminal","country":"China","country_iso":"CN","unit_name":"Sinopec Lianyungang LNG Terminal","status":"cancelled","facility_type":"import","floating_type":"unknown","capacity_mtpa":3,"capacity_bcm_y":4.08,"start_year":null,"planned_start_year":null,"original_planned_start_year":null,"fid_year":null,"construction_year":null,"shelved_year":2015,"cancelled_year":2017,"stop_year":2017,"estimated_cost_usd":null,"estimated_cost_original":null,"estimated_cost_currency":null,"power_stations_supplied":null,"floating_vessel_name":null,"ccs_project":null,"hydrogen_project":null,"ammonia_project":null,"synthetic_lng_project":null,"retrofit_proposed":null,"url":"https://lngatlas.org/terminal/ganyu-lng-terminal-cn/","data_source":"Data: Global Gas Infrastructure Tracker, Global Energy Monitor, September 2025"},{"terminal_slug":"gas-atacama-flng-terminal-cl","terminal_name":"Gas Atacama FLNG Terminal","country":"Chile","country_iso":"CL","unit_name":null,"status":"cancelled","facility_type":"import","floating_type":"flng","capacity_mtpa":1.4,"capacity_bcm_y":1.9,"start_year":null,"planned_start_year":null,"original_planned_start_year":2015,"fid_year":null,"construction_year":null,"shelved_year":2016,"cancelled_year":2018,"stop_year":2018,"estimated_cost_usd":350000000,"estimated_cost_original":350000000,"estimated_cost_currency":"USD","power_stations_supplied":null,"floating_vessel_name":null,"ccs_project":null,"hydrogen_project":null,"ammonia_project":null,"synthetic_lng_project":null,"retrofit_proposed":null,"url":"https://lngatlas.org/terminal/gas-atacama-flng-terminal-cl/","data_source":"Data: Global Gas Infrastructure Tracker, Global Energy Monitor, September 2025"},{"terminal_slug":"strategic-gas-emergency-reserve-sger-fsru-ie","terminal_name":"Gas Networks Ireland LNG Terminal","country":"Ireland","country_iso":"IE","unit_name":null,"status":"proposed","facility_type":"import","floating_type":"floating","capacity_mtpa":null,"capacity_bcm_y":null,"start_year":null,"planned_start_year":null,"original_planned_start_year":null,"fid_year":null,"construction_year":null,"shelved_year":null,"cancelled_year":null,"stop_year":null,"estimated_cost_usd":327000000,"estimated_cost_original":300000000,"estimated_cost_currency":"EUR","power_stations_supplied":null,"floating_vessel_name":null,"ccs_project":null,"hydrogen_project":null,"ammonia_project":null,"synthetic_lng_project":null,"retrofit_proposed":null,"url":"https://lngatlas.org/terminal/strategic-gas-emergency-reserve-sger-fsru-ie/","data_source":"Data: Global Gas Infrastructure Tracker, Global Energy Monitor, September 2025"},{"terminal_slug":"gasport-fsru-pk","terminal_name":"GasPort FSRU","country":"Pakistan","country_iso":"PK","unit_name":null,"status":"operating","facility_type":"import","floating_type":"fsru","capacity_mtpa":5,"capacity_bcm_y":6.8,"start_year":2017,"planned_start_year":null,"original_planned_start_year":null,"fid_year":null,"construction_year":2016,"shelved_year":null,"cancelled_year":null,"stop_year":null,"estimated_cost_usd":500000000,"estimated_cost_original":500000000,"estimated_cost_currency":"USD","power_stations_supplied":null,"floating_vessel_name":"BW Integrity","ccs_project":null,"hydrogen_project":null,"ammonia_project":null,"synthetic_lng_project":null,"retrofit_proposed":null,"url":"https://lngatlas.org/terminal/gasport-fsru-pk/","data_source":"Data: Global Gas Infrastructure Tracker, Global Energy Monitor, September 2025"},{"terminal_slug":"gasport-fsru-2-pk","terminal_name":"GasPort FSRU 2","country":"Pakistan","country_iso":"PK","unit_name":null,"status":"proposed","facility_type":"import","floating_type":"fsru","capacity_mtpa":0.69,"capacity_bcm_y":0.94,"start_year":null,"planned_start_year":null,"original_planned_start_year":2021,"fid_year":null,"construction_year":null,"shelved_year":2022,"cancelled_year":null,"stop_year":null,"estimated_cost_usd":null,"estimated_cost_original":null,"estimated_cost_currency":null,"power_stations_supplied":null,"floating_vessel_name":null,"ccs_project":null,"hydrogen_project":null,"ammonia_project":null,"synthetic_lng_project":null,"retrofit_proposed":null,"url":"https://lngatlas.org/terminal/gasport-fsru-2-pk/","data_source":"Data: Global Gas Infrastructure Tracker, Global Energy Monitor, September 2025"},{"terminal_slug":"gate-lng-terminal-nl","terminal_name":"Gate LNG Terminal","country":"Netherlands","country_iso":"NL","unit_name":null,"status":"operating","facility_type":"import","floating_type":"unknown","capacity_mtpa":11.76,"capacity_bcm_y":16,"start_year":2011,"planned_start_year":null,"original_planned_start_year":null,"fid_year":2007,"construction_year":2008,"shelved_year":null,"cancelled_year":null,"stop_year":null,"estimated_cost_usd":872000000,"estimated_cost_original":800000000,"estimated_cost_currency":"EUR","power_stations_supplied":null,"floating_vessel_name":null,"ccs_project":null,"hydrogen_project":null,"ammonia_project":null,"synthetic_lng_project":null,"retrofit_proposed":null,"url":"https://lngatlas.org/terminal/gate-lng-terminal-nl/","data_source":"Data: Global Gas Infrastructure Tracker, Global Energy Monitor, September 2025"},{"terminal_slug":"gate-lng-terminal-nl","terminal_name":"Gate LNG Terminal","country":"Netherlands","country_iso":"NL","unit_name":"Expansion","status":"construction","facility_type":"import","floating_type":"unknown","capacity_mtpa":2.94,"capacity_bcm_y":4,"start_year":null,"planned_start_year":null,"original_planned_start_year":2026,"fid_year":2023,"construction_year":2023,"shelved_year":null,"cancelled_year":null,"stop_year":null,"estimated_cost_usd":381500000,"estimated_cost_original":350000000,"estimated_cost_currency":"EUR","power_stations_supplied":null,"floating_vessel_name":null,"ccs_project":null,"hydrogen_project":null,"ammonia_project":null,"synthetic_lng_project":null,"retrofit_proposed":null,"url":"https://lngatlas.org/terminal/gate-lng-terminal-nl/","data_source":"Data: Global Gas Infrastructure Tracker, Global Energy Monitor, September 2025"},{"terminal_slug":"gato-negro-manzanillo-lng-terminal-mx","terminal_name":"Gato Negro Manzanillo LNG Terminal","country":"Mexico","country_iso":"MX","unit_name":null,"status":"proposed","facility_type":"export","floating_type":"unknown","capacity_mtpa":6,"capacity_bcm_y":8.16,"start_year":null,"planned_start_year":2030,"original_planned_start_year":2027,"fid_year":2026,"construction_year":2026,"shelved_year":null,"cancelled_year":null,"stop_year":null,"estimated_cost_usd":null,"estimated_cost_original":null,"estimated_cost_currency":null,"power_stations_supplied":null,"floating_vessel_name":null,"ccs_project":null,"hydrogen_project":null,"ammonia_project":null,"synthetic_lng_project":null,"retrofit_proposed":null,"url":"https://lngatlas.org/terminal/gato-negro-manzanillo-lng-terminal-mx/","data_source":"Data: Global Gas Infrastructure Tracker, Global Energy Monitor, September 2025"},{"terminal_slug":"geelong-fsru-au","terminal_name":"Geelong FSRU","country":"Australia","country_iso":"AU","unit_name":null,"status":"proposed","facility_type":"import","floating_type":"fsru","capacity_mtpa":3,"capacity_bcm_y":4.08,"start_year":null,"planned_start_year":2028,"original_planned_start_year":2024,"fid_year":2025,"construction_year":2026,"shelved_year":null,"cancelled_year":null,"stop_year":null,"estimated_cost_usd":181600000,"estimated_cost_original":250000000,"estimated_cost_currency":"AUD","power_stations_supplied":null,"floating_vessel_name":null,"ccs_project":null,"hydrogen_project":null,"ammonia_project":null,"synthetic_lng_project":null,"retrofit_proposed":null,"url":"https://lngatlas.org/terminal/geelong-fsru-au/","data_source":"Data: Global Gas Infrastructure Tracker, Global Energy Monitor, September 2025"},{"terminal_slug":"geramar-fsru-br","terminal_name":"Geramar FSRU","country":"Brazil","country_iso":"BR","unit_name":null,"status":"shelved","facility_type":"import","floating_type":"fsru","capacity_mtpa":null,"capacity_bcm_y":null,"start_year":null,"planned_start_year":null,"original_planned_start_year":2026,"fid_year":null,"construction_year":null,"shelved_year":2025,"cancelled_year":null,"stop_year":null,"estimated_cost_usd":null,"estimated_cost_original":null,"estimated_cost_currency":null,"power_stations_supplied":"Geramar III power station","floating_vessel_name":null,"ccs_project":null,"hydrogen_project":null,"ammonia_project":null,"synthetic_lng_project":null,"retrofit_proposed":null,"url":"https://lngatlas.org/terminal/geramar-fsru-br/","data_source":"Data: Global Gas Infrastructure Tracker, Global Energy Monitor, September 2025"},{"terminal_slug":"gibbstown-deepwater-port-lng-terminal-us","terminal_name":"Gibbstown Deepwater Port LNG Terminal","country":"United States","country_iso":"US","unit_name":null,"status":"proposed","facility_type":"export","floating_type":"unknown","capacity_mtpa":1.5,"capacity_bcm_y":2.04,"start_year":null,"planned_start_year":null,"original_planned_start_year":null,"fid_year":null,"construction_year":null,"shelved_year":null,"cancelled_year":null,"stop_year":null,"estimated_cost_usd":450000000,"estimated_cost_original":450000000,"estimated_cost_currency":"USD","power_stations_supplied":null,"floating_vessel_name":null,"ccs_project":null,"hydrogen_project":null,"ammonia_project":null,"synthetic_lng_project":null,"retrofit_proposed":null,"url":"https://lngatlas.org/terminal/gibbstown-deepwater-port-lng-terminal-us/","data_source":"Data: Global Gas Infrastructure Tracker, Global Energy Monitor, September 2025"},{"terminal_slug":"gibraltar-lng-terminal-gi","terminal_name":"Gibraltar LNG Terminal","country":"Gibraltar","country_iso":"GI","unit_name":null,"status":"operating","facility_type":"import","floating_type":"floating","capacity_mtpa":0.1,"capacity_bcm_y":0.14,"start_year":2019,"planned_start_year":null,"original_planned_start_year":null,"fid_year":null,"construction_year":2016,"shelved_year":null,"cancelled_year":null,"stop_year":null,"estimated_cost_usd":null,"estimated_cost_original":null,"estimated_cost_currency":null,"power_stations_supplied":"Gibraltar's Rock power station","floating_vessel_name":null,"ccs_project":null,"hydrogen_project":null,"ammonia_project":null,"synthetic_lng_project":null,"retrofit_proposed":null,"url":"https://lngatlas.org/terminal/gibraltar-lng-terminal-gi/","data_source":"Data: Global Gas Infrastructure Tracker, Global Energy Monitor, September 2025"},{"terminal_slug":"gioia-tauro-lng-terminal-it","terminal_name":"Gioia Tauro LNG Terminal","country":"Italy","country_iso":"IT","unit_name":null,"status":"proposed","facility_type":"import","floating_type":"unknown","capacity_mtpa":8.82,"capacity_bcm_y":12,"start_year":null,"planned_start_year":null,"original_planned_start_year":2026,"fid_year":null,"construction_year":null,"shelved_year":null,"cancelled_year":null,"stop_year":null,"estimated_cost_usd":1090000000,"estimated_cost_original":1000000000,"estimated_cost_currency":"EUR","power_stations_supplied":null,"floating_vessel_name":null,"ccs_project":null,"hydrogen_project":null,"ammonia_project":null,"synthetic_lng_project":null,"retrofit_proposed":null,"url":"https://lngatlas.org/terminal/gioia-tauro-lng-terminal-it/","data_source":"Data: Global Gas Infrastructure Tracker, Global Energy Monitor, September 2025"},{"terminal_slug":"gladstone-lng-terminal-au","terminal_name":"Gladstone LNG Terminal","country":"Australia","country_iso":"AU","unit_name":"T1","status":"operating","facility_type":"export","floating_type":"unknown","capacity_mtpa":3.9,"capacity_bcm_y":5.31,"start_year":2015,"planned_start_year":null,"original_planned_start_year":null,"fid_year":2011,"construction_year":null,"shelved_year":null,"cancelled_year":null,"stop_year":null,"estimated_cost_usd":null,"estimated_cost_original":null,"estimated_cost_currency":null,"power_stations_supplied":null,"floating_vessel_name":null,"ccs_project":null,"hydrogen_project":null,"ammonia_project":null,"synthetic_lng_project":null,"retrofit_proposed":null,"url":"https://lngatlas.org/terminal/gladstone-lng-terminal-au/","data_source":"Data: Global Gas Infrastructure Tracker, Global Energy Monitor, September 2025"},{"terminal_slug":"gladstone-lng-terminal-au","terminal_name":"Gladstone LNG Terminal","country":"Australia","country_iso":"AU","unit_name":"T2","status":"operating","facility_type":"export","floating_type":"unknown","capacity_mtpa":3.9,"capacity_bcm_y":5.31,"start_year":2016,"planned_start_year":null,"original_planned_start_year":null,"fid_year":null,"construction_year":null,"shelved_year":null,"cancelled_year":null,"stop_year":null,"estimated_cost_usd":null,"estimated_cost_original":null,"estimated_cost_currency":null,"power_stations_supplied":null,"floating_vessel_name":null,"ccs_project":null,"hydrogen_project":null,"ammonia_project":null,"synthetic_lng_project":null,"retrofit_proposed":null,"url":"https://lngatlas.org/terminal/gladstone-lng-terminal-au/","data_source":"Data: Global Gas Infrastructure Tracker, Global Energy Monitor, September 2025"},{"terminal_slug":"golar-lagos-fsru-ng","terminal_name":"Golar Lagos FSRU","country":"Nigeria","country_iso":"NG","unit_name":null,"status":"cancelled","facility_type":"import","floating_type":"fsru","capacity_mtpa":5.7,"capacity_bcm_y":7.76,"start_year":null,"planned_start_year":null,"original_planned_start_year":null,"fid_year":null,"construction_year":null,"shelved_year":null,"cancelled_year":2022,"stop_year":2022,"estimated_cost_usd":null,"estimated_cost_original":null,"estimated_cost_currency":null,"power_stations_supplied":null,"floating_vessel_name":null,"ccs_project":null,"hydrogen_project":null,"ammonia_project":null,"synthetic_lng_project":null,"retrofit_proposed":null,"url":"https://lngatlas.org/terminal/golar-lagos-fsru-ng/","data_source":"Data: Global Gas Infrastructure Tracker, Global Energy Monitor, September 2025"},{"terminal_slug":"golar-nigeria-flng-terminal-ng","terminal_name":"Golar Nigeria FLNG Terminal","country":"Nigeria","country_iso":"NG","unit_name":null,"status":"proposed","facility_type":"export","floating_type":"flng","capacity_mtpa":null,"capacity_bcm_y":null,"start_year":null,"planned_start_year":null,"original_planned_start_year":null,"fid_year":2024,"construction_year":null,"shelved_year":null,"cancelled_year":null,"stop_year":null,"estimated_cost_usd":null,"estimated_cost_original":null,"estimated_cost_currency":null,"power_stations_supplied":null,"floating_vessel_name":null,"ccs_project":null,"hydrogen_project":null,"ammonia_project":null,"synthetic_lng_project":null,"retrofit_proposed":null,"url":"https://lngatlas.org/terminal/golar-nigeria-flng-terminal-ng/","data_source":"Data: Global Gas Infrastructure Tracker, Global Energy Monitor, September 2025"},{"terminal_slug":"goldboro-lng-terminal-ca","terminal_name":"Goldboro LNG Terminal","country":"Canada","country_iso":"CA","unit_name":"T1","status":"shelved","facility_type":"export","floating_type":"unknown","capacity_mtpa":null,"capacity_bcm_y":null,"start_year":null,"planned_start_year":null,"original_planned_start_year":2025,"fid_year":2021,"construction_year":null,"shelved_year":2023,"cancelled_year":null,"stop_year":null,"estimated_cost_usd":null,"estimated_cost_original":null,"estimated_cost_currency":null,"power_stations_supplied":null,"floating_vessel_name":null,"ccs_project":null,"hydrogen_project":null,"ammonia_project":null,"synthetic_lng_project":null,"retrofit_proposed":null,"url":"https://lngatlas.org/terminal/goldboro-lng-terminal-ca/","data_source":"Data: Global Gas Infrastructure Tracker, Global Energy Monitor, September 2025"},{"terminal_slug":"goldboro-lng-terminal-ca","terminal_name":"Goldboro LNG Terminal","country":"Canada","country_iso":"CA","unit_name":"T2","status":"shelved","facility_type":"export","floating_type":"unknown","capacity_mtpa":null,"capacity_bcm_y":null,"start_year":null,"planned_start_year":null,"original_planned_start_year":2025,"fid_year":2021,"construction_year":null,"shelved_year":2023,"cancelled_year":null,"stop_year":null,"estimated_cost_usd":null,"estimated_cost_original":null,"estimated_cost_currency":null,"power_stations_supplied":null,"floating_vessel_name":null,"ccs_project":null,"hydrogen_project":null,"ammonia_project":null,"synthetic_lng_project":null,"retrofit_proposed":null,"url":"https://lngatlas.org/terminal/goldboro-lng-terminal-ca/","data_source":"Data: Global Gas Infrastructure Tracker, Global Energy Monitor, September 2025"},{"terminal_slug":"golden-pass-lng-terminal-us","terminal_name":"Golden Pass LNG Terminal","country":"United States","country_iso":"US","unit_name":"Import Terminal","status":"mothballed","facility_type":"import","floating_type":"unknown","capacity_mtpa":15.7,"capacity_bcm_y":21.36,"start_year":2010,"planned_start_year":null,"original_planned_start_year":null,"fid_year":null,"construction_year":null,"shelved_year":null,"cancelled_year":null,"stop_year":null,"estimated_cost_usd":null,"estimated_cost_original":null,"estimated_cost_currency":null,"power_stations_supplied":null,"floating_vessel_name":null,"ccs_project":null,"hydrogen_project":null,"ammonia_project":null,"synthetic_lng_project":null,"retrofit_proposed":null,"url":"https://lngatlas.org/terminal/golden-pass-lng-terminal-us/","data_source":"Data: Global Gas Infrastructure Tracker, Global Energy Monitor, September 2025"},{"terminal_slug":"golden-pass-lng-terminal-us","terminal_name":"Golden Pass LNG Terminal","country":"United States","country_iso":"US","unit_name":"T1","status":"construction","facility_type":"export","floating_type":"unknown","capacity_mtpa":5.2,"capacity_bcm_y":7.07,"start_year":null,"planned_start_year":2026,"original_planned_start_year":2025,"fid_year":2019,"construction_year":2019,"shelved_year":null,"cancelled_year":null,"stop_year":null,"estimated_cost_usd":3333333333,"estimated_cost_original":3333333333,"estimated_cost_currency":"USD","power_stations_supplied":null,"floating_vessel_name":null,"ccs_project":null,"hydrogen_project":null,"ammonia_project":null,"synthetic_lng_project":null,"retrofit_proposed":null,"url":"https://lngatlas.org/terminal/golden-pass-lng-terminal-us/","data_source":"Data: Global Gas Infrastructure Tracker, Global Energy Monitor, September 2025"},{"terminal_slug":"golden-pass-lng-terminal-us","terminal_name":"Golden Pass LNG Terminal","country":"United States","country_iso":"US","unit_name":"T2","status":"construction","facility_type":"export","floating_type":"unknown","capacity_mtpa":5.2,"capacity_bcm_y":7.07,"start_year":null,"planned_start_year":2026,"original_planned_start_year":2025,"fid_year":2019,"construction_year":2019,"shelved_year":null,"cancelled_year":null,"stop_year":null,"estimated_cost_usd":3333333333,"estimated_cost_original":3333333333,"estimated_cost_currency":"USD","power_stations_supplied":null,"floating_vessel_name":null,"ccs_project":null,"hydrogen_project":null,"ammonia_project":null,"synthetic_lng_project":null,"retrofit_proposed":null,"url":"https://lngatlas.org/terminal/golden-pass-lng-terminal-us/","data_source":"Data: Global Gas Infrastructure Tracker, Global Energy Monitor, September 2025"},{"terminal_slug":"golden-pass-lng-terminal-us","terminal_name":"Golden Pass LNG Terminal","country":"United States","country_iso":"US","unit_name":"T3","status":"construction","facility_type":"export","floating_type":"unknown","capacity_mtpa":5.2,"capacity_bcm_y":7.07,"start_year":null,"planned_start_year":2027,"original_planned_start_year":2025,"fid_year":2019,"construction_year":2019,"shelved_year":null,"cancelled_year":null,"stop_year":null,"estimated_cost_usd":3333333333,"estimated_cost_original":3333333333,"estimated_cost_currency":"USD","power_stations_supplied":null,"floating_vessel_name":null,"ccs_project":null,"hydrogen_project":null,"ammonia_project":null,"synthetic_lng_project":null,"retrofit_proposed":null,"url":"https://lngatlas.org/terminal/golden-pass-lng-terminal-us/","data_source":"Data: Global Gas Infrastructure Tracker, Global Energy Monitor, September 2025"},{"terminal_slug":"gopalpur-lng-terminal-in","terminal_name":"Gopalpur LNG Terminal","country":"India","country_iso":"IN","unit_name":null,"status":"proposed","facility_type":"import","floating_type":"floating","capacity_mtpa":5,"capacity_bcm_y":6.8,"start_year":null,"planned_start_year":2028,"original_planned_start_year":2025,"fid_year":2025,"construction_year":null,"shelved_year":null,"cancelled_year":null,"stop_year":null,"estimated_cost_usd":826020000,"estimated_cost_original":63540000000,"estimated_cost_currency":"INR","power_stations_supplied":null,"floating_vessel_name":null,"ccs_project":null,"hydrogen_project":null,"ammonia_project":null,"synthetic_lng_project":null,"retrofit_proposed":null,"url":"https://lngatlas.org/terminal/gopalpur-lng-terminal-in/","data_source":"Data: Global Gas Infrastructure Tracker, Global Energy Monitor, September 2025"},{"terminal_slug":"gorgon-lng-terminal-au","terminal_name":"Gorgon LNG Terminal","country":"Australia","country_iso":"AU","unit_name":"T1","status":"operating","facility_type":"export","floating_type":"unknown","capacity_mtpa":5.2,"capacity_bcm_y":7.07,"start_year":2016,"planned_start_year":null,"original_planned_start_year":null,"fid_year":2009,"construction_year":null,"shelved_year":null,"cancelled_year":null,"stop_year":null,"estimated_cost_usd":18333333333,"estimated_cost_original":18333333333,"estimated_cost_currency":"USD","power_stations_supplied":null,"floating_vessel_name":null,"ccs_project":true,"hydrogen_project":null,"ammonia_project":null,"synthetic_lng_project":null,"retrofit_proposed":null,"url":"https://lngatlas.org/terminal/gorgon-lng-terminal-au/","data_source":"Data: Global Gas Infrastructure Tracker, Global Energy Monitor, September 2025"},{"terminal_slug":"gorgon-lng-terminal-au","terminal_name":"Gorgon LNG Terminal","country":"Australia","country_iso":"AU","unit_name":"T2","status":"operating","facility_type":"export","floating_type":"unknown","capacity_mtpa":5.2,"capacity_bcm_y":7.07,"start_year":2016,"planned_start_year":null,"original_planned_start_year":null,"fid_year":null,"construction_year":null,"shelved_year":null,"cancelled_year":null,"stop_year":null,"estimated_cost_usd":18333333333,"estimated_cost_original":18333333333,"estimated_cost_currency":"USD","power_stations_supplied":null,"floating_vessel_name":null,"ccs_project":true,"hydrogen_project":null,"ammonia_project":null,"synthetic_lng_project":null,"retrofit_proposed":null,"url":"https://lngatlas.org/terminal/gorgon-lng-terminal-au/","data_source":"Data: Global Gas Infrastructure Tracker, Global Energy Monitor, September 2025"},{"terminal_slug":"gorgon-lng-terminal-au","terminal_name":"Gorgon LNG Terminal","country":"Australia","country_iso":"AU","unit_name":"T3","status":"operating","facility_type":"export","floating_type":"unknown","capacity_mtpa":5.2,"capacity_bcm_y":7.07,"start_year":2017,"planned_start_year":null,"original_planned_start_year":null,"fid_year":null,"construction_year":null,"shelved_year":null,"cancelled_year":null,"stop_year":null,"estimated_cost_usd":18333333333,"estimated_cost_original":18333333333,"estimated_cost_currency":"USD","power_stations_supplied":null,"floating_vessel_name":null,"ccs_project":true,"hydrogen_project":null,"ammonia_project":null,"synthetic_lng_project":null,"retrofit_proposed":null,"url":"https://lngatlas.org/terminal/gorgon-lng-terminal-au/","data_source":"Data: Global Gas Infrastructure Tracker, Global Energy Monitor, September 2025"},{"terminal_slug":"gorgon-lng-terminal-au","terminal_name":"Gorgon LNG Terminal","country":"Australia","country_iso":"AU","unit_name":"T4","status":"cancelled","facility_type":"export","floating_type":"unknown","capacity_mtpa":5.2,"capacity_bcm_y":7.07,"start_year":null,"planned_start_year":null,"original_planned_start_year":null,"fid_year":null,"construction_year":null,"shelved_year":null,"cancelled_year":null,"stop_year":null,"estimated_cost_usd":null,"estimated_cost_original":null,"estimated_cost_currency":null,"power_stations_supplied":null,"floating_vessel_name":null,"ccs_project":true,"hydrogen_project":null,"ammonia_project":null,"synthetic_lng_project":null,"retrofit_proposed":null,"url":"https://lngatlas.org/terminal/gorgon-lng-terminal-au/","data_source":"Data: Global Gas Infrastructure Tracker, Global Energy Monitor, September 2025"},{"terminal_slug":"gorontalo-fsru-id","terminal_name":"Gorontalo FSRU","country":"Indonesia","country_iso":"ID","unit_name":null,"status":"shelved","facility_type":"import","floating_type":"fsru","capacity_mtpa":0.2,"capacity_bcm_y":0.27,"start_year":2022,"planned_start_year":null,"original_planned_start_year":null,"fid_year":null,"construction_year":null,"shelved_year":2020,"cancelled_year":null,"stop_year":null,"estimated_cost_usd":null,"estimated_cost_original":null,"estimated_cost_currency":null,"power_stations_supplied":null,"floating_vessel_name":"Hua Xiang FSRU","ccs_project":null,"hydrogen_project":null,"ammonia_project":null,"synthetic_lng_project":null,"retrofit_proposed":null,"url":"https://lngatlas.org/terminal/gorontalo-fsru-id/","data_source":"Data: Global Gas Infrastructure Tracker, Global Energy Monitor, September 2025"},{"terminal_slug":"gorskaya-flng-terminal-ru","terminal_name":"Gorskaya FLNG Terminal","country":"Russia","country_iso":"RU","unit_name":"T1","status":"cancelled","facility_type":"export","floating_type":"flng","capacity_mtpa":0.42,"capacity_bcm_y":0.57,"start_year":null,"planned_start_year":null,"original_planned_start_year":null,"fid_year":null,"construction_year":null,"shelved_year":null,"cancelled_year":null,"stop_year":null,"estimated_cost_usd":104430000,"estimated_cost_original":104430000,"estimated_cost_currency":"USD","power_stations_supplied":null,"floating_vessel_name":null,"ccs_project":null,"hydrogen_project":null,"ammonia_project":null,"synthetic_lng_project":null,"retrofit_proposed":null,"url":"https://lngatlas.org/terminal/gorskaya-flng-terminal-ru/","data_source":"Data: Global Gas Infrastructure Tracker, Global Energy Monitor, September 2025"},{"terminal_slug":"gorskaya-flng-terminal-ru","terminal_name":"Gorskaya FLNG Terminal","country":"Russia","country_iso":"RU","unit_name":"T2","status":"cancelled","facility_type":"export","floating_type":"flng","capacity_mtpa":0.42,"capacity_bcm_y":0.57,"start_year":null,"planned_start_year":null,"original_planned_start_year":null,"fid_year":null,"construction_year":null,"shelved_year":null,"cancelled_year":null,"stop_year":null,"estimated_cost_usd":104430000,"estimated_cost_original":104430000,"estimated_cost_currency":"USD","power_stations_supplied":null,"floating_vessel_name":null,"ccs_project":null,"hydrogen_project":null,"ammonia_project":null,"synthetic_lng_project":null,"retrofit_proposed":null,"url":"https://lngatlas.org/terminal/gorskaya-flng-terminal-ru/","data_source":"Data: Global Gas Infrastructure Tracker, Global Energy Monitor, September 2025"},{"terminal_slug":"gorskaya-flng-terminal-ru","terminal_name":"Gorskaya FLNG Terminal","country":"Russia","country_iso":"RU","unit_name":"T3","status":"cancelled","facility_type":"export","floating_type":"flng","capacity_mtpa":0.42,"capacity_bcm_y":0.57,"start_year":null,"planned_start_year":null,"original_planned_start_year":null,"fid_year":null,"construction_year":null,"shelved_year":null,"cancelled_year":null,"stop_year":null,"estimated_cost_usd":104430000,"estimated_cost_original":104430000,"estimated_cost_currency":"USD","power_stations_supplied":null,"floating_vessel_name":null,"ccs_project":null,"hydrogen_project":null,"ammonia_project":null,"synthetic_lng_project":null,"retrofit_proposed":null,"url":"https://lngatlas.org/terminal/gorskaya-flng-terminal-ru/","data_source":"Data: Global Gas Infrastructure Tracker, Global Energy Monitor, September 2025"},{"terminal_slug":"gothenburg-lng-terminal-se","terminal_name":"Gothenburg LNG Terminal","country":"Sweden","country_iso":"SE","unit_name":null,"status":"cancelled","facility_type":"import","floating_type":"unknown","capacity_mtpa":0.4,"capacity_bcm_y":0.54,"start_year":null,"planned_start_year":null,"original_planned_start_year":null,"fid_year":null,"construction_year":null,"shelved_year":null,"cancelled_year":2019,"stop_year":2019,"estimated_cost_usd":null,"estimated_cost_original":null,"estimated_cost_currency":null,"power_stations_supplied":null,"floating_vessel_name":null,"ccs_project":null,"hydrogen_project":null,"ammonia_project":null,"synthetic_lng_project":null,"retrofit_proposed":null,"url":"https://lngatlas.org/terminal/gothenburg-lng-terminal-se/","data_source":"Data: Global Gas Infrastructure Tracker, Global Energy Monitor, September 2025"},{"terminal_slug":"grain-lng-terminal-gb","terminal_name":"Grain LNG Terminal","country":"United Kingdom","country_iso":"GB","unit_name":null,"status":"operating","facility_type":"import","floating_type":"unknown","capacity_mtpa":14.3,"capacity_bcm_y":19.46,"start_year":2005,"planned_start_year":null,"original_planned_start_year":null,"fid_year":null,"construction_year":null,"shelved_year":null,"cancelled_year":null,"stop_year":null,"estimated_cost_usd":null,"estimated_cost_original":null,"estimated_cost_currency":null,"power_stations_supplied":null,"floating_vessel_name":null,"ccs_project":null,"hydrogen_project":null,"ammonia_project":null,"synthetic_lng_project":null,"retrofit_proposed":null,"url":"https://lngatlas.org/terminal/grain-lng-terminal-gb/","data_source":"Data: Global Gas Infrastructure Tracker, Global Energy Monitor, September 2025"},{"terminal_slug":"grain-lng-terminal-gb","terminal_name":"Grain LNG Terminal","country":"United Kingdom","country_iso":"GB","unit_name":"Expansion","status":"construction","facility_type":"import","floating_type":"unknown","capacity_mtpa":8.7,"capacity_bcm_y":11.84,"start_year":null,"planned_start_year":null,"original_planned_start_year":2025,"fid_year":null,"construction_year":2022,"shelved_year":null,"cancelled_year":null,"stop_year":null,"estimated_cost_usd":218000000,"estimated_cost_original":200000000,"estimated_cost_currency":"EUR","power_stations_supplied":null,"floating_vessel_name":null,"ccs_project":null,"hydrogen_project":null,"ammonia_project":null,"synthetic_lng_project":null,"retrofit_proposed":null,"url":"https://lngatlas.org/terminal/grain-lng-terminal-gb/","data_source":"Data: Global Gas Infrastructure Tracker, Global Energy Monitor, September 2025"},{"terminal_slug":"gran-canaria-lng-terminal-es","terminal_name":"Gran Canaria LNG Terminal","country":"Spain","country_iso":"ES","unit_name":null,"status":"cancelled","facility_type":"import","floating_type":"unknown","capacity_mtpa":0.96,"capacity_bcm_y":1.31,"start_year":null,"planned_start_year":2029,"original_planned_start_year":2027,"fid_year":2008,"construction_year":null,"shelved_year":2022,"cancelled_year":2025,"stop_year":2025,"estimated_cost_usd":295935000,"estimated_cost_original":271500000,"estimated_cost_currency":"EUR","power_stations_supplied":null,"floating_vessel_name":null,"ccs_project":null,"hydrogen_project":null,"ammonia_project":null,"synthetic_lng_project":null,"retrofit_proposed":null,"url":"https://lngatlas.org/terminal/gran-canaria-lng-terminal-es/","data_source":"Data: Global Gas Infrastructure Tracker, Global Energy Monitor, September 2025"},{"terminal_slug":"grand-isle-deepwater-port-terminal-us","terminal_name":"Grand Isle Deepwater Port Terminal","country":"United States","country_iso":"US","unit_name":"Phase 1 (Platform 1)","status":"shelved","facility_type":"export","floating_type":"floating","capacity_mtpa":2.1,"capacity_bcm_y":2.86,"start_year":null,"planned_start_year":null,"original_planned_start_year":2026,"fid_year":null,"construction_year":null,"shelved_year":2024,"cancelled_year":null,"stop_year":null,"estimated_cost_usd":null,"estimated_cost_original":null,"estimated_cost_currency":null,"power_stations_supplied":null,"floating_vessel_name":null,"ccs_project":null,"hydrogen_project":null,"ammonia_project":null,"synthetic_lng_project":null,"retrofit_proposed":null,"url":"https://lngatlas.org/terminal/grand-isle-deepwater-port-terminal-us/","data_source":"Data: Global Gas Infrastructure Tracker, Global Energy Monitor, September 2025"},{"terminal_slug":"grand-isle-deepwater-port-terminal-us","terminal_name":"Grand Isle Deepwater Port Terminal","country":"United States","country_iso":"US","unit_name":"Phase 2 (Platform 2)","status":"shelved","facility_type":"export","floating_type":"floating","capacity_mtpa":2.1,"capacity_bcm_y":2.86,"start_year":null,"planned_start_year":null,"original_planned_start_year":2026,"fid_year":null,"construction_year":null,"shelved_year":2024,"cancelled_year":null,"stop_year":null,"estimated_cost_usd":null,"estimated_cost_original":null,"estimated_cost_currency":null,"power_stations_supplied":null,"floating_vessel_name":null,"ccs_project":null,"hydrogen_project":null,"ammonia_project":null,"synthetic_lng_project":null,"retrofit_proposed":null,"url":"https://lngatlas.org/terminal/grand-isle-deepwater-port-terminal-us/","data_source":"Data: Global Gas Infrastructure Tracker, Global Energy Monitor, September 2025"},{"terminal_slug":"grangemouth-fsru-gb","terminal_name":"Grangemouth FSRU","country":"United Kingdom","country_iso":"GB","unit_name":null,"status":"proposed","facility_type":"import","floating_type":"fsru","capacity_mtpa":5,"capacity_bcm_y":6.8,"start_year":null,"planned_start_year":null,"original_planned_start_year":2027,"fid_year":2025,"construction_year":null,"shelved_year":null,"cancelled_year":null,"stop_year":null,"estimated_cost_usd":600000000,"estimated_cost_original":600000000,"estimated_cost_currency":"USD","power_stations_supplied":null,"floating_vessel_name":null,"ccs_project":null,"hydrogen_project":null,"ammonia_project":null,"synthetic_lng_project":null,"retrofit_proposed":null,"url":"https://lngatlas.org/terminal/grangemouth-fsru-gb/","data_source":"Data: Global Gas Infrastructure Tracker, Global Energy Monitor, September 2025"},{"terminal_slug":"grassy-point-lng-terminal-ca","terminal_name":"Grassy Point LNG Terminal","country":"Canada","country_iso":"CA","unit_name":"Phase 1","status":"cancelled","facility_type":"export","floating_type":"unknown","capacity_mtpa":15,"capacity_bcm_y":20.41,"start_year":null,"planned_start_year":null,"original_planned_start_year":null,"fid_year":null,"construction_year":null,"shelved_year":null,"cancelled_year":2018,"stop_year":2018,"estimated_cost_usd":null,"estimated_cost_original":null,"estimated_cost_currency":null,"power_stations_supplied":null,"floating_vessel_name":null,"ccs_project":null,"hydrogen_project":null,"ammonia_project":null,"synthetic_lng_project":null,"retrofit_proposed":null,"url":"https://lngatlas.org/terminal/grassy-point-lng-terminal-ca/","data_source":"Data: Global Gas Infrastructure Tracker, Global Energy Monitor, September 2025"},{"terminal_slug":"grassy-point-lng-terminal-ca","terminal_name":"Grassy Point LNG Terminal","country":"Canada","country_iso":"CA","unit_name":"Phase 2","status":"cancelled","facility_type":"export","floating_type":"unknown","capacity_mtpa":5,"capacity_bcm_y":6.8,"start_year":null,"planned_start_year":null,"original_planned_start_year":null,"fid_year":null,"construction_year":null,"shelved_year":null,"cancelled_year":2018,"stop_year":2018,"estimated_cost_usd":null,"estimated_cost_original":null,"estimated_cost_currency":null,"power_stations_supplied":null,"floating_vessel_name":null,"ccs_project":null,"hydrogen_project":null,"ammonia_project":null,"synthetic_lng_project":null,"retrofit_proposed":null,"url":"https://lngatlas.org/terminal/grassy-point-lng-terminal-ca/","data_source":"Data: Global Gas Infrastructure Tracker, Global Energy Monitor, September 2025"},{"terminal_slug":"greater-tortue-ahmeyim-flng-terminal-mr","terminal_name":"Greater Tortue Ahmeyim FLNG Terminal","country":"Mauritania","country_iso":"MR","unit_name":"Phase 1","status":"operating","facility_type":"export","floating_type":"flng","capacity_mtpa":2.4,"capacity_bcm_y":3.27,"start_year":2025,"planned_start_year":2024,"original_planned_start_year":2023,"fid_year":2018,"construction_year":2019,"shelved_year":null,"cancelled_year":null,"stop_year":null,"estimated_cost_usd":4600000000,"estimated_cost_original":4600000000,"estimated_cost_currency":"USD","power_stations_supplied":null,"floating_vessel_name":null,"ccs_project":null,"hydrogen_project":null,"ammonia_project":null,"synthetic_lng_project":null,"retrofit_proposed":null,"url":"https://lngatlas.org/terminal/greater-tortue-ahmeyim-flng-terminal-mr/","data_source":"Data: Global Gas Infrastructure Tracker, Global Energy Monitor, September 2025"},{"terminal_slug":"greater-tortue-ahmeyim-flng-terminal-mr","terminal_name":"Greater Tortue Ahmeyim FLNG Terminal","country":"Mauritania","country_iso":"MR","unit_name":"Phase 2","status":"proposed","facility_type":"export","floating_type":"flng","capacity_mtpa":3,"capacity_bcm_y":4.08,"start_year":null,"planned_start_year":null,"original_planned_start_year":2027,"fid_year":2024,"construction_year":null,"shelved_year":null,"cancelled_year":null,"stop_year":null,"estimated_cost_usd":5000000000,"estimated_cost_original":5000000000,"estimated_cost_currency":"USD","power_stations_supplied":null,"floating_vessel_name":null,"ccs_project":null,"hydrogen_project":null,"ammonia_project":null,"synthetic_lng_project":null,"retrofit_proposed":null,"url":"https://lngatlas.org/terminal/greater-tortue-ahmeyim-flng-terminal-mr/","data_source":"Data: Global Gas Infrastructure Tracker, Global Energy Monitor, September 2025"},{"terminal_slug":"gresik-lng-terminal-id","terminal_name":"Gresik LNG Terminal","country":"Indonesia","country_iso":"ID","unit_name":null,"status":"proposed","facility_type":"import","floating_type":"unknown","capacity_mtpa":null,"capacity_bcm_y":null,"start_year":null,"planned_start_year":null,"original_planned_start_year":2027,"fid_year":null,"construction_year":null,"shelved_year":null,"cancelled_year":null,"stop_year":null,"estimated_cost_usd":null,"estimated_cost_original":null,"estimated_cost_currency":null,"power_stations_supplied":null,"floating_vessel_name":null,"ccs_project":null,"hydrogen_project":null,"ammonia_project":null,"synthetic_lng_project":null,"retrofit_proposed":null,"url":"https://lngatlas.org/terminal/gresik-lng-terminal-id/","data_source":"Data: Global Gas Infrastructure Tracker, Global Energy Monitor, September 2025"},{"terminal_slug":"guanabara-bay-fsru-br","terminal_name":"Guanabara Bay FSRU","country":"Brazil","country_iso":"BR","unit_name":null,"status":"operating","facility_type":"import","floating_type":"fsru","capacity_mtpa":10.95,"capacity_bcm_y":14.9,"start_year":2009,"planned_start_year":null,"original_planned_start_year":null,"fid_year":null,"construction_year":null,"shelved_year":null,"cancelled_year":null,"stop_year":null,"estimated_cost_usd":null,"estimated_cost_original":null,"estimated_cost_currency":null,"power_stations_supplied":"Governador Leonel Brizola power station, Aureliano Chaves power station","floating_vessel_name":"Excelerate Experience","ccs_project":null,"hydrogen_project":null,"ammonia_project":null,"synthetic_lng_project":null,"retrofit_proposed":null,"url":"https://lngatlas.org/terminal/guanabara-bay-fsru-br/","data_source":"Data: Global Gas Infrastructure Tracker, Global Energy Monitor, September 2025"},{"terminal_slug":"guangdong-dapeng-lng-terminal-cn","terminal_name":"Guangdong Dapeng LNG Terminal","country":"China","country_iso":"CN","unit_name":"Phase 1","status":"operating","facility_type":"import","floating_type":"unknown","capacity_mtpa":7.7,"capacity_bcm_y":10.48,"start_year":2006,"planned_start_year":null,"original_planned_start_year":null,"fid_year":null,"construction_year":2003,"shelved_year":null,"cancelled_year":null,"stop_year":null,"estimated_cost_usd":1184000000,"estimated_cost_original":7400000000,"estimated_cost_currency":"RMB","power_stations_supplied":null,"floating_vessel_name":null,"ccs_project":null,"hydrogen_project":null,"ammonia_project":null,"synthetic_lng_project":null,"retrofit_proposed":null,"url":"https://lngatlas.org/terminal/guangdong-dapeng-lng-terminal-cn/","data_source":"Data: Global Gas Infrastructure Tracker, Global Energy Monitor, September 2025"},{"terminal_slug":"guangdong-dapeng-lng-terminal-cn","terminal_name":"Guangdong Dapeng LNG Terminal","country":"China","country_iso":"CN","unit_name":"Expansion","status":"proposed","facility_type":"import","floating_type":"unknown","capacity_mtpa":null,"capacity_bcm_y":null,"start_year":null,"planned_start_year":null,"original_planned_start_year":null,"fid_year":null,"construction_year":null,"shelved_year":null,"cancelled_year":null,"stop_year":null,"estimated_cost_usd":null,"estimated_cost_original":null,"estimated_cost_currency":null,"power_stations_supplied":null,"floating_vessel_name":null,"ccs_project":null,"hydrogen_project":null,"ammonia_project":null,"synthetic_lng_project":null,"retrofit_proposed":null,"url":"https://lngatlas.org/terminal/guangdong-dapeng-lng-terminal-cn/","data_source":"Data: Global Gas Infrastructure Tracker, Global Energy Monitor, September 2025"},{"terminal_slug":"guangxi-lng-terminal-cn","terminal_name":"Guangxi LNG Terminal","country":"China","country_iso":"CN","unit_name":"Phase I","status":"operating","facility_type":"import","floating_type":"unknown","capacity_mtpa":3,"capacity_bcm_y":4.08,"start_year":2016,"planned_start_year":null,"original_planned_start_year":null,"fid_year":null,"construction_year":2013,"shelved_year":null,"cancelled_year":null,"stop_year":null,"estimated_cost_usd":2800000000,"estimated_cost_original":2800000000,"estimated_cost_currency":"USD","power_stations_supplied":null,"floating_vessel_name":null,"ccs_project":null,"hydrogen_project":null,"ammonia_project":null,"synthetic_lng_project":null,"retrofit_proposed":null,"url":"https://lngatlas.org/terminal/guangxi-lng-terminal-cn/","data_source":"Data: Global Gas Infrastructure Tracker, Global Energy Monitor, September 2025"},{"terminal_slug":"guangxi-lng-terminal-cn","terminal_name":"Guangxi LNG Terminal","country":"China","country_iso":"CN","unit_name":"Phase II","status":"operating","facility_type":"import","floating_type":"unknown","capacity_mtpa":3,"capacity_bcm_y":4.08,"start_year":2025,"planned_start_year":null,"original_planned_start_year":null,"fid_year":null,"construction_year":2022,"shelved_year":null,"cancelled_year":null,"stop_year":null,"estimated_cost_usd":308774400,"estimated_cost_original":1929840000,"estimated_cost_currency":"RMB","power_stations_supplied":null,"floating_vessel_name":null,"ccs_project":null,"hydrogen_project":null,"ammonia_project":null,"synthetic_lng_project":null,"retrofit_proposed":null,"url":"https://lngatlas.org/terminal/guangxi-lng-terminal-cn/","data_source":"Data: Global Gas Infrastructure Tracker, Global Energy Monitor, September 2025"},{"terminal_slug":"guangxi-lng-terminal-cn","terminal_name":"Guangxi LNG Terminal","country":"China","country_iso":"CN","unit_name":"Phase III","status":"construction","facility_type":"import","floating_type":"unknown","capacity_mtpa":6,"capacity_bcm_y":8.16,"start_year":null,"planned_start_year":null,"original_planned_start_year":2024,"fid_year":null,"construction_year":2021,"shelved_year":null,"cancelled_year":null,"stop_year":null,"estimated_cost_usd":1249204800,"estimated_cost_original":7807530000,"estimated_cost_currency":"RMB","power_stations_supplied":null,"floating_vessel_name":null,"ccs_project":null,"hydrogen_project":null,"ammonia_project":null,"synthetic_lng_project":null,"retrofit_proposed":null,"url":"https://lngatlas.org/terminal/guangxi-lng-terminal-cn/","data_source":"Data: Global Gas Infrastructure Tracker, Global Energy Monitor, September 2025"},{"terminal_slug":"guangzhou-nansha-lng-terminal-cn","terminal_name":"Guangzhou Nansha LNG Terminal","country":"China","country_iso":"CN","unit_name":"Phase 1","status":"operating","facility_type":"import","floating_type":"unknown","capacity_mtpa":1,"capacity_bcm_y":1.36,"start_year":2023,"planned_start_year":null,"original_planned_start_year":null,"fid_year":null,"construction_year":2019,"shelved_year":null,"cancelled_year":null,"stop_year":null,"estimated_cost_usd":700800000,"estimated_cost_original":4380000000,"estimated_cost_currency":"RMB","power_stations_supplied":null,"floating_vessel_name":null,"ccs_project":null,"hydrogen_project":null,"ammonia_project":null,"synthetic_lng_project":null,"retrofit_proposed":null,"url":"https://lngatlas.org/terminal/guangzhou-nansha-lng-terminal-cn/","data_source":"Data: Global Gas Infrastructure Tracker, Global Energy Monitor, September 2025"},{"terminal_slug":"guangzhou-nansha-lng-terminal-cn","terminal_name":"Guangzhou Nansha LNG Terminal","country":"China","country_iso":"CN","unit_name":"Phase 2","status":"proposed","facility_type":"import","floating_type":"unknown","capacity_mtpa":1,"capacity_bcm_y":1.36,"start_year":null,"planned_start_year":null,"original_planned_start_year":null,"fid_year":null,"construction_year":null,"shelved_year":null,"cancelled_year":null,"stop_year":null,"estimated_cost_usd":272000000,"estimated_cost_original":1700000000,"estimated_cost_currency":"RMB","power_stations_supplied":null,"floating_vessel_name":null,"ccs_project":null,"hydrogen_project":null,"ammonia_project":null,"synthetic_lng_project":null,"retrofit_proposed":null,"url":"https://lngatlas.org/terminal/guangzhou-nansha-lng-terminal-cn/","data_source":"Data: Global Gas Infrastructure Tracker, Global Energy Monitor, September 2025"},{"terminal_slug":"guinea-lng-terminal-gn","terminal_name":"Guinea LNG Terminal","country":"Guinea","country_iso":"GN","unit_name":"Export Terminal","status":"proposed","facility_type":"export","floating_type":"unknown","capacity_mtpa":null,"capacity_bcm_y":null,"start_year":null,"planned_start_year":null,"original_planned_start_year":2023,"fid_year":null,"construction_year":null,"shelved_year":null,"cancelled_year":null,"stop_year":null,"estimated_cost_usd":null,"estimated_cost_original":null,"estimated_cost_currency":null,"power_stations_supplied":"West Africa Kamsar power station","floating_vessel_name":null,"ccs_project":null,"hydrogen_project":null,"ammonia_project":null,"synthetic_lng_project":null,"retrofit_proposed":null,"url":"https://lngatlas.org/terminal/guinea-lng-terminal-gn/","data_source":"Data: Global Gas Infrastructure Tracker, Global Energy Monitor, September 2025"},{"terminal_slug":"guinea-lng-terminal-gn","terminal_name":"Guinea LNG Terminal","country":"Guinea","country_iso":"GN","unit_name":"Import Terminal","status":"proposed","facility_type":"import","floating_type":"unknown","capacity_mtpa":null,"capacity_bcm_y":null,"start_year":null,"planned_start_year":2025,"original_planned_start_year":2023,"fid_year":null,"construction_year":null,"shelved_year":null,"cancelled_year":null,"stop_year":null,"estimated_cost_usd":null,"estimated_cost_original":null,"estimated_cost_currency":null,"power_stations_supplied":"West Africa Kamsar power station","floating_vessel_name":null,"ccs_project":null,"hydrogen_project":null,"ammonia_project":null,"synthetic_lng_project":null,"retrofit_proposed":null,"url":"https://lngatlas.org/terminal/guinea-lng-terminal-gn/","data_source":"Data: Global Gas Infrastructure Tracker, Global Energy Monitor, September 2025"},{"terminal_slug":"gulf-gateway-deepwater-port-lng-terminal-us","terminal_name":"Gulf Gateway Deepwater Port LNG Terminal","country":"United States","country_iso":"US","unit_name":null,"status":"retired","facility_type":"import","floating_type":"unknown","capacity_mtpa":5.3,"capacity_bcm_y":7.21,"start_year":2005,"planned_start_year":null,"original_planned_start_year":null,"fid_year":null,"construction_year":null,"shelved_year":null,"cancelled_year":null,"stop_year":2011,"estimated_cost_usd":null,"estimated_cost_original":null,"estimated_cost_currency":null,"power_stations_supplied":null,"floating_vessel_name":null,"ccs_project":null,"hydrogen_project":null,"ammonia_project":null,"synthetic_lng_project":null,"retrofit_proposed":null,"url":"https://lngatlas.org/terminal/gulf-gateway-deepwater-port-lng-terminal-us/","data_source":"Data: Global Gas Infrastructure Tracker, Global Energy Monitor, September 2025"},{"terminal_slug":"gulf-lng-terminal-us","terminal_name":"Gulf LNG Terminal","country":"United States","country_iso":"US","unit_name":"Import Terminal","status":"operating","facility_type":"import","floating_type":"unknown","capacity_mtpa":8.8,"capacity_bcm_y":11.97,"start_year":2011,"planned_start_year":null,"original_planned_start_year":null,"fid_year":null,"construction_year":null,"shelved_year":null,"cancelled_year":null,"stop_year":null,"estimated_cost_usd":null,"estimated_cost_original":null,"estimated_cost_currency":null,"power_stations_supplied":null,"floating_vessel_name":null,"ccs_project":null,"hydrogen_project":null,"ammonia_project":null,"synthetic_lng_project":null,"retrofit_proposed":null,"url":"https://lngatlas.org/terminal/gulf-lng-terminal-us/","data_source":"Data: Global Gas Infrastructure Tracker, Global Energy Monitor, September 2025"},{"terminal_slug":"gulf-lng-terminal-us","terminal_name":"Gulf LNG Terminal","country":"United States","country_iso":"US","unit_name":"Export Terminal (T1-T2)","status":"proposed","facility_type":"export","floating_type":"unknown","capacity_mtpa":10.86,"capacity_bcm_y":14.78,"start_year":null,"planned_start_year":null,"original_planned_start_year":2027,"fid_year":null,"construction_year":null,"shelved_year":2022,"cancelled_year":null,"stop_year":null,"estimated_cost_usd":8000000000,"estimated_cost_original":8000000000,"estimated_cost_currency":"USD","power_stations_supplied":null,"floating_vessel_name":null,"ccs_project":null,"hydrogen_project":null,"ammonia_project":null,"synthetic_lng_project":null,"retrofit_proposed":null,"url":"https://lngatlas.org/terminal/gulf-lng-terminal-us/","data_source":"Data: Global Gas Infrastructure Tracker, Global Energy Monitor, September 2025"},{"terminal_slug":"gulf-of-saros-fsru-tr","terminal_name":"Gulf of Saros FSRU","country":"Türkiye","country_iso":"TR","unit_name":null,"status":"operating","facility_type":"import","floating_type":"fsru","capacity_mtpa":5,"capacity_bcm_y":6.8,"start_year":2023,"planned_start_year":null,"original_planned_start_year":null,"fid_year":null,"construction_year":2019,"shelved_year":null,"cancelled_year":null,"stop_year":null,"estimated_cost_usd":null,"estimated_cost_original":null,"estimated_cost_currency":null,"power_stations_supplied":null,"floating_vessel_name":"Vasant","ccs_project":null,"hydrogen_project":null,"ammonia_project":null,"synthetic_lng_project":null,"retrofit_proposed":null,"url":"https://lngatlas.org/terminal/gulf-of-saros-fsru-tr/","data_source":"Data: Global Gas Infrastructure Tracker, Global Energy Monitor, September 2025"},{"terminal_slug":"gulf-of-thailand-fsru-th","terminal_name":"Gulf of Thailand FSRU","country":"Thailand","country_iso":"TH","unit_name":null,"status":"cancelled","facility_type":"import","floating_type":"fsru","capacity_mtpa":5,"capacity_bcm_y":6.8,"start_year":null,"planned_start_year":null,"original_planned_start_year":2024,"fid_year":null,"construction_year":null,"shelved_year":null,"cancelled_year":2021,"stop_year":2021,"estimated_cost_usd":null,"estimated_cost_original":null,"estimated_cost_currency":null,"power_stations_supplied":null,"floating_vessel_name":null,"ccs_project":null,"hydrogen_project":null,"ammonia_project":null,"synthetic_lng_project":null,"retrofit_proposed":null,"url":"https://lngatlas.org/terminal/gulf-of-thailand-fsru-th/","data_source":"Data: Global Gas Infrastructure Tracker, Global Energy Monitor, September 2025"},{"terminal_slug":"gulfstream-lng-terminal-us","terminal_name":"Gulfstream LNG Terminal","country":"United States","country_iso":"US","unit_name":null,"status":"proposed","facility_type":"export","floating_type":"unknown","capacity_mtpa":4,"capacity_bcm_y":5.44,"start_year":null,"planned_start_year":2030,"original_planned_start_year":2029,"fid_year":null,"construction_year":2027,"shelved_year":null,"cancelled_year":null,"stop_year":null,"estimated_cost_usd":null,"estimated_cost_original":null,"estimated_cost_currency":null,"power_stations_supplied":null,"floating_vessel_name":null,"ccs_project":null,"hydrogen_project":null,"ammonia_project":null,"synthetic_lng_project":null,"retrofit_proposed":null,"url":"https://lngatlas.org/terminal/gulfstream-lng-terminal-us/","data_source":"Data: Global Gas Infrastructure Tracker, Global Energy Monitor, September 2025"},{"terminal_slug":"guyana-lng-terminal-gy","terminal_name":"Guyana LNG Terminal","country":"Guyana","country_iso":"GY","unit_name":null,"status":"proposed","facility_type":"export","floating_type":"unknown","capacity_mtpa":null,"capacity_bcm_y":null,"start_year":null,"planned_start_year":null,"original_planned_start_year":null,"fid_year":null,"construction_year":null,"shelved_year":null,"cancelled_year":null,"stop_year":null,"estimated_cost_usd":null,"estimated_cost_original":null,"estimated_cost_currency":null,"power_stations_supplied":null,"floating_vessel_name":null,"ccs_project":null,"hydrogen_project":null,"ammonia_project":null,"synthetic_lng_project":null,"retrofit_proposed":null,"url":"https://lngatlas.org/terminal/guyana-lng-terminal-gy/","data_source":"Data: Global Gas Infrastructure Tracker, Global Energy Monitor, September 2025"},{"terminal_slug":"gwangyang-2-lng-terminal-kr","terminal_name":"Gwangyang 2 LNG Terminal","country":"South Korea","country_iso":"KR","unit_name":null,"status":"construction","facility_type":"import","floating_type":"unknown","capacity_mtpa":2.1,"capacity_bcm_y":2.86,"start_year":null,"planned_start_year":2026,"original_planned_start_year":2025,"fid_year":null,"construction_year":2023,"shelved_year":null,"cancelled_year":null,"stop_year":null,"estimated_cost_usd":744000000,"estimated_cost_original":930000000000,"estimated_cost_currency":"KRW","power_stations_supplied":null,"floating_vessel_name":null,"ccs_project":null,"hydrogen_project":null,"ammonia_project":null,"synthetic_lng_project":null,"retrofit_proposed":null,"url":"https://lngatlas.org/terminal/gwangyang-2-lng-terminal-kr/","data_source":"Data: Global Gas Infrastructure Tracker, Global Energy Monitor, September 2025"},{"terminal_slug":"gwangyang-lng-terminal-kr","terminal_name":"Gwangyang LNG Terminal","country":"South Korea","country_iso":"KR","unit_name":null,"status":"operating","facility_type":"import","floating_type":"unknown","capacity_mtpa":7.1,"capacity_bcm_y":9.66,"start_year":2005,"planned_start_year":null,"original_planned_start_year":null,"fid_year":null,"construction_year":null,"shelved_year":null,"cancelled_year":null,"stop_year":null,"estimated_cost_usd":840000000,"estimated_cost_original":1050000000000,"estimated_cost_currency":"KRW","power_stations_supplied":null,"floating_vessel_name":null,"ccs_project":null,"hydrogen_project":null,"ammonia_project":true,"synthetic_lng_project":null,"retrofit_proposed":null,"url":"https://lngatlas.org/terminal/gwangyang-lng-terminal-kr/","data_source":"Data: Global Gas Infrastructure Tracker, Global Energy Monitor, September 2025"},{"terminal_slug":"gavle-lng-terminal-se","terminal_name":"Gävle LNG Terminal","country":"Sweden","country_iso":"SE","unit_name":null,"status":"cancelled","facility_type":"import","floating_type":"unknown","capacity_mtpa":null,"capacity_bcm_y":null,"start_year":null,"planned_start_year":null,"original_planned_start_year":null,"fid_year":null,"construction_year":null,"shelved_year":2016,"cancelled_year":2018,"stop_year":2018,"estimated_cost_usd":null,"estimated_cost_original":null,"estimated_cost_currency":null,"power_stations_supplied":null,"floating_vessel_name":null,"ccs_project":null,"hydrogen_project":null,"ammonia_project":null,"synthetic_lng_project":null,"retrofit_proposed":null,"url":"https://lngatlas.org/terminal/gavle-lng-terminal-se/","data_source":"Data: Global Gas Infrastructure Tracker, Global Energy Monitor, September 2025"},{"terminal_slug":"h-energy-kakinada-lng-terminal-in","terminal_name":"H-Energy Kakinada LNG Terminal","country":"India","country_iso":"IN","unit_name":null,"status":"shelved","facility_type":"import","floating_type":"floating","capacity_mtpa":4,"capacity_bcm_y":5.44,"start_year":null,"planned_start_year":2026,"original_planned_start_year":2024,"fid_year":null,"construction_year":null,"shelved_year":2024,"cancelled_year":null,"stop_year":null,"estimated_cost_usd":208000000,"estimated_cost_original":16000000000,"estimated_cost_currency":"INR","power_stations_supplied":null,"floating_vessel_name":null,"ccs_project":null,"hydrogen_project":null,"ammonia_project":null,"synthetic_lng_project":null,"retrofit_proposed":null,"url":"https://lngatlas.org/terminal/h-energy-kakinada-lng-terminal-in/","data_source":"Data: Global Gas Infrastructure Tracker, Global Energy Monitor, September 2025"},{"terminal_slug":"higas-lng-terminal-it","terminal_name":"HIGAS LNG Terminal","country":"Italy","country_iso":"IT","unit_name":null,"status":"operating","facility_type":"import","floating_type":"unknown","capacity_mtpa":0.2,"capacity_bcm_y":0.27,"start_year":2021,"planned_start_year":null,"original_planned_start_year":2020,"fid_year":null,"construction_year":2018,"shelved_year":null,"cancelled_year":null,"stop_year":null,"estimated_cost_usd":41638000,"estimated_cost_original":38200000,"estimated_cost_currency":"EUR","power_stations_supplied":null,"floating_vessel_name":null,"ccs_project":null,"hydrogen_project":null,"ammonia_project":null,"synthetic_lng_project":null,"retrofit_proposed":null,"url":"https://lngatlas.org/terminal/higas-lng-terminal-it/","data_source":"Data: Global Gas Infrastructure Tracker, Global Energy Monitor, September 2025"},{"terminal_slug":"hachinohe-lng-terminal-jp","terminal_name":"Hachinohe LNG Terminal","country":"Japan","country_iso":"JP","unit_name":null,"status":"operating","facility_type":"import","floating_type":"unknown","capacity_mtpa":1.5,"capacity_bcm_y":2.04,"start_year":2015,"planned_start_year":null,"original_planned_start_year":null,"fid_year":null,"construction_year":null,"shelved_year":null,"cancelled_year":null,"stop_year":null,"estimated_cost_usd":null,"estimated_cost_original":null,"estimated_cost_currency":null,"power_stations_supplied":null,"floating_vessel_name":null,"ccs_project":null,"hydrogen_project":null,"ammonia_project":null,"synthetic_lng_project":null,"retrofit_proposed":null,"url":"https://lngatlas.org/terminal/hachinohe-lng-terminal-jp/","data_source":"Data: Global Gas Infrastructure Tracker, Global Energy Monitor, September 2025"},{"terminal_slug":"hadera-fsru-terminal-il","terminal_name":"Hadera FSRU Terminal","country":"Israel","country_iso":"IL","unit_name":null,"status":"idle","facility_type":"import","floating_type":"fsru","capacity_mtpa":3.8,"capacity_bcm_y":5.17,"start_year":2013,"planned_start_year":null,"original_planned_start_year":null,"fid_year":null,"construction_year":null,"shelved_year":null,"cancelled_year":null,"stop_year":2022,"estimated_cost_usd":null,"estimated_cost_original":null,"estimated_cost_currency":null,"power_stations_supplied":null,"floating_vessel_name":"Excelsior FSRU","ccs_project":null,"hydrogen_project":null,"ammonia_project":null,"synthetic_lng_project":null,"retrofit_proposed":null,"url":"https://lngatlas.org/terminal/hadera-fsru-terminal-il/","data_source":"Data: Global Gas Infrastructure Tracker, Global Energy Monitor, September 2025"},{"terminal_slug":"hai-lang-lng-terminal-vn","terminal_name":"Hai Lang LNG Terminal","country":"Vietnam","country_iso":"VN","unit_name":null,"status":"proposed","facility_type":"import","floating_type":"unknown","capacity_mtpa":1.5,"capacity_bcm_y":2.04,"start_year":null,"planned_start_year":2029,"original_planned_start_year":2026,"fid_year":null,"construction_year":2025,"shelved_year":null,"cancelled_year":null,"stop_year":null,"estimated_cost_usd":null,"estimated_cost_original":null,"estimated_cost_currency":null,"power_stations_supplied":"Hai Lang power station","floating_vessel_name":null,"ccs_project":null,"hydrogen_project":null,"ammonia_project":null,"synthetic_lng_project":null,"retrofit_proposed":null,"url":"https://lngatlas.org/terminal/hai-lang-lng-terminal-vn/","data_source":"Data: Global Gas Infrastructure Tracker, Global Energy Monitor, September 2025"},{"terminal_slug":"hainan-lng-terminal-cn","terminal_name":"Hainan LNG Terminal","country":"China","country_iso":"CN","unit_name":"Phase I","status":"operating","facility_type":"import","floating_type":"unknown","capacity_mtpa":3,"capacity_bcm_y":4.08,"start_year":2014,"planned_start_year":null,"original_planned_start_year":null,"fid_year":null,"construction_year":2011,"shelved_year":null,"cancelled_year":null,"stop_year":null,"estimated_cost_usd":1040000000,"estimated_cost_original":6500000000,"estimated_cost_currency":"RMB","power_stations_supplied":null,"floating_vessel_name":null,"ccs_project":null,"hydrogen_project":null,"ammonia_project":null,"synthetic_lng_project":null,"retrofit_proposed":null,"url":"https://lngatlas.org/terminal/hainan-lng-terminal-cn/","data_source":"Data: Global Gas Infrastructure Tracker, Global Energy Monitor, September 2025"},{"terminal_slug":"hainan-lng-terminal-cn","terminal_name":"Hainan LNG Terminal","country":"China","country_iso":"CN","unit_name":"Phase II (Expansion)","status":"construction","facility_type":"import","floating_type":"unknown","capacity_mtpa":3,"capacity_bcm_y":4.08,"start_year":null,"planned_start_year":null,"original_planned_start_year":null,"fid_year":null,"construction_year":2024,"shelved_year":null,"cancelled_year":null,"stop_year":null,"estimated_cost_usd":496000000,"estimated_cost_original":3100000000,"estimated_cost_currency":"RMB","power_stations_supplied":null,"floating_vessel_name":null,"ccs_project":null,"hydrogen_project":null,"ammonia_project":null,"synthetic_lng_project":null,"retrofit_proposed":null,"url":"https://lngatlas.org/terminal/hainan-lng-terminal-cn/","data_source":"Data: Global Gas Infrastructure Tracker, Global Energy Monitor, September 2025"},{"terminal_slug":"hainan-shennan-lng-storage-facility-cn","terminal_name":"Hainan Shennan LNG Storage Facility","country":"China","country_iso":"CN","unit_name":"Phase 1","status":"operating","facility_type":"import","floating_type":"unknown","capacity_mtpa":0.27,"capacity_bcm_y":0.37,"start_year":2014,"planned_start_year":null,"original_planned_start_year":null,"fid_year":null,"construction_year":2012,"shelved_year":null,"cancelled_year":null,"stop_year":null,"estimated_cost_usd":136000000,"estimated_cost_original":850000000,"estimated_cost_currency":"RMB","power_stations_supplied":null,"floating_vessel_name":null,"ccs_project":null,"hydrogen_project":null,"ammonia_project":null,"synthetic_lng_project":null,"retrofit_proposed":null,"url":"https://lngatlas.org/terminal/hainan-shennan-lng-storage-facility-cn/","data_source":"Data: Global Gas Infrastructure Tracker, Global Energy Monitor, September 2025"},{"terminal_slug":"haiphong-fsru-vn","terminal_name":"Haiphong FSRU","country":"Vietnam","country_iso":"VN","unit_name":null,"status":"construction","facility_type":"import","floating_type":"fsru","capacity_mtpa":null,"capacity_bcm_y":null,"start_year":null,"planned_start_year":null,"original_planned_start_year":2030,"fid_year":null,"construction_year":2025,"shelved_year":null,"cancelled_year":null,"stop_year":null,"estimated_cost_usd":null,"estimated_cost_original":null,"estimated_cost_currency":null,"power_stations_supplied":"Haiphong LNG power station","floating_vessel_name":null,"ccs_project":null,"hydrogen_project":null,"ammonia_project":null,"synthetic_lng_project":null,"retrofit_proposed":null,"url":"https://lngatlas.org/terminal/haiphong-fsru-vn/","data_source":"Data: Global Gas Infrastructure Tracker, Global Energy Monitor, September 2025"},{"terminal_slug":"hakodate-lng-terminal-jp","terminal_name":"Hakodate LNG Terminal","country":"Japan","country_iso":"JP","unit_name":null,"status":"operating","facility_type":"import","floating_type":"unknown","capacity_mtpa":0.2,"capacity_bcm_y":0.27,"start_year":2006,"planned_start_year":null,"original_planned_start_year":null,"fid_year":null,"construction_year":null,"shelved_year":null,"cancelled_year":null,"stop_year":null,"estimated_cost_usd":null,"estimated_cost_original":null,"estimated_cost_currency":null,"power_stations_supplied":null,"floating_vessel_name":null,"ccs_project":null,"hydrogen_project":null,"ammonia_project":null,"synthetic_lng_project":null,"retrofit_proposed":null,"url":"https://lngatlas.org/terminal/hakodate-lng-terminal-jp/","data_source":"Data: Global Gas Infrastructure Tracker, Global Energy Monitor, September 2025"},{"terminal_slug":"haldia-fsru-in","terminal_name":"Haldia FSRU","country":"India","country_iso":"IN","unit_name":"Phase 1","status":"proposed","facility_type":"import","floating_type":"fsru","capacity_mtpa":1.5,"capacity_bcm_y":2.04,"start_year":null,"planned_start_year":null,"original_planned_start_year":2027,"fid_year":null,"construction_year":null,"shelved_year":null,"cancelled_year":null,"stop_year":null,"estimated_cost_usd":300000000,"estimated_cost_original":300000000,"estimated_cost_currency":"USD","power_stations_supplied":null,"floating_vessel_name":null,"ccs_project":null,"hydrogen_project":null,"ammonia_project":null,"synthetic_lng_project":null,"retrofit_proposed":null,"url":"https://lngatlas.org/terminal/haldia-fsru-in/","data_source":"Data: Global Gas Infrastructure Tracker, Global Energy Monitor, September 2025"},{"terminal_slug":"haldia-fsru-in","terminal_name":"Haldia FSRU","country":"India","country_iso":"IN","unit_name":"Phase 2","status":"proposed","facility_type":"import","floating_type":"fsru","capacity_mtpa":1.5,"capacity_bcm_y":2.04,"start_year":null,"planned_start_year":null,"original_planned_start_year":null,"fid_year":null,"construction_year":null,"shelved_year":null,"cancelled_year":null,"stop_year":null,"estimated_cost_usd":null,"estimated_cost_original":null,"estimated_cost_currency":null,"power_stations_supplied":null,"floating_vessel_name":null,"ccs_project":null,"hydrogen_project":null,"ammonia_project":null,"synthetic_lng_project":null,"retrofit_proposed":null,"url":"https://lngatlas.org/terminal/haldia-fsru-in/","data_source":"Data: Global Gas Infrastructure Tracker, Global Energy Monitor, September 2025"},{"terminal_slug":"haldia-lng-terminal-in","terminal_name":"Haldia LNG Terminal","country":"India","country_iso":"IN","unit_name":null,"status":"cancelled","facility_type":"import","floating_type":"unknown","capacity_mtpa":1,"capacity_bcm_y":1.36,"start_year":null,"planned_start_year":null,"original_planned_start_year":2020,"fid_year":null,"construction_year":null,"shelved_year":2021,"cancelled_year":2023,"stop_year":2023,"estimated_cost_usd":195000000,"estimated_cost_original":15000000000,"estimated_cost_currency":"INR","power_stations_supplied":null,"floating_vessel_name":null,"ccs_project":null,"hydrogen_project":null,"ammonia_project":null,"synthetic_lng_project":null,"retrofit_proposed":null,"url":"https://lngatlas.org/terminal/haldia-lng-terminal-in/","data_source":"Data: Global Gas Infrastructure Tracker, Global Energy Monitor, September 2025"},{"terminal_slug":"hambantota-lng-terminal-lk","terminal_name":"Hambantota LNG Terminal","country":"Sri Lanka","country_iso":"LK","unit_name":null,"status":"cancelled","facility_type":"import","floating_type":"unknown","capacity_mtpa":1,"capacity_bcm_y":1.36,"start_year":null,"planned_start_year":null,"original_planned_start_year":null,"fid_year":null,"construction_year":null,"shelved_year":2023,"cancelled_year":2025,"stop_year":2025,"estimated_cost_usd":100000000,"estimated_cost_original":100000000,"estimated_cost_currency":"USD","power_stations_supplied":null,"floating_vessel_name":null,"ccs_project":null,"hydrogen_project":null,"ammonia_project":null,"synthetic_lng_project":null,"retrofit_proposed":null,"url":"https://lngatlas.org/terminal/hambantota-lng-terminal-lk/","data_source":"Data: Global Gas Infrastructure Tracker, Global Energy Monitor, September 2025"},{"terminal_slug":"hamina-lng-terminal-fi","terminal_name":"Hamina LNG Terminal","country":"Finland","country_iso":"FI","unit_name":null,"status":"operating","facility_type":"import","floating_type":"unknown","capacity_mtpa":0.17,"capacity_bcm_y":0.23,"start_year":2022,"planned_start_year":null,"original_planned_start_year":2020,"fid_year":2018,"construction_year":2017,"shelved_year":null,"cancelled_year":null,"stop_year":null,"estimated_cost_usd":109000000,"estimated_cost_original":100000000,"estimated_cost_currency":"EUR","power_stations_supplied":null,"floating_vessel_name":null,"ccs_project":null,"hydrogen_project":null,"ammonia_project":null,"synthetic_lng_project":null,"retrofit_proposed":null,"url":"https://lngatlas.org/terminal/hamina-lng-terminal-fi/","data_source":"Data: Global Gas Infrastructure Tracker, Global Energy Monitor, September 2025"},{"terminal_slug":"hammerfest-lng-snohvit-terminal-no","terminal_name":"Hammerfest LNG Snohvit Terminal","country":"Norway","country_iso":"NO","unit_name":null,"status":"operating","facility_type":"export","floating_type":"unknown","capacity_mtpa":4.2,"capacity_bcm_y":5.71,"start_year":2007,"planned_start_year":null,"original_planned_start_year":null,"fid_year":null,"construction_year":null,"shelved_year":null,"cancelled_year":null,"stop_year":2020,"estimated_cost_usd":5900000000,"estimated_cost_original":5900000000,"estimated_cost_currency":"USD","power_stations_supplied":null,"floating_vessel_name":null,"ccs_project":null,"hydrogen_project":null,"ammonia_project":null,"synthetic_lng_project":null,"retrofit_proposed":null,"url":"https://lngatlas.org/terminal/hammerfest-lng-snohvit-terminal-no/","data_source":"Data: Global Gas Infrastructure Tracker, Global Energy Monitor, September 2025"},{"terminal_slug":"hatsukaichi-lng-terminal-jp","terminal_name":"Hatsukaichi LNG Terminal","country":"Japan","country_iso":"JP","unit_name":null,"status":"operating","facility_type":"import","floating_type":"unknown","capacity_mtpa":0.9,"capacity_bcm_y":1.22,"start_year":1996,"planned_start_year":null,"original_planned_start_year":null,"fid_year":null,"construction_year":null,"shelved_year":null,"cancelled_year":null,"stop_year":null,"estimated_cost_usd":null,"estimated_cost_original":null,"estimated_cost_currency":null,"power_stations_supplied":null,"floating_vessel_name":null,"ccs_project":null,"hydrogen_project":null,"ammonia_project":null,"synthetic_lng_project":null,"retrofit_proposed":null,"url":"https://lngatlas.org/terminal/hatsukaichi-lng-terminal-jp/","data_source":"Data: Global Gas Infrastructure Tracker, Global Energy Monitor, September 2025"},{"terminal_slug":"hazira-fsru-in","terminal_name":"Hazira FSRU","country":"India","country_iso":"IN","unit_name":null,"status":"cancelled","facility_type":"import","floating_type":"fsru","capacity_mtpa":5,"capacity_bcm_y":6.8,"start_year":null,"planned_start_year":null,"original_planned_start_year":null,"fid_year":null,"construction_year":null,"shelved_year":2020,"cancelled_year":2022,"stop_year":2022,"estimated_cost_usd":null,"estimated_cost_original":null,"estimated_cost_currency":null,"power_stations_supplied":null,"floating_vessel_name":null,"ccs_project":null,"hydrogen_project":null,"ammonia_project":null,"synthetic_lng_project":null,"retrofit_proposed":null,"url":"https://lngatlas.org/terminal/hazira-fsru-in/","data_source":"Data: Global Gas Infrastructure Tracker, Global Energy Monitor, September 2025"},{"terminal_slug":"hazira-lng-terminal-in","terminal_name":"Hazira LNG Terminal","country":"India","country_iso":"IN","unit_name":null,"status":"operating","facility_type":"import","floating_type":"unknown","capacity_mtpa":5.2,"capacity_bcm_y":7.07,"start_year":2005,"planned_start_year":null,"original_planned_start_year":null,"fid_year":null,"construction_year":null,"shelved_year":null,"cancelled_year":null,"stop_year":null,"estimated_cost_usd":null,"estimated_cost_original":null,"estimated_cost_currency":null,"power_stations_supplied":null,"floating_vessel_name":null,"ccs_project":null,"hydrogen_project":null,"ammonia_project":null,"synthetic_lng_project":null,"retrofit_proposed":null,"url":"https://lngatlas.org/terminal/hazira-lng-terminal-in/","data_source":"Data: Global Gas Infrastructure Tracker, Global Energy Monitor, September 2025"},{"terminal_slug":"hazira-lng-terminal-in","terminal_name":"Hazira LNG Terminal","country":"India","country_iso":"IN","unit_name":"Expansion (Original Proposal)","status":"cancelled","facility_type":"import","floating_type":"unknown","capacity_mtpa":5,"capacity_bcm_y":6.8,"start_year":null,"planned_start_year":null,"original_planned_start_year":null,"fid_year":null,"construction_year":null,"shelved_year":2019,"cancelled_year":2021,"stop_year":2021,"estimated_cost_usd":null,"estimated_cost_original":null,"estimated_cost_currency":null,"power_stations_supplied":null,"floating_vessel_name":null,"ccs_project":null,"hydrogen_project":null,"ammonia_project":null,"synthetic_lng_project":null,"retrofit_proposed":null,"url":"https://lngatlas.org/terminal/hazira-lng-terminal-in/","data_source":"Data: Global Gas Infrastructure Tracker, Global Energy Monitor, September 2025"},{"terminal_slug":"hazira-lng-terminal-in","terminal_name":"Hazira LNG Terminal","country":"India","country_iso":"IN","unit_name":"Expansion (Updated Proposal)","status":"proposed","facility_type":"import","floating_type":"unknown","capacity_mtpa":19.92,"capacity_bcm_y":27.1,"start_year":null,"planned_start_year":null,"original_planned_start_year":null,"fid_year":null,"construction_year":null,"shelved_year":null,"cancelled_year":null,"stop_year":null,"estimated_cost_usd":2808000000,"estimated_cost_original":216000000000,"estimated_cost_currency":"INR","power_stations_supplied":null,"floating_vessel_name":null,"ccs_project":null,"hydrogen_project":null,"ammonia_project":null,"synthetic_lng_project":null,"retrofit_proposed":null,"url":"https://lngatlas.org/terminal/hazira-lng-terminal-in/","data_source":"Data: Global Gas Infrastructure Tracker, Global Energy Monitor, September 2025"},{"terminal_slug":"hibiki-lng-terminal-jp","terminal_name":"Hibiki LNG Terminal","country":"Japan","country_iso":"JP","unit_name":null,"status":"operating","facility_type":"import","floating_type":"unknown","capacity_mtpa":2.4,"capacity_bcm_y":3.27,"start_year":2014,"planned_start_year":null,"original_planned_start_year":null,"fid_year":null,"construction_year":null,"shelved_year":null,"cancelled_year":null,"stop_year":null,"estimated_cost_usd":null,"estimated_cost_original":null,"estimated_cost_currency":null,"power_stations_supplied":"Hibiki Natural Gas power plant","floating_vessel_name":null,"ccs_project":null,"hydrogen_project":null,"ammonia_project":null,"synthetic_lng_project":null,"retrofit_proposed":null,"url":"https://lngatlas.org/terminal/hibiki-lng-terminal-jp/","data_source":"Data: Global Gas Infrastructure Tracker, Global Energy Monitor, September 2025"},{"terminal_slug":"hibiki-lng-terminal-jp","terminal_name":"Hibiki LNG Terminal","country":"Japan","country_iso":"JP","unit_name":"Expansion","status":"construction","facility_type":"import","floating_type":"unknown","capacity_mtpa":null,"capacity_bcm_y":null,"start_year":null,"planned_start_year":null,"original_planned_start_year":2029,"fid_year":2024,"construction_year":2025,"shelved_year":null,"cancelled_year":null,"stop_year":null,"estimated_cost_usd":330000000,"estimated_cost_original":330000000,"estimated_cost_currency":"USD","power_stations_supplied":"Hibiki Natural Gas power plant","floating_vessel_name":null,"ccs_project":null,"hydrogen_project":null,"ammonia_project":null,"synthetic_lng_project":null,"retrofit_proposed":null,"url":"https://lngatlas.org/terminal/hibiki-lng-terminal-jp/","data_source":"Data: Global Gas Infrastructure Tracker, Global Energy Monitor, September 2025"},{"terminal_slug":"hidrovias-do-brasil-fsru-br","terminal_name":"Hidrovias do Brasil FSRU","country":"Brazil","country_iso":"BR","unit_name":null,"status":"cancelled","facility_type":"import","floating_type":"fsru","capacity_mtpa":3.76,"capacity_bcm_y":5.12,"start_year":null,"planned_start_year":null,"original_planned_start_year":null,"fid_year":null,"construction_year":null,"shelved_year":null,"cancelled_year":null,"stop_year":null,"estimated_cost_usd":null,"estimated_cost_original":null,"estimated_cost_currency":null,"power_stations_supplied":"Vila do Conde power station","floating_vessel_name":null,"ccs_project":null,"hydrogen_project":null,"ammonia_project":null,"synthetic_lng_project":null,"retrofit_proposed":null,"url":"https://lngatlas.org/terminal/hidrovias-do-brasil-fsru-br/","data_source":"Data: Global Gas Infrastructure Tracker, Global Energy Monitor, September 2025"},{"terminal_slug":"higashi-niigata-lng-terminal-jp","terminal_name":"Higashi Niigata LNG Terminal","country":"Japan","country_iso":"JP","unit_name":null,"status":"operating","facility_type":"import","floating_type":"unknown","capacity_mtpa":8.9,"capacity_bcm_y":12.11,"start_year":1984,"planned_start_year":null,"original_planned_start_year":null,"fid_year":null,"construction_year":null,"shelved_year":null,"cancelled_year":null,"stop_year":null,"estimated_cost_usd":null,"estimated_cost_original":null,"estimated_cost_currency":null,"power_stations_supplied":null,"floating_vessel_name":null,"ccs_project":null,"hydrogen_project":null,"ammonia_project":null,"synthetic_lng_project":null,"retrofit_proposed":null,"url":"https://lngatlas.org/terminal/higashi-niigata-lng-terminal-jp/","data_source":"Data: Global Gas Infrastructure Tracker, Global Energy Monitor, September 2025"},{"terminal_slug":"higashi-ohgishima-lng-terminal-jp","terminal_name":"Higashi Ohgishima LNG Terminal","country":"Japan","country_iso":"JP","unit_name":null,"status":"operating","facility_type":"import","floating_type":"unknown","capacity_mtpa":13.2,"capacity_bcm_y":17.96,"start_year":1984,"planned_start_year":null,"original_planned_start_year":null,"fid_year":null,"construction_year":null,"shelved_year":null,"cancelled_year":null,"stop_year":null,"estimated_cost_usd":null,"estimated_cost_original":null,"estimated_cost_currency":null,"power_stations_supplied":null,"floating_vessel_name":null,"ccs_project":null,"hydrogen_project":null,"ammonia_project":null,"synthetic_lng_project":null,"retrofit_proposed":null,"url":"https://lngatlas.org/terminal/higashi-ohgishima-lng-terminal-jp/","data_source":"Data: Global Gas Infrastructure Tracker, Global Energy Monitor, September 2025"},{"terminal_slug":"higashi-ohgishima-lng-terminal-jp","terminal_name":"Higashi Ohgishima LNG Terminal","country":"Japan","country_iso":"JP","unit_name":"Expansion","status":"cancelled","facility_type":"import","floating_type":"unknown","capacity_mtpa":6,"capacity_bcm_y":8.16,"start_year":null,"planned_start_year":null,"original_planned_start_year":2023,"fid_year":null,"construction_year":null,"shelved_year":2015,"cancelled_year":2017,"stop_year":2017,"estimated_cost_usd":null,"estimated_cost_original":null,"estimated_cost_currency":null,"power_stations_supplied":null,"floating_vessel_name":null,"ccs_project":null,"hydrogen_project":null,"ammonia_project":null,"synthetic_lng_project":null,"retrofit_proposed":null,"url":"https://lngatlas.org/terminal/higashi-ohgishima-lng-terminal-jp/","data_source":"Data: Global Gas Infrastructure Tracker, Global Energy Monitor, September 2025"},{"terminal_slug":"himeji-joint-lng-terminal-jp","terminal_name":"Himeji Joint LNG Terminal","country":"Japan","country_iso":"JP","unit_name":null,"status":"operating","facility_type":"import","floating_type":"unknown","capacity_mtpa":8.1,"capacity_bcm_y":11.02,"start_year":1979,"planned_start_year":null,"original_planned_start_year":null,"fid_year":null,"construction_year":null,"shelved_year":null,"cancelled_year":null,"stop_year":null,"estimated_cost_usd":null,"estimated_cost_original":null,"estimated_cost_currency":null,"power_stations_supplied":null,"floating_vessel_name":null,"ccs_project":null,"hydrogen_project":null,"ammonia_project":null,"synthetic_lng_project":null,"retrofit_proposed":null,"url":"https://lngatlas.org/terminal/himeji-joint-lng-terminal-jp/","data_source":"Data: Global Gas Infrastructure Tracker, Global Energy Monitor, September 2025"},{"terminal_slug":"himeji-lng-terminal-jp","terminal_name":"Himeji LNG Terminal","country":"Japan","country_iso":"JP","unit_name":null,"status":"operating","facility_type":"import","floating_type":"unknown","capacity_mtpa":5.5,"capacity_bcm_y":7.48,"start_year":1979,"planned_start_year":null,"original_planned_start_year":null,"fid_year":null,"construction_year":null,"shelved_year":null,"cancelled_year":null,"stop_year":null,"estimated_cost_usd":null,"estimated_cost_original":null,"estimated_cost_currency":null,"power_stations_supplied":null,"floating_vessel_name":null,"ccs_project":null,"hydrogen_project":null,"ammonia_project":null,"synthetic_lng_project":null,"retrofit_proposed":null,"url":"https://lngatlas.org/terminal/himeji-lng-terminal-jp/","data_source":"Data: Global Gas Infrastructure Tracker, Global Energy Monitor, September 2025"},{"terminal_slug":"hitachi-lng-terminal-jp","terminal_name":"Hitachi LNG Terminal","country":"Japan","country_iso":"JP","unit_name":null,"status":"operating","facility_type":"import","floating_type":"unknown","capacity_mtpa":3.2,"capacity_bcm_y":4.35,"start_year":2016,"planned_start_year":null,"original_planned_start_year":null,"fid_year":null,"construction_year":null,"shelved_year":null,"cancelled_year":null,"stop_year":null,"estimated_cost_usd":null,"estimated_cost_original":null,"estimated_cost_currency":null,"power_stations_supplied":null,"floating_vessel_name":null,"ccs_project":null,"hydrogen_project":null,"ammonia_project":null,"synthetic_lng_project":null,"retrofit_proposed":null,"url":"https://lngatlas.org/terminal/hitachi-lng-terminal-jp/","data_source":"Data: Global Gas Infrastructure Tracker, Global Energy Monitor, September 2025"},{"terminal_slug":"hitachi-lng-terminal-jp","terminal_name":"Hitachi LNG Terminal","country":"Japan","country_iso":"JP","unit_name":"Expansion","status":"operating","facility_type":"import","floating_type":"unknown","capacity_mtpa":3.2,"capacity_bcm_y":4.35,"start_year":2021,"planned_start_year":null,"original_planned_start_year":null,"fid_year":null,"construction_year":null,"shelved_year":null,"cancelled_year":null,"stop_year":null,"estimated_cost_usd":null,"estimated_cost_original":null,"estimated_cost_currency":null,"power_stations_supplied":null,"floating_vessel_name":null,"ccs_project":null,"hydrogen_project":null,"ammonia_project":null,"synthetic_lng_project":null,"retrofit_proposed":null,"url":"https://lngatlas.org/terminal/hitachi-lng-terminal-jp/","data_source":"Data: Global Gas Infrastructure Tracker, Global Energy Monitor, September 2025"},{"terminal_slug":"hoegh-cyprus-fsru-cy","terminal_name":"Hoegh Cyprus FSRU","country":"Cyprus","country_iso":"CY","unit_name":null,"status":"cancelled","facility_type":"import","floating_type":"fsru","capacity_mtpa":null,"capacity_bcm_y":null,"start_year":null,"planned_start_year":null,"original_planned_start_year":2021,"fid_year":null,"construction_year":null,"shelved_year":null,"cancelled_year":2021,"stop_year":2021,"estimated_cost_usd":null,"estimated_cost_original":null,"estimated_cost_currency":null,"power_stations_supplied":null,"floating_vessel_name":null,"ccs_project":null,"hydrogen_project":null,"ammonia_project":null,"synthetic_lng_project":null,"retrofit_proposed":null,"url":"https://lngatlas.org/terminal/hoegh-cyprus-fsru-cy/","data_source":"Data: Global Gas Infrastructure Tracker, Global Energy Monitor, September 2025"},{"terminal_slug":"hong-kong-fsru-hk","terminal_name":"Hong Kong FSRU","country":"Hong Kong","country_iso":"HK","unit_name":null,"status":"operating","facility_type":"import","floating_type":"fsru","capacity_mtpa":6.1,"capacity_bcm_y":8.3,"start_year":2023,"planned_start_year":null,"original_planned_start_year":2021,"fid_year":null,"construction_year":2021,"shelved_year":null,"cancelled_year":null,"stop_year":null,"estimated_cost_usd":1000000000,"estimated_cost_original":1000000000,"estimated_cost_currency":"USD","power_stations_supplied":"Black Point power station, CKI Lamma power station","floating_vessel_name":"Bauhinia Spirit","ccs_project":null,"hydrogen_project":null,"ammonia_project":null,"synthetic_lng_project":null,"retrofit_proposed":null,"url":"https://lngatlas.org/terminal/hong-kong-fsru-hk/","data_source":"Data: Global Gas Infrastructure Tracker, Global Energy Monitor, September 2025"},{"terminal_slug":"hongmei-lng-terminal-cn","terminal_name":"Hongmei LNG Terminal","country":"China","country_iso":"CN","unit_name":"Phase 1","status":"operating","facility_type":"import","floating_type":"unknown","capacity_mtpa":1.5,"capacity_bcm_y":2.04,"start_year":2012,"planned_start_year":null,"original_planned_start_year":null,"fid_year":null,"construction_year":2008,"shelved_year":null,"cancelled_year":null,"stop_year":null,"estimated_cost_usd":null,"estimated_cost_original":null,"estimated_cost_currency":null,"power_stations_supplied":null,"floating_vessel_name":null,"ccs_project":null,"hydrogen_project":null,"ammonia_project":null,"synthetic_lng_project":null,"retrofit_proposed":null,"url":"https://lngatlas.org/terminal/hongmei-lng-terminal-cn/","data_source":"Data: Global Gas Infrastructure Tracker, Global Energy Monitor, September 2025"},{"terminal_slug":"hsieh-ho-lng-terminal-tw","terminal_name":"Hsieh-Ho LNG Terminal","country":"Taiwan","country_iso":"TW","unit_name":"Phase 1","status":"proposed","facility_type":"import","floating_type":"floating","capacity_mtpa":1.5,"capacity_bcm_y":2.04,"start_year":null,"planned_start_year":2032,"original_planned_start_year":2025,"fid_year":null,"construction_year":null,"shelved_year":null,"cancelled_year":null,"stop_year":null,"estimated_cost_usd":null,"estimated_cost_original":null,"estimated_cost_currency":null,"power_stations_supplied":null,"floating_vessel_name":null,"ccs_project":null,"hydrogen_project":null,"ammonia_project":null,"synthetic_lng_project":null,"retrofit_proposed":null,"url":"https://lngatlas.org/terminal/hsieh-ho-lng-terminal-tw/","data_source":"Data: Global Gas Infrastructure Tracker, Global Energy Monitor, September 2025"},{"terminal_slug":"huelva-lng-terminal-es","terminal_name":"Huelva LNG Terminal","country":"Spain","country_iso":"ES","unit_name":null,"status":"operating","facility_type":"import","floating_type":"unknown","capacity_mtpa":8.7,"capacity_bcm_y":11.84,"start_year":1988,"planned_start_year":null,"original_planned_start_year":null,"fid_year":null,"construction_year":null,"shelved_year":null,"cancelled_year":null,"stop_year":null,"estimated_cost_usd":null,"estimated_cost_original":null,"estimated_cost_currency":null,"power_stations_supplied":null,"floating_vessel_name":null,"ccs_project":null,"hydrogen_project":null,"ammonia_project":null,"synthetic_lng_project":null,"retrofit_proposed":null,"url":"https://lngatlas.org/terminal/huelva-lng-terminal-es/","data_source":"Data: Global Gas Infrastructure Tracker, Global Energy Monitor, September 2025"},{"terminal_slug":"huizhou-lng-terminal-cn","terminal_name":"Huizhou LNG Terminal","country":"China","country_iso":"CN","unit_name":"Phase 1","status":"operating","facility_type":"import","floating_type":"unknown","capacity_mtpa":4,"capacity_bcm_y":5.44,"start_year":2024,"planned_start_year":null,"original_planned_start_year":null,"fid_year":null,"construction_year":2021,"shelved_year":null,"cancelled_year":null,"stop_year":null,"estimated_cost_usd":1056000000,"estimated_cost_original":6600000000,"estimated_cost_currency":"RMB","power_stations_supplied":null,"floating_vessel_name":null,"ccs_project":null,"hydrogen_project":null,"ammonia_project":null,"synthetic_lng_project":null,"retrofit_proposed":null,"url":"https://lngatlas.org/terminal/huizhou-lng-terminal-cn/","data_source":"Data: Global Gas Infrastructure Tracker, Global Energy Monitor, September 2025"},{"terminal_slug":"huizhou-lng-terminal-cn","terminal_name":"Huizhou LNG Terminal","country":"China","country_iso":"CN","unit_name":"Phase 2","status":"proposed","facility_type":"import","floating_type":"unknown","capacity_mtpa":3.75,"capacity_bcm_y":5.1,"start_year":null,"planned_start_year":null,"original_planned_start_year":null,"fid_year":null,"construction_year":null,"shelved_year":null,"cancelled_year":null,"stop_year":null,"estimated_cost_usd":514579200,"estimated_cost_original":3216120000,"estimated_cost_currency":"RMB","power_stations_supplied":null,"floating_vessel_name":null,"ccs_project":null,"hydrogen_project":null,"ammonia_project":null,"synthetic_lng_project":null,"retrofit_proposed":null,"url":"https://lngatlas.org/terminal/huizhou-lng-terminal-cn/","data_source":"Data: Global Gas Infrastructure Tracker, Global Energy Monitor, September 2025"},{"terminal_slug":"ichthys-flng-terminal-au","terminal_name":"Ichthys FLNG Terminal","country":"Australia","country_iso":"AU","unit_name":"T1","status":"operating","facility_type":"export","floating_type":"flng","capacity_mtpa":4.65,"capacity_bcm_y":6.33,"start_year":2018,"planned_start_year":null,"original_planned_start_year":2017,"fid_year":2012,"construction_year":2012,"shelved_year":null,"cancelled_year":null,"stop_year":null,"estimated_cost_usd":22500000000,"estimated_cost_original":22500000000,"estimated_cost_currency":"USD","power_stations_supplied":null,"floating_vessel_name":null,"ccs_project":true,"hydrogen_project":null,"ammonia_project":null,"synthetic_lng_project":null,"retrofit_proposed":null,"url":"https://lngatlas.org/terminal/ichthys-flng-terminal-au/","data_source":"Data: Global Gas Infrastructure Tracker, Global Energy Monitor, September 2025"},{"terminal_slug":"ichthys-flng-terminal-au","terminal_name":"Ichthys FLNG Terminal","country":"Australia","country_iso":"AU","unit_name":"T2","status":"operating","facility_type":"export","floating_type":"flng","capacity_mtpa":4.65,"capacity_bcm_y":6.33,"start_year":2018,"planned_start_year":null,"original_planned_start_year":2017,"fid_year":2012,"construction_year":2012,"shelved_year":null,"cancelled_year":null,"stop_year":null,"estimated_cost_usd":22500000000,"estimated_cost_original":22500000000,"estimated_cost_currency":"USD","power_stations_supplied":null,"floating_vessel_name":null,"ccs_project":true,"hydrogen_project":null,"ammonia_project":null,"synthetic_lng_project":null,"retrofit_proposed":null,"url":"https://lngatlas.org/terminal/ichthys-flng-terminal-au/","data_source":"Data: Global Gas Infrastructure Tracker, Global Energy Monitor, September 2025"},{"terminal_slug":"ichthys-flng-terminal-au","terminal_name":"Ichthys FLNG Terminal","country":"Australia","country_iso":"AU","unit_name":"T3","status":"proposed","facility_type":"export","floating_type":"flng","capacity_mtpa":null,"capacity_bcm_y":null,"start_year":null,"planned_start_year":2030,"original_planned_start_year":2023,"fid_year":null,"construction_year":null,"shelved_year":null,"cancelled_year":null,"stop_year":null,"estimated_cost_usd":null,"estimated_cost_original":null,"estimated_cost_currency":null,"power_stations_supplied":null,"floating_vessel_name":null,"ccs_project":true,"hydrogen_project":null,"ammonia_project":null,"synthetic_lng_project":null,"retrofit_proposed":null,"url":"https://lngatlas.org/terminal/ichthys-flng-terminal-au/","data_source":"Data: Global Gas Infrastructure Tracker, Global Energy Monitor, September 2025"},{"terminal_slug":"ilo-lng-terminal-pe","terminal_name":"Ilo LNG Terminal","country":"Peru","country_iso":"PE","unit_name":null,"status":"shelved","facility_type":"export","floating_type":"unknown","capacity_mtpa":null,"capacity_bcm_y":null,"start_year":null,"planned_start_year":null,"original_planned_start_year":null,"fid_year":null,"construction_year":null,"shelved_year":2024,"cancelled_year":null,"stop_year":null,"estimated_cost_usd":null,"estimated_cost_original":null,"estimated_cost_currency":null,"power_stations_supplied":null,"floating_vessel_name":null,"ccs_project":null,"hydrogen_project":null,"ammonia_project":null,"synthetic_lng_project":null,"retrofit_proposed":null,"url":"https://lngatlas.org/terminal/ilo-lng-terminal-pe/","data_source":"Data: Global Gas Infrastructure Tracker, Global Energy Monitor, September 2025"},{"terminal_slug":"imetame-lng-terminal-br","terminal_name":"Imetame LNG Terminal","country":"Brazil","country_iso":"BR","unit_name":null,"status":"cancelled","facility_type":"import","floating_type":"unknown","capacity_mtpa":null,"capacity_bcm_y":null,"start_year":null,"planned_start_year":null,"original_planned_start_year":2025,"fid_year":null,"construction_year":null,"shelved_year":2023,"cancelled_year":2025,"stop_year":2025,"estimated_cost_usd":null,"estimated_cost_original":null,"estimated_cost_currency":null,"power_stations_supplied":"Imetame I power station","floating_vessel_name":null,"ccs_project":null,"hydrogen_project":null,"ammonia_project":null,"synthetic_lng_project":null,"retrofit_proposed":null,"url":"https://lngatlas.org/terminal/imetame-lng-terminal-br/","data_source":"Data: Global Gas Infrastructure Tracker, Global Energy Monitor, September 2025"},{"terminal_slug":"incheon-lng-terminal-kr","terminal_name":"Incheon LNG Terminal","country":"South Korea","country_iso":"KR","unit_name":null,"status":"operating","facility_type":"import","floating_type":"unknown","capacity_mtpa":54.5,"capacity_bcm_y":74.15,"start_year":1996,"planned_start_year":null,"original_planned_start_year":null,"fid_year":null,"construction_year":null,"shelved_year":null,"cancelled_year":null,"stop_year":null,"estimated_cost_usd":null,"estimated_cost_original":null,"estimated_cost_currency":null,"power_stations_supplied":null,"floating_vessel_name":null,"ccs_project":null,"hydrogen_project":null,"ammonia_project":null,"synthetic_lng_project":null,"retrofit_proposed":null,"url":"https://lngatlas.org/terminal/incheon-lng-terminal-kr/","data_source":"Data: Global Gas Infrastructure Tracker, Global Energy Monitor, September 2025"},{"terminal_slug":"ingleside-energy-lng-terminal-us","terminal_name":"Ingleside Energy LNG Terminal","country":"United States","country_iso":"US","unit_name":null,"status":"cancelled","facility_type":"export","floating_type":"unknown","capacity_mtpa":7.67,"capacity_bcm_y":10.44,"start_year":null,"planned_start_year":null,"original_planned_start_year":2016,"fid_year":null,"construction_year":null,"shelved_year":2008,"cancelled_year":2010,"stop_year":2010,"estimated_cost_usd":null,"estimated_cost_original":null,"estimated_cost_currency":null,"power_stations_supplied":null,"floating_vessel_name":null,"ccs_project":null,"hydrogen_project":null,"ammonia_project":null,"synthetic_lng_project":null,"retrofit_proposed":null,"url":"https://lngatlas.org/terminal/ingleside-energy-lng-terminal-us/","data_source":"Data: Global Gas Infrastructure Tracker, Global Energy Monitor, September 2025"},{"terminal_slug":"inkoo-fsru-fi","terminal_name":"Inkoo FSRU","country":"Finland","country_iso":"FI","unit_name":null,"status":"operating","facility_type":"import","floating_type":"fsru","capacity_mtpa":3.67,"capacity_bcm_y":4.99,"start_year":2023,"planned_start_year":null,"original_planned_start_year":2022,"fid_year":null,"construction_year":2022,"shelved_year":null,"cancelled_year":null,"stop_year":null,"estimated_cost_usd":501400000,"estimated_cost_original":460000000,"estimated_cost_currency":"EUR","power_stations_supplied":null,"floating_vessel_name":"Excelerate Energy Exemplar","ccs_project":null,"hydrogen_project":null,"ammonia_project":null,"synthetic_lng_project":null,"retrofit_proposed":null,"url":"https://lngatlas.org/terminal/inkoo-fsru-fi/","data_source":"Data: Global Gas Infrastructure Tracker, Global Energy Monitor, September 2025"},{"terminal_slug":"iran-flng-terminal-ir","terminal_name":"Iran FLNG Terminal","country":"Iran","country_iso":"IR","unit_name":null,"status":"cancelled","facility_type":"export","floating_type":"flng","capacity_mtpa":0.5,"capacity_bcm_y":0.68,"start_year":null,"planned_start_year":null,"original_planned_start_year":null,"fid_year":null,"construction_year":null,"shelved_year":2017,"cancelled_year":2019,"stop_year":2019,"estimated_cost_usd":600000000,"estimated_cost_original":600000000,"estimated_cost_currency":"USD","power_stations_supplied":null,"floating_vessel_name":null,"ccs_project":null,"hydrogen_project":null,"ammonia_project":null,"synthetic_lng_project":null,"retrofit_proposed":null,"url":"https://lngatlas.org/terminal/iran-flng-terminal-ir/","data_source":"Data: Global Gas Infrastructure Tracker, Global Energy Monitor, September 2025"},{"terminal_slug":"iran-nioc-lng-terminal-ir","terminal_name":"Iran NIOC LNG Terminal","country":"Iran","country_iso":"IR","unit_name":"T1","status":"construction","facility_type":"export","floating_type":"unknown","capacity_mtpa":5.4,"capacity_bcm_y":7.35,"start_year":null,"planned_start_year":null,"original_planned_start_year":2025,"fid_year":null,"construction_year":2023,"shelved_year":null,"cancelled_year":null,"stop_year":null,"estimated_cost_usd":5000000000,"estimated_cost_original":5000000000,"estimated_cost_currency":"USD","power_stations_supplied":"Tonbak LNG power station","floating_vessel_name":null,"ccs_project":null,"hydrogen_project":null,"ammonia_project":null,"synthetic_lng_project":null,"retrofit_proposed":null,"url":"https://lngatlas.org/terminal/iran-nioc-lng-terminal-ir/","data_source":"Data: Global Gas Infrastructure Tracker, Global Energy Monitor, September 2025"},{"terminal_slug":"iran-nioc-lng-terminal-ir","terminal_name":"Iran NIOC LNG Terminal","country":"Iran","country_iso":"IR","unit_name":"T2","status":"construction","facility_type":"export","floating_type":"unknown","capacity_mtpa":5.4,"capacity_bcm_y":7.35,"start_year":null,"planned_start_year":null,"original_planned_start_year":2025,"fid_year":null,"construction_year":2023,"shelved_year":null,"cancelled_year":null,"stop_year":null,"estimated_cost_usd":5000000000,"estimated_cost_original":5000000000,"estimated_cost_currency":"USD","power_stations_supplied":"Tonbak LNG power station","floating_vessel_name":null,"ccs_project":null,"hydrogen_project":null,"ammonia_project":null,"synthetic_lng_project":null,"retrofit_proposed":null,"url":"https://lngatlas.org/terminal/iran-nioc-lng-terminal-ir/","data_source":"Data: Global Gas Infrastructure Tracker, Global Energy Monitor, September 2025"},{"terminal_slug":"iran-nioc-lng-terminal-ir","terminal_name":"Iran NIOC LNG Terminal","country":"Iran","country_iso":"IR","unit_name":"T3","status":"construction","facility_type":"export","floating_type":"unknown","capacity_mtpa":1.5,"capacity_bcm_y":2.04,"start_year":null,"planned_start_year":null,"original_planned_start_year":2026,"fid_year":null,"construction_year":2024,"shelved_year":null,"cancelled_year":null,"stop_year":null,"estimated_cost_usd":null,"estimated_cost_original":null,"estimated_cost_currency":null,"power_stations_supplied":"Tonbak LNG power station","floating_vessel_name":null,"ccs_project":null,"hydrogen_project":null,"ammonia_project":null,"synthetic_lng_project":null,"retrofit_proposed":null,"url":"https://lngatlas.org/terminal/iran-nioc-lng-terminal-ir/","data_source":"Data: Global Gas Infrastructure Tracker, Global Energy Monitor, September 2025"},{"terminal_slug":"ishikari-lng-terminal-jp","terminal_name":"Ishikari LNG Terminal","country":"Japan","country_iso":"JP","unit_name":null,"status":"operating","facility_type":"import","floating_type":"unknown","capacity_mtpa":4.6,"capacity_bcm_y":6.26,"start_year":2012,"planned_start_year":null,"original_planned_start_year":null,"fid_year":null,"construction_year":null,"shelved_year":null,"cancelled_year":null,"stop_year":null,"estimated_cost_usd":null,"estimated_cost_original":null,"estimated_cost_currency":null,"power_stations_supplied":null,"floating_vessel_name":null,"ccs_project":null,"hydrogen_project":null,"ammonia_project":null,"synthetic_lng_project":null,"retrofit_proposed":null,"url":"https://lngatlas.org/terminal/ishikari-lng-terminal-jp/","data_source":"Data: Global Gas Infrastructure Tracker, Global Energy Monitor, September 2025"},{"terminal_slug":"island-power-producers-lng-terminal-bs","terminal_name":"Island Power Producers LNG Terminal","country":"Bahamas","country_iso":"BS","unit_name":null,"status":"proposed","facility_type":"import","floating_type":"unknown","capacity_mtpa":null,"capacity_bcm_y":null,"start_year":null,"planned_start_year":null,"original_planned_start_year":null,"fid_year":null,"construction_year":null,"shelved_year":null,"cancelled_year":null,"stop_year":null,"estimated_cost_usd":null,"estimated_cost_original":null,"estimated_cost_currency":null,"power_stations_supplied":"Island Power Producers power plant","floating_vessel_name":null,"ccs_project":null,"hydrogen_project":null,"ammonia_project":null,"synthetic_lng_project":null,"retrofit_proposed":null,"url":"https://lngatlas.org/terminal/island-power-producers-lng-terminal-bs/","data_source":"Data: Global Gas Infrastructure Tracker, Global Energy Monitor, September 2025"},{"terminal_slug":"itacoatiara-fsru-br","terminal_name":"Itacoatiara FSRU","country":"Brazil","country_iso":"BR","unit_name":null,"status":"cancelled","facility_type":"import","floating_type":"fsru","capacity_mtpa":3.76,"capacity_bcm_y":5.12,"start_year":null,"planned_start_year":null,"original_planned_start_year":null,"fid_year":null,"construction_year":null,"shelved_year":2023,"cancelled_year":2025,"stop_year":2025,"estimated_cost_usd":31554000,"estimated_cost_original":175300000,"estimated_cost_currency":"BRL","power_stations_supplied":"Itacoatiara power station","floating_vessel_name":null,"ccs_project":null,"hydrogen_project":null,"ammonia_project":null,"synthetic_lng_project":null,"retrofit_proposed":null,"url":"https://lngatlas.org/terminal/itacoatiara-fsru-br/","data_source":"Data: Global Gas Infrastructure Tracker, Global Energy Monitor, September 2025"},{"terminal_slug":"itaqui-fsru-br","terminal_name":"Itaqui FSRU","country":"Brazil","country_iso":"BR","unit_name":null,"status":"shelved","facility_type":"import","floating_type":"fsru","capacity_mtpa":5.64,"capacity_bcm_y":7.67,"start_year":null,"planned_start_year":null,"original_planned_start_year":null,"fid_year":2023,"construction_year":null,"shelved_year":2025,"cancelled_year":null,"stop_year":null,"estimated_cost_usd":180000000,"estimated_cost_original":1000000000,"estimated_cost_currency":"BRL","power_stations_supplied":"Geramar III","floating_vessel_name":null,"ccs_project":null,"hydrogen_project":null,"ammonia_project":null,"synthetic_lng_project":null,"retrofit_proposed":null,"url":"https://lngatlas.org/terminal/itaqui-fsru-br/","data_source":"Data: Global Gas Infrastructure Tracker, Global Energy Monitor, September 2025"},{"terminal_slug":"ivory-coast-fsru-ci","terminal_name":"Ivory Coast FSRU","country":"Côte d'Ivoire","country_iso":"CI","unit_name":null,"status":"shelved","facility_type":"import","floating_type":"fsru","capacity_mtpa":3,"capacity_bcm_y":4.08,"start_year":null,"planned_start_year":2023,"original_planned_start_year":2018,"fid_year":null,"construction_year":null,"shelved_year":2023,"cancelled_year":null,"stop_year":null,"estimated_cost_usd":100000000,"estimated_cost_original":100000000,"estimated_cost_currency":"USD","power_stations_supplied":null,"floating_vessel_name":null,"ccs_project":null,"hydrogen_project":null,"ammonia_project":null,"synthetic_lng_project":null,"retrofit_proposed":null,"url":"https://lngatlas.org/terminal/ivory-coast-fsru-ci/","data_source":"Data: Global Gas Infrastructure Tracker, Global Energy Monitor, September 2025"},{"terminal_slug":"izmir-aliaga-lng-terminal-tr","terminal_name":"Izmir Aliaga LNG Terminal","country":"Türkiye","country_iso":"TR","unit_name":null,"status":"operating","facility_type":"import","floating_type":"unknown","capacity_mtpa":10.7,"capacity_bcm_y":14.56,"start_year":2006,"planned_start_year":null,"original_planned_start_year":null,"fid_year":null,"construction_year":null,"shelved_year":null,"cancelled_year":null,"stop_year":null,"estimated_cost_usd":null,"estimated_cost_original":null,"estimated_cost_currency":null,"power_stations_supplied":null,"floating_vessel_name":null,"ccs_project":null,"hydrogen_project":null,"ammonia_project":null,"synthetic_lng_project":null,"retrofit_proposed":null,"url":"https://lngatlas.org/terminal/izmir-aliaga-lng-terminal-tr/","data_source":"Data: Global Gas Infrastructure Tracker, Global Energy Monitor, September 2025"},{"terminal_slug":"jafrabad-fsru-in","terminal_name":"Jafrabad FSRU","country":"India","country_iso":"IN","unit_name":"Phase 1","status":"construction","facility_type":"import","floating_type":"fsru","capacity_mtpa":5,"capacity_bcm_y":6.8,"start_year":null,"planned_start_year":null,"original_planned_start_year":2022,"fid_year":null,"construction_year":2016,"shelved_year":null,"cancelled_year":null,"stop_year":null,"estimated_cost_usd":null,"estimated_cost_original":null,"estimated_cost_currency":null,"power_stations_supplied":null,"floating_vessel_name":"Vasant 1","ccs_project":null,"hydrogen_project":null,"ammonia_project":null,"synthetic_lng_project":null,"retrofit_proposed":null,"url":"https://lngatlas.org/terminal/jafrabad-fsru-in/","data_source":"Data: Global Gas Infrastructure Tracker, Global Energy Monitor, September 2025"},{"terminal_slug":"jafrabad-fsru-in","terminal_name":"Jafrabad FSRU","country":"India","country_iso":"IN","unit_name":"Phase 2","status":"proposed","facility_type":"import","floating_type":"fsru","capacity_mtpa":5,"capacity_bcm_y":6.8,"start_year":null,"planned_start_year":null,"original_planned_start_year":null,"fid_year":null,"construction_year":null,"shelved_year":null,"cancelled_year":null,"stop_year":null,"estimated_cost_usd":null,"estimated_cost_original":null,"estimated_cost_currency":null,"power_stations_supplied":null,"floating_vessel_name":"Vasant 1","ccs_project":null,"hydrogen_project":null,"ammonia_project":null,"synthetic_lng_project":null,"retrofit_proposed":null,"url":"https://lngatlas.org/terminal/jafrabad-fsru-in/","data_source":"Data: Global Gas Infrastructure Tracker, Global Energy Monitor, September 2025"},{"terminal_slug":"jaigarh-lng-terminal-in","terminal_name":"Jaigarh LNG Terminal","country":"India","country_iso":"IN","unit_name":"Phase I","status":"construction","facility_type":"import","floating_type":"floating","capacity_mtpa":6,"capacity_bcm_y":8.16,"start_year":null,"planned_start_year":2026,"original_planned_start_year":2022,"fid_year":null,"construction_year":2016,"shelved_year":null,"cancelled_year":null,"stop_year":null,"estimated_cost_usd":null,"estimated_cost_original":null,"estimated_cost_currency":null,"power_stations_supplied":null,"floating_vessel_name":null,"ccs_project":null,"hydrogen_project":null,"ammonia_project":null,"synthetic_lng_project":null,"retrofit_proposed":null,"url":"https://lngatlas.org/terminal/jaigarh-lng-terminal-in/","data_source":"Data: Global Gas Infrastructure Tracker, Global Energy Monitor, September 2025"},{"terminal_slug":"jaigarh-lng-terminal-in","terminal_name":"Jaigarh LNG Terminal","country":"India","country_iso":"IN","unit_name":"Phase II","status":"proposed","facility_type":"import","floating_type":"floating","capacity_mtpa":8,"capacity_bcm_y":10.88,"start_year":null,"planned_start_year":null,"original_planned_start_year":null,"fid_year":null,"construction_year":null,"shelved_year":null,"cancelled_year":null,"stop_year":null,"estimated_cost_usd":null,"estimated_cost_original":null,"estimated_cost_currency":null,"power_stations_supplied":null,"floating_vessel_name":null,"ccs_project":null,"hydrogen_project":null,"ammonia_project":null,"synthetic_lng_project":null,"retrofit_proposed":null,"url":"https://lngatlas.org/terminal/jaigarh-lng-terminal-in/","data_source":"Data: Global Gas Infrastructure Tracker, Global Energy Monitor, September 2025"},{"terminal_slug":"jambeli-fsru-ec","terminal_name":"Jambelí FSRU","country":"Ecuador","country_iso":"EC","unit_name":null,"status":"proposed","facility_type":"import","floating_type":"fsru","capacity_mtpa":0.38,"capacity_bcm_y":0.52,"start_year":null,"planned_start_year":null,"original_planned_start_year":2025,"fid_year":null,"construction_year":null,"shelved_year":null,"cancelled_year":null,"stop_year":null,"estimated_cost_usd":null,"estimated_cost_original":null,"estimated_cost_currency":null,"power_stations_supplied":"Termogas Machala I power station","floating_vessel_name":null,"ccs_project":null,"hydrogen_project":null,"ammonia_project":null,"synthetic_lng_project":null,"retrofit_proposed":null,"url":"https://lngatlas.org/terminal/jambeli-fsru-ec/","data_source":"Data: Global Gas Infrastructure Tracker, Global Energy Monitor, September 2025"},{"terminal_slug":"jawa-satu-fsru-id","terminal_name":"Jawa Satu FSRU","country":"Indonesia","country_iso":"ID","unit_name":null,"status":"operating","facility_type":"import","floating_type":"fsru","capacity_mtpa":2.4,"capacity_bcm_y":3.27,"start_year":2021,"planned_start_year":null,"original_planned_start_year":null,"fid_year":null,"construction_year":2018,"shelved_year":null,"cancelled_year":null,"stop_year":null,"estimated_cost_usd":350000000,"estimated_cost_original":350000000,"estimated_cost_currency":"USD","power_stations_supplied":"PLTGU Jawa-1 power station","floating_vessel_name":"Jawa Satu FSRU","ccs_project":null,"hydrogen_project":null,"ammonia_project":null,"synthetic_lng_project":null,"retrofit_proposed":null,"url":"https://lngatlas.org/terminal/jawa-satu-fsru-id/","data_source":"Data: Global Gas Infrastructure Tracker, Global Energy Monitor, September 2025"},{"terminal_slug":"jebel-ali-flng-terminal-ae","terminal_name":"Jebel Ali FLNG Terminal","country":"United Arab Emirates","country_iso":"AE","unit_name":null,"status":"operating","facility_type":"import","floating_type":"flng","capacity_mtpa":6,"capacity_bcm_y":8.16,"start_year":2010,"planned_start_year":null,"original_planned_start_year":null,"fid_year":null,"construction_year":null,"shelved_year":null,"cancelled_year":null,"stop_year":null,"estimated_cost_usd":null,"estimated_cost_original":null,"estimated_cost_currency":null,"power_stations_supplied":null,"floating_vessel_name":"FSRU Explorer","ccs_project":null,"hydrogen_project":null,"ammonia_project":null,"synthetic_lng_project":null,"retrofit_proposed":null,"url":"https://lngatlas.org/terminal/jebel-ali-flng-terminal-ae/","data_source":"Data: Global Gas Infrastructure Tracker, Global Energy Monitor, September 2025"},{"terminal_slug":"jeju-aewol-lng-terminal-kr","terminal_name":"Jeju Aewol LNG Terminal","country":"South Korea","country_iso":"KR","unit_name":null,"status":"operating","facility_type":"import","floating_type":"unknown","capacity_mtpa":1.1,"capacity_bcm_y":1.5,"start_year":2019,"planned_start_year":null,"original_planned_start_year":null,"fid_year":null,"construction_year":null,"shelved_year":null,"cancelled_year":null,"stop_year":null,"estimated_cost_usd":null,"estimated_cost_original":null,"estimated_cost_currency":null,"power_stations_supplied":null,"floating_vessel_name":null,"ccs_project":null,"hydrogen_project":null,"ammonia_project":null,"synthetic_lng_project":null,"retrofit_proposed":null,"url":"https://lngatlas.org/terminal/jeju-aewol-lng-terminal-kr/","data_source":"Data: Global Gas Infrastructure Tracker, Global Energy Monitor, September 2025"},{"terminal_slug":"jiangmen-guanghai-bay-lng-terminal-cn","terminal_name":"Jiangmen LNG Terminal","country":"China","country_iso":"CN","unit_name":"Phase 1","status":"shelved","facility_type":"import","floating_type":"unknown","capacity_mtpa":3,"capacity_bcm_y":4.08,"start_year":null,"planned_start_year":null,"original_planned_start_year":null,"fid_year":null,"construction_year":null,"shelved_year":2023,"cancelled_year":null,"stop_year":null,"estimated_cost_usd":null,"estimated_cost_original":null,"estimated_cost_currency":null,"power_stations_supplied":null,"floating_vessel_name":null,"ccs_project":null,"hydrogen_project":null,"ammonia_project":null,"synthetic_lng_project":null,"retrofit_proposed":null,"url":"https://lngatlas.org/terminal/jiangmen-guanghai-bay-lng-terminal-cn/","data_source":"Data: Global Gas Infrastructure Tracker, Global Energy Monitor, September 2025"},{"terminal_slug":"jiangmen-guanghai-bay-lng-terminal-cn","terminal_name":"Jiangmen LNG Terminal","country":"China","country_iso":"CN","unit_name":"Phase 2","status":"shelved","facility_type":"import","floating_type":"unknown","capacity_mtpa":6,"capacity_bcm_y":8.16,"start_year":null,"planned_start_year":null,"original_planned_start_year":null,"fid_year":null,"construction_year":null,"shelved_year":null,"cancelled_year":null,"stop_year":null,"estimated_cost_usd":null,"estimated_cost_original":null,"estimated_cost_currency":null,"power_stations_supplied":null,"floating_vessel_name":null,"ccs_project":null,"hydrogen_project":null,"ammonia_project":null,"synthetic_lng_project":null,"retrofit_proposed":null,"url":"https://lngatlas.org/terminal/jiangmen-guanghai-bay-lng-terminal-cn/","data_source":"Data: Global Gas Infrastructure Tracker, Global Energy Monitor, September 2025"},{"terminal_slug":"jiangyin-lng-terminal-garson-gas-cn","terminal_name":"Jiangyin LNG Terminal (Garson Gas)","country":"China","country_iso":"CN","unit_name":null,"status":"construction","facility_type":"import","floating_type":"unknown","capacity_mtpa":1,"capacity_bcm_y":1.36,"start_year":null,"planned_start_year":null,"original_planned_start_year":2022,"fid_year":null,"construction_year":2021,"shelved_year":null,"cancelled_year":null,"stop_year":null,"estimated_cost_usd":800000000,"estimated_cost_original":5000000000,"estimated_cost_currency":"RMB","power_stations_supplied":null,"floating_vessel_name":null,"ccs_project":null,"hydrogen_project":null,"ammonia_project":null,"synthetic_lng_project":null,"retrofit_proposed":null,"url":"https://lngatlas.org/terminal/jiangyin-lng-terminal-garson-gas-cn/","data_source":"Data: Global Gas Infrastructure Tracker, Global Energy Monitor, September 2025"},{"terminal_slug":"jiangyin-lng-terminal-hanas-cn","terminal_name":"Jiangyin LNG Terminal (Hanas)","country":"China","country_iso":"CN","unit_name":null,"status":"cancelled","facility_type":"import","floating_type":"unknown","capacity_mtpa":1,"capacity_bcm_y":1.36,"start_year":null,"planned_start_year":null,"original_planned_start_year":null,"fid_year":null,"construction_year":null,"shelved_year":2018,"cancelled_year":2020,"stop_year":2020,"estimated_cost_usd":600000000,"estimated_cost_original":600000000,"estimated_cost_currency":"USD","power_stations_supplied":null,"floating_vessel_name":null,"ccs_project":null,"hydrogen_project":null,"ammonia_project":null,"synthetic_lng_project":null,"retrofit_proposed":null,"url":"https://lngatlas.org/terminal/jiangyin-lng-terminal-hanas-cn/","data_source":"Data: Global Gas Infrastructure Tracker, Global Energy Monitor, September 2025"},{"terminal_slug":"jiangyin-lng-terminal-zhongtian-energy-cn","terminal_name":"Jiangyin LNG Terminal (Zhongtian Energy)","country":"China","country_iso":"CN","unit_name":null,"status":"shelved","facility_type":"import","floating_type":"unknown","capacity_mtpa":2,"capacity_bcm_y":2.72,"start_year":null,"planned_start_year":null,"original_planned_start_year":2021,"fid_year":null,"construction_year":null,"shelved_year":2023,"cancelled_year":null,"stop_year":null,"estimated_cost_usd":240000000,"estimated_cost_original":1500000000,"estimated_cost_currency":"RMB","power_stations_supplied":null,"floating_vessel_name":null,"ccs_project":null,"hydrogen_project":null,"ammonia_project":null,"synthetic_lng_project":null,"retrofit_proposed":null,"url":"https://lngatlas.org/terminal/jiangyin-lng-terminal-zhongtian-energy-cn/","data_source":"Data: Global Gas Infrastructure Tracker, Global Energy Monitor, September 2025"},{"terminal_slug":"jieyang-lng-terminal-petrochina-cn","terminal_name":"Jieyang LNG Terminal (PetroChina)","country":"China","country_iso":"CN","unit_name":"Phase 1","status":"shelved","facility_type":"import","floating_type":"unknown","capacity_mtpa":3,"capacity_bcm_y":4.08,"start_year":null,"planned_start_year":null,"original_planned_start_year":null,"fid_year":null,"construction_year":null,"shelved_year":null,"cancelled_year":null,"stop_year":null,"estimated_cost_usd":null,"estimated_cost_original":null,"estimated_cost_currency":null,"power_stations_supplied":null,"floating_vessel_name":null,"ccs_project":null,"hydrogen_project":null,"ammonia_project":null,"synthetic_lng_project":null,"retrofit_proposed":null,"url":"https://lngatlas.org/terminal/jieyang-lng-terminal-petrochina-cn/","data_source":"Data: Global Gas Infrastructure Tracker, Global Energy Monitor, September 2025"},{"terminal_slug":"jieyang-lng-terminal-pipechina-cn","terminal_name":"Jieyang LNG Terminal (PipeChina)","country":"China","country_iso":"CN","unit_name":"Phase 1","status":"operating","facility_type":"import","floating_type":"unknown","capacity_mtpa":5.04,"capacity_bcm_y":6.86,"start_year":2017,"planned_start_year":null,"original_planned_start_year":null,"fid_year":null,"construction_year":2013,"shelved_year":null,"cancelled_year":null,"stop_year":null,"estimated_cost_usd":1632000000,"estimated_cost_original":10200000000,"estimated_cost_currency":"RMB","power_stations_supplied":null,"floating_vessel_name":null,"ccs_project":null,"hydrogen_project":null,"ammonia_project":null,"synthetic_lng_project":null,"retrofit_proposed":null,"url":"https://lngatlas.org/terminal/jieyang-lng-terminal-pipechina-cn/","data_source":"Data: Global Gas Infrastructure Tracker, Global Energy Monitor, September 2025"},{"terminal_slug":"jieyang-lng-terminal-pipechina-cn","terminal_name":"Jieyang LNG Terminal (PipeChina)","country":"China","country_iso":"CN","unit_name":"Phase 2","status":"proposed","facility_type":"import","floating_type":"unknown","capacity_mtpa":5,"capacity_bcm_y":6.8,"start_year":null,"planned_start_year":null,"original_planned_start_year":null,"fid_year":null,"construction_year":null,"shelved_year":null,"cancelled_year":null,"stop_year":null,"estimated_cost_usd":null,"estimated_cost_original":null,"estimated_cost_currency":null,"power_stations_supplied":null,"floating_vessel_name":null,"ccs_project":null,"hydrogen_project":null,"ammonia_project":null,"synthetic_lng_project":null,"retrofit_proposed":null,"url":"https://lngatlas.org/terminal/jieyang-lng-terminal-pipechina-cn/","data_source":"Data: Global Gas Infrastructure Tracker, Global Energy Monitor, September 2025"},{"terminal_slug":"jinzhou-lng-terminal-cn","terminal_name":"Jinzhou FLNG Terminal","country":"China","country_iso":"CN","unit_name":null,"status":"cancelled","facility_type":"import","floating_type":"flng","capacity_mtpa":2.8,"capacity_bcm_y":3.81,"start_year":null,"planned_start_year":null,"original_planned_start_year":null,"fid_year":null,"construction_year":null,"shelved_year":null,"cancelled_year":2023,"stop_year":2023,"estimated_cost_usd":640000000,"estimated_cost_original":4000000000,"estimated_cost_currency":"RMB","power_stations_supplied":null,"floating_vessel_name":null,"ccs_project":null,"hydrogen_project":null,"ammonia_project":null,"synthetic_lng_project":null,"retrofit_proposed":null,"url":"https://lngatlas.org/terminal/jinzhou-lng-terminal-cn/","data_source":"Data: Global Gas Infrastructure Tracker, Global Energy Monitor, September 2025"},{"terminal_slug":"jiujiang-lng-terminal-cn","terminal_name":"Jiujiang LNG Terminal","country":"China","country_iso":"CN","unit_name":null,"status":"cancelled","facility_type":"import","floating_type":"unknown","capacity_mtpa":null,"capacity_bcm_y":null,"start_year":null,"planned_start_year":null,"original_planned_start_year":2023,"fid_year":null,"construction_year":null,"shelved_year":null,"cancelled_year":null,"stop_year":null,"estimated_cost_usd":null,"estimated_cost_original":null,"estimated_cost_currency":null,"power_stations_supplied":null,"floating_vessel_name":null,"ccs_project":null,"hydrogen_project":null,"ammonia_project":null,"synthetic_lng_project":null,"retrofit_proposed":null,"url":"https://lngatlas.org/terminal/jiujiang-lng-terminal-cn/","data_source":"Data: Global Gas Infrastructure Tracker, Global Energy Monitor, September 2025"},{"terminal_slug":"joetsu-lng-terminal-jp","terminal_name":"Joetsu LNG Terminal","country":"Japan","country_iso":"JP","unit_name":null,"status":"operating","facility_type":"import","floating_type":"unknown","capacity_mtpa":3.2,"capacity_bcm_y":4.35,"start_year":2012,"planned_start_year":null,"original_planned_start_year":null,"fid_year":null,"construction_year":null,"shelved_year":null,"cancelled_year":null,"stop_year":null,"estimated_cost_usd":null,"estimated_cost_original":null,"estimated_cost_currency":null,"power_stations_supplied":null,"floating_vessel_name":null,"ccs_project":null,"hydrogen_project":null,"ammonia_project":null,"synthetic_lng_project":null,"retrofit_proposed":null,"url":"https://lngatlas.org/terminal/joetsu-lng-terminal-jp/","data_source":"Data: Global Gas Infrastructure Tracker, Global Energy Monitor, September 2025"},{"terminal_slug":"jordan-cove-lng-terminal-us","terminal_name":"Jordan Cove LNG Terminal","country":"United States","country_iso":"US","unit_name":"T1-T5","status":"cancelled","facility_type":"export","floating_type":"unknown","capacity_mtpa":7.5,"capacity_bcm_y":10.2,"start_year":null,"planned_start_year":2025,"original_planned_start_year":2024,"fid_year":null,"construction_year":null,"shelved_year":null,"cancelled_year":2021,"stop_year":2021,"estimated_cost_usd":null,"estimated_cost_original":null,"estimated_cost_currency":null,"power_stations_supplied":null,"floating_vessel_name":null,"ccs_project":null,"hydrogen_project":null,"ammonia_project":null,"synthetic_lng_project":null,"retrofit_proposed":null,"url":"https://lngatlas.org/terminal/jordan-cove-lng-terminal-us/","data_source":"Data: Global Gas Infrastructure Tracker, Global Energy Monitor, September 2025"},{"terminal_slug":"jorf-lasfar-lng-terminal-ma","terminal_name":"Jorf Lasfar LNG Terminal","country":"Morocco","country_iso":"MA","unit_name":null,"status":"proposed","facility_type":"import","floating_type":"unknown","capacity_mtpa":5.14,"capacity_bcm_y":6.99,"start_year":null,"planned_start_year":null,"original_planned_start_year":2025,"fid_year":null,"construction_year":null,"shelved_year":null,"cancelled_year":null,"stop_year":null,"estimated_cost_usd":800000000,"estimated_cost_original":800000000,"estimated_cost_currency":"USD","power_stations_supplied":null,"floating_vessel_name":null,"ccs_project":null,"hydrogen_project":null,"ammonia_project":null,"synthetic_lng_project":null,"retrofit_proposed":null,"url":"https://lngatlas.org/terminal/jorf-lasfar-lng-terminal-ma/","data_source":"Data: Global Gas Infrastructure Tracker, Global Energy Monitor, September 2025"},{"terminal_slug":"kogas-dangjin-lng-terminal-kr","terminal_name":"KOGAS Dangjin LNG Terminal","country":"South Korea","country_iso":"KR","unit_name":"Phase 1","status":"construction","facility_type":"import","floating_type":"unknown","capacity_mtpa":6,"capacity_bcm_y":8.16,"start_year":null,"planned_start_year":2027,"original_planned_start_year":2031,"fid_year":null,"construction_year":null,"shelved_year":null,"cancelled_year":null,"stop_year":null,"estimated_cost_usd":null,"estimated_cost_original":null,"estimated_cost_currency":null,"power_stations_supplied":null,"floating_vessel_name":null,"ccs_project":null,"hydrogen_project":null,"ammonia_project":null,"synthetic_lng_project":null,"retrofit_proposed":null,"url":"https://lngatlas.org/terminal/kogas-dangjin-lng-terminal-kr/","data_source":"Data: Global Gas Infrastructure Tracker, Global Energy Monitor, September 2025"},{"terminal_slug":"kogas-dangjin-lng-terminal-kr","terminal_name":"KOGAS Dangjin LNG Terminal","country":"South Korea","country_iso":"KR","unit_name":"Phase 2","status":"proposed","facility_type":"import","floating_type":"unknown","capacity_mtpa":7.7,"capacity_bcm_y":10.48,"start_year":null,"planned_start_year":null,"original_planned_start_year":2029,"fid_year":null,"construction_year":null,"shelved_year":null,"cancelled_year":null,"stop_year":null,"estimated_cost_usd":null,"estimated_cost_original":null,"estimated_cost_currency":null,"power_stations_supplied":null,"floating_vessel_name":null,"ccs_project":null,"hydrogen_project":null,"ammonia_project":null,"synthetic_lng_project":null,"retrofit_proposed":null,"url":"https://lngatlas.org/terminal/kogas-dangjin-lng-terminal-kr/","data_source":"Data: Global Gas Infrastructure Tracker, Global Energy Monitor, September 2025"},{"terminal_slug":"kagoshima-lng-terminal-jp","terminal_name":"Kagoshima LNG Terminal","country":"Japan","country_iso":"JP","unit_name":null,"status":"operating","facility_type":"import","floating_type":"unknown","capacity_mtpa":0.2,"capacity_bcm_y":0.27,"start_year":1996,"planned_start_year":null,"original_planned_start_year":null,"fid_year":null,"construction_year":null,"shelved_year":null,"cancelled_year":null,"stop_year":null,"estimated_cost_usd":null,"estimated_cost_original":null,"estimated_cost_currency":null,"power_stations_supplied":null,"floating_vessel_name":null,"ccs_project":null,"hydrogen_project":null,"ammonia_project":null,"synthetic_lng_project":null,"retrofit_proposed":null,"url":"https://lngatlas.org/terminal/kagoshima-lng-terminal-jp/","data_source":"Data: Global Gas Infrastructure Tracker, Global Energy Monitor, September 2025"},{"terminal_slug":"kanbauk-fsru-mm","terminal_name":"Kanbauk FSRU","country":"Myanmar","country_iso":"MM","unit_name":null,"status":"cancelled","facility_type":"import","floating_type":"fsru","capacity_mtpa":4,"capacity_bcm_y":5.44,"start_year":null,"planned_start_year":null,"original_planned_start_year":2024,"fid_year":null,"construction_year":null,"shelved_year":2021,"cancelled_year":2023,"stop_year":2023,"estimated_cost_usd":2100000000,"estimated_cost_original":2100000000,"estimated_cost_currency":"USD","power_stations_supplied":"Kanbauk power station","floating_vessel_name":null,"ccs_project":null,"hydrogen_project":null,"ammonia_project":null,"synthetic_lng_project":null,"retrofit_proposed":null,"url":"https://lngatlas.org/terminal/kanbauk-fsru-mm/","data_source":"Data: Global Gas Infrastructure Tracker, Global Energy Monitor, September 2025"},{"terminal_slug":"kangan-lng-terminal-ir","terminal_name":"Kangan LNG Terminal","country":"Iran","country_iso":"IR","unit_name":null,"status":"cancelled","facility_type":"export","floating_type":"unknown","capacity_mtpa":2,"capacity_bcm_y":2.72,"start_year":null,"planned_start_year":null,"original_planned_start_year":2024,"fid_year":null,"construction_year":null,"shelved_year":null,"cancelled_year":2022,"stop_year":2022,"estimated_cost_usd":null,"estimated_cost_original":null,"estimated_cost_currency":null,"power_stations_supplied":null,"floating_vessel_name":null,"ccs_project":null,"hydrogen_project":null,"ammonia_project":null,"synthetic_lng_project":null,"retrofit_proposed":null,"url":"https://lngatlas.org/terminal/kangan-lng-terminal-ir/","data_source":"Data: Global Gas Infrastructure Tracker, Global Energy Monitor, September 2025"},{"terminal_slug":"kara-lng-terminal-ru","terminal_name":"Kara LNG Terminal","country":"Russia","country_iso":"RU","unit_name":null,"status":"proposed","facility_type":"export","floating_type":"unknown","capacity_mtpa":22.5,"capacity_bcm_y":30.61,"start_year":null,"planned_start_year":null,"original_planned_start_year":2030,"fid_year":null,"construction_year":null,"shelved_year":null,"cancelled_year":null,"stop_year":null,"estimated_cost_usd":null,"estimated_cost_original":null,"estimated_cost_currency":null,"power_stations_supplied":null,"floating_vessel_name":null,"ccs_project":null,"hydrogen_project":null,"ammonia_project":null,"synthetic_lng_project":null,"retrofit_proposed":null,"url":"https://lngatlas.org/terminal/kara-lng-terminal-ru/","data_source":"Data: Global Gas Infrastructure Tracker, Global Energy Monitor, September 2025"},{"terminal_slug":"karaikal-fsru-in","terminal_name":"Karaikal FSRU","country":"India","country_iso":"IN","unit_name":"Phase 1","status":"proposed","facility_type":"import","floating_type":"fsru","capacity_mtpa":1,"capacity_bcm_y":1.36,"start_year":null,"planned_start_year":2026,"original_planned_start_year":2022,"fid_year":null,"construction_year":null,"shelved_year":null,"cancelled_year":null,"stop_year":null,"estimated_cost_usd":null,"estimated_cost_original":null,"estimated_cost_currency":null,"power_stations_supplied":null,"floating_vessel_name":"FSU Ghasha","ccs_project":null,"hydrogen_project":null,"ammonia_project":null,"synthetic_lng_project":null,"retrofit_proposed":null,"url":"https://lngatlas.org/terminal/karaikal-fsru-in/","data_source":"Data: Global Gas Infrastructure Tracker, Global Energy Monitor, September 2025"},{"terminal_slug":"karaikal-fsru-in","terminal_name":"Karaikal FSRU","country":"India","country_iso":"IN","unit_name":"Phase 2","status":"proposed","facility_type":"import","floating_type":"fsru","capacity_mtpa":2,"capacity_bcm_y":2.72,"start_year":null,"planned_start_year":null,"original_planned_start_year":null,"fid_year":null,"construction_year":null,"shelved_year":null,"cancelled_year":null,"stop_year":null,"estimated_cost_usd":null,"estimated_cost_original":null,"estimated_cost_currency":null,"power_stations_supplied":null,"floating_vessel_name":"FSU Ghasha","ccs_project":null,"hydrogen_project":null,"ammonia_project":null,"synthetic_lng_project":null,"retrofit_proposed":null,"url":"https://lngatlas.org/terminal/karaikal-fsru-in/","data_source":"Data: Global Gas Infrastructure Tracker, Global Energy Monitor, September 2025"},{"terminal_slug":"karimun-island-lng-terminal-id","terminal_name":"Karimun Island LNG Terminal","country":"Indonesia","country_iso":"ID","unit_name":null,"status":"cancelled","facility_type":"import","floating_type":"unknown","capacity_mtpa":null,"capacity_bcm_y":null,"start_year":null,"planned_start_year":null,"original_planned_start_year":2024,"fid_year":null,"construction_year":null,"shelved_year":2023,"cancelled_year":null,"stop_year":null,"estimated_cost_usd":700000000,"estimated_cost_original":700000000,"estimated_cost_currency":"USD","power_stations_supplied":null,"floating_vessel_name":null,"ccs_project":null,"hydrogen_project":null,"ammonia_project":null,"synthetic_lng_project":null,"retrofit_proposed":null,"url":"https://lngatlas.org/terminal/karimun-island-lng-terminal-id/","data_source":"Data: Global Gas Infrastructure Tracker, Global Energy Monitor, September 2025"},{"terminal_slug":"karmol-dakar-fsru-sn","terminal_name":"Karmol Dakar FSRU","country":"Senegal","country_iso":"SN","unit_name":null,"status":"construction","facility_type":"import","floating_type":"fsru","capacity_mtpa":2.5,"capacity_bcm_y":3.4,"start_year":null,"planned_start_year":2025,"original_planned_start_year":2023,"fid_year":null,"construction_year":2021,"shelved_year":null,"cancelled_year":null,"stop_year":null,"estimated_cost_usd":null,"estimated_cost_original":null,"estimated_cost_currency":null,"power_stations_supplied":null,"floating_vessel_name":"Karmol LNGT Powership","ccs_project":null,"hydrogen_project":null,"ammonia_project":null,"synthetic_lng_project":null,"retrofit_proposed":null,"url":"https://lngatlas.org/terminal/karmol-dakar-fsru-sn/","data_source":"Data: Global Gas Infrastructure Tracker, Global Energy Monitor, September 2025"},{"terminal_slug":"karwar-fsru-in","terminal_name":"Karwar FSRU","country":"India","country_iso":"IN","unit_name":null,"status":"cancelled","facility_type":"import","floating_type":"fsru","capacity_mtpa":7,"capacity_bcm_y":9.52,"start_year":null,"planned_start_year":null,"original_planned_start_year":2018,"fid_year":null,"construction_year":null,"shelved_year":2019,"cancelled_year":2021,"stop_year":2021,"estimated_cost_usd":null,"estimated_cost_original":null,"estimated_cost_currency":null,"power_stations_supplied":null,"floating_vessel_name":null,"ccs_project":null,"hydrogen_project":null,"ammonia_project":null,"synthetic_lng_project":null,"retrofit_proposed":null,"url":"https://lngatlas.org/terminal/karwar-fsru-in/","data_source":"Data: Global Gas Infrastructure Tracker, Global Energy Monitor, September 2025"},{"terminal_slug":"kawagoe-lng-terminal-jp","terminal_name":"Kawagoe LNG Terminal","country":"Japan","country_iso":"JP","unit_name":null,"status":"operating","facility_type":"import","floating_type":"unknown","capacity_mtpa":8.7,"capacity_bcm_y":11.84,"start_year":1997,"planned_start_year":null,"original_planned_start_year":null,"fid_year":null,"construction_year":null,"shelved_year":null,"cancelled_year":null,"stop_year":null,"estimated_cost_usd":null,"estimated_cost_original":null,"estimated_cost_currency":null,"power_stations_supplied":null,"floating_vessel_name":null,"ccs_project":null,"hydrogen_project":null,"ammonia_project":null,"synthetic_lng_project":null,"retrofit_proposed":null,"url":"https://lngatlas.org/terminal/kawagoe-lng-terminal-jp/","data_source":"Data: Global Gas Infrastructure Tracker, Global Energy Monitor, September 2025"},{"terminal_slug":"kemaman-lng-terminal-my","terminal_name":"Kemaman LNG Terminal","country":"Malaysia","country_iso":"MY","unit_name":null,"status":"proposed","facility_type":"import","floating_type":"unknown","capacity_mtpa":null,"capacity_bcm_y":null,"start_year":null,"planned_start_year":null,"original_planned_start_year":2028,"fid_year":2025,"construction_year":null,"shelved_year":null,"cancelled_year":null,"stop_year":null,"estimated_cost_usd":null,"estimated_cost_original":null,"estimated_cost_currency":null,"power_stations_supplied":null,"floating_vessel_name":null,"ccs_project":null,"hydrogen_project":null,"ammonia_project":null,"synthetic_lng_project":null,"retrofit_proposed":null,"url":"https://lngatlas.org/terminal/kemaman-lng-terminal-my/","data_source":"Data: Global Gas Infrastructure Tracker, Global Energy Monitor, September 2025"},{"terminal_slug":"kenai-lng-terminal-us","terminal_name":"Kenai LNG Terminal","country":"United States","country_iso":"US","unit_name":"Export Terminal","status":"mothballed","facility_type":"export","floating_type":"unknown","capacity_mtpa":1.5,"capacity_bcm_y":2.04,"start_year":1969,"planned_start_year":null,"original_planned_start_year":null,"fid_year":null,"construction_year":null,"shelved_year":null,"cancelled_year":null,"stop_year":2017,"estimated_cost_usd":null,"estimated_cost_original":null,"estimated_cost_currency":null,"power_stations_supplied":null,"floating_vessel_name":null,"ccs_project":null,"hydrogen_project":null,"ammonia_project":null,"synthetic_lng_project":null,"retrofit_proposed":null,"url":"https://lngatlas.org/terminal/kenai-lng-terminal-us/","data_source":"Data: Global Gas Infrastructure Tracker, Global Energy Monitor, September 2025"},{"terminal_slug":"kenai-lng-terminal-us","terminal_name":"Kenai LNG Terminal","country":"United States","country_iso":"US","unit_name":"Import Terminal","status":"proposed","facility_type":"import","floating_type":"unknown","capacity_mtpa":0.08,"capacity_bcm_y":0.11,"start_year":null,"planned_start_year":2028,"original_planned_start_year":2025,"fid_year":null,"construction_year":null,"shelved_year":null,"cancelled_year":null,"stop_year":null,"estimated_cost_usd":null,"estimated_cost_original":null,"estimated_cost_currency":null,"power_stations_supplied":null,"floating_vessel_name":null,"ccs_project":null,"hydrogen_project":null,"ammonia_project":null,"synthetic_lng_project":null,"retrofit_proposed":null,"url":"https://lngatlas.org/terminal/kenai-lng-terminal-us/","data_source":"Data: Global Gas Infrastructure Tracker, Global Energy Monitor, September 2025"},{"terminal_slug":"kerawalapitiya-lng-terminal-lk","terminal_name":"Kerawalapitiya LNG Terminal","country":"Sri Lanka","country_iso":"LK","unit_name":null,"status":"proposed","facility_type":"import","floating_type":"unknown","capacity_mtpa":2.7,"capacity_bcm_y":3.67,"start_year":null,"planned_start_year":2028,"original_planned_start_year":2021,"fid_year":null,"construction_year":null,"shelved_year":2021,"cancelled_year":null,"stop_year":null,"estimated_cost_usd":250000000,"estimated_cost_original":250000000,"estimated_cost_currency":"USD","power_stations_supplied":"Kerawalapitiya LNG power station","floating_vessel_name":null,"ccs_project":null,"hydrogen_project":null,"ammonia_project":null,"synthetic_lng_project":null,"retrofit_proposed":null,"url":"https://lngatlas.org/terminal/kerawalapitiya-lng-terminal-lk/","data_source":"Data: Global Gas Infrastructure Tracker, Global Energy Monitor, September 2025"},{"terminal_slug":"keyspan-lng-terminal-us","terminal_name":"Keyspan LNG Terminal","country":"United States","country_iso":"US","unit_name":null,"status":"cancelled","facility_type":"import","floating_type":"unknown","capacity_mtpa":4,"capacity_bcm_y":5.44,"start_year":null,"planned_start_year":null,"original_planned_start_year":null,"fid_year":null,"construction_year":null,"shelved_year":2006,"cancelled_year":2007,"stop_year":2007,"estimated_cost_usd":null,"estimated_cost_original":null,"estimated_cost_currency":null,"power_stations_supplied":null,"floating_vessel_name":null,"ccs_project":null,"hydrogen_project":null,"ammonia_project":null,"synthetic_lng_project":null,"retrofit_proposed":null,"url":"https://lngatlas.org/terminal/keyspan-lng-terminal-us/","data_source":"Data: Global Gas Infrastructure Tracker, Global Energy Monitor, September 2025"},{"terminal_slug":"khabarovskiy-lng-terminal-ru","terminal_name":"Khabarovskiy LNG Terminal","country":"Russia","country_iso":"RU","unit_name":null,"status":"proposed","facility_type":"export","floating_type":"unknown","capacity_mtpa":0.08,"capacity_bcm_y":0.11,"start_year":null,"planned_start_year":2026,"original_planned_start_year":2025,"fid_year":null,"construction_year":null,"shelved_year":null,"cancelled_year":null,"stop_year":null,"estimated_cost_usd":40000000,"estimated_cost_original":40000000,"estimated_cost_currency":"USD","power_stations_supplied":null,"floating_vessel_name":null,"ccs_project":null,"hydrogen_project":null,"ammonia_project":null,"synthetic_lng_project":null,"retrofit_proposed":null,"url":"https://lngatlas.org/terminal/khabarovskiy-lng-terminal-ru/","data_source":"Data: Global Gas Infrastructure Tracker, Global Energy Monitor, September 2025"},{"terminal_slug":"khanh-hoa-lng-terminal-vn","terminal_name":"Khanh Hoa LNG Terminal","country":"Vietnam","country_iso":"VN","unit_name":null,"status":"shelved","facility_type":"import","floating_type":"unknown","capacity_mtpa":null,"capacity_bcm_y":null,"start_year":null,"planned_start_year":null,"original_planned_start_year":2030,"fid_year":null,"construction_year":null,"shelved_year":2023,"cancelled_year":null,"stop_year":null,"estimated_cost_usd":null,"estimated_cost_original":null,"estimated_cost_currency":null,"power_stations_supplied":null,"floating_vessel_name":null,"ccs_project":null,"hydrogen_project":null,"ammonia_project":null,"synthetic_lng_project":null,"retrofit_proposed":null,"url":"https://lngatlas.org/terminal/khanh-hoa-lng-terminal-vn/","data_source":"Data: Global Gas Infrastructure Tracker, Global Energy Monitor, September 2025"},{"terminal_slug":"khor-al-zubair-fsru-iq","terminal_name":"Khor Al-Zubair FSRU","country":"Iraq","country_iso":"IQ","unit_name":null,"status":"proposed","facility_type":"import","floating_type":"fsru","capacity_mtpa":3.83,"capacity_bcm_y":5.21,"start_year":null,"planned_start_year":null,"original_planned_start_year":2025,"fid_year":null,"construction_year":null,"shelved_year":null,"cancelled_year":null,"stop_year":null,"estimated_cost_usd":null,"estimated_cost_original":null,"estimated_cost_currency":null,"power_stations_supplied":null,"floating_vessel_name":null,"ccs_project":null,"hydrogen_project":null,"ammonia_project":null,"synthetic_lng_project":null,"retrofit_proposed":null,"url":"https://lngatlas.org/terminal/khor-al-zubair-fsru-iq/","data_source":"Data: Global Gas Infrastructure Tracker, Global Energy Monitor, September 2025"},{"terminal_slug":"kitimat-lng-terminal-ca","terminal_name":"Kitimat LNG Terminal","country":"Canada","country_iso":"CA","unit_name":"T1-T3","status":"cancelled","facility_type":"export","floating_type":"unknown","capacity_mtpa":18,"capacity_bcm_y":24.49,"start_year":null,"planned_start_year":null,"original_planned_start_year":2029,"fid_year":2023,"construction_year":null,"shelved_year":null,"cancelled_year":2021,"stop_year":2021,"estimated_cost_usd":null,"estimated_cost_original":null,"estimated_cost_currency":null,"power_stations_supplied":null,"floating_vessel_name":null,"ccs_project":null,"hydrogen_project":null,"ammonia_project":null,"synthetic_lng_project":null,"retrofit_proposed":null,"url":"https://lngatlas.org/terminal/kitimat-lng-terminal-ca/","data_source":"Data: Global Gas Infrastructure Tracker, Global Energy Monitor, September 2025"},{"terminal_slug":"kitsault-lng-terminal-ca","terminal_name":"Kitsault LNG Terminal","country":"Canada","country_iso":"CA","unit_name":"T1-T4","status":"cancelled","facility_type":"export","floating_type":"unknown","capacity_mtpa":20,"capacity_bcm_y":27.21,"start_year":null,"planned_start_year":null,"original_planned_start_year":null,"fid_year":null,"construction_year":null,"shelved_year":2007,"cancelled_year":2009,"stop_year":2009,"estimated_cost_usd":null,"estimated_cost_original":null,"estimated_cost_currency":null,"power_stations_supplied":null,"floating_vessel_name":null,"ccs_project":null,"hydrogen_project":null,"ammonia_project":null,"synthetic_lng_project":null,"retrofit_proposed":null,"url":"https://lngatlas.org/terminal/kitsault-lng-terminal-ca/","data_source":"Data: Global Gas Infrastructure Tracker, Global Energy Monitor, September 2025"},{"terminal_slug":"kiyanly-lng-terminal-tm","terminal_name":"Kiyanly LNG Terminal","country":"Turkmenistan","country_iso":"TM","unit_name":null,"status":"operating","facility_type":"export","floating_type":"unknown","capacity_mtpa":0.2,"capacity_bcm_y":0.27,"start_year":2009,"planned_start_year":null,"original_planned_start_year":null,"fid_year":null,"construction_year":null,"shelved_year":null,"cancelled_year":null,"stop_year":null,"estimated_cost_usd":null,"estimated_cost_original":null,"estimated_cost_currency":null,"power_stations_supplied":null,"floating_vessel_name":null,"ccs_project":null,"hydrogen_project":null,"ammonia_project":null,"synthetic_lng_project":null,"retrofit_proposed":null,"url":"https://lngatlas.org/terminal/kiyanly-lng-terminal-tm/","data_source":"Data: Global Gas Infrastructure Tracker, Global Energy Monitor, September 2025"},{"terminal_slug":"klaipeda-fsru-lt","terminal_name":"Klaipeda FSRU","country":"Lithuania","country_iso":"LT","unit_name":null,"status":"operating","facility_type":"import","floating_type":"fsru","capacity_mtpa":2.9,"capacity_bcm_y":3.95,"start_year":2014,"planned_start_year":null,"original_planned_start_year":null,"fid_year":null,"construction_year":2012,"shelved_year":null,"cancelled_year":null,"stop_year":null,"estimated_cost_usd":114800000,"estimated_cost_original":350000000,"estimated_cost_currency":"LTL","power_stations_supplied":null,"floating_vessel_name":"Independence","ccs_project":null,"hydrogen_project":null,"ammonia_project":null,"synthetic_lng_project":null,"retrofit_proposed":null,"url":"https://lngatlas.org/terminal/klaipeda-fsru-lt/","data_source":"Data: Global Gas Infrastructure Tracker, Global Energy Monitor, September 2025"},{"terminal_slug":"klaipeda-fsru-lt","terminal_name":"Klaipeda FSRU","country":"Lithuania","country_iso":"LT","unit_name":"Expansion","status":"shelved","facility_type":"import","floating_type":"fsru","capacity_mtpa":1.84,"capacity_bcm_y":2.5,"start_year":null,"planned_start_year":null,"original_planned_start_year":2026,"fid_year":null,"construction_year":null,"shelved_year":2023,"cancelled_year":null,"stop_year":null,"estimated_cost_usd":null,"estimated_cost_original":null,"estimated_cost_currency":null,"power_stations_supplied":null,"floating_vessel_name":"Independence","ccs_project":null,"hydrogen_project":null,"ammonia_project":null,"synthetic_lng_project":null,"retrofit_proposed":null,"url":"https://lngatlas.org/terminal/klaipeda-fsru-lt/","data_source":"Data: Global Gas Infrastructure Tracker, Global Energy Monitor, September 2025"},{"terminal_slug":"klaipeda-small-scale-lng-terminal-lt","terminal_name":"Klaipeda Small-Scale LNG Terminal","country":"Lithuania","country_iso":"LT","unit_name":null,"status":"operating","facility_type":"unknown","floating_type":"unknown","capacity_mtpa":null,"capacity_bcm_y":null,"start_year":2020,"planned_start_year":null,"original_planned_start_year":null,"fid_year":null,"construction_year":null,"shelved_year":null,"cancelled_year":null,"stop_year":null,"estimated_cost_usd":null,"estimated_cost_original":null,"estimated_cost_currency":null,"power_stations_supplied":null,"floating_vessel_name":null,"ccs_project":null,"hydrogen_project":null,"ammonia_project":null,"synthetic_lng_project":null,"retrofit_proposed":null,"url":"https://lngatlas.org/terminal/klaipeda-small-scale-lng-terminal-lt/","data_source":"Data: Global Gas Infrastructure Tracker, Global Energy Monitor, September 2025"},{"terminal_slug":"kochi-lng-terminal-in","terminal_name":"Kochi LNG Terminal","country":"India","country_iso":"IN","unit_name":null,"status":"operating","facility_type":"import","floating_type":"unknown","capacity_mtpa":5,"capacity_bcm_y":6.8,"start_year":2013,"planned_start_year":null,"original_planned_start_year":null,"fid_year":null,"construction_year":null,"shelved_year":null,"cancelled_year":null,"stop_year":null,"estimated_cost_usd":null,"estimated_cost_original":null,"estimated_cost_currency":null,"power_stations_supplied":null,"floating_vessel_name":null,"ccs_project":null,"hydrogen_project":null,"ammonia_project":null,"synthetic_lng_project":null,"retrofit_proposed":null,"url":"https://lngatlas.org/terminal/kochi-lng-terminal-in/","data_source":"Data: Global Gas Infrastructure Tracker, Global Energy Monitor, September 2025"},{"terminal_slug":"kollsnes-lng-terminal-no","terminal_name":"Kollsnes LNG Terminal","country":"Norway","country_iso":"NO","unit_name":null,"status":"operating","facility_type":"export","floating_type":"unknown","capacity_mtpa":0.04,"capacity_bcm_y":0.05,"start_year":2003,"planned_start_year":null,"original_planned_start_year":null,"fid_year":null,"construction_year":null,"shelved_year":null,"cancelled_year":null,"stop_year":null,"estimated_cost_usd":null,"estimated_cost_original":null,"estimated_cost_currency":null,"power_stations_supplied":null,"floating_vessel_name":null,"ccs_project":null,"hydrogen_project":null,"ammonia_project":null,"synthetic_lng_project":null,"retrofit_proposed":null,"url":"https://lngatlas.org/terminal/kollsnes-lng-terminal-no/","data_source":"Data: Global Gas Infrastructure Tracker, Global Energy Monitor, September 2025"},{"terminal_slug":"kollsnes-lng-terminal-no","terminal_name":"Kollsnes LNG Terminal","country":"Norway","country_iso":"NO","unit_name":"Expansion","status":"operating","facility_type":"export","floating_type":"unknown","capacity_mtpa":0.08,"capacity_bcm_y":0.11,"start_year":2007,"planned_start_year":null,"original_planned_start_year":null,"fid_year":null,"construction_year":null,"shelved_year":null,"cancelled_year":null,"stop_year":null,"estimated_cost_usd":null,"estimated_cost_original":null,"estimated_cost_currency":null,"power_stations_supplied":null,"floating_vessel_name":null,"ccs_project":null,"hydrogen_project":null,"ammonia_project":null,"synthetic_lng_project":null,"retrofit_proposed":null,"url":"https://lngatlas.org/terminal/kollsnes-lng-terminal-no/","data_source":"Data: Global Gas Infrastructure Tracker, Global Energy Monitor, September 2025"},{"terminal_slug":"krishna-godavari-fsru-in","terminal_name":"Krishna Godavari FSRU","country":"India","country_iso":"IN","unit_name":null,"status":"cancelled","facility_type":"import","floating_type":"fsru","capacity_mtpa":4.7,"capacity_bcm_y":6.39,"start_year":null,"planned_start_year":null,"original_planned_start_year":null,"fid_year":null,"construction_year":null,"shelved_year":2019,"cancelled_year":2021,"stop_year":2021,"estimated_cost_usd":347100000,"estimated_cost_original":26700000000,"estimated_cost_currency":"INR","power_stations_supplied":null,"floating_vessel_name":null,"ccs_project":null,"hydrogen_project":null,"ammonia_project":null,"synthetic_lng_project":null,"retrofit_proposed":null,"url":"https://lngatlas.org/terminal/krishna-godavari-fsru-in/","data_source":"Data: Global Gas Infrastructure Tracker, Global Energy Monitor, September 2025"},{"terminal_slug":"krishnapatnam-fsru-in","terminal_name":"Krishnapatnam FSRU","country":"India","country_iso":"IN","unit_name":null,"status":"cancelled","facility_type":"import","floating_type":"fsru","capacity_mtpa":1,"capacity_bcm_y":1.36,"start_year":null,"planned_start_year":null,"original_planned_start_year":2022,"fid_year":null,"construction_year":null,"shelved_year":2022,"cancelled_year":null,"stop_year":null,"estimated_cost_usd":223000000,"estimated_cost_original":223000000,"estimated_cost_currency":"USD","power_stations_supplied":null,"floating_vessel_name":null,"ccs_project":null,"hydrogen_project":null,"ammonia_project":null,"synthetic_lng_project":null,"retrofit_proposed":null,"url":"https://lngatlas.org/terminal/krishnapatnam-fsru-in/","data_source":"Data: Global Gas Infrastructure Tracker, Global Energy Monitor, September 2025"},{"terminal_slug":"krk-fsru-hr","terminal_name":"Krk FSRU","country":"Croatia","country_iso":"HR","unit_name":null,"status":"operating","facility_type":"import","floating_type":"fsru","capacity_mtpa":1.91,"capacity_bcm_y":2.6,"start_year":2021,"planned_start_year":null,"original_planned_start_year":null,"fid_year":2019,"construction_year":null,"shelved_year":null,"cancelled_year":null,"stop_year":null,"estimated_cost_usd":254624000,"estimated_cost_original":233600000,"estimated_cost_currency":"EUR","power_stations_supplied":null,"floating_vessel_name":null,"ccs_project":null,"hydrogen_project":null,"ammonia_project":null,"synthetic_lng_project":null,"retrofit_proposed":null,"url":"https://lngatlas.org/terminal/krk-fsru-hr/","data_source":"Data: Global Gas Infrastructure Tracker, Global Energy Monitor, September 2025"},{"terminal_slug":"krk-fsru-hr","terminal_name":"Krk FSRU","country":"Croatia","country_iso":"HR","unit_name":"2022 Capacity Expansion","status":"operating","facility_type":"import","floating_type":"fsru","capacity_mtpa":0.22,"capacity_bcm_y":0.3,"start_year":2022,"planned_start_year":null,"original_planned_start_year":null,"fid_year":null,"construction_year":null,"shelved_year":null,"cancelled_year":null,"stop_year":null,"estimated_cost_usd":null,"estimated_cost_original":null,"estimated_cost_currency":null,"power_stations_supplied":null,"floating_vessel_name":null,"ccs_project":null,"hydrogen_project":null,"ammonia_project":null,"synthetic_lng_project":null,"retrofit_proposed":null,"url":"https://lngatlas.org/terminal/krk-fsru-hr/","data_source":"Data: Global Gas Infrastructure Tracker, Global Energy Monitor, September 2025"},{"terminal_slug":"krk-fsru-hr","terminal_name":"Krk FSRU","country":"Croatia","country_iso":"HR","unit_name":"Phase 1 Expansion","status":"construction","facility_type":"import","floating_type":"fsru","capacity_mtpa":2.35,"capacity_bcm_y":3.2,"start_year":null,"planned_start_year":2025,"original_planned_start_year":2024,"fid_year":2022,"construction_year":2023,"shelved_year":null,"cancelled_year":null,"stop_year":null,"estimated_cost_usd":27250000,"estimated_cost_original":25000000,"estimated_cost_currency":"EUR","power_stations_supplied":null,"floating_vessel_name":null,"ccs_project":null,"hydrogen_project":null,"ammonia_project":null,"synthetic_lng_project":null,"retrofit_proposed":null,"url":"https://lngatlas.org/terminal/krk-fsru-hr/","data_source":"Data: Global Gas Infrastructure Tracker, Global Energy Monitor, September 2025"},{"terminal_slug":"krk-fsru-hr","terminal_name":"Krk FSRU","country":"Croatia","country_iso":"HR","unit_name":"Phase 2 Expansion (Onshore)","status":"proposed","facility_type":"import","floating_type":"fsru","capacity_mtpa":3.01,"capacity_bcm_y":4.1,"start_year":null,"planned_start_year":null,"original_planned_start_year":2030,"fid_year":null,"construction_year":null,"shelved_year":null,"cancelled_year":null,"stop_year":null,"estimated_cost_usd":null,"estimated_cost_original":null,"estimated_cost_currency":null,"power_stations_supplied":null,"floating_vessel_name":null,"ccs_project":null,"hydrogen_project":null,"ammonia_project":null,"synthetic_lng_project":null,"retrofit_proposed":null,"url":"https://lngatlas.org/terminal/krk-fsru-hr/","data_source":"Data: Global Gas Infrastructure Tracker, Global Energy Monitor, September 2025"},{"terminal_slug":"ksi-lisims-flng-terminal-ca","terminal_name":"Ksi Lisims FLNG Terminal","country":"Canada","country_iso":"CA","unit_name":null,"status":"proposed","facility_type":"export","floating_type":"flng","capacity_mtpa":12,"capacity_bcm_y":16.33,"start_year":null,"planned_start_year":2029,"original_planned_start_year":2027,"fid_year":2025,"construction_year":null,"shelved_year":null,"cancelled_year":null,"stop_year":null,"estimated_cost_usd":10000000000,"estimated_cost_original":10000000000,"estimated_cost_currency":"USD","power_stations_supplied":null,"floating_vessel_name":null,"ccs_project":null,"hydrogen_project":null,"ammonia_project":null,"synthetic_lng_project":null,"retrofit_proposed":null,"url":"https://lngatlas.org/terminal/ksi-lisims-flng-terminal-ca/","data_source":"Data: Global Gas Infrastructure Tracker, Global Energy Monitor, September 2025"},{"terminal_slug":"kukrahati-lng-terminal-in","terminal_name":"Kukrahati LNG Terminal","country":"India","country_iso":"IN","unit_name":null,"status":"cancelled","facility_type":"import","floating_type":"unknown","capacity_mtpa":3,"capacity_bcm_y":4.08,"start_year":null,"planned_start_year":null,"original_planned_start_year":2024,"fid_year":null,"construction_year":null,"shelved_year":2022,"cancelled_year":null,"stop_year":null,"estimated_cost_usd":null,"estimated_cost_original":null,"estimated_cost_currency":null,"power_stations_supplied":null,"floating_vessel_name":null,"ccs_project":null,"hydrogen_project":null,"ammonia_project":null,"synthetic_lng_project":null,"retrofit_proposed":null,"url":"https://lngatlas.org/terminal/kukrahati-lng-terminal-in/","data_source":"Data: Global Gas Infrastructure Tracker, Global Energy Monitor, September 2025"},{"terminal_slug":"kulevi-lng-terminal-ge","terminal_name":"Kulevi LNG Terminal","country":"Georgia","country_iso":"GE","unit_name":null,"status":"cancelled","facility_type":"import","floating_type":"unknown","capacity_mtpa":null,"capacity_bcm_y":null,"start_year":null,"planned_start_year":null,"original_planned_start_year":null,"fid_year":null,"construction_year":null,"shelved_year":null,"cancelled_year":2016,"stop_year":2016,"estimated_cost_usd":null,"estimated_cost_original":null,"estimated_cost_currency":null,"power_stations_supplied":null,"floating_vessel_name":null,"ccs_project":null,"hydrogen_project":null,"ammonia_project":null,"synthetic_lng_project":null,"retrofit_proposed":null,"url":"https://lngatlas.org/terminal/kulevi-lng-terminal-ge/","data_source":"Data: Global Gas Infrastructure Tracker, Global Energy Monitor, September 2025"},{"terminal_slug":"kushiro-lng-terminal-jp","terminal_name":"Kushiro LNG Terminal","country":"Japan","country_iso":"JP","unit_name":null,"status":"operating","facility_type":"import","floating_type":"unknown","capacity_mtpa":0.5,"capacity_bcm_y":0.68,"start_year":2015,"planned_start_year":null,"original_planned_start_year":null,"fid_year":null,"construction_year":null,"shelved_year":null,"cancelled_year":null,"stop_year":null,"estimated_cost_usd":null,"estimated_cost_original":null,"estimated_cost_currency":null,"power_stations_supplied":null,"floating_vessel_name":null,"ccs_project":null,"hydrogen_project":null,"ammonia_project":null,"synthetic_lng_project":null,"retrofit_proposed":null,"url":"https://lngatlas.org/terminal/kushiro-lng-terminal-jp/","data_source":"Data: Global Gas Infrastructure Tracker, Global Energy Monitor, September 2025"},{"terminal_slug":"kutubdia-reliance-fsru-bd","terminal_name":"Kutubdia (Reliance) FSRU","country":"Bangladesh","country_iso":"BD","unit_name":null,"status":"cancelled","facility_type":"import","floating_type":"fsru","capacity_mtpa":3.75,"capacity_bcm_y":5.1,"start_year":null,"planned_start_year":null,"original_planned_start_year":null,"fid_year":null,"construction_year":null,"shelved_year":null,"cancelled_year":2018,"stop_year":2018,"estimated_cost_usd":316666666,"estimated_cost_original":316666666,"estimated_cost_currency":"USD","power_stations_supplied":null,"floating_vessel_name":null,"ccs_project":null,"hydrogen_project":null,"ammonia_project":null,"synthetic_lng_project":null,"retrofit_proposed":null,"url":"https://lngatlas.org/terminal/kutubdia-reliance-fsru-bd/","data_source":"Data: Global Gas Infrastructure Tracker, Global Energy Monitor, September 2025"},{"terminal_slug":"kutubdia-lng-terminal-petronet-bd","terminal_name":"Kutubdia LNG Terminal (Petronet)","country":"Bangladesh","country_iso":"BD","unit_name":null,"status":"cancelled","facility_type":"import","floating_type":"unknown","capacity_mtpa":7.5,"capacity_bcm_y":10.2,"start_year":null,"planned_start_year":null,"original_planned_start_year":2025,"fid_year":null,"construction_year":null,"shelved_year":2019,"cancelled_year":2021,"stop_year":2021,"estimated_cost_usd":633333333,"estimated_cost_original":633333333,"estimated_cost_currency":"USD","power_stations_supplied":null,"floating_vessel_name":null,"ccs_project":null,"hydrogen_project":null,"ammonia_project":null,"synthetic_lng_project":null,"retrofit_proposed":null,"url":"https://lngatlas.org/terminal/kutubdia-lng-terminal-petronet-bd/","data_source":"Data: Global Gas Infrastructure Tracker, Global Energy Monitor, September 2025"},{"terminal_slug":"kwispaa-lng-terminal-ca","terminal_name":"Kwispaa LNG Terminal","country":"Canada","country_iso":"CA","unit_name":"T1-T4","status":"cancelled","facility_type":"export","floating_type":"unknown","capacity_mtpa":24,"capacity_bcm_y":32.65,"start_year":null,"planned_start_year":null,"original_planned_start_year":null,"fid_year":null,"construction_year":null,"shelved_year":null,"cancelled_year":2019,"stop_year":2019,"estimated_cost_usd":null,"estimated_cost_original":null,"estimated_cost_currency":null,"power_stations_supplied":null,"floating_vessel_name":null,"ccs_project":null,"hydrogen_project":null,"ammonia_project":null,"synthetic_lng_project":null,"retrofit_proposed":null,"url":"https://lngatlas.org/terminal/kwispaa-lng-terminal-ca/","data_source":"Data: Global Gas Infrastructure Tracker, Global Energy Monitor, September 2025"},{"terminal_slug":"lng-alliance-mangalore-fsru-in","terminal_name":"LNG Alliance Mangalore FSRU","country":"India","country_iso":"IN","unit_name":null,"status":"shelved","facility_type":"import","floating_type":"fsru","capacity_mtpa":4,"capacity_bcm_y":5.44,"start_year":null,"planned_start_year":null,"original_planned_start_year":null,"fid_year":null,"construction_year":null,"shelved_year":2024,"cancelled_year":null,"stop_year":null,"estimated_cost_usd":290000000,"estimated_cost_original":290000000,"estimated_cost_currency":"USD","power_stations_supplied":null,"floating_vessel_name":null,"ccs_project":null,"hydrogen_project":null,"ammonia_project":null,"synthetic_lng_project":null,"retrofit_proposed":null,"url":"https://lngatlas.org/terminal/lng-alliance-mangalore-fsru-in/","data_source":"Data: Global Gas Infrastructure Tracker, Global Energy Monitor, September 2025"},{"terminal_slug":"lng-canada-terminal-ca","terminal_name":"LNG Canada Terminal","country":"Canada","country_iso":"CA","unit_name":"Phase 1 (T1-T2)","status":"operating","facility_type":"export","floating_type":"unknown","capacity_mtpa":14,"capacity_bcm_y":19.05,"start_year":2025,"planned_start_year":null,"original_planned_start_year":null,"fid_year":2018,"construction_year":2018,"shelved_year":null,"cancelled_year":null,"stop_year":null,"estimated_cost_usd":14000000000,"estimated_cost_original":17500000000,"estimated_cost_currency":"CAN","power_stations_supplied":null,"floating_vessel_name":null,"ccs_project":null,"hydrogen_project":null,"ammonia_project":null,"synthetic_lng_project":null,"retrofit_proposed":null,"url":"https://lngatlas.org/terminal/lng-canada-terminal-ca/","data_source":"Data: Global Gas Infrastructure Tracker, Global Energy Monitor, September 2025"},{"terminal_slug":"lng-canada-terminal-ca","terminal_name":"LNG Canada Terminal","country":"Canada","country_iso":"CA","unit_name":"Phase 2 (T3-T4)","status":"proposed","facility_type":"export","floating_type":"unknown","capacity_mtpa":14,"capacity_bcm_y":19.05,"start_year":null,"planned_start_year":2030,"original_planned_start_year":2025,"fid_year":null,"construction_year":null,"shelved_year":null,"cancelled_year":null,"stop_year":null,"estimated_cost_usd":null,"estimated_cost_original":null,"estimated_cost_currency":null,"power_stations_supplied":null,"floating_vessel_name":null,"ccs_project":null,"hydrogen_project":null,"ammonia_project":null,"synthetic_lng_project":null,"retrofit_proposed":null,"url":"https://lngatlas.org/terminal/lng-canada-terminal-ca/","data_source":"Data: Global Gas Infrastructure Tracker, Global Energy Monitor, September 2025"},{"terminal_slug":"lng-easy-floating-lng-terminal-pk","terminal_name":"LNG Easy Floating LNG Terminal","country":"Pakistan","country_iso":"PK","unit_name":null,"status":"shelved","facility_type":"import","floating_type":"floating","capacity_mtpa":1,"capacity_bcm_y":1.36,"start_year":null,"planned_start_year":null,"original_planned_start_year":2022,"fid_year":null,"construction_year":null,"shelved_year":2025,"cancelled_year":null,"stop_year":null,"estimated_cost_usd":null,"estimated_cost_original":null,"estimated_cost_currency":null,"power_stations_supplied":null,"floating_vessel_name":null,"ccs_project":null,"hydrogen_project":null,"ammonia_project":null,"synthetic_lng_project":null,"retrofit_proposed":null,"url":"https://lngatlas.org/terminal/lng-easy-floating-lng-terminal-pk/","data_source":"Data: Global Gas Infrastructure Tracker, Global Energy Monitor, September 2025"},{"terminal_slug":"lng-yakutia-terminal-ru","terminal_name":"LNG Yakutia Terminal","country":"Russia","country_iso":"RU","unit_name":"Phase I","status":"proposed","facility_type":"export","floating_type":"unknown","capacity_mtpa":0.18,"capacity_bcm_y":0.24,"start_year":null,"planned_start_year":null,"original_planned_start_year":2027,"fid_year":null,"construction_year":null,"shelved_year":null,"cancelled_year":null,"stop_year":null,"estimated_cost_usd":73500,"estimated_cost_original":5250000,"estimated_cost_currency":"RUB","power_stations_supplied":null,"floating_vessel_name":null,"ccs_project":null,"hydrogen_project":null,"ammonia_project":null,"synthetic_lng_project":null,"retrofit_proposed":null,"url":"https://lngatlas.org/terminal/lng-yakutia-terminal-ru/","data_source":"Data: Global Gas Infrastructure Tracker, Global Energy Monitor, September 2025"},{"terminal_slug":"lng-yakutia-terminal-ru","terminal_name":"LNG Yakutia Terminal","country":"Russia","country_iso":"RU","unit_name":"Phase II","status":"proposed","facility_type":"export","floating_type":"unknown","capacity_mtpa":0.35,"capacity_bcm_y":0.48,"start_year":null,"planned_start_year":null,"original_planned_start_year":null,"fid_year":null,"construction_year":null,"shelved_year":null,"cancelled_year":null,"stop_year":null,"estimated_cost_usd":73500,"estimated_cost_original":5250000,"estimated_cost_currency":"RUB","power_stations_supplied":null,"floating_vessel_name":null,"ccs_project":null,"hydrogen_project":null,"ammonia_project":null,"synthetic_lng_project":null,"retrofit_proposed":null,"url":"https://lngatlas.org/terminal/lng-yakutia-terminal-ru/","data_source":"Data: Global Gas Infrastructure Tracker, Global Energy Monitor, September 2025"},{"terminal_slug":"lahad-datu-sabah-lng-terminal-my","terminal_name":"Lahad Datu Sabah LNG Terminal","country":"Malaysia","country_iso":"MY","unit_name":null,"status":"cancelled","facility_type":"import","floating_type":"unknown","capacity_mtpa":0.76,"capacity_bcm_y":1.03,"start_year":null,"planned_start_year":null,"original_planned_start_year":null,"fid_year":null,"construction_year":null,"shelved_year":null,"cancelled_year":2016,"stop_year":2016,"estimated_cost_usd":241000000,"estimated_cost_original":241000000,"estimated_cost_currency":"USD","power_stations_supplied":null,"floating_vessel_name":null,"ccs_project":null,"hydrogen_project":null,"ammonia_project":null,"synthetic_lng_project":null,"retrofit_proposed":null,"url":"https://lngatlas.org/terminal/lahad-datu-sabah-lng-terminal-my/","data_source":"Data: Global Gas Infrastructure Tracker, Global Energy Monitor, September 2025"},{"terminal_slug":"lakach-field-flng-terminal-mx","terminal_name":"Lakach Field FLNG Terminal","country":"Mexico","country_iso":"MX","unit_name":null,"status":"shelved","facility_type":"export","floating_type":"flng","capacity_mtpa":1.4,"capacity_bcm_y":1.9,"start_year":null,"planned_start_year":null,"original_planned_start_year":2024,"fid_year":null,"construction_year":null,"shelved_year":2023,"cancelled_year":null,"stop_year":null,"estimated_cost_usd":null,"estimated_cost_original":null,"estimated_cost_currency":null,"power_stations_supplied":null,"floating_vessel_name":"Sevan Driller","ccs_project":null,"hydrogen_project":null,"ammonia_project":null,"synthetic_lng_project":null,"retrofit_proposed":null,"url":"https://lngatlas.org/terminal/lakach-field-flng-terminal-mx/","data_source":"Data: Global Gas Infrastructure Tracker, Global Energy Monitor, September 2025"},{"terminal_slug":"lake-charles-lng-terminal-us","terminal_name":"Lake Charles LNG Terminal","country":"United States","country_iso":"US","unit_name":"Import Terminal","status":"mothballed","facility_type":"import","floating_type":"unknown","capacity_mtpa":17.9,"capacity_bcm_y":24.35,"start_year":1982,"planned_start_year":null,"original_planned_start_year":null,"fid_year":null,"construction_year":null,"shelved_year":null,"cancelled_year":null,"stop_year":null,"estimated_cost_usd":null,"estimated_cost_original":null,"estimated_cost_currency":null,"power_stations_supplied":null,"floating_vessel_name":null,"ccs_project":null,"hydrogen_project":null,"ammonia_project":null,"synthetic_lng_project":null,"retrofit_proposed":null,"url":"https://lngatlas.org/terminal/lake-charles-lng-terminal-us/","data_source":"Data: Global Gas Infrastructure Tracker, Global Energy Monitor, September 2025"},{"terminal_slug":"lake-charles-lng-terminal-us","terminal_name":"Lake Charles LNG Terminal","country":"United States","country_iso":"US","unit_name":"Export Terminal (T1-T3)","status":"proposed","facility_type":"export","floating_type":"unknown","capacity_mtpa":17.8,"capacity_bcm_y":24.22,"start_year":null,"planned_start_year":null,"original_planned_start_year":2028,"fid_year":2025,"construction_year":null,"shelved_year":null,"cancelled_year":null,"stop_year":null,"estimated_cost_usd":13200000000,"estimated_cost_original":13200000000,"estimated_cost_currency":"USD","power_stations_supplied":null,"floating_vessel_name":null,"ccs_project":null,"hydrogen_project":null,"ammonia_project":null,"synthetic_lng_project":null,"retrofit_proposed":null,"url":"https://lngatlas.org/terminal/lake-charles-lng-terminal-us/","data_source":"Data: Global Gas Infrastructure Tracker, Global Energy Monitor, September 2025"},{"terminal_slug":"lampung-fsru-id","terminal_name":"Lampung FSRU","country":"Indonesia","country_iso":"ID","unit_name":null,"status":"operating","facility_type":"import","floating_type":"fsru","capacity_mtpa":2.7,"capacity_bcm_y":3.67,"start_year":2014,"planned_start_year":null,"original_planned_start_year":null,"fid_year":null,"construction_year":2013,"shelved_year":null,"cancelled_year":null,"stop_year":null,"estimated_cost_usd":null,"estimated_cost_original":null,"estimated_cost_currency":null,"power_stations_supplied":null,"floating_vessel_name":null,"ccs_project":null,"hydrogen_project":null,"ammonia_project":null,"synthetic_lng_project":null,"retrofit_proposed":null,"url":"https://lngatlas.org/terminal/lampung-fsru-id/","data_source":"Data: Global Gas Infrastructure Tracker, Global Energy Monitor, September 2025"},{"terminal_slug":"lazaro-cardenas-lng-terminal-mx","terminal_name":"Lazaro Cardenas LNG Terminal","country":"Mexico","country_iso":"MX","unit_name":null,"status":"cancelled","facility_type":"import","floating_type":"unknown","capacity_mtpa":2.94,"capacity_bcm_y":4,"start_year":null,"planned_start_year":null,"original_planned_start_year":null,"fid_year":null,"construction_year":null,"shelved_year":2007,"cancelled_year":2009,"stop_year":2009,"estimated_cost_usd":null,"estimated_cost_original":null,"estimated_cost_currency":null,"power_stations_supplied":null,"floating_vessel_name":null,"ccs_project":null,"hydrogen_project":null,"ammonia_project":null,"synthetic_lng_project":null,"retrofit_proposed":null,"url":"https://lngatlas.org/terminal/lazaro-cardenas-lng-terminal-mx/","data_source":"Data: Global Gas Infrastructure Tracker, Global Energy Monitor, September 2025"},{"terminal_slug":"le-havre-fsru-fr","terminal_name":"Le Havre FSRU","country":"France","country_iso":"FR","unit_name":null,"status":"operating","facility_type":"import","floating_type":"fsru","capacity_mtpa":3.67,"capacity_bcm_y":4.99,"start_year":2023,"planned_start_year":null,"original_planned_start_year":null,"fid_year":null,"construction_year":2022,"shelved_year":null,"cancelled_year":null,"stop_year":null,"estimated_cost_usd":null,"estimated_cost_original":null,"estimated_cost_currency":null,"power_stations_supplied":null,"floating_vessel_name":null,"ccs_project":null,"hydrogen_project":null,"ammonia_project":null,"synthetic_lng_project":null,"retrofit_proposed":null,"url":"https://lngatlas.org/terminal/le-havre-fsru-fr/","data_source":"Data: Global Gas Infrastructure Tracker, Global Energy Monitor, September 2025"},{"terminal_slug":"le-havre-antifer-lng-terminal-fr","terminal_name":"Le Havre-Antifer LNG Terminal","country":"France","country_iso":"FR","unit_name":null,"status":"cancelled","facility_type":"import","floating_type":"unknown","capacity_mtpa":7,"capacity_bcm_y":9.52,"start_year":null,"planned_start_year":null,"original_planned_start_year":null,"fid_year":null,"construction_year":null,"shelved_year":2011,"cancelled_year":2013,"stop_year":2013,"estimated_cost_usd":null,"estimated_cost_original":null,"estimated_cost_currency":null,"power_stations_supplied":null,"floating_vessel_name":null,"ccs_project":null,"hydrogen_project":null,"ammonia_project":null,"synthetic_lng_project":null,"retrofit_proposed":null,"url":"https://lngatlas.org/terminal/le-havre-antifer-lng-terminal-fr/","data_source":"Data: Global Gas Infrastructure Tracker, Global Energy Monitor, September 2025"},{"terminal_slug":"lianyungang-lng-terminal-cn","terminal_name":"Lianyungang LNG Terminal","country":"China","country_iso":"CN","unit_name":null,"status":"cancelled","facility_type":"import","floating_type":"unknown","capacity_mtpa":3,"capacity_bcm_y":4.08,"start_year":null,"planned_start_year":null,"original_planned_start_year":null,"fid_year":null,"construction_year":null,"shelved_year":2015,"cancelled_year":2017,"stop_year":2017,"estimated_cost_usd":null,"estimated_cost_original":null,"estimated_cost_currency":null,"power_stations_supplied":null,"floating_vessel_name":null,"ccs_project":null,"hydrogen_project":null,"ammonia_project":null,"synthetic_lng_project":null,"retrofit_proposed":null,"url":"https://lngatlas.org/terminal/lianyungang-lng-terminal-cn/","data_source":"Data: Global Gas Infrastructure Tracker, Global Energy Monitor, September 2025"},{"terminal_slug":"liberty-fsru-us","terminal_name":"Liberty FSRU","country":"United States","country_iso":"US","unit_name":null,"status":"cancelled","facility_type":"import","floating_type":"fsru","capacity_mtpa":18,"capacity_bcm_y":24.49,"start_year":null,"planned_start_year":null,"original_planned_start_year":null,"fid_year":null,"construction_year":null,"shelved_year":null,"cancelled_year":2012,"stop_year":2012,"estimated_cost_usd":null,"estimated_cost_original":null,"estimated_cost_currency":null,"power_stations_supplied":null,"floating_vessel_name":null,"ccs_project":null,"hydrogen_project":null,"ammonia_project":null,"synthetic_lng_project":null,"retrofit_proposed":null,"url":"https://lngatlas.org/terminal/liberty-fsru-us/","data_source":"Data: Global Gas Infrastructure Tracker, Global Energy Monitor, September 2025"},{"terminal_slug":"liquid-niugini-flng-terminal-pg","terminal_name":"Liquid Niugini FLNG Terminal","country":"Papua New Guinea","country_iso":"PG","unit_name":null,"status":"cancelled","facility_type":"export","floating_type":"flng","capacity_mtpa":5,"capacity_bcm_y":6.8,"start_year":null,"planned_start_year":null,"original_planned_start_year":null,"fid_year":null,"construction_year":null,"shelved_year":null,"cancelled_year":2024,"stop_year":2024,"estimated_cost_usd":5000000000,"estimated_cost_original":5000000000,"estimated_cost_currency":"USD","power_stations_supplied":null,"floating_vessel_name":null,"ccs_project":null,"hydrogen_project":null,"ammonia_project":null,"synthetic_lng_project":null,"retrofit_proposed":null,"url":"https://lngatlas.org/terminal/liquid-niugini-flng-terminal-pg/","data_source":"Data: Global Gas Infrastructure Tracker, Global Energy Monitor, September 2025"},{"terminal_slug":"liuheng-lng-terminal-sinopec-cn","terminal_name":"Liuheng LNG Terminal (Sinopec)","country":"China","country_iso":"CN","unit_name":"Phase 1","status":"construction","facility_type":"import","floating_type":"unknown","capacity_mtpa":7.18,"capacity_bcm_y":9.77,"start_year":null,"planned_start_year":null,"original_planned_start_year":2025,"fid_year":null,"construction_year":2025,"shelved_year":null,"cancelled_year":null,"stop_year":null,"estimated_cost_usd":1664000000,"estimated_cost_original":10400000000,"estimated_cost_currency":"RMB","power_stations_supplied":null,"floating_vessel_name":null,"ccs_project":null,"hydrogen_project":null,"ammonia_project":null,"synthetic_lng_project":null,"retrofit_proposed":null,"url":"https://lngatlas.org/terminal/liuheng-lng-terminal-sinopec-cn/","data_source":"Data: Global Gas Infrastructure Tracker, Global Energy Monitor, September 2025"},{"terminal_slug":"liuheng-lng-terminal-sinopec-cn","terminal_name":"Liuheng LNG Terminal (Sinopec)","country":"China","country_iso":"CN","unit_name":"Phase 2","status":"proposed","facility_type":"import","floating_type":"unknown","capacity_mtpa":7.82,"capacity_bcm_y":10.64,"start_year":null,"planned_start_year":null,"original_planned_start_year":2030,"fid_year":null,"construction_year":null,"shelved_year":null,"cancelled_year":null,"stop_year":null,"estimated_cost_usd":1040000000,"estimated_cost_original":6500000000,"estimated_cost_currency":"RMB","power_stations_supplied":null,"floating_vessel_name":null,"ccs_project":null,"hydrogen_project":null,"ammonia_project":null,"synthetic_lng_project":null,"retrofit_proposed":null,"url":"https://lngatlas.org/terminal/liuheng-lng-terminal-sinopec-cn/","data_source":"Data: Global Gas Infrastructure Tracker, Global Energy Monitor, September 2025"},{"terminal_slug":"liuheng-lng-terminal-zhejiang-energy-cn","terminal_name":"Liuheng LNG Terminal (Zhejiang Energy)","country":"China","country_iso":"CN","unit_name":"Phase 1","status":"construction","facility_type":"import","floating_type":"unknown","capacity_mtpa":6.35,"capacity_bcm_y":8.64,"start_year":null,"planned_start_year":2027,"original_planned_start_year":2026,"fid_year":null,"construction_year":2023,"shelved_year":null,"cancelled_year":null,"stop_year":null,"estimated_cost_usd":1512000000,"estimated_cost_original":9450000000,"estimated_cost_currency":"RMB","power_stations_supplied":null,"floating_vessel_name":null,"ccs_project":null,"hydrogen_project":null,"ammonia_project":null,"synthetic_lng_project":null,"retrofit_proposed":null,"url":"https://lngatlas.org/terminal/liuheng-lng-terminal-zhejiang-energy-cn/","data_source":"Data: Global Gas Infrastructure Tracker, Global Energy Monitor, September 2025"},{"terminal_slug":"liuheng-lng-terminal-zhejiang-energy-cn","terminal_name":"Liuheng LNG Terminal (Zhejiang Energy)","country":"China","country_iso":"CN","unit_name":"Phase 2","status":"proposed","facility_type":"import","floating_type":"unknown","capacity_mtpa":5,"capacity_bcm_y":6.8,"start_year":null,"planned_start_year":null,"original_planned_start_year":null,"fid_year":null,"construction_year":null,"shelved_year":null,"cancelled_year":null,"stop_year":null,"estimated_cost_usd":null,"estimated_cost_original":null,"estimated_cost_currency":null,"power_stations_supplied":null,"floating_vessel_name":null,"ccs_project":null,"hydrogen_project":null,"ammonia_project":null,"synthetic_lng_project":null,"retrofit_proposed":null,"url":"https://lngatlas.org/terminal/liuheng-lng-terminal-zhejiang-energy-cn/","data_source":"Data: Global Gas Infrastructure Tracker, Global Energy Monitor, September 2025"},{"terminal_slug":"long-an-lng-terminal-vn","terminal_name":"Long An LNG Terminal","country":"Vietnam","country_iso":"VN","unit_name":null,"status":"proposed","facility_type":"import","floating_type":"unknown","capacity_mtpa":null,"capacity_bcm_y":null,"start_year":null,"planned_start_year":null,"original_planned_start_year":2030,"fid_year":null,"construction_year":null,"shelved_year":null,"cancelled_year":null,"stop_year":null,"estimated_cost_usd":3000000000,"estimated_cost_original":3000000000,"estimated_cost_currency":"USD","power_stations_supplied":"Long An power station","floating_vessel_name":null,"ccs_project":null,"hydrogen_project":null,"ammonia_project":null,"synthetic_lng_project":null,"retrofit_proposed":null,"url":"https://lngatlas.org/terminal/long-an-lng-terminal-vn/","data_source":"Data: Global Gas Infrastructure Tracker, Global Energy Monitor, September 2025"},{"terminal_slug":"long-beach-lng-terminal-us","terminal_name":"Long Beach LNG Terminal","country":"United States","country_iso":"US","unit_name":null,"status":"cancelled","facility_type":"import","floating_type":"unknown","capacity_mtpa":5,"capacity_bcm_y":6.8,"start_year":null,"planned_start_year":null,"original_planned_start_year":null,"fid_year":null,"construction_year":null,"shelved_year":null,"cancelled_year":2007,"stop_year":2007,"estimated_cost_usd":null,"estimated_cost_original":null,"estimated_cost_currency":null,"power_stations_supplied":null,"floating_vessel_name":null,"ccs_project":null,"hydrogen_project":null,"ammonia_project":null,"synthetic_lng_project":null,"retrofit_proposed":null,"url":"https://lngatlas.org/terminal/long-beach-lng-terminal-us/","data_source":"Data: Global Gas Infrastructure Tracker, Global Energy Monitor, September 2025"},{"terminal_slug":"long-son-lng-terminal-vn","terminal_name":"Long Son LNG Terminal","country":"Vietnam","country_iso":"VN","unit_name":null,"status":"proposed","facility_type":"import","floating_type":"unknown","capacity_mtpa":4.4,"capacity_bcm_y":5.99,"start_year":null,"planned_start_year":2030,"original_planned_start_year":2025,"fid_year":null,"construction_year":null,"shelved_year":null,"cancelled_year":null,"stop_year":null,"estimated_cost_usd":null,"estimated_cost_original":null,"estimated_cost_currency":null,"power_stations_supplied":null,"floating_vessel_name":null,"ccs_project":null,"hydrogen_project":null,"ammonia_project":null,"synthetic_lng_project":null,"retrofit_proposed":null,"url":"https://lngatlas.org/terminal/long-son-lng-terminal-vn/","data_source":"Data: Global Gas Infrastructure Tracker, Global Energy Monitor, September 2025"},{"terminal_slug":"longford-lng-terminal-au","terminal_name":"Longford LNG Terminal","country":"Australia","country_iso":"AU","unit_name":null,"status":"cancelled","facility_type":"import","floating_type":"unknown","capacity_mtpa":null,"capacity_bcm_y":null,"start_year":null,"planned_start_year":null,"original_planned_start_year":2022,"fid_year":null,"construction_year":null,"shelved_year":null,"cancelled_year":2019,"stop_year":2019,"estimated_cost_usd":null,"estimated_cost_original":null,"estimated_cost_currency":null,"power_stations_supplied":null,"floating_vessel_name":null,"ccs_project":null,"hydrogen_project":null,"ammonia_project":null,"synthetic_lng_project":null,"retrofit_proposed":null,"url":"https://lngatlas.org/terminal/longford-lng-terminal-au/","data_source":"Data: Global Gas Infrastructure Tracker, Global Energy Monitor, September 2025"},{"terminal_slug":"longkou-nanshan-lng-terminal-cn","terminal_name":"Longkou Nanshan LNG Terminal","country":"China","country_iso":"CN","unit_name":"Phase 1","status":"construction","facility_type":"import","floating_type":"unknown","capacity_mtpa":6.45,"capacity_bcm_y":8.78,"start_year":null,"planned_start_year":2025,"original_planned_start_year":2023,"fid_year":null,"construction_year":2020,"shelved_year":null,"cancelled_year":null,"stop_year":null,"estimated_cost_usd":1644380800,"estimated_cost_original":10277380000,"estimated_cost_currency":"RMB","power_stations_supplied":null,"floating_vessel_name":null,"ccs_project":null,"hydrogen_project":null,"ammonia_project":null,"synthetic_lng_project":null,"retrofit_proposed":null,"url":"https://lngatlas.org/terminal/longkou-nanshan-lng-terminal-cn/","data_source":"Data: Global Gas Infrastructure Tracker, Global Energy Monitor, September 2025"},{"terminal_slug":"longkou-nanshan-lng-terminal-cn","terminal_name":"Longkou Nanshan LNG Terminal","country":"China","country_iso":"CN","unit_name":"Phase 2 and 3","status":"proposed","facility_type":"import","floating_type":"unknown","capacity_mtpa":14,"capacity_bcm_y":19.05,"start_year":null,"planned_start_year":null,"original_planned_start_year":null,"fid_year":null,"construction_year":null,"shelved_year":null,"cancelled_year":null,"stop_year":null,"estimated_cost_usd":3840000000,"estimated_cost_original":24000000000,"estimated_cost_currency":"RMB","power_stations_supplied":null,"floating_vessel_name":null,"ccs_project":null,"hydrogen_project":null,"ammonia_project":null,"synthetic_lng_project":null,"retrofit_proposed":null,"url":"https://lngatlas.org/terminal/longkou-nanshan-lng-terminal-cn/","data_source":"Data: Global Gas Infrastructure Tracker, Global Energy Monitor, September 2025"},{"terminal_slug":"louisiana-lng-terminal-us","terminal_name":"Louisiana LNG Terminal","country":"United States","country_iso":"US","unit_name":"T1-T2","status":"cancelled","facility_type":"export","floating_type":"unknown","capacity_mtpa":5,"capacity_bcm_y":6.8,"start_year":null,"planned_start_year":null,"original_planned_start_year":null,"fid_year":null,"construction_year":null,"shelved_year":2017,"cancelled_year":2019,"stop_year":2019,"estimated_cost_usd":null,"estimated_cost_original":null,"estimated_cost_currency":null,"power_stations_supplied":null,"floating_vessel_name":null,"ccs_project":null,"hydrogen_project":null,"ammonia_project":null,"synthetic_lng_project":null,"retrofit_proposed":null,"url":"https://lngatlas.org/terminal/louisiana-lng-terminal-us/","data_source":"Data: Global Gas Infrastructure Tracker, Global Energy Monitor, September 2025"},{"terminal_slug":"lubmin-fsru-de","terminal_name":"Lubmin FSRU","country":"Germany","country_iso":"DE","unit_name":"LNG import terminal","status":"retired","facility_type":"import","floating_type":"fsru","capacity_mtpa":3.82,"capacity_bcm_y":5.2,"start_year":2023,"planned_start_year":null,"original_planned_start_year":2022,"fid_year":null,"construction_year":2022,"shelved_year":null,"cancelled_year":null,"stop_year":2024,"estimated_cost_usd":1090000000,"estimated_cost_original":1000000000,"estimated_cost_currency":"EUR","power_stations_supplied":null,"floating_vessel_name":"Neptune","ccs_project":null,"hydrogen_project":true,"ammonia_project":true,"synthetic_lng_project":null,"retrofit_proposed":null,"url":"https://lngatlas.org/terminal/lubmin-fsru-de/","data_source":"Data: Global Gas Infrastructure Tracker, Global Energy Monitor, September 2025"},{"terminal_slug":"lubmin-fsru-de","terminal_name":"Lubmin FSRU","country":"Germany","country_iso":"DE","unit_name":"Hydrogen import terminal","status":"proposed","facility_type":"import","floating_type":"fsru","capacity_mtpa":null,"capacity_bcm_y":null,"start_year":null,"planned_start_year":null,"original_planned_start_year":2026,"fid_year":null,"construction_year":null,"shelved_year":null,"cancelled_year":null,"stop_year":null,"estimated_cost_usd":null,"estimated_cost_original":null,"estimated_cost_currency":null,"power_stations_supplied":null,"floating_vessel_name":"Neptune","ccs_project":null,"hydrogen_project":true,"ammonia_project":true,"synthetic_lng_project":null,"retrofit_proposed":null,"url":"https://lngatlas.org/terminal/lubmin-fsru-de/","data_source":"Data: Global Gas Infrastructure Tracker, Global Energy Monitor, September 2025"},{"terminal_slug":"lubmin-rwe-fsru-de","terminal_name":"Lubmin RWE FSRU","country":"Germany","country_iso":"DE","unit_name":null,"status":"shelved","facility_type":"import","floating_type":"fsru","capacity_mtpa":3.67,"capacity_bcm_y":4.99,"start_year":null,"planned_start_year":null,"original_planned_start_year":2023,"fid_year":null,"construction_year":null,"shelved_year":2025,"cancelled_year":null,"stop_year":null,"estimated_cost_usd":null,"estimated_cost_original":null,"estimated_cost_currency":null,"power_stations_supplied":null,"floating_vessel_name":null,"ccs_project":null,"hydrogen_project":null,"ammonia_project":null,"synthetic_lng_project":null,"retrofit_proposed":null,"url":"https://lngatlas.org/terminal/lubmin-rwe-fsru-de/","data_source":"Data: Global Gas Infrastructure Tracker, Global Energy Monitor, September 2025"},{"terminal_slug":"lumut-fsru-my","terminal_name":"Lumut LNG Terminal","country":"Malaysia","country_iso":"MY","unit_name":null,"status":"proposed","facility_type":"import","floating_type":"unknown","capacity_mtpa":null,"capacity_bcm_y":null,"start_year":null,"planned_start_year":null,"original_planned_start_year":null,"fid_year":null,"construction_year":null,"shelved_year":null,"cancelled_year":null,"stop_year":null,"estimated_cost_usd":null,"estimated_cost_original":null,"estimated_cost_currency":null,"power_stations_supplied":null,"floating_vessel_name":null,"ccs_project":null,"hydrogen_project":null,"ammonia_project":null,"synthetic_lng_project":null,"retrofit_proposed":null,"url":"https://lngatlas.org/terminal/lumut-fsru-my/","data_source":"Data: Global Gas Infrastructure Tracker, Global Energy Monitor, September 2025"},{"terminal_slug":"lysekil-lng-terminal-se","terminal_name":"Lysekil LNG Terminal","country":"Sweden","country_iso":"SE","unit_name":null,"status":"operating","facility_type":"import","floating_type":"unknown","capacity_mtpa":0.2,"capacity_bcm_y":0.27,"start_year":2014,"planned_start_year":null,"original_planned_start_year":null,"fid_year":null,"construction_year":null,"shelved_year":null,"cancelled_year":null,"stop_year":null,"estimated_cost_usd":null,"estimated_cost_original":null,"estimated_cost_currency":null,"power_stations_supplied":null,"floating_vessel_name":null,"ccs_project":null,"hydrogen_project":null,"ammonia_project":null,"synthetic_lng_project":null,"retrofit_proposed":null,"url":"https://lngatlas.org/terminal/lysekil-lng-terminal-se/","data_source":"Data: Global Gas Infrastructure Tracker, Global Energy Monitor, September 2025"},{"terminal_slug":"mcv-lng-terminal-mm","terminal_name":"MCV LNG Terminal","country":"Myanmar","country_iso":"MM","unit_name":null,"status":"mothballed","facility_type":"import","floating_type":"unknown","capacity_mtpa":0.4,"capacity_bcm_y":0.54,"start_year":2020,"planned_start_year":null,"original_planned_start_year":null,"fid_year":null,"construction_year":null,"shelved_year":null,"cancelled_year":null,"stop_year":2021,"estimated_cost_usd":null,"estimated_cost_original":null,"estimated_cost_currency":null,"power_stations_supplied":null,"floating_vessel_name":null,"ccs_project":null,"hydrogen_project":null,"ammonia_project":null,"synthetic_lng_project":null,"retrofit_proposed":null,"url":"https://lngatlas.org/terminal/mcv-lng-terminal-mm/","data_source":"Data: Global Gas Infrastructure Tracker, Global Energy Monitor, September 2025"},{"terminal_slug":"madura-flng-terminal-id","terminal_name":"Madura FLNG Terminal","country":"Indonesia","country_iso":"ID","unit_name":null,"status":"shelved","facility_type":"export","floating_type":"flng","capacity_mtpa":null,"capacity_bcm_y":null,"start_year":null,"planned_start_year":null,"original_planned_start_year":null,"fid_year":null,"construction_year":null,"shelved_year":2025,"cancelled_year":null,"stop_year":null,"estimated_cost_usd":null,"estimated_cost_original":null,"estimated_cost_currency":null,"power_stations_supplied":null,"floating_vessel_name":null,"ccs_project":null,"hydrogen_project":null,"ammonia_project":null,"synthetic_lng_project":null,"retrofit_proposed":null,"url":"https://lngatlas.org/terminal/madura-flng-terminal-id/","data_source":"Data: Global Gas Infrastructure Tracker, Global Energy Monitor, September 2025"},{"terminal_slug":"magnolia-lng-terminal-us","terminal_name":"Magnolia LNG Terminal","country":"United States","country_iso":"US","unit_name":"Phase 1 (T1-T2)","status":"proposed","facility_type":"export","floating_type":"unknown","capacity_mtpa":4.4,"capacity_bcm_y":5.99,"start_year":null,"planned_start_year":2027,"original_planned_start_year":2026,"fid_year":2025,"construction_year":null,"shelved_year":null,"cancelled_year":null,"stop_year":null,"estimated_cost_usd":null,"estimated_cost_original":null,"estimated_cost_currency":null,"power_stations_supplied":null,"floating_vessel_name":null,"ccs_project":null,"hydrogen_project":null,"ammonia_project":null,"synthetic_lng_project":null,"retrofit_proposed":null,"url":"https://lngatlas.org/terminal/magnolia-lng-terminal-us/","data_source":"Data: Global Gas Infrastructure Tracker, Global Energy Monitor, September 2025"},{"terminal_slug":"magnolia-lng-terminal-us","terminal_name":"Magnolia LNG Terminal","country":"United States","country_iso":"US","unit_name":"Phase 2 (T3-T4)","status":"proposed","facility_type":"export","floating_type":"unknown","capacity_mtpa":4.4,"capacity_bcm_y":5.99,"start_year":null,"planned_start_year":null,"original_planned_start_year":2026,"fid_year":2023,"construction_year":null,"shelved_year":null,"cancelled_year":null,"stop_year":null,"estimated_cost_usd":null,"estimated_cost_original":null,"estimated_cost_currency":null,"power_stations_supplied":null,"floating_vessel_name":null,"ccs_project":null,"hydrogen_project":null,"ammonia_project":null,"synthetic_lng_project":null,"retrofit_proposed":null,"url":"https://lngatlas.org/terminal/magnolia-lng-terminal-us/","data_source":"Data: Global Gas Infrastructure Tracker, Global Energy Monitor, September 2025"},{"terminal_slug":"mailiao-lng-terminal-tw","terminal_name":"Mailiao LNG Terminal","country":"Taiwan","country_iso":"TW","unit_name":null,"status":"proposed","facility_type":"import","floating_type":"unknown","capacity_mtpa":6,"capacity_bcm_y":8.16,"start_year":null,"planned_start_year":null,"original_planned_start_year":null,"fid_year":null,"construction_year":null,"shelved_year":null,"cancelled_year":null,"stop_year":null,"estimated_cost_usd":1700000000,"estimated_cost_original":50000000000,"estimated_cost_currency":"NTD","power_stations_supplied":null,"floating_vessel_name":null,"ccs_project":null,"hydrogen_project":null,"ammonia_project":null,"synthetic_lng_project":null,"retrofit_proposed":null,"url":"https://lngatlas.org/terminal/mailiao-lng-terminal-tw/","data_source":"Data: Global Gas Infrastructure Tracker, Global Energy Monitor, September 2025"},{"terminal_slug":"main-pass-energy-hub-flng-terminal-us","terminal_name":"Main Pass Energy Hub FLNG Terminal","country":"United States","country_iso":"US","unit_name":"T1-T6","status":"cancelled","facility_type":"export","floating_type":"flng","capacity_mtpa":24,"capacity_bcm_y":32.65,"start_year":null,"planned_start_year":null,"original_planned_start_year":2020,"fid_year":null,"construction_year":null,"shelved_year":null,"cancelled_year":2021,"stop_year":2021,"estimated_cost_usd":14000000000,"estimated_cost_original":14000000000,"estimated_cost_currency":"USD","power_stations_supplied":null,"floating_vessel_name":null,"ccs_project":null,"hydrogen_project":null,"ammonia_project":null,"synthetic_lng_project":null,"retrofit_proposed":null,"url":"https://lngatlas.org/terminal/main-pass-energy-hub-flng-terminal-us/","data_source":"Data: Global Gas Infrastructure Tracker, Global Energy Monitor, September 2025"},{"terminal_slug":"malahat-lng-terminal-ca","terminal_name":"Malahat LNG Terminal","country":"Canada","country_iso":"CA","unit_name":null,"status":"cancelled","facility_type":"export","floating_type":"unknown","capacity_mtpa":6,"capacity_bcm_y":8.16,"start_year":null,"planned_start_year":null,"original_planned_start_year":null,"fid_year":null,"construction_year":null,"shelved_year":null,"cancelled_year":2017,"stop_year":2017,"estimated_cost_usd":null,"estimated_cost_original":null,"estimated_cost_currency":null,"power_stations_supplied":null,"floating_vessel_name":null,"ccs_project":null,"hydrogen_project":null,"ammonia_project":null,"synthetic_lng_project":null,"retrofit_proposed":null,"url":"https://lngatlas.org/terminal/malahat-lng-terminal-ca/","data_source":"Data: Global Gas Infrastructure Tracker, Global Energy Monitor, September 2025"},{"terminal_slug":"mlng-t9-lng-terminal-my","terminal_name":"Malaysia LNG Terminal Train 9","country":"Malaysia","country_iso":"MY","unit_name":null,"status":"operating","facility_type":"export","floating_type":"unknown","capacity_mtpa":3.6,"capacity_bcm_y":4.9,"start_year":2016,"planned_start_year":null,"original_planned_start_year":null,"fid_year":null,"construction_year":null,"shelved_year":null,"cancelled_year":null,"stop_year":null,"estimated_cost_usd":null,"estimated_cost_original":null,"estimated_cost_currency":null,"power_stations_supplied":null,"floating_vessel_name":null,"ccs_project":null,"hydrogen_project":null,"ammonia_project":null,"synthetic_lng_project":null,"retrofit_proposed":null,"url":"https://lngatlas.org/terminal/mlng-t9-lng-terminal-my/","data_source":"Data: Global Gas Infrastructure Tracker, Global Energy Monitor, September 2025"},{"terminal_slug":"energia-2000-manzanillo-fsru-do","terminal_name":"Manzanillo (Dominican Republic) LNG Terminal","country":"Dominican Republic","country_iso":"DO","unit_name":null,"status":"construction","facility_type":"import","floating_type":"floating","capacity_mtpa":1,"capacity_bcm_y":1.36,"start_year":null,"planned_start_year":null,"original_planned_start_year":2025,"fid_year":2022,"construction_year":2024,"shelved_year":null,"cancelled_year":null,"stop_year":null,"estimated_cost_usd":null,"estimated_cost_original":null,"estimated_cost_currency":null,"power_stations_supplied":"Manzanillo (Haina Investment) power station, Manzanillo (Manzanillo Energy) power station, Manzanillo PowerLand","floating_vessel_name":"Energos Freeze FSRU","ccs_project":null,"hydrogen_project":null,"ammonia_project":null,"synthetic_lng_project":null,"retrofit_proposed":null,"url":"https://lngatlas.org/terminal/energia-2000-manzanillo-fsru-do/","data_source":"Data: Global Gas Infrastructure Tracker, Global Energy Monitor, September 2025"},{"terminal_slug":"manzanillo-mexico-lng-terminal-mx","terminal_name":"Manzanillo (Mexico) LNG Terminal","country":"Mexico","country_iso":"MX","unit_name":null,"status":"operating","facility_type":"import","floating_type":"unknown","capacity_mtpa":3.8,"capacity_bcm_y":5.17,"start_year":2012,"planned_start_year":null,"original_planned_start_year":null,"fid_year":null,"construction_year":null,"shelved_year":null,"cancelled_year":null,"stop_year":null,"estimated_cost_usd":null,"estimated_cost_original":null,"estimated_cost_currency":null,"power_stations_supplied":"Manzanillo power station","floating_vessel_name":null,"ccs_project":null,"hydrogen_project":null,"ammonia_project":null,"synthetic_lng_project":null,"retrofit_proposed":null,"url":"https://lngatlas.org/terminal/manzanillo-mexico-lng-terminal-mx/","data_source":"Data: Global Gas Infrastructure Tracker, Global Energy Monitor, September 2025"},{"terminal_slug":"map-ta-phut-lng-terminal-1-th","terminal_name":"Map Ta Phut LNG Terminal 1","country":"Thailand","country_iso":"TH","unit_name":null,"status":"operating","facility_type":"import","floating_type":"unknown","capacity_mtpa":10,"capacity_bcm_y":13.61,"start_year":2011,"planned_start_year":null,"original_planned_start_year":null,"fid_year":null,"construction_year":null,"shelved_year":null,"cancelled_year":null,"stop_year":null,"estimated_cost_usd":null,"estimated_cost_original":null,"estimated_cost_currency":null,"power_stations_supplied":null,"floating_vessel_name":null,"ccs_project":null,"hydrogen_project":null,"ammonia_project":null,"synthetic_lng_project":null,"retrofit_proposed":null,"url":"https://lngatlas.org/terminal/map-ta-phut-lng-terminal-1-th/","data_source":"Data: Global Gas Infrastructure Tracker, Global Energy Monitor, September 2025"},{"terminal_slug":"map-ta-phut-lng-terminal-1-th","terminal_name":"Map Ta Phut LNG Terminal 1","country":"Thailand","country_iso":"TH","unit_name":"Expansion","status":"operating","facility_type":"import","floating_type":"unknown","capacity_mtpa":1.5,"capacity_bcm_y":2.04,"start_year":2019,"planned_start_year":null,"original_planned_start_year":null,"fid_year":null,"construction_year":2019,"shelved_year":null,"cancelled_year":null,"stop_year":null,"estimated_cost_usd":28000000,"estimated_cost_original":28000000,"estimated_cost_currency":"USD","power_stations_supplied":null,"floating_vessel_name":null,"ccs_project":null,"hydrogen_project":null,"ammonia_project":null,"synthetic_lng_project":null,"retrofit_proposed":null,"url":"https://lngatlas.org/terminal/map-ta-phut-lng-terminal-1-th/","data_source":"Data: Global Gas Infrastructure Tracker, Global Energy Monitor, September 2025"},{"terminal_slug":"map-ta-phut-lng-terminal-2-th","terminal_name":"Map Ta Phut LNG Terminal 2","country":"Thailand","country_iso":"TH","unit_name":null,"status":"operating","facility_type":"import","floating_type":"unknown","capacity_mtpa":7.5,"capacity_bcm_y":10.2,"start_year":2023,"planned_start_year":null,"original_planned_start_year":2022,"fid_year":null,"construction_year":2019,"shelved_year":null,"cancelled_year":null,"stop_year":null,"estimated_cost_usd":1116500000,"estimated_cost_original":38500000000,"estimated_cost_currency":"THB","power_stations_supplied":null,"floating_vessel_name":null,"ccs_project":null,"hydrogen_project":null,"ammonia_project":null,"synthetic_lng_project":null,"retrofit_proposed":null,"url":"https://lngatlas.org/terminal/map-ta-phut-lng-terminal-2-th/","data_source":"Data: Global Gas Infrastructure Tracker, Global Energy Monitor, September 2025"},{"terminal_slug":"map-ta-phut-lng-terminal-3-th","terminal_name":"Map Ta Phut LNG Terminal 3","country":"Thailand","country_iso":"TH","unit_name":"Phase I","status":"proposed","facility_type":"import","floating_type":"unknown","capacity_mtpa":5,"capacity_bcm_y":6.8,"start_year":null,"planned_start_year":2029,"original_planned_start_year":2025,"fid_year":2025,"construction_year":2025,"shelved_year":null,"cancelled_year":null,"stop_year":null,"estimated_cost_usd":1830000000,"estimated_cost_original":1830000000,"estimated_cost_currency":"USD","power_stations_supplied":null,"floating_vessel_name":null,"ccs_project":null,"hydrogen_project":null,"ammonia_project":null,"synthetic_lng_project":null,"retrofit_proposed":null,"url":"https://lngatlas.org/terminal/map-ta-phut-lng-terminal-3-th/","data_source":"Data: Global Gas Infrastructure Tracker, Global Energy Monitor, September 2025"},{"terminal_slug":"map-ta-phut-lng-terminal-3-th","terminal_name":"Map Ta Phut LNG Terminal 3","country":"Thailand","country_iso":"TH","unit_name":"Phase II","status":"proposed","facility_type":"import","floating_type":"unknown","capacity_mtpa":5.8,"capacity_bcm_y":7.89,"start_year":null,"planned_start_year":null,"original_planned_start_year":2029,"fid_year":2025,"construction_year":null,"shelved_year":null,"cancelled_year":null,"stop_year":null,"estimated_cost_usd":null,"estimated_cost_original":null,"estimated_cost_currency":null,"power_stations_supplied":null,"floating_vessel_name":null,"ccs_project":null,"hydrogen_project":null,"ammonia_project":null,"synthetic_lng_project":null,"retrofit_proposed":null,"url":"https://lngatlas.org/terminal/map-ta-phut-lng-terminal-3-th/","data_source":"Data: Global Gas Infrastructure Tracker, Global Energy Monitor, September 2025"},{"terminal_slug":"mariveles-samat-lng-terminal-ph","terminal_name":"Mariveles LNG Terminal","country":"Philippines","country_iso":"PH","unit_name":null,"status":"proposed","facility_type":"import","floating_type":"unknown","capacity_mtpa":0.4,"capacity_bcm_y":0.54,"start_year":null,"planned_start_year":null,"original_planned_start_year":2024,"fid_year":null,"construction_year":null,"shelved_year":null,"cancelled_year":null,"stop_year":null,"estimated_cost_usd":67000000,"estimated_cost_original":67000000,"estimated_cost_currency":"USD","power_stations_supplied":null,"floating_vessel_name":null,"ccs_project":null,"hydrogen_project":null,"ammonia_project":null,"synthetic_lng_project":null,"retrofit_proposed":null,"url":"https://lngatlas.org/terminal/mariveles-samat-lng-terminal-ph/","data_source":"Data: Global Gas Infrastructure Tracker, Global Energy Monitor, September 2025"},{"terminal_slug":"marmara-lng-terminal-tr","terminal_name":"Marmara LNG Terminal","country":"Türkiye","country_iso":"TR","unit_name":null,"status":"operating","facility_type":"import","floating_type":"unknown","capacity_mtpa":4.6,"capacity_bcm_y":6.26,"start_year":1994,"planned_start_year":null,"original_planned_start_year":null,"fid_year":null,"construction_year":null,"shelved_year":null,"cancelled_year":null,"stop_year":null,"estimated_cost_usd":null,"estimated_cost_original":null,"estimated_cost_currency":null,"power_stations_supplied":null,"floating_vessel_name":null,"ccs_project":null,"hydrogen_project":null,"ammonia_project":null,"synthetic_lng_project":null,"retrofit_proposed":null,"url":"https://lngatlas.org/terminal/marmara-lng-terminal-tr/","data_source":"Data: Global Gas Infrastructure Tracker, Global Energy Monitor, September 2025"},{"terminal_slug":"marsa-el-brega-lng-terminal-ly","terminal_name":"Marsa El Brega LNG Terminal","country":"Libya","country_iso":"LY","unit_name":"T1","status":"mothballed","facility_type":"export","floating_type":"unknown","capacity_mtpa":0.8,"capacity_bcm_y":1.09,"start_year":1970,"planned_start_year":null,"original_planned_start_year":null,"fid_year":null,"construction_year":null,"shelved_year":null,"cancelled_year":null,"stop_year":2011,"estimated_cost_usd":null,"estimated_cost_original":null,"estimated_cost_currency":null,"power_stations_supplied":null,"floating_vessel_name":null,"ccs_project":null,"hydrogen_project":null,"ammonia_project":null,"synthetic_lng_project":null,"retrofit_proposed":null,"url":"https://lngatlas.org/terminal/marsa-el-brega-lng-terminal-ly/","data_source":"Data: Global Gas Infrastructure Tracker, Global Energy Monitor, September 2025"},{"terminal_slug":"marsa-el-brega-lng-terminal-ly","terminal_name":"Marsa El Brega LNG Terminal","country":"Libya","country_iso":"LY","unit_name":"T2","status":"mothballed","facility_type":"export","floating_type":"unknown","capacity_mtpa":0.8,"capacity_bcm_y":1.09,"start_year":1970,"planned_start_year":null,"original_planned_start_year":null,"fid_year":null,"construction_year":null,"shelved_year":null,"cancelled_year":null,"stop_year":2011,"estimated_cost_usd":null,"estimated_cost_original":null,"estimated_cost_currency":null,"power_stations_supplied":null,"floating_vessel_name":null,"ccs_project":null,"hydrogen_project":null,"ammonia_project":null,"synthetic_lng_project":null,"retrofit_proposed":null,"url":"https://lngatlas.org/terminal/marsa-el-brega-lng-terminal-ly/","data_source":"Data: Global Gas Infrastructure Tracker, Global Energy Monitor, September 2025"},{"terminal_slug":"marsa-el-brega-lng-terminal-ly","terminal_name":"Marsa El Brega LNG Terminal","country":"Libya","country_iso":"LY","unit_name":"T3","status":"mothballed","facility_type":"export","floating_type":"unknown","capacity_mtpa":0.8,"capacity_bcm_y":1.09,"start_year":1970,"planned_start_year":null,"original_planned_start_year":null,"fid_year":null,"construction_year":null,"shelved_year":null,"cancelled_year":null,"stop_year":2011,"estimated_cost_usd":null,"estimated_cost_original":null,"estimated_cost_currency":null,"power_stations_supplied":null,"floating_vessel_name":null,"ccs_project":null,"hydrogen_project":null,"ammonia_project":null,"synthetic_lng_project":null,"retrofit_proposed":null,"url":"https://lngatlas.org/terminal/marsa-el-brega-lng-terminal-ly/","data_source":"Data: Global Gas Infrastructure Tracker, Global Energy Monitor, September 2025"},{"terminal_slug":"marsa-el-brega-lng-terminal-ly","terminal_name":"Marsa El Brega LNG Terminal","country":"Libya","country_iso":"LY","unit_name":"T4","status":"mothballed","facility_type":"export","floating_type":"unknown","capacity_mtpa":0.8,"capacity_bcm_y":1.09,"start_year":1970,"planned_start_year":null,"original_planned_start_year":null,"fid_year":null,"construction_year":null,"shelved_year":null,"cancelled_year":null,"stop_year":2011,"estimated_cost_usd":null,"estimated_cost_original":null,"estimated_cost_currency":null,"power_stations_supplied":null,"floating_vessel_name":null,"ccs_project":null,"hydrogen_project":null,"ammonia_project":null,"synthetic_lng_project":null,"retrofit_proposed":null,"url":"https://lngatlas.org/terminal/marsa-el-brega-lng-terminal-ly/","data_source":"Data: Global Gas Infrastructure Tracker, Global Energy Monitor, September 2025"},{"terminal_slug":"marshal-vasilevskiy-fsru-ru","terminal_name":"Marshal Vasilevskiy FSRU","country":"Russia","country_iso":"RU","unit_name":null,"status":"idle","facility_type":"unknown","floating_type":"fsru","capacity_mtpa":3.76,"capacity_bcm_y":5.12,"start_year":2019,"planned_start_year":null,"original_planned_start_year":null,"fid_year":null,"construction_year":null,"shelved_year":null,"cancelled_year":null,"stop_year":null,"estimated_cost_usd":588000000,"estimated_cost_original":42000000000,"estimated_cost_currency":"RUB","power_stations_supplied":null,"floating_vessel_name":"Marshal Vasilevskiy","ccs_project":null,"hydrogen_project":null,"ammonia_project":null,"synthetic_lng_project":null,"retrofit_proposed":null,"url":"https://lngatlas.org/terminal/marshal-vasilevskiy-fsru-ru/","data_source":"Data: Global Gas Infrastructure Tracker, Global Energy Monitor, September 2025"},{"terminal_slug":"mashal-lng-terminal-pk","terminal_name":"Mashal LNG Terminal","country":"Pakistan","country_iso":"PK","unit_name":null,"status":"cancelled","facility_type":"import","floating_type":"unknown","capacity_mtpa":3.5,"capacity_bcm_y":4.76,"start_year":null,"planned_start_year":null,"original_planned_start_year":null,"fid_year":null,"construction_year":null,"shelved_year":null,"cancelled_year":2011,"stop_year":2011,"estimated_cost_usd":null,"estimated_cost_original":null,"estimated_cost_currency":null,"power_stations_supplied":null,"floating_vessel_name":null,"ccs_project":null,"hydrogen_project":null,"ammonia_project":null,"synthetic_lng_project":null,"retrofit_proposed":null,"url":"https://lngatlas.org/terminal/mashal-lng-terminal-pk/","data_source":"Data: Global Gas Infrastructure Tracker, Global Energy Monitor, September 2025"},{"terminal_slug":"matarbari-ge-lng-terminal-bd","terminal_name":"Matarbari GE LNG Terminal","country":"Bangladesh","country_iso":"BD","unit_name":"GE Terminal","status":"cancelled","facility_type":"import","floating_type":"unknown","capacity_mtpa":null,"capacity_bcm_y":null,"start_year":null,"planned_start_year":null,"original_planned_start_year":2021,"fid_year":null,"construction_year":null,"shelved_year":2020,"cancelled_year":2022,"stop_year":2022,"estimated_cost_usd":null,"estimated_cost_original":null,"estimated_cost_currency":null,"power_stations_supplied":"Matarbari LNG power station","floating_vessel_name":null,"ccs_project":null,"hydrogen_project":null,"ammonia_project":null,"synthetic_lng_project":null,"retrofit_proposed":null,"url":"https://lngatlas.org/terminal/matarbari-ge-lng-terminal-bd/","data_source":"Data: Global Gas Infrastructure Tracker, Global Energy Monitor, September 2025"},{"terminal_slug":"rpgc-matarbari-lng-terminal-bd","terminal_name":"Matarbari LNG Terminal","country":"Bangladesh","country_iso":"BD","unit_name":"Summit Terminal","status":"proposed","facility_type":"import","floating_type":"unknown","capacity_mtpa":7.5,"capacity_bcm_y":10.2,"start_year":null,"planned_start_year":2030,"original_planned_start_year":2023,"fid_year":null,"construction_year":null,"shelved_year":null,"cancelled_year":null,"stop_year":null,"estimated_cost_usd":1000000000,"estimated_cost_original":1000000000,"estimated_cost_currency":"USD","power_stations_supplied":null,"floating_vessel_name":null,"ccs_project":null,"hydrogen_project":null,"ammonia_project":null,"synthetic_lng_project":null,"retrofit_proposed":null,"url":"https://lngatlas.org/terminal/rpgc-matarbari-lng-terminal-bd/","data_source":"Data: Global Gas Infrastructure Tracker, Global Energy Monitor, September 2025"},{"terminal_slug":"matola-fsru-mz","terminal_name":"Matola FSRU","country":"Mozambique","country_iso":"MZ","unit_name":null,"status":"proposed","facility_type":"import","floating_type":"fsru","capacity_mtpa":2.5,"capacity_bcm_y":3.4,"start_year":null,"planned_start_year":2027,"original_planned_start_year":2025,"fid_year":2025,"construction_year":null,"shelved_year":null,"cancelled_year":null,"stop_year":null,"estimated_cost_usd":550000000,"estimated_cost_original":550000000,"estimated_cost_currency":"USD","power_stations_supplied":null,"floating_vessel_name":null,"ccs_project":null,"hydrogen_project":null,"ammonia_project":null,"synthetic_lng_project":null,"retrofit_proposed":null,"url":"https://lngatlas.org/terminal/matola-fsru-mz/","data_source":"Data: Global Gas Infrastructure Tracker, Global Energy Monitor, September 2025"},{"terminal_slug":"maurice-bonnefil-lng-terminal-ht","terminal_name":"Maurice Bonnefil LNG Terminal","country":"Haiti","country_iso":"HT","unit_name":null,"status":"cancelled","facility_type":"import","floating_type":"unknown","capacity_mtpa":null,"capacity_bcm_y":null,"start_year":null,"planned_start_year":null,"original_planned_start_year":2016,"fid_year":null,"construction_year":2013,"shelved_year":2017,"cancelled_year":2018,"stop_year":2018,"estimated_cost_usd":123000000,"estimated_cost_original":123000000,"estimated_cost_currency":"USD","power_stations_supplied":null,"floating_vessel_name":null,"ccs_project":null,"hydrogen_project":null,"ammonia_project":null,"synthetic_lng_project":null,"retrofit_proposed":null,"url":"https://lngatlas.org/terminal/maurice-bonnefil-lng-terminal-ht/","data_source":"Data: Global Gas Infrastructure Tracker, Global Energy Monitor, September 2025"},{"terminal_slug":"mauritius-fsru-mu","terminal_name":"Mauritius FSRU","country":"Mauritius","country_iso":"MU","unit_name":null,"status":"shelved","facility_type":"import","floating_type":"fsru","capacity_mtpa":null,"capacity_bcm_y":null,"start_year":null,"planned_start_year":null,"original_planned_start_year":null,"fid_year":null,"construction_year":null,"shelved_year":2024,"cancelled_year":null,"stop_year":null,"estimated_cost_usd":null,"estimated_cost_original":null,"estimated_cost_currency":null,"power_stations_supplied":null,"floating_vessel_name":null,"ccs_project":null,"hydrogen_project":null,"ammonia_project":null,"synthetic_lng_project":null,"retrofit_proposed":null,"url":"https://lngatlas.org/terminal/mauritius-fsru-mu/","data_source":"Data: Global Gas Infrastructure Tracker, Global Energy Monitor, September 2025"},{"terminal_slug":"mee-laung-gyaing-fsru-mm","terminal_name":"Mee Laung Gyaing FSRU","country":"Myanmar","country_iso":"MM","unit_name":null,"status":"shelved","facility_type":"import","floating_type":"fsru","capacity_mtpa":null,"capacity_bcm_y":null,"start_year":null,"planned_start_year":null,"original_planned_start_year":2023,"fid_year":null,"construction_year":null,"shelved_year":2022,"cancelled_year":null,"stop_year":null,"estimated_cost_usd":null,"estimated_cost_original":null,"estimated_cost_currency":null,"power_stations_supplied":"Mee Laung Gyaing power station","floating_vessel_name":null,"ccs_project":null,"hydrogen_project":null,"ammonia_project":null,"synthetic_lng_project":null,"retrofit_proposed":null,"url":"https://lngatlas.org/terminal/mee-laung-gyaing-fsru-mm/","data_source":"Data: Global Gas Infrastructure Tracker, Global Energy Monitor, September 2025"},{"terminal_slug":"mejillones-lng-terminal-cl","terminal_name":"Mejillones LNG Terminal","country":"Chile","country_iso":"CL","unit_name":null,"status":"operating","facility_type":"import","floating_type":"unknown","capacity_mtpa":1.5,"capacity_bcm_y":2.04,"start_year":2010,"planned_start_year":null,"original_planned_start_year":null,"fid_year":null,"construction_year":null,"shelved_year":null,"cancelled_year":null,"stop_year":null,"estimated_cost_usd":500000000,"estimated_cost_original":500000000,"estimated_cost_currency":"USD","power_stations_supplied":"Mejillones power station, Tocopilla power station","floating_vessel_name":null,"ccs_project":null,"hydrogen_project":null,"ammonia_project":null,"synthetic_lng_project":null,"retrofit_proposed":null,"url":"https://lngatlas.org/terminal/mejillones-lng-terminal-cl/","data_source":"Data: Global Gas Infrastructure Tracker, Global Energy Monitor, September 2025"},{"terminal_slug":"melaka-lng-terminal-my","terminal_name":"Melaka FSRU","country":"Malaysia","country_iso":"MY","unit_name":null,"status":"operating","facility_type":"import","floating_type":"fsru","capacity_mtpa":3.8,"capacity_bcm_y":5.17,"start_year":2013,"planned_start_year":null,"original_planned_start_year":null,"fid_year":2012,"construction_year":null,"shelved_year":null,"cancelled_year":null,"stop_year":null,"estimated_cost_usd":null,"estimated_cost_original":null,"estimated_cost_currency":null,"power_stations_supplied":null,"floating_vessel_name":"Tenaga Empat (FSU), Tenaga Satu (FSU)","ccs_project":null,"hydrogen_project":null,"ammonia_project":null,"synthetic_lng_project":null,"retrofit_proposed":null,"url":"https://lngatlas.org/terminal/melaka-lng-terminal-my/","data_source":"Data: Global Gas Infrastructure Tracker, Global Energy Monitor, September 2025"},{"terminal_slug":"mina-al-ahmadi-lng-terminal-kw","terminal_name":"Mina Al-Ahmadi LNG Terminal","country":"Kuwait","country_iso":"KW","unit_name":"Explorer FSRU","status":"idle","facility_type":"import","floating_type":"floating","capacity_mtpa":3.8,"capacity_bcm_y":5.17,"start_year":2009,"planned_start_year":null,"original_planned_start_year":null,"fid_year":null,"construction_year":null,"shelved_year":null,"cancelled_year":null,"stop_year":2014,"estimated_cost_usd":null,"estimated_cost_original":null,"estimated_cost_currency":null,"power_stations_supplied":null,"floating_vessel_name":"Explorer, Golar Igloo","ccs_project":null,"hydrogen_project":null,"ammonia_project":null,"synthetic_lng_project":null,"retrofit_proposed":null,"url":"https://lngatlas.org/terminal/mina-al-ahmadi-lng-terminal-kw/","data_source":"Data: Global Gas Infrastructure Tracker, Global Energy Monitor, September 2025"},{"terminal_slug":"mina-al-ahmadi-lng-terminal-kw","terminal_name":"Mina Al-Ahmadi LNG Terminal","country":"Kuwait","country_iso":"KW","unit_name":"Golar FSRU","status":"mothballed","facility_type":"import","floating_type":"floating","capacity_mtpa":5.8,"capacity_bcm_y":7.89,"start_year":2014,"planned_start_year":null,"original_planned_start_year":null,"fid_year":null,"construction_year":null,"shelved_year":null,"cancelled_year":null,"stop_year":2022,"estimated_cost_usd":null,"estimated_cost_original":null,"estimated_cost_currency":null,"power_stations_supplied":null,"floating_vessel_name":"Explorer, Golar Igloo","ccs_project":null,"hydrogen_project":null,"ammonia_project":null,"synthetic_lng_project":null,"retrofit_proposed":null,"url":"https://lngatlas.org/terminal/mina-al-ahmadi-lng-terminal-kw/","data_source":"Data: Global Gas Infrastructure Tracker, Global Energy Monitor, September 2025"},{"terminal_slug":"mizushima-lng-terminal-jp","terminal_name":"Mizushima LNG Terminal","country":"Japan","country_iso":"JP","unit_name":null,"status":"operating","facility_type":"import","floating_type":"unknown","capacity_mtpa":4.3,"capacity_bcm_y":5.85,"start_year":2006,"planned_start_year":null,"original_planned_start_year":null,"fid_year":null,"construction_year":null,"shelved_year":null,"cancelled_year":null,"stop_year":null,"estimated_cost_usd":null,"estimated_cost_original":null,"estimated_cost_currency":null,"power_stations_supplied":null,"floating_vessel_name":null,"ccs_project":null,"hydrogen_project":null,"ammonia_project":null,"synthetic_lng_project":null,"retrofit_proposed":null,"url":"https://lngatlas.org/terminal/mizushima-lng-terminal-jp/","data_source":"Data: Global Gas Infrastructure Tracker, Global Energy Monitor, September 2025"},{"terminal_slug":"moheshkhali-floating-lng-terminal-bd","terminal_name":"Moheshkhali Floating LNG Terminal","country":"Bangladesh","country_iso":"BD","unit_name":null,"status":"operating","facility_type":"import","floating_type":"floating","capacity_mtpa":4.5,"capacity_bcm_y":6.12,"start_year":2018,"planned_start_year":null,"original_planned_start_year":null,"fid_year":null,"construction_year":2017,"shelved_year":null,"cancelled_year":null,"stop_year":null,"estimated_cost_usd":179500000,"estimated_cost_original":179500000,"estimated_cost_currency":"USD","power_stations_supplied":null,"floating_vessel_name":"Excelerate Excellence","ccs_project":null,"hydrogen_project":null,"ammonia_project":null,"synthetic_lng_project":null,"retrofit_proposed":null,"url":"https://lngatlas.org/terminal/moheshkhali-floating-lng-terminal-bd/","data_source":"Data: Global Gas Infrastructure Tracker, Global Energy Monitor, September 2025"},{"terminal_slug":"mombasa-lng-terminal-ke","terminal_name":"Mombasa LNG Terminal","country":"Kenya","country_iso":"KE","unit_name":"Original Proposal","status":"shelved","facility_type":"import","floating_type":"unknown","capacity_mtpa":0.26,"capacity_bcm_y":0.35,"start_year":null,"planned_start_year":null,"original_planned_start_year":null,"fid_year":null,"construction_year":null,"shelved_year":2024,"cancelled_year":null,"stop_year":null,"estimated_cost_usd":500000000,"estimated_cost_original":500000000,"estimated_cost_currency":"USD","power_stations_supplied":null,"floating_vessel_name":null,"ccs_project":null,"hydrogen_project":null,"ammonia_project":null,"synthetic_lng_project":null,"retrofit_proposed":null,"url":"https://lngatlas.org/terminal/mombasa-lng-terminal-ke/","data_source":"Data: Global Gas Infrastructure Tracker, Global Energy Monitor, September 2025"},{"terminal_slug":"mombasa-lng-terminal-ke","terminal_name":"Mombasa LNG Terminal","country":"Kenya","country_iso":"KE","unit_name":"Second Proposal","status":"proposed","facility_type":"import","floating_type":"unknown","capacity_mtpa":6.2,"capacity_bcm_y":8.44,"start_year":null,"planned_start_year":null,"original_planned_start_year":2027,"fid_year":null,"construction_year":null,"shelved_year":null,"cancelled_year":null,"stop_year":null,"estimated_cost_usd":null,"estimated_cost_original":null,"estimated_cost_currency":null,"power_stations_supplied":null,"floating_vessel_name":null,"ccs_project":null,"hydrogen_project":null,"ammonia_project":null,"synthetic_lng_project":null,"retrofit_proposed":null,"url":"https://lngatlas.org/terminal/mombasa-lng-terminal-ke/","data_source":"Data: Global Gas Infrastructure Tracker, Global Energy Monitor, September 2025"},{"terminal_slug":"monkey-island-lng-terminal-us","terminal_name":"Monkey Island LNG Terminal","country":"United States","country_iso":"US","unit_name":"Phase 1 (T1-T3)","status":"proposed","facility_type":"export","floating_type":"unknown","capacity_mtpa":15.6,"capacity_bcm_y":21.22,"start_year":null,"planned_start_year":2030,"original_planned_start_year":2022,"fid_year":null,"construction_year":null,"shelved_year":2016,"cancelled_year":2018,"stop_year":2018,"estimated_cost_usd":null,"estimated_cost_original":null,"estimated_cost_currency":null,"power_stations_supplied":null,"floating_vessel_name":null,"ccs_project":null,"hydrogen_project":null,"ammonia_project":null,"synthetic_lng_project":null,"retrofit_proposed":null,"url":"https://lngatlas.org/terminal/monkey-island-lng-terminal-us/","data_source":"Data: Global Gas Infrastructure Tracker, Global Energy Monitor, September 2025"},{"terminal_slug":"monkey-island-lng-terminal-us","terminal_name":"Monkey Island LNG Terminal","country":"United States","country_iso":"US","unit_name":"Phase 2 (T4-T5)","status":"proposed","facility_type":"export","floating_type":"unknown","capacity_mtpa":10.4,"capacity_bcm_y":14.15,"start_year":null,"planned_start_year":2030,"original_planned_start_year":2022,"fid_year":null,"construction_year":null,"shelved_year":2016,"cancelled_year":2018,"stop_year":2018,"estimated_cost_usd":null,"estimated_cost_original":null,"estimated_cost_currency":null,"power_stations_supplied":null,"floating_vessel_name":null,"ccs_project":null,"hydrogen_project":null,"ammonia_project":null,"synthetic_lng_project":null,"retrofit_proposed":null,"url":"https://lngatlas.org/terminal/monkey-island-lng-terminal-us/","data_source":"Data: Global Gas Infrastructure Tracker, Global Energy Monitor, September 2025"},{"terminal_slug":"montego-bay-lng-terminal-jm","terminal_name":"Montego Bay LNG Terminal","country":"Jamaica","country_iso":"JM","unit_name":null,"status":"operating","facility_type":"import","floating_type":"unknown","capacity_mtpa":0.5,"capacity_bcm_y":0.68,"start_year":2016,"planned_start_year":null,"original_planned_start_year":null,"fid_year":null,"construction_year":2015,"shelved_year":null,"cancelled_year":null,"stop_year":null,"estimated_cost_usd":200000000,"estimated_cost_original":200000000,"estimated_cost_currency":"USD","power_stations_supplied":"Bogue power station","floating_vessel_name":null,"ccs_project":null,"hydrogen_project":null,"ammonia_project":null,"synthetic_lng_project":null,"retrofit_proposed":null,"url":"https://lngatlas.org/terminal/montego-bay-lng-terminal-jm/","data_source":"Data: Global Gas Infrastructure Tracker, Global Energy Monitor, September 2025"},{"terminal_slug":"monteverde-pacific-lng-terminal-ec","terminal_name":"Monteverde Pacific LNG Terminal","country":"Ecuador","country_iso":"EC","unit_name":null,"status":"proposed","facility_type":"import","floating_type":"unknown","capacity_mtpa":null,"capacity_bcm_y":null,"start_year":null,"planned_start_year":null,"original_planned_start_year":2029,"fid_year":null,"construction_year":null,"shelved_year":null,"cancelled_year":null,"stop_year":null,"estimated_cost_usd":null,"estimated_cost_original":null,"estimated_cost_currency":null,"power_stations_supplied":null,"floating_vessel_name":null,"ccs_project":null,"hydrogen_project":null,"ammonia_project":null,"synthetic_lng_project":null,"retrofit_proposed":null,"url":"https://lngatlas.org/terminal/monteverde-pacific-lng-terminal-ec/","data_source":"Data: Global Gas Infrastructure Tracker, Global Energy Monitor, September 2025"},{"terminal_slug":"montoir-lng-terminal-fr","terminal_name":"Montoir LNG Terminal","country":"France","country_iso":"FR","unit_name":null,"status":"operating","facility_type":"import","floating_type":"unknown","capacity_mtpa":8,"capacity_bcm_y":10.88,"start_year":1980,"planned_start_year":null,"original_planned_start_year":null,"fid_year":null,"construction_year":null,"shelved_year":null,"cancelled_year":null,"stop_year":null,"estimated_cost_usd":null,"estimated_cost_original":null,"estimated_cost_currency":null,"power_stations_supplied":null,"floating_vessel_name":null,"ccs_project":null,"hydrogen_project":null,"ammonia_project":null,"synthetic_lng_project":null,"retrofit_proposed":null,"url":"https://lngatlas.org/terminal/montoir-lng-terminal-fr/","data_source":"Data: Global Gas Infrastructure Tracker, Global Energy Monitor, September 2025"},{"terminal_slug":"montoir-lng-terminal-fr","terminal_name":"Montoir LNG Terminal","country":"France","country_iso":"FR","unit_name":"Expansion","status":"proposed","facility_type":"import","floating_type":"unknown","capacity_mtpa":1.84,"capacity_bcm_y":2.5,"start_year":null,"planned_start_year":null,"original_planned_start_year":2023,"fid_year":null,"construction_year":null,"shelved_year":null,"cancelled_year":null,"stop_year":null,"estimated_cost_usd":545000000,"estimated_cost_original":500000000,"estimated_cost_currency":"EUR","power_stations_supplied":null,"floating_vessel_name":null,"ccs_project":null,"hydrogen_project":null,"ammonia_project":null,"synthetic_lng_project":null,"retrofit_proposed":null,"url":"https://lngatlas.org/terminal/montoir-lng-terminal-fr/","data_source":"Data: Global Gas Infrastructure Tracker, Global Energy Monitor, September 2025"},{"terminal_slug":"morocco-fsru-ma","terminal_name":"Morocco FSRU","country":"Morocco","country_iso":"MA","unit_name":null,"status":"proposed","facility_type":"import","floating_type":"fsru","capacity_mtpa":null,"capacity_bcm_y":null,"start_year":null,"planned_start_year":null,"original_planned_start_year":2021,"fid_year":null,"construction_year":null,"shelved_year":null,"cancelled_year":null,"stop_year":null,"estimated_cost_usd":null,"estimated_cost_original":null,"estimated_cost_currency":null,"power_stations_supplied":null,"floating_vessel_name":null,"ccs_project":null,"hydrogen_project":null,"ammonia_project":null,"synthetic_lng_project":null,"retrofit_proposed":null,"url":"https://lngatlas.org/terminal/morocco-fsru-ma/","data_source":"Data: Global Gas Infrastructure Tracker, Global Energy Monitor, September 2025"},{"terminal_slug":"mosjoen-lng-terminal-no","terminal_name":"Mosjoen LNG Terminal","country":"Norway","country_iso":"NO","unit_name":null,"status":"operating","facility_type":"import","floating_type":"unknown","capacity_mtpa":0.4,"capacity_bcm_y":0.54,"start_year":2007,"planned_start_year":null,"original_planned_start_year":null,"fid_year":null,"construction_year":null,"shelved_year":null,"cancelled_year":null,"stop_year":null,"estimated_cost_usd":null,"estimated_cost_original":null,"estimated_cost_currency":null,"power_stations_supplied":null,"floating_vessel_name":null,"ccs_project":null,"hydrogen_project":null,"ammonia_project":null,"synthetic_lng_project":null,"retrofit_proposed":null,"url":"https://lngatlas.org/terminal/mosjoen-lng-terminal-no/","data_source":"Data: Global Gas Infrastructure Tracker, Global Energy Monitor, September 2025"},{"terminal_slug":"mossel-bay-fsru-za","terminal_name":"Mossel Bay FSRU","country":"South Africa","country_iso":"ZA","unit_name":null,"status":"cancelled","facility_type":"import","floating_type":"fsru","capacity_mtpa":2,"capacity_bcm_y":2.72,"start_year":null,"planned_start_year":null,"original_planned_start_year":null,"fid_year":null,"construction_year":null,"shelved_year":null,"cancelled_year":2014,"stop_year":2014,"estimated_cost_usd":null,"estimated_cost_original":null,"estimated_cost_currency":null,"power_stations_supplied":null,"floating_vessel_name":null,"ccs_project":null,"hydrogen_project":null,"ammonia_project":null,"synthetic_lng_project":null,"retrofit_proposed":null,"url":"https://lngatlas.org/terminal/mossel-bay-fsru-za/","data_source":"Data: Global Gas Infrastructure Tracker, Global Energy Monitor, September 2025"},{"terminal_slug":"mowi-lng-terminal-gb","terminal_name":"Mowi LNG Terminal","country":"United Kingdom","country_iso":"GB","unit_name":null,"status":"operating","facility_type":"import","floating_type":"unknown","capacity_mtpa":0.22,"capacity_bcm_y":0.3,"start_year":2021,"planned_start_year":null,"original_planned_start_year":null,"fid_year":null,"construction_year":null,"shelved_year":null,"cancelled_year":null,"stop_year":null,"estimated_cost_usd":null,"estimated_cost_original":null,"estimated_cost_currency":null,"power_stations_supplied":null,"floating_vessel_name":null,"ccs_project":null,"hydrogen_project":null,"ammonia_project":null,"synthetic_lng_project":null,"retrofit_proposed":null,"url":"https://lngatlas.org/terminal/mowi-lng-terminal-gb/","data_source":"Data: Global Gas Infrastructure Tracker, Global Energy Monitor, September 2025"},{"terminal_slug":"mozambique-lng-terminal-mz","terminal_name":"Mozambique LNG Terminal","country":"Mozambique","country_iso":"MZ","unit_name":"T1","status":"shelved","facility_type":"export","floating_type":"unknown","capacity_mtpa":6.45,"capacity_bcm_y":8.78,"start_year":null,"planned_start_year":2029,"original_planned_start_year":2025,"fid_year":2019,"construction_year":null,"shelved_year":2021,"cancelled_year":null,"stop_year":null,"estimated_cost_usd":5000000000,"estimated_cost_original":5000000000,"estimated_cost_currency":"USD","power_stations_supplied":null,"floating_vessel_name":null,"ccs_project":null,"hydrogen_project":null,"ammonia_project":null,"synthetic_lng_project":null,"retrofit_proposed":null,"url":"https://lngatlas.org/terminal/mozambique-lng-terminal-mz/","data_source":"Data: Global Gas Infrastructure Tracker, Global Energy Monitor, September 2025"},{"terminal_slug":"mozambique-lng-terminal-mz","terminal_name":"Mozambique LNG Terminal","country":"Mozambique","country_iso":"MZ","unit_name":"T2","status":"shelved","facility_type":"export","floating_type":"unknown","capacity_mtpa":6.45,"capacity_bcm_y":8.78,"start_year":null,"planned_start_year":2029,"original_planned_start_year":2025,"fid_year":2019,"construction_year":null,"shelved_year":2021,"cancelled_year":null,"stop_year":null,"estimated_cost_usd":5000000000,"estimated_cost_original":5000000000,"estimated_cost_currency":"USD","power_stations_supplied":null,"floating_vessel_name":null,"ccs_project":null,"hydrogen_project":null,"ammonia_project":null,"synthetic_lng_project":null,"retrofit_proposed":null,"url":"https://lngatlas.org/terminal/mozambique-lng-terminal-mz/","data_source":"Data: Global Gas Infrastructure Tracker, Global Energy Monitor, September 2025"},{"terminal_slug":"mozambique-lng-terminal-mz","terminal_name":"Mozambique LNG Terminal","country":"Mozambique","country_iso":"MZ","unit_name":"T3","status":"shelved","facility_type":"export","floating_type":"unknown","capacity_mtpa":5,"capacity_bcm_y":6.8,"start_year":null,"planned_start_year":null,"original_planned_start_year":2025,"fid_year":null,"construction_year":null,"shelved_year":2021,"cancelled_year":null,"stop_year":null,"estimated_cost_usd":5000000000,"estimated_cost_original":5000000000,"estimated_cost_currency":"USD","power_stations_supplied":null,"floating_vessel_name":null,"ccs_project":null,"hydrogen_project":null,"ammonia_project":null,"synthetic_lng_project":null,"retrofit_proposed":null,"url":"https://lngatlas.org/terminal/mozambique-lng-terminal-mz/","data_source":"Data: Global Gas Infrastructure Tracker, Global Energy Monitor, September 2025"},{"terminal_slug":"mozambique-lng-terminal-mz","terminal_name":"Mozambique LNG Terminal","country":"Mozambique","country_iso":"MZ","unit_name":"T4","status":"shelved","facility_type":"export","floating_type":"unknown","capacity_mtpa":5,"capacity_bcm_y":6.8,"start_year":null,"planned_start_year":null,"original_planned_start_year":2025,"fid_year":null,"construction_year":null,"shelved_year":2021,"cancelled_year":null,"stop_year":null,"estimated_cost_usd":5000000000,"estimated_cost_original":5000000000,"estimated_cost_currency":"USD","power_stations_supplied":null,"floating_vessel_name":null,"ccs_project":null,"hydrogen_project":null,"ammonia_project":null,"synthetic_lng_project":null,"retrofit_proposed":null,"url":"https://lngatlas.org/terminal/mozambique-lng-terminal-mz/","data_source":"Data: Global Gas Infrastructure Tracker, Global Energy Monitor, September 2025"},{"terminal_slug":"mugardos-lng-terminal-es","terminal_name":"Mugardos LNG Terminal","country":"Spain","country_iso":"ES","unit_name":null,"status":"operating","facility_type":"import","floating_type":"unknown","capacity_mtpa":2.6,"capacity_bcm_y":3.54,"start_year":2007,"planned_start_year":null,"original_planned_start_year":null,"fid_year":null,"construction_year":null,"shelved_year":null,"cancelled_year":null,"stop_year":null,"estimated_cost_usd":null,"estimated_cost_original":null,"estimated_cost_currency":null,"power_stations_supplied":null,"floating_vessel_name":null,"ccs_project":null,"hydrogen_project":null,"ammonia_project":null,"synthetic_lng_project":null,"retrofit_proposed":null,"url":"https://lngatlas.org/terminal/mugardos-lng-terminal-es/","data_source":"Data: Global Gas Infrastructure Tracker, Global Energy Monitor, September 2025"},{"terminal_slug":"mugardos-lng-terminal-es","terminal_name":"Mugardos LNG Terminal","country":"Spain","country_iso":"ES","unit_name":"Expansion","status":"cancelled","facility_type":"import","floating_type":"unknown","capacity_mtpa":2.65,"capacity_bcm_y":3.61,"start_year":null,"planned_start_year":null,"original_planned_start_year":2024,"fid_year":null,"construction_year":null,"shelved_year":2022,"cancelled_year":2024,"stop_year":2024,"estimated_cost_usd":39240000,"estimated_cost_original":36000000,"estimated_cost_currency":"EUR","power_stations_supplied":null,"floating_vessel_name":null,"ccs_project":null,"hydrogen_project":null,"ammonia_project":null,"synthetic_lng_project":null,"retrofit_proposed":null,"url":"https://lngatlas.org/terminal/mugardos-lng-terminal-es/","data_source":"Data: Global Gas Infrastructure Tracker, Global Energy Monitor, September 2025"},{"terminal_slug":"mui-ke-ga-fsru-vn","terminal_name":"Mui Ke Ga FSRU","country":"Vietnam","country_iso":"VN","unit_name":null,"status":"shelved","facility_type":"import","floating_type":"fsru","capacity_mtpa":1.5,"capacity_bcm_y":2.04,"start_year":null,"planned_start_year":null,"original_planned_start_year":2025,"fid_year":2021,"construction_year":null,"shelved_year":2025,"cancelled_year":null,"stop_year":null,"estimated_cost_usd":null,"estimated_cost_original":null,"estimated_cost_currency":null,"power_stations_supplied":null,"floating_vessel_name":null,"ccs_project":null,"hydrogen_project":null,"ammonia_project":null,"synthetic_lng_project":null,"retrofit_proposed":null,"url":"https://lngatlas.org/terminal/mui-ke-ga-fsru-vn/","data_source":"Data: Global Gas Infrastructure Tracker, Global Energy Monitor, September 2025"},{"terminal_slug":"mukran-fsru-de","terminal_name":"Mukran FSRU","country":"Germany","country_iso":"DE","unit_name":"Vessel 1","status":"operating","facility_type":"import","floating_type":"fsru","capacity_mtpa":9.92,"capacity_bcm_y":13.5,"start_year":2024,"planned_start_year":null,"original_planned_start_year":null,"fid_year":null,"construction_year":null,"shelved_year":null,"cancelled_year":null,"stop_year":null,"estimated_cost_usd":null,"estimated_cost_original":null,"estimated_cost_currency":null,"power_stations_supplied":null,"floating_vessel_name":"Energos Power","ccs_project":null,"hydrogen_project":null,"ammonia_project":null,"synthetic_lng_project":null,"retrofit_proposed":null,"url":"https://lngatlas.org/terminal/mukran-fsru-de/","data_source":"Data: Global Gas Infrastructure Tracker, Global Energy Monitor, September 2025"},{"terminal_slug":"mukran-fsru-de","terminal_name":"Mukran FSRU","country":"Germany","country_iso":"DE","unit_name":"Vessel 2","status":"mothballed","facility_type":"import","floating_type":"fsru","capacity_mtpa":null,"capacity_bcm_y":null,"start_year":2024,"planned_start_year":2027,"original_planned_start_year":null,"fid_year":null,"construction_year":null,"shelved_year":null,"cancelled_year":null,"stop_year":2025,"estimated_cost_usd":null,"estimated_cost_original":null,"estimated_cost_currency":null,"power_stations_supplied":null,"floating_vessel_name":"Energos Power","ccs_project":null,"hydrogen_project":null,"ammonia_project":null,"synthetic_lng_project":null,"retrofit_proposed":null,"url":"https://lngatlas.org/terminal/mukran-fsru-de/","data_source":"Data: Global Gas Infrastructure Tracker, Global Energy Monitor, September 2025"},{"terminal_slug":"mumbai-fsru-in","terminal_name":"Mumbai FSRU","country":"India","country_iso":"IN","unit_name":null,"status":"cancelled","facility_type":"import","floating_type":"fsru","capacity_mtpa":5,"capacity_bcm_y":6.8,"start_year":null,"planned_start_year":null,"original_planned_start_year":null,"fid_year":null,"construction_year":null,"shelved_year":2023,"cancelled_year":null,"stop_year":null,"estimated_cost_usd":349700000,"estimated_cost_original":26900000000,"estimated_cost_currency":"INR","power_stations_supplied":null,"floating_vessel_name":null,"ccs_project":null,"hydrogen_project":null,"ammonia_project":null,"synthetic_lng_project":null,"retrofit_proposed":null,"url":"https://lngatlas.org/terminal/mumbai-fsru-in/","data_source":"Data: Global Gas Infrastructure Tracker, Global Energy Monitor, September 2025"},{"terminal_slug":"mundra-lng-terminal-in","terminal_name":"Mundra LNG Terminal","country":"India","country_iso":"IN","unit_name":null,"status":"operating","facility_type":"import","floating_type":"unknown","capacity_mtpa":5,"capacity_bcm_y":6.8,"start_year":2020,"planned_start_year":null,"original_planned_start_year":null,"fid_year":null,"construction_year":null,"shelved_year":null,"cancelled_year":null,"stop_year":null,"estimated_cost_usd":null,"estimated_cost_original":null,"estimated_cost_currency":null,"power_stations_supplied":null,"floating_vessel_name":null,"ccs_project":null,"hydrogen_project":null,"ammonia_project":null,"synthetic_lng_project":null,"retrofit_proposed":null,"url":"https://lngatlas.org/terminal/mundra-lng-terminal-in/","data_source":"Data: Global Gas Infrastructure Tracker, Global Energy Monitor, September 2025"},{"terminal_slug":"murmansk-lng-terminal-ru","terminal_name":"Murmansk LNG Terminal","country":"Russia","country_iso":"RU","unit_name":"T1","status":"proposed","facility_type":"export","floating_type":"unknown","capacity_mtpa":6.8,"capacity_bcm_y":9.25,"start_year":null,"planned_start_year":null,"original_planned_start_year":2027,"fid_year":null,"construction_year":2027,"shelved_year":null,"cancelled_year":null,"stop_year":null,"estimated_cost_usd":null,"estimated_cost_original":null,"estimated_cost_currency":null,"power_stations_supplied":null,"floating_vessel_name":null,"ccs_project":null,"hydrogen_project":null,"ammonia_project":null,"synthetic_lng_project":null,"retrofit_proposed":null,"url":"https://lngatlas.org/terminal/murmansk-lng-terminal-ru/","data_source":"Data: Global Gas Infrastructure Tracker, Global Energy Monitor, September 2025"},{"terminal_slug":"murmansk-lng-terminal-ru","terminal_name":"Murmansk LNG Terminal","country":"Russia","country_iso":"RU","unit_name":"T2","status":"proposed","facility_type":"export","floating_type":"unknown","capacity_mtpa":6.8,"capacity_bcm_y":9.25,"start_year":null,"planned_start_year":null,"original_planned_start_year":2029,"fid_year":null,"construction_year":null,"shelved_year":null,"cancelled_year":null,"stop_year":null,"estimated_cost_usd":null,"estimated_cost_original":null,"estimated_cost_currency":null,"power_stations_supplied":null,"floating_vessel_name":null,"ccs_project":null,"hydrogen_project":null,"ammonia_project":null,"synthetic_lng_project":null,"retrofit_proposed":null,"url":"https://lngatlas.org/terminal/murmansk-lng-terminal-ru/","data_source":"Data: Global Gas Infrastructure Tracker, Global Energy Monitor, September 2025"},{"terminal_slug":"murmansk-lng-terminal-ru","terminal_name":"Murmansk LNG Terminal","country":"Russia","country_iso":"RU","unit_name":"T3","status":"proposed","facility_type":"export","floating_type":"unknown","capacity_mtpa":6.8,"capacity_bcm_y":9.25,"start_year":null,"planned_start_year":null,"original_planned_start_year":2029,"fid_year":null,"construction_year":null,"shelved_year":null,"cancelled_year":null,"stop_year":null,"estimated_cost_usd":null,"estimated_cost_original":null,"estimated_cost_currency":null,"power_stations_supplied":null,"floating_vessel_name":null,"ccs_project":null,"hydrogen_project":null,"ammonia_project":null,"synthetic_lng_project":null,"retrofit_proposed":null,"url":"https://lngatlas.org/terminal/murmansk-lng-terminal-ru/","data_source":"Data: Global Gas Infrastructure Tracker, Global Energy Monitor, September 2025"},{"terminal_slug":"nacala-fsru-mz","terminal_name":"Nacala FSRU","country":"Mozambique","country_iso":"MZ","unit_name":null,"status":"shelved","facility_type":"import","floating_type":"fsru","capacity_mtpa":null,"capacity_bcm_y":null,"start_year":null,"planned_start_year":null,"original_planned_start_year":null,"fid_year":null,"construction_year":2021,"shelved_year":2024,"cancelled_year":null,"stop_year":null,"estimated_cost_usd":null,"estimated_cost_original":null,"estimated_cost_currency":null,"power_stations_supplied":null,"floating_vessel_name":null,"ccs_project":null,"hydrogen_project":null,"ammonia_project":null,"synthetic_lng_project":null,"retrofit_proposed":null,"url":"https://lngatlas.org/terminal/nacala-fsru-mz/","data_source":"Data: Global Gas Infrastructure Tracker, Global Energy Monitor, September 2025"},{"terminal_slug":"nador-fsru-ma","terminal_name":"Nador FSRU","country":"Morocco","country_iso":"MA","unit_name":null,"status":"proposed","facility_type":"import","floating_type":"fsru","capacity_mtpa":null,"capacity_bcm_y":null,"start_year":null,"planned_start_year":null,"original_planned_start_year":2026,"fid_year":null,"construction_year":null,"shelved_year":null,"cancelled_year":null,"stop_year":null,"estimated_cost_usd":null,"estimated_cost_original":null,"estimated_cost_currency":null,"power_stations_supplied":null,"floating_vessel_name":null,"ccs_project":null,"hydrogen_project":null,"ammonia_project":null,"synthetic_lng_project":null,"retrofit_proposed":null,"url":"https://lngatlas.org/terminal/nador-fsru-ma/","data_source":"Data: Global Gas Infrastructure Tracker, Global Energy Monitor, September 2025"},{"terminal_slug":"nagasaki-lng-terminal-jp","terminal_name":"Nagasaki LNG Terminal","country":"Japan","country_iso":"JP","unit_name":null,"status":"operating","facility_type":"import","floating_type":"unknown","capacity_mtpa":0.2,"capacity_bcm_y":0.27,"start_year":2003,"planned_start_year":null,"original_planned_start_year":null,"fid_year":null,"construction_year":null,"shelved_year":null,"cancelled_year":null,"stop_year":null,"estimated_cost_usd":null,"estimated_cost_original":null,"estimated_cost_currency":null,"power_stations_supplied":null,"floating_vessel_name":null,"ccs_project":null,"hydrogen_project":null,"ammonia_project":null,"synthetic_lng_project":null,"retrofit_proposed":null,"url":"https://lngatlas.org/terminal/nagasaki-lng-terminal-jp/","data_source":"Data: Global Gas Infrastructure Tracker, Global Energy Monitor, September 2025"},{"terminal_slug":"nakagusuku-lng-terminal-jp","terminal_name":"Nakagusuku LNG Terminal","country":"Japan","country_iso":"JP","unit_name":null,"status":"operating","facility_type":"import","floating_type":"unknown","capacity_mtpa":9,"capacity_bcm_y":12.24,"start_year":2013,"planned_start_year":null,"original_planned_start_year":null,"fid_year":null,"construction_year":null,"shelved_year":null,"cancelled_year":null,"stop_year":null,"estimated_cost_usd":null,"estimated_cost_original":null,"estimated_cost_currency":null,"power_stations_supplied":null,"floating_vessel_name":null,"ccs_project":null,"hydrogen_project":null,"ammonia_project":null,"synthetic_lng_project":null,"retrofit_proposed":null,"url":"https://lngatlas.org/terminal/nakagusuku-lng-terminal-jp/","data_source":"Data: Global Gas Infrastructure Tracker, Global Energy Monitor, September 2025"},{"terminal_slug":"nam-dinh-lng-terminal-vn","terminal_name":"Nam Dinh LNG Terminal","country":"Vietnam","country_iso":"VN","unit_name":null,"status":"proposed","facility_type":"import","floating_type":"unknown","capacity_mtpa":0.65,"capacity_bcm_y":0.88,"start_year":null,"planned_start_year":null,"original_planned_start_year":null,"fid_year":2022,"construction_year":null,"shelved_year":null,"cancelled_year":null,"stop_year":null,"estimated_cost_usd":null,"estimated_cost_original":null,"estimated_cost_currency":null,"power_stations_supplied":null,"floating_vessel_name":null,"ccs_project":null,"hydrogen_project":null,"ammonia_project":null,"synthetic_lng_project":null,"retrofit_proposed":null,"url":"https://lngatlas.org/terminal/nam-dinh-lng-terminal-vn/","data_source":"Data: Global Gas Infrastructure Tracker, Global Energy Monitor, September 2025"},{"terminal_slug":"naoetsu-lng-terminal-jp","terminal_name":"Naoetsu LNG Terminal","country":"Japan","country_iso":"JP","unit_name":null,"status":"operating","facility_type":"import","floating_type":"unknown","capacity_mtpa":2.1,"capacity_bcm_y":2.86,"start_year":2013,"planned_start_year":null,"original_planned_start_year":null,"fid_year":null,"construction_year":null,"shelved_year":null,"cancelled_year":null,"stop_year":null,"estimated_cost_usd":null,"estimated_cost_original":null,"estimated_cost_currency":null,"power_stations_supplied":null,"floating_vessel_name":null,"ccs_project":null,"hydrogen_project":null,"ammonia_project":null,"synthetic_lng_project":null,"retrofit_proposed":null,"url":"https://lngatlas.org/terminal/naoetsu-lng-terminal-jp/","data_source":"Data: Global Gas Infrastructure Tracker, Global Energy Monitor, September 2025"},{"terminal_slug":"negishi-lng-terminal-jp","terminal_name":"Negishi LNG Terminal","country":"Japan","country_iso":"JP","unit_name":null,"status":"operating","facility_type":"import","floating_type":"unknown","capacity_mtpa":12,"capacity_bcm_y":16.33,"start_year":1969,"planned_start_year":null,"original_planned_start_year":null,"fid_year":null,"construction_year":null,"shelved_year":null,"cancelled_year":null,"stop_year":null,"estimated_cost_usd":null,"estimated_cost_original":null,"estimated_cost_currency":null,"power_stations_supplied":null,"floating_vessel_name":null,"ccs_project":null,"hydrogen_project":null,"ammonia_project":null,"synthetic_lng_project":null,"retrofit_proposed":null,"url":"https://lngatlas.org/terminal/negishi-lng-terminal-jp/","data_source":"Data: Global Gas Infrastructure Tracker, Global Energy Monitor, September 2025"},{"terminal_slug":"neptune-lng-terminal-us","terminal_name":"Neptune LNG Terminal","country":"United States","country_iso":"US","unit_name":null,"status":"mothballed","facility_type":"import","floating_type":"unknown","capacity_mtpa":null,"capacity_bcm_y":null,"start_year":2010,"planned_start_year":null,"original_planned_start_year":null,"fid_year":null,"construction_year":null,"shelved_year":null,"cancelled_year":null,"stop_year":2013,"estimated_cost_usd":null,"estimated_cost_original":null,"estimated_cost_currency":null,"power_stations_supplied":null,"floating_vessel_name":null,"ccs_project":null,"hydrogen_project":null,"ammonia_project":null,"synthetic_lng_project":null,"retrofit_proposed":null,"url":"https://lngatlas.org/terminal/neptune-lng-terminal-us/","data_source":"Data: Global Gas Infrastructure Tracker, Global Energy Monitor, September 2025"},{"terminal_slug":"new-fortress-altamira-lng-terminal-mx","terminal_name":"New Fortress Altamira LNG Terminal","country":"Mexico","country_iso":"MX","unit_name":"Unit 1","status":"operating","facility_type":"export","floating_type":"floating","capacity_mtpa":1.4,"capacity_bcm_y":1.9,"start_year":2024,"planned_start_year":null,"original_planned_start_year":null,"fid_year":null,"construction_year":2022,"shelved_year":null,"cancelled_year":null,"stop_year":null,"estimated_cost_usd":433333333,"estimated_cost_original":433333333,"estimated_cost_currency":"USD","power_stations_supplied":null,"floating_vessel_name":null,"ccs_project":null,"hydrogen_project":null,"ammonia_project":null,"synthetic_lng_project":null,"retrofit_proposed":null,"url":"https://lngatlas.org/terminal/new-fortress-altamira-lng-terminal-mx/","data_source":"Data: Global Gas Infrastructure Tracker, Global Energy Monitor, September 2025"},{"terminal_slug":"new-fortress-altamira-lng-terminal-mx","terminal_name":"New Fortress Altamira LNG Terminal","country":"Mexico","country_iso":"MX","unit_name":"Unit 2","status":"construction","facility_type":"export","floating_type":"floating","capacity_mtpa":1.4,"capacity_bcm_y":1.9,"start_year":null,"planned_start_year":2027,"original_planned_start_year":2026,"fid_year":null,"construction_year":2025,"shelved_year":null,"cancelled_year":null,"stop_year":null,"estimated_cost_usd":700000000,"estimated_cost_original":700000000,"estimated_cost_currency":"USD","power_stations_supplied":null,"floating_vessel_name":null,"ccs_project":null,"hydrogen_project":null,"ammonia_project":null,"synthetic_lng_project":null,"retrofit_proposed":null,"url":"https://lngatlas.org/terminal/new-fortress-altamira-lng-terminal-mx/","data_source":"Data: Global Gas Infrastructure Tracker, Global Energy Monitor, September 2025"},{"terminal_slug":"new-fortress-altamira-lng-terminal-mx","terminal_name":"New Fortress Altamira LNG Terminal","country":"Mexico","country_iso":"MX","unit_name":"Unit 3","status":"proposed","facility_type":"export","floating_type":"floating","capacity_mtpa":1.4,"capacity_bcm_y":1.9,"start_year":null,"planned_start_year":null,"original_planned_start_year":null,"fid_year":null,"construction_year":null,"shelved_year":null,"cancelled_year":null,"stop_year":null,"estimated_cost_usd":433333333,"estimated_cost_original":433333333,"estimated_cost_currency":"USD","power_stations_supplied":null,"floating_vessel_name":null,"ccs_project":null,"hydrogen_project":null,"ammonia_project":null,"synthetic_lng_project":null,"retrofit_proposed":null,"url":"https://lngatlas.org/terminal/new-fortress-altamira-lng-terminal-mx/","data_source":"Data: Global Gas Infrastructure Tracker, Global Energy Monitor, September 2025"},{"terminal_slug":"new-fortress-altamira-lng-terminal-mx","terminal_name":"New Fortress Altamira LNG Terminal","country":"Mexico","country_iso":"MX","unit_name":"Unit 4","status":"shelved","facility_type":"export","floating_type":"floating","capacity_mtpa":1.4,"capacity_bcm_y":1.9,"start_year":null,"planned_start_year":null,"original_planned_start_year":null,"fid_year":null,"construction_year":null,"shelved_year":2025,"cancelled_year":null,"stop_year":null,"estimated_cost_usd":null,"estimated_cost_original":null,"estimated_cost_currency":null,"power_stations_supplied":null,"floating_vessel_name":null,"ccs_project":null,"hydrogen_project":null,"ammonia_project":null,"synthetic_lng_project":null,"retrofit_proposed":null,"url":"https://lngatlas.org/terminal/new-fortress-altamira-lng-terminal-mx/","data_source":"Data: Global Gas Infrastructure Tracker, Global Energy Monitor, September 2025"},{"terminal_slug":"new-fortress-altamira-lng-terminal-mx","terminal_name":"New Fortress Altamira LNG Terminal","country":"Mexico","country_iso":"MX","unit_name":"Unit 5","status":"shelved","facility_type":"export","floating_type":"floating","capacity_mtpa":1.4,"capacity_bcm_y":1.9,"start_year":null,"planned_start_year":null,"original_planned_start_year":null,"fid_year":null,"construction_year":null,"shelved_year":2025,"cancelled_year":null,"stop_year":null,"estimated_cost_usd":null,"estimated_cost_original":null,"estimated_cost_currency":null,"power_stations_supplied":null,"floating_vessel_name":null,"ccs_project":null,"hydrogen_project":null,"ammonia_project":null,"synthetic_lng_project":null,"retrofit_proposed":null,"url":"https://lngatlas.org/terminal/new-fortress-altamira-lng-terminal-mx/","data_source":"Data: Global Gas Infrastructure Tracker, Global Energy Monitor, September 2025"},{"terminal_slug":"new-fortress-angola-lng-terminal-ao","terminal_name":"New Fortress Angola LNG Terminal","country":"Angola","country_iso":"AO","unit_name":null,"status":"cancelled","facility_type":"import","floating_type":"unknown","capacity_mtpa":null,"capacity_bcm_y":null,"start_year":null,"planned_start_year":null,"original_planned_start_year":null,"fid_year":null,"construction_year":null,"shelved_year":null,"cancelled_year":2023,"stop_year":2023,"estimated_cost_usd":null,"estimated_cost_original":null,"estimated_cost_currency":null,"power_stations_supplied":null,"floating_vessel_name":null,"ccs_project":null,"hydrogen_project":null,"ammonia_project":null,"synthetic_lng_project":null,"retrofit_proposed":null,"url":"https://lngatlas.org/terminal/new-fortress-angola-lng-terminal-ao/","data_source":"Data: Global Gas Infrastructure Tracker, Global Energy Monitor, September 2025"},{"terminal_slug":"new-fortress-banda-lng-terminal-mr","terminal_name":"New Fortress Banda LNG Terminal","country":"Mauritania","country_iso":"MR","unit_name":null,"status":"cancelled","facility_type":"export","floating_type":"unknown","capacity_mtpa":null,"capacity_bcm_y":null,"start_year":null,"planned_start_year":null,"original_planned_start_year":2024,"fid_year":null,"construction_year":null,"shelved_year":2023,"cancelled_year":2025,"stop_year":2025,"estimated_cost_usd":null,"estimated_cost_original":null,"estimated_cost_currency":null,"power_stations_supplied":"Banda Gas-to-Power Project, Nouakchott Nord power plant","floating_vessel_name":null,"ccs_project":null,"hydrogen_project":null,"ammonia_project":null,"synthetic_lng_project":null,"retrofit_proposed":null,"url":"https://lngatlas.org/terminal/new-fortress-banda-lng-terminal-mr/","data_source":"Data: Global Gas Infrastructure Tracker, Global Energy Monitor, September 2025"},{"terminal_slug":"new-fortress-barcarena-fsru-br","terminal_name":"New Fortress Barcarena FSRU","country":"Brazil","country_iso":"BR","unit_name":null,"status":"operating","facility_type":"import","floating_type":"fsru","capacity_mtpa":6,"capacity_bcm_y":8.16,"start_year":2024,"planned_start_year":null,"original_planned_start_year":null,"fid_year":2021,"construction_year":2022,"shelved_year":null,"cancelled_year":null,"stop_year":null,"estimated_cost_usd":null,"estimated_cost_original":null,"estimated_cost_currency":null,"power_stations_supplied":"Novo Tempo Barcarena power station","floating_vessel_name":"Energos Celsius","ccs_project":null,"hydrogen_project":null,"ammonia_project":null,"synthetic_lng_project":null,"retrofit_proposed":null,"url":"https://lngatlas.org/terminal/new-fortress-barcarena-fsru-br/","data_source":"Data: Global Gas Infrastructure Tracker, Global Energy Monitor, September 2025"},{"terminal_slug":"new-fortress-colombo-lng-terminal-lk","terminal_name":"New Fortress Colombo LNG Terminal","country":"Sri Lanka","country_iso":"LK","unit_name":null,"status":"cancelled","facility_type":"import","floating_type":"unknown","capacity_mtpa":null,"capacity_bcm_y":null,"start_year":null,"planned_start_year":null,"original_planned_start_year":2023,"fid_year":null,"construction_year":null,"shelved_year":2023,"cancelled_year":null,"stop_year":null,"estimated_cost_usd":null,"estimated_cost_original":null,"estimated_cost_currency":null,"power_stations_supplied":"Yugadanavi power station","floating_vessel_name":null,"ccs_project":null,"hydrogen_project":null,"ammonia_project":null,"synthetic_lng_project":null,"retrofit_proposed":null,"url":"https://lngatlas.org/terminal/new-fortress-colombo-lng-terminal-lk/","data_source":"Data: Global Gas Infrastructure Tracker, Global Energy Monitor, September 2025"},{"terminal_slug":"new-fortress-grand-isle-flng-terminal-us","terminal_name":"New Fortress Grand Isle FLNG Terminal","country":"United States","country_iso":"US","unit_name":null,"status":"cancelled","facility_type":"export","floating_type":"flng","capacity_mtpa":2.8,"capacity_bcm_y":3.81,"start_year":null,"planned_start_year":null,"original_planned_start_year":2023,"fid_year":null,"construction_year":null,"shelved_year":2023,"cancelled_year":2025,"stop_year":2025,"estimated_cost_usd":1400000000,"estimated_cost_original":1400000000,"estimated_cost_currency":"USD","power_stations_supplied":null,"floating_vessel_name":null,"ccs_project":null,"hydrogen_project":null,"ammonia_project":null,"synthetic_lng_project":null,"retrofit_proposed":null,"url":"https://lngatlas.org/terminal/new-fortress-grand-isle-flng-terminal-us/","data_source":"Data: Global Gas Infrastructure Tracker, Global Energy Monitor, September 2025"},{"terminal_slug":"new-fortress-wyalusing-lng-terminal-us","terminal_name":"New Fortress Wyalusing LNG Terminal","country":"United States","country_iso":"US","unit_name":"T1-T2","status":"cancelled","facility_type":"export","floating_type":"unknown","capacity_mtpa":null,"capacity_bcm_y":null,"start_year":null,"planned_start_year":2024,"original_planned_start_year":2020,"fid_year":null,"construction_year":null,"shelved_year":2022,"cancelled_year":2025,"stop_year":2025,"estimated_cost_usd":800000000,"estimated_cost_original":800000000,"estimated_cost_currency":"USD","power_stations_supplied":null,"floating_vessel_name":null,"ccs_project":null,"hydrogen_project":null,"ammonia_project":null,"synthetic_lng_project":null,"retrofit_proposed":null,"url":"https://lngatlas.org/terminal/new-fortress-wyalusing-lng-terminal-us/","data_source":"Data: Global Gas Infrastructure Tracker, Global Energy Monitor, September 2025"},{"terminal_slug":"newmed-flng-terminal-il","terminal_name":"NewMed FLNG Terminal","country":"Israel","country_iso":"IL","unit_name":null,"status":"proposed","facility_type":"export","floating_type":"flng","capacity_mtpa":5.14,"capacity_bcm_y":6.99,"start_year":null,"planned_start_year":null,"original_planned_start_year":null,"fid_year":null,"construction_year":null,"shelved_year":null,"cancelled_year":null,"stop_year":null,"estimated_cost_usd":435000000,"estimated_cost_original":435000000,"estimated_cost_currency":"USD","power_stations_supplied":null,"floating_vessel_name":null,"ccs_project":null,"hydrogen_project":null,"ammonia_project":null,"synthetic_lng_project":null,"retrofit_proposed":null,"url":"https://lngatlas.org/terminal/newmed-flng-terminal-il/","data_source":"Data: Global Gas Infrastructure Tracker, Global Energy Monitor, September 2025"},{"terminal_slug":"newtimes-energy-lng-terminal-ca","terminal_name":"NewTimes Energy LNG Terminal","country":"Canada","country_iso":"CA","unit_name":"T1","status":"cancelled","facility_type":"export","floating_type":"unknown","capacity_mtpa":4,"capacity_bcm_y":5.44,"start_year":null,"planned_start_year":null,"original_planned_start_year":2019,"fid_year":null,"construction_year":null,"shelved_year":2018,"cancelled_year":2020,"stop_year":2020,"estimated_cost_usd":null,"estimated_cost_original":null,"estimated_cost_currency":null,"power_stations_supplied":null,"floating_vessel_name":null,"ccs_project":null,"hydrogen_project":null,"ammonia_project":null,"synthetic_lng_project":null,"retrofit_proposed":null,"url":"https://lngatlas.org/terminal/newtimes-energy-lng-terminal-ca/","data_source":"Data: Global Gas Infrastructure Tracker, Global Energy Monitor, September 2025"},{"terminal_slug":"newtimes-energy-lng-terminal-ca","terminal_name":"NewTimes Energy LNG Terminal","country":"Canada","country_iso":"CA","unit_name":"T2","status":"cancelled","facility_type":"export","floating_type":"unknown","capacity_mtpa":4,"capacity_bcm_y":5.44,"start_year":null,"planned_start_year":null,"original_planned_start_year":2020,"fid_year":null,"construction_year":null,"shelved_year":2018,"cancelled_year":2020,"stop_year":2020,"estimated_cost_usd":null,"estimated_cost_original":null,"estimated_cost_currency":null,"power_stations_supplied":null,"floating_vessel_name":null,"ccs_project":null,"hydrogen_project":null,"ammonia_project":null,"synthetic_lng_project":null,"retrofit_proposed":null,"url":"https://lngatlas.org/terminal/newtimes-energy-lng-terminal-ca/","data_source":"Data: Global Gas Infrastructure Tracker, Global Energy Monitor, September 2025"},{"terminal_slug":"newtimes-energy-lng-terminal-ca","terminal_name":"NewTimes Energy LNG Terminal","country":"Canada","country_iso":"CA","unit_name":"T3","status":"cancelled","facility_type":"export","floating_type":"unknown","capacity_mtpa":4,"capacity_bcm_y":5.44,"start_year":null,"planned_start_year":null,"original_planned_start_year":2021,"fid_year":null,"construction_year":null,"shelved_year":2018,"cancelled_year":2020,"stop_year":2020,"estimated_cost_usd":null,"estimated_cost_original":null,"estimated_cost_currency":null,"power_stations_supplied":null,"floating_vessel_name":null,"ccs_project":null,"hydrogen_project":null,"ammonia_project":null,"synthetic_lng_project":null,"retrofit_proposed":null,"url":"https://lngatlas.org/terminal/newtimes-energy-lng-terminal-ca/","data_source":"Data: Global Gas Infrastructure Tracker, Global Energy Monitor, September 2025"},{"terminal_slug":"newcastle-fsru-au","terminal_name":"Newcastle FSRU","country":"Australia","country_iso":"AU","unit_name":null,"status":"shelved","facility_type":"import","floating_type":"fsru","capacity_mtpa":1,"capacity_bcm_y":1.36,"start_year":null,"planned_start_year":null,"original_planned_start_year":2022,"fid_year":2020,"construction_year":null,"shelved_year":2023,"cancelled_year":null,"stop_year":null,"estimated_cost_usd":427849600,"estimated_cost_original":589000000,"estimated_cost_currency":"AUD","power_stations_supplied":null,"floating_vessel_name":null,"ccs_project":null,"hydrogen_project":null,"ammonia_project":null,"synthetic_lng_project":null,"retrofit_proposed":null,"url":"https://lngatlas.org/terminal/newcastle-fsru-au/","data_source":"Data: Global Gas Infrastructure Tracker, Global Energy Monitor, September 2025"},{"terminal_slug":"nextdecade-cork-fsru-ie","terminal_name":"NextDecade Cork FSRU","country":"Ireland","country_iso":"IE","unit_name":null,"status":"cancelled","facility_type":"import","floating_type":"fsru","capacity_mtpa":3,"capacity_bcm_y":4.08,"start_year":null,"planned_start_year":null,"original_planned_start_year":null,"fid_year":null,"construction_year":null,"shelved_year":null,"cancelled_year":2021,"stop_year":2021,"estimated_cost_usd":136250000,"estimated_cost_original":125000000,"estimated_cost_currency":"EUR","power_stations_supplied":null,"floating_vessel_name":null,"ccs_project":null,"hydrogen_project":null,"ammonia_project":null,"synthetic_lng_project":null,"retrofit_proposed":null,"url":"https://lngatlas.org/terminal/nextdecade-cork-fsru-ie/","data_source":"Data: Global Gas Infrastructure Tracker, Global Energy Monitor, September 2025"},{"terminal_slug":"nghi-son-lng-terminal-vn","terminal_name":"Nghi Son LNG Terminal","country":"Vietnam","country_iso":"VN","unit_name":null,"status":"proposed","facility_type":"import","floating_type":"unknown","capacity_mtpa":1.2,"capacity_bcm_y":1.63,"start_year":null,"planned_start_year":null,"original_planned_start_year":2030,"fid_year":null,"construction_year":null,"shelved_year":null,"cancelled_year":null,"stop_year":null,"estimated_cost_usd":null,"estimated_cost_original":null,"estimated_cost_currency":null,"power_stations_supplied":"Nghi Son Power Station","floating_vessel_name":null,"ccs_project":null,"hydrogen_project":null,"ammonia_project":null,"synthetic_lng_project":null,"retrofit_proposed":null,"url":"https://lngatlas.org/terminal/nghi-son-lng-terminal-vn/","data_source":"Data: Global Gas Infrastructure Tracker, Global Energy Monitor, September 2025"},{"terminal_slug":"ngqura-lng-terminal-za","terminal_name":"Ngqura LNG Terminal","country":"South Africa","country_iso":"ZA","unit_name":null,"status":"proposed","facility_type":"import","floating_type":"unknown","capacity_mtpa":2.8,"capacity_bcm_y":3.81,"start_year":null,"planned_start_year":null,"original_planned_start_year":2029,"fid_year":null,"construction_year":null,"shelved_year":null,"cancelled_year":null,"stop_year":null,"estimated_cost_usd":null,"estimated_cost_original":null,"estimated_cost_currency":null,"power_stations_supplied":null,"floating_vessel_name":null,"ccs_project":null,"hydrogen_project":null,"ammonia_project":null,"synthetic_lng_project":null,"retrofit_proposed":null,"url":"https://lngatlas.org/terminal/ngqura-lng-terminal-za/","data_source":"Data: Global Gas Infrastructure Tracker, Global Energy Monitor, September 2025"},{"terminal_slug":"nigeria-lng-terminal-ng","terminal_name":"Nigeria LNG Terminal","country":"Nigeria","country_iso":"NG","unit_name":"T01","status":"operating","facility_type":"export","floating_type":"unknown","capacity_mtpa":3.3,"capacity_bcm_y":4.49,"start_year":1999,"planned_start_year":null,"original_planned_start_year":null,"fid_year":null,"construction_year":null,"shelved_year":null,"cancelled_year":null,"stop_year":null,"estimated_cost_usd":null,"estimated_cost_original":null,"estimated_cost_currency":null,"power_stations_supplied":null,"floating_vessel_name":null,"ccs_project":null,"hydrogen_project":null,"ammonia_project":null,"synthetic_lng_project":null,"retrofit_proposed":null,"url":"https://lngatlas.org/terminal/nigeria-lng-terminal-ng/","data_source":"Data: Global Gas Infrastructure Tracker, Global Energy Monitor, September 2025"},{"terminal_slug":"nigeria-lng-terminal-ng","terminal_name":"Nigeria LNG Terminal","country":"Nigeria","country_iso":"NG","unit_name":"T02","status":"operating","facility_type":"export","floating_type":"unknown","capacity_mtpa":3.3,"capacity_bcm_y":4.49,"start_year":2000,"planned_start_year":null,"original_planned_start_year":null,"fid_year":null,"construction_year":null,"shelved_year":null,"cancelled_year":null,"stop_year":null,"estimated_cost_usd":null,"estimated_cost_original":null,"estimated_cost_currency":null,"power_stations_supplied":null,"floating_vessel_name":null,"ccs_project":null,"hydrogen_project":null,"ammonia_project":null,"synthetic_lng_project":null,"retrofit_proposed":null,"url":"https://lngatlas.org/terminal/nigeria-lng-terminal-ng/","data_source":"Data: Global Gas Infrastructure Tracker, Global Energy Monitor, September 2025"},{"terminal_slug":"nigeria-lng-terminal-ng","terminal_name":"Nigeria LNG Terminal","country":"Nigeria","country_iso":"NG","unit_name":"T03","status":"operating","facility_type":"export","floating_type":"unknown","capacity_mtpa":3.3,"capacity_bcm_y":4.49,"start_year":2002,"planned_start_year":null,"original_planned_start_year":null,"fid_year":null,"construction_year":null,"shelved_year":null,"cancelled_year":null,"stop_year":null,"estimated_cost_usd":null,"estimated_cost_original":null,"estimated_cost_currency":null,"power_stations_supplied":null,"floating_vessel_name":null,"ccs_project":null,"hydrogen_project":null,"ammonia_project":null,"synthetic_lng_project":null,"retrofit_proposed":null,"url":"https://lngatlas.org/terminal/nigeria-lng-terminal-ng/","data_source":"Data: Global Gas Infrastructure Tracker, Global Energy Monitor, September 2025"},{"terminal_slug":"nigeria-lng-terminal-ng","terminal_name":"Nigeria LNG Terminal","country":"Nigeria","country_iso":"NG","unit_name":"T04","status":"operating","facility_type":"export","floating_type":"unknown","capacity_mtpa":4.1,"capacity_bcm_y":5.58,"start_year":2005,"planned_start_year":null,"original_planned_start_year":null,"fid_year":null,"construction_year":null,"shelved_year":null,"cancelled_year":null,"stop_year":null,"estimated_cost_usd":null,"estimated_cost_original":null,"estimated_cost_currency":null,"power_stations_supplied":null,"floating_vessel_name":null,"ccs_project":null,"hydrogen_project":null,"ammonia_project":null,"synthetic_lng_project":null,"retrofit_proposed":null,"url":"https://lngatlas.org/terminal/nigeria-lng-terminal-ng/","data_source":"Data: Global Gas Infrastructure Tracker, Global Energy Monitor, September 2025"},{"terminal_slug":"nigeria-lng-terminal-ng","terminal_name":"Nigeria LNG Terminal","country":"Nigeria","country_iso":"NG","unit_name":"T05","status":"operating","facility_type":"export","floating_type":"unknown","capacity_mtpa":4.1,"capacity_bcm_y":5.58,"start_year":2006,"planned_start_year":null,"original_planned_start_year":null,"fid_year":null,"construction_year":null,"shelved_year":null,"cancelled_year":null,"stop_year":null,"estimated_cost_usd":null,"estimated_cost_original":null,"estimated_cost_currency":null,"power_stations_supplied":null,"floating_vessel_name":null,"ccs_project":null,"hydrogen_project":null,"ammonia_project":null,"synthetic_lng_project":null,"retrofit_proposed":null,"url":"https://lngatlas.org/terminal/nigeria-lng-terminal-ng/","data_source":"Data: Global Gas Infrastructure Tracker, Global Energy Monitor, September 2025"},{"terminal_slug":"nigeria-lng-terminal-ng","terminal_name":"Nigeria LNG Terminal","country":"Nigeria","country_iso":"NG","unit_name":"T06","status":"operating","facility_type":"export","floating_type":"unknown","capacity_mtpa":4.1,"capacity_bcm_y":5.58,"start_year":2008,"planned_start_year":null,"original_planned_start_year":null,"fid_year":null,"construction_year":null,"shelved_year":null,"cancelled_year":null,"stop_year":null,"estimated_cost_usd":null,"estimated_cost_original":null,"estimated_cost_currency":null,"power_stations_supplied":null,"floating_vessel_name":null,"ccs_project":null,"hydrogen_project":null,"ammonia_project":null,"synthetic_lng_project":null,"retrofit_proposed":null,"url":"https://lngatlas.org/terminal/nigeria-lng-terminal-ng/","data_source":"Data: Global Gas Infrastructure Tracker, Global Energy Monitor, September 2025"},{"terminal_slug":"nigeria-lng-terminal-ng","terminal_name":"Nigeria LNG Terminal","country":"Nigeria","country_iso":"NG","unit_name":"T07","status":"construction","facility_type":"export","floating_type":"unknown","capacity_mtpa":4.2,"capacity_bcm_y":5.71,"start_year":null,"planned_start_year":2027,"original_planned_start_year":2024,"fid_year":2019,"construction_year":2021,"shelved_year":null,"cancelled_year":null,"stop_year":null,"estimated_cost_usd":3592105263,"estimated_cost_original":3592105263,"estimated_cost_currency":"USD","power_stations_supplied":null,"floating_vessel_name":null,"ccs_project":null,"hydrogen_project":null,"ammonia_project":null,"synthetic_lng_project":null,"retrofit_proposed":null,"url":"https://lngatlas.org/terminal/nigeria-lng-terminal-ng/","data_source":"Data: Global Gas Infrastructure Tracker, Global Energy Monitor, September 2025"},{"terminal_slug":"nigeria-lng-terminal-ng","terminal_name":"Nigeria LNG Terminal","country":"Nigeria","country_iso":"NG","unit_name":"T08","status":"shelved","facility_type":"export","floating_type":"unknown","capacity_mtpa":null,"capacity_bcm_y":null,"start_year":null,"planned_start_year":null,"original_planned_start_year":null,"fid_year":null,"construction_year":null,"shelved_year":2023,"cancelled_year":null,"stop_year":null,"estimated_cost_usd":null,"estimated_cost_original":null,"estimated_cost_currency":null,"power_stations_supplied":null,"floating_vessel_name":null,"ccs_project":null,"hydrogen_project":null,"ammonia_project":null,"synthetic_lng_project":null,"retrofit_proposed":null,"url":"https://lngatlas.org/terminal/nigeria-lng-terminal-ng/","data_source":"Data: Global Gas Infrastructure Tracker, Global Energy Monitor, September 2025"},{"terminal_slug":"nigeria-lng-terminal-ng","terminal_name":"Nigeria LNG Terminal","country":"Nigeria","country_iso":"NG","unit_name":"T09","status":"shelved","facility_type":"export","floating_type":"unknown","capacity_mtpa":null,"capacity_bcm_y":null,"start_year":null,"planned_start_year":null,"original_planned_start_year":null,"fid_year":null,"construction_year":null,"shelved_year":2023,"cancelled_year":null,"stop_year":null,"estimated_cost_usd":null,"estimated_cost_original":null,"estimated_cost_currency":null,"power_stations_supplied":null,"floating_vessel_name":null,"ccs_project":null,"hydrogen_project":null,"ammonia_project":null,"synthetic_lng_project":null,"retrofit_proposed":null,"url":"https://lngatlas.org/terminal/nigeria-lng-terminal-ng/","data_source":"Data: Global Gas Infrastructure Tracker, Global Energy Monitor, September 2025"},{"terminal_slug":"nigeria-lng-terminal-ng","terminal_name":"Nigeria LNG Terminal","country":"Nigeria","country_iso":"NG","unit_name":"T10","status":"shelved","facility_type":"export","floating_type":"unknown","capacity_mtpa":null,"capacity_bcm_y":null,"start_year":null,"planned_start_year":null,"original_planned_start_year":null,"fid_year":null,"construction_year":null,"shelved_year":2023,"cancelled_year":null,"stop_year":null,"estimated_cost_usd":null,"estimated_cost_original":null,"estimated_cost_currency":null,"power_stations_supplied":null,"floating_vessel_name":null,"ccs_project":null,"hydrogen_project":null,"ammonia_project":null,"synthetic_lng_project":null,"retrofit_proposed":null,"url":"https://lngatlas.org/terminal/nigeria-lng-terminal-ng/","data_source":"Data: Global Gas Infrastructure Tracker, Global Energy Monitor, September 2025"},{"terminal_slug":"nigeria-lng-terminal-ng","terminal_name":"Nigeria LNG Terminal","country":"Nigeria","country_iso":"NG","unit_name":"T11","status":"shelved","facility_type":"export","floating_type":"unknown","capacity_mtpa":null,"capacity_bcm_y":null,"start_year":null,"planned_start_year":null,"original_planned_start_year":null,"fid_year":null,"construction_year":null,"shelved_year":2023,"cancelled_year":null,"stop_year":null,"estimated_cost_usd":null,"estimated_cost_original":null,"estimated_cost_currency":null,"power_stations_supplied":null,"floating_vessel_name":null,"ccs_project":null,"hydrogen_project":null,"ammonia_project":null,"synthetic_lng_project":null,"retrofit_proposed":null,"url":"https://lngatlas.org/terminal/nigeria-lng-terminal-ng/","data_source":"Data: Global Gas Infrastructure Tracker, Global Energy Monitor, September 2025"},{"terminal_slug":"nigeria-lng-terminal-ng","terminal_name":"Nigeria LNG Terminal","country":"Nigeria","country_iso":"NG","unit_name":"T12","status":"shelved","facility_type":"export","floating_type":"unknown","capacity_mtpa":null,"capacity_bcm_y":null,"start_year":null,"planned_start_year":null,"original_planned_start_year":null,"fid_year":null,"construction_year":null,"shelved_year":2023,"cancelled_year":null,"stop_year":null,"estimated_cost_usd":null,"estimated_cost_original":null,"estimated_cost_currency":null,"power_stations_supplied":null,"floating_vessel_name":null,"ccs_project":null,"hydrogen_project":null,"ammonia_project":null,"synthetic_lng_project":null,"retrofit_proposed":null,"url":"https://lngatlas.org/terminal/nigeria-lng-terminal-ng/","data_source":"Data: Global Gas Infrastructure Tracker, Global Energy Monitor, September 2025"},{"terminal_slug":"nigeria-lng-terminal-ng","terminal_name":"Nigeria LNG Terminal","country":"Nigeria","country_iso":"NG","unit_name":"Trains 1–6 Debottlenecking Project","status":"proposed","facility_type":"export","floating_type":"unknown","capacity_mtpa":3.4,"capacity_bcm_y":4.63,"start_year":null,"planned_start_year":2027,"original_planned_start_year":2024,"fid_year":2019,"construction_year":null,"shelved_year":null,"cancelled_year":null,"stop_year":null,"estimated_cost_usd":2907894737,"estimated_cost_original":2907894737,"estimated_cost_currency":"USD","power_stations_supplied":null,"floating_vessel_name":null,"ccs_project":null,"hydrogen_project":null,"ammonia_project":null,"synthetic_lng_project":null,"retrofit_proposed":null,"url":"https://lngatlas.org/terminal/nigeria-lng-terminal-ng/","data_source":"Data: Global Gas Infrastructure Tracker, Global Energy Monitor, September 2025"},{"terminal_slug":"niihama-lng-terminal-jp","terminal_name":"Niihama LNG Terminal","country":"Japan","country_iso":"JP","unit_name":null,"status":"operating","facility_type":"import","floating_type":"unknown","capacity_mtpa":1,"capacity_bcm_y":1.36,"start_year":2022,"planned_start_year":null,"original_planned_start_year":null,"fid_year":null,"construction_year":2018,"shelved_year":null,"cancelled_year":null,"stop_year":null,"estimated_cost_usd":593000000,"estimated_cost_original":593000000,"estimated_cost_currency":"USD","power_stations_supplied":"Niihama Kita thermal power station","floating_vessel_name":null,"ccs_project":null,"hydrogen_project":null,"ammonia_project":null,"synthetic_lng_project":null,"retrofit_proposed":null,"url":"https://lngatlas.org/terminal/niihama-lng-terminal-jp/","data_source":"Data: Global Gas Infrastructure Tracker, Global Energy Monitor, September 2025"},{"terminal_slug":"nimofast-antonina-lng-terminal-br","terminal_name":"Nimofast Antonina LNG Terminal","country":"Brazil","country_iso":"BR","unit_name":null,"status":"shelved","facility_type":"import","floating_type":"unknown","capacity_mtpa":1.61,"capacity_bcm_y":2.19,"start_year":null,"planned_start_year":null,"original_planned_start_year":2025,"fid_year":2023,"construction_year":null,"shelved_year":2025,"cancelled_year":null,"stop_year":null,"estimated_cost_usd":100000000,"estimated_cost_original":100000000,"estimated_cost_currency":"USD","power_stations_supplied":null,"floating_vessel_name":null,"ccs_project":null,"hydrogen_project":null,"ammonia_project":null,"synthetic_lng_project":null,"retrofit_proposed":null,"url":"https://lngatlas.org/terminal/nimofast-antonina-lng-terminal-br/","data_source":"Data: Global Gas Infrastructure Tracker, Global Energy Monitor, September 2025"},{"terminal_slug":"nisgaa-lng-terminal-ca","terminal_name":"Nisga'a LNG Terminal","country":"Canada","country_iso":"CA","unit_name":null,"status":"cancelled","facility_type":"export","floating_type":"unknown","capacity_mtpa":null,"capacity_bcm_y":null,"start_year":null,"planned_start_year":null,"original_planned_start_year":null,"fid_year":null,"construction_year":null,"shelved_year":2017,"cancelled_year":2019,"stop_year":2019,"estimated_cost_usd":null,"estimated_cost_original":null,"estimated_cost_currency":null,"power_stations_supplied":null,"floating_vessel_name":null,"ccs_project":null,"hydrogen_project":null,"ammonia_project":null,"synthetic_lng_project":null,"retrofit_proposed":null,"url":"https://lngatlas.org/terminal/nisgaa-lng-terminal-ca/","data_source":"Data: Global Gas Infrastructure Tracker, Global Energy Monitor, September 2025"},{"terminal_slug":"nopetro-lng-terminal-us","terminal_name":"Nopetro LNG Terminal","country":"United States","country_iso":"US","unit_name":null,"status":"cancelled","facility_type":"export","floating_type":"unknown","capacity_mtpa":0.08,"capacity_bcm_y":0.11,"start_year":null,"planned_start_year":null,"original_planned_start_year":2024,"fid_year":null,"construction_year":null,"shelved_year":null,"cancelled_year":2023,"stop_year":2023,"estimated_cost_usd":100000000,"estimated_cost_original":100000000,"estimated_cost_currency":"USD","power_stations_supplied":null,"floating_vessel_name":null,"ccs_project":null,"hydrogen_project":null,"ammonia_project":null,"synthetic_lng_project":null,"retrofit_proposed":null,"url":"https://lngatlas.org/terminal/nopetro-lng-terminal-us/","data_source":"Data: Global Gas Infrastructure Tracker, Global Energy Monitor, September 2025"},{"terminal_slug":"north-pars-lng-terminal-ir","terminal_name":"North Pars LNG Terminal","country":"Iran","country_iso":"IR","unit_name":"T1-T4","status":"cancelled","facility_type":"export","floating_type":"unknown","capacity_mtpa":32,"capacity_bcm_y":43.54,"start_year":null,"planned_start_year":null,"original_planned_start_year":null,"fid_year":null,"construction_year":null,"shelved_year":2020,"cancelled_year":2022,"stop_year":2022,"estimated_cost_usd":null,"estimated_cost_original":null,"estimated_cost_currency":null,"power_stations_supplied":null,"floating_vessel_name":null,"ccs_project":null,"hydrogen_project":null,"ammonia_project":null,"synthetic_lng_project":null,"retrofit_proposed":null,"url":"https://lngatlas.org/terminal/north-pars-lng-terminal-ir/","data_source":"Data: Global Gas Infrastructure Tracker, Global Energy Monitor, September 2025"},{"terminal_slug":"north-west-shelf-lng-terminal-au","terminal_name":"North West Shelf LNG Terminal","country":"Australia","country_iso":"AU","unit_name":"T1","status":"operating","facility_type":"export","floating_type":"unknown","capacity_mtpa":2.5,"capacity_bcm_y":3.4,"start_year":1989,"planned_start_year":null,"original_planned_start_year":null,"fid_year":null,"construction_year":null,"shelved_year":null,"cancelled_year":null,"stop_year":null,"estimated_cost_usd":null,"estimated_cost_original":null,"estimated_cost_currency":null,"power_stations_supplied":null,"floating_vessel_name":null,"ccs_project":null,"hydrogen_project":null,"ammonia_project":null,"synthetic_lng_project":null,"retrofit_proposed":null,"url":"https://lngatlas.org/terminal/north-west-shelf-lng-terminal-au/","data_source":"Data: Global Gas Infrastructure Tracker, Global Energy Monitor, September 2025"},{"terminal_slug":"north-west-shelf-lng-terminal-au","terminal_name":"North West Shelf LNG Terminal","country":"Australia","country_iso":"AU","unit_name":"T2","status":"retired","facility_type":"export","floating_type":"unknown","capacity_mtpa":2.5,"capacity_bcm_y":3.4,"start_year":1989,"planned_start_year":null,"original_planned_start_year":null,"fid_year":null,"construction_year":null,"shelved_year":null,"cancelled_year":null,"stop_year":2025,"estimated_cost_usd":null,"estimated_cost_original":null,"estimated_cost_currency":null,"power_stations_supplied":null,"floating_vessel_name":null,"ccs_project":null,"hydrogen_project":null,"ammonia_project":null,"synthetic_lng_project":null,"retrofit_proposed":null,"url":"https://lngatlas.org/terminal/north-west-shelf-lng-terminal-au/","data_source":"Data: Global Gas Infrastructure Tracker, Global Energy Monitor, September 2025"},{"terminal_slug":"north-west-shelf-lng-terminal-au","terminal_name":"North West Shelf LNG Terminal","country":"Australia","country_iso":"AU","unit_name":"T3","status":"operating","facility_type":"export","floating_type":"unknown","capacity_mtpa":2.5,"capacity_bcm_y":3.4,"start_year":1992,"planned_start_year":null,"original_planned_start_year":null,"fid_year":null,"construction_year":null,"shelved_year":null,"cancelled_year":null,"stop_year":null,"estimated_cost_usd":null,"estimated_cost_original":null,"estimated_cost_currency":null,"power_stations_supplied":null,"floating_vessel_name":null,"ccs_project":null,"hydrogen_project":null,"ammonia_project":null,"synthetic_lng_project":null,"retrofit_proposed":null,"url":"https://lngatlas.org/terminal/north-west-shelf-lng-terminal-au/","data_source":"Data: Global Gas Infrastructure Tracker, Global Energy Monitor, September 2025"},{"terminal_slug":"north-west-shelf-lng-terminal-au","terminal_name":"North West Shelf LNG Terminal","country":"Australia","country_iso":"AU","unit_name":"T4","status":"operating","facility_type":"export","floating_type":"unknown","capacity_mtpa":4.6,"capacity_bcm_y":6.26,"start_year":2004,"planned_start_year":null,"original_planned_start_year":null,"fid_year":null,"construction_year":null,"shelved_year":null,"cancelled_year":null,"stop_year":null,"estimated_cost_usd":null,"estimated_cost_original":null,"estimated_cost_currency":null,"power_stations_supplied":null,"floating_vessel_name":null,"ccs_project":null,"hydrogen_project":null,"ammonia_project":null,"synthetic_lng_project":null,"retrofit_proposed":null,"url":"https://lngatlas.org/terminal/north-west-shelf-lng-terminal-au/","data_source":"Data: Global Gas Infrastructure Tracker, Global Energy Monitor, September 2025"},{"terminal_slug":"north-west-shelf-lng-terminal-au","terminal_name":"North West Shelf LNG Terminal","country":"Australia","country_iso":"AU","unit_name":"T5","status":"operating","facility_type":"export","floating_type":"unknown","capacity_mtpa":4.6,"capacity_bcm_y":6.26,"start_year":2008,"planned_start_year":null,"original_planned_start_year":null,"fid_year":null,"construction_year":null,"shelved_year":null,"cancelled_year":null,"stop_year":null,"estimated_cost_usd":null,"estimated_cost_original":null,"estimated_cost_currency":null,"power_stations_supplied":null,"floating_vessel_name":null,"ccs_project":null,"hydrogen_project":null,"ammonia_project":null,"synthetic_lng_project":null,"retrofit_proposed":null,"url":"https://lngatlas.org/terminal/north-west-shelf-lng-terminal-au/","data_source":"Data: Global Gas Infrastructure Tracker, Global Energy Monitor, September 2025"},{"terminal_slug":"northeast-asia-lng-hub-terminal-kr","terminal_name":"Northeast Asia LNG Hub Terminal","country":"South Korea","country_iso":"KR","unit_name":null,"status":"construction","facility_type":"import","floating_type":"unknown","capacity_mtpa":3,"capacity_bcm_y":4.08,"start_year":null,"planned_start_year":2027,"original_planned_start_year":2024,"fid_year":null,"construction_year":2024,"shelved_year":null,"cancelled_year":null,"stop_year":null,"estimated_cost_usd":1120000000,"estimated_cost_original":1400000000000,"estimated_cost_currency":"KRW","power_stations_supplied":null,"floating_vessel_name":null,"ccs_project":null,"hydrogen_project":null,"ammonia_project":null,"synthetic_lng_project":null,"retrofit_proposed":null,"url":"https://lngatlas.org/terminal/northeast-asia-lng-hub-terminal-kr/","data_source":"Data: Global Gas Infrastructure Tracker, Global Energy Monitor, September 2025"},{"terminal_slug":"northeast-gateway-lng-terminal-us","terminal_name":"Northeast Gateway FSRU","country":"United States","country_iso":"US","unit_name":null,"status":"idle","facility_type":"import","floating_type":"fsru","capacity_mtpa":3,"capacity_bcm_y":4.08,"start_year":2008,"planned_start_year":null,"original_planned_start_year":null,"fid_year":null,"construction_year":null,"shelved_year":null,"cancelled_year":null,"stop_year":2022,"estimated_cost_usd":null,"estimated_cost_original":null,"estimated_cost_currency":null,"power_stations_supplied":null,"floating_vessel_name":null,"ccs_project":null,"hydrogen_project":null,"ammonia_project":null,"synthetic_lng_project":null,"retrofit_proposed":null,"url":"https://lngatlas.org/terminal/northeast-gateway-lng-terminal-us/","data_source":"Data: Global Gas Infrastructure Tracker, Global Energy Monitor, September 2025"},{"terminal_slug":"northern-territory-lng-terminal-au","terminal_name":"Northern Territory LNG Terminal","country":"Australia","country_iso":"AU","unit_name":null,"status":"proposed","facility_type":"export","floating_type":"unknown","capacity_mtpa":6.6,"capacity_bcm_y":8.98,"start_year":null,"planned_start_year":2031,"original_planned_start_year":2029,"fid_year":2026,"construction_year":null,"shelved_year":null,"cancelled_year":null,"stop_year":null,"estimated_cost_usd":null,"estimated_cost_original":null,"estimated_cost_currency":null,"power_stations_supplied":null,"floating_vessel_name":null,"ccs_project":null,"hydrogen_project":null,"ammonia_project":null,"synthetic_lng_project":null,"retrofit_proposed":null,"url":"https://lngatlas.org/terminal/northern-territory-lng-terminal-au/","data_source":"Data: Global Gas Infrastructure Tracker, Global Energy Monitor, September 2025"},{"terminal_slug":"northern-vietnam-lng-terminal-vn","terminal_name":"Northern Vietnam LNG Terminal","country":"Vietnam","country_iso":"VN","unit_name":"Phase 1","status":"proposed","facility_type":"import","floating_type":"unknown","capacity_mtpa":0.7,"capacity_bcm_y":0.95,"start_year":null,"planned_start_year":null,"original_planned_start_year":2027,"fid_year":null,"construction_year":null,"shelved_year":null,"cancelled_year":null,"stop_year":null,"estimated_cost_usd":null,"estimated_cost_original":null,"estimated_cost_currency":null,"power_stations_supplied":null,"floating_vessel_name":null,"ccs_project":null,"hydrogen_project":null,"ammonia_project":null,"synthetic_lng_project":null,"retrofit_proposed":null,"url":"https://lngatlas.org/terminal/northern-vietnam-lng-terminal-vn/","data_source":"Data: Global Gas Infrastructure Tracker, Global Energy Monitor, September 2025"},{"terminal_slug":"northern-vietnam-lng-terminal-vn","terminal_name":"Northern Vietnam LNG Terminal","country":"Vietnam","country_iso":"VN","unit_name":"Phase 2","status":"proposed","facility_type":"import","floating_type":"unknown","capacity_mtpa":0.5,"capacity_bcm_y":0.68,"start_year":null,"planned_start_year":null,"original_planned_start_year":null,"fid_year":null,"construction_year":null,"shelved_year":null,"cancelled_year":null,"stop_year":null,"estimated_cost_usd":null,"estimated_cost_original":null,"estimated_cost_currency":null,"power_stations_supplied":null,"floating_vessel_name":null,"ccs_project":null,"hydrogen_project":null,"ammonia_project":null,"synthetic_lng_project":null,"retrofit_proposed":null,"url":"https://lngatlas.org/terminal/northern-vietnam-lng-terminal-vn/","data_source":"Data: Global Gas Infrastructure Tracker, Global Energy Monitor, September 2025"},{"terminal_slug":"nusantara-regas-satu-terminal-id","terminal_name":"Nusantara Regas Satu Terminal","country":"Indonesia","country_iso":"ID","unit_name":null,"status":"operating","facility_type":"import","floating_type":"floating","capacity_mtpa":3,"capacity_bcm_y":4.08,"start_year":2012,"planned_start_year":null,"original_planned_start_year":null,"fid_year":null,"construction_year":null,"shelved_year":null,"cancelled_year":null,"stop_year":null,"estimated_cost_usd":null,"estimated_cost_original":null,"estimated_cost_currency":null,"power_stations_supplied":null,"floating_vessel_name":null,"ccs_project":null,"hydrogen_project":null,"ammonia_project":null,"synthetic_lng_project":null,"retrofit_proposed":null,"url":"https://lngatlas.org/terminal/nusantara-regas-satu-terminal-id/","data_source":"Data: Global Gas Infrastructure Tracker, Global Energy Monitor, September 2025"},{"terminal_slug":"obsky-lng-terminal-ru","terminal_name":"Obsky LNG Terminal","country":"Russia","country_iso":"RU","unit_name":"T1","status":"proposed","facility_type":"export","floating_type":"unknown","capacity_mtpa":4.8,"capacity_bcm_y":6.53,"start_year":null,"planned_start_year":2027,"original_planned_start_year":2022,"fid_year":2023,"construction_year":null,"shelved_year":null,"cancelled_year":null,"stop_year":null,"estimated_cost_usd":6750000000,"estimated_cost_original":6750000000,"estimated_cost_currency":"USD","power_stations_supplied":null,"floating_vessel_name":null,"ccs_project":null,"hydrogen_project":null,"ammonia_project":null,"synthetic_lng_project":null,"retrofit_proposed":null,"url":"https://lngatlas.org/terminal/obsky-lng-terminal-ru/","data_source":"Data: Global Gas Infrastructure Tracker, Global Energy Monitor, September 2025"},{"terminal_slug":"ocean-cay-lng-terminal-bs","terminal_name":"Ocean Cay LNG Terminal","country":"Bahamas","country_iso":"BS","unit_name":null,"status":"cancelled","facility_type":"import","floating_type":"unknown","capacity_mtpa":6.42,"capacity_bcm_y":8.73,"start_year":null,"planned_start_year":null,"original_planned_start_year":null,"fid_year":null,"construction_year":null,"shelved_year":null,"cancelled_year":null,"stop_year":null,"estimated_cost_usd":null,"estimated_cost_original":null,"estimated_cost_currency":null,"power_stations_supplied":null,"floating_vessel_name":null,"ccs_project":null,"hydrogen_project":null,"ammonia_project":null,"synthetic_lng_project":null,"retrofit_proposed":null,"url":"https://lngatlas.org/terminal/ocean-cay-lng-terminal-bs/","data_source":"Data: Global Gas Infrastructure Tracker, Global Energy Monitor, September 2025"},{"terminal_slug":"oceanway-lng-terminal-us","terminal_name":"OceanWay LNG Terminal","country":"United States","country_iso":"US","unit_name":null,"status":"cancelled","facility_type":"import","floating_type":"unknown","capacity_mtpa":9.2,"capacity_bcm_y":12.52,"start_year":null,"planned_start_year":null,"original_planned_start_year":null,"fid_year":null,"construction_year":null,"shelved_year":2011,"cancelled_year":2013,"stop_year":2013,"estimated_cost_usd":null,"estimated_cost_original":null,"estimated_cost_currency":null,"power_stations_supplied":null,"floating_vessel_name":null,"ccs_project":null,"hydrogen_project":null,"ammonia_project":null,"synthetic_lng_project":null,"retrofit_proposed":null,"url":"https://lngatlas.org/terminal/oceanway-lng-terminal-us/","data_source":"Data: Global Gas Infrastructure Tracker, Global Energy Monitor, September 2025"},{"terminal_slug":"ohgishima-lng-terminal-jp","terminal_name":"Ohgishima LNG Terminal","country":"Japan","country_iso":"JP","unit_name":null,"status":"operating","facility_type":"import","floating_type":"unknown","capacity_mtpa":10.2,"capacity_bcm_y":13.88,"start_year":1998,"planned_start_year":null,"original_planned_start_year":null,"fid_year":null,"construction_year":null,"shelved_year":null,"cancelled_year":null,"stop_year":null,"estimated_cost_usd":null,"estimated_cost_original":null,"estimated_cost_currency":null,"power_stations_supplied":null,"floating_vessel_name":null,"ccs_project":null,"hydrogen_project":null,"ammonia_project":null,"synthetic_lng_project":null,"retrofit_proposed":null,"url":"https://lngatlas.org/terminal/ohgishima-lng-terminal-jp/","data_source":"Data: Global Gas Infrastructure Tracker, Global Energy Monitor, September 2025"},{"terminal_slug":"oita-lng-terminal-jp","terminal_name":"Oita LNG Terminal","country":"Japan","country_iso":"JP","unit_name":null,"status":"operating","facility_type":"import","floating_type":"unknown","capacity_mtpa":5.4,"capacity_bcm_y":7.35,"start_year":1990,"planned_start_year":null,"original_planned_start_year":null,"fid_year":null,"construction_year":null,"shelved_year":null,"cancelled_year":null,"stop_year":null,"estimated_cost_usd":null,"estimated_cost_original":null,"estimated_cost_currency":null,"power_stations_supplied":null,"floating_vessel_name":null,"ccs_project":null,"hydrogen_project":null,"ammonia_project":null,"synthetic_lng_project":null,"retrofit_proposed":null,"url":"https://lngatlas.org/terminal/oita-lng-terminal-jp/","data_source":"Data: Global Gas Infrastructure Tracker, Global Energy Monitor, September 2025"},{"terminal_slug":"old-harbour-fsru-jm","terminal_name":"Old Harbour FSRU","country":"Jamaica","country_iso":"JM","unit_name":null,"status":"operating","facility_type":"import","floating_type":"fsru","capacity_mtpa":3.6,"capacity_bcm_y":4.9,"start_year":2019,"planned_start_year":null,"original_planned_start_year":null,"fid_year":null,"construction_year":null,"shelved_year":null,"cancelled_year":null,"stop_year":null,"estimated_cost_usd":null,"estimated_cost_original":null,"estimated_cost_currency":null,"power_stations_supplied":"South Jamaica Power Centre, Jamalco power station","floating_vessel_name":"Höegh Gallant","ccs_project":null,"hydrogen_project":null,"ammonia_project":null,"synthetic_lng_project":null,"retrofit_proposed":null,"url":"https://lngatlas.org/terminal/old-harbour-fsru-jm/","data_source":"Data: Global Gas Infrastructure Tracker, Global Energy Monitor, September 2025"},{"terminal_slug":"olokola-lng-terminal-ng","terminal_name":"Olokola LNG Terminal","country":"Nigeria","country_iso":"NG","unit_name":"T1","status":"proposed","facility_type":"export","floating_type":"unknown","capacity_mtpa":6.3,"capacity_bcm_y":8.57,"start_year":null,"planned_start_year":null,"original_planned_start_year":2011,"fid_year":null,"construction_year":null,"shelved_year":2015,"cancelled_year":2017,"stop_year":2017,"estimated_cost_usd":null,"estimated_cost_original":null,"estimated_cost_currency":null,"power_stations_supplied":null,"floating_vessel_name":null,"ccs_project":null,"hydrogen_project":null,"ammonia_project":null,"synthetic_lng_project":null,"retrofit_proposed":null,"url":"https://lngatlas.org/terminal/olokola-lng-terminal-ng/","data_source":"Data: Global Gas Infrastructure Tracker, Global Energy Monitor, September 2025"},{"terminal_slug":"olokola-lng-terminal-ng","terminal_name":"Olokola LNG Terminal","country":"Nigeria","country_iso":"NG","unit_name":"T2","status":"proposed","facility_type":"export","floating_type":"unknown","capacity_mtpa":6.3,"capacity_bcm_y":8.57,"start_year":null,"planned_start_year":null,"original_planned_start_year":2011,"fid_year":null,"construction_year":null,"shelved_year":2015,"cancelled_year":2017,"stop_year":2017,"estimated_cost_usd":null,"estimated_cost_original":null,"estimated_cost_currency":null,"power_stations_supplied":null,"floating_vessel_name":null,"ccs_project":null,"hydrogen_project":null,"ammonia_project":null,"synthetic_lng_project":null,"retrofit_proposed":null,"url":"https://lngatlas.org/terminal/olokola-lng-terminal-ng/","data_source":"Data: Global Gas Infrastructure Tracker, Global Energy Monitor, September 2025"},{"terminal_slug":"olokola-lng-terminal-ng","terminal_name":"Olokola LNG Terminal","country":"Nigeria","country_iso":"NG","unit_name":"T3","status":"cancelled","facility_type":"export","floating_type":"unknown","capacity_mtpa":5.5,"capacity_bcm_y":7.48,"start_year":null,"planned_start_year":null,"original_planned_start_year":null,"fid_year":null,"construction_year":null,"shelved_year":null,"cancelled_year":2023,"stop_year":2023,"estimated_cost_usd":null,"estimated_cost_original":null,"estimated_cost_currency":null,"power_stations_supplied":null,"floating_vessel_name":null,"ccs_project":null,"hydrogen_project":null,"ammonia_project":null,"synthetic_lng_project":null,"retrofit_proposed":null,"url":"https://lngatlas.org/terminal/olokola-lng-terminal-ng/","data_source":"Data: Global Gas Infrastructure Tracker, Global Energy Monitor, September 2025"},{"terminal_slug":"olokola-lng-terminal-ng","terminal_name":"Olokola LNG Terminal","country":"Nigeria","country_iso":"NG","unit_name":"T4","status":"cancelled","facility_type":"export","floating_type":"unknown","capacity_mtpa":5.5,"capacity_bcm_y":7.48,"start_year":null,"planned_start_year":null,"original_planned_start_year":null,"fid_year":null,"construction_year":null,"shelved_year":null,"cancelled_year":2023,"stop_year":2023,"estimated_cost_usd":null,"estimated_cost_original":null,"estimated_cost_currency":null,"power_stations_supplied":null,"floating_vessel_name":null,"ccs_project":null,"hydrogen_project":null,"ammonia_project":null,"synthetic_lng_project":null,"retrofit_proposed":null,"url":"https://lngatlas.org/terminal/olokola-lng-terminal-ng/","data_source":"Data: Global Gas Infrastructure Tracker, Global Energy Monitor, September 2025"},{"terminal_slug":"oman-qalhat-lng-terminal-om","terminal_name":"Oman Qalhat LNG Terminal","country":"Oman","country_iso":"OM","unit_name":"T1","status":"operating","facility_type":"export","floating_type":"unknown","capacity_mtpa":3.8,"capacity_bcm_y":5.17,"start_year":1999,"planned_start_year":null,"original_planned_start_year":null,"fid_year":null,"construction_year":null,"shelved_year":null,"cancelled_year":null,"stop_year":null,"estimated_cost_usd":1000000000,"estimated_cost_original":1000000000,"estimated_cost_currency":"USD","power_stations_supplied":null,"floating_vessel_name":null,"ccs_project":null,"hydrogen_project":null,"ammonia_project":null,"synthetic_lng_project":null,"retrofit_proposed":null,"url":"https://lngatlas.org/terminal/oman-qalhat-lng-terminal-om/","data_source":"Data: Global Gas Infrastructure Tracker, Global Energy Monitor, September 2025"},{"terminal_slug":"oman-qalhat-lng-terminal-om","terminal_name":"Oman Qalhat LNG Terminal","country":"Oman","country_iso":"OM","unit_name":"T2","status":"operating","facility_type":"export","floating_type":"unknown","capacity_mtpa":3.8,"capacity_bcm_y":5.17,"start_year":2000,"planned_start_year":null,"original_planned_start_year":null,"fid_year":null,"construction_year":null,"shelved_year":null,"cancelled_year":null,"stop_year":null,"estimated_cost_usd":1000000000,"estimated_cost_original":1000000000,"estimated_cost_currency":"USD","power_stations_supplied":null,"floating_vessel_name":null,"ccs_project":null,"hydrogen_project":null,"ammonia_project":null,"synthetic_lng_project":null,"retrofit_proposed":null,"url":"https://lngatlas.org/terminal/oman-qalhat-lng-terminal-om/","data_source":"Data: Global Gas Infrastructure Tracker, Global Energy Monitor, September 2025"},{"terminal_slug":"oman-qalhat-lng-terminal-om","terminal_name":"Oman Qalhat LNG Terminal","country":"Oman","country_iso":"OM","unit_name":"T3","status":"operating","facility_type":"export","floating_type":"unknown","capacity_mtpa":3.8,"capacity_bcm_y":5.17,"start_year":2006,"planned_start_year":null,"original_planned_start_year":null,"fid_year":null,"construction_year":null,"shelved_year":null,"cancelled_year":null,"stop_year":null,"estimated_cost_usd":null,"estimated_cost_original":null,"estimated_cost_currency":null,"power_stations_supplied":null,"floating_vessel_name":null,"ccs_project":null,"hydrogen_project":null,"ammonia_project":null,"synthetic_lng_project":null,"retrofit_proposed":null,"url":"https://lngatlas.org/terminal/oman-qalhat-lng-terminal-om/","data_source":"Data: Global Gas Infrastructure Tracker, Global Energy Monitor, September 2025"},{"terminal_slug":"oman-qalhat-lng-terminal-om","terminal_name":"Oman Qalhat LNG Terminal","country":"Oman","country_iso":"OM","unit_name":"Debottlenecking Project","status":"operating","facility_type":"export","floating_type":"unknown","capacity_mtpa":null,"capacity_bcm_y":null,"start_year":2023,"planned_start_year":null,"original_planned_start_year":null,"fid_year":null,"construction_year":2021,"shelved_year":null,"cancelled_year":null,"stop_year":null,"estimated_cost_usd":null,"estimated_cost_original":null,"estimated_cost_currency":null,"power_stations_supplied":null,"floating_vessel_name":null,"ccs_project":null,"hydrogen_project":null,"ammonia_project":null,"synthetic_lng_project":null,"retrofit_proposed":null,"url":"https://lngatlas.org/terminal/oman-qalhat-lng-terminal-om/","data_source":"Data: Global Gas Infrastructure Tracker, Global Energy Monitor, September 2025"},{"terminal_slug":"oman-qalhat-lng-terminal-om","terminal_name":"Oman Qalhat LNG Terminal","country":"Oman","country_iso":"OM","unit_name":"T4","status":"proposed","facility_type":"export","floating_type":"unknown","capacity_mtpa":3.8,"capacity_bcm_y":5.17,"start_year":null,"planned_start_year":null,"original_planned_start_year":null,"fid_year":null,"construction_year":null,"shelved_year":null,"cancelled_year":null,"stop_year":null,"estimated_cost_usd":null,"estimated_cost_original":null,"estimated_cost_currency":null,"power_stations_supplied":null,"floating_vessel_name":null,"ccs_project":null,"hydrogen_project":null,"ammonia_project":null,"synthetic_lng_project":null,"retrofit_proposed":null,"url":"https://lngatlas.org/terminal/oman-qalhat-lng-terminal-om/","data_source":"Data: Global Gas Infrastructure Tracker, Global Energy Monitor, September 2025"},{"terminal_slug":"orca-flng-terminal-ca","terminal_name":"Orca FLNG Terminal","country":"Canada","country_iso":"CA","unit_name":"T1-T6","status":"cancelled","facility_type":"export","floating_type":"flng","capacity_mtpa":30,"capacity_bcm_y":40.82,"start_year":null,"planned_start_year":null,"original_planned_start_year":2019,"fid_year":null,"construction_year":null,"shelved_year":2017,"cancelled_year":2019,"stop_year":2019,"estimated_cost_usd":null,"estimated_cost_original":null,"estimated_cost_currency":null,"power_stations_supplied":null,"floating_vessel_name":null,"ccs_project":null,"hydrogen_project":null,"ammonia_project":null,"synthetic_lng_project":null,"retrofit_proposed":null,"url":"https://lngatlas.org/terminal/orca-flng-terminal-ca/","data_source":"Data: Global Gas Infrastructure Tracker, Global Energy Monitor, September 2025"},{"terminal_slug":"oregon-lng-terminal-us","terminal_name":"Oregon LNG Terminal","country":"United States","country_iso":"US","unit_name":"Export Terminal (T1-T2)","status":"cancelled","facility_type":"export","floating_type":"unknown","capacity_mtpa":9.6,"capacity_bcm_y":13.06,"start_year":null,"planned_start_year":null,"original_planned_start_year":null,"fid_year":null,"construction_year":null,"shelved_year":null,"cancelled_year":2016,"stop_year":2016,"estimated_cost_usd":null,"estimated_cost_original":null,"estimated_cost_currency":null,"power_stations_supplied":null,"floating_vessel_name":null,"ccs_project":null,"hydrogen_project":null,"ammonia_project":null,"synthetic_lng_project":null,"retrofit_proposed":null,"url":"https://lngatlas.org/terminal/oregon-lng-terminal-us/","data_source":"Data: Global Gas Infrastructure Tracker, Global Energy Monitor, September 2025"},{"terminal_slug":"oregon-lng-terminal-us","terminal_name":"Oregon LNG Terminal","country":"United States","country_iso":"US","unit_name":"Import Terminal","status":"cancelled","facility_type":"import","floating_type":"unknown","capacity_mtpa":3.83,"capacity_bcm_y":5.21,"start_year":null,"planned_start_year":null,"original_planned_start_year":null,"fid_year":null,"construction_year":null,"shelved_year":null,"cancelled_year":2016,"stop_year":2016,"estimated_cost_usd":null,"estimated_cost_original":null,"estimated_cost_currency":null,"power_stations_supplied":null,"floating_vessel_name":null,"ccs_project":null,"hydrogen_project":null,"ammonia_project":null,"synthetic_lng_project":null,"retrofit_proposed":null,"url":"https://lngatlas.org/terminal/oregon-lng-terminal-us/","data_source":"Data: Global Gas Infrastructure Tracker, Global Energy Monitor, September 2025"},{"terminal_slug":"outer-harbor-fsru-au","terminal_name":"Outer Harbor FSRU","country":"Australia","country_iso":"AU","unit_name":null,"status":"proposed","facility_type":"import","floating_type":"fsru","capacity_mtpa":2,"capacity_bcm_y":2.72,"start_year":null,"planned_start_year":2027,"original_planned_start_year":2024,"fid_year":2025,"construction_year":2024,"shelved_year":null,"cancelled_year":null,"stop_year":null,"estimated_cost_usd":217920000,"estimated_cost_original":300000000,"estimated_cost_currency":"AUD","power_stations_supplied":null,"floating_vessel_name":null,"ccs_project":null,"hydrogen_project":null,"ammonia_project":null,"synthetic_lng_project":null,"retrofit_proposed":null,"url":"https://lngatlas.org/terminal/outer-harbor-fsru-au/","data_source":"Data: Global Gas Infrastructure Tracker, Global Energy Monitor, September 2025"},{"terminal_slug":"oxnard-lng-terminal-us","terminal_name":"Oxnard LNG Terminal","country":"United States","country_iso":"US","unit_name":null,"status":"cancelled","facility_type":"import","floating_type":"unknown","capacity_mtpa":11.5,"capacity_bcm_y":15.65,"start_year":null,"planned_start_year":null,"original_planned_start_year":null,"fid_year":null,"construction_year":null,"shelved_year":null,"cancelled_year":2010,"stop_year":2010,"estimated_cost_usd":null,"estimated_cost_original":null,"estimated_cost_currency":null,"power_stations_supplied":null,"floating_vessel_name":null,"ccs_project":null,"hydrogen_project":null,"ammonia_project":null,"synthetic_lng_project":null,"retrofit_proposed":null,"url":"https://lngatlas.org/terminal/oxnard-lng-terminal-us/","data_source":"Data: Global Gas Infrastructure Tracker, Global Energy Monitor, September 2025"},{"terminal_slug":"pawa-png-fsru-project-pg","terminal_name":"PAWA PNG FSRU Project","country":"Papua New Guinea","country_iso":"PG","unit_name":"T1","status":"shelved","facility_type":"import","floating_type":"fsru","capacity_mtpa":null,"capacity_bcm_y":null,"start_year":null,"planned_start_year":null,"original_planned_start_year":null,"fid_year":null,"construction_year":null,"shelved_year":2024,"cancelled_year":null,"stop_year":null,"estimated_cost_usd":null,"estimated_cost_original":null,"estimated_cost_currency":null,"power_stations_supplied":null,"floating_vessel_name":null,"ccs_project":null,"hydrogen_project":null,"ammonia_project":null,"synthetic_lng_project":null,"retrofit_proposed":null,"url":"https://lngatlas.org/terminal/pawa-png-fsru-project-pg/","data_source":"Data: Global Gas Infrastructure Tracker, Global Energy Monitor, September 2025"},{"terminal_slug":"pawa-png-fsru-project-pg","terminal_name":"PAWA PNG FSRU Project","country":"Papua New Guinea","country_iso":"PG","unit_name":"T10","status":"shelved","facility_type":"import","floating_type":"fsru","capacity_mtpa":null,"capacity_bcm_y":null,"start_year":null,"planned_start_year":null,"original_planned_start_year":null,"fid_year":null,"construction_year":null,"shelved_year":2025,"cancelled_year":null,"stop_year":null,"estimated_cost_usd":null,"estimated_cost_original":null,"estimated_cost_currency":null,"power_stations_supplied":null,"floating_vessel_name":null,"ccs_project":null,"hydrogen_project":null,"ammonia_project":null,"synthetic_lng_project":null,"retrofit_proposed":null,"url":"https://lngatlas.org/terminal/pawa-png-fsru-project-pg/","data_source":"Data: Global Gas Infrastructure Tracker, Global Energy Monitor, September 2025"},{"terminal_slug":"pawa-png-fsru-project-pg","terminal_name":"PAWA PNG FSRU Project","country":"Papua New Guinea","country_iso":"PG","unit_name":"T11","status":"shelved","facility_type":"import","floating_type":"fsru","capacity_mtpa":null,"capacity_bcm_y":null,"start_year":null,"planned_start_year":null,"original_planned_start_year":null,"fid_year":null,"construction_year":null,"shelved_year":2025,"cancelled_year":null,"stop_year":null,"estimated_cost_usd":null,"estimated_cost_original":null,"estimated_cost_currency":null,"power_stations_supplied":null,"floating_vessel_name":null,"ccs_project":null,"hydrogen_project":null,"ammonia_project":null,"synthetic_lng_project":null,"retrofit_proposed":null,"url":"https://lngatlas.org/terminal/pawa-png-fsru-project-pg/","data_source":"Data: Global Gas Infrastructure Tracker, Global Energy Monitor, September 2025"},{"terminal_slug":"pawa-png-fsru-project-pg","terminal_name":"PAWA PNG FSRU Project","country":"Papua New Guinea","country_iso":"PG","unit_name":"T12","status":"shelved","facility_type":"import","floating_type":"fsru","capacity_mtpa":null,"capacity_bcm_y":null,"start_year":null,"planned_start_year":null,"original_planned_start_year":null,"fid_year":null,"construction_year":null,"shelved_year":2025,"cancelled_year":null,"stop_year":null,"estimated_cost_usd":null,"estimated_cost_original":null,"estimated_cost_currency":null,"power_stations_supplied":null,"floating_vessel_name":null,"ccs_project":null,"hydrogen_project":null,"ammonia_project":null,"synthetic_lng_project":null,"retrofit_proposed":null,"url":"https://lngatlas.org/terminal/pawa-png-fsru-project-pg/","data_source":"Data: Global Gas Infrastructure Tracker, Global Energy Monitor, September 2025"},{"terminal_slug":"pawa-png-fsru-project-pg","terminal_name":"PAWA PNG FSRU Project","country":"Papua New Guinea","country_iso":"PG","unit_name":"T2","status":"shelved","facility_type":"import","floating_type":"fsru","capacity_mtpa":null,"capacity_bcm_y":null,"start_year":null,"planned_start_year":null,"original_planned_start_year":null,"fid_year":null,"construction_year":null,"shelved_year":2025,"cancelled_year":null,"stop_year":null,"estimated_cost_usd":null,"estimated_cost_original":null,"estimated_cost_currency":null,"power_stations_supplied":null,"floating_vessel_name":null,"ccs_project":null,"hydrogen_project":null,"ammonia_project":null,"synthetic_lng_project":null,"retrofit_proposed":null,"url":"https://lngatlas.org/terminal/pawa-png-fsru-project-pg/","data_source":"Data: Global Gas Infrastructure Tracker, Global Energy Monitor, September 2025"},{"terminal_slug":"pawa-png-fsru-project-pg","terminal_name":"PAWA PNG FSRU Project","country":"Papua New Guinea","country_iso":"PG","unit_name":"T3","status":"shelved","facility_type":"import","floating_type":"fsru","capacity_mtpa":null,"capacity_bcm_y":null,"start_year":null,"planned_start_year":null,"original_planned_start_year":null,"fid_year":null,"construction_year":null,"shelved_year":2025,"cancelled_year":null,"stop_year":null,"estimated_cost_usd":null,"estimated_cost_original":null,"estimated_cost_currency":null,"power_stations_supplied":null,"floating_vessel_name":null,"ccs_project":null,"hydrogen_project":null,"ammonia_project":null,"synthetic_lng_project":null,"retrofit_proposed":null,"url":"https://lngatlas.org/terminal/pawa-png-fsru-project-pg/","data_source":"Data: Global Gas Infrastructure Tracker, Global Energy Monitor, September 2025"},{"terminal_slug":"pawa-png-fsru-project-pg","terminal_name":"PAWA PNG FSRU Project","country":"Papua New Guinea","country_iso":"PG","unit_name":"T4","status":"shelved","facility_type":"import","floating_type":"fsru","capacity_mtpa":null,"capacity_bcm_y":null,"start_year":null,"planned_start_year":null,"original_planned_start_year":null,"fid_year":null,"construction_year":null,"shelved_year":2025,"cancelled_year":null,"stop_year":null,"estimated_cost_usd":null,"estimated_cost_original":null,"estimated_cost_currency":null,"power_stations_supplied":null,"floating_vessel_name":null,"ccs_project":null,"hydrogen_project":null,"ammonia_project":null,"synthetic_lng_project":null,"retrofit_proposed":null,"url":"https://lngatlas.org/terminal/pawa-png-fsru-project-pg/","data_source":"Data: Global Gas Infrastructure Tracker, Global Energy Monitor, September 2025"},{"terminal_slug":"pawa-png-fsru-project-pg","terminal_name":"PAWA PNG FSRU Project","country":"Papua New Guinea","country_iso":"PG","unit_name":"T5","status":"shelved","facility_type":"import","floating_type":"fsru","capacity_mtpa":null,"capacity_bcm_y":null,"start_year":null,"planned_start_year":null,"original_planned_start_year":null,"fid_year":null,"construction_year":null,"shelved_year":2025,"cancelled_year":null,"stop_year":null,"estimated_cost_usd":null,"estimated_cost_original":null,"estimated_cost_currency":null,"power_stations_supplied":null,"floating_vessel_name":null,"ccs_project":null,"hydrogen_project":null,"ammonia_project":null,"synthetic_lng_project":null,"retrofit_proposed":null,"url":"https://lngatlas.org/terminal/pawa-png-fsru-project-pg/","data_source":"Data: Global Gas Infrastructure Tracker, Global Energy Monitor, September 2025"},{"terminal_slug":"pawa-png-fsru-project-pg","terminal_name":"PAWA PNG FSRU Project","country":"Papua New Guinea","country_iso":"PG","unit_name":"T6","status":"shelved","facility_type":"import","floating_type":"fsru","capacity_mtpa":null,"capacity_bcm_y":null,"start_year":null,"planned_start_year":null,"original_planned_start_year":null,"fid_year":null,"construction_year":null,"shelved_year":2025,"cancelled_year":null,"stop_year":null,"estimated_cost_usd":null,"estimated_cost_original":null,"estimated_cost_currency":null,"power_stations_supplied":null,"floating_vessel_name":null,"ccs_project":null,"hydrogen_project":null,"ammonia_project":null,"synthetic_lng_project":null,"retrofit_proposed":null,"url":"https://lngatlas.org/terminal/pawa-png-fsru-project-pg/","data_source":"Data: Global Gas Infrastructure Tracker, Global Energy Monitor, September 2025"},{"terminal_slug":"pawa-png-fsru-project-pg","terminal_name":"PAWA PNG FSRU Project","country":"Papua New Guinea","country_iso":"PG","unit_name":"T7","status":"shelved","facility_type":"import","floating_type":"fsru","capacity_mtpa":null,"capacity_bcm_y":null,"start_year":null,"planned_start_year":null,"original_planned_start_year":null,"fid_year":null,"construction_year":null,"shelved_year":2025,"cancelled_year":null,"stop_year":null,"estimated_cost_usd":null,"estimated_cost_original":null,"estimated_cost_currency":null,"power_stations_supplied":null,"floating_vessel_name":null,"ccs_project":null,"hydrogen_project":null,"ammonia_project":null,"synthetic_lng_project":null,"retrofit_proposed":null,"url":"https://lngatlas.org/terminal/pawa-png-fsru-project-pg/","data_source":"Data: Global Gas Infrastructure Tracker, Global Energy Monitor, September 2025"},{"terminal_slug":"pawa-png-fsru-project-pg","terminal_name":"PAWA PNG FSRU Project","country":"Papua New Guinea","country_iso":"PG","unit_name":"T8","status":"shelved","facility_type":"import","floating_type":"fsru","capacity_mtpa":null,"capacity_bcm_y":null,"start_year":null,"planned_start_year":null,"original_planned_start_year":null,"fid_year":null,"construction_year":null,"shelved_year":2025,"cancelled_year":null,"stop_year":null,"estimated_cost_usd":null,"estimated_cost_original":null,"estimated_cost_currency":null,"power_stations_supplied":null,"floating_vessel_name":null,"ccs_project":null,"hydrogen_project":null,"ammonia_project":null,"synthetic_lng_project":null,"retrofit_proposed":null,"url":"https://lngatlas.org/terminal/pawa-png-fsru-project-pg/","data_source":"Data: Global Gas Infrastructure Tracker, Global Energy Monitor, September 2025"},{"terminal_slug":"pawa-png-fsru-project-pg","terminal_name":"PAWA PNG FSRU Project","country":"Papua New Guinea","country_iso":"PG","unit_name":"T9","status":"shelved","facility_type":"import","floating_type":"fsru","capacity_mtpa":null,"capacity_bcm_y":null,"start_year":null,"planned_start_year":null,"original_planned_start_year":null,"fid_year":null,"construction_year":null,"shelved_year":2025,"cancelled_year":null,"stop_year":null,"estimated_cost_usd":null,"estimated_cost_original":null,"estimated_cost_currency":null,"power_stations_supplied":null,"floating_vessel_name":null,"ccs_project":null,"hydrogen_project":null,"ammonia_project":null,"synthetic_lng_project":null,"retrofit_proposed":null,"url":"https://lngatlas.org/terminal/pawa-png-fsru-project-pg/","data_source":"Data: Global Gas Infrastructure Tracker, Global Energy Monitor, September 2025"},{"terminal_slug":"pemex-lng-terminal-mx","terminal_name":"PEMEX LNG Terminal","country":"Mexico","country_iso":"MX","unit_name":null,"status":"cancelled","facility_type":"export","floating_type":"unknown","capacity_mtpa":5,"capacity_bcm_y":6.8,"start_year":null,"planned_start_year":null,"original_planned_start_year":2020,"fid_year":null,"construction_year":null,"shelved_year":2016,"cancelled_year":2018,"stop_year":2018,"estimated_cost_usd":null,"estimated_cost_original":null,"estimated_cost_currency":null,"power_stations_supplied":null,"floating_vessel_name":null,"ccs_project":null,"hydrogen_project":null,"ammonia_project":null,"synthetic_lng_project":null,"retrofit_proposed":null,"url":"https://lngatlas.org/terminal/pemex-lng-terminal-mx/","data_source":"Data: Global Gas Infrastructure Tracker, Global Energy Monitor, September 2025"},{"terminal_slug":"pnoc-batangas-lng-terminal-ph","terminal_name":"PNOC Batangas LNG Terminal","country":"Philippines","country_iso":"PH","unit_name":null,"status":"cancelled","facility_type":"import","floating_type":"floating","capacity_mtpa":null,"capacity_bcm_y":null,"start_year":null,"planned_start_year":null,"original_planned_start_year":2020,"fid_year":null,"construction_year":null,"shelved_year":null,"cancelled_year":2019,"stop_year":2019,"estimated_cost_usd":null,"estimated_cost_original":null,"estimated_cost_currency":null,"power_stations_supplied":null,"floating_vessel_name":null,"ccs_project":null,"hydrogen_project":null,"ammonia_project":null,"synthetic_lng_project":null,"retrofit_proposed":null,"url":"https://lngatlas.org/terminal/pnoc-batangas-lng-terminal-ph/","data_source":"Data: Global Gas Infrastructure Tracker, Global Energy Monitor, September 2025"},{"terminal_slug":"posco-dangjin-lng-terminal-kr","terminal_name":"POSCO Dangjin LNG Terminal","country":"South Korea","country_iso":"KR","unit_name":null,"status":"shelved","facility_type":"import","floating_type":"unknown","capacity_mtpa":3.5,"capacity_bcm_y":4.76,"start_year":null,"planned_start_year":null,"original_planned_start_year":2027,"fid_year":null,"construction_year":null,"shelved_year":2025,"cancelled_year":null,"stop_year":null,"estimated_cost_usd":567000000,"estimated_cost_original":567000000,"estimated_cost_currency":"USD","power_stations_supplied":null,"floating_vessel_name":null,"ccs_project":null,"hydrogen_project":null,"ammonia_project":null,"synthetic_lng_project":null,"retrofit_proposed":null,"url":"https://lngatlas.org/terminal/posco-dangjin-lng-terminal-kr/","data_source":"Data: Global Gas Infrastructure Tracker, Global Energy Monitor, September 2025"},{"terminal_slug":"pacific-northwest-lng-terminal-ca","terminal_name":"Pacific NorthWest LNG Terminal","country":"Canada","country_iso":"CA","unit_name":"T1-T3","status":"cancelled","facility_type":"export","floating_type":"unknown","capacity_mtpa":18,"capacity_bcm_y":24.49,"start_year":null,"planned_start_year":null,"original_planned_start_year":null,"fid_year":null,"construction_year":null,"shelved_year":null,"cancelled_year":2017,"stop_year":2017,"estimated_cost_usd":null,"estimated_cost_original":null,"estimated_cost_currency":null,"power_stations_supplied":null,"floating_vessel_name":null,"ccs_project":null,"hydrogen_project":null,"ammonia_project":null,"synthetic_lng_project":null,"retrofit_proposed":null,"url":"https://lngatlas.org/terminal/pacific-northwest-lng-terminal-ca/","data_source":"Data: Global Gas Infrastructure Tracker, Global Energy Monitor, September 2025"},{"terminal_slug":"pagbilao-grande-island-lng-terminal-ph","terminal_name":"Pagbilao Grande Island LNG Terminal","country":"Philippines","country_iso":"PH","unit_name":null,"status":"shelved","facility_type":"import","floating_type":"unknown","capacity_mtpa":3,"capacity_bcm_y":4.08,"start_year":null,"planned_start_year":2028,"original_planned_start_year":2022,"fid_year":null,"construction_year":2020,"shelved_year":2023,"cancelled_year":null,"stop_year":null,"estimated_cost_usd":null,"estimated_cost_original":null,"estimated_cost_currency":null,"power_stations_supplied":"Pagbilao Combined Cycle power station","floating_vessel_name":null,"ccs_project":null,"hydrogen_project":null,"ammonia_project":null,"synthetic_lng_project":null,"retrofit_proposed":null,"url":"https://lngatlas.org/terminal/pagbilao-grande-island-lng-terminal-ph/","data_source":"Data: Global Gas Infrastructure Tracker, Global Energy Monitor, September 2025"},{"terminal_slug":"pakistan-state-oil-lng-terminal-pk","terminal_name":"Pakistan State Oil LNG Terminal","country":"Pakistan","country_iso":"PK","unit_name":null,"status":"shelved","facility_type":"import","floating_type":"unknown","capacity_mtpa":null,"capacity_bcm_y":null,"start_year":null,"planned_start_year":null,"original_planned_start_year":null,"fid_year":null,"construction_year":null,"shelved_year":2024,"cancelled_year":null,"stop_year":null,"estimated_cost_usd":500000000,"estimated_cost_original":500000000,"estimated_cost_currency":"USD","power_stations_supplied":null,"floating_vessel_name":null,"ccs_project":null,"hydrogen_project":null,"ammonia_project":null,"synthetic_lng_project":null,"retrofit_proposed":null,"url":"https://lngatlas.org/terminal/pakistan-state-oil-lng-terminal-pk/","data_source":"Data: Global Gas Infrastructure Tracker, Global Energy Monitor, September 2025"},{"terminal_slug":"paldiski-fsru-ee","terminal_name":"Paldiski FSRU","country":"Estonia","country_iso":"EE","unit_name":null,"status":"construction","facility_type":"import","floating_type":"fsru","capacity_mtpa":null,"capacity_bcm_y":null,"start_year":null,"planned_start_year":2025,"original_planned_start_year":2022,"fid_year":null,"construction_year":2022,"shelved_year":null,"cancelled_year":null,"stop_year":null,"estimated_cost_usd":545000000,"estimated_cost_original":500000000,"estimated_cost_currency":"EUR","power_stations_supplied":null,"floating_vessel_name":null,"ccs_project":null,"hydrogen_project":null,"ammonia_project":null,"synthetic_lng_project":null,"retrofit_proposed":null,"url":"https://lngatlas.org/terminal/paldiski-fsru-ee/","data_source":"Data: Global Gas Infrastructure Tracker, Global Energy Monitor, September 2025"},{"terminal_slug":"paldiski-lng-terminal-ee","terminal_name":"Paldiski LNG Terminal","country":"Estonia","country_iso":"EE","unit_name":null,"status":"shelved","facility_type":"import","floating_type":"unknown","capacity_mtpa":1.84,"capacity_bcm_y":2.5,"start_year":null,"planned_start_year":2025,"original_planned_start_year":2019,"fid_year":null,"construction_year":2016,"shelved_year":2024,"cancelled_year":null,"stop_year":null,"estimated_cost_usd":436000000,"estimated_cost_original":400000000,"estimated_cost_currency":"EUR","power_stations_supplied":null,"floating_vessel_name":null,"ccs_project":null,"hydrogen_project":null,"ammonia_project":null,"synthetic_lng_project":null,"retrofit_proposed":null,"url":"https://lngatlas.org/terminal/paldiski-lng-terminal-ee/","data_source":"Data: Global Gas Infrastructure Tracker, Global Energy Monitor, September 2025"},{"terminal_slug":"palu-lng-terminal-id","terminal_name":"Palu LNG Terminal","country":"Indonesia","country_iso":"ID","unit_name":null,"status":"shelved","facility_type":"import","floating_type":"unknown","capacity_mtpa":2,"capacity_bcm_y":2.72,"start_year":null,"planned_start_year":null,"original_planned_start_year":null,"fid_year":null,"construction_year":null,"shelved_year":2024,"cancelled_year":null,"stop_year":null,"estimated_cost_usd":null,"estimated_cost_original":null,"estimated_cost_currency":null,"power_stations_supplied":null,"floating_vessel_name":null,"ccs_project":null,"hydrogen_project":null,"ammonia_project":null,"synthetic_lng_project":null,"retrofit_proposed":null,"url":"https://lngatlas.org/terminal/palu-lng-terminal-id/","data_source":"Data: Global Gas Infrastructure Tracker, Global Energy Monitor, September 2025"},{"terminal_slug":"pandora-flng-terminal-pg","terminal_name":"Pandora FLNG Terminal","country":"Papua New Guinea","country_iso":"PG","unit_name":null,"status":"cancelled","facility_type":"export","floating_type":"flng","capacity_mtpa":1,"capacity_bcm_y":1.36,"start_year":null,"planned_start_year":null,"original_planned_start_year":null,"fid_year":null,"construction_year":null,"shelved_year":2017,"cancelled_year":2019,"stop_year":2019,"estimated_cost_usd":1250000000,"estimated_cost_original":1250000000,"estimated_cost_currency":"USD","power_stations_supplied":null,"floating_vessel_name":null,"ccs_project":null,"hydrogen_project":null,"ammonia_project":null,"synthetic_lng_project":null,"retrofit_proposed":null,"url":"https://lngatlas.org/terminal/pandora-flng-terminal-pg/","data_source":"Data: Global Gas Infrastructure Tracker, Global Energy Monitor, September 2025"},{"terminal_slug":"panigaglia-lng-terminal-it","terminal_name":"Panigaglia LNG Terminal","country":"Italy","country_iso":"IT","unit_name":null,"status":"operating","facility_type":"import","floating_type":"unknown","capacity_mtpa":2.5,"capacity_bcm_y":3.4,"start_year":1969,"planned_start_year":null,"original_planned_start_year":null,"fid_year":null,"construction_year":null,"shelved_year":null,"cancelled_year":null,"stop_year":null,"estimated_cost_usd":null,"estimated_cost_original":null,"estimated_cost_currency":null,"power_stations_supplied":null,"floating_vessel_name":null,"ccs_project":null,"hydrogen_project":null,"ammonia_project":null,"synthetic_lng_project":null,"retrofit_proposed":null,"url":"https://lngatlas.org/terminal/panigaglia-lng-terminal-it/","data_source":"Data: Global Gas Infrastructure Tracker, Global Energy Monitor, September 2025"},{"terminal_slug":"panigaglia-lng-terminal-it","terminal_name":"Panigaglia LNG Terminal","country":"Italy","country_iso":"IT","unit_name":"Expansion","status":"cancelled","facility_type":"import","floating_type":"unknown","capacity_mtpa":3.5,"capacity_bcm_y":4.76,"start_year":null,"planned_start_year":null,"original_planned_start_year":2022,"fid_year":null,"construction_year":null,"shelved_year":2013,"cancelled_year":2015,"stop_year":2015,"estimated_cost_usd":null,"estimated_cost_original":null,"estimated_cost_currency":null,"power_stations_supplied":null,"floating_vessel_name":null,"ccs_project":null,"hydrogen_project":null,"ammonia_project":null,"synthetic_lng_project":null,"retrofit_proposed":null,"url":"https://lngatlas.org/terminal/panigaglia-lng-terminal-it/","data_source":"Data: Global Gas Infrastructure Tracker, Global Energy Monitor, September 2025"},{"terminal_slug":"panjin-lng-terminal-cn","terminal_name":"Panjin LNG Terminal","country":"China","country_iso":"CN","unit_name":null,"status":"cancelled","facility_type":"import","floating_type":"unknown","capacity_mtpa":null,"capacity_bcm_y":null,"start_year":null,"planned_start_year":null,"original_planned_start_year":null,"fid_year":null,"construction_year":null,"shelved_year":2022,"cancelled_year":2024,"stop_year":2024,"estimated_cost_usd":null,"estimated_cost_original":null,"estimated_cost_currency":null,"power_stations_supplied":null,"floating_vessel_name":null,"ccs_project":null,"hydrogen_project":null,"ammonia_project":null,"synthetic_lng_project":null,"retrofit_proposed":null,"url":"https://lngatlas.org/terminal/panjin-lng-terminal-cn/","data_source":"Data: Global Gas Infrastructure Tracker, Global Energy Monitor, September 2025"},{"terminal_slug":"papua-lng-terminal-pg","terminal_name":"Papua LNG Terminal","country":"Papua New Guinea","country_iso":"PG","unit_name":"T1","status":"proposed","facility_type":"export","floating_type":"unknown","capacity_mtpa":1.4,"capacity_bcm_y":1.9,"start_year":null,"planned_start_year":2028,"original_planned_start_year":2027,"fid_year":2026,"construction_year":null,"shelved_year":null,"cancelled_year":null,"stop_year":null,"estimated_cost_usd":null,"estimated_cost_original":null,"estimated_cost_currency":null,"power_stations_supplied":null,"floating_vessel_name":null,"ccs_project":true,"hydrogen_project":null,"ammonia_project":null,"synthetic_lng_project":null,"retrofit_proposed":null,"url":"https://lngatlas.org/terminal/papua-lng-terminal-pg/","data_source":"Data: Global Gas Infrastructure Tracker, Global Energy Monitor, September 2025"},{"terminal_slug":"papua-lng-terminal-pg","terminal_name":"Papua LNG Terminal","country":"Papua New Guinea","country_iso":"PG","unit_name":"T2","status":"proposed","facility_type":"export","floating_type":"unknown","capacity_mtpa":1.4,"capacity_bcm_y":1.9,"start_year":null,"planned_start_year":2028,"original_planned_start_year":2027,"fid_year":2026,"construction_year":null,"shelved_year":null,"cancelled_year":null,"stop_year":null,"estimated_cost_usd":null,"estimated_cost_original":null,"estimated_cost_currency":null,"power_stations_supplied":null,"floating_vessel_name":null,"ccs_project":true,"hydrogen_project":null,"ammonia_project":null,"synthetic_lng_project":null,"retrofit_proposed":null,"url":"https://lngatlas.org/terminal/papua-lng-terminal-pg/","data_source":"Data: Global Gas Infrastructure Tracker, Global Energy Monitor, September 2025"},{"terminal_slug":"papua-lng-terminal-pg","terminal_name":"Papua LNG Terminal","country":"Papua New Guinea","country_iso":"PG","unit_name":"T3","status":"proposed","facility_type":"export","floating_type":"unknown","capacity_mtpa":1.4,"capacity_bcm_y":1.9,"start_year":null,"planned_start_year":2028,"original_planned_start_year":2027,"fid_year":2026,"construction_year":null,"shelved_year":null,"cancelled_year":null,"stop_year":null,"estimated_cost_usd":null,"estimated_cost_original":null,"estimated_cost_currency":null,"power_stations_supplied":null,"floating_vessel_name":null,"ccs_project":true,"hydrogen_project":null,"ammonia_project":null,"synthetic_lng_project":null,"retrofit_proposed":null,"url":"https://lngatlas.org/terminal/papua-lng-terminal-pg/","data_source":"Data: Global Gas Infrastructure Tracker, Global Energy Monitor, September 2025"},{"terminal_slug":"papua-lng-terminal-pg","terminal_name":"Papua LNG Terminal","country":"Papua New Guinea","country_iso":"PG","unit_name":"T4","status":"proposed","facility_type":"export","floating_type":"unknown","capacity_mtpa":1.4,"capacity_bcm_y":1.9,"start_year":null,"planned_start_year":2028,"original_planned_start_year":2027,"fid_year":2026,"construction_year":null,"shelved_year":null,"cancelled_year":null,"stop_year":null,"estimated_cost_usd":null,"estimated_cost_original":null,"estimated_cost_currency":null,"power_stations_supplied":null,"floating_vessel_name":null,"ccs_project":true,"hydrogen_project":null,"ammonia_project":null,"synthetic_lng_project":null,"retrofit_proposed":null,"url":"https://lngatlas.org/terminal/papua-lng-terminal-pg/","data_source":"Data: Global Gas Infrastructure Tracker, Global Energy Monitor, September 2025"},{"terminal_slug":"papua-lng-terminal-pg","terminal_name":"Papua LNG Terminal","country":"Papua New Guinea","country_iso":"PG","unit_name":"T5","status":"proposed","facility_type":"export","floating_type":"unknown","capacity_mtpa":1,"capacity_bcm_y":1.36,"start_year":null,"planned_start_year":null,"original_planned_start_year":null,"fid_year":2026,"construction_year":null,"shelved_year":null,"cancelled_year":null,"stop_year":null,"estimated_cost_usd":3268800000,"estimated_cost_original":4500000000,"estimated_cost_currency":"AUD","power_stations_supplied":null,"floating_vessel_name":null,"ccs_project":true,"hydrogen_project":null,"ammonia_project":null,"synthetic_lng_project":null,"retrofit_proposed":null,"url":"https://lngatlas.org/terminal/papua-lng-terminal-pg/","data_source":"Data: Global Gas Infrastructure Tracker, Global Energy Monitor, September 2025"},{"terminal_slug":"papua-new-guinea-lng-terminal-pg","terminal_name":"Papua New Guinea LNG Terminal","country":"Papua New Guinea","country_iso":"PG","unit_name":"T1","status":"operating","facility_type":"export","floating_type":"unknown","capacity_mtpa":4.15,"capacity_bcm_y":5.65,"start_year":2014,"planned_start_year":null,"original_planned_start_year":null,"fid_year":null,"construction_year":null,"shelved_year":null,"cancelled_year":null,"stop_year":null,"estimated_cost_usd":9500000000,"estimated_cost_original":9500000000,"estimated_cost_currency":"USD","power_stations_supplied":null,"floating_vessel_name":null,"ccs_project":null,"hydrogen_project":null,"ammonia_project":null,"synthetic_lng_project":null,"retrofit_proposed":null,"url":"https://lngatlas.org/terminal/papua-new-guinea-lng-terminal-pg/","data_source":"Data: Global Gas Infrastructure Tracker, Global Energy Monitor, September 2025"},{"terminal_slug":"papua-new-guinea-lng-terminal-pg","terminal_name":"Papua New Guinea LNG Terminal","country":"Papua New Guinea","country_iso":"PG","unit_name":"T2","status":"operating","facility_type":"export","floating_type":"unknown","capacity_mtpa":4.15,"capacity_bcm_y":5.65,"start_year":2014,"planned_start_year":null,"original_planned_start_year":null,"fid_year":null,"construction_year":null,"shelved_year":null,"cancelled_year":null,"stop_year":null,"estimated_cost_usd":9500000000,"estimated_cost_original":9500000000,"estimated_cost_currency":"USD","power_stations_supplied":null,"floating_vessel_name":null,"ccs_project":null,"hydrogen_project":null,"ammonia_project":null,"synthetic_lng_project":null,"retrofit_proposed":null,"url":"https://lngatlas.org/terminal/papua-new-guinea-lng-terminal-pg/","data_source":"Data: Global Gas Infrastructure Tracker, Global Energy Monitor, September 2025"},{"terminal_slug":"papua-new-guinea-lng-terminal-pg","terminal_name":"Papua New Guinea LNG Terminal","country":"Papua New Guinea","country_iso":"PG","unit_name":"T3","status":"cancelled","facility_type":"export","floating_type":"unknown","capacity_mtpa":2.6,"capacity_bcm_y":3.54,"start_year":null,"planned_start_year":null,"original_planned_start_year":2025,"fid_year":2023,"construction_year":null,"shelved_year":null,"cancelled_year":null,"stop_year":null,"estimated_cost_usd":null,"estimated_cost_original":null,"estimated_cost_currency":null,"power_stations_supplied":null,"floating_vessel_name":null,"ccs_project":null,"hydrogen_project":null,"ammonia_project":null,"synthetic_lng_project":null,"retrofit_proposed":null,"url":"https://lngatlas.org/terminal/papua-new-guinea-lng-terminal-pg/","data_source":"Data: Global Gas Infrastructure Tracker, Global Energy Monitor, September 2025"},{"terminal_slug":"parana-fsru-br","terminal_name":"Paraná FSRU","country":"Brazil","country_iso":"BR","unit_name":null,"status":"cancelled","facility_type":"import","floating_type":"fsru","capacity_mtpa":3.76,"capacity_bcm_y":5.12,"start_year":null,"planned_start_year":null,"original_planned_start_year":null,"fid_year":null,"construction_year":null,"shelved_year":2023,"cancelled_year":2025,"stop_year":2025,"estimated_cost_usd":null,"estimated_cost_original":null,"estimated_cost_currency":null,"power_stations_supplied":"Araucária power station","floating_vessel_name":null,"ccs_project":null,"hydrogen_project":null,"ammonia_project":null,"synthetic_lng_project":null,"retrofit_proposed":null,"url":"https://lngatlas.org/terminal/parana-fsru-br/","data_source":"Data: Global Gas Infrastructure Tracker, Global Energy Monitor, September 2025"},{"terminal_slug":"pasca-flng-terminal-pg","terminal_name":"Pasca FLNG Terminal","country":"Papua New Guinea","country_iso":"PG","unit_name":null,"status":"proposed","facility_type":"export","floating_type":"flng","capacity_mtpa":0.75,"capacity_bcm_y":1.02,"start_year":null,"planned_start_year":2031,"original_planned_start_year":2030,"fid_year":2026,"construction_year":null,"shelved_year":null,"cancelled_year":null,"stop_year":null,"estimated_cost_usd":800000000,"estimated_cost_original":800000000,"estimated_cost_currency":"USD","power_stations_supplied":null,"floating_vessel_name":null,"ccs_project":null,"hydrogen_project":null,"ammonia_project":null,"synthetic_lng_project":null,"retrofit_proposed":null,"url":"https://lngatlas.org/terminal/pasca-flng-terminal-pg/","data_source":"Data: Global Gas Infrastructure Tracker, Global Energy Monitor, September 2025"},{"terminal_slug":"payra-fsru-bd","terminal_name":"Payra FSRU","country":"Bangladesh","country_iso":"BD","unit_name":null,"status":"proposed","facility_type":"import","floating_type":"fsru","capacity_mtpa":3.75,"capacity_bcm_y":5.1,"start_year":null,"planned_start_year":2028,"original_planned_start_year":2025,"fid_year":null,"construction_year":null,"shelved_year":2022,"cancelled_year":null,"stop_year":null,"estimated_cost_usd":null,"estimated_cost_original":null,"estimated_cost_currency":null,"power_stations_supplied":null,"floating_vessel_name":null,"ccs_project":null,"hydrogen_project":null,"ammonia_project":null,"synthetic_lng_project":null,"retrofit_proposed":null,"url":"https://lngatlas.org/terminal/payra-fsru-bd/","data_source":"Data: Global Gas Infrastructure Tracker, Global Energy Monitor, September 2025"},{"terminal_slug":"payra-lng-terminal-bd","terminal_name":"Payra LNG Terminal","country":"Bangladesh","country_iso":"BD","unit_name":null,"status":"cancelled","facility_type":"import","floating_type":"unknown","capacity_mtpa":7.5,"capacity_bcm_y":10.2,"start_year":null,"planned_start_year":null,"original_planned_start_year":null,"fid_year":null,"construction_year":null,"shelved_year":null,"cancelled_year":2022,"stop_year":2022,"estimated_cost_usd":null,"estimated_cost_original":null,"estimated_cost_currency":null,"power_stations_supplied":"Payra LNG power station","floating_vessel_name":null,"ccs_project":null,"hydrogen_project":null,"ammonia_project":null,"synthetic_lng_project":null,"retrofit_proposed":null,"url":"https://lngatlas.org/terminal/payra-lng-terminal-bd/","data_source":"Data: Global Gas Infrastructure Tracker, Global Energy Monitor, September 2025"},{"terminal_slug":"pechora-lng-terminal-ru","terminal_name":"Pechora LNG Terminal","country":"Russia","country_iso":"RU","unit_name":null,"status":"cancelled","facility_type":"export","floating_type":"unknown","capacity_mtpa":4.3,"capacity_bcm_y":5.85,"start_year":null,"planned_start_year":null,"original_planned_start_year":null,"fid_year":null,"construction_year":null,"shelved_year":2020,"cancelled_year":2022,"stop_year":2022,"estimated_cost_usd":4000000000,"estimated_cost_original":4000000000,"estimated_cost_currency":"USD","power_stations_supplied":null,"floating_vessel_name":null,"ccs_project":null,"hydrogen_project":null,"ammonia_project":null,"synthetic_lng_project":null,"retrofit_proposed":null,"url":"https://lngatlas.org/terminal/pechora-lng-terminal-ru/","data_source":"Data: Global Gas Infrastructure Tracker, Global Energy Monitor, September 2025"},{"terminal_slug":"pecem-fsru-br","terminal_name":"Pecém FSRU","country":"Brazil","country_iso":"BR","unit_name":"Petrobras Terminal","status":"retired","facility_type":"import","floating_type":"fsru","capacity_mtpa":3.8,"capacity_bcm_y":5.17,"start_year":2008,"planned_start_year":null,"original_planned_start_year":null,"fid_year":null,"construction_year":null,"shelved_year":null,"cancelled_year":null,"stop_year":2023,"estimated_cost_usd":null,"estimated_cost_original":null,"estimated_cost_currency":null,"power_stations_supplied":"Termoceará power station, Fortaleza power station","floating_vessel_name":"Energos Winter","ccs_project":null,"hydrogen_project":null,"ammonia_project":null,"synthetic_lng_project":null,"retrofit_proposed":null,"url":"https://lngatlas.org/terminal/pecem-fsru-br/","data_source":"Data: Global Gas Infrastructure Tracker, Global Energy Monitor, September 2025"},{"terminal_slug":"pecem-fsru-br","terminal_name":"Pecém FSRU","country":"Brazil","country_iso":"BR","unit_name":"Eneva/Ceiba Terminal","status":"proposed","facility_type":"import","floating_type":"fsru","capacity_mtpa":5.64,"capacity_bcm_y":7.67,"start_year":null,"planned_start_year":null,"original_planned_start_year":null,"fid_year":null,"construction_year":null,"shelved_year":null,"cancelled_year":null,"stop_year":null,"estimated_cost_usd":null,"estimated_cost_original":null,"estimated_cost_currency":null,"power_stations_supplied":"Termoceará power station, Fortaleza power station","floating_vessel_name":"Energos Winter","ccs_project":null,"hydrogen_project":null,"ammonia_project":null,"synthetic_lng_project":null,"retrofit_proposed":null,"url":"https://lngatlas.org/terminal/pecem-fsru-br/","data_source":"Data: Global Gas Infrastructure Tracker, Global Energy Monitor, September 2025"},{"terminal_slug":"penco-lirquen-fsru-cl","terminal_name":"Penco Lirquén FSRU","country":"Chile","country_iso":"CL","unit_name":null,"status":"proposed","facility_type":"import","floating_type":"fsru","capacity_mtpa":2.7,"capacity_bcm_y":3.67,"start_year":null,"planned_start_year":null,"original_planned_start_year":2027,"fid_year":null,"construction_year":null,"shelved_year":2022,"cancelled_year":null,"stop_year":null,"estimated_cost_usd":null,"estimated_cost_original":null,"estimated_cost_currency":null,"power_stations_supplied":"El Campesino power station","floating_vessel_name":null,"ccs_project":null,"hydrogen_project":null,"ammonia_project":null,"synthetic_lng_project":null,"retrofit_proposed":null,"url":"https://lngatlas.org/terminal/penco-lirquen-fsru-cl/","data_source":"Data: Global Gas Infrastructure Tracker, Global Energy Monitor, September 2025"},{"terminal_slug":"pengerang-johor-lng-terminal-my","terminal_name":"Pengerang Johor LNG Terminal","country":"Malaysia","country_iso":"MY","unit_name":null,"status":"operating","facility_type":"import","floating_type":"unknown","capacity_mtpa":3.5,"capacity_bcm_y":4.76,"start_year":2017,"planned_start_year":null,"original_planned_start_year":null,"fid_year":null,"construction_year":2014,"shelved_year":null,"cancelled_year":null,"stop_year":null,"estimated_cost_usd":594000000,"estimated_cost_original":2700000000,"estimated_cost_currency":"MR","power_stations_supplied":null,"floating_vessel_name":null,"ccs_project":null,"hydrogen_project":null,"ammonia_project":null,"synthetic_lng_project":null,"retrofit_proposed":null,"url":"https://lngatlas.org/terminal/pengerang-johor-lng-terminal-my/","data_source":"Data: Global Gas Infrastructure Tracker, Global Energy Monitor, September 2025"},{"terminal_slug":"penglai-lng-terminal-baota-cn","terminal_name":"Penglai LNG Terminal","country":"China","country_iso":"CN","unit_name":null,"status":"cancelled","facility_type":"import","floating_type":"unknown","capacity_mtpa":2.6,"capacity_bcm_y":3.54,"start_year":null,"planned_start_year":null,"original_planned_start_year":2020,"fid_year":null,"construction_year":null,"shelved_year":2023,"cancelled_year":2025,"stop_year":2025,"estimated_cost_usd":null,"estimated_cost_original":null,"estimated_cost_currency":null,"power_stations_supplied":null,"floating_vessel_name":null,"ccs_project":null,"hydrogen_project":null,"ammonia_project":null,"synthetic_lng_project":null,"retrofit_proposed":null,"url":"https://lngatlas.org/terminal/penglai-lng-terminal-baota-cn/","data_source":"Data: Global Gas Infrastructure Tracker, Global Energy Monitor, September 2025"},{"terminal_slug":"penn-lng-terminal-us","terminal_name":"Penn LNG Terminal","country":"United States","country_iso":"US","unit_name":null,"status":"proposed","facility_type":"export","floating_type":"unknown","capacity_mtpa":7,"capacity_bcm_y":9.52,"start_year":null,"planned_start_year":null,"original_planned_start_year":2028,"fid_year":2024,"construction_year":null,"shelved_year":null,"cancelled_year":null,"stop_year":null,"estimated_cost_usd":6400000000,"estimated_cost_original":6400000000,"estimated_cost_currency":"USD","power_stations_supplied":null,"floating_vessel_name":null,"ccs_project":null,"hydrogen_project":null,"ammonia_project":null,"synthetic_lng_project":null,"retrofit_proposed":null,"url":"https://lngatlas.org/terminal/penn-lng-terminal-us/","data_source":"Data: Global Gas Infrastructure Tracker, Global Energy Monitor, September 2025"},{"terminal_slug":"penuelas-lng-terminal-pr","terminal_name":"Penuelas LNG Terminal","country":"United States","country_iso":"US","unit_name":null,"status":"operating","facility_type":"import","floating_type":"unknown","capacity_mtpa":2,"capacity_bcm_y":2.72,"start_year":2000,"planned_start_year":null,"original_planned_start_year":null,"fid_year":null,"construction_year":null,"shelved_year":null,"cancelled_year":null,"stop_year":null,"estimated_cost_usd":null,"estimated_cost_original":null,"estimated_cost_currency":null,"power_stations_supplied":null,"floating_vessel_name":null,"ccs_project":null,"hydrogen_project":null,"ammonia_project":null,"synthetic_lng_project":null,"retrofit_proposed":null,"url":"https://lngatlas.org/terminal/penuelas-lng-terminal-pr/","data_source":"Data: Global Gas Infrastructure Tracker, Global Energy Monitor, September 2025"},{"terminal_slug":"persian-nioc-lng-terminal-ir","terminal_name":"Persian NIOC LNG Terminal","country":"Iran","country_iso":"IR","unit_name":"T1-T2","status":"cancelled","facility_type":"export","floating_type":"unknown","capacity_mtpa":16,"capacity_bcm_y":21.77,"start_year":null,"planned_start_year":null,"original_planned_start_year":null,"fid_year":null,"construction_year":null,"shelved_year":2014,"cancelled_year":2016,"stop_year":2016,"estimated_cost_usd":10000000000,"estimated_cost_original":10000000000,"estimated_cost_currency":"USD","power_stations_supplied":null,"floating_vessel_name":null,"ccs_project":null,"hydrogen_project":null,"ammonia_project":null,"synthetic_lng_project":null,"retrofit_proposed":null,"url":"https://lngatlas.org/terminal/persian-nioc-lng-terminal-ir/","data_source":"Data: Global Gas Infrastructure Tracker, Global Energy Monitor, September 2025"},{"terminal_slug":"pertamina-bangladesh-fsru-bd","terminal_name":"Pertamina Bangladesh FSRU","country":"Bangladesh","country_iso":"BD","unit_name":null,"status":"cancelled","facility_type":"import","floating_type":"fsru","capacity_mtpa":null,"capacity_bcm_y":null,"start_year":null,"planned_start_year":null,"original_planned_start_year":2023,"fid_year":null,"construction_year":null,"shelved_year":2020,"cancelled_year":2022,"stop_year":2022,"estimated_cost_usd":null,"estimated_cost_original":null,"estimated_cost_currency":null,"power_stations_supplied":"Pertamina Bangladesh power station","floating_vessel_name":null,"ccs_project":null,"hydrogen_project":null,"ammonia_project":null,"synthetic_lng_project":null,"retrofit_proposed":null,"url":"https://lngatlas.org/terminal/pertamina-bangladesh-fsru-bd/","data_source":"Data: Global Gas Infrastructure Tracker, Global Energy Monitor, September 2025"},{"terminal_slug":"peru-lng-terminal-pe","terminal_name":"Peru LNG Terminal","country":"Peru","country_iso":"PE","unit_name":null,"status":"operating","facility_type":"export","floating_type":"unknown","capacity_mtpa":4.45,"capacity_bcm_y":6.05,"start_year":2010,"planned_start_year":null,"original_planned_start_year":null,"fid_year":2006,"construction_year":2005,"shelved_year":null,"cancelled_year":null,"stop_year":null,"estimated_cost_usd":3800000000,"estimated_cost_original":3800000000,"estimated_cost_currency":"USD","power_stations_supplied":null,"floating_vessel_name":null,"ccs_project":null,"hydrogen_project":null,"ammonia_project":null,"synthetic_lng_project":null,"retrofit_proposed":null,"url":"https://lngatlas.org/terminal/peru-lng-terminal-pe/","data_source":"Data: Global Gas Infrastructure Tracker, Global Energy Monitor, September 2025"},{"terminal_slug":"petronas-flng-terminal-sr","terminal_name":"Petronas FLNG Terminal","country":"Suriname","country_iso":"SR","unit_name":null,"status":"proposed","facility_type":"export","floating_type":"flng","capacity_mtpa":null,"capacity_bcm_y":null,"start_year":null,"planned_start_year":null,"original_planned_start_year":2031,"fid_year":2026,"construction_year":null,"shelved_year":null,"cancelled_year":null,"stop_year":null,"estimated_cost_usd":null,"estimated_cost_original":null,"estimated_cost_currency":null,"power_stations_supplied":null,"floating_vessel_name":null,"ccs_project":null,"hydrogen_project":null,"ammonia_project":null,"synthetic_lng_project":null,"retrofit_proposed":null,"url":"https://lngatlas.org/terminal/petronas-flng-terminal-sr/","data_source":"Data: Global Gas Infrastructure Tracker, Global Energy Monitor, September 2025"},{"terminal_slug":"philippines-lng-terminal-ph","terminal_name":"Philippines LNG Terminal","country":"Philippines","country_iso":"PH","unit_name":null,"status":"operating","facility_type":"import","floating_type":"floating","capacity_mtpa":5,"capacity_bcm_y":6.8,"start_year":2023,"planned_start_year":null,"original_planned_start_year":2022,"fid_year":null,"construction_year":2021,"shelved_year":null,"cancelled_year":null,"stop_year":null,"estimated_cost_usd":262800000,"estimated_cost_original":14600000000,"estimated_cost_currency":"PHP","power_stations_supplied":"Ilijan power station","floating_vessel_name":"ISH FSU","ccs_project":null,"hydrogen_project":null,"ammonia_project":null,"synthetic_lng_project":null,"retrofit_proposed":null,"url":"https://lngatlas.org/terminal/philippines-lng-terminal-ph/","data_source":"Data: Global Gas Infrastructure Tracker, Global Energy Monitor, September 2025"},{"terminal_slug":"pichilingue-lng-terminal-mx","terminal_name":"Pichilingue LNG Terminal","country":"Mexico","country_iso":"MX","unit_name":null,"status":"operating","facility_type":"import","floating_type":"unknown","capacity_mtpa":0.8,"capacity_bcm_y":1.09,"start_year":2021,"planned_start_year":null,"original_planned_start_year":null,"fid_year":null,"construction_year":null,"shelved_year":null,"cancelled_year":null,"stop_year":null,"estimated_cost_usd":null,"estimated_cost_original":null,"estimated_cost_currency":null,"power_stations_supplied":"Amaunet power station, CTG La Paz, CTG Baja California Sur","floating_vessel_name":null,"ccs_project":null,"hydrogen_project":null,"ammonia_project":null,"synthetic_lng_project":null,"retrofit_proposed":null,"url":"https://lngatlas.org/terminal/pichilingue-lng-terminal-mx/","data_source":"Data: Global Gas Infrastructure Tracker, Global Energy Monitor, September 2025"},{"terminal_slug":"pilot-cork-fsru-ie","terminal_name":"Pilot Cork FSRU","country":"Ireland","country_iso":"IE","unit_name":null,"status":"shelved","facility_type":"import","floating_type":"fsru","capacity_mtpa":3,"capacity_bcm_y":4.08,"start_year":null,"planned_start_year":null,"original_planned_start_year":null,"fid_year":null,"construction_year":null,"shelved_year":2025,"cancelled_year":null,"stop_year":null,"estimated_cost_usd":null,"estimated_cost_original":null,"estimated_cost_currency":null,"power_stations_supplied":null,"floating_vessel_name":null,"ccs_project":null,"hydrogen_project":null,"ammonia_project":null,"synthetic_lng_project":null,"retrofit_proposed":null,"url":"https://lngatlas.org/terminal/pilot-cork-fsru-ie/","data_source":"Data: Global Gas Infrastructure Tracker, Global Energy Monitor, September 2025"},{"terminal_slug":"pinghu-lng-terminal-cn","terminal_name":"Pinghu LNG Terminal","country":"China","country_iso":"CN","unit_name":null,"status":"operating","facility_type":"import","floating_type":"unknown","capacity_mtpa":1,"capacity_bcm_y":1.36,"start_year":2022,"planned_start_year":null,"original_planned_start_year":null,"fid_year":null,"construction_year":2020,"shelved_year":null,"cancelled_year":null,"stop_year":null,"estimated_cost_usd":384000000,"estimated_cost_original":2400000000,"estimated_cost_currency":"RMB","power_stations_supplied":null,"floating_vessel_name":null,"ccs_project":null,"hydrogen_project":null,"ammonia_project":null,"synthetic_lng_project":null,"retrofit_proposed":null,"url":"https://lngatlas.org/terminal/pinghu-lng-terminal-cn/","data_source":"Data: Global Gas Infrastructure Tracker, Global Energy Monitor, September 2025"},{"terminal_slug":"piombino-fsru-it","terminal_name":"Piombino FSRU","country":"Italy","country_iso":"IT","unit_name":null,"status":"operating","facility_type":"import","floating_type":"fsru","capacity_mtpa":3.67,"capacity_bcm_y":4.99,"start_year":2023,"planned_start_year":null,"original_planned_start_year":null,"fid_year":null,"construction_year":2022,"shelved_year":null,"cancelled_year":null,"stop_year":null,"estimated_cost_usd":null,"estimated_cost_original":null,"estimated_cost_currency":null,"power_stations_supplied":null,"floating_vessel_name":"Italis LNG","ccs_project":null,"hydrogen_project":null,"ammonia_project":null,"synthetic_lng_project":null,"retrofit_proposed":null,"url":"https://lngatlas.org/terminal/piombino-fsru-it/","data_source":"Data: Global Gas Infrastructure Tracker, Global Energy Monitor, September 2025"},{"terminal_slug":"placentia-bay-flng-terminal-ca","terminal_name":"Placentia Bay FLNG Terminal","country":"Canada","country_iso":"CA","unit_name":null,"status":"shelved","facility_type":"export","floating_type":"flng","capacity_mtpa":4,"capacity_bcm_y":5.44,"start_year":null,"planned_start_year":null,"original_planned_start_year":2030,"fid_year":2026,"construction_year":null,"shelved_year":2025,"cancelled_year":null,"stop_year":null,"estimated_cost_usd":10000000000,"estimated_cost_original":10000000000,"estimated_cost_currency":"USD","power_stations_supplied":null,"floating_vessel_name":null,"ccs_project":null,"hydrogen_project":null,"ammonia_project":null,"synthetic_lng_project":null,"retrofit_proposed":null,"url":"https://lngatlas.org/terminal/placentia-bay-flng-terminal-ca/","data_source":"Data: Global Gas Infrastructure Tracker, Global Energy Monitor, September 2025"},{"terminal_slug":"plaquemines-lng-terminal-us","terminal_name":"Plaquemines LNG Terminal","country":"United States","country_iso":"US","unit_name":"Phase 1 (T1–18)","status":"operating","facility_type":"export","floating_type":"unknown","capacity_mtpa":10,"capacity_bcm_y":13.61,"start_year":2025,"planned_start_year":null,"original_planned_start_year":null,"fid_year":2022,"construction_year":2023,"shelved_year":null,"cancelled_year":null,"stop_year":null,"estimated_cost_usd":15750000000,"estimated_cost_original":15750000000,"estimated_cost_currency":"USD","power_stations_supplied":null,"floating_vessel_name":null,"ccs_project":true,"hydrogen_project":null,"ammonia_project":null,"synthetic_lng_project":null,"retrofit_proposed":null,"url":"https://lngatlas.org/terminal/plaquemines-lng-terminal-us/","data_source":"Data: Global Gas Infrastructure Tracker, Global Energy Monitor, September 2025"},{"terminal_slug":"plaquemines-lng-terminal-us","terminal_name":"Plaquemines LNG Terminal","country":"United States","country_iso":"US","unit_name":"Expansion (T37-60)","status":"proposed","facility_type":"export","floating_type":"unknown","capacity_mtpa":24.8,"capacity_bcm_y":33.74,"start_year":null,"planned_start_year":null,"original_planned_start_year":null,"fid_year":null,"construction_year":null,"shelved_year":null,"cancelled_year":null,"stop_year":null,"estimated_cost_usd":18000000000,"estimated_cost_original":18000000000,"estimated_cost_currency":"USD","power_stations_supplied":null,"floating_vessel_name":null,"ccs_project":true,"hydrogen_project":null,"ammonia_project":null,"synthetic_lng_project":null,"retrofit_proposed":null,"url":"https://lngatlas.org/terminal/plaquemines-lng-terminal-us/","data_source":"Data: Global Gas Infrastructure Tracker, Global Energy Monitor, September 2025"},{"terminal_slug":"plaquemines-lng-terminal-us","terminal_name":"Plaquemines LNG Terminal","country":"United States","country_iso":"US","unit_name":"Phase 2 (T19–36)","status":"construction","facility_type":"export","floating_type":"unknown","capacity_mtpa":10,"capacity_bcm_y":13.61,"start_year":null,"planned_start_year":2026,"original_planned_start_year":2025,"fid_year":2023,"construction_year":2023,"shelved_year":null,"cancelled_year":null,"stop_year":null,"estimated_cost_usd":7800000000,"estimated_cost_original":7800000000,"estimated_cost_currency":"USD","power_stations_supplied":null,"floating_vessel_name":null,"ccs_project":true,"hydrogen_project":null,"ammonia_project":null,"synthetic_lng_project":null,"retrofit_proposed":null,"url":"https://lngatlas.org/terminal/plaquemines-lng-terminal-us/","data_source":"Data: Global Gas Infrastructure Tracker, Global Energy Monitor, September 2025"},{"terminal_slug":"pluto-lng-terminal-au","terminal_name":"Pluto LNG Terminal","country":"Australia","country_iso":"AU","unit_name":"T1","status":"operating","facility_type":"export","floating_type":"unknown","capacity_mtpa":4.9,"capacity_bcm_y":6.67,"start_year":2012,"planned_start_year":null,"original_planned_start_year":null,"fid_year":2007,"construction_year":null,"shelved_year":null,"cancelled_year":null,"stop_year":null,"estimated_cost_usd":12000000000,"estimated_cost_original":12000000000,"estimated_cost_currency":"USD","power_stations_supplied":null,"floating_vessel_name":null,"ccs_project":null,"hydrogen_project":null,"ammonia_project":null,"synthetic_lng_project":null,"retrofit_proposed":null,"url":"https://lngatlas.org/terminal/pluto-lng-terminal-au/","data_source":"Data: Global Gas Infrastructure Tracker, Global Energy Monitor, September 2025"},{"terminal_slug":"pluto-lng-terminal-au","terminal_name":"Pluto LNG Terminal","country":"Australia","country_iso":"AU","unit_name":"T2","status":"construction","facility_type":"export","floating_type":"unknown","capacity_mtpa":5,"capacity_bcm_y":6.8,"start_year":null,"planned_start_year":null,"original_planned_start_year":2026,"fid_year":2021,"construction_year":2022,"shelved_year":null,"cancelled_year":null,"stop_year":null,"estimated_cost_usd":5600000000,"estimated_cost_original":5600000000,"estimated_cost_currency":"USD","power_stations_supplied":null,"floating_vessel_name":null,"ccs_project":null,"hydrogen_project":null,"ammonia_project":null,"synthetic_lng_project":null,"retrofit_proposed":null,"url":"https://lngatlas.org/terminal/pluto-lng-terminal-au/","data_source":"Data: Global Gas Infrastructure Tracker, Global Energy Monitor, September 2025"},{"terminal_slug":"pluto-lng-terminal-au","terminal_name":"Pluto LNG Terminal","country":"Australia","country_iso":"AU","unit_name":"T3","status":"cancelled","facility_type":"export","floating_type":"unknown","capacity_mtpa":4.3,"capacity_bcm_y":5.85,"start_year":null,"planned_start_year":null,"original_planned_start_year":null,"fid_year":null,"construction_year":null,"shelved_year":null,"cancelled_year":null,"stop_year":null,"estimated_cost_usd":null,"estimated_cost_original":null,"estimated_cost_currency":null,"power_stations_supplied":null,"floating_vessel_name":null,"ccs_project":null,"hydrogen_project":null,"ammonia_project":null,"synthetic_lng_project":null,"retrofit_proposed":null,"url":"https://lngatlas.org/terminal/pluto-lng-terminal-au/","data_source":"Data: Global Gas Infrastructure Tracker, Global Energy Monitor, September 2025"},{"terminal_slug":"point-comfort-lng-terminal-us","terminal_name":"Point Comfort LNG Terminal","country":"United States","country_iso":"US","unit_name":"T1-T2","status":"cancelled","facility_type":"export","floating_type":"unknown","capacity_mtpa":9,"capacity_bcm_y":12.24,"start_year":null,"planned_start_year":null,"original_planned_start_year":null,"fid_year":null,"construction_year":null,"shelved_year":2018,"cancelled_year":2020,"stop_year":2020,"estimated_cost_usd":null,"estimated_cost_original":null,"estimated_cost_currency":null,"power_stations_supplied":null,"floating_vessel_name":null,"ccs_project":null,"hydrogen_project":null,"ammonia_project":null,"synthetic_lng_project":null,"retrofit_proposed":null,"url":"https://lngatlas.org/terminal/point-comfort-lng-terminal-us/","data_source":"Data: Global Gas Infrastructure Tracker, Global Energy Monitor, September 2025"},{"terminal_slug":"pointe-lng-terminal-us","terminal_name":"Pointe LNG Terminal","country":"United States","country_iso":"US","unit_name":"T1-T3","status":"cancelled","facility_type":"export","floating_type":"unknown","capacity_mtpa":6,"capacity_bcm_y":8.16,"start_year":null,"planned_start_year":null,"original_planned_start_year":2026,"fid_year":2022,"construction_year":null,"shelved_year":2022,"cancelled_year":2024,"stop_year":2024,"estimated_cost_usd":4000000000,"estimated_cost_original":4000000000,"estimated_cost_currency":"USD","power_stations_supplied":null,"floating_vessel_name":null,"ccs_project":null,"hydrogen_project":null,"ammonia_project":null,"synthetic_lng_project":null,"retrofit_proposed":null,"url":"https://lngatlas.org/terminal/pointe-lng-terminal-us/","data_source":"Data: Global Gas Infrastructure Tracker, Global Energy Monitor, September 2025"},{"terminal_slug":"polish-baltic-sea-coast-fsru-pl","terminal_name":"Polish Baltic Sea Coast FSRU","country":"Poland","country_iso":"PL","unit_name":null,"status":"construction","facility_type":"import","floating_type":"fsru","capacity_mtpa":4.48,"capacity_bcm_y":6.1,"start_year":null,"planned_start_year":2028,"original_planned_start_year":2025,"fid_year":2023,"construction_year":2025,"shelved_year":null,"cancelled_year":null,"stop_year":null,"estimated_cost_usd":1308000000,"estimated_cost_original":1200000000,"estimated_cost_currency":"EUR","power_stations_supplied":null,"floating_vessel_name":null,"ccs_project":null,"hydrogen_project":null,"ammonia_project":null,"synthetic_lng_project":null,"retrofit_proposed":null,"url":"https://lngatlas.org/terminal/polish-baltic-sea-coast-fsru-pl/","data_source":"Data: Global Gas Infrastructure Tracker, Global Energy Monitor, September 2025"},{"terminal_slug":"polish-baltic-sea-coast-fsru-pl","terminal_name":"Polish Baltic Sea Coast FSRU","country":"Poland","country_iso":"PL","unit_name":"Expansion (FSRU 2)","status":"proposed","facility_type":"import","floating_type":"fsru","capacity_mtpa":3.31,"capacity_bcm_y":4.5,"start_year":null,"planned_start_year":null,"original_planned_start_year":2028,"fid_year":null,"construction_year":null,"shelved_year":2023,"cancelled_year":null,"stop_year":null,"estimated_cost_usd":null,"estimated_cost_original":null,"estimated_cost_currency":null,"power_stations_supplied":null,"floating_vessel_name":null,"ccs_project":null,"hydrogen_project":null,"ammonia_project":null,"synthetic_lng_project":null,"retrofit_proposed":null,"url":"https://lngatlas.org/terminal/polish-baltic-sea-coast-fsru-pl/","data_source":"Data: Global Gas Infrastructure Tracker, Global Energy Monitor, September 2025"},{"terminal_slug":"pori-lng-terminal-fi","terminal_name":"Pori LNG Terminal","country":"Finland","country_iso":"FI","unit_name":null,"status":"operating","facility_type":"import","floating_type":"unknown","capacity_mtpa":0.1,"capacity_bcm_y":0.14,"start_year":2016,"planned_start_year":null,"original_planned_start_year":null,"fid_year":2014,"construction_year":2014,"shelved_year":null,"cancelled_year":null,"stop_year":null,"estimated_cost_usd":88000000,"estimated_cost_original":88000000,"estimated_cost_currency":"USD","power_stations_supplied":null,"floating_vessel_name":null,"ccs_project":null,"hydrogen_project":null,"ammonia_project":null,"synthetic_lng_project":null,"retrofit_proposed":null,"url":"https://lngatlas.org/terminal/pori-lng-terminal-fi/","data_source":"Data: Global Gas Infrastructure Tracker, Global Energy Monitor, September 2025"},{"terminal_slug":"port-arthur-lng-terminal-us","terminal_name":"Port Arthur LNG Terminal","country":"United States","country_iso":"US","unit_name":"T1","status":"construction","facility_type":"export","floating_type":"unknown","capacity_mtpa":6.5,"capacity_bcm_y":8.84,"start_year":null,"planned_start_year":null,"original_planned_start_year":2027,"fid_year":2023,"construction_year":2024,"shelved_year":null,"cancelled_year":null,"stop_year":null,"estimated_cost_usd":6500000000,"estimated_cost_original":6500000000,"estimated_cost_currency":"USD","power_stations_supplied":null,"floating_vessel_name":null,"ccs_project":null,"hydrogen_project":null,"ammonia_project":null,"synthetic_lng_project":null,"retrofit_proposed":null,"url":"https://lngatlas.org/terminal/port-arthur-lng-terminal-us/","data_source":"Data: Global Gas Infrastructure Tracker, Global Energy Monitor, September 2025"},{"terminal_slug":"port-arthur-lng-terminal-us","terminal_name":"Port Arthur LNG Terminal","country":"United States","country_iso":"US","unit_name":"T2","status":"construction","facility_type":"export","floating_type":"unknown","capacity_mtpa":6.5,"capacity_bcm_y":8.84,"start_year":null,"planned_start_year":null,"original_planned_start_year":2028,"fid_year":2023,"construction_year":2024,"shelved_year":null,"cancelled_year":null,"stop_year":null,"estimated_cost_usd":6500000000,"estimated_cost_original":6500000000,"estimated_cost_currency":"USD","power_stations_supplied":null,"floating_vessel_name":null,"ccs_project":null,"hydrogen_project":null,"ammonia_project":null,"synthetic_lng_project":null,"retrofit_proposed":null,"url":"https://lngatlas.org/terminal/port-arthur-lng-terminal-us/","data_source":"Data: Global Gas Infrastructure Tracker, Global Energy Monitor, September 2025"},{"terminal_slug":"port-arthur-lng-terminal-us","terminal_name":"Port Arthur LNG Terminal","country":"United States","country_iso":"US","unit_name":"T3","status":"proposed","facility_type":"export","floating_type":"unknown","capacity_mtpa":6.5,"capacity_bcm_y":8.84,"start_year":null,"planned_start_year":2030,"original_planned_start_year":2023,"fid_year":2025,"construction_year":null,"shelved_year":null,"cancelled_year":null,"stop_year":null,"estimated_cost_usd":7000000000,"estimated_cost_original":7000000000,"estimated_cost_currency":"USD","power_stations_supplied":null,"floating_vessel_name":null,"ccs_project":null,"hydrogen_project":null,"ammonia_project":null,"synthetic_lng_project":null,"retrofit_proposed":null,"url":"https://lngatlas.org/terminal/port-arthur-lng-terminal-us/","data_source":"Data: Global Gas Infrastructure Tracker, Global Energy Monitor, September 2025"},{"terminal_slug":"port-arthur-lng-terminal-us","terminal_name":"Port Arthur LNG Terminal","country":"United States","country_iso":"US","unit_name":"T4","status":"proposed","facility_type":"export","floating_type":"unknown","capacity_mtpa":6.5,"capacity_bcm_y":8.84,"start_year":null,"planned_start_year":2031,"original_planned_start_year":2023,"fid_year":2025,"construction_year":null,"shelved_year":null,"cancelled_year":null,"stop_year":null,"estimated_cost_usd":7000000000,"estimated_cost_original":7000000000,"estimated_cost_currency":"USD","power_stations_supplied":null,"floating_vessel_name":null,"ccs_project":null,"hydrogen_project":null,"ammonia_project":null,"synthetic_lng_project":null,"retrofit_proposed":null,"url":"https://lngatlas.org/terminal/port-arthur-lng-terminal-us/","data_source":"Data: Global Gas Infrastructure Tracker, Global Energy Monitor, September 2025"},{"terminal_slug":"port-dolphin-lng-terminal-us","terminal_name":"Port Dolphin LNG Terminal","country":"United States","country_iso":"US","unit_name":null,"status":"cancelled","facility_type":"import","floating_type":"unknown","capacity_mtpa":6.4,"capacity_bcm_y":8.71,"start_year":null,"planned_start_year":null,"original_planned_start_year":null,"fid_year":null,"construction_year":null,"shelved_year":null,"cancelled_year":2015,"stop_year":2015,"estimated_cost_usd":null,"estimated_cost_original":null,"estimated_cost_currency":null,"power_stations_supplied":null,"floating_vessel_name":null,"ccs_project":null,"hydrogen_project":null,"ammonia_project":null,"synthetic_lng_project":null,"retrofit_proposed":null,"url":"https://lngatlas.org/terminal/port-dolphin-lng-terminal-us/","data_source":"Data: Global Gas Infrastructure Tracker, Global Energy Monitor, September 2025"},{"terminal_slug":"port-edward-lng-terminal-ca","terminal_name":"Port Edward LNG Terminal","country":"Canada","country_iso":"CA","unit_name":null,"status":"cancelled","facility_type":"export","floating_type":"unknown","capacity_mtpa":0.3,"capacity_bcm_y":0.41,"start_year":null,"planned_start_year":null,"original_planned_start_year":2024,"fid_year":null,"construction_year":null,"shelved_year":null,"cancelled_year":2024,"stop_year":2024,"estimated_cost_usd":240000000,"estimated_cost_original":300000000,"estimated_cost_currency":"CAN","power_stations_supplied":null,"floating_vessel_name":null,"ccs_project":null,"hydrogen_project":null,"ammonia_project":null,"synthetic_lng_project":null,"retrofit_proposed":null,"url":"https://lngatlas.org/terminal/port-edward-lng-terminal-ca/","data_source":"Data: Global Gas Infrastructure Tracker, Global Energy Monitor, September 2025"},{"terminal_slug":"port-esperanza-fsru-us","terminal_name":"Port Esperanza FSRU","country":"United States","country_iso":"US","unit_name":null,"status":"cancelled","facility_type":"import","floating_type":"fsru","capacity_mtpa":null,"capacity_bcm_y":null,"start_year":null,"planned_start_year":null,"original_planned_start_year":null,"fid_year":null,"construction_year":null,"shelved_year":2009,"cancelled_year":2011,"stop_year":2011,"estimated_cost_usd":null,"estimated_cost_original":null,"estimated_cost_currency":null,"power_stations_supplied":null,"floating_vessel_name":null,"ccs_project":null,"hydrogen_project":null,"ammonia_project":null,"synthetic_lng_project":null,"retrofit_proposed":null,"url":"https://lngatlas.org/terminal/port-esperanza-fsru-us/","data_source":"Data: Global Gas Infrastructure Tracker, Global Energy Monitor, September 2025"},{"terminal_slug":"port-kembla-fsru-au","terminal_name":"Port Kembla FSRU","country":"Australia","country_iso":"AU","unit_name":null,"status":"construction","facility_type":"import","floating_type":"fsru","capacity_mtpa":2.33,"capacity_bcm_y":3.17,"start_year":null,"planned_start_year":2027,"original_planned_start_year":2023,"fid_year":2021,"construction_year":2021,"shelved_year":null,"cancelled_year":null,"stop_year":null,"estimated_cost_usd":726400000,"estimated_cost_original":1000000000,"estimated_cost_currency":"AUD","power_stations_supplied":null,"floating_vessel_name":"Höegh Galleon","ccs_project":null,"hydrogen_project":true,"ammonia_project":null,"synthetic_lng_project":null,"retrofit_proposed":null,"url":"https://lngatlas.org/terminal/port-kembla-fsru-au/","data_source":"Data: Global Gas Infrastructure Tracker, Global Energy Monitor, September 2025"},{"terminal_slug":"port-lavaca-flng-terminal-us","terminal_name":"Port Lavaca FLNG Terminal","country":"United States","country_iso":"US","unit_name":null,"status":"cancelled","facility_type":"export","floating_type":"flng","capacity_mtpa":10,"capacity_bcm_y":13.61,"start_year":null,"planned_start_year":null,"original_planned_start_year":null,"fid_year":null,"construction_year":null,"shelved_year":null,"cancelled_year":2015,"stop_year":2015,"estimated_cost_usd":null,"estimated_cost_original":null,"estimated_cost_currency":null,"power_stations_supplied":null,"floating_vessel_name":null,"ccs_project":null,"hydrogen_project":null,"ammonia_project":null,"synthetic_lng_project":null,"retrofit_proposed":null,"url":"https://lngatlas.org/terminal/port-lavaca-flng-terminal-us/","data_source":"Data: Global Gas Infrastructure Tracker, Global Energy Monitor, September 2025"},{"terminal_slug":"port-meridian-fsru-gb","terminal_name":"Port Meridian FSRU","country":"United Kingdom","country_iso":"GB","unit_name":null,"status":"cancelled","facility_type":"import","floating_type":"fsru","capacity_mtpa":6,"capacity_bcm_y":8.16,"start_year":null,"planned_start_year":null,"original_planned_start_year":2024,"fid_year":null,"construction_year":null,"shelved_year":null,"cancelled_year":2021,"stop_year":2021,"estimated_cost_usd":441000000,"estimated_cost_original":350000000,"estimated_cost_currency":"GBP","power_stations_supplied":null,"floating_vessel_name":null,"ccs_project":null,"hydrogen_project":null,"ammonia_project":null,"synthetic_lng_project":null,"retrofit_proposed":null,"url":"https://lngatlas.org/terminal/port-meridian-fsru-gb/","data_source":"Data: Global Gas Infrastructure Tracker, Global Energy Monitor, September 2025"},{"terminal_slug":"port-pelican-lng-terminal-us","terminal_name":"Port Pelican LNG Terminal","country":"United States","country_iso":"US","unit_name":null,"status":"cancelled","facility_type":"import","floating_type":"unknown","capacity_mtpa":12,"capacity_bcm_y":16.33,"start_year":null,"planned_start_year":null,"original_planned_start_year":null,"fid_year":null,"construction_year":null,"shelved_year":null,"cancelled_year":2005,"stop_year":2005,"estimated_cost_usd":null,"estimated_cost_original":null,"estimated_cost_currency":null,"power_stations_supplied":null,"floating_vessel_name":null,"ccs_project":null,"hydrogen_project":null,"ammonia_project":null,"synthetic_lng_project":null,"retrofit_proposed":null,"url":"https://lngatlas.org/terminal/port-pelican-lng-terminal-us/","data_source":"Data: Global Gas Infrastructure Tracker, Global Energy Monitor, September 2025"},{"terminal_slug":"port-phillip-bay-fsru-au","terminal_name":"Port Phillip Bay FSRU","country":"Australia","country_iso":"AU","unit_name":null,"status":"proposed","facility_type":"import","floating_type":"fsru","capacity_mtpa":4.7,"capacity_bcm_y":6.39,"start_year":null,"planned_start_year":2029,"original_planned_start_year":2024,"fid_year":2026,"construction_year":2026,"shelved_year":null,"cancelled_year":null,"stop_year":null,"estimated_cost_usd":null,"estimated_cost_original":null,"estimated_cost_currency":null,"power_stations_supplied":null,"floating_vessel_name":null,"ccs_project":null,"hydrogen_project":null,"ammonia_project":null,"synthetic_lng_project":null,"retrofit_proposed":null,"url":"https://lngatlas.org/terminal/port-phillip-bay-fsru-au/","data_source":"Data: Global Gas Infrastructure Tracker, Global Energy Monitor, September 2025"},{"terminal_slug":"port-of-vlora-fsru-al","terminal_name":"Port of Vlora FSRU","country":"Albania","country_iso":"AL","unit_name":null,"status":"shelved","facility_type":"import","floating_type":"fsru","capacity_mtpa":null,"capacity_bcm_y":null,"start_year":null,"planned_start_year":null,"original_planned_start_year":2023,"fid_year":null,"construction_year":null,"shelved_year":2024,"cancelled_year":null,"stop_year":null,"estimated_cost_usd":null,"estimated_cost_original":null,"estimated_cost_currency":null,"power_stations_supplied":null,"floating_vessel_name":null,"ccs_project":null,"hydrogen_project":null,"ammonia_project":null,"synthetic_lng_project":null,"retrofit_proposed":null,"url":"https://lngatlas.org/terminal/port-of-vlora-fsru-al/","data_source":"Data: Global Gas Infrastructure Tracker, Global Energy Monitor, September 2025"},{"terminal_slug":"porto-empedocle-lng-terminal-it","terminal_name":"Porto Empedocle LNG Terminal","country":"Italy","country_iso":"IT","unit_name":null,"status":"proposed","facility_type":"import","floating_type":"unknown","capacity_mtpa":5.88,"capacity_bcm_y":8,"start_year":null,"planned_start_year":2026,"original_planned_start_year":2015,"fid_year":null,"construction_year":null,"shelved_year":null,"cancelled_year":null,"stop_year":null,"estimated_cost_usd":1090000000,"estimated_cost_original":1000000000,"estimated_cost_currency":"EUR","power_stations_supplied":null,"floating_vessel_name":null,"ccs_project":null,"hydrogen_project":null,"ammonia_project":null,"synthetic_lng_project":null,"retrofit_proposed":null,"url":"https://lngatlas.org/terminal/porto-empedocle-lng-terminal-it/","data_source":"Data: Global Gas Infrastructure Tracker, Global Energy Monitor, September 2025"},{"terminal_slug":"porto-norte-fluminense-fsru-br","terminal_name":"Porto Norte Fluminense FSRU","country":"Brazil","country_iso":"BR","unit_name":null,"status":"proposed","facility_type":"import","floating_type":"fsru","capacity_mtpa":5.64,"capacity_bcm_y":7.67,"start_year":null,"planned_start_year":null,"original_planned_start_year":2027,"fid_year":null,"construction_year":null,"shelved_year":null,"cancelled_year":null,"stop_year":null,"estimated_cost_usd":null,"estimated_cost_original":null,"estimated_cost_currency":null,"power_stations_supplied":"Porto Norte Fluminense I & II power stations","floating_vessel_name":null,"ccs_project":null,"hydrogen_project":null,"ammonia_project":null,"synthetic_lng_project":null,"retrofit_proposed":null,"url":"https://lngatlas.org/terminal/porto-norte-fluminense-fsru-br/","data_source":"Data: Global Gas Infrastructure Tracker, Global Energy Monitor, September 2025"},{"terminal_slug":"porto-torres-fsru-it","terminal_name":"Porto Torres FSRU","country":"Italy","country_iso":"IT","unit_name":null,"status":"shelved","facility_type":"import","floating_type":"fsru","capacity_mtpa":3.67,"capacity_bcm_y":4.99,"start_year":null,"planned_start_year":2023,"original_planned_start_year":2025,"fid_year":null,"construction_year":null,"shelved_year":2025,"cancelled_year":null,"stop_year":null,"estimated_cost_usd":null,"estimated_cost_original":null,"estimated_cost_currency":null,"power_stations_supplied":null,"floating_vessel_name":"Golar Tundra","ccs_project":null,"hydrogen_project":null,"ammonia_project":null,"synthetic_lng_project":null,"retrofit_proposed":null,"url":"https://lngatlas.org/terminal/porto-torres-fsru-it/","data_source":"Data: Global Gas Infrastructure Tracker, Global Energy Monitor, September 2025"},{"terminal_slug":"porto-do-acu-fsru-br","terminal_name":"Porto do Açu FSRU","country":"Brazil","country_iso":"BR","unit_name":null,"status":"operating","facility_type":"import","floating_type":"fsru","capacity_mtpa":7.5,"capacity_bcm_y":10.2,"start_year":2021,"planned_start_year":null,"original_planned_start_year":null,"fid_year":null,"construction_year":null,"shelved_year":null,"cancelled_year":null,"stop_year":null,"estimated_cost_usd":null,"estimated_cost_original":null,"estimated_cost_currency":null,"power_stations_supplied":"GNA I, GNA II, GNA III and IV power stations (plus potential secondary supply via pipeline to Norte Fluminense power station and Marlim Azul power station)","floating_vessel_name":"BW Magna","ccs_project":null,"hydrogen_project":null,"ammonia_project":null,"synthetic_lng_project":null,"retrofit_proposed":null,"url":"https://lngatlas.org/terminal/porto-do-acu-fsru-br/","data_source":"Data: Global Gas Infrastructure Tracker, Global Energy Monitor, September 2025"},{"terminal_slug":"portovaya-lng-terminal-ru","terminal_name":"Portovaya LNG Terminal","country":"Russia","country_iso":"RU","unit_name":"T1","status":"operating","facility_type":"export","floating_type":"unknown","capacity_mtpa":0.75,"capacity_bcm_y":1.02,"start_year":2022,"planned_start_year":null,"original_planned_start_year":2018,"fid_year":null,"construction_year":2016,"shelved_year":null,"cancelled_year":null,"stop_year":null,"estimated_cost_usd":810000000,"estimated_cost_original":810000000,"estimated_cost_currency":"USD","power_stations_supplied":null,"floating_vessel_name":null,"ccs_project":null,"hydrogen_project":null,"ammonia_project":null,"synthetic_lng_project":null,"retrofit_proposed":null,"url":"https://lngatlas.org/terminal/portovaya-lng-terminal-ru/","data_source":"Data: Global Gas Infrastructure Tracker, Global Energy Monitor, September 2025"},{"terminal_slug":"portovaya-lng-terminal-ru","terminal_name":"Portovaya LNG Terminal","country":"Russia","country_iso":"RU","unit_name":"T2","status":"operating","facility_type":"export","floating_type":"unknown","capacity_mtpa":0.75,"capacity_bcm_y":1.02,"start_year":2022,"planned_start_year":null,"original_planned_start_year":2018,"fid_year":null,"construction_year":2016,"shelved_year":null,"cancelled_year":null,"stop_year":null,"estimated_cost_usd":810000000,"estimated_cost_original":810000000,"estimated_cost_currency":"USD","power_stations_supplied":null,"floating_vessel_name":null,"ccs_project":null,"hydrogen_project":null,"ammonia_project":null,"synthetic_lng_project":null,"retrofit_proposed":null,"url":"https://lngatlas.org/terminal/portovaya-lng-terminal-ru/","data_source":"Data: Global Gas Infrastructure Tracker, Global Energy Monitor, September 2025"},{"terminal_slug":"portovaya-lng-terminal-ru","terminal_name":"Portovaya LNG Terminal","country":"Russia","country_iso":"RU","unit_name":"T3","status":"shelved","facility_type":"export","floating_type":"unknown","capacity_mtpa":2,"capacity_bcm_y":2.72,"start_year":null,"planned_start_year":null,"original_planned_start_year":null,"fid_year":null,"construction_year":null,"shelved_year":2025,"cancelled_year":null,"stop_year":null,"estimated_cost_usd":2000000000,"estimated_cost_original":2000000000,"estimated_cost_currency":"USD","power_stations_supplied":null,"floating_vessel_name":null,"ccs_project":null,"hydrogen_project":null,"ammonia_project":null,"synthetic_lng_project":null,"retrofit_proposed":null,"url":"https://lngatlas.org/terminal/portovaya-lng-terminal-ru/","data_source":"Data: Global Gas Infrastructure Tracker, Global Energy Monitor, September 2025"},{"terminal_slug":"portovesme-fsru-it","terminal_name":"Portovesme FSRU","country":"Italy","country_iso":"IT","unit_name":null,"status":"shelved","facility_type":"import","floating_type":"fsru","capacity_mtpa":null,"capacity_bcm_y":null,"start_year":null,"planned_start_year":null,"original_planned_start_year":2024,"fid_year":null,"construction_year":null,"shelved_year":null,"cancelled_year":null,"stop_year":null,"estimated_cost_usd":283000000,"estimated_cost_original":283000000,"estimated_cost_currency":"USD","power_stations_supplied":null,"floating_vessel_name":"Golar Arctic","ccs_project":null,"hydrogen_project":null,"ammonia_project":null,"synthetic_lng_project":null,"retrofit_proposed":null,"url":"https://lngatlas.org/terminal/portovesme-fsru-it/","data_source":"Data: Global Gas Infrastructure Tracker, Global Energy Monitor, September 2025"},{"terminal_slug":"poseidon-flng-terminal-au","terminal_name":"Poseidon FLNG Terminal","country":"Australia","country_iso":"AU","unit_name":null,"status":"cancelled","facility_type":"export","floating_type":"flng","capacity_mtpa":3.9,"capacity_bcm_y":5.31,"start_year":null,"planned_start_year":null,"original_planned_start_year":null,"fid_year":null,"construction_year":null,"shelved_year":2020,"cancelled_year":2022,"stop_year":2022,"estimated_cost_usd":null,"estimated_cost_original":null,"estimated_cost_currency":null,"power_stations_supplied":null,"floating_vessel_name":null,"ccs_project":null,"hydrogen_project":null,"ammonia_project":null,"synthetic_lng_project":null,"retrofit_proposed":null,"url":"https://lngatlas.org/terminal/poseidon-flng-terminal-au/","data_source":"Data: Global Gas Infrastructure Tracker, Global Energy Monitor, September 2025"},{"terminal_slug":"predator-fsru-ie","terminal_name":"Predator FSRU","country":"Ireland","country_iso":"IE","unit_name":null,"status":"proposed","facility_type":"import","floating_type":"fsru","capacity_mtpa":1.91,"capacity_bcm_y":2.6,"start_year":null,"planned_start_year":null,"original_planned_start_year":2024,"fid_year":null,"construction_year":null,"shelved_year":2024,"cancelled_year":null,"stop_year":null,"estimated_cost_usd":null,"estimated_cost_original":null,"estimated_cost_currency":null,"power_stations_supplied":null,"floating_vessel_name":null,"ccs_project":null,"hydrogen_project":null,"ammonia_project":null,"synthetic_lng_project":null,"retrofit_proposed":null,"url":"https://lngatlas.org/terminal/predator-fsru-ie/","data_source":"Data: Global Gas Infrastructure Tracker, Global Energy Monitor, September 2025"},{"terminal_slug":"prelude-flng-terminal-au","terminal_name":"Prelude FLNG Terminal","country":"Australia","country_iso":"AU","unit_name":null,"status":"operating","facility_type":"export","floating_type":"flng","capacity_mtpa":3.6,"capacity_bcm_y":4.9,"start_year":2019,"planned_start_year":null,"original_planned_start_year":null,"fid_year":null,"construction_year":2012,"shelved_year":null,"cancelled_year":null,"stop_year":null,"estimated_cost_usd":17433600000,"estimated_cost_original":24000000000,"estimated_cost_currency":"AUD","power_stations_supplied":null,"floating_vessel_name":null,"ccs_project":null,"hydrogen_project":null,"ammonia_project":null,"synthetic_lng_project":null,"retrofit_proposed":null,"url":"https://lngatlas.org/terminal/prelude-flng-terminal-au/","data_source":"Data: Global Gas Infrastructure Tracker, Global Energy Monitor, September 2025"},{"terminal_slug":"presidente-kennedy-fsru-br","terminal_name":"Presidente Kennedy FSRU","country":"Brazil","country_iso":"BR","unit_name":null,"status":"shelved","facility_type":"import","floating_type":"fsru","capacity_mtpa":5.37,"capacity_bcm_y":7.31,"start_year":null,"planned_start_year":null,"original_planned_start_year":2027,"fid_year":null,"construction_year":null,"shelved_year":2025,"cancelled_year":null,"stop_year":null,"estimated_cost_usd":52362000,"estimated_cost_original":290900000,"estimated_cost_currency":"BRL","power_stations_supplied":"Presidente Kennedy power station","floating_vessel_name":null,"ccs_project":null,"hydrogen_project":null,"ammonia_project":null,"synthetic_lng_project":null,"retrofit_proposed":null,"url":"https://lngatlas.org/terminal/presidente-kennedy-fsru-br/","data_source":"Data: Global Gas Infrastructure Tracker, Global Energy Monitor, September 2025"},{"terminal_slug":"prince-rupert-lng-terminal-ca","terminal_name":"Prince Rupert LNG Terminal","country":"Canada","country_iso":"CA","unit_name":"T1-T3","status":"cancelled","facility_type":"export","floating_type":"unknown","capacity_mtpa":21,"capacity_bcm_y":28.57,"start_year":null,"planned_start_year":null,"original_planned_start_year":null,"fid_year":null,"construction_year":null,"shelved_year":null,"cancelled_year":2017,"stop_year":2017,"estimated_cost_usd":null,"estimated_cost_original":null,"estimated_cost_currency":null,"power_stations_supplied":null,"floating_vessel_name":null,"ccs_project":null,"hydrogen_project":null,"ammonia_project":null,"synthetic_lng_project":null,"retrofit_proposed":null,"url":"https://lngatlas.org/terminal/prince-rupert-lng-terminal-ca/","data_source":"Data: Global Gas Infrastructure Tracker, Global Energy Monitor, September 2025"},{"terminal_slug":"priolo-augusta-lng-terminal-it","terminal_name":"Priolo Augusta LNG Terminal","country":"Italy","country_iso":"IT","unit_name":null,"status":"cancelled","facility_type":"import","floating_type":"unknown","capacity_mtpa":5.88,"capacity_bcm_y":8,"start_year":null,"planned_start_year":null,"original_planned_start_year":null,"fid_year":null,"construction_year":null,"shelved_year":2014,"cancelled_year":2016,"stop_year":2016,"estimated_cost_usd":null,"estimated_cost_original":null,"estimated_cost_currency":null,"power_stations_supplied":null,"floating_vessel_name":null,"ccs_project":null,"hydrogen_project":null,"ammonia_project":null,"synthetic_lng_project":null,"retrofit_proposed":null,"url":"https://lngatlas.org/terminal/priolo-augusta-lng-terminal-it/","data_source":"Data: Global Gas Infrastructure Tracker, Global Energy Monitor, September 2025"},{"terminal_slug":"progreso-lng-terminal-mx","terminal_name":"Progreso LNG Terminal","country":"Mexico","country_iso":"MX","unit_name":null,"status":"cancelled","facility_type":"import","floating_type":"unknown","capacity_mtpa":null,"capacity_bcm_y":null,"start_year":null,"planned_start_year":null,"original_planned_start_year":null,"fid_year":null,"construction_year":null,"shelved_year":null,"cancelled_year":null,"stop_year":null,"estimated_cost_usd":null,"estimated_cost_original":null,"estimated_cost_currency":null,"power_stations_supplied":null,"floating_vessel_name":null,"ccs_project":null,"hydrogen_project":null,"ammonia_project":null,"synthetic_lng_project":null,"retrofit_proposed":null,"url":"https://lngatlas.org/terminal/progreso-lng-terminal-mx/","data_source":"Data: Global Gas Infrastructure Tracker, Global Energy Monitor, September 2025"},{"terminal_slug":"project-venezuela-lng-terminal-ve","terminal_name":"Project Venezuela LNG Terminal","country":"Venezuela","country_iso":"VE","unit_name":null,"status":"cancelled","facility_type":"export","floating_type":"unknown","capacity_mtpa":4,"capacity_bcm_y":5.44,"start_year":null,"planned_start_year":null,"original_planned_start_year":null,"fid_year":null,"construction_year":null,"shelved_year":2002,"cancelled_year":2004,"stop_year":2004,"estimated_cost_usd":2000000000,"estimated_cost_original":2000000000,"estimated_cost_currency":"USD","power_stations_supplied":null,"floating_vessel_name":null,"ccs_project":null,"hydrogen_project":null,"ammonia_project":null,"synthetic_lng_project":null,"retrofit_proposed":null,"url":"https://lngatlas.org/terminal/project-venezuela-lng-terminal-ve/","data_source":"Data: Global Gas Infrastructure Tracker, Global Energy Monitor, September 2025"},{"terminal_slug":"puerto-brisa-lng-terminal-co","terminal_name":"Puerto Brisa LNG Terminal","country":"Colombia","country_iso":"CO","unit_name":"Phase 1","status":"proposed","facility_type":"import","floating_type":"floating","capacity_mtpa":1.84,"capacity_bcm_y":2.5,"start_year":null,"planned_start_year":null,"original_planned_start_year":2026,"fid_year":null,"construction_year":null,"shelved_year":null,"cancelled_year":null,"stop_year":null,"estimated_cost_usd":null,"estimated_cost_original":null,"estimated_cost_currency":null,"power_stations_supplied":null,"floating_vessel_name":null,"ccs_project":null,"hydrogen_project":null,"ammonia_project":null,"synthetic_lng_project":null,"retrofit_proposed":null,"url":"https://lngatlas.org/terminal/puerto-brisa-lng-terminal-co/","data_source":"Data: Global Gas Infrastructure Tracker, Global Energy Monitor, September 2025"},{"terminal_slug":"puerto-brisa-lng-terminal-co","terminal_name":"Puerto Brisa LNG Terminal","country":"Colombia","country_iso":"CO","unit_name":"Phase 2","status":"proposed","facility_type":"import","floating_type":"floating","capacity_mtpa":3.07,"capacity_bcm_y":4.18,"start_year":null,"planned_start_year":null,"original_planned_start_year":null,"fid_year":null,"construction_year":null,"shelved_year":null,"cancelled_year":null,"stop_year":null,"estimated_cost_usd":null,"estimated_cost_original":null,"estimated_cost_currency":null,"power_stations_supplied":null,"floating_vessel_name":null,"ccs_project":null,"hydrogen_project":null,"ammonia_project":null,"synthetic_lng_project":null,"retrofit_proposed":null,"url":"https://lngatlas.org/terminal/puerto-brisa-lng-terminal-co/","data_source":"Data: Global Gas Infrastructure Tracker, Global Energy Monitor, September 2025"},{"terminal_slug":"puerto-cortes-lng-terminal-hn","terminal_name":"Puerto Cortés LNG Terminal","country":"Honduras","country_iso":"HN","unit_name":null,"status":"construction","facility_type":"import","floating_type":"unknown","capacity_mtpa":null,"capacity_bcm_y":null,"start_year":null,"planned_start_year":null,"original_planned_start_year":null,"fid_year":null,"construction_year":null,"shelved_year":null,"cancelled_year":null,"stop_year":null,"estimated_cost_usd":null,"estimated_cost_original":null,"estimated_cost_currency":null,"power_stations_supplied":"Brassavola power station","floating_vessel_name":null,"ccs_project":null,"hydrogen_project":null,"ammonia_project":null,"synthetic_lng_project":null,"retrofit_proposed":null,"url":"https://lngatlas.org/terminal/puerto-cortes-lng-terminal-hn/","data_source":"Data: Global Gas Infrastructure Tracker, Global Energy Monitor, September 2025"},{"terminal_slug":"puerto-sandino-fsru-ni","terminal_name":"Puerto Sandino FSRU","country":"Nicaragua","country_iso":"NI","unit_name":null,"status":"construction","facility_type":"import","floating_type":"fsru","capacity_mtpa":5,"capacity_bcm_y":6.8,"start_year":null,"planned_start_year":2025,"original_planned_start_year":2024,"fid_year":2021,"construction_year":2020,"shelved_year":null,"cancelled_year":null,"stop_year":null,"estimated_cost_usd":null,"estimated_cost_original":null,"estimated_cost_currency":null,"power_stations_supplied":"Puerto Sandino power station","floating_vessel_name":"Energos Princess","ccs_project":null,"hydrogen_project":null,"ammonia_project":null,"synthetic_lng_project":null,"retrofit_proposed":null,"url":"https://lngatlas.org/terminal/puerto-sandino-fsru-ni/","data_source":"Data: Global Gas Infrastructure Tracker, Global Energy Monitor, September 2025"},{"terminal_slug":"puerto-de-la-luz-lng-terminal-es","terminal_name":"Puerto de la Luz LNG Terminal","country":"Spain","country_iso":"ES","unit_name":null,"status":"proposed","facility_type":"import","floating_type":"unknown","capacity_mtpa":null,"capacity_bcm_y":null,"start_year":null,"planned_start_year":null,"original_planned_start_year":null,"fid_year":null,"construction_year":null,"shelved_year":null,"cancelled_year":null,"stop_year":null,"estimated_cost_usd":98100000,"estimated_cost_original":90000000,"estimated_cost_currency":"EUR","power_stations_supplied":null,"floating_vessel_name":null,"ccs_project":null,"hydrogen_project":null,"ammonia_project":null,"synthetic_lng_project":null,"retrofit_proposed":null,"url":"https://lngatlas.org/terminal/puerto-de-la-luz-lng-terminal-es/","data_source":"Data: Global Gas Infrastructure Tracker, Global Energy Monitor, September 2025"},{"terminal_slug":"punta-europa-lng-terminal-gq","terminal_name":"Punta Europa LNG Terminal","country":"Equatorial Guinea","country_iso":"GQ","unit_name":"T1","status":"operating","facility_type":"export","floating_type":"unknown","capacity_mtpa":3.7,"capacity_bcm_y":5.03,"start_year":2007,"planned_start_year":null,"original_planned_start_year":null,"fid_year":null,"construction_year":2005,"shelved_year":null,"cancelled_year":null,"stop_year":null,"estimated_cost_usd":1500000000,"estimated_cost_original":1500000000,"estimated_cost_currency":"USD","power_stations_supplied":null,"floating_vessel_name":null,"ccs_project":null,"hydrogen_project":null,"ammonia_project":null,"synthetic_lng_project":null,"retrofit_proposed":null,"url":"https://lngatlas.org/terminal/punta-europa-lng-terminal-gq/","data_source":"Data: Global Gas Infrastructure Tracker, Global Energy Monitor, September 2025"},{"terminal_slug":"punta-europa-lng-terminal-gq","terminal_name":"Punta Europa LNG Terminal","country":"Equatorial Guinea","country_iso":"GQ","unit_name":"T2","status":"cancelled","facility_type":"export","floating_type":"unknown","capacity_mtpa":4.4,"capacity_bcm_y":5.99,"start_year":null,"planned_start_year":null,"original_planned_start_year":2016,"fid_year":2012,"construction_year":null,"shelved_year":null,"cancelled_year":2021,"stop_year":2021,"estimated_cost_usd":null,"estimated_cost_original":null,"estimated_cost_currency":null,"power_stations_supplied":null,"floating_vessel_name":null,"ccs_project":null,"hydrogen_project":null,"ammonia_project":null,"synthetic_lng_project":null,"retrofit_proposed":null,"url":"https://lngatlas.org/terminal/punta-europa-lng-terminal-gq/","data_source":"Data: Global Gas Infrastructure Tracker, Global Energy Monitor, September 2025"},{"terminal_slug":"putian-lng-terminal-cn","terminal_name":"Putian LNG Terminal","country":"China","country_iso":"CN","unit_name":"Phase 1","status":"proposed","facility_type":"import","floating_type":"unknown","capacity_mtpa":5.65,"capacity_bcm_y":7.69,"start_year":null,"planned_start_year":null,"original_planned_start_year":2026,"fid_year":null,"construction_year":null,"shelved_year":null,"cancelled_year":null,"stop_year":null,"estimated_cost_usd":841600000,"estimated_cost_original":5260000000,"estimated_cost_currency":"RMB","power_stations_supplied":null,"floating_vessel_name":null,"ccs_project":null,"hydrogen_project":null,"ammonia_project":null,"synthetic_lng_project":null,"retrofit_proposed":null,"url":"https://lngatlas.org/terminal/putian-lng-terminal-cn/","data_source":"Data: Global Gas Infrastructure Tracker, Global Energy Monitor, September 2025"},{"terminal_slug":"putian-lng-terminal-cn","terminal_name":"Putian LNG Terminal","country":"China","country_iso":"CN","unit_name":"Phase 2","status":"proposed","facility_type":"import","floating_type":"unknown","capacity_mtpa":4.35,"capacity_bcm_y":5.92,"start_year":null,"planned_start_year":null,"original_planned_start_year":null,"fid_year":null,"construction_year":null,"shelved_year":null,"cancelled_year":null,"stop_year":null,"estimated_cost_usd":null,"estimated_cost_original":null,"estimated_cost_currency":null,"power_stations_supplied":null,"floating_vessel_name":null,"ccs_project":null,"hydrogen_project":null,"ammonia_project":null,"synthetic_lng_project":null,"retrofit_proposed":null,"url":"https://lngatlas.org/terminal/putian-lng-terminal-cn/","data_source":"Data: Global Gas Infrastructure Tracker, Global Energy Monitor, September 2025"},{"terminal_slug":"pyeongtaek-lng-terminal-kr","terminal_name":"Pyeongtaek LNG Terminal","country":"South Korea","country_iso":"KR","unit_name":null,"status":"operating","facility_type":"import","floating_type":"unknown","capacity_mtpa":41,"capacity_bcm_y":55.78,"start_year":1986,"planned_start_year":null,"original_planned_start_year":null,"fid_year":null,"construction_year":null,"shelved_year":null,"cancelled_year":null,"stop_year":null,"estimated_cost_usd":null,"estimated_cost_original":null,"estimated_cost_currency":null,"power_stations_supplied":null,"floating_vessel_name":null,"ccs_project":null,"hydrogen_project":null,"ammonia_project":null,"synthetic_lng_project":null,"retrofit_proposed":null,"url":"https://lngatlas.org/terminal/pyeongtaek-lng-terminal-kr/","data_source":"Data: Global Gas Infrastructure Tracker, Global Energy Monitor, September 2025"},{"terminal_slug":"qatar-north-field-lng-terminal-qa","terminal_name":"Qatar North Field LNG Terminal","country":"Qatar","country_iso":"QA","unit_name":"North Field East (T1-4)","status":"construction","facility_type":"export","floating_type":"unknown","capacity_mtpa":32,"capacity_bcm_y":43.54,"start_year":null,"planned_start_year":null,"original_planned_start_year":2026,"fid_year":2021,"construction_year":2023,"shelved_year":null,"cancelled_year":null,"stop_year":null,"estimated_cost_usd":28750000000,"estimated_cost_original":28750000000,"estimated_cost_currency":"USD","power_stations_supplied":null,"floating_vessel_name":null,"ccs_project":true,"hydrogen_project":null,"ammonia_project":null,"synthetic_lng_project":null,"retrofit_proposed":null,"url":"https://lngatlas.org/terminal/qatar-north-field-lng-terminal-qa/","data_source":"Data: Global Gas Infrastructure Tracker, Global Energy Monitor, September 2025"},{"terminal_slug":"qatar-north-field-lng-terminal-qa","terminal_name":"Qatar North Field LNG Terminal","country":"Qatar","country_iso":"QA","unit_name":"North Field South (T5-6)","status":"construction","facility_type":"export","floating_type":"unknown","capacity_mtpa":16,"capacity_bcm_y":21.77,"start_year":null,"planned_start_year":2028,"original_planned_start_year":2027,"fid_year":2022,"construction_year":2023,"shelved_year":null,"cancelled_year":null,"stop_year":null,"estimated_cost_usd":10000000000,"estimated_cost_original":10000000000,"estimated_cost_currency":"USD","power_stations_supplied":null,"floating_vessel_name":null,"ccs_project":true,"hydrogen_project":null,"ammonia_project":null,"synthetic_lng_project":null,"retrofit_proposed":null,"url":"https://lngatlas.org/terminal/qatar-north-field-lng-terminal-qa/","data_source":"Data: Global Gas Infrastructure Tracker, Global Energy Monitor, September 2025"},{"terminal_slug":"qatar-north-field-lng-terminal-qa","terminal_name":"Qatar North Field LNG Terminal","country":"Qatar","country_iso":"QA","unit_name":"North Field West  (T7-8)","status":"proposed","facility_type":"export","floating_type":"unknown","capacity_mtpa":16,"capacity_bcm_y":21.77,"start_year":null,"planned_start_year":null,"original_planned_start_year":2030,"fid_year":2024,"construction_year":null,"shelved_year":null,"cancelled_year":null,"stop_year":null,"estimated_cost_usd":null,"estimated_cost_original":null,"estimated_cost_currency":null,"power_stations_supplied":null,"floating_vessel_name":null,"ccs_project":true,"hydrogen_project":null,"ammonia_project":null,"synthetic_lng_project":null,"retrofit_proposed":null,"url":"https://lngatlas.org/terminal/qatar-north-field-lng-terminal-qa/","data_source":"Data: Global Gas Infrastructure Tracker, Global Energy Monitor, September 2025"},{"terminal_slug":"qatarenergy-lng-n-qa","terminal_name":"QatarEnergy LNG (N)","country":"Qatar","country_iso":"QA","unit_name":"N(1) T1-3","status":"operating","facility_type":"export","floating_type":"unknown","capacity_mtpa":9.6,"capacity_bcm_y":13.06,"start_year":1996,"planned_start_year":null,"original_planned_start_year":null,"fid_year":null,"construction_year":null,"shelved_year":null,"cancelled_year":null,"stop_year":null,"estimated_cost_usd":2300000000,"estimated_cost_original":2300000000,"estimated_cost_currency":"USD","power_stations_supplied":null,"floating_vessel_name":null,"ccs_project":null,"hydrogen_project":null,"ammonia_project":null,"synthetic_lng_project":null,"retrofit_proposed":null,"url":"https://lngatlas.org/terminal/qatarenergy-lng-n-qa/","data_source":"Data: Global Gas Infrastructure Tracker, Global Energy Monitor, September 2025"},{"terminal_slug":"qatarenergy-lng-n-qa","terminal_name":"QatarEnergy LNG (N)","country":"Qatar","country_iso":"QA","unit_name":"N(2) T4-5","status":"operating","facility_type":"export","floating_type":"unknown","capacity_mtpa":15.6,"capacity_bcm_y":21.22,"start_year":2009,"planned_start_year":null,"original_planned_start_year":null,"fid_year":null,"construction_year":null,"shelved_year":null,"cancelled_year":null,"stop_year":null,"estimated_cost_usd":null,"estimated_cost_original":null,"estimated_cost_currency":null,"power_stations_supplied":null,"floating_vessel_name":null,"ccs_project":null,"hydrogen_project":null,"ammonia_project":null,"synthetic_lng_project":null,"retrofit_proposed":null,"url":"https://lngatlas.org/terminal/qatarenergy-lng-n-qa/","data_source":"Data: Global Gas Infrastructure Tracker, Global Energy Monitor, September 2025"},{"terminal_slug":"qatarenergy-lng-n-qa","terminal_name":"QatarEnergy LNG (N)","country":"Qatar","country_iso":"QA","unit_name":"N(3) T6","status":"operating","facility_type":"export","floating_type":"unknown","capacity_mtpa":7.8,"capacity_bcm_y":10.61,"start_year":2010,"planned_start_year":null,"original_planned_start_year":null,"fid_year":null,"construction_year":null,"shelved_year":null,"cancelled_year":null,"stop_year":null,"estimated_cost_usd":null,"estimated_cost_original":null,"estimated_cost_currency":null,"power_stations_supplied":null,"floating_vessel_name":null,"ccs_project":null,"hydrogen_project":null,"ammonia_project":null,"synthetic_lng_project":null,"retrofit_proposed":null,"url":"https://lngatlas.org/terminal/qatarenergy-lng-n-qa/","data_source":"Data: Global Gas Infrastructure Tracker, Global Energy Monitor, September 2025"},{"terminal_slug":"qatarenergy-lng-n-qa","terminal_name":"QatarEnergy LNG (N)","country":"Qatar","country_iso":"QA","unit_name":"N(4) T7","status":"operating","facility_type":"export","floating_type":"unknown","capacity_mtpa":7.8,"capacity_bcm_y":10.61,"start_year":2011,"planned_start_year":null,"original_planned_start_year":null,"fid_year":null,"construction_year":null,"shelved_year":null,"cancelled_year":null,"stop_year":null,"estimated_cost_usd":null,"estimated_cost_original":null,"estimated_cost_currency":null,"power_stations_supplied":null,"floating_vessel_name":null,"ccs_project":null,"hydrogen_project":null,"ammonia_project":null,"synthetic_lng_project":null,"retrofit_proposed":null,"url":"https://lngatlas.org/terminal/qatarenergy-lng-n-qa/","data_source":"Data: Global Gas Infrastructure Tracker, Global Energy Monitor, September 2025"},{"terminal_slug":"qatarenergy-lng-s-qa","terminal_name":"QatarEnergy LNG (S)","country":"Qatar","country_iso":"QA","unit_name":"S(1) T1-2","status":"operating","facility_type":"export","floating_type":"unknown","capacity_mtpa":6.6,"capacity_bcm_y":8.98,"start_year":1999,"planned_start_year":null,"original_planned_start_year":null,"fid_year":null,"construction_year":null,"shelved_year":null,"cancelled_year":null,"stop_year":null,"estimated_cost_usd":null,"estimated_cost_original":null,"estimated_cost_currency":null,"power_stations_supplied":null,"floating_vessel_name":null,"ccs_project":null,"hydrogen_project":null,"ammonia_project":null,"synthetic_lng_project":null,"retrofit_proposed":null,"url":"https://lngatlas.org/terminal/qatarenergy-lng-s-qa/","data_source":"Data: Global Gas Infrastructure Tracker, Global Energy Monitor, September 2025"},{"terminal_slug":"qatarenergy-lng-s-qa","terminal_name":"QatarEnergy LNG (S)","country":"Qatar","country_iso":"QA","unit_name":"S(2) T3-5","status":"operating","facility_type":"export","floating_type":"unknown","capacity_mtpa":14.1,"capacity_bcm_y":19.18,"start_year":2004,"planned_start_year":null,"original_planned_start_year":null,"fid_year":null,"construction_year":null,"shelved_year":null,"cancelled_year":null,"stop_year":null,"estimated_cost_usd":null,"estimated_cost_original":null,"estimated_cost_currency":null,"power_stations_supplied":null,"floating_vessel_name":null,"ccs_project":null,"hydrogen_project":null,"ammonia_project":null,"synthetic_lng_project":null,"retrofit_proposed":null,"url":"https://lngatlas.org/terminal/qatarenergy-lng-s-qa/","data_source":"Data: Global Gas Infrastructure Tracker, Global Energy Monitor, September 2025"},{"terminal_slug":"qatarenergy-lng-s-qa","terminal_name":"QatarEnergy LNG (S)","country":"Qatar","country_iso":"QA","unit_name":"S(3) T6-7","status":"operating","facility_type":"export","floating_type":"unknown","capacity_mtpa":15.6,"capacity_bcm_y":21.22,"start_year":2009,"planned_start_year":null,"original_planned_start_year":null,"fid_year":null,"construction_year":null,"shelved_year":null,"cancelled_year":null,"stop_year":null,"estimated_cost_usd":null,"estimated_cost_original":null,"estimated_cost_currency":null,"power_stations_supplied":null,"floating_vessel_name":null,"ccs_project":null,"hydrogen_project":null,"ammonia_project":null,"synthetic_lng_project":null,"retrofit_proposed":null,"url":"https://lngatlas.org/terminal/qatarenergy-lng-s-qa/","data_source":"Data: Global Gas Infrastructure Tracker, Global Energy Monitor, September 2025"},{"terminal_slug":"qeshm-lng-terminal-ir","terminal_name":"Qeshm LNG Terminal","country":"Iran","country_iso":"IR","unit_name":"T1-T3","status":"cancelled","facility_type":"export","floating_type":"unknown","capacity_mtpa":3.45,"capacity_bcm_y":4.69,"start_year":null,"planned_start_year":null,"original_planned_start_year":null,"fid_year":null,"construction_year":null,"shelved_year":2019,"cancelled_year":2021,"stop_year":2021,"estimated_cost_usd":null,"estimated_cost_original":null,"estimated_cost_currency":null,"power_stations_supplied":null,"floating_vessel_name":null,"ccs_project":null,"hydrogen_project":null,"ammonia_project":null,"synthetic_lng_project":null,"retrofit_proposed":null,"url":"https://lngatlas.org/terminal/qeshm-lng-terminal-ir/","data_source":"Data: Global Gas Infrastructure Tracker, Global Energy Monitor, September 2025"},{"terminal_slug":"qidong-lng-terminal-cn","terminal_name":"Qidong LNG Terminal","country":"China","country_iso":"CN","unit_name":"Phase 1","status":"operating","facility_type":"import","floating_type":"unknown","capacity_mtpa":0.6,"capacity_bcm_y":0.82,"start_year":2017,"planned_start_year":null,"original_planned_start_year":null,"fid_year":null,"construction_year":2014,"shelved_year":null,"cancelled_year":null,"stop_year":null,"estimated_cost_usd":28800000,"estimated_cost_original":180000000,"estimated_cost_currency":"RMB","power_stations_supplied":null,"floating_vessel_name":null,"ccs_project":null,"hydrogen_project":null,"ammonia_project":null,"synthetic_lng_project":null,"retrofit_proposed":null,"url":"https://lngatlas.org/terminal/qidong-lng-terminal-cn/","data_source":"Data: Global Gas Infrastructure Tracker, Global Energy Monitor, September 2025"},{"terminal_slug":"qidong-lng-terminal-cn","terminal_name":"Qidong LNG Terminal","country":"China","country_iso":"CN","unit_name":"Phase 2","status":"operating","facility_type":"import","floating_type":"unknown","capacity_mtpa":0.55,"capacity_bcm_y":0.75,"start_year":2018,"planned_start_year":null,"original_planned_start_year":null,"fid_year":null,"construction_year":null,"shelved_year":null,"cancelled_year":null,"stop_year":null,"estimated_cost_usd":119004800,"estimated_cost_original":743780000,"estimated_cost_currency":"RMB","power_stations_supplied":null,"floating_vessel_name":null,"ccs_project":null,"hydrogen_project":null,"ammonia_project":null,"synthetic_lng_project":null,"retrofit_proposed":null,"url":"https://lngatlas.org/terminal/qidong-lng-terminal-cn/","data_source":"Data: Global Gas Infrastructure Tracker, Global Energy Monitor, September 2025"},{"terminal_slug":"qidong-lng-terminal-cn","terminal_name":"Qidong LNG Terminal","country":"China","country_iso":"CN","unit_name":"Phase 3","status":"operating","facility_type":"import","floating_type":"unknown","capacity_mtpa":1.85,"capacity_bcm_y":2.52,"start_year":2020,"planned_start_year":null,"original_planned_start_year":null,"fid_year":null,"construction_year":2018,"shelved_year":null,"cancelled_year":null,"stop_year":null,"estimated_cost_usd":null,"estimated_cost_original":null,"estimated_cost_currency":null,"power_stations_supplied":null,"floating_vessel_name":null,"ccs_project":null,"hydrogen_project":null,"ammonia_project":null,"synthetic_lng_project":null,"retrofit_proposed":null,"url":"https://lngatlas.org/terminal/qidong-lng-terminal-cn/","data_source":"Data: Global Gas Infrastructure Tracker, Global Energy Monitor, September 2025"},{"terminal_slug":"qidong-lng-terminal-cn","terminal_name":"Qidong LNG Terminal","country":"China","country_iso":"CN","unit_name":"Phase 4","status":"operating","facility_type":"import","floating_type":"unknown","capacity_mtpa":2,"capacity_bcm_y":2.72,"start_year":2022,"planned_start_year":null,"original_planned_start_year":null,"fid_year":null,"construction_year":null,"shelved_year":null,"cancelled_year":null,"stop_year":null,"estimated_cost_usd":103339200,"estimated_cost_original":645870000,"estimated_cost_currency":"RMB","power_stations_supplied":null,"floating_vessel_name":null,"ccs_project":null,"hydrogen_project":null,"ammonia_project":null,"synthetic_lng_project":null,"retrofit_proposed":null,"url":"https://lngatlas.org/terminal/qidong-lng-terminal-cn/","data_source":"Data: Global Gas Infrastructure Tracker, Global Energy Monitor, September 2025"},{"terminal_slug":"qidong-lng-terminal-cn","terminal_name":"Qidong LNG Terminal","country":"China","country_iso":"CN","unit_name":"Phase 5","status":"operating","facility_type":"import","floating_type":"unknown","capacity_mtpa":null,"capacity_bcm_y":null,"start_year":2024,"planned_start_year":null,"original_planned_start_year":2023,"fid_year":null,"construction_year":2021,"shelved_year":null,"cancelled_year":null,"stop_year":null,"estimated_cost_usd":null,"estimated_cost_original":null,"estimated_cost_currency":null,"power_stations_supplied":null,"floating_vessel_name":null,"ccs_project":null,"hydrogen_project":null,"ammonia_project":null,"synthetic_lng_project":null,"retrofit_proposed":null,"url":"https://lngatlas.org/terminal/qidong-lng-terminal-cn/","data_source":"Data: Global Gas Infrastructure Tracker, Global Energy Monitor, September 2025"},{"terminal_slug":"qilak-lng-terminal-us","terminal_name":"Qilak LNG Terminal","country":"United States","country_iso":"US","unit_name":null,"status":"proposed","facility_type":"export","floating_type":"unknown","capacity_mtpa":4,"capacity_bcm_y":5.44,"start_year":null,"planned_start_year":2033,"original_planned_start_year":2026,"fid_year":2025,"construction_year":null,"shelved_year":null,"cancelled_year":null,"stop_year":null,"estimated_cost_usd":4500000000,"estimated_cost_original":4500000000,"estimated_cost_currency":"USD","power_stations_supplied":null,"floating_vessel_name":null,"ccs_project":null,"hydrogen_project":null,"ammonia_project":null,"synthetic_lng_project":null,"retrofit_proposed":null,"url":"https://lngatlas.org/terminal/qilak-lng-terminal-us/","data_source":"Data: Global Gas Infrastructure Tracker, Global Energy Monitor, September 2025"},{"terminal_slug":"qinzhou-lng-terminal-cn","terminal_name":"Qinzhou LNG Terminal","country":"China","country_iso":"CN","unit_name":null,"status":"proposed","facility_type":"import","floating_type":"unknown","capacity_mtpa":4,"capacity_bcm_y":5.44,"start_year":null,"planned_start_year":null,"original_planned_start_year":null,"fid_year":null,"construction_year":null,"shelved_year":null,"cancelled_year":null,"stop_year":null,"estimated_cost_usd":null,"estimated_cost_original":null,"estimated_cost_currency":null,"power_stations_supplied":null,"floating_vessel_name":null,"ccs_project":null,"hydrogen_project":null,"ammonia_project":null,"synthetic_lng_project":null,"retrofit_proposed":null,"url":"https://lngatlas.org/terminal/qinzhou-lng-terminal-cn/","data_source":"Data: Global Gas Infrastructure Tracker, Global Energy Monitor, September 2025"},{"terminal_slug":"quang-nam-lng-terminal-vn","terminal_name":"Quang Nam LNG Terminal","country":"Vietnam","country_iso":"VN","unit_name":null,"status":"cancelled","facility_type":"import","floating_type":"unknown","capacity_mtpa":null,"capacity_bcm_y":null,"start_year":null,"planned_start_year":null,"original_planned_start_year":null,"fid_year":null,"construction_year":null,"shelved_year":2023,"cancelled_year":2025,"stop_year":2025,"estimated_cost_usd":null,"estimated_cost_original":null,"estimated_cost_currency":null,"power_stations_supplied":null,"floating_vessel_name":null,"ccs_project":null,"hydrogen_project":null,"ammonia_project":null,"synthetic_lng_project":null,"retrofit_proposed":null,"url":"https://lngatlas.org/terminal/quang-nam-lng-terminal-vn/","data_source":"Data: Global Gas Infrastructure Tracker, Global Energy Monitor, September 2025"},{"terminal_slug":"quang-ninh-lng-terminal-vn","terminal_name":"Quang Ninh LNG Terminal","country":"Vietnam","country_iso":"VN","unit_name":null,"status":"proposed","facility_type":"import","floating_type":"unknown","capacity_mtpa":1.2,"capacity_bcm_y":1.63,"start_year":null,"planned_start_year":null,"original_planned_start_year":2029,"fid_year":null,"construction_year":null,"shelved_year":null,"cancelled_year":null,"stop_year":null,"estimated_cost_usd":null,"estimated_cost_original":null,"estimated_cost_currency":null,"power_stations_supplied":"Quang Ninh Combined Cycle power station","floating_vessel_name":null,"ccs_project":null,"hydrogen_project":null,"ammonia_project":null,"synthetic_lng_project":null,"retrofit_proposed":null,"url":"https://lngatlas.org/terminal/quang-ninh-lng-terminal-vn/","data_source":"Data: Global Gas Infrastructure Tracker, Global Energy Monitor, September 2025"},{"terminal_slug":"quanzhou-lng-terminal-cn","terminal_name":"Quanzhou LNG Terminal","country":"China","country_iso":"CN","unit_name":"Phase 1","status":"shelved","facility_type":"import","floating_type":"unknown","capacity_mtpa":3,"capacity_bcm_y":4.08,"start_year":null,"planned_start_year":null,"original_planned_start_year":null,"fid_year":null,"construction_year":null,"shelved_year":null,"cancelled_year":null,"stop_year":null,"estimated_cost_usd":null,"estimated_cost_original":null,"estimated_cost_currency":null,"power_stations_supplied":null,"floating_vessel_name":null,"ccs_project":null,"hydrogen_project":null,"ammonia_project":null,"synthetic_lng_project":null,"retrofit_proposed":null,"url":"https://lngatlas.org/terminal/quanzhou-lng-terminal-cn/","data_source":"Data: Global Gas Infrastructure Tracker, Global Energy Monitor, September 2025"},{"terminal_slug":"quanzhou-lng-terminal-cn","terminal_name":"Quanzhou LNG Terminal","country":"China","country_iso":"CN","unit_name":"Phase 2","status":"shelved","facility_type":"import","floating_type":"unknown","capacity_mtpa":3,"capacity_bcm_y":4.08,"start_year":null,"planned_start_year":null,"original_planned_start_year":null,"fid_year":null,"construction_year":null,"shelved_year":null,"cancelled_year":null,"stop_year":null,"estimated_cost_usd":null,"estimated_cost_original":null,"estimated_cost_currency":null,"power_stations_supplied":null,"floating_vessel_name":null,"ccs_project":null,"hydrogen_project":null,"ammonia_project":null,"synthetic_lng_project":null,"retrofit_proposed":null,"url":"https://lngatlas.org/terminal/quanzhou-lng-terminal-cn/","data_source":"Data: Global Gas Infrastructure Tracker, Global Energy Monitor, September 2025"},{"terminal_slug":"queensland-curtis-lng-terminal-au","terminal_name":"Queensland Curtis LNG Terminal","country":"Australia","country_iso":"AU","unit_name":"T1","status":"operating","facility_type":"export","floating_type":"unknown","capacity_mtpa":4.25,"capacity_bcm_y":5.78,"start_year":2014,"planned_start_year":null,"original_planned_start_year":null,"fid_year":null,"construction_year":null,"shelved_year":null,"cancelled_year":null,"stop_year":null,"estimated_cost_usd":3000000000,"estimated_cost_original":3000000000,"estimated_cost_currency":"USD","power_stations_supplied":null,"floating_vessel_name":null,"ccs_project":null,"hydrogen_project":null,"ammonia_project":null,"synthetic_lng_project":null,"retrofit_proposed":null,"url":"https://lngatlas.org/terminal/queensland-curtis-lng-terminal-au/","data_source":"Data: Global Gas Infrastructure Tracker, Global Energy Monitor, September 2025"},{"terminal_slug":"queensland-curtis-lng-terminal-au","terminal_name":"Queensland Curtis LNG Terminal","country":"Australia","country_iso":"AU","unit_name":"T2","status":"operating","facility_type":"export","floating_type":"unknown","capacity_mtpa":4.25,"capacity_bcm_y":5.78,"start_year":2014,"planned_start_year":null,"original_planned_start_year":null,"fid_year":null,"construction_year":null,"shelved_year":null,"cancelled_year":null,"stop_year":null,"estimated_cost_usd":3000000000,"estimated_cost_original":3000000000,"estimated_cost_currency":"USD","power_stations_supplied":null,"floating_vessel_name":null,"ccs_project":null,"hydrogen_project":null,"ammonia_project":null,"synthetic_lng_project":null,"retrofit_proposed":null,"url":"https://lngatlas.org/terminal/queensland-curtis-lng-terminal-au/","data_source":"Data: Global Gas Infrastructure Tracker, Global Energy Monitor, September 2025"},{"terminal_slug":"quezon-lng-terminal-ph","terminal_name":"Quezon LNG Terminal","country":"Philippines","country_iso":"PH","unit_name":null,"status":"proposed","facility_type":"import","floating_type":"unknown","capacity_mtpa":1.1,"capacity_bcm_y":1.5,"start_year":null,"planned_start_year":null,"original_planned_start_year":2028,"fid_year":null,"construction_year":null,"shelved_year":null,"cancelled_year":null,"stop_year":null,"estimated_cost_usd":null,"estimated_cost_original":null,"estimated_cost_currency":null,"power_stations_supplied":"San Francisco power station","floating_vessel_name":null,"ccs_project":null,"hydrogen_project":null,"ammonia_project":null,"synthetic_lng_project":null,"retrofit_proposed":null,"url":"https://lngatlas.org/terminal/quezon-lng-terminal-ph/","data_source":"Data: Global Gas Infrastructure Tracker, Global Energy Monitor, September 2025"},{"terminal_slug":"quintero-lng-terminal-cl","terminal_name":"Quintero LNG Terminal","country":"Chile","country_iso":"CL","unit_name":null,"status":"operating","facility_type":"import","floating_type":"unknown","capacity_mtpa":4,"capacity_bcm_y":5.44,"start_year":2009,"planned_start_year":null,"original_planned_start_year":null,"fid_year":null,"construction_year":2006,"shelved_year":null,"cancelled_year":null,"stop_year":null,"estimated_cost_usd":1200000000,"estimated_cost_original":1200000000,"estimated_cost_currency":"USD","power_stations_supplied":null,"floating_vessel_name":null,"ccs_project":null,"hydrogen_project":null,"ammonia_project":null,"synthetic_lng_project":null,"retrofit_proposed":null,"url":"https://lngatlas.org/terminal/quintero-lng-terminal-cl/","data_source":"Data: Global Gas Infrastructure Tracker, Global Energy Monitor, September 2025"},{"terminal_slug":"quintero-lng-terminal-cl","terminal_name":"Quintero LNG Terminal","country":"Chile","country_iso":"CL","unit_name":"Expansion","status":"cancelled","facility_type":"import","floating_type":"unknown","capacity_mtpa":1.35,"capacity_bcm_y":1.84,"start_year":null,"planned_start_year":null,"original_planned_start_year":null,"fid_year":null,"construction_year":null,"shelved_year":null,"cancelled_year":2017,"stop_year":2017,"estimated_cost_usd":null,"estimated_cost_original":null,"estimated_cost_currency":null,"power_stations_supplied":null,"floating_vessel_name":null,"ccs_project":null,"hydrogen_project":null,"ammonia_project":null,"synthetic_lng_project":null,"retrofit_proposed":null,"url":"https://lngatlas.org/terminal/quintero-lng-terminal-cl/","data_source":"Data: Global Gas Infrastructure Tracker, Global Energy Monitor, September 2025"},{"terminal_slug":"quoddy-bay-lng-terminal-us","terminal_name":"Quoddy Bay LNG Terminal","country":"United States","country_iso":"US","unit_name":null,"status":"cancelled","facility_type":"import","floating_type":"unknown","capacity_mtpa":null,"capacity_bcm_y":null,"start_year":null,"planned_start_year":null,"original_planned_start_year":null,"fid_year":null,"construction_year":null,"shelved_year":2010,"cancelled_year":2012,"stop_year":2012,"estimated_cost_usd":null,"estimated_cost_original":null,"estimated_cost_currency":null,"power_stations_supplied":null,"floating_vessel_name":null,"ccs_project":null,"hydrogen_project":null,"ammonia_project":null,"synthetic_lng_project":null,"retrofit_proposed":null,"url":"https://lngatlas.org/terminal/quoddy-bay-lng-terminal-us/","data_source":"Data: Global Gas Infrastructure Tracker, Global Energy Monitor, September 2025"},{"terminal_slug":"qushan-lng-terminal-cn","terminal_name":"Qushan LNG Terminal","country":"China","country_iso":"CN","unit_name":null,"status":"shelved","facility_type":"import","floating_type":"unknown","capacity_mtpa":3,"capacity_bcm_y":4.08,"start_year":null,"planned_start_year":null,"original_planned_start_year":null,"fid_year":null,"construction_year":null,"shelved_year":null,"cancelled_year":null,"stop_year":null,"estimated_cost_usd":null,"estimated_cost_original":null,"estimated_cost_currency":null,"power_stations_supplied":null,"floating_vessel_name":null,"ccs_project":null,"hydrogen_project":null,"ammonia_project":null,"synthetic_lng_project":null,"retrofit_proposed":null,"url":"https://lngatlas.org/terminal/qushan-lng-terminal-cn/","data_source":"Data: Global Gas Infrastructure Tracker, Global Energy Monitor, September 2025"},{"terminal_slug":"quynh-lap-lng-terminal-vn","terminal_name":"Quynh Lap LNG Terminal","country":"Vietnam","country_iso":"VN","unit_name":null,"status":"proposed","facility_type":"import","floating_type":"unknown","capacity_mtpa":1.15,"capacity_bcm_y":1.56,"start_year":null,"planned_start_year":null,"original_planned_start_year":2030,"fid_year":null,"construction_year":null,"shelved_year":null,"cancelled_year":null,"stop_year":null,"estimated_cost_usd":null,"estimated_cost_original":null,"estimated_cost_currency":null,"power_stations_supplied":"Quynh Lap power station","floating_vessel_name":null,"ccs_project":null,"hydrogen_project":null,"ammonia_project":null,"synthetic_lng_project":null,"retrofit_proposed":null,"url":"https://lngatlas.org/terminal/quynh-lap-lng-terminal-vn/","data_source":"Data: Global Gas Infrastructure Tracker, Global Energy Monitor, September 2025"},{"terminal_slug":"yan-fsru-my","terminal_name":"RGT Yan LNG Terminal","country":"Malaysia","country_iso":"MY","unit_name":null,"status":"proposed","facility_type":"import","floating_type":"unknown","capacity_mtpa":null,"capacity_bcm_y":null,"start_year":null,"planned_start_year":null,"original_planned_start_year":null,"fid_year":null,"construction_year":null,"shelved_year":null,"cancelled_year":null,"stop_year":null,"estimated_cost_usd":3150000000,"estimated_cost_original":3150000000,"estimated_cost_currency":"USD","power_stations_supplied":"Pulau Bunting power station","floating_vessel_name":null,"ccs_project":null,"hydrogen_project":null,"ammonia_project":null,"synthetic_lng_project":null,"retrofit_proposed":null,"url":"https://lngatlas.org/terminal/yan-fsru-my/","data_source":"Data: Global Gas Infrastructure Tracker, Global Energy Monitor, September 2025"},{"terminal_slug":"rabaska-lng-terminal-ca","terminal_name":"Rabaska LNG Terminal","country":"Canada","country_iso":"CA","unit_name":null,"status":"cancelled","facility_type":"import","floating_type":"unknown","capacity_mtpa":3.8,"capacity_bcm_y":5.17,"start_year":null,"planned_start_year":null,"original_planned_start_year":2014,"fid_year":null,"construction_year":null,"shelved_year":2011,"cancelled_year":2013,"stop_year":2013,"estimated_cost_usd":672000000,"estimated_cost_original":840000000,"estimated_cost_currency":"CAN","power_stations_supplied":null,"floating_vessel_name":null,"ccs_project":null,"hydrogen_project":null,"ammonia_project":null,"synthetic_lng_project":null,"retrofit_proposed":null,"url":"https://lngatlas.org/terminal/rabaska-lng-terminal-ca/","data_source":"Data: Global Gas Infrastructure Tracker, Global Energy Monitor, September 2025"},{"terminal_slug":"rakhine-lng-terminal-mm","terminal_name":"Rakhine LNG Terminal","country":"Myanmar","country_iso":"MM","unit_name":null,"status":"cancelled","facility_type":"import","floating_type":"unknown","capacity_mtpa":null,"capacity_bcm_y":null,"start_year":null,"planned_start_year":null,"original_planned_start_year":2022,"fid_year":null,"construction_year":null,"shelved_year":2023,"cancelled_year":2025,"stop_year":2025,"estimated_cost_usd":null,"estimated_cost_original":null,"estimated_cost_currency":null,"power_stations_supplied":"Kyaukphu (PowerChina) power station","floating_vessel_name":null,"ccs_project":null,"hydrogen_project":null,"ammonia_project":null,"synthetic_lng_project":null,"retrofit_proposed":null,"url":"https://lngatlas.org/terminal/rakhine-lng-terminal-mm/","data_source":"Data: Global Gas Infrastructure Tracker, Global Energy Monitor, September 2025"},{"terminal_slug":"rauma-lng-terminal-fi","terminal_name":"Rauma LNG Terminal","country":"Finland","country_iso":"FI","unit_name":null,"status":"cancelled","facility_type":"import","floating_type":"unknown","capacity_mtpa":null,"capacity_bcm_y":null,"start_year":null,"planned_start_year":null,"original_planned_start_year":null,"fid_year":null,"construction_year":null,"shelved_year":2021,"cancelled_year":2023,"stop_year":2023,"estimated_cost_usd":null,"estimated_cost_original":null,"estimated_cost_currency":null,"power_stations_supplied":null,"floating_vessel_name":null,"ccs_project":null,"hydrogen_project":null,"ammonia_project":null,"synthetic_lng_project":null,"retrofit_proposed":null,"url":"https://lngatlas.org/terminal/rauma-lng-terminal-fi/","data_source":"Data: Global Gas Infrastructure Tracker, Global Energy Monitor, September 2025"},{"terminal_slug":"ravenna-fsru-it","terminal_name":"Ravenna FSRU","country":"Italy","country_iso":"IT","unit_name":null,"status":"construction","facility_type":"import","floating_type":"fsru","capacity_mtpa":3.67,"capacity_bcm_y":4.99,"start_year":null,"planned_start_year":2025,"original_planned_start_year":2024,"fid_year":null,"construction_year":2024,"shelved_year":null,"cancelled_year":null,"stop_year":null,"estimated_cost_usd":1090000000,"estimated_cost_original":1000000000,"estimated_cost_currency":"EUR","power_stations_supplied":null,"floating_vessel_name":"BW Singapore","ccs_project":null,"hydrogen_project":null,"ammonia_project":null,"synthetic_lng_project":null,"retrofit_proposed":null,"url":"https://lngatlas.org/terminal/ravenna-fsru-it/","data_source":"Data: Global Gas Infrastructure Tracker, Global Energy Monitor, September 2025"},{"terminal_slug":"ravenna-lng-terminal-it","terminal_name":"Ravenna LNG Terminal","country":"Italy","country_iso":"IT","unit_name":null,"status":"operating","facility_type":"import","floating_type":"unknown","capacity_mtpa":0.7,"capacity_bcm_y":0.95,"start_year":2021,"planned_start_year":null,"original_planned_start_year":null,"fid_year":null,"construction_year":2018,"shelved_year":null,"cancelled_year":null,"stop_year":null,"estimated_cost_usd":109000000,"estimated_cost_original":100000000,"estimated_cost_currency":"EUR","power_stations_supplied":null,"floating_vessel_name":null,"ccs_project":null,"hydrogen_project":null,"ammonia_project":null,"synthetic_lng_project":null,"retrofit_proposed":null,"url":"https://lngatlas.org/terminal/ravenna-lng-terminal-it/","data_source":"Data: Global Gas Infrastructure Tracker, Global Energy Monitor, September 2025"},{"terminal_slug":"revithoussa-lng-terminal-gr","terminal_name":"Revithoussa LNG Terminal","country":"Greece","country_iso":"GR","unit_name":null,"status":"operating","facility_type":"import","floating_type":"unknown","capacity_mtpa":5.1,"capacity_bcm_y":6.94,"start_year":2000,"planned_start_year":null,"original_planned_start_year":null,"fid_year":null,"construction_year":null,"shelved_year":null,"cancelled_year":null,"stop_year":null,"estimated_cost_usd":null,"estimated_cost_original":null,"estimated_cost_currency":null,"power_stations_supplied":null,"floating_vessel_name":null,"ccs_project":null,"hydrogen_project":null,"ammonia_project":null,"synthetic_lng_project":null,"retrofit_proposed":null,"url":"https://lngatlas.org/terminal/revithoussa-lng-terminal-gr/","data_source":"Data: Global Gas Infrastructure Tracker, Global Energy Monitor, September 2025"},{"terminal_slug":"richards-bay-fsru-za","terminal_name":"Richards Bay FSRU","country":"South Africa","country_iso":"ZA","unit_name":null,"status":"cancelled","facility_type":"import","floating_type":"fsru","capacity_mtpa":null,"capacity_bcm_y":null,"start_year":null,"planned_start_year":null,"original_planned_start_year":null,"fid_year":null,"construction_year":null,"shelved_year":2019,"cancelled_year":2024,"stop_year":2024,"estimated_cost_usd":null,"estimated_cost_original":null,"estimated_cost_currency":null,"power_stations_supplied":null,"floating_vessel_name":null,"ccs_project":null,"hydrogen_project":null,"ammonia_project":null,"synthetic_lng_project":null,"retrofit_proposed":null,"url":"https://lngatlas.org/terminal/richards-bay-fsru-za/","data_source":"Data: Global Gas Infrastructure Tracker, Global Energy Monitor, September 2025"},{"terminal_slug":"richards-bay-transnet-fsru-za","terminal_name":"Richards Bay Transnet FSRU","country":"South Africa","country_iso":"ZA","unit_name":"Phase 1","status":"proposed","facility_type":"import","floating_type":"fsru","capacity_mtpa":3.07,"capacity_bcm_y":4.18,"start_year":null,"planned_start_year":2028,"original_planned_start_year":2026,"fid_year":2026,"construction_year":null,"shelved_year":null,"cancelled_year":null,"stop_year":null,"estimated_cost_usd":148800000,"estimated_cost_original":148800000,"estimated_cost_currency":"USD","power_stations_supplied":null,"floating_vessel_name":null,"ccs_project":null,"hydrogen_project":null,"ammonia_project":null,"synthetic_lng_project":null,"retrofit_proposed":null,"url":"https://lngatlas.org/terminal/richards-bay-transnet-fsru-za/","data_source":"Data: Global Gas Infrastructure Tracker, Global Energy Monitor, September 2025"},{"terminal_slug":"richards-bay-transnet-fsru-za","terminal_name":"Richards Bay Transnet FSRU","country":"South Africa","country_iso":"ZA","unit_name":"Phase 2","status":"proposed","facility_type":"import","floating_type":"fsru","capacity_mtpa":1.53,"capacity_bcm_y":2.08,"start_year":null,"planned_start_year":null,"original_planned_start_year":2030,"fid_year":null,"construction_year":null,"shelved_year":null,"cancelled_year":null,"stop_year":null,"estimated_cost_usd":223200000,"estimated_cost_original":223200000,"estimated_cost_currency":"USD","power_stations_supplied":null,"floating_vessel_name":null,"ccs_project":null,"hydrogen_project":null,"ammonia_project":null,"synthetic_lng_project":null,"retrofit_proposed":null,"url":"https://lngatlas.org/terminal/richards-bay-transnet-fsru-za/","data_source":"Data: Global Gas Infrastructure Tracker, Global Energy Monitor, September 2025"},{"terminal_slug":"riga-fsru-lv","terminal_name":"Riga FSRU","country":"Latvia","country_iso":"LV","unit_name":null,"status":"cancelled","facility_type":"import","floating_type":"fsru","capacity_mtpa":3.6,"capacity_bcm_y":4.9,"start_year":null,"planned_start_year":null,"original_planned_start_year":null,"fid_year":null,"construction_year":null,"shelved_year":2013,"cancelled_year":2015,"stop_year":2015,"estimated_cost_usd":null,"estimated_cost_original":null,"estimated_cost_currency":null,"power_stations_supplied":null,"floating_vessel_name":null,"ccs_project":null,"hydrogen_project":null,"ammonia_project":null,"synthetic_lng_project":null,"retrofit_proposed":null,"url":"https://lngatlas.org/terminal/riga-fsru-lv/","data_source":"Data: Global Gas Infrastructure Tracker, Global Energy Monitor, September 2025"},{"terminal_slug":"riga-fsru-lv","terminal_name":"Riga FSRU","country":"Latvia","country_iso":"LV","unit_name":"Revived Project","status":"shelved","facility_type":"import","floating_type":"fsru","capacity_mtpa":null,"capacity_bcm_y":null,"start_year":null,"planned_start_year":null,"original_planned_start_year":null,"fid_year":null,"construction_year":null,"shelved_year":2024,"cancelled_year":null,"stop_year":null,"estimated_cost_usd":null,"estimated_cost_original":null,"estimated_cost_currency":null,"power_stations_supplied":null,"floating_vessel_name":null,"ccs_project":null,"hydrogen_project":null,"ammonia_project":null,"synthetic_lng_project":null,"retrofit_proposed":null,"url":"https://lngatlas.org/terminal/riga-fsru-lv/","data_source":"Data: Global Gas Infrastructure Tracker, Global Energy Monitor, September 2025"},{"terminal_slug":"rio-grande-lng-terminal-us","terminal_name":"Rio Grande LNG Terminal","country":"United States","country_iso":"US","unit_name":"T1 (Phase 1)","status":"construction","facility_type":"export","floating_type":"unknown","capacity_mtpa":5.87,"capacity_bcm_y":7.99,"start_year":null,"planned_start_year":2028,"original_planned_start_year":2027,"fid_year":2023,"construction_year":2023,"shelved_year":null,"cancelled_year":null,"stop_year":null,"estimated_cost_usd":6133333333,"estimated_cost_original":6133333333,"estimated_cost_currency":"USD","power_stations_supplied":null,"floating_vessel_name":null,"ccs_project":true,"hydrogen_project":null,"ammonia_project":null,"synthetic_lng_project":null,"retrofit_proposed":null,"url":"https://lngatlas.org/terminal/rio-grande-lng-terminal-us/","data_source":"Data: Global Gas Infrastructure Tracker, Global Energy Monitor, September 2025"},{"terminal_slug":"rio-grande-lng-terminal-us","terminal_name":"Rio Grande LNG Terminal","country":"United States","country_iso":"US","unit_name":"T2 (Phase 1)","status":"construction","facility_type":"export","floating_type":"unknown","capacity_mtpa":5.87,"capacity_bcm_y":7.99,"start_year":null,"planned_start_year":2028,"original_planned_start_year":2027,"fid_year":2023,"construction_year":2023,"shelved_year":null,"cancelled_year":null,"stop_year":null,"estimated_cost_usd":6133333333,"estimated_cost_original":6133333333,"estimated_cost_currency":"USD","power_stations_supplied":null,"floating_vessel_name":null,"ccs_project":true,"hydrogen_project":null,"ammonia_project":null,"synthetic_lng_project":null,"retrofit_proposed":null,"url":"https://lngatlas.org/terminal/rio-grande-lng-terminal-us/","data_source":"Data: Global Gas Infrastructure Tracker, Global Energy Monitor, September 2025"},{"terminal_slug":"rio-grande-lng-terminal-us","terminal_name":"Rio Grande LNG Terminal","country":"United States","country_iso":"US","unit_name":"T3 (Phase 1)","status":"construction","facility_type":"export","floating_type":"unknown","capacity_mtpa":5.87,"capacity_bcm_y":7.99,"start_year":null,"planned_start_year":2029,"original_planned_start_year":2027,"fid_year":2023,"construction_year":2023,"shelved_year":null,"cancelled_year":null,"stop_year":null,"estimated_cost_usd":6133333333,"estimated_cost_original":6133333333,"estimated_cost_currency":"USD","power_stations_supplied":null,"floating_vessel_name":null,"ccs_project":true,"hydrogen_project":null,"ammonia_project":null,"synthetic_lng_project":null,"retrofit_proposed":null,"url":"https://lngatlas.org/terminal/rio-grande-lng-terminal-us/","data_source":"Data: Global Gas Infrastructure Tracker, Global Energy Monitor, September 2025"},{"terminal_slug":"rio-grande-lng-terminal-us","terminal_name":"Rio Grande LNG Terminal","country":"United States","country_iso":"US","unit_name":"T4 (Phase 2)","status":"construction","facility_type":"export","floating_type":"unknown","capacity_mtpa":6,"capacity_bcm_y":8.16,"start_year":null,"planned_start_year":2030,"original_planned_start_year":2029,"fid_year":2025,"construction_year":2025,"shelved_year":null,"cancelled_year":null,"stop_year":null,"estimated_cost_usd":6700000000,"estimated_cost_original":6700000000,"estimated_cost_currency":"USD","power_stations_supplied":null,"floating_vessel_name":null,"ccs_project":true,"hydrogen_project":null,"ammonia_project":null,"synthetic_lng_project":null,"retrofit_proposed":null,"url":"https://lngatlas.org/terminal/rio-grande-lng-terminal-us/","data_source":"Data: Global Gas Infrastructure Tracker, Global Energy Monitor, September 2025"},{"terminal_slug":"rio-grande-lng-terminal-us","terminal_name":"Rio Grande LNG Terminal","country":"United States","country_iso":"US","unit_name":"T5 (Phase 2)","status":"proposed","facility_type":"export","floating_type":"unknown","capacity_mtpa":5.4,"capacity_bcm_y":7.35,"start_year":null,"planned_start_year":2031,"original_planned_start_year":2029,"fid_year":2025,"construction_year":null,"shelved_year":null,"cancelled_year":null,"stop_year":null,"estimated_cost_usd":6700000000,"estimated_cost_original":6700000000,"estimated_cost_currency":"USD","power_stations_supplied":null,"floating_vessel_name":null,"ccs_project":true,"hydrogen_project":null,"ammonia_project":null,"synthetic_lng_project":null,"retrofit_proposed":null,"url":"https://lngatlas.org/terminal/rio-grande-lng-terminal-us/","data_source":"Data: Global Gas Infrastructure Tracker, Global Energy Monitor, September 2025"},{"terminal_slug":"rio-grande-lng-terminal-us","terminal_name":"Rio Grande LNG Terminal","country":"United States","country_iso":"US","unit_name":"T6 (original, cancelled proposal)","status":"cancelled","facility_type":"export","floating_type":"unknown","capacity_mtpa":4.5,"capacity_bcm_y":6.12,"start_year":null,"planned_start_year":null,"original_planned_start_year":null,"fid_year":null,"construction_year":null,"shelved_year":null,"cancelled_year":2020,"stop_year":2020,"estimated_cost_usd":null,"estimated_cost_original":null,"estimated_cost_currency":null,"power_stations_supplied":null,"floating_vessel_name":null,"ccs_project":true,"hydrogen_project":null,"ammonia_project":null,"synthetic_lng_project":null,"retrofit_proposed":null,"url":"https://lngatlas.org/terminal/rio-grande-lng-terminal-us/","data_source":"Data: Global Gas Infrastructure Tracker, Global Energy Monitor, September 2025"},{"terminal_slug":"rio-grande-lng-terminal-us","terminal_name":"Rio Grande LNG Terminal","country":"United States","country_iso":"US","unit_name":"T6-T8","status":"proposed","facility_type":"export","floating_type":"unknown","capacity_mtpa":18,"capacity_bcm_y":24.49,"start_year":null,"planned_start_year":null,"original_planned_start_year":null,"fid_year":null,"construction_year":null,"shelved_year":null,"cancelled_year":null,"stop_year":null,"estimated_cost_usd":null,"estimated_cost_original":null,"estimated_cost_currency":null,"power_stations_supplied":null,"floating_vessel_name":null,"ccs_project":true,"hydrogen_project":null,"ammonia_project":null,"synthetic_lng_project":null,"retrofit_proposed":null,"url":"https://lngatlas.org/terminal/rio-grande-lng-terminal-us/","data_source":"Data: Global Gas Infrastructure Tracker, Global Energy Monitor, September 2025"},{"terminal_slug":"risavika-lng-terminal-no","terminal_name":"Risavika LNG Terminal","country":"Norway","country_iso":"NO","unit_name":null,"status":"operating","facility_type":"export","floating_type":"unknown","capacity_mtpa":0.33,"capacity_bcm_y":0.45,"start_year":2010,"planned_start_year":null,"original_planned_start_year":null,"fid_year":null,"construction_year":2007,"shelved_year":null,"cancelled_year":null,"stop_year":null,"estimated_cost_usd":null,"estimated_cost_original":null,"estimated_cost_currency":null,"power_stations_supplied":null,"floating_vessel_name":null,"ccs_project":null,"hydrogen_project":null,"ammonia_project":null,"synthetic_lng_project":null,"retrofit_proposed":null,"url":"https://lngatlas.org/terminal/risavika-lng-terminal-no/","data_source":"Data: Global Gas Infrastructure Tracker, Global Energy Monitor, September 2025"},{"terminal_slug":"riverside-lng-terminal-ng","terminal_name":"Riverside LNG Terminal","country":"Nigeria","country_iso":"NG","unit_name":null,"status":"shelved","facility_type":"export","floating_type":"unknown","capacity_mtpa":1.4,"capacity_bcm_y":1.9,"start_year":null,"planned_start_year":null,"original_planned_start_year":2026,"fid_year":null,"construction_year":null,"shelved_year":2025,"cancelled_year":null,"stop_year":null,"estimated_cost_usd":null,"estimated_cost_original":null,"estimated_cost_currency":null,"power_stations_supplied":null,"floating_vessel_name":null,"ccs_project":null,"hydrogen_project":null,"ammonia_project":null,"synthetic_lng_project":null,"retrofit_proposed":null,"url":"https://lngatlas.org/terminal/riverside-lng-terminal-ng/","data_source":"Data: Global Gas Infrastructure Tracker, Global Energy Monitor, September 2025"},{"terminal_slug":"rizhao-lanshan-lng-terminal-cn","terminal_name":"Rizhao LNG Terminal","country":"China","country_iso":"CN","unit_name":"Hanas Terminal","status":"cancelled","facility_type":"import","floating_type":"unknown","capacity_mtpa":6,"capacity_bcm_y":8.16,"start_year":null,"planned_start_year":null,"original_planned_start_year":null,"fid_year":null,"construction_year":null,"shelved_year":2016,"cancelled_year":2018,"stop_year":2018,"estimated_cost_usd":null,"estimated_cost_original":null,"estimated_cost_currency":null,"power_stations_supplied":null,"floating_vessel_name":null,"ccs_project":null,"hydrogen_project":null,"ammonia_project":null,"synthetic_lng_project":null,"retrofit_proposed":null,"url":"https://lngatlas.org/terminal/rizhao-lanshan-lng-terminal-cn/","data_source":"Data: Global Gas Infrastructure Tracker, Global Energy Monitor, September 2025"},{"terminal_slug":"rizhao-lanshan-lng-terminal-cn","terminal_name":"Rizhao LNG Terminal","country":"China","country_iso":"CN","unit_name":"Jingneng Terminal","status":"cancelled","facility_type":"import","floating_type":"unknown","capacity_mtpa":5,"capacity_bcm_y":6.8,"start_year":null,"planned_start_year":null,"original_planned_start_year":null,"fid_year":null,"construction_year":null,"shelved_year":2020,"cancelled_year":2024,"stop_year":2024,"estimated_cost_usd":1072000000,"estimated_cost_original":6700000000,"estimated_cost_currency":"RMB","power_stations_supplied":null,"floating_vessel_name":null,"ccs_project":null,"hydrogen_project":null,"ammonia_project":null,"synthetic_lng_project":null,"retrofit_proposed":null,"url":"https://lngatlas.org/terminal/rizhao-lanshan-lng-terminal-cn/","data_source":"Data: Global Gas Infrastructure Tracker, Global Energy Monitor, September 2025"},{"terminal_slug":"rizhao-lanshan-lng-terminal-cn","terminal_name":"Rizhao LNG Terminal","country":"China","country_iso":"CN","unit_name":"Pacific Oil &Gas Terminal","status":"cancelled","facility_type":"import","floating_type":"unknown","capacity_mtpa":2,"capacity_bcm_y":2.72,"start_year":null,"planned_start_year":null,"original_planned_start_year":2020,"fid_year":null,"construction_year":null,"shelved_year":2019,"cancelled_year":2021,"stop_year":2021,"estimated_cost_usd":1600000000,"estimated_cost_original":10000000000,"estimated_cost_currency":"RMB","power_stations_supplied":null,"floating_vessel_name":null,"ccs_project":null,"hydrogen_project":null,"ammonia_project":null,"synthetic_lng_project":null,"retrofit_proposed":null,"url":"https://lngatlas.org/terminal/rizhao-lanshan-lng-terminal-cn/","data_source":"Data: Global Gas Infrastructure Tracker, Global Energy Monitor, September 2025"},{"terminal_slug":"rongcheng-lng-terminal-cn","terminal_name":"Rongcheng LNG Terminal","country":"China","country_iso":"CN","unit_name":null,"status":"cancelled","facility_type":"import","floating_type":"unknown","capacity_mtpa":null,"capacity_bcm_y":null,"start_year":null,"planned_start_year":null,"original_planned_start_year":null,"fid_year":null,"construction_year":null,"shelved_year":null,"cancelled_year":2024,"stop_year":2024,"estimated_cost_usd":null,"estimated_cost_original":null,"estimated_cost_currency":null,"power_stations_supplied":null,"floating_vessel_name":null,"ccs_project":null,"hydrogen_project":null,"ammonia_project":null,"synthetic_lng_project":null,"retrofit_proposed":null,"url":"https://lngatlas.org/terminal/rongcheng-lng-terminal-cn/","data_source":"Data: Global Gas Infrastructure Tracker, Global Energy Monitor, September 2025"},{"terminal_slug":"rostock-lng-terminal-de","terminal_name":"Rostock LNG Terminal","country":"Germany","country_iso":"DE","unit_name":null,"status":"shelved","facility_type":"import","floating_type":"unknown","capacity_mtpa":0.8,"capacity_bcm_y":1.09,"start_year":null,"planned_start_year":2026,"original_planned_start_year":2023,"fid_year":null,"construction_year":null,"shelved_year":2025,"cancelled_year":2021,"stop_year":2021,"estimated_cost_usd":null,"estimated_cost_original":null,"estimated_cost_currency":null,"power_stations_supplied":null,"floating_vessel_name":null,"ccs_project":null,"hydrogen_project":null,"ammonia_project":null,"synthetic_lng_project":null,"retrofit_proposed":null,"url":"https://lngatlas.org/terminal/rostock-lng-terminal-de/","data_source":"Data: Global Gas Infrastructure Tracker, Global Energy Monitor, September 2025"},{"terminal_slug":"rovuma-flng-terminal-mz","terminal_name":"Rovuma FLNG Terminal","country":"Mozambique","country_iso":"MZ","unit_name":null,"status":"shelved","facility_type":"export","floating_type":"flng","capacity_mtpa":3,"capacity_bcm_y":4.08,"start_year":null,"planned_start_year":null,"original_planned_start_year":null,"fid_year":null,"construction_year":null,"shelved_year":2024,"cancelled_year":null,"stop_year":null,"estimated_cost_usd":null,"estimated_cost_original":null,"estimated_cost_currency":null,"power_stations_supplied":null,"floating_vessel_name":null,"ccs_project":null,"hydrogen_project":null,"ammonia_project":null,"synthetic_lng_project":null,"retrofit_proposed":null,"url":"https://lngatlas.org/terminal/rovuma-flng-terminal-mz/","data_source":"Data: Global Gas Infrastructure Tracker, Global Energy Monitor, September 2025"},{"terminal_slug":"rovuma-lng-terminal-mz","terminal_name":"Rovuma LNG Terminal","country":"Mozambique","country_iso":"MZ","unit_name":"T1-T12","status":"proposed","facility_type":"export","floating_type":"unknown","capacity_mtpa":18,"capacity_bcm_y":24.49,"start_year":null,"planned_start_year":2027,"original_planned_start_year":2025,"fid_year":2026,"construction_year":null,"shelved_year":null,"cancelled_year":null,"stop_year":null,"estimated_cost_usd":22000000000,"estimated_cost_original":22000000000,"estimated_cost_currency":"USD","power_stations_supplied":null,"floating_vessel_name":null,"ccs_project":null,"hydrogen_project":null,"ammonia_project":null,"synthetic_lng_project":null,"retrofit_proposed":null,"url":"https://lngatlas.org/terminal/rovuma-lng-terminal-mz/","data_source":"Data: Global Gas Infrastructure Tracker, Global Energy Monitor, September 2025"},{"terminal_slug":"rudong-lng-terminal-china-resources-cn","terminal_name":"Rudong LNG Terminal (China Resources)","country":"China","country_iso":"CN","unit_name":null,"status":"construction","facility_type":"import","floating_type":"unknown","capacity_mtpa":6.5,"capacity_bcm_y":8.84,"start_year":null,"planned_start_year":null,"original_planned_start_year":2026,"fid_year":null,"construction_year":2023,"shelved_year":null,"cancelled_year":null,"stop_year":null,"estimated_cost_usd":1280000000,"estimated_cost_original":8000000000,"estimated_cost_currency":"RMB","power_stations_supplied":null,"floating_vessel_name":null,"ccs_project":null,"hydrogen_project":null,"ammonia_project":null,"synthetic_lng_project":null,"retrofit_proposed":null,"url":"https://lngatlas.org/terminal/rudong-lng-terminal-china-resources-cn/","data_source":"Data: Global Gas Infrastructure Tracker, Global Energy Monitor, September 2025"},{"terminal_slug":"rudong-lng-terminal-gcl-poly-cn","terminal_name":"Rudong LNG Terminal (GCL-Poly)","country":"China","country_iso":"CN","unit_name":"Phase 1","status":"construction","facility_type":"import","floating_type":"unknown","capacity_mtpa":3.5,"capacity_bcm_y":4.76,"start_year":null,"planned_start_year":null,"original_planned_start_year":2025,"fid_year":null,"construction_year":2022,"shelved_year":null,"cancelled_year":null,"stop_year":null,"estimated_cost_usd":805083200,"estimated_cost_original":5031770000,"estimated_cost_currency":"RMB","power_stations_supplied":null,"floating_vessel_name":null,"ccs_project":null,"hydrogen_project":null,"ammonia_project":null,"synthetic_lng_project":null,"retrofit_proposed":null,"url":"https://lngatlas.org/terminal/rudong-lng-terminal-gcl-poly-cn/","data_source":"Data: Global Gas Infrastructure Tracker, Global Energy Monitor, September 2025"},{"terminal_slug":"rudong-lng-terminal-jiangsu-guoxin-cn","terminal_name":"Rudong LNG Terminal (Jiangsu Guoxin)","country":"China","country_iso":"CN","unit_name":"Phase 1","status":"construction","facility_type":"import","floating_type":"unknown","capacity_mtpa":2.95,"capacity_bcm_y":4.01,"start_year":null,"planned_start_year":2025,"original_planned_start_year":2023,"fid_year":null,"construction_year":2020,"shelved_year":null,"cancelled_year":null,"stop_year":null,"estimated_cost_usd":832000000,"estimated_cost_original":5200000000,"estimated_cost_currency":"RMB","power_stations_supplied":null,"floating_vessel_name":null,"ccs_project":null,"hydrogen_project":null,"ammonia_project":null,"synthetic_lng_project":null,"retrofit_proposed":null,"url":"https://lngatlas.org/terminal/rudong-lng-terminal-jiangsu-guoxin-cn/","data_source":"Data: Global Gas Infrastructure Tracker, Global Energy Monitor, September 2025"},{"terminal_slug":"rudong-lng-terminal-jiangsu-guoxin-cn","terminal_name":"Rudong LNG Terminal (Jiangsu Guoxin)","country":"China","country_iso":"CN","unit_name":"Phase 2","status":"construction","facility_type":"import","floating_type":"unknown","capacity_mtpa":3.05,"capacity_bcm_y":4.15,"start_year":null,"planned_start_year":null,"original_planned_start_year":2025,"fid_year":null,"construction_year":2024,"shelved_year":null,"cancelled_year":null,"stop_year":null,"estimated_cost_usd":401600000,"estimated_cost_original":2510000000,"estimated_cost_currency":"RMB","power_stations_supplied":null,"floating_vessel_name":null,"ccs_project":null,"hydrogen_project":null,"ammonia_project":null,"synthetic_lng_project":null,"retrofit_proposed":null,"url":"https://lngatlas.org/terminal/rudong-lng-terminal-jiangsu-guoxin-cn/","data_source":"Data: Global Gas Infrastructure Tracker, Global Energy Monitor, September 2025"},{"terminal_slug":"rudong-lng-terminal-petrochina-cn","terminal_name":"Rudong LNG Terminal (PetroChina)","country":"China","country_iso":"CN","unit_name":"Phase 1","status":"operating","facility_type":"import","floating_type":"unknown","capacity_mtpa":3.5,"capacity_bcm_y":4.76,"start_year":2011,"planned_start_year":null,"original_planned_start_year":null,"fid_year":null,"construction_year":2008,"shelved_year":null,"cancelled_year":null,"stop_year":null,"estimated_cost_usd":1060480000,"estimated_cost_original":6628000000,"estimated_cost_currency":"RMB","power_stations_supplied":null,"floating_vessel_name":null,"ccs_project":null,"hydrogen_project":null,"ammonia_project":null,"synthetic_lng_project":null,"retrofit_proposed":null,"url":"https://lngatlas.org/terminal/rudong-lng-terminal-petrochina-cn/","data_source":"Data: Global Gas Infrastructure Tracker, Global Energy Monitor, September 2025"},{"terminal_slug":"rudong-lng-terminal-petrochina-cn","terminal_name":"Rudong LNG Terminal (PetroChina)","country":"China","country_iso":"CN","unit_name":"Phase 2","status":"operating","facility_type":"import","floating_type":"unknown","capacity_mtpa":3,"capacity_bcm_y":4.08,"start_year":2016,"planned_start_year":null,"original_planned_start_year":null,"fid_year":null,"construction_year":2014,"shelved_year":null,"cancelled_year":null,"stop_year":null,"estimated_cost_usd":294864000,"estimated_cost_original":1842900000,"estimated_cost_currency":"RMB","power_stations_supplied":null,"floating_vessel_name":null,"ccs_project":null,"hydrogen_project":null,"ammonia_project":null,"synthetic_lng_project":null,"retrofit_proposed":null,"url":"https://lngatlas.org/terminal/rudong-lng-terminal-petrochina-cn/","data_source":"Data: Global Gas Infrastructure Tracker, Global Energy Monitor, September 2025"},{"terminal_slug":"rudong-lng-terminal-petrochina-cn","terminal_name":"Rudong LNG Terminal (PetroChina)","country":"China","country_iso":"CN","unit_name":"Phase 3","status":"operating","facility_type":"import","floating_type":"unknown","capacity_mtpa":3.5,"capacity_bcm_y":4.76,"start_year":2021,"planned_start_year":null,"original_planned_start_year":null,"fid_year":null,"construction_year":2018,"shelved_year":null,"cancelled_year":null,"stop_year":null,"estimated_cost_usd":247360000,"estimated_cost_original":1546000000,"estimated_cost_currency":"RMB","power_stations_supplied":null,"floating_vessel_name":null,"ccs_project":null,"hydrogen_project":null,"ammonia_project":null,"synthetic_lng_project":null,"retrofit_proposed":null,"url":"https://lngatlas.org/terminal/rudong-lng-terminal-petrochina-cn/","data_source":"Data: Global Gas Infrastructure Tracker, Global Energy Monitor, September 2025"},{"terminal_slug":"rudong-lng-terminal-petrochina-cn","terminal_name":"Rudong LNG Terminal (PetroChina)","country":"China","country_iso":"CN","unit_name":"Phase 4","status":"proposed","facility_type":"import","floating_type":"unknown","capacity_mtpa":null,"capacity_bcm_y":null,"start_year":null,"planned_start_year":null,"original_planned_start_year":null,"fid_year":null,"construction_year":null,"shelved_year":null,"cancelled_year":null,"stop_year":null,"estimated_cost_usd":null,"estimated_cost_original":null,"estimated_cost_currency":null,"power_stations_supplied":null,"floating_vessel_name":null,"ccs_project":null,"hydrogen_project":null,"ammonia_project":null,"synthetic_lng_project":null,"retrofit_proposed":null,"url":"https://lngatlas.org/terminal/rudong-lng-terminal-petrochina-cn/","data_source":"Data: Global Gas Infrastructure Tracker, Global Energy Monitor, September 2025"},{"terminal_slug":"ruwais-fsru-ae","terminal_name":"Ruwais FSRU","country":"United Arab Emirates","country_iso":"AE","unit_name":null,"status":"operating","facility_type":"import","floating_type":"fsru","capacity_mtpa":3.8,"capacity_bcm_y":5.17,"start_year":2016,"planned_start_year":null,"original_planned_start_year":null,"fid_year":null,"construction_year":null,"shelved_year":null,"cancelled_year":null,"stop_year":null,"estimated_cost_usd":null,"estimated_cost_original":null,"estimated_cost_currency":null,"power_stations_supplied":null,"floating_vessel_name":"FSRU Express","ccs_project":null,"hydrogen_project":null,"ammonia_project":null,"synthetic_lng_project":null,"retrofit_proposed":null,"url":"https://lngatlas.org/terminal/ruwais-fsru-ae/","data_source":"Data: Global Gas Infrastructure Tracker, Global Energy Monitor, September 2025"},{"terminal_slug":"ruwais-lng-terminal-ae","terminal_name":"Ruwais LNG Terminal","country":"United Arab Emirates","country_iso":"AE","unit_name":"T1","status":"construction","facility_type":"export","floating_type":"unknown","capacity_mtpa":4.8,"capacity_bcm_y":6.53,"start_year":null,"planned_start_year":null,"original_planned_start_year":2028,"fid_year":2024,"construction_year":2024,"shelved_year":null,"cancelled_year":null,"stop_year":null,"estimated_cost_usd":null,"estimated_cost_original":null,"estimated_cost_currency":null,"power_stations_supplied":null,"floating_vessel_name":null,"ccs_project":null,"hydrogen_project":null,"ammonia_project":null,"synthetic_lng_project":null,"retrofit_proposed":null,"url":"https://lngatlas.org/terminal/ruwais-lng-terminal-ae/","data_source":"Data: Global Gas Infrastructure Tracker, Global Energy Monitor, September 2025"},{"terminal_slug":"ruwais-lng-terminal-ae","terminal_name":"Ruwais LNG Terminal","country":"United Arab Emirates","country_iso":"AE","unit_name":"T2","status":"construction","facility_type":"export","floating_type":"unknown","capacity_mtpa":4.8,"capacity_bcm_y":6.53,"start_year":null,"planned_start_year":null,"original_planned_start_year":2029,"fid_year":2024,"construction_year":2024,"shelved_year":null,"cancelled_year":null,"stop_year":null,"estimated_cost_usd":null,"estimated_cost_original":null,"estimated_cost_currency":null,"power_stations_supplied":null,"floating_vessel_name":null,"ccs_project":null,"hydrogen_project":null,"ammonia_project":null,"synthetic_lng_project":null,"retrofit_proposed":null,"url":"https://lngatlas.org/terminal/ruwais-lng-terminal-ae/","data_source":"Data: Global Gas Infrastructure Tracker, Global Energy Monitor, September 2025"},{"terminal_slug":"sk-group-sri-lanka-lng-terminal-lk","terminal_name":"SK Group Sri Lanka LNG Terminal","country":"Sri Lanka","country_iso":"LK","unit_name":null,"status":"cancelled","facility_type":"import","floating_type":"unknown","capacity_mtpa":null,"capacity_bcm_y":null,"start_year":null,"planned_start_year":null,"original_planned_start_year":null,"fid_year":null,"construction_year":null,"shelved_year":2022,"cancelled_year":null,"stop_year":null,"estimated_cost_usd":600000000,"estimated_cost_original":600000000,"estimated_cost_currency":"USD","power_stations_supplied":null,"floating_vessel_name":null,"ccs_project":null,"hydrogen_project":null,"ammonia_project":null,"synthetic_lng_project":null,"retrofit_proposed":null,"url":"https://lngatlas.org/terminal/sk-group-sri-lanka-lng-terminal-lk/","data_source":"Data: Global Gas Infrastructure Tracker, Global Energy Monitor, September 2025"},{"terminal_slug":"slng-2-lng-terminal-sg","terminal_name":"SLNG 2 LNG Terminal","country":"Singapore","country_iso":"SG","unit_name":null,"status":"proposed","facility_type":"import","floating_type":"floating","capacity_mtpa":5,"capacity_bcm_y":6.8,"start_year":null,"planned_start_year":null,"original_planned_start_year":2030,"fid_year":null,"construction_year":null,"shelved_year":2023,"cancelled_year":null,"stop_year":null,"estimated_cost_usd":null,"estimated_cost_original":null,"estimated_cost_currency":null,"power_stations_supplied":null,"floating_vessel_name":null,"ccs_project":null,"hydrogen_project":null,"ammonia_project":null,"synthetic_lng_project":null,"retrofit_proposed":null,"url":"https://lngatlas.org/terminal/slng-2-lng-terminal-sg/","data_source":"Data: Global Gas Infrastructure Tracker, Global Energy Monitor, September 2025"},{"terminal_slug":"st-lng-flng-terminal-us","terminal_name":"ST LNG FLNG Terminal","country":"United States","country_iso":"US","unit_name":"Phase 1-4","status":"proposed","facility_type":"export","floating_type":"flng","capacity_mtpa":8.4,"capacity_bcm_y":11.43,"start_year":null,"planned_start_year":null,"original_planned_start_year":null,"fid_year":null,"construction_year":null,"shelved_year":null,"cancelled_year":null,"stop_year":null,"estimated_cost_usd":null,"estimated_cost_original":null,"estimated_cost_currency":null,"power_stations_supplied":null,"floating_vessel_name":null,"ccs_project":null,"hydrogen_project":null,"ammonia_project":null,"synthetic_lng_project":null,"retrofit_proposed":null,"url":"https://lngatlas.org/terminal/st-lng-flng-terminal-us/","data_source":"Data: Global Gas Infrastructure Tracker, Global Energy Monitor, September 2025"},{"terminal_slug":"sabine-pass-lng-terminal-us","terminal_name":"Sabine Pass LNG Terminal","country":"United States","country_iso":"US","unit_name":"Import Terminal","status":"operating","facility_type":"import","floating_type":"unknown","capacity_mtpa":30.4,"capacity_bcm_y":41.36,"start_year":2008,"planned_start_year":null,"original_planned_start_year":null,"fid_year":null,"construction_year":null,"shelved_year":null,"cancelled_year":null,"stop_year":null,"estimated_cost_usd":null,"estimated_cost_original":null,"estimated_cost_currency":null,"power_stations_supplied":null,"floating_vessel_name":null,"ccs_project":null,"hydrogen_project":null,"ammonia_project":null,"synthetic_lng_project":null,"retrofit_proposed":null,"url":"https://lngatlas.org/terminal/sabine-pass-lng-terminal-us/","data_source":"Data: Global Gas Infrastructure Tracker, Global Energy Monitor, September 2025"},{"terminal_slug":"sabine-pass-lng-terminal-us","terminal_name":"Sabine Pass LNG Terminal","country":"United States","country_iso":"US","unit_name":"T1","status":"operating","facility_type":"export","floating_type":"unknown","capacity_mtpa":5,"capacity_bcm_y":6.8,"start_year":2016,"planned_start_year":null,"original_planned_start_year":null,"fid_year":null,"construction_year":null,"shelved_year":null,"cancelled_year":null,"stop_year":null,"estimated_cost_usd":3600000000,"estimated_cost_original":3600000000,"estimated_cost_currency":"USD","power_stations_supplied":null,"floating_vessel_name":null,"ccs_project":null,"hydrogen_project":null,"ammonia_project":null,"synthetic_lng_project":null,"retrofit_proposed":null,"url":"https://lngatlas.org/terminal/sabine-pass-lng-terminal-us/","data_source":"Data: Global Gas Infrastructure Tracker, Global Energy Monitor, September 2025"},{"terminal_slug":"sabine-pass-lng-terminal-us","terminal_name":"Sabine Pass LNG Terminal","country":"United States","country_iso":"US","unit_name":"T2","status":"operating","facility_type":"export","floating_type":"unknown","capacity_mtpa":5,"capacity_bcm_y":6.8,"start_year":2016,"planned_start_year":null,"original_planned_start_year":null,"fid_year":null,"construction_year":null,"shelved_year":null,"cancelled_year":null,"stop_year":null,"estimated_cost_usd":3600000000,"estimated_cost_original":3600000000,"estimated_cost_currency":"USD","power_stations_supplied":null,"floating_vessel_name":null,"ccs_project":null,"hydrogen_project":null,"ammonia_project":null,"synthetic_lng_project":null,"retrofit_proposed":null,"url":"https://lngatlas.org/terminal/sabine-pass-lng-terminal-us/","data_source":"Data: Global Gas Infrastructure Tracker, Global Energy Monitor, September 2025"},{"terminal_slug":"sabine-pass-lng-terminal-us","terminal_name":"Sabine Pass LNG Terminal","country":"United States","country_iso":"US","unit_name":"T3","status":"operating","facility_type":"export","floating_type":"unknown","capacity_mtpa":5,"capacity_bcm_y":6.8,"start_year":2017,"planned_start_year":null,"original_planned_start_year":null,"fid_year":null,"construction_year":null,"shelved_year":null,"cancelled_year":null,"stop_year":null,"estimated_cost_usd":3600000000,"estimated_cost_original":3600000000,"estimated_cost_currency":"USD","power_stations_supplied":null,"floating_vessel_name":null,"ccs_project":null,"hydrogen_project":null,"ammonia_project":null,"synthetic_lng_project":null,"retrofit_proposed":null,"url":"https://lngatlas.org/terminal/sabine-pass-lng-terminal-us/","data_source":"Data: Global Gas Infrastructure Tracker, Global Energy Monitor, September 2025"},{"terminal_slug":"sabine-pass-lng-terminal-us","terminal_name":"Sabine Pass LNG Terminal","country":"United States","country_iso":"US","unit_name":"T4","status":"operating","facility_type":"export","floating_type":"unknown","capacity_mtpa":5,"capacity_bcm_y":6.8,"start_year":2017,"planned_start_year":null,"original_planned_start_year":null,"fid_year":null,"construction_year":null,"shelved_year":null,"cancelled_year":null,"stop_year":null,"estimated_cost_usd":3600000000,"estimated_cost_original":3600000000,"estimated_cost_currency":"USD","power_stations_supplied":null,"floating_vessel_name":null,"ccs_project":null,"hydrogen_project":null,"ammonia_project":null,"synthetic_lng_project":null,"retrofit_proposed":null,"url":"https://lngatlas.org/terminal/sabine-pass-lng-terminal-us/","data_source":"Data: Global Gas Infrastructure Tracker, Global Energy Monitor, September 2025"},{"terminal_slug":"sabine-pass-lng-terminal-us","terminal_name":"Sabine Pass LNG Terminal","country":"United States","country_iso":"US","unit_name":"T5","status":"operating","facility_type":"export","floating_type":"unknown","capacity_mtpa":5,"capacity_bcm_y":6.8,"start_year":2018,"planned_start_year":null,"original_planned_start_year":null,"fid_year":null,"construction_year":null,"shelved_year":null,"cancelled_year":null,"stop_year":null,"estimated_cost_usd":3600000000,"estimated_cost_original":3600000000,"estimated_cost_currency":"USD","power_stations_supplied":null,"floating_vessel_name":null,"ccs_project":null,"hydrogen_project":null,"ammonia_project":null,"synthetic_lng_project":null,"retrofit_proposed":null,"url":"https://lngatlas.org/terminal/sabine-pass-lng-terminal-us/","data_source":"Data: Global Gas Infrastructure Tracker, Global Energy Monitor, September 2025"},{"terminal_slug":"sabine-pass-lng-terminal-us","terminal_name":"Sabine Pass LNG Terminal","country":"United States","country_iso":"US","unit_name":"T6","status":"operating","facility_type":"export","floating_type":"unknown","capacity_mtpa":4.5,"capacity_bcm_y":6.12,"start_year":2021,"planned_start_year":null,"original_planned_start_year":null,"fid_year":null,"construction_year":null,"shelved_year":null,"cancelled_year":null,"stop_year":null,"estimated_cost_usd":2500000000,"estimated_cost_original":2500000000,"estimated_cost_currency":"USD","power_stations_supplied":null,"floating_vessel_name":null,"ccs_project":null,"hydrogen_project":null,"ammonia_project":null,"synthetic_lng_project":null,"retrofit_proposed":null,"url":"https://lngatlas.org/terminal/sabine-pass-lng-terminal-us/","data_source":"Data: Global Gas Infrastructure Tracker, Global Energy Monitor, September 2025"},{"terminal_slug":"sabine-pass-lng-terminal-us","terminal_name":"Sabine Pass LNG Terminal","country":"United States","country_iso":"US","unit_name":"Stage 5 Expansion Project (T1–T3)","status":"proposed","facility_type":"export","floating_type":"unknown","capacity_mtpa":20,"capacity_bcm_y":27.21,"start_year":null,"planned_start_year":2032,"original_planned_start_year":2031,"fid_year":2026,"construction_year":2026,"shelved_year":null,"cancelled_year":null,"stop_year":null,"estimated_cost_usd":15000000000,"estimated_cost_original":15000000000,"estimated_cost_currency":"USD","power_stations_supplied":null,"floating_vessel_name":null,"ccs_project":null,"hydrogen_project":null,"ammonia_project":null,"synthetic_lng_project":null,"retrofit_proposed":null,"url":"https://lngatlas.org/terminal/sabine-pass-lng-terminal-us/","data_source":"Data: Global Gas Infrastructure Tracker, Global Energy Monitor, September 2025"},{"terminal_slug":"safe-harbor-energy-lng-terminal-us","terminal_name":"Safe Harbor Energy LNG Terminal","country":"United States","country_iso":"US","unit_name":null,"status":"cancelled","facility_type":"import","floating_type":"unknown","capacity_mtpa":15.33,"capacity_bcm_y":20.86,"start_year":null,"planned_start_year":null,"original_planned_start_year":null,"fid_year":null,"construction_year":null,"shelved_year":2012,"cancelled_year":2014,"stop_year":2014,"estimated_cost_usd":null,"estimated_cost_original":null,"estimated_cost_currency":null,"power_stations_supplied":null,"floating_vessel_name":null,"ccs_project":null,"hydrogen_project":null,"ammonia_project":null,"synthetic_lng_project":null,"retrofit_proposed":null,"url":"https://lngatlas.org/terminal/safe-harbor-energy-lng-terminal-us/","data_source":"Data: Global Gas Infrastructure Tracker, Global Energy Monitor, September 2025"},{"terminal_slug":"saguaro-energia-lng-terminal-mx","terminal_name":"Saguaro Energía LNG Terminal","country":"Mexico","country_iso":"MX","unit_name":"Phase 1 (Trains 1-3)","status":"proposed","facility_type":"export","floating_type":"unknown","capacity_mtpa":15,"capacity_bcm_y":20.41,"start_year":null,"planned_start_year":null,"original_planned_start_year":2028,"fid_year":2025,"construction_year":null,"shelved_year":null,"cancelled_year":null,"stop_year":null,"estimated_cost_usd":null,"estimated_cost_original":null,"estimated_cost_currency":null,"power_stations_supplied":null,"floating_vessel_name":null,"ccs_project":null,"hydrogen_project":null,"ammonia_project":null,"synthetic_lng_project":null,"retrofit_proposed":null,"url":"https://lngatlas.org/terminal/saguaro-energia-lng-terminal-mx/","data_source":"Data: Global Gas Infrastructure Tracker, Global Energy Monitor, September 2025"},{"terminal_slug":"saguaro-energia-lng-terminal-mx","terminal_name":"Saguaro Energía LNG Terminal","country":"Mexico","country_iso":"MX","unit_name":"Phase 2 (Trains 4-6)","status":"proposed","facility_type":"export","floating_type":"unknown","capacity_mtpa":15,"capacity_bcm_y":20.41,"start_year":null,"planned_start_year":null,"original_planned_start_year":null,"fid_year":null,"construction_year":null,"shelved_year":null,"cancelled_year":null,"stop_year":null,"estimated_cost_usd":null,"estimated_cost_original":null,"estimated_cost_currency":null,"power_stations_supplied":null,"floating_vessel_name":null,"ccs_project":null,"hydrogen_project":null,"ammonia_project":null,"synthetic_lng_project":null,"retrofit_proposed":null,"url":"https://lngatlas.org/terminal/saguaro-energia-lng-terminal-mx/","data_source":"Data: Global Gas Infrastructure Tracker, Global Energy Monitor, September 2025"},{"terminal_slug":"sagunto-lng-terminal-es","terminal_name":"Sagunto LNG Terminal","country":"Spain","country_iso":"ES","unit_name":null,"status":"operating","facility_type":"import","floating_type":"unknown","capacity_mtpa":6.4,"capacity_bcm_y":8.71,"start_year":2006,"planned_start_year":null,"original_planned_start_year":null,"fid_year":null,"construction_year":null,"shelved_year":null,"cancelled_year":null,"stop_year":null,"estimated_cost_usd":null,"estimated_cost_original":null,"estimated_cost_currency":null,"power_stations_supplied":null,"floating_vessel_name":null,"ccs_project":null,"hydrogen_project":null,"ammonia_project":null,"synthetic_lng_project":null,"retrofit_proposed":null,"url":"https://lngatlas.org/terminal/sagunto-lng-terminal-es/","data_source":"Data: Global Gas Infrastructure Tracker, Global Energy Monitor, September 2025"},{"terminal_slug":"saint-john-lng-terminal-ca","terminal_name":"Saint John LNG Terminal","country":"Canada","country_iso":"CA","unit_name":"Import Facility","status":"operating","facility_type":"import","floating_type":"unknown","capacity_mtpa":7.5,"capacity_bcm_y":10.2,"start_year":2009,"planned_start_year":null,"original_planned_start_year":null,"fid_year":null,"construction_year":null,"shelved_year":null,"cancelled_year":null,"stop_year":null,"estimated_cost_usd":756000000,"estimated_cost_original":756000000,"estimated_cost_currency":"USD","power_stations_supplied":null,"floating_vessel_name":null,"ccs_project":null,"hydrogen_project":null,"ammonia_project":null,"synthetic_lng_project":null,"retrofit_proposed":null,"url":"https://lngatlas.org/terminal/saint-john-lng-terminal-ca/","data_source":"Data: Global Gas Infrastructure Tracker, Global Energy Monitor, September 2025"},{"terminal_slug":"saint-john-lng-terminal-ca","terminal_name":"Saint John LNG Terminal","country":"Canada","country_iso":"CA","unit_name":"Export Facility (first proposal)","status":"cancelled","facility_type":"export","floating_type":"unknown","capacity_mtpa":7.5,"capacity_bcm_y":10.2,"start_year":null,"planned_start_year":null,"original_planned_start_year":null,"fid_year":null,"construction_year":null,"shelved_year":null,"cancelled_year":2016,"stop_year":2016,"estimated_cost_usd":null,"estimated_cost_original":null,"estimated_cost_currency":null,"power_stations_supplied":null,"floating_vessel_name":null,"ccs_project":null,"hydrogen_project":null,"ammonia_project":null,"synthetic_lng_project":null,"retrofit_proposed":null,"url":"https://lngatlas.org/terminal/saint-john-lng-terminal-ca/","data_source":"Data: Global Gas Infrastructure Tracker, Global Energy Monitor, September 2025"},{"terminal_slug":"saint-john-lng-terminal-ca","terminal_name":"Saint John LNG Terminal","country":"Canada","country_iso":"CA","unit_name":"Export Facility (second proposal)","status":"cancelled","facility_type":"export","floating_type":"unknown","capacity_mtpa":null,"capacity_bcm_y":null,"start_year":null,"planned_start_year":null,"original_planned_start_year":null,"fid_year":null,"construction_year":null,"shelved_year":null,"cancelled_year":2023,"stop_year":2023,"estimated_cost_usd":null,"estimated_cost_original":null,"estimated_cost_currency":null,"power_stations_supplied":null,"floating_vessel_name":null,"ccs_project":null,"hydrogen_project":null,"ammonia_project":null,"synthetic_lng_project":null,"retrofit_proposed":null,"url":"https://lngatlas.org/terminal/saint-john-lng-terminal-ca/","data_source":"Data: Global Gas Infrastructure Tracker, Global Energy Monitor, September 2025"},{"terminal_slug":"sakai-lng-terminal-jp","terminal_name":"Sakai LNG Terminal","country":"Japan","country_iso":"JP","unit_name":null,"status":"operating","facility_type":"import","floating_type":"unknown","capacity_mtpa":6.4,"capacity_bcm_y":8.71,"start_year":2006,"planned_start_year":null,"original_planned_start_year":null,"fid_year":null,"construction_year":null,"shelved_year":null,"cancelled_year":null,"stop_year":null,"estimated_cost_usd":null,"estimated_cost_original":null,"estimated_cost_currency":null,"power_stations_supplied":null,"floating_vessel_name":null,"ccs_project":null,"hydrogen_project":null,"ammonia_project":null,"synthetic_lng_project":null,"retrofit_proposed":null,"url":"https://lngatlas.org/terminal/sakai-lng-terminal-jp/","data_source":"Data: Global Gas Infrastructure Tracker, Global Energy Monitor, September 2025"},{"terminal_slug":"sakaide-lng-terminal-jp","terminal_name":"Sakaide LNG Terminal","country":"Japan","country_iso":"JP","unit_name":null,"status":"operating","facility_type":"import","floating_type":"unknown","capacity_mtpa":1.2,"capacity_bcm_y":1.63,"start_year":2010,"planned_start_year":null,"original_planned_start_year":null,"fid_year":null,"construction_year":null,"shelved_year":null,"cancelled_year":null,"stop_year":null,"estimated_cost_usd":null,"estimated_cost_original":null,"estimated_cost_currency":null,"power_stations_supplied":null,"floating_vessel_name":null,"ccs_project":null,"hydrogen_project":null,"ammonia_project":null,"synthetic_lng_project":null,"retrofit_proposed":null,"url":"https://lngatlas.org/terminal/sakaide-lng-terminal-jp/","data_source":"Data: Global Gas Infrastructure Tracker, Global Energy Monitor, September 2025"},{"terminal_slug":"sakhalin-ii-lng-terminal-ru","terminal_name":"Sakhalin II LNG Terminal","country":"Russia","country_iso":"RU","unit_name":"T1","status":"operating","facility_type":"export","floating_type":"unknown","capacity_mtpa":4.8,"capacity_bcm_y":6.53,"start_year":2009,"planned_start_year":null,"original_planned_start_year":null,"fid_year":null,"construction_year":1998,"shelved_year":null,"cancelled_year":null,"stop_year":null,"estimated_cost_usd":12500000000,"estimated_cost_original":12500000000,"estimated_cost_currency":"USD","power_stations_supplied":null,"floating_vessel_name":null,"ccs_project":null,"hydrogen_project":null,"ammonia_project":null,"synthetic_lng_project":null,"retrofit_proposed":null,"url":"https://lngatlas.org/terminal/sakhalin-ii-lng-terminal-ru/","data_source":"Data: Global Gas Infrastructure Tracker, Global Energy Monitor, September 2025"},{"terminal_slug":"sakhalin-ii-lng-terminal-ru","terminal_name":"Sakhalin II LNG Terminal","country":"Russia","country_iso":"RU","unit_name":"T2","status":"operating","facility_type":"export","floating_type":"unknown","capacity_mtpa":4.8,"capacity_bcm_y":6.53,"start_year":2009,"planned_start_year":null,"original_planned_start_year":null,"fid_year":null,"construction_year":1998,"shelved_year":null,"cancelled_year":null,"stop_year":null,"estimated_cost_usd":12500000000,"estimated_cost_original":12500000000,"estimated_cost_currency":"USD","power_stations_supplied":null,"floating_vessel_name":null,"ccs_project":null,"hydrogen_project":null,"ammonia_project":null,"synthetic_lng_project":null,"retrofit_proposed":null,"url":"https://lngatlas.org/terminal/sakhalin-ii-lng-terminal-ru/","data_source":"Data: Global Gas Infrastructure Tracker, Global Energy Monitor, September 2025"},{"terminal_slug":"sakhalin-ii-lng-terminal-ru","terminal_name":"Sakhalin II LNG Terminal","country":"Russia","country_iso":"RU","unit_name":"T3","status":"proposed","facility_type":"export","floating_type":"unknown","capacity_mtpa":5.4,"capacity_bcm_y":7.35,"start_year":null,"planned_start_year":2028,"original_planned_start_year":2023,"fid_year":2008,"construction_year":null,"shelved_year":null,"cancelled_year":null,"stop_year":null,"estimated_cost_usd":null,"estimated_cost_original":null,"estimated_cost_currency":null,"power_stations_supplied":null,"floating_vessel_name":null,"ccs_project":null,"hydrogen_project":null,"ammonia_project":null,"synthetic_lng_project":null,"retrofit_proposed":null,"url":"https://lngatlas.org/terminal/sakhalin-ii-lng-terminal-ru/","data_source":"Data: Global Gas Infrastructure Tracker, Global Energy Monitor, September 2025"},{"terminal_slug":"saldanha-bay-fsru-za","terminal_name":"Saldanha Bay FSRU","country":"South Africa","country_iso":"ZA","unit_name":null,"status":"cancelled","facility_type":"import","floating_type":"fsru","capacity_mtpa":null,"capacity_bcm_y":null,"start_year":null,"planned_start_year":null,"original_planned_start_year":null,"fid_year":null,"construction_year":null,"shelved_year":2019,"cancelled_year":2024,"stop_year":2024,"estimated_cost_usd":null,"estimated_cost_original":null,"estimated_cost_currency":null,"power_stations_supplied":null,"floating_vessel_name":null,"ccs_project":null,"hydrogen_project":null,"ammonia_project":null,"synthetic_lng_project":null,"retrofit_proposed":null,"url":"https://lngatlas.org/terminal/saldanha-bay-fsru-za/","data_source":"Data: Global Gas Infrastructure Tracker, Global Energy Monitor, September 2025"},{"terminal_slug":"salina-cruz-lng-terminal-cfe-mx","terminal_name":"Salina Cruz LNG Terminal (CFE)","country":"Mexico","country_iso":"MX","unit_name":null,"status":"shelved","facility_type":"export","floating_type":"unknown","capacity_mtpa":3,"capacity_bcm_y":4.08,"start_year":null,"planned_start_year":null,"original_planned_start_year":null,"fid_year":null,"construction_year":null,"shelved_year":null,"cancelled_year":null,"stop_year":null,"estimated_cost_usd":null,"estimated_cost_original":null,"estimated_cost_currency":null,"power_stations_supplied":null,"floating_vessel_name":null,"ccs_project":null,"hydrogen_project":null,"ammonia_project":null,"synthetic_lng_project":null,"retrofit_proposed":null,"url":"https://lngatlas.org/terminal/salina-cruz-lng-terminal-cfe-mx/","data_source":"Data: Global Gas Infrastructure Tracker, Global Energy Monitor, September 2025"},{"terminal_slug":"salina-cruz-lng-terminal-pilot-gfi-mx","terminal_name":"Salina Cruz LNG Terminal (Pilot/GFI)","country":"Mexico","country_iso":"MX","unit_name":null,"status":"proposed","facility_type":"export","floating_type":"unknown","capacity_mtpa":0.34,"capacity_bcm_y":0.46,"start_year":null,"planned_start_year":null,"original_planned_start_year":2027,"fid_year":2025,"construction_year":null,"shelved_year":null,"cancelled_year":null,"stop_year":null,"estimated_cost_usd":null,"estimated_cost_original":null,"estimated_cost_currency":null,"power_stations_supplied":null,"floating_vessel_name":null,"ccs_project":null,"hydrogen_project":null,"ammonia_project":null,"synthetic_lng_project":null,"retrofit_proposed":null,"url":"https://lngatlas.org/terminal/salina-cruz-lng-terminal-pilot-gfi-mx/","data_source":"Data: Global Gas Infrastructure Tracker, Global Energy Monitor, September 2025"},{"terminal_slug":"samcheok-lng-terminal-kr","terminal_name":"Samcheok LNG Terminal","country":"South Korea","country_iso":"KR","unit_name":null,"status":"operating","facility_type":"import","floating_type":"unknown","capacity_mtpa":6.6,"capacity_bcm_y":8.98,"start_year":2014,"planned_start_year":null,"original_planned_start_year":null,"fid_year":null,"construction_year":null,"shelved_year":null,"cancelled_year":null,"stop_year":null,"estimated_cost_usd":1190000000,"estimated_cost_original":1190000000,"estimated_cost_currency":"USD","power_stations_supplied":null,"floating_vessel_name":null,"ccs_project":null,"hydrogen_project":null,"ammonia_project":null,"synthetic_lng_project":null,"retrofit_proposed":null,"url":"https://lngatlas.org/terminal/samcheok-lng-terminal-kr/","data_source":"Data: Global Gas Infrastructure Tracker, Global Energy Monitor, September 2025"},{"terminal_slug":"samcheok-lng-terminal-kr","terminal_name":"Samcheok LNG Terminal","country":"South Korea","country_iso":"KR","unit_name":"Expansion","status":"operating","facility_type":"import","floating_type":"unknown","capacity_mtpa":5,"capacity_bcm_y":6.8,"start_year":2016,"planned_start_year":null,"original_planned_start_year":null,"fid_year":null,"construction_year":null,"shelved_year":null,"cancelled_year":null,"stop_year":null,"estimated_cost_usd":null,"estimated_cost_original":null,"estimated_cost_currency":null,"power_stations_supplied":null,"floating_vessel_name":null,"ccs_project":null,"hydrogen_project":null,"ammonia_project":null,"synthetic_lng_project":null,"retrofit_proposed":null,"url":"https://lngatlas.org/terminal/samcheok-lng-terminal-kr/","data_source":"Data: Global Gas Infrastructure Tracker, Global Energy Monitor, September 2025"},{"terminal_slug":"san-juan-lng-terminal-pr","terminal_name":"San Juan LNG Terminal","country":"United States","country_iso":"US","unit_name":null,"status":"operating","facility_type":"import","floating_type":"floating","capacity_mtpa":1.1,"capacity_bcm_y":1.5,"start_year":2020,"planned_start_year":null,"original_planned_start_year":null,"fid_year":null,"construction_year":null,"shelved_year":null,"cancelled_year":null,"stop_year":null,"estimated_cost_usd":null,"estimated_cost_original":null,"estimated_cost_currency":null,"power_stations_supplied":null,"floating_vessel_name":null,"ccs_project":null,"hydrogen_project":null,"ammonia_project":null,"synthetic_lng_project":null,"retrofit_proposed":null,"url":"https://lngatlas.org/terminal/san-juan-lng-terminal-pr/","data_source":"Data: Global Gas Infrastructure Tracker, Global Energy Monitor, September 2025"},{"terminal_slug":"san-pedro-de-macoris-lng-terminal-do","terminal_name":"San Pedro de Macoris LNG Terminal","country":"Dominican Republic","country_iso":"DO","unit_name":null,"status":"cancelled","facility_type":"import","floating_type":"unknown","capacity_mtpa":1,"capacity_bcm_y":1.36,"start_year":null,"planned_start_year":null,"original_planned_start_year":2016,"fid_year":null,"construction_year":null,"shelved_year":2017,"cancelled_year":2019,"stop_year":2019,"estimated_cost_usd":350000000,"estimated_cost_original":350000000,"estimated_cost_currency":"USD","power_stations_supplied":null,"floating_vessel_name":null,"ccs_project":null,"hydrogen_project":null,"ammonia_project":null,"synthetic_lng_project":null,"retrofit_proposed":null,"url":"https://lngatlas.org/terminal/san-pedro-de-macoris-lng-terminal-do/","data_source":"Data: Global Gas Infrastructure Tracker, Global Energy Monitor, September 2025"},{"terminal_slug":"santos-basin-flng-terminal-br","terminal_name":"Santos Basin FLNG Terminal","country":"Brazil","country_iso":"BR","unit_name":null,"status":"cancelled","facility_type":"export","floating_type":"flng","capacity_mtpa":2.7,"capacity_bcm_y":3.67,"start_year":null,"planned_start_year":null,"original_planned_start_year":null,"fid_year":null,"construction_year":null,"shelved_year":2013,"cancelled_year":2015,"stop_year":2015,"estimated_cost_usd":null,"estimated_cost_original":null,"estimated_cost_currency":null,"power_stations_supplied":null,"floating_vessel_name":null,"ccs_project":null,"hydrogen_project":null,"ammonia_project":null,"synthetic_lng_project":null,"retrofit_proposed":null,"url":"https://lngatlas.org/terminal/santos-basin-flng-terminal-br/","data_source":"Data: Global Gas Infrastructure Tracker, Global Energy Monitor, September 2025"},{"terminal_slug":"satu-flng-terminal-my","terminal_name":"Satu FLNG Terminal","country":"Malaysia","country_iso":"MY","unit_name":null,"status":"operating","facility_type":"export","floating_type":"flng","capacity_mtpa":1.2,"capacity_bcm_y":1.63,"start_year":2017,"planned_start_year":null,"original_planned_start_year":null,"fid_year":null,"construction_year":null,"shelved_year":null,"cancelled_year":null,"stop_year":null,"estimated_cost_usd":null,"estimated_cost_original":null,"estimated_cost_currency":null,"power_stations_supplied":null,"floating_vessel_name":null,"ccs_project":null,"hydrogen_project":null,"ammonia_project":null,"synthetic_lng_project":null,"retrofit_proposed":null,"url":"https://lngatlas.org/terminal/satu-flng-terminal-my/","data_source":"Data: Global Gas Infrastructure Tracker, Global Energy Monitor, September 2025"},{"terminal_slug":"mlng-satu-lng-terminal-my","terminal_name":"Satu Malaysia Terminal","country":"Malaysia","country_iso":"MY","unit_name":"T1-T3","status":"operating","facility_type":"export","floating_type":"unknown","capacity_mtpa":8.4,"capacity_bcm_y":11.43,"start_year":1983,"planned_start_year":null,"original_planned_start_year":null,"fid_year":null,"construction_year":null,"shelved_year":null,"cancelled_year":null,"stop_year":null,"estimated_cost_usd":null,"estimated_cost_original":null,"estimated_cost_currency":null,"power_stations_supplied":null,"floating_vessel_name":null,"ccs_project":null,"hydrogen_project":null,"ammonia_project":null,"synthetic_lng_project":null,"retrofit_proposed":null,"url":"https://lngatlas.org/terminal/mlng-satu-lng-terminal-my/","data_source":"Data: Global Gas Infrastructure Tracker, Global Energy Monitor, September 2025"},{"terminal_slug":"scarborough-flng-terminal-au","terminal_name":"Scarborough FLNG Terminal","country":"Australia","country_iso":"AU","unit_name":null,"status":"cancelled","facility_type":"export","floating_type":"flng","capacity_mtpa":7,"capacity_bcm_y":9.52,"start_year":null,"planned_start_year":null,"original_planned_start_year":null,"fid_year":null,"construction_year":null,"shelved_year":null,"cancelled_year":null,"stop_year":null,"estimated_cost_usd":null,"estimated_cost_original":null,"estimated_cost_currency":null,"power_stations_supplied":null,"floating_vessel_name":null,"ccs_project":null,"hydrogen_project":null,"ammonia_project":null,"synthetic_lng_project":null,"retrofit_proposed":null,"url":"https://lngatlas.org/terminal/scarborough-flng-terminal-au/","data_source":"Data: Global Gas Infrastructure Tracker, Global Energy Monitor, September 2025"},{"terminal_slug":"selaata-fsru-lb","terminal_name":"Selaata FSRU","country":"Lebanon","country_iso":"LB","unit_name":null,"status":"cancelled","facility_type":"import","floating_type":"fsru","capacity_mtpa":null,"capacity_bcm_y":null,"start_year":null,"planned_start_year":null,"original_planned_start_year":null,"fid_year":null,"construction_year":null,"shelved_year":2022,"cancelled_year":2024,"stop_year":2024,"estimated_cost_usd":null,"estimated_cost_original":null,"estimated_cost_currency":null,"power_stations_supplied":"Selaata Power Plant","floating_vessel_name":null,"ccs_project":null,"hydrogen_project":null,"ammonia_project":null,"synthetic_lng_project":null,"retrofit_proposed":null,"url":"https://lngatlas.org/terminal/selaata-fsru-lb/","data_source":"Data: Global Gas Infrastructure Tracker, Global Energy Monitor, September 2025"},{"terminal_slug":"senboku-1-lng-terminal-jp","terminal_name":"Senboku 1 LNG Terminal","country":"Japan","country_iso":"JP","unit_name":null,"status":"operating","facility_type":"import","floating_type":"unknown","capacity_mtpa":1.9,"capacity_bcm_y":2.59,"start_year":1972,"planned_start_year":null,"original_planned_start_year":null,"fid_year":null,"construction_year":null,"shelved_year":null,"cancelled_year":null,"stop_year":null,"estimated_cost_usd":null,"estimated_cost_original":null,"estimated_cost_currency":null,"power_stations_supplied":null,"floating_vessel_name":null,"ccs_project":null,"hydrogen_project":null,"ammonia_project":null,"synthetic_lng_project":null,"retrofit_proposed":null,"url":"https://lngatlas.org/terminal/senboku-1-lng-terminal-jp/","data_source":"Data: Global Gas Infrastructure Tracker, Global Energy Monitor, September 2025"},{"terminal_slug":"senboku-2-lng-terminal-jp","terminal_name":"Senboku 2 LNG Terminal","country":"Japan","country_iso":"JP","unit_name":null,"status":"operating","facility_type":"import","floating_type":"unknown","capacity_mtpa":9.9,"capacity_bcm_y":13.47,"start_year":1977,"planned_start_year":null,"original_planned_start_year":null,"fid_year":null,"construction_year":null,"shelved_year":null,"cancelled_year":null,"stop_year":null,"estimated_cost_usd":null,"estimated_cost_original":null,"estimated_cost_currency":null,"power_stations_supplied":null,"floating_vessel_name":null,"ccs_project":null,"hydrogen_project":null,"ammonia_project":null,"synthetic_lng_project":null,"retrofit_proposed":null,"url":"https://lngatlas.org/terminal/senboku-2-lng-terminal-jp/","data_source":"Data: Global Gas Infrastructure Tracker, Global Energy Monitor, September 2025"},{"terminal_slug":"sendai-lng-terminal-jp","terminal_name":"Sendai LNG Terminal","country":"Japan","country_iso":"JP","unit_name":null,"status":"operating","facility_type":"import","floating_type":"unknown","capacity_mtpa":0.8,"capacity_bcm_y":1.09,"start_year":2013,"planned_start_year":null,"original_planned_start_year":null,"fid_year":null,"construction_year":null,"shelved_year":null,"cancelled_year":null,"stop_year":null,"estimated_cost_usd":null,"estimated_cost_original":null,"estimated_cost_currency":null,"power_stations_supplied":null,"floating_vessel_name":null,"ccs_project":null,"hydrogen_project":null,"ammonia_project":null,"synthetic_lng_project":null,"retrofit_proposed":null,"url":"https://lngatlas.org/terminal/sendai-lng-terminal-jp/","data_source":"Data: Global Gas Infrastructure Tracker, Global Energy Monitor, September 2025"},{"terminal_slug":"sengkang-lng-terminal-id","terminal_name":"Sengkang LNG Terminal","country":"Indonesia","country_iso":"ID","unit_name":"T1","status":"shelved","facility_type":"export","floating_type":"unknown","capacity_mtpa":0.5,"capacity_bcm_y":0.68,"start_year":null,"planned_start_year":2023,"original_planned_start_year":2014,"fid_year":null,"construction_year":null,"shelved_year":null,"cancelled_year":null,"stop_year":null,"estimated_cost_usd":null,"estimated_cost_original":null,"estimated_cost_currency":null,"power_stations_supplied":null,"floating_vessel_name":null,"ccs_project":null,"hydrogen_project":null,"ammonia_project":null,"synthetic_lng_project":null,"retrofit_proposed":null,"url":"https://lngatlas.org/terminal/sengkang-lng-terminal-id/","data_source":"Data: Global Gas Infrastructure Tracker, Global Energy Monitor, September 2025"},{"terminal_slug":"sengkang-lng-terminal-id","terminal_name":"Sengkang LNG Terminal","country":"Indonesia","country_iso":"ID","unit_name":"T2-T4 Expansion","status":"shelved","facility_type":"export","floating_type":"unknown","capacity_mtpa":1.5,"capacity_bcm_y":2.04,"start_year":null,"planned_start_year":2023,"original_planned_start_year":2014,"fid_year":null,"construction_year":null,"shelved_year":null,"cancelled_year":null,"stop_year":null,"estimated_cost_usd":null,"estimated_cost_original":null,"estimated_cost_currency":null,"power_stations_supplied":null,"floating_vessel_name":null,"ccs_project":null,"hydrogen_project":null,"ammonia_project":null,"synthetic_lng_project":null,"retrofit_proposed":null,"url":"https://lngatlas.org/terminal/sengkang-lng-terminal-id/","data_source":"Data: Global Gas Infrastructure Tracker, Global Energy Monitor, September 2025"},{"terminal_slug":"sepetiba-bay-fsru-br","terminal_name":"Sepetiba Bay FSRU","country":"Brazil","country_iso":"BR","unit_name":null,"status":"operating","facility_type":"import","floating_type":"fsru","capacity_mtpa":2.7,"capacity_bcm_y":3.67,"start_year":2022,"planned_start_year":null,"original_planned_start_year":null,"fid_year":2021,"construction_year":null,"shelved_year":null,"cancelled_year":null,"stop_year":null,"estimated_cost_usd":null,"estimated_cost_original":null,"estimated_cost_currency":null,"power_stations_supplied":"Karkey I, Karkey II, Porsud I, Porsud II","floating_vessel_name":"LNGt Powership Asia","ccs_project":null,"hydrogen_project":null,"ammonia_project":null,"synthetic_lng_project":null,"retrofit_proposed":null,"url":"https://lngatlas.org/terminal/sepetiba-bay-fsru-br/","data_source":"Data: Global Gas Infrastructure Tracker, Global Energy Monitor, September 2025"},{"terminal_slug":"sergipe-fsru-br","terminal_name":"Sergipe FSRU","country":"Brazil","country_iso":"BR","unit_name":null,"status":"operating","facility_type":"import","floating_type":"fsru","capacity_mtpa":5.64,"capacity_bcm_y":7.67,"start_year":2020,"planned_start_year":null,"original_planned_start_year":null,"fid_year":null,"construction_year":null,"shelved_year":null,"cancelled_year":null,"stop_year":null,"estimated_cost_usd":null,"estimated_cost_original":null,"estimated_cost_currency":null,"power_stations_supplied":"Porto de Sergipe power station","floating_vessel_name":"Energos Nanook","ccs_project":null,"hydrogen_project":null,"ammonia_project":null,"synthetic_lng_project":null,"retrofit_proposed":null,"url":"https://lngatlas.org/terminal/sergipe-fsru-br/","data_source":"Data: Global Gas Infrastructure Tracker, Global Energy Monitor, September 2025"},{"terminal_slug":"shandong-lng-terminal-cn","terminal_name":"Shandong LNG Terminal","country":"China","country_iso":"CN","unit_name":"Phase 1","status":"operating","facility_type":"import","floating_type":"unknown","capacity_mtpa":3,"capacity_bcm_y":4.08,"start_year":2014,"planned_start_year":null,"original_planned_start_year":null,"fid_year":null,"construction_year":2011,"shelved_year":null,"cancelled_year":null,"stop_year":null,"estimated_cost_usd":null,"estimated_cost_original":null,"estimated_cost_currency":null,"power_stations_supplied":null,"floating_vessel_name":null,"ccs_project":null,"hydrogen_project":null,"ammonia_project":null,"synthetic_lng_project":null,"retrofit_proposed":null,"url":"https://lngatlas.org/terminal/shandong-lng-terminal-cn/","data_source":"Data: Global Gas Infrastructure Tracker, Global Energy Monitor, September 2025"},{"terminal_slug":"shandong-lng-terminal-cn","terminal_name":"Shandong LNG Terminal","country":"China","country_iso":"CN","unit_name":"Phase 2","status":"operating","facility_type":"import","floating_type":"unknown","capacity_mtpa":4,"capacity_bcm_y":5.44,"start_year":2021,"planned_start_year":null,"original_planned_start_year":null,"fid_year":null,"construction_year":2018,"shelved_year":null,"cancelled_year":null,"stop_year":null,"estimated_cost_usd":null,"estimated_cost_original":null,"estimated_cost_currency":null,"power_stations_supplied":null,"floating_vessel_name":null,"ccs_project":null,"hydrogen_project":null,"ammonia_project":null,"synthetic_lng_project":null,"retrofit_proposed":null,"url":"https://lngatlas.org/terminal/shandong-lng-terminal-cn/","data_source":"Data: Global Gas Infrastructure Tracker, Global Energy Monitor, September 2025"},{"terminal_slug":"shandong-lng-terminal-cn","terminal_name":"Shandong LNG Terminal","country":"China","country_iso":"CN","unit_name":"Phase 3","status":"operating","facility_type":"import","floating_type":"unknown","capacity_mtpa":4,"capacity_bcm_y":5.44,"start_year":2023,"planned_start_year":null,"original_planned_start_year":null,"fid_year":null,"construction_year":2021,"shelved_year":null,"cancelled_year":null,"stop_year":null,"estimated_cost_usd":null,"estimated_cost_original":null,"estimated_cost_currency":null,"power_stations_supplied":null,"floating_vessel_name":null,"ccs_project":null,"hydrogen_project":null,"ammonia_project":null,"synthetic_lng_project":null,"retrofit_proposed":null,"url":"https://lngatlas.org/terminal/shandong-lng-terminal-cn/","data_source":"Data: Global Gas Infrastructure Tracker, Global Energy Monitor, September 2025"},{"terminal_slug":"shanghai-yangshan-lng-terminal-cn","terminal_name":"Shanghai Yangshan LNG Terminal","country":"China","country_iso":"CN","unit_name":"Phase 1","status":"operating","facility_type":"import","floating_type":"unknown","capacity_mtpa":3,"capacity_bcm_y":4.08,"start_year":2009,"planned_start_year":null,"original_planned_start_year":null,"fid_year":null,"construction_year":2007,"shelved_year":null,"cancelled_year":null,"stop_year":null,"estimated_cost_usd":480000000,"estimated_cost_original":3000000000,"estimated_cost_currency":"RMB","power_stations_supplied":null,"floating_vessel_name":null,"ccs_project":null,"hydrogen_project":null,"ammonia_project":null,"synthetic_lng_project":null,"retrofit_proposed":null,"url":"https://lngatlas.org/terminal/shanghai-yangshan-lng-terminal-cn/","data_source":"Data: Global Gas Infrastructure Tracker, Global Energy Monitor, September 2025"},{"terminal_slug":"shanghai-yangshan-lng-terminal-cn","terminal_name":"Shanghai Yangshan LNG Terminal","country":"China","country_iso":"CN","unit_name":"Phase I Expansion","status":"operating","facility_type":"import","floating_type":"unknown","capacity_mtpa":null,"capacity_bcm_y":null,"start_year":2020,"planned_start_year":null,"original_planned_start_year":null,"fid_year":null,"construction_year":2016,"shelved_year":null,"cancelled_year":null,"stop_year":null,"estimated_cost_usd":480000000,"estimated_cost_original":3000000000,"estimated_cost_currency":"RMB","power_stations_supplied":null,"floating_vessel_name":null,"ccs_project":null,"hydrogen_project":null,"ammonia_project":null,"synthetic_lng_project":null,"retrofit_proposed":null,"url":"https://lngatlas.org/terminal/shanghai-yangshan-lng-terminal-cn/","data_source":"Data: Global Gas Infrastructure Tracker, Global Energy Monitor, September 2025"},{"terminal_slug":"shanghai-yangshan-lng-terminal-cn","terminal_name":"Shanghai Yangshan LNG Terminal","country":"China","country_iso":"CN","unit_name":"Phase II Stage 2","status":"proposed","facility_type":"unknown","floating_type":"unknown","capacity_mtpa":null,"capacity_bcm_y":null,"start_year":null,"planned_start_year":null,"original_planned_start_year":2027,"fid_year":null,"construction_year":null,"shelved_year":null,"cancelled_year":null,"stop_year":null,"estimated_cost_usd":null,"estimated_cost_original":null,"estimated_cost_currency":null,"power_stations_supplied":null,"floating_vessel_name":null,"ccs_project":null,"hydrogen_project":null,"ammonia_project":null,"synthetic_lng_project":null,"retrofit_proposed":null,"url":"https://lngatlas.org/terminal/shanghai-yangshan-lng-terminal-cn/","data_source":"Data: Global Gas Infrastructure Tracker, Global Energy Monitor, September 2025"},{"terminal_slug":"shanghai-yangshan-lng-terminal-cn","terminal_name":"Shanghai Yangshan LNG Terminal","country":"China","country_iso":"CN","unit_name":"Phase II Stage 3","status":"proposed","facility_type":"unknown","floating_type":"unknown","capacity_mtpa":3,"capacity_bcm_y":4.08,"start_year":null,"planned_start_year":null,"original_planned_start_year":2030,"fid_year":null,"construction_year":null,"shelved_year":null,"cancelled_year":null,"stop_year":null,"estimated_cost_usd":null,"estimated_cost_original":null,"estimated_cost_currency":null,"power_stations_supplied":null,"floating_vessel_name":null,"ccs_project":null,"hydrogen_project":null,"ammonia_project":null,"synthetic_lng_project":null,"retrofit_proposed":null,"url":"https://lngatlas.org/terminal/shanghai-yangshan-lng-terminal-cn/","data_source":"Data: Global Gas Infrastructure Tracker, Global Energy Monitor, September 2025"},{"terminal_slug":"shanghai-yangshan-lng-terminal-cn","terminal_name":"Shanghai Yangshan LNG Terminal","country":"China","country_iso":"CN","unit_name":"Phase II stage 1","status":"construction","facility_type":"import","floating_type":"unknown","capacity_mtpa":3,"capacity_bcm_y":4.08,"start_year":null,"planned_start_year":null,"original_planned_start_year":2025,"fid_year":null,"construction_year":2022,"shelved_year":null,"cancelled_year":null,"stop_year":null,"estimated_cost_usd":2720000000,"estimated_cost_original":17000000000,"estimated_cost_currency":"RMB","power_stations_supplied":null,"floating_vessel_name":null,"ccs_project":null,"hydrogen_project":null,"ammonia_project":null,"synthetic_lng_project":null,"retrofit_proposed":null,"url":"https://lngatlas.org/terminal/shanghai-yangshan-lng-terminal-cn/","data_source":"Data: Global Gas Infrastructure Tracker, Global Energy Monitor, September 2025"},{"terminal_slug":"shannon-fsru-ie","terminal_name":"Shannon FSRU","country":"Ireland","country_iso":"IE","unit_name":null,"status":"proposed","facility_type":"import","floating_type":"fsru","capacity_mtpa":6.06,"capacity_bcm_y":8.24,"start_year":null,"planned_start_year":null,"original_planned_start_year":2022,"fid_year":null,"construction_year":null,"shelved_year":null,"cancelled_year":null,"stop_year":null,"estimated_cost_usd":708500000,"estimated_cost_original":650000000,"estimated_cost_currency":"EUR","power_stations_supplied":"Mag Mell power station","floating_vessel_name":null,"ccs_project":null,"hydrogen_project":null,"ammonia_project":null,"synthetic_lng_project":null,"retrofit_proposed":null,"url":"https://lngatlas.org/terminal/shannon-fsru-ie/","data_source":"Data: Global Gas Infrastructure Tracker, Global Energy Monitor, September 2025"},{"terminal_slug":"shantou-lng-terminal-cn","terminal_name":"Shantou LNG Terminal","country":"China","country_iso":"CN","unit_name":"Guang'ao LNG Terminal","status":"proposed","facility_type":"import","floating_type":"unknown","capacity_mtpa":3,"capacity_bcm_y":4.08,"start_year":null,"planned_start_year":null,"original_planned_start_year":null,"fid_year":null,"construction_year":null,"shelved_year":null,"cancelled_year":null,"stop_year":null,"estimated_cost_usd":1760000000,"estimated_cost_original":11000000000,"estimated_cost_currency":"RMB","power_stations_supplied":null,"floating_vessel_name":null,"ccs_project":null,"hydrogen_project":null,"ammonia_project":null,"synthetic_lng_project":null,"retrofit_proposed":null,"url":"https://lngatlas.org/terminal/shantou-lng-terminal-cn/","data_source":"Data: Global Gas Infrastructure Tracker, Global Energy Monitor, September 2025"},{"terminal_slug":"shantou-lng-terminal-cn","terminal_name":"Shantou LNG Terminal","country":"China","country_iso":"CN","unit_name":"Nan'ao LNG Terminal","status":"cancelled","facility_type":"import","floating_type":"unknown","capacity_mtpa":3,"capacity_bcm_y":4.08,"start_year":null,"planned_start_year":null,"original_planned_start_year":null,"fid_year":null,"construction_year":null,"shelved_year":null,"cancelled_year":2011,"stop_year":2011,"estimated_cost_usd":96000000,"estimated_cost_original":600000000,"estimated_cost_currency":"RMB","power_stations_supplied":null,"floating_vessel_name":null,"ccs_project":null,"hydrogen_project":null,"ammonia_project":null,"synthetic_lng_project":null,"retrofit_proposed":null,"url":"https://lngatlas.org/terminal/shantou-lng-terminal-cn/","data_source":"Data: Global Gas Infrastructure Tracker, Global Energy Monitor, September 2025"},{"terminal_slug":"shanwei-lng-terminal-cn","terminal_name":"Shanwei LNG Terminal","country":"China","country_iso":"CN","unit_name":null,"status":"shelved","facility_type":"import","floating_type":"unknown","capacity_mtpa":null,"capacity_bcm_y":null,"start_year":null,"planned_start_year":null,"original_planned_start_year":null,"fid_year":null,"construction_year":null,"shelved_year":null,"cancelled_year":null,"stop_year":null,"estimated_cost_usd":null,"estimated_cost_original":null,"estimated_cost_currency":null,"power_stations_supplied":null,"floating_vessel_name":null,"ccs_project":null,"hydrogen_project":null,"ammonia_project":null,"synthetic_lng_project":null,"retrofit_proposed":null,"url":"https://lngatlas.org/terminal/shanwei-lng-terminal-cn/","data_source":"Data: Global Gas Infrastructure Tracker, Global Energy Monitor, September 2025"},{"terminal_slug":"sharjah-fsru-ae","terminal_name":"Sharjah FSRU","country":"United Arab Emirates","country_iso":"AE","unit_name":null,"status":"cancelled","facility_type":"import","floating_type":"fsru","capacity_mtpa":7.67,"capacity_bcm_y":10.44,"start_year":null,"planned_start_year":null,"original_planned_start_year":2020,"fid_year":null,"construction_year":null,"shelved_year":2020,"cancelled_year":2024,"stop_year":2024,"estimated_cost_usd":null,"estimated_cost_original":null,"estimated_cost_currency":null,"power_stations_supplied":null,"floating_vessel_name":null,"ccs_project":null,"hydrogen_project":null,"ammonia_project":null,"synthetic_lng_project":null,"retrofit_proposed":null,"url":"https://lngatlas.org/terminal/sharjah-fsru-ae/","data_source":"Data: Global Gas Infrastructure Tracker, Global Energy Monitor, September 2025"},{"terminal_slug":"sheikh-sabah-lng-terminal-jo","terminal_name":"Sheikh Sabah LNG Terminal","country":"Jordan","country_iso":"JO","unit_name":null,"status":"proposed","facility_type":"import","floating_type":"unknown","capacity_mtpa":5.48,"capacity_bcm_y":7.46,"start_year":null,"planned_start_year":null,"original_planned_start_year":2026,"fid_year":null,"construction_year":null,"shelved_year":null,"cancelled_year":null,"stop_year":null,"estimated_cost_usd":125000000,"estimated_cost_original":125000000,"estimated_cost_currency":"USD","power_stations_supplied":null,"floating_vessel_name":null,"ccs_project":null,"hydrogen_project":null,"ammonia_project":null,"synthetic_lng_project":null,"retrofit_proposed":null,"url":"https://lngatlas.org/terminal/sheikh-sabah-lng-terminal-jo/","data_source":"Data: Global Gas Infrastructure Tracker, Global Energy Monitor, September 2025"},{"terminal_slug":"shenzhen-diefu-cnooc-lng-terminal-cn","terminal_name":"Shenzhen Diefu CNOOC LNG Terminal","country":"China","country_iso":"CN","unit_name":"Phase 1","status":"operating","facility_type":"import","floating_type":"unknown","capacity_mtpa":4,"capacity_bcm_y":5.44,"start_year":2018,"planned_start_year":null,"original_planned_start_year":null,"fid_year":null,"construction_year":2012,"shelved_year":null,"cancelled_year":null,"stop_year":null,"estimated_cost_usd":1280000000,"estimated_cost_original":8000000000,"estimated_cost_currency":"RMB","power_stations_supplied":null,"floating_vessel_name":null,"ccs_project":null,"hydrogen_project":null,"ammonia_project":null,"synthetic_lng_project":null,"retrofit_proposed":null,"url":"https://lngatlas.org/terminal/shenzhen-diefu-cnooc-lng-terminal-cn/","data_source":"Data: Global Gas Infrastructure Tracker, Global Energy Monitor, September 2025"},{"terminal_slug":"shenzhen-lng-terminal-cn","terminal_name":"Shenzhen LNG Terminal","country":"China","country_iso":"CN","unit_name":"Phase 1","status":"construction","facility_type":"import","floating_type":"unknown","capacity_mtpa":3,"capacity_bcm_y":4.08,"start_year":null,"planned_start_year":null,"original_planned_start_year":2024,"fid_year":null,"construction_year":2017,"shelved_year":null,"cancelled_year":null,"stop_year":null,"estimated_cost_usd":1120121600,"estimated_cost_original":7000760000,"estimated_cost_currency":"RMB","power_stations_supplied":null,"floating_vessel_name":null,"ccs_project":null,"hydrogen_project":null,"ammonia_project":null,"synthetic_lng_project":null,"retrofit_proposed":null,"url":"https://lngatlas.org/terminal/shenzhen-lng-terminal-cn/","data_source":"Data: Global Gas Infrastructure Tracker, Global Energy Monitor, September 2025"},{"terminal_slug":"shenzhen-lng-terminal-shenzhen-gas-cn","terminal_name":"Shenzhen LNG Terminal (Shenzhen Gas)","country":"China","country_iso":"CN","unit_name":"Phase 1","status":"operating","facility_type":"import","floating_type":"unknown","capacity_mtpa":0.8,"capacity_bcm_y":1.09,"start_year":2019,"planned_start_year":null,"original_planned_start_year":null,"fid_year":null,"construction_year":2014,"shelved_year":null,"cancelled_year":null,"stop_year":null,"estimated_cost_usd":256000000,"estimated_cost_original":1600000000,"estimated_cost_currency":"RMB","power_stations_supplied":null,"floating_vessel_name":null,"ccs_project":null,"hydrogen_project":null,"ammonia_project":null,"synthetic_lng_project":null,"retrofit_proposed":null,"url":"https://lngatlas.org/terminal/shenzhen-lng-terminal-shenzhen-gas-cn/","data_source":"Data: Global Gas Infrastructure Tracker, Global Energy Monitor, September 2025"},{"terminal_slug":"shenzhen-lng-terminal-shenzhen-gas-cn","terminal_name":"Shenzhen LNG Terminal (Shenzhen Gas)","country":"China","country_iso":"CN","unit_name":"Phase 2","status":"construction","facility_type":"import","floating_type":"unknown","capacity_mtpa":2,"capacity_bcm_y":2.72,"start_year":null,"planned_start_year":null,"original_planned_start_year":null,"fid_year":null,"construction_year":2022,"shelved_year":null,"cancelled_year":null,"stop_year":null,"estimated_cost_usd":592000000,"estimated_cost_original":3700000000,"estimated_cost_currency":"RMB","power_stations_supplied":null,"floating_vessel_name":null,"ccs_project":null,"hydrogen_project":null,"ammonia_project":null,"synthetic_lng_project":null,"retrofit_proposed":null,"url":"https://lngatlas.org/terminal/shenzhen-lng-terminal-shenzhen-gas-cn/","data_source":"Data: Global Gas Infrastructure Tracker, Global Energy Monitor, September 2025"},{"terminal_slug":"shin-minato-lng-terminal-jp","terminal_name":"Shin Minato LNG Terminal","country":"Japan","country_iso":"JP","unit_name":null,"status":"operating","facility_type":"import","floating_type":"unknown","capacity_mtpa":0.3,"capacity_bcm_y":0.41,"start_year":1997,"planned_start_year":null,"original_planned_start_year":null,"fid_year":null,"construction_year":null,"shelved_year":null,"cancelled_year":null,"stop_year":null,"estimated_cost_usd":null,"estimated_cost_original":null,"estimated_cost_currency":null,"power_stations_supplied":null,"floating_vessel_name":null,"ccs_project":null,"hydrogen_project":null,"ammonia_project":null,"synthetic_lng_project":null,"retrofit_proposed":null,"url":"https://lngatlas.org/terminal/shin-minato-lng-terminal-jp/","data_source":"Data: Global Gas Infrastructure Tracker, Global Energy Monitor, September 2025"},{"terminal_slug":"shin-sendai-lng-terminal-jp","terminal_name":"Shin-Sendai LNG Terminal","country":"Japan","country_iso":"JP","unit_name":null,"status":"operating","facility_type":"import","floating_type":"unknown","capacity_mtpa":1.7,"capacity_bcm_y":2.31,"start_year":2015,"planned_start_year":null,"original_planned_start_year":null,"fid_year":null,"construction_year":null,"shelved_year":null,"cancelled_year":null,"stop_year":null,"estimated_cost_usd":null,"estimated_cost_original":null,"estimated_cost_currency":null,"power_stations_supplied":null,"floating_vessel_name":null,"ccs_project":null,"hydrogen_project":null,"ammonia_project":null,"synthetic_lng_project":null,"retrofit_proposed":null,"url":"https://lngatlas.org/terminal/shin-sendai-lng-terminal-jp/","data_source":"Data: Global Gas Infrastructure Tracker, Global Energy Monitor, September 2025"},{"terminal_slug":"shtokman-lng-terminal-ru","terminal_name":"Shtokman LNG Terminal","country":"Russia","country_iso":"RU","unit_name":null,"status":"cancelled","facility_type":"export","floating_type":"unknown","capacity_mtpa":30,"capacity_bcm_y":40.82,"start_year":null,"planned_start_year":null,"original_planned_start_year":2035,"fid_year":2011,"construction_year":null,"shelved_year":null,"cancelled_year":2012,"stop_year":2012,"estimated_cost_usd":null,"estimated_cost_original":null,"estimated_cost_currency":null,"power_stations_supplied":null,"floating_vessel_name":null,"ccs_project":null,"hydrogen_project":null,"ammonia_project":null,"synthetic_lng_project":null,"retrofit_proposed":null,"url":"https://lngatlas.org/terminal/shtokman-lng-terminal-ru/","data_source":"Data: Global Gas Infrastructure Tracker, Global Energy Monitor, September 2025"},{"terminal_slug":"sines-lng-terminal-pt","terminal_name":"Sines LNG Terminal","country":"Portugal","country_iso":"PT","unit_name":null,"status":"operating","facility_type":"import","floating_type":"unknown","capacity_mtpa":5.6,"capacity_bcm_y":7.62,"start_year":2004,"planned_start_year":null,"original_planned_start_year":null,"fid_year":null,"construction_year":null,"shelved_year":null,"cancelled_year":null,"stop_year":null,"estimated_cost_usd":null,"estimated_cost_original":null,"estimated_cost_currency":null,"power_stations_supplied":null,"floating_vessel_name":null,"ccs_project":null,"hydrogen_project":null,"ammonia_project":null,"synthetic_lng_project":null,"retrofit_proposed":null,"url":"https://lngatlas.org/terminal/sines-lng-terminal-pt/","data_source":"Data: Global Gas Infrastructure Tracker, Global Energy Monitor, September 2025"},{"terminal_slug":"singapore-lng-terminal-sg","terminal_name":"Singapore LNG Terminal","country":"Singapore","country_iso":"SG","unit_name":"Phase 1","status":"operating","facility_type":"import","floating_type":"unknown","capacity_mtpa":3.5,"capacity_bcm_y":4.76,"start_year":2013,"planned_start_year":null,"original_planned_start_year":null,"fid_year":null,"construction_year":null,"shelved_year":null,"cancelled_year":null,"stop_year":null,"estimated_cost_usd":null,"estimated_cost_original":null,"estimated_cost_currency":null,"power_stations_supplied":null,"floating_vessel_name":null,"ccs_project":null,"hydrogen_project":null,"ammonia_project":null,"synthetic_lng_project":null,"retrofit_proposed":null,"url":"https://lngatlas.org/terminal/singapore-lng-terminal-sg/","data_source":"Data: Global Gas Infrastructure Tracker, Global Energy Monitor, September 2025"},{"terminal_slug":"singapore-lng-terminal-sg","terminal_name":"Singapore LNG Terminal","country":"Singapore","country_iso":"SG","unit_name":"Phase 2","status":"operating","facility_type":"import","floating_type":"unknown","capacity_mtpa":2.5,"capacity_bcm_y":3.4,"start_year":2014,"planned_start_year":null,"original_planned_start_year":null,"fid_year":null,"construction_year":2010,"shelved_year":null,"cancelled_year":null,"stop_year":null,"estimated_cost_usd":null,"estimated_cost_original":null,"estimated_cost_currency":null,"power_stations_supplied":null,"floating_vessel_name":null,"ccs_project":null,"hydrogen_project":null,"ammonia_project":null,"synthetic_lng_project":null,"retrofit_proposed":null,"url":"https://lngatlas.org/terminal/singapore-lng-terminal-sg/","data_source":"Data: Global Gas Infrastructure Tracker, Global Energy Monitor, September 2025"},{"terminal_slug":"singapore-lng-terminal-sg","terminal_name":"Singapore LNG Terminal","country":"Singapore","country_iso":"SG","unit_name":"Phase 3","status":"operating","facility_type":"import","floating_type":"unknown","capacity_mtpa":5,"capacity_bcm_y":6.8,"start_year":2018,"planned_start_year":null,"original_planned_start_year":null,"fid_year":null,"construction_year":2015,"shelved_year":null,"cancelled_year":null,"stop_year":null,"estimated_cost_usd":null,"estimated_cost_original":null,"estimated_cost_currency":null,"power_stations_supplied":null,"floating_vessel_name":null,"ccs_project":null,"hydrogen_project":null,"ammonia_project":null,"synthetic_lng_project":null,"retrofit_proposed":null,"url":"https://lngatlas.org/terminal/singapore-lng-terminal-sg/","data_source":"Data: Global Gas Infrastructure Tracker, Global Energy Monitor, September 2025"},{"terminal_slug":"singapore-offshore-lng-terminal-sg","terminal_name":"Singapore Offshore LNG Terminal","country":"Singapore","country_iso":"SG","unit_name":null,"status":"cancelled","facility_type":"import","floating_type":"unknown","capacity_mtpa":null,"capacity_bcm_y":null,"start_year":null,"planned_start_year":null,"original_planned_start_year":null,"fid_year":null,"construction_year":null,"shelved_year":2022,"cancelled_year":null,"stop_year":null,"estimated_cost_usd":null,"estimated_cost_original":null,"estimated_cost_currency":null,"power_stations_supplied":null,"floating_vessel_name":null,"ccs_project":null,"hydrogen_project":null,"ammonia_project":null,"synthetic_lng_project":null,"retrofit_proposed":null,"url":"https://lngatlas.org/terminal/singapore-offshore-lng-terminal-sg/","data_source":"Data: Global Gas Infrastructure Tracker, Global Energy Monitor, September 2025"},{"terminal_slug":"sinolam-lng-terminal-pa","terminal_name":"Sinolam LNG Terminal","country":"Panama","country_iso":"PA","unit_name":null,"status":"shelved","facility_type":"import","floating_type":"unknown","capacity_mtpa":1.1,"capacity_bcm_y":1.5,"start_year":null,"planned_start_year":null,"original_planned_start_year":2024,"fid_year":null,"construction_year":null,"shelved_year":null,"cancelled_year":null,"stop_year":null,"estimated_cost_usd":null,"estimated_cost_original":null,"estimated_cost_currency":null,"power_stations_supplied":"Gas to Power Panama (GTPP) power station","floating_vessel_name":"GasLog Singapore (FSU only)","ccs_project":null,"hydrogen_project":null,"ammonia_project":null,"synthetic_lng_project":null,"retrofit_proposed":null,"url":"https://lngatlas.org/terminal/sinolam-lng-terminal-pa/","data_source":"Data: Global Gas Infrastructure Tracker, Global Energy Monitor, September 2025"},{"terminal_slug":"sinopec-longkou-lng-terminal-cn","terminal_name":"Sinopec Longkou LNG Terminal","country":"China","country_iso":"CN","unit_name":"Phase 1","status":"construction","facility_type":"import","floating_type":"unknown","capacity_mtpa":6.5,"capacity_bcm_y":8.84,"start_year":null,"planned_start_year":null,"original_planned_start_year":2023,"fid_year":null,"construction_year":2021,"shelved_year":null,"cancelled_year":null,"stop_year":null,"estimated_cost_usd":1328643200,"estimated_cost_original":8304020000,"estimated_cost_currency":"RMB","power_stations_supplied":null,"floating_vessel_name":null,"ccs_project":null,"hydrogen_project":null,"ammonia_project":null,"synthetic_lng_project":null,"retrofit_proposed":null,"url":"https://lngatlas.org/terminal/sinopec-longkou-lng-terminal-cn/","data_source":"Data: Global Gas Infrastructure Tracker, Global Energy Monitor, September 2025"},{"terminal_slug":"sinopec-longkou-lng-terminal-cn","terminal_name":"Sinopec Longkou LNG Terminal","country":"China","country_iso":"CN","unit_name":"Phase 2","status":"proposed","facility_type":"import","floating_type":"unknown","capacity_mtpa":5.5,"capacity_bcm_y":7.48,"start_year":null,"planned_start_year":null,"original_planned_start_year":null,"fid_year":null,"construction_year":null,"shelved_year":null,"cancelled_year":null,"stop_year":null,"estimated_cost_usd":null,"estimated_cost_original":null,"estimated_cost_currency":null,"power_stations_supplied":null,"floating_vessel_name":null,"ccs_project":null,"hydrogen_project":null,"ammonia_project":null,"synthetic_lng_project":null,"retrofit_proposed":null,"url":"https://lngatlas.org/terminal/sinopec-longkou-lng-terminal-cn/","data_source":"Data: Global Gas Infrastructure Tracker, Global Energy Monitor, September 2025"},{"terminal_slug":"sittwe-lng-terminal-mm","terminal_name":"Sittwe LNG Terminal","country":"Myanmar","country_iso":"MM","unit_name":null,"status":"cancelled","facility_type":"import","floating_type":"unknown","capacity_mtpa":null,"capacity_bcm_y":null,"start_year":null,"planned_start_year":null,"original_planned_start_year":null,"fid_year":null,"construction_year":null,"shelved_year":2021,"cancelled_year":2023,"stop_year":2023,"estimated_cost_usd":null,"estimated_cost_original":null,"estimated_cost_currency":null,"power_stations_supplied":null,"floating_vessel_name":null,"ccs_project":null,"hydrogen_project":null,"ammonia_project":null,"synthetic_lng_project":null,"retrofit_proposed":null,"url":"https://lngatlas.org/terminal/sittwe-lng-terminal-mm/","data_source":"Data: Global Gas Infrastructure Tracker, Global Energy Monitor, September 2025"},{"terminal_slug":"skeena-lng-terminal-ca","terminal_name":"Skeena LNG Terminal","country":"Canada","country_iso":"CA","unit_name":null,"status":"cancelled","facility_type":"export","floating_type":"unknown","capacity_mtpa":0.15,"capacity_bcm_y":0.2,"start_year":null,"planned_start_year":null,"original_planned_start_year":null,"fid_year":null,"construction_year":null,"shelved_year":2021,"cancelled_year":2025,"stop_year":2025,"estimated_cost_usd":null,"estimated_cost_original":null,"estimated_cost_currency":null,"power_stations_supplied":null,"floating_vessel_name":null,"ccs_project":null,"hydrogen_project":null,"ammonia_project":null,"synthetic_lng_project":null,"retrofit_proposed":null,"url":"https://lngatlas.org/terminal/skeena-lng-terminal-ca/","data_source":"Data: Global Gas Infrastructure Tracker, Global Energy Monitor, September 2025"},{"terminal_slug":"skikda-lng-terminal-dz","terminal_name":"Skikda LNG Terminal","country":"Algeria","country_iso":"DZ","unit_name":"T10","status":"retired","facility_type":"export","floating_type":"unknown","capacity_mtpa":1,"capacity_bcm_y":1.36,"start_year":1972,"planned_start_year":null,"original_planned_start_year":null,"fid_year":null,"construction_year":null,"shelved_year":null,"cancelled_year":null,"stop_year":null,"estimated_cost_usd":null,"estimated_cost_original":null,"estimated_cost_currency":null,"power_stations_supplied":null,"floating_vessel_name":null,"ccs_project":null,"hydrogen_project":null,"ammonia_project":null,"synthetic_lng_project":null,"retrofit_proposed":null,"url":"https://lngatlas.org/terminal/skikda-lng-terminal-dz/","data_source":"Data: Global Gas Infrastructure Tracker, Global Energy Monitor, September 2025"},{"terminal_slug":"skikda-lng-terminal-dz","terminal_name":"Skikda LNG Terminal","country":"Algeria","country_iso":"DZ","unit_name":"T20","status":"retired","facility_type":"export","floating_type":"unknown","capacity_mtpa":1,"capacity_bcm_y":1.36,"start_year":1972,"planned_start_year":null,"original_planned_start_year":null,"fid_year":null,"construction_year":null,"shelved_year":null,"cancelled_year":null,"stop_year":2004,"estimated_cost_usd":null,"estimated_cost_original":null,"estimated_cost_currency":null,"power_stations_supplied":null,"floating_vessel_name":null,"ccs_project":null,"hydrogen_project":null,"ammonia_project":null,"synthetic_lng_project":null,"retrofit_proposed":null,"url":"https://lngatlas.org/terminal/skikda-lng-terminal-dz/","data_source":"Data: Global Gas Infrastructure Tracker, Global Energy Monitor, September 2025"},{"terminal_slug":"skikda-lng-terminal-dz","terminal_name":"Skikda LNG Terminal","country":"Algeria","country_iso":"DZ","unit_name":"T30","status":"retired","facility_type":"export","floating_type":"unknown","capacity_mtpa":1,"capacity_bcm_y":1.36,"start_year":1972,"planned_start_year":null,"original_planned_start_year":null,"fid_year":null,"construction_year":null,"shelved_year":null,"cancelled_year":null,"stop_year":null,"estimated_cost_usd":null,"estimated_cost_original":null,"estimated_cost_currency":null,"power_stations_supplied":null,"floating_vessel_name":null,"ccs_project":null,"hydrogen_project":null,"ammonia_project":null,"synthetic_lng_project":null,"retrofit_proposed":null,"url":"https://lngatlas.org/terminal/skikda-lng-terminal-dz/","data_source":"Data: Global Gas Infrastructure Tracker, Global Energy Monitor, September 2025"},{"terminal_slug":"skikda-lng-terminal-dz","terminal_name":"Skikda LNG Terminal","country":"Algeria","country_iso":"DZ","unit_name":"T40","status":"retired","facility_type":"export","floating_type":"unknown","capacity_mtpa":1,"capacity_bcm_y":1.36,"start_year":1981,"planned_start_year":null,"original_planned_start_year":null,"fid_year":null,"construction_year":null,"shelved_year":null,"cancelled_year":null,"stop_year":2004,"estimated_cost_usd":null,"estimated_cost_original":null,"estimated_cost_currency":null,"power_stations_supplied":null,"floating_vessel_name":null,"ccs_project":null,"hydrogen_project":null,"ammonia_project":null,"synthetic_lng_project":null,"retrofit_proposed":null,"url":"https://lngatlas.org/terminal/skikda-lng-terminal-dz/","data_source":"Data: Global Gas Infrastructure Tracker, Global Energy Monitor, September 2025"},{"terminal_slug":"skikda-lng-terminal-dz","terminal_name":"Skikda LNG Terminal","country":"Algeria","country_iso":"DZ","unit_name":"T5P","status":"retired","facility_type":"export","floating_type":"unknown","capacity_mtpa":1.25,"capacity_bcm_y":1.7,"start_year":1981,"planned_start_year":null,"original_planned_start_year":null,"fid_year":null,"construction_year":null,"shelved_year":null,"cancelled_year":null,"stop_year":null,"estimated_cost_usd":null,"estimated_cost_original":null,"estimated_cost_currency":null,"power_stations_supplied":null,"floating_vessel_name":null,"ccs_project":null,"hydrogen_project":null,"ammonia_project":null,"synthetic_lng_project":null,"retrofit_proposed":null,"url":"https://lngatlas.org/terminal/skikda-lng-terminal-dz/","data_source":"Data: Global Gas Infrastructure Tracker, Global Energy Monitor, September 2025"},{"terminal_slug":"skikda-lng-terminal-dz","terminal_name":"Skikda LNG Terminal","country":"Algeria","country_iso":"DZ","unit_name":"T6P","status":"retired","facility_type":"export","floating_type":"unknown","capacity_mtpa":1.25,"capacity_bcm_y":1.7,"start_year":1981,"planned_start_year":null,"original_planned_start_year":null,"fid_year":null,"construction_year":null,"shelved_year":null,"cancelled_year":null,"stop_year":null,"estimated_cost_usd":null,"estimated_cost_original":null,"estimated_cost_currency":null,"power_stations_supplied":null,"floating_vessel_name":null,"ccs_project":null,"hydrogen_project":null,"ammonia_project":null,"synthetic_lng_project":null,"retrofit_proposed":null,"url":"https://lngatlas.org/terminal/skikda-lng-terminal-dz/","data_source":"Data: Global Gas Infrastructure Tracker, Global Energy Monitor, September 2025"},{"terminal_slug":"skikda-lng-terminal-dz","terminal_name":"Skikda LNG Terminal","country":"Algeria","country_iso":"DZ","unit_name":"GL1K Rebuild","status":"operating","facility_type":"export","floating_type":"unknown","capacity_mtpa":4.5,"capacity_bcm_y":6.12,"start_year":2013,"planned_start_year":null,"original_planned_start_year":null,"fid_year":null,"construction_year":null,"shelved_year":null,"cancelled_year":null,"stop_year":null,"estimated_cost_usd":2800000000,"estimated_cost_original":2800000000,"estimated_cost_currency":"USD","power_stations_supplied":null,"floating_vessel_name":null,"ccs_project":null,"hydrogen_project":null,"ammonia_project":null,"synthetic_lng_project":null,"retrofit_proposed":null,"url":"https://lngatlas.org/terminal/skikda-lng-terminal-dz/","data_source":"Data: Global Gas Infrastructure Tracker, Global Energy Monitor, September 2025"},{"terminal_slug":"skulte-lng-terminal-lv","terminal_name":"Skulte LNG Terminal","country":"Latvia","country_iso":"LV","unit_name":null,"status":"shelved","facility_type":"import","floating_type":"floating","capacity_mtpa":3,"capacity_bcm_y":4.08,"start_year":null,"planned_start_year":2024,"original_planned_start_year":2023,"fid_year":null,"construction_year":null,"shelved_year":2025,"cancelled_year":null,"stop_year":null,"estimated_cost_usd":119900000,"estimated_cost_original":110000000,"estimated_cost_currency":"EUR","power_stations_supplied":null,"floating_vessel_name":null,"ccs_project":null,"hydrogen_project":null,"ammonia_project":null,"synthetic_lng_project":null,"retrofit_proposed":null,"url":"https://lngatlas.org/terminal/skulte-lng-terminal-lv/","data_source":"Data: Global Gas Infrastructure Tracker, Global Energy Monitor, September 2025"},{"terminal_slug":"snurrevarden-lng-terminal-no","terminal_name":"Snurrevarden LNG Terminal","country":"Norway","country_iso":"NO","unit_name":null,"status":"operating","facility_type":"export","floating_type":"unknown","capacity_mtpa":0.02,"capacity_bcm_y":0.03,"start_year":2003,"planned_start_year":null,"original_planned_start_year":null,"fid_year":null,"construction_year":null,"shelved_year":null,"cancelled_year":null,"stop_year":null,"estimated_cost_usd":null,"estimated_cost_original":null,"estimated_cost_currency":null,"power_stations_supplied":null,"floating_vessel_name":null,"ccs_project":null,"hydrogen_project":null,"ammonia_project":null,"synthetic_lng_project":null,"retrofit_proposed":null,"url":"https://lngatlas.org/terminal/snurrevarden-lng-terminal-no/","data_source":"Data: Global Gas Infrastructure Tracker, Global Energy Monitor, September 2025"},{"terminal_slug":"sodegaura-lng-terminal-jp","terminal_name":"Sodegaura LNG Terminal","country":"Japan","country_iso":"JP","unit_name":null,"status":"operating","facility_type":"import","floating_type":"unknown","capacity_mtpa":31.4,"capacity_bcm_y":42.72,"start_year":1973,"planned_start_year":null,"original_planned_start_year":null,"fid_year":null,"construction_year":null,"shelved_year":null,"cancelled_year":null,"stop_year":null,"estimated_cost_usd":null,"estimated_cost_original":null,"estimated_cost_currency":null,"power_stations_supplied":null,"floating_vessel_name":null,"ccs_project":null,"hydrogen_project":null,"ammonia_project":null,"synthetic_lng_project":null,"retrofit_proposed":null,"url":"https://lngatlas.org/terminal/sodegaura-lng-terminal-jp/","data_source":"Data: Global Gas Infrastructure Tracker, Global Energy Monitor, September 2025"},{"terminal_slug":"sodeshi-shimizu-lng-terminal-jp","terminal_name":"Sodeshi Shimizu LNG Terminal","country":"Japan","country_iso":"JP","unit_name":null,"status":"operating","facility_type":"import","floating_type":"unknown","capacity_mtpa":2.9,"capacity_bcm_y":3.95,"start_year":1996,"planned_start_year":null,"original_planned_start_year":null,"fid_year":null,"construction_year":null,"shelved_year":null,"cancelled_year":null,"stop_year":null,"estimated_cost_usd":null,"estimated_cost_original":null,"estimated_cost_currency":null,"power_stations_supplied":null,"floating_vessel_name":null,"ccs_project":null,"hydrogen_project":null,"ammonia_project":null,"synthetic_lng_project":null,"retrofit_proposed":null,"url":"https://lngatlas.org/terminal/sodeshi-shimizu-lng-terminal-jp/","data_source":"Data: Global Gas Infrastructure Tracker, Global Energy Monitor, September 2025"},{"terminal_slug":"soma-port-lng-terminal-jp","terminal_name":"Soma Port LNG Terminal","country":"Japan","country_iso":"JP","unit_name":null,"status":"operating","facility_type":"import","floating_type":"unknown","capacity_mtpa":1.5,"capacity_bcm_y":2.04,"start_year":2018,"planned_start_year":null,"original_planned_start_year":null,"fid_year":null,"construction_year":null,"shelved_year":null,"cancelled_year":null,"stop_year":2022,"estimated_cost_usd":null,"estimated_cost_original":null,"estimated_cost_currency":null,"power_stations_supplied":null,"floating_vessel_name":null,"ccs_project":null,"hydrogen_project":null,"ammonia_project":null,"synthetic_lng_project":null,"retrofit_proposed":null,"url":"https://lngatlas.org/terminal/soma-port-lng-terminal-jp/","data_source":"Data: Global Gas Infrastructure Tracker, Global Energy Monitor, September 2025"},{"terminal_slug":"son-my-lng-terminal-vn","terminal_name":"Son My LNG Terminal","country":"Vietnam","country_iso":"VN","unit_name":"Phase 1","status":"proposed","facility_type":"import","floating_type":"unknown","capacity_mtpa":2.4,"capacity_bcm_y":3.27,"start_year":null,"planned_start_year":2027,"original_planned_start_year":2026,"fid_year":2023,"construction_year":null,"shelved_year":null,"cancelled_year":null,"stop_year":null,"estimated_cost_usd":null,"estimated_cost_original":null,"estimated_cost_currency":null,"power_stations_supplied":"Son My I power station, Son My II power station","floating_vessel_name":null,"ccs_project":null,"hydrogen_project":null,"ammonia_project":null,"synthetic_lng_project":null,"retrofit_proposed":null,"url":"https://lngatlas.org/terminal/son-my-lng-terminal-vn/","data_source":"Data: Global Gas Infrastructure Tracker, Global Energy Monitor, September 2025"},{"terminal_slug":"son-my-lng-terminal-vn","terminal_name":"Son My LNG Terminal","country":"Vietnam","country_iso":"VN","unit_name":"Phase 2","status":"proposed","facility_type":"import","floating_type":"unknown","capacity_mtpa":2.4,"capacity_bcm_y":3.27,"start_year":null,"planned_start_year":null,"original_planned_start_year":null,"fid_year":2023,"construction_year":null,"shelved_year":null,"cancelled_year":null,"stop_year":null,"estimated_cost_usd":null,"estimated_cost_original":null,"estimated_cost_currency":null,"power_stations_supplied":"Son My I power station, Son My II power station","floating_vessel_name":null,"ccs_project":null,"hydrogen_project":null,"ammonia_project":null,"synthetic_lng_project":null,"retrofit_proposed":null,"url":"https://lngatlas.org/terminal/son-my-lng-terminal-vn/","data_source":"Data: Global Gas Infrastructure Tracker, Global Energy Monitor, September 2025"},{"terminal_slug":"songkhla-fsru-th","terminal_name":"Songkhla FSRU","country":"Thailand","country_iso":"TH","unit_name":null,"status":"cancelled","facility_type":"import","floating_type":"fsru","capacity_mtpa":3,"capacity_bcm_y":4.08,"start_year":null,"planned_start_year":null,"original_planned_start_year":null,"fid_year":null,"construction_year":null,"shelved_year":null,"cancelled_year":2018,"stop_year":2018,"estimated_cost_usd":null,"estimated_cost_original":null,"estimated_cost_currency":null,"power_stations_supplied":null,"floating_vessel_name":null,"ccs_project":null,"hydrogen_project":null,"ammonia_project":null,"synthetic_lng_project":null,"retrofit_proposed":null,"url":"https://lngatlas.org/terminal/songkhla-fsru-th/","data_source":"Data: Global Gas Infrastructure Tracker, Global Energy Monitor, September 2025"},{"terminal_slug":"sorong-fsru-id","terminal_name":"Sorong LNG Terminal","country":"Indonesia","country_iso":"ID","unit_name":null,"status":"cancelled","facility_type":"import","floating_type":"unknown","capacity_mtpa":null,"capacity_bcm_y":null,"start_year":null,"planned_start_year":null,"original_planned_start_year":null,"fid_year":null,"construction_year":null,"shelved_year":null,"cancelled_year":2021,"stop_year":2021,"estimated_cost_usd":null,"estimated_cost_original":null,"estimated_cost_currency":null,"power_stations_supplied":null,"floating_vessel_name":null,"ccs_project":null,"hydrogen_project":null,"ammonia_project":null,"synthetic_lng_project":null,"retrofit_proposed":null,"url":"https://lngatlas.org/terminal/sorong-fsru-id/","data_source":"Data: Global Gas Infrastructure Tracker, Global Energy Monitor, September 2025"},{"terminal_slug":"south-east-lng-terminal-vn","terminal_name":"South East LNG Terminal","country":"Vietnam","country_iso":"VN","unit_name":null,"status":"cancelled","facility_type":"import","floating_type":"unknown","capacity_mtpa":6,"capacity_bcm_y":8.16,"start_year":null,"planned_start_year":null,"original_planned_start_year":2022,"fid_year":null,"construction_year":null,"shelved_year":null,"cancelled_year":2023,"stop_year":2023,"estimated_cost_usd":null,"estimated_cost_original":null,"estimated_cost_currency":null,"power_stations_supplied":null,"floating_vessel_name":null,"ccs_project":null,"hydrogen_project":null,"ammonia_project":null,"synthetic_lng_project":null,"retrofit_proposed":null,"url":"https://lngatlas.org/terminal/south-east-lng-terminal-vn/","data_source":"Data: Global Gas Infrastructure Tracker, Global Energy Monitor, September 2025"},{"terminal_slug":"south-hook-lng-terminal-gb","terminal_name":"South Hook LNG Terminal","country":"United Kingdom","country_iso":"GB","unit_name":null,"status":"operating","facility_type":"import","floating_type":"unknown","capacity_mtpa":15.6,"capacity_bcm_y":21.22,"start_year":2009,"planned_start_year":null,"original_planned_start_year":null,"fid_year":null,"construction_year":null,"shelved_year":null,"cancelled_year":null,"stop_year":null,"estimated_cost_usd":null,"estimated_cost_original":null,"estimated_cost_currency":null,"power_stations_supplied":null,"floating_vessel_name":null,"ccs_project":null,"hydrogen_project":null,"ammonia_project":null,"synthetic_lng_project":null,"retrofit_proposed":null,"url":"https://lngatlas.org/terminal/south-hook-lng-terminal-gb/","data_source":"Data: Global Gas Infrastructure Tracker, Global Energy Monitor, September 2025"},{"terminal_slug":"south-hook-lng-terminal-gb","terminal_name":"South Hook LNG Terminal","country":"United Kingdom","country_iso":"GB","unit_name":"Expansion","status":"proposed","facility_type":"import","floating_type":"unknown","capacity_mtpa":4.6,"capacity_bcm_y":6.26,"start_year":null,"planned_start_year":null,"original_planned_start_year":2025,"fid_year":null,"construction_year":null,"shelved_year":null,"cancelled_year":null,"stop_year":null,"estimated_cost_usd":null,"estimated_cost_original":null,"estimated_cost_currency":null,"power_stations_supplied":null,"floating_vessel_name":null,"ccs_project":null,"hydrogen_project":null,"ammonia_project":null,"synthetic_lng_project":null,"retrofit_proposed":null,"url":"https://lngatlas.org/terminal/south-hook-lng-terminal-gb/","data_source":"Data: Global Gas Infrastructure Tracker, Global Energy Monitor, September 2025"},{"terminal_slug":"south-pars-lng-terminal-ir","terminal_name":"South Pars LNG Terminal","country":"Iran","country_iso":"IR","unit_name":"T1-T2","status":"cancelled","facility_type":"export","floating_type":"unknown","capacity_mtpa":10,"capacity_bcm_y":13.61,"start_year":null,"planned_start_year":null,"original_planned_start_year":null,"fid_year":null,"construction_year":null,"shelved_year":2020,"cancelled_year":2022,"stop_year":2022,"estimated_cost_usd":null,"estimated_cost_original":null,"estimated_cost_currency":null,"power_stations_supplied":null,"floating_vessel_name":null,"ccs_project":null,"hydrogen_project":null,"ammonia_project":null,"synthetic_lng_project":null,"retrofit_proposed":null,"url":"https://lngatlas.org/terminal/south-pars-lng-terminal-ir/","data_source":"Data: Global Gas Infrastructure Tracker, Global Energy Monitor, September 2025"},{"terminal_slug":"south-texas-lng-terminal-us","terminal_name":"South Texas LNG Terminal","country":"United States","country_iso":"US","unit_name":"T1-T2","status":"cancelled","facility_type":"export","floating_type":"unknown","capacity_mtpa":8,"capacity_bcm_y":10.88,"start_year":null,"planned_start_year":null,"original_planned_start_year":null,"fid_year":null,"construction_year":null,"shelved_year":null,"cancelled_year":2015,"stop_year":2015,"estimated_cost_usd":null,"estimated_cost_original":null,"estimated_cost_currency":null,"power_stations_supplied":null,"floating_vessel_name":null,"ccs_project":null,"hydrogen_project":null,"ammonia_project":null,"synthetic_lng_project":null,"retrofit_proposed":null,"url":"https://lngatlas.org/terminal/south-texas-lng-terminal-us/","data_source":"Data: Global Gas Infrastructure Tracker, Global Energy Monitor, September 2025"},{"terminal_slug":"south-west-fsru-vn","terminal_name":"South West FSRU","country":"Vietnam","country_iso":"VN","unit_name":null,"status":"cancelled","facility_type":"import","floating_type":"fsru","capacity_mtpa":1,"capacity_bcm_y":1.36,"start_year":null,"planned_start_year":null,"original_planned_start_year":2030,"fid_year":null,"construction_year":null,"shelved_year":null,"cancelled_year":2023,"stop_year":2023,"estimated_cost_usd":null,"estimated_cost_original":null,"estimated_cost_currency":null,"power_stations_supplied":"Ca Mau power station","floating_vessel_name":null,"ccs_project":null,"hydrogen_project":null,"ammonia_project":null,"synthetic_lng_project":null,"retrofit_proposed":null,"url":"https://lngatlas.org/terminal/south-west-fsru-vn/","data_source":"Data: Global Gas Infrastructure Tracker, Global Energy Monitor, September 2025"},{"terminal_slug":"southern-finland-lng-terminal-fi","terminal_name":"Southern Finland LNG Terminal","country":"Finland","country_iso":"FI","unit_name":null,"status":"cancelled","facility_type":"import","floating_type":"unknown","capacity_mtpa":null,"capacity_bcm_y":null,"start_year":null,"planned_start_year":null,"original_planned_start_year":null,"fid_year":null,"construction_year":null,"shelved_year":null,"cancelled_year":2015,"stop_year":2015,"estimated_cost_usd":null,"estimated_cost_original":null,"estimated_cost_currency":null,"power_stations_supplied":null,"floating_vessel_name":null,"ccs_project":null,"hydrogen_project":null,"ammonia_project":null,"synthetic_lng_project":null,"retrofit_proposed":null,"url":"https://lngatlas.org/terminal/southern-finland-lng-terminal-fi/","data_source":"Data: Global Gas Infrastructure Tracker, Global Energy Monitor, September 2025"},{"terminal_slug":"sparrows-point-lng-terminal-us","terminal_name":"Sparrows Point LNG Terminal","country":"United States","country_iso":"US","unit_name":null,"status":"cancelled","facility_type":"import","floating_type":"unknown","capacity_mtpa":11.5,"capacity_bcm_y":15.65,"start_year":null,"planned_start_year":null,"original_planned_start_year":null,"fid_year":null,"construction_year":null,"shelved_year":null,"cancelled_year":2013,"stop_year":2013,"estimated_cost_usd":null,"estimated_cost_original":null,"estimated_cost_currency":null,"power_stations_supplied":null,"floating_vessel_name":null,"ccs_project":null,"hydrogen_project":null,"ammonia_project":null,"synthetic_lng_project":null,"retrofit_proposed":null,"url":"https://lngatlas.org/terminal/sparrows-point-lng-terminal-us/","data_source":"Data: Global Gas Infrastructure Tracker, Global Energy Monitor, September 2025"},{"terminal_slug":"stade-fsru-de","terminal_name":"Stade FSRU","country":"Germany","country_iso":"DE","unit_name":null,"status":"construction","facility_type":"import","floating_type":"fsru","capacity_mtpa":4.41,"capacity_bcm_y":6,"start_year":null,"planned_start_year":2025,"original_planned_start_year":2024,"fid_year":null,"construction_year":2023,"shelved_year":null,"cancelled_year":null,"stop_year":null,"estimated_cost_usd":null,"estimated_cost_original":null,"estimated_cost_currency":null,"power_stations_supplied":null,"floating_vessel_name":"Transgas Force","ccs_project":null,"hydrogen_project":null,"ammonia_project":null,"synthetic_lng_project":null,"retrofit_proposed":null,"url":"https://lngatlas.org/terminal/stade-fsru-de/","data_source":"Data: Global Gas Infrastructure Tracker, Global Energy Monitor, September 2025"},{"terminal_slug":"stade-lng-terminal-de","terminal_name":"Stade LNG Terminal","country":"Germany","country_iso":"DE","unit_name":null,"status":"construction","facility_type":"import","floating_type":"unknown","capacity_mtpa":9.78,"capacity_bcm_y":13.31,"start_year":null,"planned_start_year":2027,"original_planned_start_year":2026,"fid_year":2024,"construction_year":2024,"shelved_year":null,"cancelled_year":null,"stop_year":null,"estimated_cost_usd":1090000000,"estimated_cost_original":1000000000,"estimated_cost_currency":"EUR","power_stations_supplied":null,"floating_vessel_name":null,"ccs_project":null,"hydrogen_project":true,"ammonia_project":true,"synthetic_lng_project":null,"retrofit_proposed":true,"url":"https://lngatlas.org/terminal/stade-lng-terminal-de/","data_source":"Data: Global Gas Infrastructure Tracker, Global Energy Monitor, September 2025"},{"terminal_slug":"stavian-chan-may-lng-terminal-vn","terminal_name":"Stavian Chan May LNG Terminal","country":"Vietnam","country_iso":"VN","unit_name":null,"status":"proposed","facility_type":"import","floating_type":"unknown","capacity_mtpa":null,"capacity_bcm_y":null,"start_year":null,"planned_start_year":null,"original_planned_start_year":null,"fid_year":null,"construction_year":null,"shelved_year":null,"cancelled_year":null,"stop_year":null,"estimated_cost_usd":null,"estimated_cost_original":null,"estimated_cost_currency":null,"power_stations_supplied":null,"floating_vessel_name":null,"ccs_project":null,"hydrogen_project":null,"ammonia_project":null,"synthetic_lng_project":null,"retrofit_proposed":null,"url":"https://lngatlas.org/terminal/stavian-chan-may-lng-terminal-vn/","data_source":"Data: Global Gas Infrastructure Tracker, Global Energy Monitor, September 2025"},{"terminal_slug":"steelhead-fsru-ca","terminal_name":"Steelhead FSRU","country":"Canada","country_iso":"CA","unit_name":null,"status":"cancelled","facility_type":"import","floating_type":"fsru","capacity_mtpa":6,"capacity_bcm_y":8.16,"start_year":null,"planned_start_year":null,"original_planned_start_year":null,"fid_year":null,"construction_year":null,"shelved_year":null,"cancelled_year":2017,"stop_year":2017,"estimated_cost_usd":null,"estimated_cost_original":null,"estimated_cost_currency":null,"power_stations_supplied":null,"floating_vessel_name":null,"ccs_project":null,"hydrogen_project":null,"ammonia_project":null,"synthetic_lng_project":null,"retrofit_proposed":null,"url":"https://lngatlas.org/terminal/steelhead-fsru-ca/","data_source":"Data: Global Gas Infrastructure Tracker, Global Energy Monitor, September 2025"},{"terminal_slug":"stewart-energy-lng-terminal-ca","terminal_name":"Stewart Energy LNG Terminal","country":"Canada","country_iso":"CA","unit_name":"FLNG","status":"cancelled","facility_type":"export","floating_type":"floating","capacity_mtpa":5,"capacity_bcm_y":6.8,"start_year":null,"planned_start_year":2025,"original_planned_start_year":2017,"fid_year":null,"construction_year":null,"shelved_year":2016,"cancelled_year":2018,"stop_year":2018,"estimated_cost_usd":null,"estimated_cost_original":null,"estimated_cost_currency":null,"power_stations_supplied":null,"floating_vessel_name":null,"ccs_project":null,"hydrogen_project":null,"ammonia_project":null,"synthetic_lng_project":null,"retrofit_proposed":null,"url":"https://lngatlas.org/terminal/stewart-energy-lng-terminal-ca/","data_source":"Data: Global Gas Infrastructure Tracker, Global Energy Monitor, September 2025"},{"terminal_slug":"stewart-energy-lng-terminal-ca","terminal_name":"Stewart Energy LNG Terminal","country":"Canada","country_iso":"CA","unit_name":"Onshore T1-T5","status":"cancelled","facility_type":"export","floating_type":"floating","capacity_mtpa":5,"capacity_bcm_y":6.8,"start_year":null,"planned_start_year":null,"original_planned_start_year":2025,"fid_year":null,"construction_year":null,"shelved_year":2016,"cancelled_year":2018,"stop_year":2018,"estimated_cost_usd":null,"estimated_cost_original":null,"estimated_cost_currency":null,"power_stations_supplied":null,"floating_vessel_name":null,"ccs_project":null,"hydrogen_project":null,"ammonia_project":null,"synthetic_lng_project":null,"retrofit_proposed":null,"url":"https://lngatlas.org/terminal/stewart-energy-lng-terminal-ca/","data_source":"Data: Global Gas Infrastructure Tracker, Global Energy Monitor, September 2025"},{"terminal_slug":"stolt-lngaz-terminal-ca","terminal_name":"Stolt LNGaz Terminal","country":"Canada","country_iso":"CA","unit_name":"T1 & T2","status":"cancelled","facility_type":"export","floating_type":"unknown","capacity_mtpa":0.5,"capacity_bcm_y":0.68,"start_year":null,"planned_start_year":null,"original_planned_start_year":2018,"fid_year":null,"construction_year":null,"shelved_year":2016,"cancelled_year":2018,"stop_year":2018,"estimated_cost_usd":null,"estimated_cost_original":null,"estimated_cost_currency":null,"power_stations_supplied":null,"floating_vessel_name":null,"ccs_project":null,"hydrogen_project":null,"ammonia_project":null,"synthetic_lng_project":null,"retrofit_proposed":null,"url":"https://lngatlas.org/terminal/stolt-lngaz-terminal-ca/","data_source":"Data: Global Gas Infrastructure Tracker, Global Energy Monitor, September 2025"},{"terminal_slug":"strom-lng-terminal-us","terminal_name":"Strom LNG Terminal","country":"United States","country_iso":"US","unit_name":null,"status":"cancelled","facility_type":"export","floating_type":"unknown","capacity_mtpa":0.15,"capacity_bcm_y":0.2,"start_year":null,"planned_start_year":null,"original_planned_start_year":null,"fid_year":null,"construction_year":null,"shelved_year":null,"cancelled_year":2021,"stop_year":2021,"estimated_cost_usd":null,"estimated_cost_original":null,"estimated_cost_currency":null,"power_stations_supplied":null,"floating_vessel_name":null,"ccs_project":null,"hydrogen_project":null,"ammonia_project":null,"synthetic_lng_project":null,"retrofit_proposed":null,"url":"https://lngatlas.org/terminal/strom-lng-terminal-us/","data_source":"Data: Global Gas Infrastructure Tracker, Global Energy Monitor, September 2025"},{"terminal_slug":"suape-fsru-br","terminal_name":"Suape FSRU","country":"Brazil","country_iso":"BR","unit_name":null,"status":"construction","facility_type":"import","floating_type":"fsru","capacity_mtpa":3.76,"capacity_bcm_y":5.12,"start_year":null,"planned_start_year":2026,"original_planned_start_year":2025,"fid_year":null,"construction_year":2022,"shelved_year":null,"cancelled_year":null,"stop_year":null,"estimated_cost_usd":null,"estimated_cost_original":null,"estimated_cost_currency":null,"power_stations_supplied":"Termopernambuco power station","floating_vessel_name":null,"ccs_project":null,"hydrogen_project":null,"ammonia_project":null,"synthetic_lng_project":null,"retrofit_proposed":null,"url":"https://lngatlas.org/terminal/suape-fsru-br/","data_source":"Data: Global Gas Infrastructure Tracker, Global Energy Monitor, September 2025"},{"terminal_slug":"sudan-red-sea-lng-terminal-sd","terminal_name":"Sudan Red Sea LNG Terminal","country":"Sudan","country_iso":"SD","unit_name":null,"status":"shelved","facility_type":"import","floating_type":"unknown","capacity_mtpa":null,"capacity_bcm_y":null,"start_year":null,"planned_start_year":null,"original_planned_start_year":null,"fid_year":null,"construction_year":null,"shelved_year":2024,"cancelled_year":null,"stop_year":null,"estimated_cost_usd":null,"estimated_cost_original":null,"estimated_cost_currency":null,"power_stations_supplied":null,"floating_vessel_name":null,"ccs_project":null,"hydrogen_project":null,"ammonia_project":null,"synthetic_lng_project":null,"retrofit_proposed":null,"url":"https://lngatlas.org/terminal/sudan-red-sea-lng-terminal-sd/","data_source":"Data: Global Gas Infrastructure Tracker, Global Energy Monitor, September 2025"},{"terminal_slug":"suizhong-lng-terminal-cn","terminal_name":"Suizhong LNG Terminal","country":"China","country_iso":"CN","unit_name":"Phase 1","status":"cancelled","facility_type":"import","floating_type":"unknown","capacity_mtpa":2.6,"capacity_bcm_y":3.54,"start_year":null,"planned_start_year":null,"original_planned_start_year":2020,"fid_year":null,"construction_year":null,"shelved_year":null,"cancelled_year":2023,"stop_year":2023,"estimated_cost_usd":560000000,"estimated_cost_original":3500000000,"estimated_cost_currency":"RMB","power_stations_supplied":null,"floating_vessel_name":null,"ccs_project":null,"hydrogen_project":null,"ammonia_project":null,"synthetic_lng_project":null,"retrofit_proposed":null,"url":"https://lngatlas.org/terminal/suizhong-lng-terminal-cn/","data_source":"Data: Global Gas Infrastructure Tracker, Global Energy Monitor, September 2025"},{"terminal_slug":"suizhong-lng-terminal-cn","terminal_name":"Suizhong LNG Terminal","country":"China","country_iso":"CN","unit_name":"Phase 2","status":"cancelled","facility_type":"import","floating_type":"unknown","capacity_mtpa":2.5,"capacity_bcm_y":3.4,"start_year":null,"planned_start_year":null,"original_planned_start_year":null,"fid_year":null,"construction_year":null,"shelved_year":null,"cancelled_year":2023,"stop_year":2023,"estimated_cost_usd":null,"estimated_cost_original":null,"estimated_cost_currency":null,"power_stations_supplied":null,"floating_vessel_name":null,"ccs_project":null,"hydrogen_project":null,"ammonia_project":null,"synthetic_lng_project":null,"retrofit_proposed":null,"url":"https://lngatlas.org/terminal/suizhong-lng-terminal-cn/","data_source":"Data: Global Gas Infrastructure Tracker, Global Energy Monitor, September 2025"},{"terminal_slug":"suizhong-lng-terminal-cn","terminal_name":"Suizhong LNG Terminal","country":"China","country_iso":"CN","unit_name":"Phase 3","status":"cancelled","facility_type":"import","floating_type":"unknown","capacity_mtpa":null,"capacity_bcm_y":null,"start_year":null,"planned_start_year":null,"original_planned_start_year":null,"fid_year":null,"construction_year":null,"shelved_year":null,"cancelled_year":2023,"stop_year":2023,"estimated_cost_usd":null,"estimated_cost_original":null,"estimated_cost_currency":null,"power_stations_supplied":null,"floating_vessel_name":null,"ccs_project":null,"hydrogen_project":null,"ammonia_project":null,"synthetic_lng_project":null,"retrofit_proposed":null,"url":"https://lngatlas.org/terminal/suizhong-lng-terminal-cn/","data_source":"Data: Global Gas Infrastructure Tracker, Global Energy Monitor, September 2025"},{"terminal_slug":"sulawesi-maluku-lng-cluster-id","terminal_name":"Sulawesi-Maluku LNG Cluster","country":"Indonesia","country_iso":"ID","unit_name":null,"status":"proposed","facility_type":"import","floating_type":"floating","capacity_mtpa":2.3,"capacity_bcm_y":3.13,"start_year":null,"planned_start_year":null,"original_planned_start_year":2026,"fid_year":null,"construction_year":null,"shelved_year":null,"cancelled_year":null,"stop_year":null,"estimated_cost_usd":null,"estimated_cost_original":null,"estimated_cost_currency":null,"power_stations_supplied":null,"floating_vessel_name":null,"ccs_project":null,"hydrogen_project":null,"ammonia_project":null,"synthetic_lng_project":null,"retrofit_proposed":null,"url":"https://lngatlas.org/terminal/sulawesi-maluku-lng-cluster-id/","data_source":"Data: Global Gas Infrastructure Tracker, Global Energy Monitor, September 2025"},{"terminal_slug":"sumed-fsru-eg","terminal_name":"Sumed BW FSRU","country":"Egypt","country_iso":"EG","unit_name":null,"status":"retired","facility_type":"import","floating_type":"fsru","capacity_mtpa":5.7,"capacity_bcm_y":7.76,"start_year":2015,"planned_start_year":null,"original_planned_start_year":null,"fid_year":null,"construction_year":null,"shelved_year":null,"cancelled_year":null,"stop_year":2023,"estimated_cost_usd":null,"estimated_cost_original":null,"estimated_cost_currency":null,"power_stations_supplied":null,"floating_vessel_name":"FSRU BW Singapore","ccs_project":null,"hydrogen_project":null,"ammonia_project":null,"synthetic_lng_project":null,"retrofit_proposed":null,"url":"https://lngatlas.org/terminal/sumed-fsru-eg/","data_source":"Data: Global Gas Infrastructure Tracker, Global Energy Monitor, September 2025"},{"terminal_slug":"summit-fsru-bd","terminal_name":"Summit FSRU","country":"Bangladesh","country_iso":"BD","unit_name":null,"status":"operating","facility_type":"import","floating_type":"fsru","capacity_mtpa":3.8,"capacity_bcm_y":5.17,"start_year":2019,"planned_start_year":null,"original_planned_start_year":null,"fid_year":null,"construction_year":2017,"shelved_year":null,"cancelled_year":null,"stop_year":2024,"estimated_cost_usd":null,"estimated_cost_original":null,"estimated_cost_currency":null,"power_stations_supplied":null,"floating_vessel_name":"Summit LNG","ccs_project":null,"hydrogen_project":null,"ammonia_project":null,"synthetic_lng_project":null,"retrofit_proposed":null,"url":"https://lngatlas.org/terminal/summit-fsru-bd/","data_source":"Data: Global Gas Infrastructure Tracker, Global Energy Monitor, September 2025"},{"terminal_slug":"summit-matarbari-fsru-bd","terminal_name":"Summit Matarbari FSRU","country":"Bangladesh","country_iso":"BD","unit_name":null,"status":"cancelled","facility_type":"import","floating_type":"fsru","capacity_mtpa":4.6,"capacity_bcm_y":6.26,"start_year":null,"planned_start_year":null,"original_planned_start_year":2026,"fid_year":null,"construction_year":null,"shelved_year":null,"cancelled_year":2024,"stop_year":2024,"estimated_cost_usd":500000000,"estimated_cost_original":500000000,"estimated_cost_currency":"USD","power_stations_supplied":null,"floating_vessel_name":null,"ccs_project":null,"hydrogen_project":null,"ammonia_project":null,"synthetic_lng_project":null,"retrofit_proposed":null,"url":"https://lngatlas.org/terminal/summit-matarbari-fsru-bd/","data_source":"Data: Global Gas Infrastructure Tracker, Global Energy Monitor, September 2025"},{"terminal_slug":"sunrise-lng-terminal-tl","terminal_name":"Sunrise FLNG Terminal","country":"Timor-Leste","country_iso":"TL","unit_name":null,"status":"proposed","facility_type":"export","floating_type":"flng","capacity_mtpa":null,"capacity_bcm_y":null,"start_year":null,"planned_start_year":null,"original_planned_start_year":null,"fid_year":2021,"construction_year":null,"shelved_year":null,"cancelled_year":null,"stop_year":null,"estimated_cost_usd":null,"estimated_cost_original":null,"estimated_cost_currency":null,"power_stations_supplied":null,"floating_vessel_name":null,"ccs_project":null,"hydrogen_project":null,"ammonia_project":null,"synthetic_lng_project":null,"retrofit_proposed":null,"url":"https://lngatlas.org/terminal/sunrise-lng-terminal-tl/","data_source":"Data: Global Gas Infrastructure Tracker, Global Energy Monitor, September 2025"},{"terminal_slug":"surat-thani-fsru-th","terminal_name":"Surat Thani FSRU","country":"Thailand","country_iso":"TH","unit_name":null,"status":"shelved","facility_type":"import","floating_type":"fsru","capacity_mtpa":5,"capacity_bcm_y":6.8,"start_year":null,"planned_start_year":null,"original_planned_start_year":2027,"fid_year":null,"construction_year":null,"shelved_year":2025,"cancelled_year":null,"stop_year":null,"estimated_cost_usd":null,"estimated_cost_original":null,"estimated_cost_currency":null,"power_stations_supplied":null,"floating_vessel_name":null,"ccs_project":null,"hydrogen_project":null,"ammonia_project":null,"synthetic_lng_project":null,"retrofit_proposed":null,"url":"https://lngatlas.org/terminal/surat-thani-fsru-th/","data_source":"Data: Global Gas Infrastructure Tracker, Global Energy Monitor, September 2025"},{"terminal_slug":"sycar-venezuela-flng-terminal-ve","terminal_name":"Sycar Venezuela FLNG Terminal","country":"Venezuela","country_iso":"VE","unit_name":null,"status":"shelved","facility_type":"export","floating_type":"flng","capacity_mtpa":null,"capacity_bcm_y":null,"start_year":null,"planned_start_year":null,"original_planned_start_year":2024,"fid_year":null,"construction_year":null,"shelved_year":null,"cancelled_year":null,"stop_year":null,"estimated_cost_usd":null,"estimated_cost_original":null,"estimated_cost_currency":null,"power_stations_supplied":null,"floating_vessel_name":null,"ccs_project":null,"hydrogen_project":null,"ammonia_project":null,"synthetic_lng_project":null,"retrofit_proposed":null,"url":"https://lngatlas.org/terminal/sycar-venezuela-flng-terminal-ve/","data_source":"Data: Global Gas Infrastructure Tracker, Global Energy Monitor, September 2025"},{"terminal_slug":"sao-marcos-bay-fsru-br","terminal_name":"São Marcos Bay FSRU","country":"Brazil","country_iso":"BR","unit_name":null,"status":"shelved","facility_type":"import","floating_type":"fsru","capacity_mtpa":5.64,"capacity_bcm_y":7.67,"start_year":null,"planned_start_year":null,"original_planned_start_year":null,"fid_year":null,"construction_year":null,"shelved_year":2025,"cancelled_year":null,"stop_year":null,"estimated_cost_usd":null,"estimated_cost_original":null,"estimated_cost_currency":null,"power_stations_supplied":"São Marcos I and II power stations","floating_vessel_name":null,"ccs_project":null,"hydrogen_project":null,"ammonia_project":null,"synthetic_lng_project":null,"retrofit_proposed":null,"url":"https://lngatlas.org/terminal/sao-marcos-bay-fsru-br/","data_source":"Data: Global Gas Infrastructure Tracker, Global Energy Monitor, September 2025"},{"terminal_slug":"tgnl-sao-luis-fsru-br","terminal_name":"TGNL São Luis FSRU","country":"Brazil","country_iso":"BR","unit_name":null,"status":"proposed","facility_type":"import","floating_type":"fsru","capacity_mtpa":6.39,"capacity_bcm_y":8.69,"start_year":null,"planned_start_year":null,"original_planned_start_year":null,"fid_year":null,"construction_year":null,"shelved_year":null,"cancelled_year":null,"stop_year":null,"estimated_cost_usd":null,"estimated_cost_original":null,"estimated_cost_currency":null,"power_stations_supplied":null,"floating_vessel_name":null,"ccs_project":null,"hydrogen_project":null,"ammonia_project":null,"synthetic_lng_project":null,"retrofit_proposed":null,"url":"https://lngatlas.org/terminal/tgnl-sao-luis-fsru-br/","data_source":"Data: Global Gas Infrastructure Tracker, Global Energy Monitor, September 2025"},{"terminal_slug":"tgs-puerto-galvan-lng-terminal-ar","terminal_name":"TGS Puerto Galván LNG Terminal","country":"Argentina","country_iso":"AR","unit_name":"Stage 1","status":"proposed","facility_type":"export","floating_type":"unknown","capacity_mtpa":2.5,"capacity_bcm_y":3.4,"start_year":null,"planned_start_year":null,"original_planned_start_year":null,"fid_year":null,"construction_year":null,"shelved_year":null,"cancelled_year":null,"stop_year":null,"estimated_cost_usd":null,"estimated_cost_original":null,"estimated_cost_currency":null,"power_stations_supplied":null,"floating_vessel_name":null,"ccs_project":null,"hydrogen_project":null,"ammonia_project":null,"synthetic_lng_project":null,"retrofit_proposed":null,"url":"https://lngatlas.org/terminal/tgs-puerto-galvan-lng-terminal-ar/","data_source":"Data: Global Gas Infrastructure Tracker, Global Energy Monitor, September 2025"},{"terminal_slug":"tgs-puerto-galvan-lng-terminal-ar","terminal_name":"TGS Puerto Galván LNG Terminal","country":"Argentina","country_iso":"AR","unit_name":"Stage 2","status":"proposed","facility_type":"export","floating_type":"unknown","capacity_mtpa":2.9,"capacity_bcm_y":3.95,"start_year":null,"planned_start_year":null,"original_planned_start_year":null,"fid_year":null,"construction_year":null,"shelved_year":null,"cancelled_year":null,"stop_year":null,"estimated_cost_usd":null,"estimated_cost_original":null,"estimated_cost_currency":null,"power_stations_supplied":null,"floating_vessel_name":null,"ccs_project":null,"hydrogen_project":null,"ammonia_project":null,"synthetic_lng_project":null,"retrofit_proposed":null,"url":"https://lngatlas.org/terminal/tgs-puerto-galvan-lng-terminal-ar/","data_source":"Data: Global Gas Infrastructure Tracker, Global Energy Monitor, September 2025"},{"terminal_slug":"tabangao-fsru-ph","terminal_name":"Tabangao FSRU","country":"Philippines","country_iso":"PH","unit_name":null,"status":"shelved","facility_type":"import","floating_type":"fsru","capacity_mtpa":3,"capacity_bcm_y":4.08,"start_year":null,"planned_start_year":null,"original_planned_start_year":2025,"fid_year":null,"construction_year":2024,"shelved_year":2021,"cancelled_year":null,"stop_year":null,"estimated_cost_usd":63000000,"estimated_cost_original":3500000000,"estimated_cost_currency":"PHP","power_stations_supplied":null,"floating_vessel_name":null,"ccs_project":null,"hydrogen_project":null,"ammonia_project":null,"synthetic_lng_project":null,"retrofit_proposed":null,"url":"https://lngatlas.org/terminal/tabangao-fsru-ph/","data_source":"Data: Global Gas Infrastructure Tracker, Global Energy Monitor, September 2025"},{"terminal_slug":"tabeer-lng-terminal-pk","terminal_name":"Tabeer LNG Terminal","country":"Pakistan","country_iso":"PK","unit_name":"Phase 1","status":"proposed","facility_type":"import","floating_type":"floating","capacity_mtpa":null,"capacity_bcm_y":null,"start_year":null,"planned_start_year":null,"original_planned_start_year":2023,"fid_year":null,"construction_year":null,"shelved_year":null,"cancelled_year":null,"stop_year":null,"estimated_cost_usd":null,"estimated_cost_original":null,"estimated_cost_currency":null,"power_stations_supplied":null,"floating_vessel_name":null,"ccs_project":null,"hydrogen_project":null,"ammonia_project":null,"synthetic_lng_project":null,"retrofit_proposed":null,"url":"https://lngatlas.org/terminal/tabeer-lng-terminal-pk/","data_source":"Data: Global Gas Infrastructure Tracker, Global Energy Monitor, September 2025"},{"terminal_slug":"tabeer-lng-terminal-pk","terminal_name":"Tabeer LNG Terminal","country":"Pakistan","country_iso":"PK","unit_name":"Phase 2","status":"proposed","facility_type":"import","floating_type":"floating","capacity_mtpa":null,"capacity_bcm_y":null,"start_year":null,"planned_start_year":null,"original_planned_start_year":null,"fid_year":null,"construction_year":null,"shelved_year":null,"cancelled_year":null,"stop_year":null,"estimated_cost_usd":null,"estimated_cost_original":null,"estimated_cost_currency":null,"power_stations_supplied":null,"floating_vessel_name":null,"ccs_project":null,"hydrogen_project":null,"ammonia_project":null,"synthetic_lng_project":null,"retrofit_proposed":null,"url":"https://lngatlas.org/terminal/tabeer-lng-terminal-pk/","data_source":"Data: Global Gas Infrastructure Tracker, Global Energy Monitor, September 2025"},{"terminal_slug":"taichung-taipower-lng-terminal-tw","terminal_name":"Taichung (TaiPower) LNG Terminal","country":"Taiwan","country_iso":"TW","unit_name":null,"status":"proposed","facility_type":"import","floating_type":"unknown","capacity_mtpa":3,"capacity_bcm_y":4.08,"start_year":null,"planned_start_year":null,"original_planned_start_year":2025,"fid_year":null,"construction_year":null,"shelved_year":null,"cancelled_year":null,"stop_year":null,"estimated_cost_usd":null,"estimated_cost_original":null,"estimated_cost_currency":null,"power_stations_supplied":null,"floating_vessel_name":null,"ccs_project":null,"hydrogen_project":null,"ammonia_project":null,"synthetic_lng_project":null,"retrofit_proposed":null,"url":"https://lngatlas.org/terminal/taichung-taipower-lng-terminal-tw/","data_source":"Data: Global Gas Infrastructure Tracker, Global Energy Monitor, September 2025"},{"terminal_slug":"taichung-lng-terminal-tw","terminal_name":"Taichung LNG Terminal","country":"Taiwan","country_iso":"TW","unit_name":"Phase 1","status":"operating","facility_type":"import","floating_type":"unknown","capacity_mtpa":1.5,"capacity_bcm_y":2.04,"start_year":2009,"planned_start_year":null,"original_planned_start_year":null,"fid_year":null,"construction_year":2004,"shelved_year":null,"cancelled_year":null,"stop_year":null,"estimated_cost_usd":1070524000,"estimated_cost_original":31486000000,"estimated_cost_currency":"NTD","power_stations_supplied":null,"floating_vessel_name":null,"ccs_project":null,"hydrogen_project":null,"ammonia_project":null,"synthetic_lng_project":null,"retrofit_proposed":null,"url":"https://lngatlas.org/terminal/taichung-lng-terminal-tw/","data_source":"Data: Global Gas Infrastructure Tracker, Global Energy Monitor, September 2025"},{"terminal_slug":"taichung-lng-terminal-tw","terminal_name":"Taichung LNG Terminal","country":"Taiwan","country_iso":"TW","unit_name":"Phase 2","status":"operating","facility_type":"import","floating_type":"unknown","capacity_mtpa":4.5,"capacity_bcm_y":6.12,"start_year":2018,"planned_start_year":null,"original_planned_start_year":null,"fid_year":null,"construction_year":2012,"shelved_year":null,"cancelled_year":null,"stop_year":null,"estimated_cost_usd":628320000,"estimated_cost_original":18480000000,"estimated_cost_currency":"NTD","power_stations_supplied":null,"floating_vessel_name":null,"ccs_project":null,"hydrogen_project":null,"ammonia_project":null,"synthetic_lng_project":null,"retrofit_proposed":null,"url":"https://lngatlas.org/terminal/taichung-lng-terminal-tw/","data_source":"Data: Global Gas Infrastructure Tracker, Global Energy Monitor, September 2025"},{"terminal_slug":"taichung-lng-terminal-tw","terminal_name":"Taichung LNG Terminal","country":"Taiwan","country_iso":"TW","unit_name":"Phase 2 expansion","status":"operating","facility_type":"import","floating_type":"unknown","capacity_mtpa":2,"capacity_bcm_y":2.72,"start_year":2025,"planned_start_year":null,"original_planned_start_year":null,"fid_year":null,"construction_year":null,"shelved_year":null,"cancelled_year":null,"stop_year":null,"estimated_cost_usd":null,"estimated_cost_original":null,"estimated_cost_currency":null,"power_stations_supplied":null,"floating_vessel_name":null,"ccs_project":null,"hydrogen_project":null,"ammonia_project":null,"synthetic_lng_project":null,"retrofit_proposed":null,"url":"https://lngatlas.org/terminal/taichung-lng-terminal-tw/","data_source":"Data: Global Gas Infrastructure Tracker, Global Energy Monitor, September 2025"},{"terminal_slug":"taichung-lng-terminal-tw","terminal_name":"Taichung LNG Terminal","country":"Taiwan","country_iso":"TW","unit_name":"Phase 3","status":"construction","facility_type":"import","floating_type":"unknown","capacity_mtpa":2,"capacity_bcm_y":2.72,"start_year":null,"planned_start_year":null,"original_planned_start_year":2026,"fid_year":null,"construction_year":2022,"shelved_year":null,"cancelled_year":null,"stop_year":null,"estimated_cost_usd":null,"estimated_cost_original":null,"estimated_cost_currency":null,"power_stations_supplied":null,"floating_vessel_name":null,"ccs_project":null,"hydrogen_project":null,"ammonia_project":null,"synthetic_lng_project":null,"retrofit_proposed":null,"url":"https://lngatlas.org/terminal/taichung-lng-terminal-tw/","data_source":"Data: Global Gas Infrastructure Tracker, Global Energy Monitor, September 2025"},{"terminal_slug":"taichung-lng-terminal-tw","terminal_name":"Taichung LNG Terminal","country":"Taiwan","country_iso":"TW","unit_name":"Phase 4","status":"proposed","facility_type":"import","floating_type":"unknown","capacity_mtpa":3,"capacity_bcm_y":4.08,"start_year":null,"planned_start_year":null,"original_planned_start_year":2028,"fid_year":null,"construction_year":2021,"shelved_year":null,"cancelled_year":null,"stop_year":null,"estimated_cost_usd":null,"estimated_cost_original":null,"estimated_cost_currency":null,"power_stations_supplied":null,"floating_vessel_name":null,"ccs_project":null,"hydrogen_project":null,"ammonia_project":null,"synthetic_lng_project":null,"retrofit_proposed":null,"url":"https://lngatlas.org/terminal/taichung-lng-terminal-tw/","data_source":"Data: Global Gas Infrastructure Tracker, Global Energy Monitor, September 2025"},{"terminal_slug":"taimyr-lng-terminal-ru","terminal_name":"Taimyr LNG Terminal","country":"Russia","country_iso":"RU","unit_name":null,"status":"proposed","facility_type":"export","floating_type":"unknown","capacity_mtpa":50,"capacity_bcm_y":68.03,"start_year":null,"planned_start_year":null,"original_planned_start_year":2030,"fid_year":null,"construction_year":null,"shelved_year":null,"cancelled_year":null,"stop_year":null,"estimated_cost_usd":null,"estimated_cost_original":null,"estimated_cost_currency":null,"power_stations_supplied":null,"floating_vessel_name":null,"ccs_project":null,"hydrogen_project":null,"ammonia_project":null,"synthetic_lng_project":null,"retrofit_proposed":null,"url":"https://lngatlas.org/terminal/taimyr-lng-terminal-ru/","data_source":"Data: Global Gas Infrastructure Tracker, Global Energy Monitor, September 2025"},{"terminal_slug":"taizhou-toumen-port-lng-terminal-cn","terminal_name":"Taizhou LNG Terminal","country":"China","country_iso":"CN","unit_name":"CGL-Poly Toumengang LNG Terminal","status":"cancelled","facility_type":"import","floating_type":"unknown","capacity_mtpa":3,"capacity_bcm_y":4.08,"start_year":null,"planned_start_year":null,"original_planned_start_year":null,"fid_year":null,"construction_year":null,"shelved_year":2018,"cancelled_year":2020,"stop_year":2020,"estimated_cost_usd":null,"estimated_cost_original":null,"estimated_cost_currency":null,"power_stations_supplied":null,"floating_vessel_name":null,"ccs_project":null,"hydrogen_project":null,"ammonia_project":null,"synthetic_lng_project":null,"retrofit_proposed":null,"url":"https://lngatlas.org/terminal/taizhou-toumen-port-lng-terminal-cn/","data_source":"Data: Global Gas Infrastructure Tracker, Global Energy Monitor, September 2025"},{"terminal_slug":"taizhou-toumen-port-lng-terminal-cn","terminal_name":"Taizhou LNG Terminal","country":"China","country_iso":"CN","unit_name":"Zhongtie Gallon Toumengang LNG Terminal","status":"cancelled","facility_type":"import","floating_type":"unknown","capacity_mtpa":3,"capacity_bcm_y":4.08,"start_year":null,"planned_start_year":null,"original_planned_start_year":null,"fid_year":null,"construction_year":null,"shelved_year":null,"cancelled_year":2023,"stop_year":2023,"estimated_cost_usd":2800000000,"estimated_cost_original":17500000000,"estimated_cost_currency":"RMB","power_stations_supplied":null,"floating_vessel_name":null,"ccs_project":null,"hydrogen_project":null,"ammonia_project":null,"synthetic_lng_project":null,"retrofit_proposed":null,"url":"https://lngatlas.org/terminal/taizhou-toumen-port-lng-terminal-cn/","data_source":"Data: Global Gas Infrastructure Tracker, Global Energy Monitor, September 2025"},{"terminal_slug":"talcahuano-fsru-cl","terminal_name":"Talcahuano FSRU","country":"Chile","country_iso":"CL","unit_name":null,"status":"shelved","facility_type":"import","floating_type":"fsru","capacity_mtpa":2.3,"capacity_bcm_y":3.13,"start_year":null,"planned_start_year":null,"original_planned_start_year":null,"fid_year":null,"construction_year":null,"shelved_year":null,"cancelled_year":null,"stop_year":null,"estimated_cost_usd":null,"estimated_cost_original":null,"estimated_cost_currency":null,"power_stations_supplied":null,"floating_vessel_name":null,"ccs_project":null,"hydrogen_project":null,"ammonia_project":null,"synthetic_lng_project":null,"retrofit_proposed":null,"url":"https://lngatlas.org/terminal/talcahuano-fsru-cl/","data_source":"Data: Global Gas Infrastructure Tracker, Global Energy Monitor, September 2025"},{"terminal_slug":"tallinn-lng-terminal-ee","terminal_name":"Tallinn LNG Terminal","country":"Estonia","country_iso":"EE","unit_name":null,"status":"proposed","facility_type":"import","floating_type":"unknown","capacity_mtpa":2.94,"capacity_bcm_y":4,"start_year":null,"planned_start_year":null,"original_planned_start_year":2030,"fid_year":null,"construction_year":null,"shelved_year":2019,"cancelled_year":2021,"stop_year":2021,"estimated_cost_usd":272500000,"estimated_cost_original":250000000,"estimated_cost_currency":"EUR","power_stations_supplied":null,"floating_vessel_name":null,"ccs_project":null,"hydrogen_project":null,"ammonia_project":null,"synthetic_lng_project":null,"retrofit_proposed":null,"url":"https://lngatlas.org/terminal/tallinn-lng-terminal-ee/","data_source":"Data: Global Gas Infrastructure Tracker, Global Energy Monitor, September 2025"},{"terminal_slug":"tamar-flng-terminal-il","terminal_name":"Tamar FLNG Terminal","country":"Israel","country_iso":"IL","unit_name":null,"status":"cancelled","facility_type":"export","floating_type":"flng","capacity_mtpa":3,"capacity_bcm_y":4.08,"start_year":null,"planned_start_year":null,"original_planned_start_year":null,"fid_year":null,"construction_year":null,"shelved_year":null,"cancelled_year":2016,"stop_year":2016,"estimated_cost_usd":3270000000,"estimated_cost_original":3000000000,"estimated_cost_currency":"EUR","power_stations_supplied":null,"floating_vessel_name":null,"ccs_project":null,"hydrogen_project":null,"ammonia_project":null,"synthetic_lng_project":null,"retrofit_proposed":null,"url":"https://lngatlas.org/terminal/tamar-flng-terminal-il/","data_source":"Data: Global Gas Infrastructure Tracker, Global Energy Monitor, September 2025"},{"terminal_slug":"tambey-lng-terminal-ru","terminal_name":"Tambey LNG Terminal","country":"Russia","country_iso":"RU","unit_name":null,"status":"proposed","facility_type":"export","floating_type":"unknown","capacity_mtpa":20,"capacity_bcm_y":27.21,"start_year":null,"planned_start_year":null,"original_planned_start_year":2030,"fid_year":null,"construction_year":null,"shelved_year":null,"cancelled_year":null,"stop_year":null,"estimated_cost_usd":null,"estimated_cost_original":null,"estimated_cost_currency":null,"power_stations_supplied":null,"floating_vessel_name":null,"ccs_project":null,"hydrogen_project":null,"ammonia_project":null,"synthetic_lng_project":null,"retrofit_proposed":null,"url":"https://lngatlas.org/terminal/tambey-lng-terminal-ru/","data_source":"Data: Global Gas Infrastructure Tracker, Global Energy Monitor, September 2025"},{"terminal_slug":"tangguh-lng-terminal-id","terminal_name":"Tangguh LNG Terminal","country":"Indonesia","country_iso":"ID","unit_name":"T1","status":"operating","facility_type":"export","floating_type":"unknown","capacity_mtpa":3.8,"capacity_bcm_y":5.17,"start_year":2009,"planned_start_year":null,"original_planned_start_year":null,"fid_year":null,"construction_year":null,"shelved_year":null,"cancelled_year":null,"stop_year":null,"estimated_cost_usd":2500000000,"estimated_cost_original":2500000000,"estimated_cost_currency":"USD","power_stations_supplied":null,"floating_vessel_name":null,"ccs_project":true,"hydrogen_project":null,"ammonia_project":null,"synthetic_lng_project":null,"retrofit_proposed":null,"url":"https://lngatlas.org/terminal/tangguh-lng-terminal-id/","data_source":"Data: Global Gas Infrastructure Tracker, Global Energy Monitor, September 2025"},{"terminal_slug":"tangguh-lng-terminal-id","terminal_name":"Tangguh LNG Terminal","country":"Indonesia","country_iso":"ID","unit_name":"T2","status":"operating","facility_type":"export","floating_type":"unknown","capacity_mtpa":3.8,"capacity_bcm_y":5.17,"start_year":2009,"planned_start_year":null,"original_planned_start_year":null,"fid_year":null,"construction_year":null,"shelved_year":null,"cancelled_year":null,"stop_year":null,"estimated_cost_usd":2500000000,"estimated_cost_original":2500000000,"estimated_cost_currency":"USD","power_stations_supplied":null,"floating_vessel_name":null,"ccs_project":true,"hydrogen_project":null,"ammonia_project":null,"synthetic_lng_project":null,"retrofit_proposed":null,"url":"https://lngatlas.org/terminal/tangguh-lng-terminal-id/","data_source":"Data: Global Gas Infrastructure Tracker, Global Energy Monitor, September 2025"},{"terminal_slug":"tangguh-lng-terminal-id","terminal_name":"Tangguh LNG Terminal","country":"Indonesia","country_iso":"ID","unit_name":"T3","status":"operating","facility_type":"export","floating_type":"unknown","capacity_mtpa":3.8,"capacity_bcm_y":5.17,"start_year":2023,"planned_start_year":null,"original_planned_start_year":2020,"fid_year":2016,"construction_year":null,"shelved_year":null,"cancelled_year":null,"stop_year":null,"estimated_cost_usd":1200000000,"estimated_cost_original":1200000000,"estimated_cost_currency":"USD","power_stations_supplied":null,"floating_vessel_name":null,"ccs_project":true,"hydrogen_project":null,"ammonia_project":null,"synthetic_lng_project":null,"retrofit_proposed":null,"url":"https://lngatlas.org/terminal/tangguh-lng-terminal-id/","data_source":"Data: Global Gas Infrastructure Tracker, Global Energy Monitor, September 2025"},{"terminal_slug":"tanglawan-lng-terminal-ph","terminal_name":"Tanglawan LNG Terminal","country":"Philippines","country_iso":"PH","unit_name":null,"status":"cancelled","facility_type":"import","floating_type":"unknown","capacity_mtpa":2.2,"capacity_bcm_y":2.99,"start_year":null,"planned_start_year":null,"original_planned_start_year":2023,"fid_year":null,"construction_year":null,"shelved_year":2019,"cancelled_year":2021,"stop_year":2021,"estimated_cost_usd":null,"estimated_cost_original":null,"estimated_cost_currency":null,"power_stations_supplied":null,"floating_vessel_name":null,"ccs_project":null,"hydrogen_project":null,"ammonia_project":null,"synthetic_lng_project":null,"retrofit_proposed":null,"url":"https://lngatlas.org/terminal/tanglawan-lng-terminal-ph/","data_source":"Data: Global Gas Infrastructure Tracker, Global Energy Monitor, September 2025"},{"terminal_slug":"tangshan-lng-terminal-petrochina-cn","terminal_name":"Tangshan LNG Terminal (PetroChina)","country":"China","country_iso":"CN","unit_name":"Phase 1","status":"operating","facility_type":"import","floating_type":"unknown","capacity_mtpa":3.5,"capacity_bcm_y":4.76,"start_year":2013,"planned_start_year":null,"original_planned_start_year":null,"fid_year":null,"construction_year":2011,"shelved_year":null,"cancelled_year":null,"stop_year":null,"estimated_cost_usd":null,"estimated_cost_original":null,"estimated_cost_currency":null,"power_stations_supplied":null,"floating_vessel_name":null,"ccs_project":null,"hydrogen_project":null,"ammonia_project":null,"synthetic_lng_project":null,"retrofit_proposed":null,"url":"https://lngatlas.org/terminal/tangshan-lng-terminal-petrochina-cn/","data_source":"Data: Global Gas Infrastructure Tracker, Global Energy Monitor, September 2025"},{"terminal_slug":"tangshan-lng-terminal-petrochina-cn","terminal_name":"Tangshan LNG Terminal (PetroChina)","country":"China","country_iso":"CN","unit_name":"Phase 2","status":"operating","facility_type":"unknown","floating_type":"unknown","capacity_mtpa":3,"capacity_bcm_y":4.08,"start_year":2014,"planned_start_year":null,"original_planned_start_year":null,"fid_year":null,"construction_year":null,"shelved_year":null,"cancelled_year":null,"stop_year":null,"estimated_cost_usd":null,"estimated_cost_original":null,"estimated_cost_currency":null,"power_stations_supplied":null,"floating_vessel_name":null,"ccs_project":null,"hydrogen_project":null,"ammonia_project":null,"synthetic_lng_project":null,"retrofit_proposed":null,"url":"https://lngatlas.org/terminal/tangshan-lng-terminal-petrochina-cn/","data_source":"Data: Global Gas Infrastructure Tracker, Global Energy Monitor, September 2025"},{"terminal_slug":"tangshan-lng-terminal-petrochina-cn","terminal_name":"Tangshan LNG Terminal (PetroChina)","country":"China","country_iso":"CN","unit_name":"Phase 3  (Expansion）","status":"operating","facility_type":"import","floating_type":"unknown","capacity_mtpa":3.5,"capacity_bcm_y":4.76,"start_year":2021,"planned_start_year":null,"original_planned_start_year":null,"fid_year":null,"construction_year":2018,"shelved_year":null,"cancelled_year":null,"stop_year":null,"estimated_cost_usd":363200000,"estimated_cost_original":2270000000,"estimated_cost_currency":"RMB","power_stations_supplied":null,"floating_vessel_name":null,"ccs_project":null,"hydrogen_project":null,"ammonia_project":null,"synthetic_lng_project":null,"retrofit_proposed":null,"url":"https://lngatlas.org/terminal/tangshan-lng-terminal-petrochina-cn/","data_source":"Data: Global Gas Infrastructure Tracker, Global Energy Monitor, September 2025"},{"terminal_slug":"tangshan-lng-terminal-xintian-cn","terminal_name":"Tangshan LNG Terminal (Xintian)","country":"China","country_iso":"CN","unit_name":"Phase 1","status":"operating","facility_type":"import","floating_type":"unknown","capacity_mtpa":5,"capacity_bcm_y":6.8,"start_year":2023,"planned_start_year":null,"original_planned_start_year":null,"fid_year":null,"construction_year":2020,"shelved_year":null,"cancelled_year":null,"stop_year":null,"estimated_cost_usd":null,"estimated_cost_original":null,"estimated_cost_currency":null,"power_stations_supplied":null,"floating_vessel_name":null,"ccs_project":null,"hydrogen_project":null,"ammonia_project":null,"synthetic_lng_project":null,"retrofit_proposed":null,"url":"https://lngatlas.org/terminal/tangshan-lng-terminal-xintian-cn/","data_source":"Data: Global Gas Infrastructure Tracker, Global Energy Monitor, September 2025"},{"terminal_slug":"tangshan-lng-terminal-xintian-cn","terminal_name":"Tangshan LNG Terminal (Xintian)","country":"China","country_iso":"CN","unit_name":"Phase 2","status":"construction","facility_type":"import","floating_type":"unknown","capacity_mtpa":5,"capacity_bcm_y":6.8,"start_year":null,"planned_start_year":null,"original_planned_start_year":2025,"fid_year":null,"construction_year":2021,"shelved_year":null,"cancelled_year":null,"stop_year":null,"estimated_cost_usd":null,"estimated_cost_original":null,"estimated_cost_currency":null,"power_stations_supplied":null,"floating_vessel_name":null,"ccs_project":null,"hydrogen_project":null,"ammonia_project":null,"synthetic_lng_project":null,"retrofit_proposed":null,"url":"https://lngatlas.org/terminal/tangshan-lng-terminal-xintian-cn/","data_source":"Data: Global Gas Infrastructure Tracker, Global Energy Monitor, September 2025"},{"terminal_slug":"tangshan-lng-terminal-xintian-cn","terminal_name":"Tangshan LNG Terminal (Xintian)","country":"China","country_iso":"CN","unit_name":"Phase 3","status":"proposed","facility_type":"import","floating_type":"unknown","capacity_mtpa":2,"capacity_bcm_y":2.72,"start_year":null,"planned_start_year":null,"original_planned_start_year":2030,"fid_year":null,"construction_year":null,"shelved_year":null,"cancelled_year":null,"stop_year":null,"estimated_cost_usd":null,"estimated_cost_original":null,"estimated_cost_currency":null,"power_stations_supplied":null,"floating_vessel_name":null,"ccs_project":null,"hydrogen_project":null,"ammonia_project":null,"synthetic_lng_project":null,"retrofit_proposed":null,"url":"https://lngatlas.org/terminal/tangshan-lng-terminal-xintian-cn/","data_source":"Data: Global Gas Infrastructure Tracker, Global Energy Monitor, September 2025"},{"terminal_slug":"tanjung-benoa-fsru-id","terminal_name":"Tanjung Benoa FSRU","country":"Indonesia","country_iso":"ID","unit_name":null,"status":"operating","facility_type":"import","floating_type":"fsru","capacity_mtpa":0.35,"capacity_bcm_y":0.48,"start_year":2016,"planned_start_year":null,"original_planned_start_year":null,"fid_year":null,"construction_year":null,"shelved_year":null,"cancelled_year":null,"stop_year":null,"estimated_cost_usd":null,"estimated_cost_original":null,"estimated_cost_currency":null,"power_stations_supplied":null,"floating_vessel_name":null,"ccs_project":null,"hydrogen_project":null,"ammonia_project":null,"synthetic_lng_project":null,"retrofit_proposed":null,"url":"https://lngatlas.org/terminal/tanjung-benoa-fsru-id/","data_source":"Data: Global Gas Infrastructure Tracker, Global Energy Monitor, September 2025"},{"terminal_slug":"tanzania-lng-terminal-tz","terminal_name":"Tanzania LNG Terminal","country":"Tanzania","country_iso":"TZ","unit_name":"T1","status":"proposed","facility_type":"export","floating_type":"unknown","capacity_mtpa":5,"capacity_bcm_y":6.8,"start_year":null,"planned_start_year":2032,"original_planned_start_year":2029,"fid_year":2028,"construction_year":null,"shelved_year":null,"cancelled_year":null,"stop_year":null,"estimated_cost_usd":21000000000,"estimated_cost_original":21000000000,"estimated_cost_currency":"USD","power_stations_supplied":null,"floating_vessel_name":null,"ccs_project":null,"hydrogen_project":null,"ammonia_project":null,"synthetic_lng_project":null,"retrofit_proposed":null,"url":"https://lngatlas.org/terminal/tanzania-lng-terminal-tz/","data_source":"Data: Global Gas Infrastructure Tracker, Global Energy Monitor, September 2025"},{"terminal_slug":"tanzania-lng-terminal-tz","terminal_name":"Tanzania LNG Terminal","country":"Tanzania","country_iso":"TZ","unit_name":"T2","status":"proposed","facility_type":"export","floating_type":"unknown","capacity_mtpa":5,"capacity_bcm_y":6.8,"start_year":null,"planned_start_year":2032,"original_planned_start_year":2029,"fid_year":2028,"construction_year":null,"shelved_year":null,"cancelled_year":null,"stop_year":null,"estimated_cost_usd":21000000000,"estimated_cost_original":21000000000,"estimated_cost_currency":"USD","power_stations_supplied":null,"floating_vessel_name":null,"ccs_project":null,"hydrogen_project":null,"ammonia_project":null,"synthetic_lng_project":null,"retrofit_proposed":null,"url":"https://lngatlas.org/terminal/tanzania-lng-terminal-tz/","data_source":"Data: Global Gas Infrastructure Tracker, Global Energy Monitor, September 2025"},{"terminal_slug":"taoyuan-lng-terminal-tw","terminal_name":"Taoyuan LNG Terminal","country":"Taiwan","country_iso":"TW","unit_name":"Phase 1","status":"operating","facility_type":"import","floating_type":"unknown","capacity_mtpa":3,"capacity_bcm_y":4.08,"start_year":2025,"planned_start_year":null,"original_planned_start_year":2023,"fid_year":null,"construction_year":2018,"shelved_year":null,"cancelled_year":null,"stop_year":null,"estimated_cost_usd":2040000000,"estimated_cost_original":60000000000,"estimated_cost_currency":"NTD","power_stations_supplied":null,"floating_vessel_name":null,"ccs_project":null,"hydrogen_project":null,"ammonia_project":null,"synthetic_lng_project":null,"retrofit_proposed":null,"url":"https://lngatlas.org/terminal/taoyuan-lng-terminal-tw/","data_source":"Data: Global Gas Infrastructure Tracker, Global Energy Monitor, September 2025"},{"terminal_slug":"taoyuan-lng-terminal-tw","terminal_name":"Taoyuan LNG Terminal","country":"Taiwan","country_iso":"TW","unit_name":"Phase 2","status":"proposed","facility_type":"import","floating_type":"unknown","capacity_mtpa":3,"capacity_bcm_y":4.08,"start_year":null,"planned_start_year":null,"original_planned_start_year":2025,"fid_year":null,"construction_year":null,"shelved_year":null,"cancelled_year":null,"stop_year":null,"estimated_cost_usd":null,"estimated_cost_original":null,"estimated_cost_currency":null,"power_stations_supplied":null,"floating_vessel_name":null,"ccs_project":null,"hydrogen_project":null,"ammonia_project":null,"synthetic_lng_project":null,"retrofit_proposed":null,"url":"https://lngatlas.org/terminal/taoyuan-lng-terminal-tw/","data_source":"Data: Global Gas Infrastructure Tracker, Global Energy Monitor, September 2025"},{"terminal_slug":"tassie-shoal-lng-terminal-au","terminal_name":"Tassie Shoal LNG Terminal","country":"Australia","country_iso":"AU","unit_name":null,"status":"cancelled","facility_type":"export","floating_type":"unknown","capacity_mtpa":3,"capacity_bcm_y":4.08,"start_year":null,"planned_start_year":null,"original_planned_start_year":2023,"fid_year":null,"construction_year":null,"shelved_year":null,"cancelled_year":null,"stop_year":null,"estimated_cost_usd":6280000000,"estimated_cost_original":6280000000,"estimated_cost_currency":"USD","power_stations_supplied":null,"floating_vessel_name":null,"ccs_project":null,"hydrogen_project":null,"ammonia_project":null,"synthetic_lng_project":null,"retrofit_proposed":null,"url":"https://lngatlas.org/terminal/tassie-shoal-lng-terminal-au/","data_source":"Data: Global Gas Infrastructure Tracker, Global Energy Monitor, September 2025"},{"terminal_slug":"teesside-gasport-fsru-gb","terminal_name":"Teesside GasPort FSRU","country":"United Kingdom","country_iso":"GB","unit_name":null,"status":"retired","facility_type":"import","floating_type":"fsru","capacity_mtpa":3,"capacity_bcm_y":4.08,"start_year":2007,"planned_start_year":null,"original_planned_start_year":null,"fid_year":null,"construction_year":null,"shelved_year":null,"cancelled_year":null,"stop_year":2015,"estimated_cost_usd":null,"estimated_cost_original":null,"estimated_cost_currency":null,"power_stations_supplied":null,"floating_vessel_name":"Excelsior","ccs_project":null,"hydrogen_project":null,"ammonia_project":null,"synthetic_lng_project":null,"retrofit_proposed":null,"url":"https://lngatlas.org/terminal/teesside-gasport-fsru-gb/","data_source":"Data: Global Gas Infrastructure Tracker, Global Energy Monitor, September 2025"},{"terminal_slug":"teesside-gasport-fsru-gb","terminal_name":"Teesside GasPort FSRU","country":"United Kingdom","country_iso":"GB","unit_name":"Recommissioned Project","status":"proposed","facility_type":"import","floating_type":"fsru","capacity_mtpa":4.41,"capacity_bcm_y":6,"start_year":null,"planned_start_year":null,"original_planned_start_year":null,"fid_year":null,"construction_year":null,"shelved_year":null,"cancelled_year":null,"stop_year":null,"estimated_cost_usd":null,"estimated_cost_original":null,"estimated_cost_currency":null,"power_stations_supplied":null,"floating_vessel_name":"Excelsior","ccs_project":null,"hydrogen_project":null,"ammonia_project":null,"synthetic_lng_project":null,"retrofit_proposed":null,"url":"https://lngatlas.org/terminal/teesside-gasport-fsru-gb/","data_source":"Data: Global Gas Infrastructure Tracker, Global Energy Monitor, September 2025"},{"terminal_slug":"teesside-wavecrest-lng-terminal-gb","terminal_name":"Teesside WaveCrest LNG Terminal","country":"United Kingdom","country_iso":"GB","unit_name":null,"status":"proposed","facility_type":"import","floating_type":"unknown","capacity_mtpa":6,"capacity_bcm_y":8.16,"start_year":null,"planned_start_year":null,"original_planned_start_year":2026,"fid_year":null,"construction_year":2025,"shelved_year":null,"cancelled_year":null,"stop_year":null,"estimated_cost_usd":null,"estimated_cost_original":null,"estimated_cost_currency":null,"power_stations_supplied":null,"floating_vessel_name":null,"ccs_project":null,"hydrogen_project":null,"ammonia_project":null,"synthetic_lng_project":null,"retrofit_proposed":null,"url":"https://lngatlas.org/terminal/teesside-wavecrest-lng-terminal-gb/","data_source":"Data: Global Gas Infrastructure Tracker, Global Energy Monitor, September 2025"},{"terminal_slug":"telfers-fsru-pa","terminal_name":"Telfers FSRU","country":"Panama","country_iso":"PA","unit_name":null,"status":"cancelled","facility_type":"import","floating_type":"fsru","capacity_mtpa":null,"capacity_bcm_y":null,"start_year":null,"planned_start_year":null,"original_planned_start_year":null,"fid_year":null,"construction_year":null,"shelved_year":null,"cancelled_year":null,"stop_year":null,"estimated_cost_usd":null,"estimated_cost_original":null,"estimated_cost_currency":null,"power_stations_supplied":"Telfers power station, Gatún power station","floating_vessel_name":null,"ccs_project":null,"hydrogen_project":null,"ammonia_project":null,"synthetic_lng_project":null,"retrofit_proposed":null,"url":"https://lngatlas.org/terminal/telfers-fsru-pa/","data_source":"Data: Global Gas Infrastructure Tracker, Global Energy Monitor, September 2025"},{"terminal_slug":"teluk-lamong-lng-terminal-id","terminal_name":"Teluk Lamong LNG Terminal","country":"Indonesia","country_iso":"ID","unit_name":null,"status":"construction","facility_type":"import","floating_type":"unknown","capacity_mtpa":0.3,"capacity_bcm_y":0.41,"start_year":null,"planned_start_year":2023,"original_planned_start_year":2019,"fid_year":null,"construction_year":2019,"shelved_year":null,"cancelled_year":null,"stop_year":null,"estimated_cost_usd":null,"estimated_cost_original":null,"estimated_cost_currency":null,"power_stations_supplied":null,"floating_vessel_name":null,"ccs_project":null,"hydrogen_project":null,"ammonia_project":null,"synthetic_lng_project":null,"retrofit_proposed":null,"url":"https://lngatlas.org/terminal/teluk-lamong-lng-terminal-id/","data_source":"Data: Global Gas Infrastructure Tracker, Global Energy Monitor, September 2025"},{"terminal_slug":"tema-fsru-gh","terminal_name":"Tema FSRU","country":"Ghana","country_iso":"GH","unit_name":null,"status":"operating","facility_type":"import","floating_type":"fsru","capacity_mtpa":1.7,"capacity_bcm_y":2.31,"start_year":2023,"planned_start_year":2025,"original_planned_start_year":2016,"fid_year":null,"construction_year":2017,"shelved_year":null,"cancelled_year":null,"stop_year":null,"estimated_cost_usd":350000000,"estimated_cost_original":350000000,"estimated_cost_currency":"USD","power_stations_supplied":null,"floating_vessel_name":"Vasant FSU, Torman LNG FRU","ccs_project":null,"hydrogen_project":null,"ammonia_project":null,"synthetic_lng_project":null,"retrofit_proposed":null,"url":"https://lngatlas.org/terminal/tema-fsru-gh/","data_source":"Data: Global Gas Infrastructure Tracker, Global Energy Monitor, September 2025"},{"terminal_slug":"tenerife-lng-terminal-es","terminal_name":"Tenerife LNG Terminal","country":"Spain","country_iso":"ES","unit_name":null,"status":"cancelled","facility_type":"import","floating_type":"unknown","capacity_mtpa":0.96,"capacity_bcm_y":1.31,"start_year":null,"planned_start_year":null,"original_planned_start_year":2022,"fid_year":2008,"construction_year":null,"shelved_year":null,"cancelled_year":2022,"stop_year":2022,"estimated_cost_usd":327000000,"estimated_cost_original":300000000,"estimated_cost_currency":"EUR","power_stations_supplied":null,"floating_vessel_name":null,"ccs_project":null,"hydrogen_project":null,"ammonia_project":null,"synthetic_lng_project":null,"retrofit_proposed":null,"url":"https://lngatlas.org/terminal/tenerife-lng-terminal-es/","data_source":"Data: Global Gas Infrastructure Tracker, Global Energy Monitor, September 2025"},{"terminal_slug":"tepor-macae-fsru-br","terminal_name":"Tepor Macaé FSRU","country":"Brazil","country_iso":"BR","unit_name":null,"status":"proposed","facility_type":"import","floating_type":"fsru","capacity_mtpa":5.64,"capacity_bcm_y":7.67,"start_year":null,"planned_start_year":null,"original_planned_start_year":2028,"fid_year":null,"construction_year":2025,"shelved_year":null,"cancelled_year":null,"stop_year":null,"estimated_cost_usd":null,"estimated_cost_original":null,"estimated_cost_currency":null,"power_stations_supplied":"Norte Fluminense, Marlim Azul, Vale Azul II & III, Litos I-IV power stations","floating_vessel_name":null,"ccs_project":null,"hydrogen_project":null,"ammonia_project":null,"synthetic_lng_project":null,"retrofit_proposed":null,"url":"https://lngatlas.org/terminal/tepor-macae-fsru-br/","data_source":"Data: Global Gas Infrastructure Tracker, Global Energy Monitor, September 2025"},{"terminal_slug":"tergas-rio-grande-lng-terminal-br","terminal_name":"Tergás Rio Grande LNG Terminal","country":"Brazil","country_iso":"BR","unit_name":null,"status":"shelved","facility_type":"import","floating_type":"unknown","capacity_mtpa":1.61,"capacity_bcm_y":2.19,"start_year":null,"planned_start_year":null,"original_planned_start_year":2026,"fid_year":null,"construction_year":null,"shelved_year":2022,"cancelled_year":null,"stop_year":null,"estimated_cost_usd":null,"estimated_cost_original":null,"estimated_cost_currency":null,"power_stations_supplied":"Rio Grande power station","floating_vessel_name":null,"ccs_project":null,"hydrogen_project":null,"ammonia_project":null,"synthetic_lng_project":null,"retrofit_proposed":null,"url":"https://lngatlas.org/terminal/tergas-rio-grande-lng-terminal-br/","data_source":"Data: Global Gas Infrastructure Tracker, Global Energy Monitor, September 2025"},{"terminal_slug":"terminal-gas-sul-fsru-br","terminal_name":"Terminal Gás Sul FSRU","country":"Brazil","country_iso":"BR","unit_name":null,"status":"idle","facility_type":"import","floating_type":"fsru","capacity_mtpa":6,"capacity_bcm_y":8.16,"start_year":2024,"planned_start_year":null,"original_planned_start_year":null,"fid_year":2021,"construction_year":2021,"shelved_year":null,"cancelled_year":null,"stop_year":2025,"estimated_cost_usd":null,"estimated_cost_original":null,"estimated_cost_currency":null,"power_stations_supplied":"Norte Catarinense power station","floating_vessel_name":"Energos Winter","ccs_project":null,"hydrogen_project":null,"ammonia_project":null,"synthetic_lng_project":null,"retrofit_proposed":null,"url":"https://lngatlas.org/terminal/terminal-gas-sul-fsru-br/","data_source":"Data: Global Gas Infrastructure Tracker, Global Energy Monitor, September 2025"},{"terminal_slug":"terneuzen-fsru-nl","terminal_name":"Terneuzen FSRU","country":"Netherlands","country_iso":"NL","unit_name":null,"status":"cancelled","facility_type":"import","floating_type":"fsru","capacity_mtpa":null,"capacity_bcm_y":null,"start_year":null,"planned_start_year":null,"original_planned_start_year":2023,"fid_year":null,"construction_year":null,"shelved_year":null,"cancelled_year":2023,"stop_year":2023,"estimated_cost_usd":null,"estimated_cost_original":null,"estimated_cost_currency":null,"power_stations_supplied":null,"floating_vessel_name":null,"ccs_project":null,"hydrogen_project":null,"ammonia_project":null,"synthetic_lng_project":null,"retrofit_proposed":null,"url":"https://lngatlas.org/terminal/terneuzen-fsru-nl/","data_source":"Data: Global Gas Infrastructure Tracker, Global Energy Monitor, September 2025"},{"terminal_slug":"texada-lng-terminal-ca","terminal_name":"Texada LNG Terminal","country":"Canada","country_iso":"CA","unit_name":null,"status":"cancelled","facility_type":"import","floating_type":"unknown","capacity_mtpa":3.8,"capacity_bcm_y":5.17,"start_year":null,"planned_start_year":null,"original_planned_start_year":null,"fid_year":null,"construction_year":null,"shelved_year":2007,"cancelled_year":2009,"stop_year":2009,"estimated_cost_usd":null,"estimated_cost_original":null,"estimated_cost_currency":null,"power_stations_supplied":null,"floating_vessel_name":null,"ccs_project":null,"hydrogen_project":null,"ammonia_project":null,"synthetic_lng_project":null,"retrofit_proposed":null,"url":"https://lngatlas.org/terminal/texada-lng-terminal-ca/","data_source":"Data: Global Gas Infrastructure Tracker, Global Energy Monitor, September 2025"},{"terminal_slug":"texas-lng-terminal-us","terminal_name":"Texas LNG Terminal","country":"United States","country_iso":"US","unit_name":"T1-T2","status":"proposed","facility_type":"export","floating_type":"unknown","capacity_mtpa":4,"capacity_bcm_y":5.44,"start_year":null,"planned_start_year":2028,"original_planned_start_year":2026,"fid_year":2025,"construction_year":null,"shelved_year":null,"cancelled_year":null,"stop_year":null,"estimated_cost_usd":3500000000,"estimated_cost_original":3500000000,"estimated_cost_currency":"USD","power_stations_supplied":null,"floating_vessel_name":null,"ccs_project":null,"hydrogen_project":null,"ammonia_project":null,"synthetic_lng_project":null,"retrofit_proposed":null,"url":"https://lngatlas.org/terminal/texas-lng-terminal-us/","data_source":"Data: Global Gas Infrastructure Tracker, Global Energy Monitor, September 2025"},{"terminal_slug":"thai-binh-fsru-vn","terminal_name":"Thai Binh FSRU","country":"Vietnam","country_iso":"VN","unit_name":null,"status":"proposed","facility_type":"import","floating_type":"fsru","capacity_mtpa":1,"capacity_bcm_y":1.36,"start_year":null,"planned_start_year":null,"original_planned_start_year":2029,"fid_year":null,"construction_year":null,"shelved_year":null,"cancelled_year":null,"stop_year":null,"estimated_cost_usd":null,"estimated_cost_original":null,"estimated_cost_currency":null,"power_stations_supplied":"Thai Binh Combined Cycle power station","floating_vessel_name":null,"ccs_project":null,"hydrogen_project":null,"ammonia_project":null,"synthetic_lng_project":null,"retrofit_proposed":null,"url":"https://lngatlas.org/terminal/thai-binh-fsru-vn/","data_source":"Data: Global Gas Infrastructure Tracker, Global Energy Monitor, September 2025"},{"terminal_slug":"thessaloniki-fsru-gr","terminal_name":"Thessaloniki FSRU","country":"Greece","country_iso":"GR","unit_name":null,"status":"proposed","facility_type":"import","floating_type":"fsru","capacity_mtpa":5.37,"capacity_bcm_y":7.31,"start_year":null,"planned_start_year":null,"original_planned_start_year":2025,"fid_year":null,"construction_year":null,"shelved_year":null,"cancelled_year":null,"stop_year":null,"estimated_cost_usd":null,"estimated_cost_original":null,"estimated_cost_currency":null,"power_stations_supplied":null,"floating_vessel_name":null,"ccs_project":null,"hydrogen_project":null,"ammonia_project":null,"synthetic_lng_project":null,"retrofit_proposed":null,"url":"https://lngatlas.org/terminal/thessaloniki-fsru-gr/","data_source":"Data: Global Gas Infrastructure Tracker, Global Energy Monitor, September 2025"},{"terminal_slug":"thi-vai-lng-terminal-vn","terminal_name":"Thi Vai LNG Terminal","country":"Vietnam","country_iso":"VN","unit_name":"Phase 1","status":"operating","facility_type":"import","floating_type":"unknown","capacity_mtpa":1,"capacity_bcm_y":1.36,"start_year":2023,"planned_start_year":null,"original_planned_start_year":2022,"fid_year":null,"construction_year":2019,"shelved_year":null,"cancelled_year":null,"stop_year":null,"estimated_cost_usd":285000000,"estimated_cost_original":285000000,"estimated_cost_currency":"USD","power_stations_supplied":"Nhon Trach power station","floating_vessel_name":null,"ccs_project":null,"hydrogen_project":null,"ammonia_project":null,"synthetic_lng_project":null,"retrofit_proposed":null,"url":"https://lngatlas.org/terminal/thi-vai-lng-terminal-vn/","data_source":"Data: Global Gas Infrastructure Tracker, Global Energy Monitor, September 2025"},{"terminal_slug":"thi-vai-lng-terminal-vn","terminal_name":"Thi Vai LNG Terminal","country":"Vietnam","country_iso":"VN","unit_name":"FSRU","status":"proposed","facility_type":"import","floating_type":"unknown","capacity_mtpa":3.76,"capacity_bcm_y":5.12,"start_year":null,"planned_start_year":null,"original_planned_start_year":2026,"fid_year":null,"construction_year":null,"shelved_year":null,"cancelled_year":null,"stop_year":null,"estimated_cost_usd":null,"estimated_cost_original":null,"estimated_cost_currency":null,"power_stations_supplied":"Nhon Trach power station","floating_vessel_name":null,"ccs_project":null,"hydrogen_project":null,"ammonia_project":null,"synthetic_lng_project":null,"retrofit_proposed":null,"url":"https://lngatlas.org/terminal/thi-vai-lng-terminal-vn/","data_source":"Data: Global Gas Infrastructure Tracker, Global Energy Monitor, September 2025"},{"terminal_slug":"thi-vai-lng-terminal-vn","terminal_name":"Thi Vai LNG Terminal","country":"Vietnam","country_iso":"VN","unit_name":"Phase 2","status":"proposed","facility_type":"import","floating_type":"unknown","capacity_mtpa":2,"capacity_bcm_y":2.72,"start_year":null,"planned_start_year":2029,"original_planned_start_year":2023,"fid_year":null,"construction_year":null,"shelved_year":null,"cancelled_year":null,"stop_year":null,"estimated_cost_usd":null,"estimated_cost_original":null,"estimated_cost_currency":null,"power_stations_supplied":"Nhon Trach power station","floating_vessel_name":null,"ccs_project":null,"hydrogen_project":null,"ammonia_project":null,"synthetic_lng_project":null,"retrofit_proposed":null,"url":"https://lngatlas.org/terminal/thi-vai-lng-terminal-vn/","data_source":"Data: Global Gas Infrastructure Tracker, Global Energy Monitor, September 2025"},{"terminal_slug":"thilawa-lng-terminal-mm","terminal_name":"Thilawa LNG Terminal","country":"Myanmar","country_iso":"MM","unit_name":null,"status":"cancelled","facility_type":"import","floating_type":"unknown","capacity_mtpa":null,"capacity_bcm_y":null,"start_year":null,"planned_start_year":null,"original_planned_start_year":2026,"fid_year":null,"construction_year":null,"shelved_year":2022,"cancelled_year":2024,"stop_year":2024,"estimated_cost_usd":2000000000,"estimated_cost_original":2000000000,"estimated_cost_currency":"USD","power_stations_supplied":"Thilawa (Sumitomo) power station","floating_vessel_name":null,"ccs_project":null,"hydrogen_project":null,"ammonia_project":null,"synthetic_lng_project":null,"retrofit_proposed":null,"url":"https://lngatlas.org/terminal/thilawa-lng-terminal-mm/","data_source":"Data: Global Gas Infrastructure Tracker, Global Energy Monitor, September 2025"},{"terminal_slug":"thrace-fsru-gr","terminal_name":"Thrace FSRU","country":"Greece","country_iso":"GR","unit_name":null,"status":"proposed","facility_type":"import","floating_type":"fsru","capacity_mtpa":4.41,"capacity_bcm_y":6,"start_year":null,"planned_start_year":null,"original_planned_start_year":null,"fid_year":null,"construction_year":null,"shelved_year":null,"cancelled_year":null,"stop_year":null,"estimated_cost_usd":null,"estimated_cost_original":null,"estimated_cost_currency":null,"power_stations_supplied":null,"floating_vessel_name":null,"ccs_project":null,"hydrogen_project":null,"ammonia_project":null,"synthetic_lng_project":null,"retrofit_proposed":null,"url":"https://lngatlas.org/terminal/thrace-fsru-gr/","data_source":"Data: Global Gas Infrastructure Tracker, Global Energy Monitor, September 2025"},{"terminal_slug":"tianjin-lng-terminal-beijing-gas-group-cn","terminal_name":"Tianjin LNG Terminal (Beijing Gas Group)","country":"China","country_iso":"CN","unit_name":"Phase 1","status":"operating","facility_type":"import","floating_type":"unknown","capacity_mtpa":5,"capacity_bcm_y":6.8,"start_year":2023,"planned_start_year":null,"original_planned_start_year":null,"fid_year":null,"construction_year":2020,"shelved_year":null,"cancelled_year":null,"stop_year":null,"estimated_cost_usd":null,"estimated_cost_original":null,"estimated_cost_currency":null,"power_stations_supplied":null,"floating_vessel_name":null,"ccs_project":null,"hydrogen_project":null,"ammonia_project":null,"synthetic_lng_project":null,"retrofit_proposed":null,"url":"https://lngatlas.org/terminal/tianjin-lng-terminal-beijing-gas-group-cn/","data_source":"Data: Global Gas Infrastructure Tracker, Global Energy Monitor, September 2025"},{"terminal_slug":"tianjin-lng-terminal-beijing-gas-group-cn","terminal_name":"Tianjin LNG Terminal (Beijing Gas Group)","country":"China","country_iso":"CN","unit_name":"Phase 2","status":"operating","facility_type":"import","floating_type":"unknown","capacity_mtpa":null,"capacity_bcm_y":null,"start_year":2024,"planned_start_year":null,"original_planned_start_year":null,"fid_year":null,"construction_year":2020,"shelved_year":null,"cancelled_year":null,"stop_year":null,"estimated_cost_usd":null,"estimated_cost_original":null,"estimated_cost_currency":null,"power_stations_supplied":null,"floating_vessel_name":null,"ccs_project":null,"hydrogen_project":null,"ammonia_project":null,"synthetic_lng_project":null,"retrofit_proposed":null,"url":"https://lngatlas.org/terminal/tianjin-lng-terminal-beijing-gas-group-cn/","data_source":"Data: Global Gas Infrastructure Tracker, Global Energy Monitor, September 2025"},{"terminal_slug":"tianjin-lng-terminal-beijing-gas-group-cn","terminal_name":"Tianjin LNG Terminal (Beijing Gas Group)","country":"China","country_iso":"CN","unit_name":"Phase 3","status":"operating","facility_type":"import","floating_type":"unknown","capacity_mtpa":null,"capacity_bcm_y":null,"start_year":2024,"planned_start_year":null,"original_planned_start_year":null,"fid_year":null,"construction_year":2022,"shelved_year":null,"cancelled_year":null,"stop_year":null,"estimated_cost_usd":null,"estimated_cost_original":null,"estimated_cost_currency":null,"power_stations_supplied":null,"floating_vessel_name":null,"ccs_project":null,"hydrogen_project":null,"ammonia_project":null,"synthetic_lng_project":null,"retrofit_proposed":null,"url":"https://lngatlas.org/terminal/tianjin-lng-terminal-beijing-gas-group-cn/","data_source":"Data: Global Gas Infrastructure Tracker, Global Energy Monitor, September 2025"},{"terminal_slug":"tianjin-lng-terminal-pipechina-cn","terminal_name":"Tianjin LNG Terminal (PipeChina)","country":"China","country_iso":"CN","unit_name":"Phase 1","status":"retired","facility_type":"import","floating_type":"floating","capacity_mtpa":2.2,"capacity_bcm_y":2.99,"start_year":2014,"planned_start_year":null,"original_planned_start_year":null,"fid_year":null,"construction_year":2012,"shelved_year":null,"cancelled_year":null,"stop_year":2023,"estimated_cost_usd":520000000,"estimated_cost_original":3250000000,"estimated_cost_currency":"RMB","power_stations_supplied":null,"floating_vessel_name":null,"ccs_project":null,"hydrogen_project":null,"ammonia_project":null,"synthetic_lng_project":null,"retrofit_proposed":null,"url":"https://lngatlas.org/terminal/tianjin-lng-terminal-pipechina-cn/","data_source":"Data: Global Gas Infrastructure Tracker, Global Energy Monitor, September 2025"},{"terminal_slug":"tianjin-lng-terminal-pipechina-cn","terminal_name":"Tianjin LNG Terminal (PipeChina)","country":"China","country_iso":"CN","unit_name":"Phase 1 replacement","status":"operating","facility_type":"import","floating_type":"floating","capacity_mtpa":null,"capacity_bcm_y":null,"start_year":2018,"planned_start_year":null,"original_planned_start_year":null,"fid_year":null,"construction_year":null,"shelved_year":null,"cancelled_year":null,"stop_year":null,"estimated_cost_usd":null,"estimated_cost_original":null,"estimated_cost_currency":null,"power_stations_supplied":null,"floating_vessel_name":null,"ccs_project":null,"hydrogen_project":null,"ammonia_project":null,"synthetic_lng_project":null,"retrofit_proposed":null,"url":"https://lngatlas.org/terminal/tianjin-lng-terminal-pipechina-cn/","data_source":"Data: Global Gas Infrastructure Tracker, Global Energy Monitor, September 2025"},{"terminal_slug":"tianjin-lng-terminal-pipechina-cn","terminal_name":"Tianjin LNG Terminal (PipeChina)","country":"China","country_iso":"CN","unit_name":"Phase 2","status":"operating","facility_type":"import","floating_type":"floating","capacity_mtpa":12,"capacity_bcm_y":16.33,"start_year":2024,"planned_start_year":null,"original_planned_start_year":2022,"fid_year":null,"construction_year":2020,"shelved_year":null,"cancelled_year":null,"stop_year":null,"estimated_cost_usd":null,"estimated_cost_original":null,"estimated_cost_currency":null,"power_stations_supplied":null,"floating_vessel_name":null,"ccs_project":null,"hydrogen_project":null,"ammonia_project":null,"synthetic_lng_project":null,"retrofit_proposed":null,"url":"https://lngatlas.org/terminal/tianjin-lng-terminal-pipechina-cn/","data_source":"Data: Global Gas Infrastructure Tracker, Global Energy Monitor, September 2025"},{"terminal_slug":"tianjin-lng-terminal-pipechina-cn","terminal_name":"Tianjin LNG Terminal (PipeChina)","country":"China","country_iso":"CN","unit_name":"Phase 3","status":"construction","facility_type":"import","floating_type":"floating","capacity_mtpa":null,"capacity_bcm_y":null,"start_year":null,"planned_start_year":null,"original_planned_start_year":null,"fid_year":null,"construction_year":2022,"shelved_year":null,"cancelled_year":null,"stop_year":null,"estimated_cost_usd":null,"estimated_cost_original":null,"estimated_cost_currency":null,"power_stations_supplied":null,"floating_vessel_name":null,"ccs_project":null,"hydrogen_project":null,"ammonia_project":null,"synthetic_lng_project":null,"retrofit_proposed":null,"url":"https://lngatlas.org/terminal/tianjin-lng-terminal-pipechina-cn/","data_source":"Data: Global Gas Infrastructure Tracker, Global Energy Monitor, September 2025"},{"terminal_slug":"tianjin-lng-terminal-sinopec-cn","terminal_name":"Tianjin LNG Terminal (Sinopec)","country":"China","country_iso":"CN","unit_name":"Phase 1","status":"operating","facility_type":"import","floating_type":"unknown","capacity_mtpa":6,"capacity_bcm_y":8.16,"start_year":2018,"planned_start_year":null,"original_planned_start_year":null,"fid_year":null,"construction_year":2015,"shelved_year":null,"cancelled_year":null,"stop_year":null,"estimated_cost_usd":2448000000,"estimated_cost_original":15300000000,"estimated_cost_currency":"RMB","power_stations_supplied":null,"floating_vessel_name":null,"ccs_project":null,"hydrogen_project":null,"ammonia_project":null,"synthetic_lng_project":null,"retrofit_proposed":null,"url":"https://lngatlas.org/terminal/tianjin-lng-terminal-sinopec-cn/","data_source":"Data: Global Gas Infrastructure Tracker, Global Energy Monitor, September 2025"},{"terminal_slug":"tianjin-lng-terminal-sinopec-cn","terminal_name":"Tianjin LNG Terminal (Sinopec)","country":"China","country_iso":"CN","unit_name":"Phase 2","status":"operating","facility_type":"import","floating_type":"unknown","capacity_mtpa":4.8,"capacity_bcm_y":6.53,"start_year":2023,"planned_start_year":null,"original_planned_start_year":null,"fid_year":null,"construction_year":2020,"shelved_year":null,"cancelled_year":null,"stop_year":null,"estimated_cost_usd":800000000,"estimated_cost_original":5000000000,"estimated_cost_currency":"RMB","power_stations_supplied":null,"floating_vessel_name":null,"ccs_project":null,"hydrogen_project":null,"ammonia_project":null,"synthetic_lng_project":null,"retrofit_proposed":null,"url":"https://lngatlas.org/terminal/tianjin-lng-terminal-sinopec-cn/","data_source":"Data: Global Gas Infrastructure Tracker, Global Energy Monitor, September 2025"},{"terminal_slug":"tianjin-lng-terminal-sinopec-cn","terminal_name":"Tianjin LNG Terminal (Sinopec)","country":"China","country_iso":"CN","unit_name":"Phase 3 (Stage 1 & 2)","status":"construction","facility_type":"import","floating_type":"unknown","capacity_mtpa":0.85,"capacity_bcm_y":1.16,"start_year":null,"planned_start_year":null,"original_planned_start_year":null,"fid_year":null,"construction_year":2023,"shelved_year":null,"cancelled_year":null,"stop_year":null,"estimated_cost_usd":1015737600,"estimated_cost_original":6348360000,"estimated_cost_currency":"RMB","power_stations_supplied":null,"floating_vessel_name":null,"ccs_project":null,"hydrogen_project":null,"ammonia_project":null,"synthetic_lng_project":null,"retrofit_proposed":null,"url":"https://lngatlas.org/terminal/tianjin-lng-terminal-sinopec-cn/","data_source":"Data: Global Gas Infrastructure Tracker, Global Energy Monitor, September 2025"},{"terminal_slug":"tien-giang-lng-terminal-vn","terminal_name":"Tien Giang LNG Terminal","country":"Vietnam","country_iso":"VN","unit_name":null,"status":"cancelled","facility_type":"import","floating_type":"unknown","capacity_mtpa":6,"capacity_bcm_y":8.16,"start_year":null,"planned_start_year":null,"original_planned_start_year":2022,"fid_year":null,"construction_year":null,"shelved_year":null,"cancelled_year":2023,"stop_year":2023,"estimated_cost_usd":null,"estimated_cost_original":null,"estimated_cost_currency":null,"power_stations_supplied":null,"floating_vessel_name":null,"ccs_project":null,"hydrogen_project":null,"ammonia_project":null,"synthetic_lng_project":null,"retrofit_proposed":null,"url":"https://lngatlas.org/terminal/tien-giang-lng-terminal-vn/","data_source":"Data: Global Gas Infrastructure Tracker, Global Energy Monitor, September 2025"},{"terminal_slug":"tien-lang-fsru-vn","terminal_name":"Tien Lang FSRU","country":"Vietnam","country_iso":"VN","unit_name":null,"status":"cancelled","facility_type":"import","floating_type":"fsru","capacity_mtpa":null,"capacity_bcm_y":null,"start_year":null,"planned_start_year":null,"original_planned_start_year":2026,"fid_year":null,"construction_year":null,"shelved_year":2023,"cancelled_year":null,"stop_year":null,"estimated_cost_usd":null,"estimated_cost_original":null,"estimated_cost_currency":null,"power_stations_supplied":"Tien Lang power station","floating_vessel_name":null,"ccs_project":null,"hydrogen_project":null,"ammonia_project":null,"synthetic_lng_project":null,"retrofit_proposed":null,"url":"https://lngatlas.org/terminal/tien-lang-fsru-vn/","data_source":"Data: Global Gas Infrastructure Tracker, Global Energy Monitor, September 2025"},{"terminal_slug":"tiga-flng-terminal-my","terminal_name":"Tiga FLNG Terminal","country":"Malaysia","country_iso":"MY","unit_name":null,"status":"construction","facility_type":"export","floating_type":"flng","capacity_mtpa":2,"capacity_bcm_y":2.72,"start_year":null,"planned_start_year":null,"original_planned_start_year":2027,"fid_year":2022,"construction_year":2024,"shelved_year":null,"cancelled_year":null,"stop_year":null,"estimated_cost_usd":2020000000,"estimated_cost_original":2020000000,"estimated_cost_currency":"USD","power_stations_supplied":null,"floating_vessel_name":null,"ccs_project":null,"hydrogen_project":null,"ammonia_project":null,"synthetic_lng_project":null,"retrofit_proposed":null,"url":"https://lngatlas.org/terminal/tiga-flng-terminal-my/","data_source":"Data: Global Gas Infrastructure Tracker, Global Energy Monitor, September 2025"},{"terminal_slug":"mlng-tiga-lng-terminal-my","terminal_name":"Tiga Malaysia LNG Terminal","country":"Malaysia","country_iso":"MY","unit_name":"T7-T8","status":"operating","facility_type":"export","floating_type":"unknown","capacity_mtpa":7.2,"capacity_bcm_y":9.8,"start_year":2003,"planned_start_year":null,"original_planned_start_year":null,"fid_year":null,"construction_year":null,"shelved_year":null,"cancelled_year":null,"stop_year":null,"estimated_cost_usd":null,"estimated_cost_original":null,"estimated_cost_currency":null,"power_stations_supplied":null,"floating_vessel_name":null,"ccs_project":null,"hydrogen_project":null,"ammonia_project":null,"synthetic_lng_project":null,"retrofit_proposed":null,"url":"https://lngatlas.org/terminal/mlng-tiga-lng-terminal-my/","data_source":"Data: Global Gas Infrastructure Tracker, Global Energy Monitor, September 2025"},{"terminal_slug":"tilbury-island-lng-terminal-ca","terminal_name":"Tilbury Island LNG Terminal","country":"Canada","country_iso":"CA","unit_name":"Original Facility","status":"operating","facility_type":"export","floating_type":"unknown","capacity_mtpa":0.03,"capacity_bcm_y":0.04,"start_year":1971,"planned_start_year":null,"original_planned_start_year":null,"fid_year":null,"construction_year":null,"shelved_year":null,"cancelled_year":null,"stop_year":null,"estimated_cost_usd":null,"estimated_cost_original":null,"estimated_cost_currency":null,"power_stations_supplied":null,"floating_vessel_name":null,"ccs_project":null,"hydrogen_project":null,"ammonia_project":null,"synthetic_lng_project":null,"retrofit_proposed":null,"url":"https://lngatlas.org/terminal/tilbury-island-lng-terminal-ca/","data_source":"Data: Global Gas Infrastructure Tracker, Global Energy Monitor, September 2025"},{"terminal_slug":"tilbury-island-lng-terminal-ca","terminal_name":"Tilbury Island LNG Terminal","country":"Canada","country_iso":"CA","unit_name":"Phase 1a Expansion","status":"operating","facility_type":"export","floating_type":"unknown","capacity_mtpa":0.25,"capacity_bcm_y":0.34,"start_year":2018,"planned_start_year":null,"original_planned_start_year":null,"fid_year":null,"construction_year":null,"shelved_year":null,"cancelled_year":null,"stop_year":null,"estimated_cost_usd":null,"estimated_cost_original":null,"estimated_cost_currency":null,"power_stations_supplied":null,"floating_vessel_name":null,"ccs_project":null,"hydrogen_project":null,"ammonia_project":null,"synthetic_lng_project":null,"retrofit_proposed":null,"url":"https://lngatlas.org/terminal/tilbury-island-lng-terminal-ca/","data_source":"Data: Global Gas Infrastructure Tracker, Global Energy Monitor, September 2025"},{"terminal_slug":"tilbury-island-lng-terminal-ca","terminal_name":"Tilbury Island LNG Terminal","country":"Canada","country_iso":"CA","unit_name":"Phase 1b Expansion","status":"proposed","facility_type":"export","floating_type":"unknown","capacity_mtpa":0.65,"capacity_bcm_y":0.88,"start_year":null,"planned_start_year":2028,"original_planned_start_year":2026,"fid_year":null,"construction_year":2026,"shelved_year":null,"cancelled_year":null,"stop_year":null,"estimated_cost_usd":null,"estimated_cost_original":null,"estimated_cost_currency":null,"power_stations_supplied":null,"floating_vessel_name":null,"ccs_project":null,"hydrogen_project":null,"ammonia_project":null,"synthetic_lng_project":null,"retrofit_proposed":null,"url":"https://lngatlas.org/terminal/tilbury-island-lng-terminal-ca/","data_source":"Data: Global Gas Infrastructure Tracker, Global Energy Monitor, September 2025"},{"terminal_slug":"tilbury-island-lng-terminal-ca","terminal_name":"Tilbury Island LNG Terminal","country":"Canada","country_iso":"CA","unit_name":"Phase 2 Expansion","status":"proposed","facility_type":"export","floating_type":"unknown","capacity_mtpa":2.5,"capacity_bcm_y":3.4,"start_year":null,"planned_start_year":null,"original_planned_start_year":2028,"fid_year":null,"construction_year":null,"shelved_year":null,"cancelled_year":null,"stop_year":null,"estimated_cost_usd":2600000000,"estimated_cost_original":3250000000,"estimated_cost_currency":"CAN","power_stations_supplied":null,"floating_vessel_name":null,"ccs_project":null,"hydrogen_project":null,"ammonia_project":null,"synthetic_lng_project":null,"retrofit_proposed":null,"url":"https://lngatlas.org/terminal/tilbury-island-lng-terminal-ca/","data_source":"Data: Global Gas Infrastructure Tracker, Global Energy Monitor, September 2025"},{"terminal_slug":"tjelbergodden-lng-terminal-no","terminal_name":"Tjelbergodden LNG Terminal","country":"Norway","country_iso":"NO","unit_name":null,"status":"retired","facility_type":"export","floating_type":"unknown","capacity_mtpa":0.01,"capacity_bcm_y":0.01,"start_year":1997,"planned_start_year":null,"original_planned_start_year":null,"fid_year":null,"construction_year":null,"shelved_year":null,"cancelled_year":null,"stop_year":2023,"estimated_cost_usd":null,"estimated_cost_original":null,"estimated_cost_currency":null,"power_stations_supplied":null,"floating_vessel_name":null,"ccs_project":null,"hydrogen_project":null,"ammonia_project":null,"synthetic_lng_project":null,"retrofit_proposed":null,"url":"https://lngatlas.org/terminal/tjelbergodden-lng-terminal-no/","data_source":"Data: Global Gas Infrastructure Tracker, Global Energy Monitor, September 2025"},{"terminal_slug":"tobata-lng-terminal-jp","terminal_name":"Tobata LNG Terminal","country":"Japan","country_iso":"JP","unit_name":null,"status":"operating","facility_type":"import","floating_type":"unknown","capacity_mtpa":7.6,"capacity_bcm_y":10.34,"start_year":1977,"planned_start_year":null,"original_planned_start_year":null,"fid_year":null,"construction_year":null,"shelved_year":null,"cancelled_year":null,"stop_year":null,"estimated_cost_usd":null,"estimated_cost_original":null,"estimated_cost_currency":null,"power_stations_supplied":null,"floating_vessel_name":null,"ccs_project":null,"hydrogen_project":null,"ammonia_project":null,"synthetic_lng_project":null,"retrofit_proposed":null,"url":"https://lngatlas.org/terminal/tobata-lng-terminal-jp/","data_source":"Data: Global Gas Infrastructure Tracker, Global Energy Monitor, September 2025"},{"terminal_slug":"tongyeong-lng-terminal-kr","terminal_name":"Tongyoung LNG Terminal","country":"South Korea","country_iso":"KR","unit_name":null,"status":"operating","facility_type":"import","floating_type":"unknown","capacity_mtpa":26.5,"capacity_bcm_y":36.05,"start_year":2002,"planned_start_year":null,"original_planned_start_year":null,"fid_year":null,"construction_year":null,"shelved_year":null,"cancelled_year":null,"stop_year":null,"estimated_cost_usd":null,"estimated_cost_original":null,"estimated_cost_currency":null,"power_stations_supplied":null,"floating_vessel_name":null,"ccs_project":null,"hydrogen_project":null,"ammonia_project":null,"synthetic_lng_project":null,"retrofit_proposed":null,"url":"https://lngatlas.org/terminal/tongyeong-lng-terminal-kr/","data_source":"Data: Global Gas Infrastructure Tracker, Global Energy Monitor, September 2025"},{"terminal_slug":"tornio-manga-lng-terminal-fi","terminal_name":"Tornio Manga LNG Terminal","country":"Finland","country_iso":"FI","unit_name":null,"status":"operating","facility_type":"import","floating_type":"unknown","capacity_mtpa":0.4,"capacity_bcm_y":0.54,"start_year":2019,"planned_start_year":null,"original_planned_start_year":null,"fid_year":2014,"construction_year":2015,"shelved_year":null,"cancelled_year":null,"stop_year":null,"estimated_cost_usd":null,"estimated_cost_original":null,"estimated_cost_currency":null,"power_stations_supplied":null,"floating_vessel_name":null,"ccs_project":null,"hydrogen_project":null,"ammonia_project":null,"synthetic_lng_project":null,"retrofit_proposed":null,"url":"https://lngatlas.org/terminal/tornio-manga-lng-terminal-fi/","data_source":"Data: Global Gas Infrastructure Tracker, Global Energy Monitor, September 2025"},{"terminal_slug":"toscana-fsru-it","terminal_name":"Toscana FSRU","country":"Italy","country_iso":"IT","unit_name":null,"status":"operating","facility_type":"import","floating_type":"fsru","capacity_mtpa":3.67,"capacity_bcm_y":4.99,"start_year":2013,"planned_start_year":null,"original_planned_start_year":null,"fid_year":null,"construction_year":2009,"shelved_year":null,"cancelled_year":null,"stop_year":2024,"estimated_cost_usd":599500000,"estimated_cost_original":550000000,"estimated_cost_currency":"EUR","power_stations_supplied":null,"floating_vessel_name":null,"ccs_project":null,"hydrogen_project":null,"ammonia_project":null,"synthetic_lng_project":null,"retrofit_proposed":null,"url":"https://lngatlas.org/terminal/toscana-fsru-it/","data_source":"Data: Global Gas Infrastructure Tracker, Global Energy Monitor, September 2025"},{"terminal_slug":"toscana-fsru-it","terminal_name":"Toscana FSRU","country":"Italy","country_iso":"IT","unit_name":"Expansion (Efficiency)","status":"operating","facility_type":"import","floating_type":"fsru","capacity_mtpa":null,"capacity_bcm_y":null,"start_year":2023,"planned_start_year":null,"original_planned_start_year":null,"fid_year":null,"construction_year":null,"shelved_year":null,"cancelled_year":null,"stop_year":null,"estimated_cost_usd":null,"estimated_cost_original":null,"estimated_cost_currency":null,"power_stations_supplied":null,"floating_vessel_name":null,"ccs_project":null,"hydrogen_project":null,"ammonia_project":null,"synthetic_lng_project":null,"retrofit_proposed":null,"url":"https://lngatlas.org/terminal/toscana-fsru-it/","data_source":"Data: Global Gas Infrastructure Tracker, Global Energy Monitor, September 2025"},{"terminal_slug":"toyama-shinko-lng-terminal-jp","terminal_name":"Toyama Shinko LNG Terminal","country":"Japan","country_iso":"JP","unit_name":null,"status":"operating","facility_type":"import","floating_type":"unknown","capacity_mtpa":1.8,"capacity_bcm_y":2.45,"start_year":2018,"planned_start_year":null,"original_planned_start_year":null,"fid_year":null,"construction_year":null,"shelved_year":null,"cancelled_year":null,"stop_year":null,"estimated_cost_usd":null,"estimated_cost_original":null,"estimated_cost_currency":null,"power_stations_supplied":null,"floating_vessel_name":null,"ccs_project":null,"hydrogen_project":null,"ammonia_project":null,"synthetic_lng_project":null,"retrofit_proposed":null,"url":"https://lngatlas.org/terminal/toyama-shinko-lng-terminal-jp/","data_source":"Data: Global Gas Infrastructure Tracker, Global Energy Monitor, September 2025"},{"terminal_slug":"transoceanic-nigeria-flng-terminal-ng","terminal_name":"Transoceanic Nigeria FLNG Terminal","country":"Nigeria","country_iso":"NG","unit_name":null,"status":"proposed","facility_type":"export","floating_type":"flng","capacity_mtpa":3,"capacity_bcm_y":4.08,"start_year":null,"planned_start_year":null,"original_planned_start_year":null,"fid_year":null,"construction_year":null,"shelved_year":null,"cancelled_year":null,"stop_year":null,"estimated_cost_usd":null,"estimated_cost_original":null,"estimated_cost_currency":null,"power_stations_supplied":null,"floating_vessel_name":null,"ccs_project":null,"hydrogen_project":null,"ammonia_project":null,"synthetic_lng_project":null,"retrofit_proposed":null,"url":"https://lngatlas.org/terminal/transoceanic-nigeria-flng-terminal-ng/","data_source":"Data: Global Gas Infrastructure Tracker, Global Energy Monitor, September 2025"},{"terminal_slug":"trieste-monfalcone-lng-terminal-it","terminal_name":"Trieste Monfalcone LNG Terminal","country":"Italy","country_iso":"IT","unit_name":null,"status":"cancelled","facility_type":"import","floating_type":"unknown","capacity_mtpa":6,"capacity_bcm_y":8.16,"start_year":null,"planned_start_year":null,"original_planned_start_year":null,"fid_year":null,"construction_year":null,"shelved_year":2009,"cancelled_year":2011,"stop_year":2011,"estimated_cost_usd":null,"estimated_cost_original":null,"estimated_cost_currency":null,"power_stations_supplied":null,"floating_vessel_name":null,"ccs_project":null,"hydrogen_project":null,"ammonia_project":null,"synthetic_lng_project":null,"retrofit_proposed":null,"url":"https://lngatlas.org/terminal/trieste-monfalcone-lng-terminal-it/","data_source":"Data: Global Gas Infrastructure Tracker, Global Energy Monitor, September 2025"},{"terminal_slug":"triton-lng-export-terminal-ca","terminal_name":"Triton LNG Export Terminal","country":"Canada","country_iso":"CA","unit_name":null,"status":"cancelled","facility_type":"export","floating_type":"unknown","capacity_mtpa":2.3,"capacity_bcm_y":3.13,"start_year":null,"planned_start_year":null,"original_planned_start_year":null,"fid_year":null,"construction_year":null,"shelved_year":2016,"cancelled_year":2018,"stop_year":2018,"estimated_cost_usd":null,"estimated_cost_original":null,"estimated_cost_currency":null,"power_stations_supplied":null,"floating_vessel_name":null,"ccs_project":null,"hydrogen_project":null,"ammonia_project":null,"synthetic_lng_project":null,"retrofit_proposed":null,"url":"https://lngatlas.org/terminal/triton-lng-export-terminal-ca/","data_source":"Data: Global Gas Infrastructure Tracker, Global Energy Monitor, September 2025"},{"terminal_slug":"utm-offshore-flng-terminal-ng","terminal_name":"UTM Offshore FLNG Terminal","country":"Nigeria","country_iso":"NG","unit_name":null,"status":"proposed","facility_type":"export","floating_type":"flng","capacity_mtpa":2.1,"capacity_bcm_y":2.86,"start_year":null,"planned_start_year":2029,"original_planned_start_year":2026,"fid_year":2025,"construction_year":null,"shelved_year":null,"cancelled_year":null,"stop_year":null,"estimated_cost_usd":null,"estimated_cost_original":null,"estimated_cost_currency":null,"power_stations_supplied":null,"floating_vessel_name":null,"ccs_project":null,"hydrogen_project":null,"ammonia_project":null,"synthetic_lng_project":null,"retrofit_proposed":null,"url":"https://lngatlas.org/terminal/utm-offshore-flng-terminal-ng/","data_source":"Data: Global Gas Infrastructure Tracker, Global Energy Monitor, September 2025"},{"terminal_slug":"ukraine-lng-terminal-ua","terminal_name":"Ukraine LNG Terminal","country":"Ukraine","country_iso":"UA","unit_name":null,"status":"cancelled","facility_type":"import","floating_type":"floating","capacity_mtpa":7.3,"capacity_bcm_y":9.93,"start_year":null,"planned_start_year":null,"original_planned_start_year":null,"fid_year":null,"construction_year":null,"shelved_year":2019,"cancelled_year":2021,"stop_year":2021,"estimated_cost_usd":1210000000,"estimated_cost_original":1210000000,"estimated_cost_currency":"USD","power_stations_supplied":null,"floating_vessel_name":null,"ccs_project":null,"hydrogen_project":null,"ammonia_project":null,"synthetic_lng_project":null,"retrofit_proposed":null,"url":"https://lngatlas.org/terminal/ukraine-lng-terminal-ua/","data_source":"Data: Global Gas Infrastructure Tracker, Global Energy Monitor, September 2025"},{"terminal_slug":"ulsan-lng-terminal-kr","terminal_name":"Ulsan LNG Terminal","country":"South Korea","country_iso":"KR","unit_name":"Phase 1 (Tanks 1-2)","status":"operating","facility_type":"import","floating_type":"unknown","capacity_mtpa":2.4,"capacity_bcm_y":3.27,"start_year":2024,"planned_start_year":null,"original_planned_start_year":null,"fid_year":null,"construction_year":2020,"shelved_year":null,"cancelled_year":null,"stop_year":null,"estimated_cost_usd":null,"estimated_cost_original":null,"estimated_cost_currency":null,"power_stations_supplied":"Ulsan GPS power station","floating_vessel_name":null,"ccs_project":null,"hydrogen_project":null,"ammonia_project":null,"synthetic_lng_project":null,"retrofit_proposed":null,"url":"https://lngatlas.org/terminal/ulsan-lng-terminal-kr/","data_source":"Data: Global Gas Infrastructure Tracker, Global Energy Monitor, September 2025"},{"terminal_slug":"ulsan-lng-terminal-kr","terminal_name":"Ulsan LNG Terminal","country":"South Korea","country_iso":"KR","unit_name":"Phase 2 (Tanks 3-4)","status":"construction","facility_type":"import","floating_type":"unknown","capacity_mtpa":2.4,"capacity_bcm_y":3.27,"start_year":null,"planned_start_year":null,"original_planned_start_year":2026,"fid_year":null,"construction_year":2022,"shelved_year":null,"cancelled_year":null,"stop_year":null,"estimated_cost_usd":null,"estimated_cost_original":null,"estimated_cost_currency":null,"power_stations_supplied":"Ulsan GPS power station","floating_vessel_name":null,"ccs_project":null,"hydrogen_project":null,"ammonia_project":null,"synthetic_lng_project":null,"retrofit_proposed":null,"url":"https://lngatlas.org/terminal/ulsan-lng-terminal-kr/","data_source":"Data: Global Gas Infrastructure Tracker, Global Energy Monitor, September 2025"},{"terminal_slug":"ulsan-lng-terminal-kr","terminal_name":"Ulsan LNG Terminal","country":"South Korea","country_iso":"KR","unit_name":"Phase 2 (Tanks 5-6)","status":"construction","facility_type":"import","floating_type":"unknown","capacity_mtpa":2.4,"capacity_bcm_y":3.27,"start_year":null,"planned_start_year":null,"original_planned_start_year":2029,"fid_year":null,"construction_year":2020,"shelved_year":null,"cancelled_year":null,"stop_year":null,"estimated_cost_usd":null,"estimated_cost_original":null,"estimated_cost_currency":null,"power_stations_supplied":"Ulsan GPS power station","floating_vessel_name":null,"ccs_project":null,"hydrogen_project":null,"ammonia_project":null,"synthetic_lng_project":null,"retrofit_proposed":null,"url":"https://lngatlas.org/terminal/ulsan-lng-terminal-kr/","data_source":"Data: Global Gas Infrastructure Tracker, Global Energy Monitor, September 2025"},{"terminal_slug":"ust-luga-lng-terminal-ru","terminal_name":"Ust Luga LNG Terminal","country":"Russia","country_iso":"RU","unit_name":"T1","status":"construction","facility_type":"export","floating_type":"unknown","capacity_mtpa":6.55,"capacity_bcm_y":8.91,"start_year":null,"planned_start_year":2027,"original_planned_start_year":2024,"fid_year":null,"construction_year":2024,"shelved_year":null,"cancelled_year":null,"stop_year":null,"estimated_cost_usd":null,"estimated_cost_original":null,"estimated_cost_currency":null,"power_stations_supplied":null,"floating_vessel_name":null,"ccs_project":null,"hydrogen_project":null,"ammonia_project":null,"synthetic_lng_project":null,"retrofit_proposed":null,"url":"https://lngatlas.org/terminal/ust-luga-lng-terminal-ru/","data_source":"Data: Global Gas Infrastructure Tracker, Global Energy Monitor, September 2025"},{"terminal_slug":"ust-luga-lng-terminal-ru","terminal_name":"Ust Luga LNG Terminal","country":"Russia","country_iso":"RU","unit_name":"T2","status":"construction","facility_type":"export","floating_type":"unknown","capacity_mtpa":6.55,"capacity_bcm_y":8.91,"start_year":null,"planned_start_year":2028,"original_planned_start_year":2025,"fid_year":null,"construction_year":2024,"shelved_year":null,"cancelled_year":null,"stop_year":null,"estimated_cost_usd":null,"estimated_cost_original":null,"estimated_cost_currency":null,"power_stations_supplied":null,"floating_vessel_name":null,"ccs_project":null,"hydrogen_project":null,"ammonia_project":null,"synthetic_lng_project":null,"retrofit_proposed":null,"url":"https://lngatlas.org/terminal/ust-luga-lng-terminal-ru/","data_source":"Data: Global Gas Infrastructure Tracker, Global Energy Monitor, September 2025"},{"terminal_slug":"ust-luga-lng-terminal-ru","terminal_name":"Ust Luga LNG Terminal","country":"Russia","country_iso":"RU","unit_name":"T3","status":"proposed","facility_type":"export","floating_type":"unknown","capacity_mtpa":6.5,"capacity_bcm_y":8.84,"start_year":null,"planned_start_year":null,"original_planned_start_year":2026,"fid_year":null,"construction_year":null,"shelved_year":null,"cancelled_year":null,"stop_year":null,"estimated_cost_usd":null,"estimated_cost_original":null,"estimated_cost_currency":null,"power_stations_supplied":null,"floating_vessel_name":null,"ccs_project":null,"hydrogen_project":null,"ammonia_project":null,"synthetic_lng_project":null,"retrofit_proposed":null,"url":"https://lngatlas.org/terminal/ust-luga-lng-terminal-ru/","data_source":"Data: Global Gas Infrastructure Tracker, Global Energy Monitor, September 2025"},{"terminal_slug":"valentina-lng-terminal-ru","terminal_name":"Valentina LNG Terminal","country":"Russia","country_iso":"RU","unit_name":null,"status":"proposed","facility_type":"export","floating_type":"unknown","capacity_mtpa":7,"capacity_bcm_y":9.52,"start_year":null,"planned_start_year":null,"original_planned_start_year":2027,"fid_year":null,"construction_year":null,"shelved_year":null,"cancelled_year":null,"stop_year":null,"estimated_cost_usd":6860000000,"estimated_cost_original":490000000000,"estimated_cost_currency":"RUB","power_stations_supplied":null,"floating_vessel_name":null,"ccs_project":null,"hydrogen_project":null,"ammonia_project":null,"synthetic_lng_project":null,"retrofit_proposed":null,"url":"https://lngatlas.org/terminal/valentina-lng-terminal-ru/","data_source":"Data: Global Gas Infrastructure Tracker, Global Energy Monitor, September 2025"},{"terminal_slug":"venezuela-offshore-lng-terminal-ve","terminal_name":"Venezuela Offshore LNG Terminal","country":"Venezuela","country_iso":"VE","unit_name":null,"status":"cancelled","facility_type":"export","floating_type":"unknown","capacity_mtpa":null,"capacity_bcm_y":null,"start_year":null,"planned_start_year":null,"original_planned_start_year":null,"fid_year":2020,"construction_year":null,"shelved_year":2018,"cancelled_year":2020,"stop_year":2020,"estimated_cost_usd":null,"estimated_cost_original":null,"estimated_cost_currency":null,"power_stations_supplied":null,"floating_vessel_name":null,"ccs_project":null,"hydrogen_project":null,"ammonia_project":null,"synthetic_lng_project":null,"retrofit_proposed":null,"url":"https://lngatlas.org/terminal/venezuela-offshore-lng-terminal-ve/","data_source":"Data: Global Gas Infrastructure Tracker, Global Energy Monitor, September 2025"},{"terminal_slug":"vires-fsru-ph","terminal_name":"Vires FSRU","country":"Philippines","country_iso":"PH","unit_name":null,"status":"cancelled","facility_type":"import","floating_type":"fsru","capacity_mtpa":3,"capacity_bcm_y":4.08,"start_year":null,"planned_start_year":2026,"original_planned_start_year":2023,"fid_year":null,"construction_year":null,"shelved_year":null,"cancelled_year":2024,"stop_year":2024,"estimated_cost_usd":null,"estimated_cost_original":null,"estimated_cost_currency":null,"power_stations_supplied":null,"floating_vessel_name":null,"ccs_project":null,"hydrogen_project":null,"ammonia_project":null,"synthetic_lng_project":null,"retrofit_proposed":null,"url":"https://lngatlas.org/terminal/vires-fsru-ph/","data_source":"Data: Global Gas Infrastructure Tracker, Global Energy Monitor, September 2025"},{"terminal_slug":"vista-del-sol-lng-terminal-us","terminal_name":"Vista Del Sol LNG Terminal","country":"United States","country_iso":"US","unit_name":null,"status":"cancelled","facility_type":"import","floating_type":"unknown","capacity_mtpa":8,"capacity_bcm_y":10.88,"start_year":null,"planned_start_year":null,"original_planned_start_year":null,"fid_year":null,"construction_year":null,"shelved_year":null,"cancelled_year":2010,"stop_year":2010,"estimated_cost_usd":null,"estimated_cost_original":null,"estimated_cost_currency":null,"power_stations_supplied":null,"floating_vessel_name":null,"ccs_project":null,"hydrogen_project":null,"ammonia_project":null,"synthetic_lng_project":null,"retrofit_proposed":null,"url":"https://lngatlas.org/terminal/vista-del-sol-lng-terminal-us/","data_source":"Data: Global Gas Infrastructure Tracker, Global Energy Monitor, September 2025"},{"terminal_slug":"vista-pacifico-lng-terminal-mx","terminal_name":"Vista Pacifico LNG Terminal","country":"Mexico","country_iso":"MX","unit_name":null,"status":"proposed","facility_type":"export","floating_type":"unknown","capacity_mtpa":3,"capacity_bcm_y":4.08,"start_year":null,"planned_start_year":null,"original_planned_start_year":2025,"fid_year":null,"construction_year":null,"shelved_year":null,"cancelled_year":null,"stop_year":null,"estimated_cost_usd":null,"estimated_cost_original":null,"estimated_cost_currency":null,"power_stations_supplied":null,"floating_vessel_name":null,"ccs_project":null,"hydrogen_project":null,"ammonia_project":null,"synthetic_lng_project":null,"retrofit_proposed":null,"url":"https://lngatlas.org/terminal/vista-pacifico-lng-terminal-mx/","data_source":"Data: Global Gas Infrastructure Tracker, Global Energy Monitor, September 2025"},{"terminal_slug":"vung-ang-lng-terminal-vn","terminal_name":"Vung Ang LNG Terminal","country":"Vietnam","country_iso":"VN","unit_name":null,"status":"proposed","facility_type":"import","floating_type":"unknown","capacity_mtpa":null,"capacity_bcm_y":null,"start_year":null,"planned_start_year":null,"original_planned_start_year":null,"fid_year":null,"construction_year":null,"shelved_year":null,"cancelled_year":2023,"stop_year":2023,"estimated_cost_usd":null,"estimated_cost_original":null,"estimated_cost_currency":null,"power_stations_supplied":"Vung Ang power station","floating_vessel_name":null,"ccs_project":null,"hydrogen_project":null,"ammonia_project":null,"synthetic_lng_project":null,"retrofit_proposed":null,"url":"https://lngatlas.org/terminal/vung-ang-lng-terminal-vn/","data_source":"Data: Global Gas Infrastructure Tracker, Global Energy Monitor, September 2025"},{"terminal_slug":"vysotsk-lng-terminal-ru","terminal_name":"Vysotsk LNG Terminal","country":"Russia","country_iso":"RU","unit_name":"T1","status":"operating","facility_type":"export","floating_type":"unknown","capacity_mtpa":0.75,"capacity_bcm_y":1.02,"start_year":2019,"planned_start_year":null,"original_planned_start_year":null,"fid_year":null,"construction_year":null,"shelved_year":null,"cancelled_year":null,"stop_year":null,"estimated_cost_usd":399000000,"estimated_cost_original":28500000000,"estimated_cost_currency":"RUB","power_stations_supplied":null,"floating_vessel_name":null,"ccs_project":null,"hydrogen_project":null,"ammonia_project":null,"synthetic_lng_project":null,"retrofit_proposed":null,"url":"https://lngatlas.org/terminal/vysotsk-lng-terminal-ru/","data_source":"Data: Global Gas Infrastructure Tracker, Global Energy Monitor, September 2025"},{"terminal_slug":"vysotsk-lng-terminal-ru","terminal_name":"Vysotsk LNG Terminal","country":"Russia","country_iso":"RU","unit_name":"T2","status":"operating","facility_type":"export","floating_type":"unknown","capacity_mtpa":0.75,"capacity_bcm_y":1.02,"start_year":2019,"planned_start_year":null,"original_planned_start_year":null,"fid_year":null,"construction_year":null,"shelved_year":null,"cancelled_year":null,"stop_year":null,"estimated_cost_usd":399000000,"estimated_cost_original":28500000000,"estimated_cost_currency":"RUB","power_stations_supplied":null,"floating_vessel_name":null,"ccs_project":null,"hydrogen_project":null,"ammonia_project":null,"synthetic_lng_project":null,"retrofit_proposed":null,"url":"https://lngatlas.org/terminal/vysotsk-lng-terminal-ru/","data_source":"Data: Global Gas Infrastructure Tracker, Global Energy Monitor, September 2025"},{"terminal_slug":"wcc-lng-terminal-ca","terminal_name":"WCC LNG Terminal","country":"Canada","country_iso":"CA","unit_name":"T1-T6","status":"cancelled","facility_type":"export","floating_type":"unknown","capacity_mtpa":30,"capacity_bcm_y":40.82,"start_year":null,"planned_start_year":null,"original_planned_start_year":2024,"fid_year":null,"construction_year":null,"shelved_year":null,"cancelled_year":2018,"stop_year":2018,"estimated_cost_usd":null,"estimated_cost_original":null,"estimated_cost_currency":null,"power_stations_supplied":null,"floating_vessel_name":null,"ccs_project":null,"hydrogen_project":null,"ammonia_project":null,"synthetic_lng_project":null,"retrofit_proposed":null,"url":"https://lngatlas.org/terminal/wcc-lng-terminal-ca/","data_source":"Data: Global Gas Infrastructure Tracker, Global Energy Monitor, September 2025"},{"terminal_slug":"wakayama-lng-terminal-jp","terminal_name":"Wakayama LNG Terminal","country":"Japan","country_iso":"JP","unit_name":null,"status":"cancelled","facility_type":"import","floating_type":"unknown","capacity_mtpa":2.57,"capacity_bcm_y":3.5,"start_year":null,"planned_start_year":null,"original_planned_start_year":2023,"fid_year":null,"construction_year":null,"shelved_year":null,"cancelled_year":2023,"stop_year":2023,"estimated_cost_usd":null,"estimated_cost_original":null,"estimated_cost_currency":null,"power_stations_supplied":null,"floating_vessel_name":null,"ccs_project":null,"hydrogen_project":null,"ammonia_project":null,"synthetic_lng_project":null,"retrofit_proposed":null,"url":"https://lngatlas.org/terminal/wakayama-lng-terminal-jp/","data_source":"Data: Global Gas Infrastructure Tracker, Global Energy Monitor, September 2025"},{"terminal_slug":"walvis-bay-lng-terminal-na","terminal_name":"Walvis Bay LNG Terminal","country":"Namibia","country_iso":"NA","unit_name":"Export Terminal","status":"cancelled","facility_type":"export","floating_type":"floating","capacity_mtpa":null,"capacity_bcm_y":null,"start_year":null,"planned_start_year":null,"original_planned_start_year":2019,"fid_year":null,"construction_year":null,"shelved_year":null,"cancelled_year":2019,"stop_year":2019,"estimated_cost_usd":null,"estimated_cost_original":null,"estimated_cost_currency":null,"power_stations_supplied":"Nathaniel Maxuilili","floating_vessel_name":null,"ccs_project":null,"hydrogen_project":null,"ammonia_project":null,"synthetic_lng_project":null,"retrofit_proposed":null,"url":"https://lngatlas.org/terminal/walvis-bay-lng-terminal-na/","data_source":"Data: Global Gas Infrastructure Tracker, Global Energy Monitor, September 2025"},{"terminal_slug":"walvis-bay-lng-terminal-na","terminal_name":"Walvis Bay LNG Terminal","country":"Namibia","country_iso":"NA","unit_name":"Import Terminal","status":"cancelled","facility_type":"import","floating_type":"floating","capacity_mtpa":null,"capacity_bcm_y":null,"start_year":null,"planned_start_year":null,"original_planned_start_year":2019,"fid_year":null,"construction_year":null,"shelved_year":null,"cancelled_year":2024,"stop_year":2024,"estimated_cost_usd":null,"estimated_cost_original":null,"estimated_cost_currency":null,"power_stations_supplied":"Nathaniel Maxuilili","floating_vessel_name":null,"ccs_project":null,"hydrogen_project":null,"ammonia_project":null,"synthetic_lng_project":null,"retrofit_proposed":null,"url":"https://lngatlas.org/terminal/walvis-bay-lng-terminal-na/","data_source":"Data: Global Gas Infrastructure Tracker, Global Energy Monitor, September 2025"},{"terminal_slug":"watson-island-lng-terminal-ca","terminal_name":"Watson Island LNG Terminal","country":"Canada","country_iso":"CA","unit_name":null,"status":"cancelled","facility_type":"export","floating_type":"unknown","capacity_mtpa":1,"capacity_bcm_y":1.36,"start_year":null,"planned_start_year":null,"original_planned_start_year":null,"fid_year":null,"construction_year":null,"shelved_year":2016,"cancelled_year":2018,"stop_year":2018,"estimated_cost_usd":null,"estimated_cost_original":null,"estimated_cost_currency":null,"power_stations_supplied":null,"floating_vessel_name":null,"ccs_project":null,"hydrogen_project":null,"ammonia_project":null,"synthetic_lng_project":null,"retrofit_proposed":null,"url":"https://lngatlas.org/terminal/watson-island-lng-terminal-ca/","data_source":"Data: Global Gas Infrastructure Tracker, Global Energy Monitor, September 2025"},{"terminal_slug":"weavers-cove-lng-terminal-us","terminal_name":"Weaver's Cove LNG Terminal","country":"United States","country_iso":"US","unit_name":null,"status":"cancelled","facility_type":"import","floating_type":"unknown","capacity_mtpa":6,"capacity_bcm_y":8.16,"start_year":null,"planned_start_year":null,"original_planned_start_year":null,"fid_year":null,"construction_year":null,"shelved_year":null,"cancelled_year":2011,"stop_year":2011,"estimated_cost_usd":null,"estimated_cost_original":null,"estimated_cost_currency":null,"power_stations_supplied":null,"floating_vessel_name":null,"ccs_project":null,"hydrogen_project":null,"ammonia_project":null,"synthetic_lng_project":null,"retrofit_proposed":null,"url":"https://lngatlas.org/terminal/weavers-cove-lng-terminal-us/","data_source":"Data: Global Gas Infrastructure Tracker, Global Energy Monitor, September 2025"},{"terminal_slug":"weihai-lng-terminal-cn","terminal_name":"Weihai LNG Terminal","country":"China","country_iso":"CN","unit_name":"Phase 1","status":"cancelled","facility_type":"import","floating_type":"unknown","capacity_mtpa":3,"capacity_bcm_y":4.08,"start_year":null,"planned_start_year":null,"original_planned_start_year":2022,"fid_year":null,"construction_year":null,"shelved_year":null,"cancelled_year":2024,"stop_year":2024,"estimated_cost_usd":1600000000,"estimated_cost_original":10000000000,"estimated_cost_currency":"RMB","power_stations_supplied":null,"floating_vessel_name":null,"ccs_project":null,"hydrogen_project":null,"ammonia_project":null,"synthetic_lng_project":null,"retrofit_proposed":null,"url":"https://lngatlas.org/terminal/weihai-lng-terminal-cn/","data_source":"Data: Global Gas Infrastructure Tracker, Global Energy Monitor, September 2025"},{"terminal_slug":"wenzhou-huagang-lng-terminal-cn","terminal_name":"Wenzhou Huagang LNG Terminal","country":"China","country_iso":"CN","unit_name":null,"status":"operating","facility_type":"import","floating_type":"unknown","capacity_mtpa":3,"capacity_bcm_y":4.08,"start_year":2025,"planned_start_year":null,"original_planned_start_year":2023,"fid_year":null,"construction_year":2020,"shelved_year":null,"cancelled_year":null,"stop_year":null,"estimated_cost_usd":448000000,"estimated_cost_original":2800000000,"estimated_cost_currency":"RMB","power_stations_supplied":null,"floating_vessel_name":null,"ccs_project":null,"hydrogen_project":null,"ammonia_project":null,"synthetic_lng_project":null,"retrofit_proposed":null,"url":"https://lngatlas.org/terminal/wenzhou-huagang-lng-terminal-cn/","data_source":"Data: Global Gas Infrastructure Tracker, Global Energy Monitor, September 2025"},{"terminal_slug":"wenzhou-lng-terminal-cn","terminal_name":"Wenzhou LNG Terminal","country":"China","country_iso":"CN","unit_name":null,"status":"operating","facility_type":"import","floating_type":"unknown","capacity_mtpa":3,"capacity_bcm_y":4.08,"start_year":2023,"planned_start_year":null,"original_planned_start_year":null,"fid_year":null,"construction_year":2018,"shelved_year":null,"cancelled_year":null,"stop_year":null,"estimated_cost_usd":1431360000,"estimated_cost_original":8946000000,"estimated_cost_currency":"RMB","power_stations_supplied":null,"floating_vessel_name":null,"ccs_project":null,"hydrogen_project":null,"ammonia_project":null,"synthetic_lng_project":null,"retrofit_proposed":null,"url":"https://lngatlas.org/terminal/wenzhou-lng-terminal-cn/","data_source":"Data: Global Gas Infrastructure Tracker, Global Energy Monitor, September 2025"},{"terminal_slug":"west-delta-lng-deepwater-port-terminal-us","terminal_name":"West Delta LNG Deepwater Port Terminal","country":"United States","country_iso":"US","unit_name":null,"status":"proposed","facility_type":"export","floating_type":"unknown","capacity_mtpa":6.1,"capacity_bcm_y":8.3,"start_year":null,"planned_start_year":2026,"original_planned_start_year":2023,"fid_year":null,"construction_year":null,"shelved_year":null,"cancelled_year":null,"stop_year":null,"estimated_cost_usd":null,"estimated_cost_original":null,"estimated_cost_currency":null,"power_stations_supplied":null,"floating_vessel_name":null,"ccs_project":null,"hydrogen_project":null,"ammonia_project":null,"synthetic_lng_project":null,"retrofit_proposed":null,"url":"https://lngatlas.org/terminal/west-delta-lng-deepwater-port-terminal-us/","data_source":"Data: Global Gas Infrastructure Tracker, Global Energy Monitor, September 2025"},{"terminal_slug":"west-guangdong-lng-terminal-cn","terminal_name":"West Guangdong LNG Terminal","country":"China","country_iso":"CN","unit_name":"Original Proposal (中海油粤西LNG接收站)","status":"cancelled","facility_type":"import","floating_type":"unknown","capacity_mtpa":3,"capacity_bcm_y":4.08,"start_year":null,"planned_start_year":null,"original_planned_start_year":null,"fid_year":null,"construction_year":null,"shelved_year":null,"cancelled_year":2018,"stop_year":2018,"estimated_cost_usd":null,"estimated_cost_original":null,"estimated_cost_currency":null,"power_stations_supplied":null,"floating_vessel_name":null,"ccs_project":null,"hydrogen_project":null,"ammonia_project":null,"synthetic_lng_project":null,"retrofit_proposed":null,"url":"https://lngatlas.org/terminal/west-guangdong-lng-terminal-cn/","data_source":"Data: Global Gas Infrastructure Tracker, Global Energy Monitor, September 2025"},{"terminal_slug":"west-guangdong-lng-terminal-cn","terminal_name":"West Guangdong LNG Terminal","country":"China","country_iso":"CN","unit_name":"协鑫中石油粤西茂名LNG接收站 (Revived Proposal )","status":"proposed","facility_type":"import","floating_type":"unknown","capacity_mtpa":3,"capacity_bcm_y":4.08,"start_year":null,"planned_start_year":null,"original_planned_start_year":null,"fid_year":null,"construction_year":null,"shelved_year":null,"cancelled_year":null,"stop_year":null,"estimated_cost_usd":null,"estimated_cost_original":null,"estimated_cost_currency":null,"power_stations_supplied":null,"floating_vessel_name":null,"ccs_project":null,"hydrogen_project":null,"ammonia_project":null,"synthetic_lng_project":null,"retrofit_proposed":null,"url":"https://lngatlas.org/terminal/west-guangdong-lng-terminal-cn/","data_source":"Data: Global Gas Infrastructure Tracker, Global Energy Monitor, September 2025"},{"terminal_slug":"west-papua-flng-terminal-id","terminal_name":"West Papua FLNG Terminal","country":"Indonesia","country_iso":"ID","unit_name":null,"status":"proposed","facility_type":"export","floating_type":"flng","capacity_mtpa":1.2,"capacity_bcm_y":1.63,"start_year":null,"planned_start_year":null,"original_planned_start_year":2026,"fid_year":2024,"construction_year":null,"shelved_year":null,"cancelled_year":null,"stop_year":null,"estimated_cost_usd":1200000000,"estimated_cost_original":1200000000,"estimated_cost_currency":"USD","power_stations_supplied":null,"floating_vessel_name":null,"ccs_project":null,"hydrogen_project":null,"ammonia_project":null,"synthetic_lng_project":null,"retrofit_proposed":null,"url":"https://lngatlas.org/terminal/west-papua-flng-terminal-id/","data_source":"Data: Global Gas Infrastructure Tracker, Global Energy Monitor, September 2025"},{"terminal_slug":"western-lng-terminal-pg","terminal_name":"Western LNG Terminal","country":"Papua New Guinea","country_iso":"PG","unit_name":null,"status":"cancelled","facility_type":"export","floating_type":"unknown","capacity_mtpa":1.5,"capacity_bcm_y":2.04,"start_year":null,"planned_start_year":null,"original_planned_start_year":2023,"fid_year":null,"construction_year":null,"shelved_year":2021,"cancelled_year":2024,"stop_year":2024,"estimated_cost_usd":null,"estimated_cost_original":null,"estimated_cost_currency":null,"power_stations_supplied":null,"floating_vessel_name":null,"ccs_project":null,"hydrogen_project":null,"ammonia_project":null,"synthetic_lng_project":null,"retrofit_proposed":null,"url":"https://lngatlas.org/terminal/western-lng-terminal-pg/","data_source":"Data: Global Gas Infrastructure Tracker, Global Energy Monitor, September 2025"},{"terminal_slug":"wheatstone-lng-terminal-au","terminal_name":"Wheatstone LNG Terminal","country":"Australia","country_iso":"AU","unit_name":"T1","status":"operating","facility_type":"export","floating_type":"unknown","capacity_mtpa":4.45,"capacity_bcm_y":6.05,"start_year":2017,"planned_start_year":null,"original_planned_start_year":null,"fid_year":null,"construction_year":null,"shelved_year":null,"cancelled_year":null,"stop_year":null,"estimated_cost_usd":null,"estimated_cost_original":null,"estimated_cost_currency":null,"power_stations_supplied":null,"floating_vessel_name":null,"ccs_project":null,"hydrogen_project":null,"ammonia_project":null,"synthetic_lng_project":null,"retrofit_proposed":null,"url":"https://lngatlas.org/terminal/wheatstone-lng-terminal-au/","data_source":"Data: Global Gas Infrastructure Tracker, Global Energy Monitor, September 2025"},{"terminal_slug":"wheatstone-lng-terminal-au","terminal_name":"Wheatstone LNG Terminal","country":"Australia","country_iso":"AU","unit_name":"T2","status":"operating","facility_type":"export","floating_type":"unknown","capacity_mtpa":4.45,"capacity_bcm_y":6.05,"start_year":2018,"planned_start_year":null,"original_planned_start_year":null,"fid_year":null,"construction_year":null,"shelved_year":null,"cancelled_year":null,"stop_year":null,"estimated_cost_usd":null,"estimated_cost_original":null,"estimated_cost_currency":null,"power_stations_supplied":null,"floating_vessel_name":null,"ccs_project":null,"hydrogen_project":null,"ammonia_project":null,"synthetic_lng_project":null,"retrofit_proposed":null,"url":"https://lngatlas.org/terminal/wheatstone-lng-terminal-au/","data_source":"Data: Global Gas Infrastructure Tracker, Global Energy Monitor, September 2025"},{"terminal_slug":"wilhelmshaven-fsru-de","terminal_name":"Wilhelmshaven FSRU","country":"Germany","country_iso":"DE","unit_name":null,"status":"operating","facility_type":"import","floating_type":"fsru","capacity_mtpa":5.7,"capacity_bcm_y":7.76,"start_year":2023,"planned_start_year":null,"original_planned_start_year":null,"fid_year":null,"construction_year":2022,"shelved_year":null,"cancelled_year":null,"stop_year":null,"estimated_cost_usd":490500000,"estimated_cost_original":450000000,"estimated_cost_currency":"EUR","power_stations_supplied":null,"floating_vessel_name":"Höegh Esperanza","ccs_project":null,"hydrogen_project":true,"ammonia_project":true,"synthetic_lng_project":null,"retrofit_proposed":null,"url":"https://lngatlas.org/terminal/wilhelmshaven-fsru-de/","data_source":"Data: Global Gas Infrastructure Tracker, Global Energy Monitor, September 2025"},{"terminal_slug":"wilhelmshaven-fsru-de","terminal_name":"Wilhelmshaven FSRU","country":"Germany","country_iso":"DE","unit_name":"Ammonia Import Terminal","status":"proposed","facility_type":"import","floating_type":"fsru","capacity_mtpa":2.6,"capacity_bcm_y":3.54,"start_year":null,"planned_start_year":null,"original_planned_start_year":2030,"fid_year":null,"construction_year":null,"shelved_year":null,"cancelled_year":null,"stop_year":null,"estimated_cost_usd":null,"estimated_cost_original":null,"estimated_cost_currency":null,"power_stations_supplied":null,"floating_vessel_name":"Höegh Esperanza","ccs_project":null,"hydrogen_project":true,"ammonia_project":true,"synthetic_lng_project":null,"retrofit_proposed":null,"url":"https://lngatlas.org/terminal/wilhelmshaven-fsru-de/","data_source":"Data: Global Gas Infrastructure Tracker, Global Energy Monitor, September 2025"},{"terminal_slug":"wilhelmshaven-nwo-fsru-de","terminal_name":"Wilhelmshaven NWO FSRU","country":"Germany","country_iso":"DE","unit_name":null,"status":"shelved","facility_type":"import","floating_type":"fsru","capacity_mtpa":6.62,"capacity_bcm_y":9.01,"start_year":null,"planned_start_year":null,"original_planned_start_year":2023,"fid_year":null,"construction_year":null,"shelved_year":null,"cancelled_year":null,"stop_year":null,"estimated_cost_usd":null,"estimated_cost_original":null,"estimated_cost_currency":null,"power_stations_supplied":null,"floating_vessel_name":null,"ccs_project":null,"hydrogen_project":null,"ammonia_project":null,"synthetic_lng_project":null,"retrofit_proposed":null,"url":"https://lngatlas.org/terminal/wilhelmshaven-nwo-fsru-de/","data_source":"Data: Global Gas Infrastructure Tracker, Global Energy Monitor, September 2025"},{"terminal_slug":"wilhelmshaven-tes-fsru-de","terminal_name":"Wilhelmshaven TES FSRU","country":"Germany","country_iso":"DE","unit_name":null,"status":"operating","facility_type":"import","floating_type":"fsru","capacity_mtpa":3.31,"capacity_bcm_y":4.5,"start_year":2025,"planned_start_year":null,"original_planned_start_year":2023,"fid_year":null,"construction_year":2023,"shelved_year":null,"cancelled_year":null,"stop_year":null,"estimated_cost_usd":null,"estimated_cost_original":null,"estimated_cost_currency":null,"power_stations_supplied":null,"floating_vessel_name":"Excelsior","ccs_project":null,"hydrogen_project":null,"ammonia_project":null,"synthetic_lng_project":null,"retrofit_proposed":null,"url":"https://lngatlas.org/terminal/wilhelmshaven-tes-fsru-de/","data_source":"Data: Global Gas Infrastructure Tracker, Global Energy Monitor, September 2025"},{"terminal_slug":"jade-energy-lng-terminal-de","terminal_name":"Wilhelmshaven TES LNG Terminal","country":"Germany","country_iso":"DE","unit_name":null,"status":"proposed","facility_type":"import","floating_type":"unknown","capacity_mtpa":11.03,"capacity_bcm_y":15.01,"start_year":null,"planned_start_year":null,"original_planned_start_year":2025,"fid_year":null,"construction_year":null,"shelved_year":null,"cancelled_year":null,"stop_year":null,"estimated_cost_usd":null,"estimated_cost_original":null,"estimated_cost_currency":null,"power_stations_supplied":null,"floating_vessel_name":null,"ccs_project":null,"hydrogen_project":true,"ammonia_project":null,"synthetic_lng_project":true,"retrofit_proposed":null,"url":"https://lngatlas.org/terminal/jade-energy-lng-terminal-de/","data_source":"Data: Global Gas Infrastructure Tracker, Global Energy Monitor, September 2025"},{"terminal_slug":"jade-energy-lng-terminal-de","terminal_name":"Wilhelmshaven TES LNG Terminal","country":"Germany","country_iso":"DE","unit_name":"eLNG Import Terminal","status":"proposed","facility_type":"import","floating_type":"unknown","capacity_mtpa":null,"capacity_bcm_y":null,"start_year":null,"planned_start_year":null,"original_planned_start_year":2025,"fid_year":null,"construction_year":null,"shelved_year":null,"cancelled_year":null,"stop_year":null,"estimated_cost_usd":null,"estimated_cost_original":null,"estimated_cost_currency":null,"power_stations_supplied":null,"floating_vessel_name":null,"ccs_project":null,"hydrogen_project":true,"ammonia_project":null,"synthetic_lng_project":true,"retrofit_proposed":null,"url":"https://lngatlas.org/terminal/jade-energy-lng-terminal-de/","data_source":"Data: Global Gas Infrastructure Tracker, Global Energy Monitor, September 2025"},{"terminal_slug":"woodfibre-lng-terminal-ca","terminal_name":"Woodfibre LNG Terminal","country":"Canada","country_iso":"CA","unit_name":null,"status":"construction","facility_type":"export","floating_type":"unknown","capacity_mtpa":2.1,"capacity_bcm_y":2.86,"start_year":null,"planned_start_year":2028,"original_planned_start_year":2025,"fid_year":null,"construction_year":2023,"shelved_year":null,"cancelled_year":null,"stop_year":null,"estimated_cost_usd":8800000000,"estimated_cost_original":8800000000,"estimated_cost_currency":"USD","power_stations_supplied":null,"floating_vessel_name":null,"ccs_project":null,"hydrogen_project":null,"ammonia_project":null,"synthetic_lng_project":null,"retrofit_proposed":null,"url":"https://lngatlas.org/terminal/woodfibre-lng-terminal-ca/","data_source":"Data: Global Gas Infrastructure Tracker, Global Energy Monitor, September 2025"},{"terminal_slug":"woodside-louisiana-lng-terminal-us","terminal_name":"Woodside Louisiana LNG Terminal","country":"United States","country_iso":"US","unit_name":"Phase 1 (T1-T3)","status":"construction","facility_type":"export","floating_type":"unknown","capacity_mtpa":16.5,"capacity_bcm_y":22.45,"start_year":null,"planned_start_year":2027,"original_planned_start_year":2024,"fid_year":2025,"construction_year":2025,"shelved_year":null,"cancelled_year":null,"stop_year":null,"estimated_cost_usd":17500000000,"estimated_cost_original":17500000000,"estimated_cost_currency":"USD","power_stations_supplied":null,"floating_vessel_name":null,"ccs_project":null,"hydrogen_project":null,"ammonia_project":null,"synthetic_lng_project":null,"retrofit_proposed":null,"url":"https://lngatlas.org/terminal/woodside-louisiana-lng-terminal-us/","data_source":"Data: Global Gas Infrastructure Tracker, Global Energy Monitor, September 2025"},{"terminal_slug":"woodside-louisiana-lng-terminal-us","terminal_name":"Woodside Louisiana LNG Terminal","country":"United States","country_iso":"US","unit_name":"Phase 2 (T4-T5)","status":"proposed","facility_type":"export","floating_type":"unknown","capacity_mtpa":11.1,"capacity_bcm_y":15.1,"start_year":null,"planned_start_year":2028,"original_planned_start_year":2025,"fid_year":2023,"construction_year":null,"shelved_year":null,"cancelled_year":null,"stop_year":null,"estimated_cost_usd":null,"estimated_cost_original":null,"estimated_cost_currency":null,"power_stations_supplied":null,"floating_vessel_name":null,"ccs_project":null,"hydrogen_project":null,"ammonia_project":null,"synthetic_lng_project":null,"retrofit_proposed":null,"url":"https://lngatlas.org/terminal/woodside-louisiana-lng-terminal-us/","data_source":"Data: Global Gas Infrastructure Tracker, Global Energy Monitor, September 2025"},{"terminal_slug":"woodside-probolinggo-lng-terminal-id","terminal_name":"Woodside Probolinggo LNG Terminal","country":"Indonesia","country_iso":"ID","unit_name":null,"status":"cancelled","facility_type":"import","floating_type":"unknown","capacity_mtpa":null,"capacity_bcm_y":null,"start_year":null,"planned_start_year":null,"original_planned_start_year":null,"fid_year":null,"construction_year":null,"shelved_year":2023,"cancelled_year":2025,"stop_year":2025,"estimated_cost_usd":null,"estimated_cost_original":null,"estimated_cost_currency":null,"power_stations_supplied":null,"floating_vessel_name":null,"ccs_project":null,"hydrogen_project":null,"ammonia_project":null,"synthetic_lng_project":null,"retrofit_proposed":null,"url":"https://lngatlas.org/terminal/woodside-probolinggo-lng-terminal-id/","data_source":"Data: Global Gas Infrastructure Tracker, Global Energy Monitor, September 2025"},{"terminal_slug":"wuhan-lng-terminal-cn","terminal_name":"Wuhan LNG Terminal","country":"China","country_iso":"CN","unit_name":null,"status":"shelved","facility_type":"import","floating_type":"unknown","capacity_mtpa":1.86,"capacity_bcm_y":2.53,"start_year":null,"planned_start_year":null,"original_planned_start_year":2035,"fid_year":null,"construction_year":null,"shelved_year":null,"cancelled_year":null,"stop_year":null,"estimated_cost_usd":null,"estimated_cost_original":null,"estimated_cost_currency":null,"power_stations_supplied":null,"floating_vessel_name":null,"ccs_project":null,"hydrogen_project":null,"ammonia_project":null,"synthetic_lng_project":null,"retrofit_proposed":null,"url":"https://lngatlas.org/terminal/wuhan-lng-terminal-cn/","data_source":"Data: Global Gas Infrastructure Tracker, Global Energy Monitor, September 2025"},{"terminal_slug":"wuhaogou-lng-storage-facility-cn","terminal_name":"Wuhaogou LNG Storage Facility","country":"China","country_iso":"CN","unit_name":"Phase 1","status":"operating","facility_type":"import","floating_type":"unknown","capacity_mtpa":0.5,"capacity_bcm_y":0.68,"start_year":2008,"planned_start_year":null,"original_planned_start_year":null,"fid_year":null,"construction_year":2006,"shelved_year":null,"cancelled_year":null,"stop_year":null,"estimated_cost_usd":160000000,"estimated_cost_original":1000000000,"estimated_cost_currency":"RMB","power_stations_supplied":null,"floating_vessel_name":null,"ccs_project":null,"hydrogen_project":null,"ammonia_project":null,"synthetic_lng_project":null,"retrofit_proposed":null,"url":"https://lngatlas.org/terminal/wuhaogou-lng-storage-facility-cn/","data_source":"Data: Global Gas Infrastructure Tracker, Global Energy Monitor, September 2025"},{"terminal_slug":"wuhaogou-lng-storage-facility-cn","terminal_name":"Wuhaogou LNG Storage Facility","country":"China","country_iso":"CN","unit_name":"Phase 2","status":"operating","facility_type":"import","floating_type":"unknown","capacity_mtpa":1,"capacity_bcm_y":1.36,"start_year":2017,"planned_start_year":null,"original_planned_start_year":null,"fid_year":null,"construction_year":null,"shelved_year":null,"cancelled_year":null,"stop_year":null,"estimated_cost_usd":192000000,"estimated_cost_original":1200000000,"estimated_cost_currency":"RMB","power_stations_supplied":null,"floating_vessel_name":null,"ccs_project":null,"hydrogen_project":null,"ammonia_project":null,"synthetic_lng_project":null,"retrofit_proposed":null,"url":"https://lngatlas.org/terminal/wuhaogou-lng-storage-facility-cn/","data_source":"Data: Global Gas Infrastructure Tracker, Global Energy Monitor, September 2025"},{"terminal_slug":"wuhu-lng-terminal-cn","terminal_name":"Wuhu LNG Terminal","country":"China","country_iso":"CN","unit_name":null,"status":"construction","facility_type":"import","floating_type":"unknown","capacity_mtpa":1.5,"capacity_bcm_y":2.04,"start_year":null,"planned_start_year":null,"original_planned_start_year":null,"fid_year":null,"construction_year":2020,"shelved_year":null,"cancelled_year":null,"stop_year":null,"estimated_cost_usd":928000000,"estimated_cost_original":5800000000,"estimated_cost_currency":"RMB","power_stations_supplied":null,"floating_vessel_name":null,"ccs_project":null,"hydrogen_project":null,"ammonia_project":null,"synthetic_lng_project":null,"retrofit_proposed":null,"url":"https://lngatlas.org/terminal/wuhu-lng-terminal-cn/","data_source":"Data: Global Gas Infrastructure Tracker, Global Energy Monitor, September 2025"},{"terminal_slug":"yakaar-teranga-lng-hub-sn","terminal_name":"Yakaar-Teranga LNG Hub","country":"Senegal","country_iso":"SN","unit_name":null,"status":"proposed","facility_type":"export","floating_type":"unknown","capacity_mtpa":10,"capacity_bcm_y":13.61,"start_year":null,"planned_start_year":null,"original_planned_start_year":2026,"fid_year":2025,"construction_year":null,"shelved_year":null,"cancelled_year":null,"stop_year":null,"estimated_cost_usd":null,"estimated_cost_original":null,"estimated_cost_currency":null,"power_stations_supplied":null,"floating_vessel_name":null,"ccs_project":null,"hydrogen_project":null,"ammonia_project":null,"synthetic_lng_project":null,"retrofit_proposed":null,"url":"https://lngatlas.org/terminal/yakaar-teranga-lng-hub-sn/","data_source":"Data: Global Gas Infrastructure Tracker, Global Energy Monitor, September 2025"},{"terminal_slug":"yakutia-lng-project-ru","terminal_name":"Yakutia LNG Project","country":"Russia","country_iso":"RU","unit_name":"T1","status":"proposed","facility_type":"export","floating_type":"unknown","capacity_mtpa":4.5,"capacity_bcm_y":6.12,"start_year":null,"planned_start_year":null,"original_planned_start_year":2027,"fid_year":2023,"construction_year":null,"shelved_year":null,"cancelled_year":null,"stop_year":null,"estimated_cost_usd":null,"estimated_cost_original":null,"estimated_cost_currency":null,"power_stations_supplied":null,"floating_vessel_name":null,"ccs_project":null,"hydrogen_project":null,"ammonia_project":null,"synthetic_lng_project":null,"retrofit_proposed":null,"url":"https://lngatlas.org/terminal/yakutia-lng-project-ru/","data_source":"Data: Global Gas Infrastructure Tracker, Global Energy Monitor, September 2025"},{"terminal_slug":"yakutia-lng-project-ru","terminal_name":"Yakutia LNG Project","country":"Russia","country_iso":"RU","unit_name":"T2","status":"proposed","facility_type":"export","floating_type":"unknown","capacity_mtpa":4.5,"capacity_bcm_y":6.12,"start_year":null,"planned_start_year":null,"original_planned_start_year":null,"fid_year":null,"construction_year":null,"shelved_year":null,"cancelled_year":null,"stop_year":null,"estimated_cost_usd":null,"estimated_cost_original":null,"estimated_cost_currency":null,"power_stations_supplied":null,"floating_vessel_name":null,"ccs_project":null,"hydrogen_project":null,"ammonia_project":null,"synthetic_lng_project":null,"retrofit_proposed":null,"url":"https://lngatlas.org/terminal/yakutia-lng-project-ru/","data_source":"Data: Global Gas Infrastructure Tracker, Global Energy Monitor, September 2025"},{"terminal_slug":"yamal-lng-terminal-ru","terminal_name":"Yamal LNG Terminal","country":"Russia","country_iso":"RU","unit_name":"T1","status":"operating","facility_type":"export","floating_type":"unknown","capacity_mtpa":5.5,"capacity_bcm_y":7.48,"start_year":2017,"planned_start_year":null,"original_planned_start_year":null,"fid_year":null,"construction_year":null,"shelved_year":null,"cancelled_year":null,"stop_year":null,"estimated_cost_usd":null,"estimated_cost_original":null,"estimated_cost_currency":null,"power_stations_supplied":null,"floating_vessel_name":null,"ccs_project":null,"hydrogen_project":null,"ammonia_project":null,"synthetic_lng_project":null,"retrofit_proposed":null,"url":"https://lngatlas.org/terminal/yamal-lng-terminal-ru/","data_source":"Data: Global Gas Infrastructure Tracker, Global Energy Monitor, September 2025"},{"terminal_slug":"yamal-lng-terminal-ru","terminal_name":"Yamal LNG Terminal","country":"Russia","country_iso":"RU","unit_name":"T2","status":"operating","facility_type":"export","floating_type":"unknown","capacity_mtpa":5.5,"capacity_bcm_y":7.48,"start_year":2018,"planned_start_year":null,"original_planned_start_year":null,"fid_year":null,"construction_year":null,"shelved_year":null,"cancelled_year":null,"stop_year":null,"estimated_cost_usd":null,"estimated_cost_original":null,"estimated_cost_currency":null,"power_stations_supplied":null,"floating_vessel_name":null,"ccs_project":null,"hydrogen_project":null,"ammonia_project":null,"synthetic_lng_project":null,"retrofit_proposed":null,"url":"https://lngatlas.org/terminal/yamal-lng-terminal-ru/","data_source":"Data: Global Gas Infrastructure Tracker, Global Energy Monitor, September 2025"},{"terminal_slug":"yamal-lng-terminal-ru","terminal_name":"Yamal LNG Terminal","country":"Russia","country_iso":"RU","unit_name":"T3","status":"operating","facility_type":"export","floating_type":"unknown","capacity_mtpa":5.5,"capacity_bcm_y":7.48,"start_year":2018,"planned_start_year":null,"original_planned_start_year":null,"fid_year":null,"construction_year":null,"shelved_year":null,"cancelled_year":null,"stop_year":null,"estimated_cost_usd":null,"estimated_cost_original":null,"estimated_cost_currency":null,"power_stations_supplied":null,"floating_vessel_name":null,"ccs_project":null,"hydrogen_project":null,"ammonia_project":null,"synthetic_lng_project":null,"retrofit_proposed":null,"url":"https://lngatlas.org/terminal/yamal-lng-terminal-ru/","data_source":"Data: Global Gas Infrastructure Tracker, Global Energy Monitor, September 2025"},{"terminal_slug":"yamal-lng-terminal-ru","terminal_name":"Yamal LNG Terminal","country":"Russia","country_iso":"RU","unit_name":"T4","status":"operating","facility_type":"export","floating_type":"unknown","capacity_mtpa":0.9,"capacity_bcm_y":1.22,"start_year":2021,"planned_start_year":null,"original_planned_start_year":null,"fid_year":null,"construction_year":null,"shelved_year":null,"cancelled_year":null,"stop_year":null,"estimated_cost_usd":null,"estimated_cost_original":null,"estimated_cost_currency":null,"power_stations_supplied":null,"floating_vessel_name":null,"ccs_project":null,"hydrogen_project":null,"ammonia_project":null,"synthetic_lng_project":null,"retrofit_proposed":null,"url":"https://lngatlas.org/terminal/yamal-lng-terminal-ru/","data_source":"Data: Global Gas Infrastructure Tracker, Global Energy Monitor, September 2025"},{"terminal_slug":"yanai-lng-terminal-jp","terminal_name":"Yanai LNG Terminal","country":"Japan","country_iso":"JP","unit_name":null,"status":"operating","facility_type":"import","floating_type":"unknown","capacity_mtpa":2.3,"capacity_bcm_y":3.13,"start_year":1990,"planned_start_year":null,"original_planned_start_year":null,"fid_year":null,"construction_year":null,"shelved_year":null,"cancelled_year":null,"stop_year":null,"estimated_cost_usd":null,"estimated_cost_original":null,"estimated_cost_currency":null,"power_stations_supplied":null,"floating_vessel_name":null,"ccs_project":null,"hydrogen_project":null,"ammonia_project":null,"synthetic_lng_project":null,"retrofit_proposed":null,"url":"https://lngatlas.org/terminal/yanai-lng-terminal-jp/","data_source":"Data: Global Gas Infrastructure Tracker, Global Energy Monitor, September 2025"},{"terminal_slug":"yancheng-lng-terminal-cn","terminal_name":"Yancheng LNG Terminal","country":"China","country_iso":"CN","unit_name":"Phase 1","status":"operating","facility_type":"import","floating_type":"unknown","capacity_mtpa":3,"capacity_bcm_y":4.08,"start_year":2022,"planned_start_year":null,"original_planned_start_year":null,"fid_year":null,"construction_year":2019,"shelved_year":null,"cancelled_year":null,"stop_year":null,"estimated_cost_usd":1440000000,"estimated_cost_original":9000000000,"estimated_cost_currency":"RMB","power_stations_supplied":null,"floating_vessel_name":null,"ccs_project":null,"hydrogen_project":null,"ammonia_project":null,"synthetic_lng_project":null,"retrofit_proposed":null,"url":"https://lngatlas.org/terminal/yancheng-lng-terminal-cn/","data_source":"Data: Global Gas Infrastructure Tracker, Global Energy Monitor, September 2025"},{"terminal_slug":"yancheng-lng-terminal-cn","terminal_name":"Yancheng LNG Terminal","country":"China","country_iso":"CN","unit_name":"Phase 1 Expansion","status":"operating","facility_type":"import","floating_type":"unknown","capacity_mtpa":3,"capacity_bcm_y":4.08,"start_year":2024,"planned_start_year":null,"original_planned_start_year":2023,"fid_year":null,"construction_year":2021,"shelved_year":null,"cancelled_year":null,"stop_year":null,"estimated_cost_usd":976000000,"estimated_cost_original":6100000000,"estimated_cost_currency":"RMB","power_stations_supplied":null,"floating_vessel_name":null,"ccs_project":null,"hydrogen_project":null,"ammonia_project":null,"synthetic_lng_project":null,"retrofit_proposed":null,"url":"https://lngatlas.org/terminal/yancheng-lng-terminal-cn/","data_source":"Data: Global Gas Infrastructure Tracker, Global Energy Monitor, September 2025"},{"terminal_slug":"yancheng-lng-terminal-cn","terminal_name":"Yancheng LNG Terminal","country":"China","country_iso":"CN","unit_name":"Phase 2","status":"proposed","facility_type":"import","floating_type":"unknown","capacity_mtpa":4,"capacity_bcm_y":5.44,"start_year":null,"planned_start_year":null,"original_planned_start_year":null,"fid_year":null,"construction_year":null,"shelved_year":null,"cancelled_year":null,"stop_year":null,"estimated_cost_usd":null,"estimated_cost_original":null,"estimated_cost_currency":null,"power_stations_supplied":null,"floating_vessel_name":null,"ccs_project":null,"hydrogen_project":null,"ammonia_project":null,"synthetic_lng_project":null,"retrofit_proposed":null,"url":"https://lngatlas.org/terminal/yancheng-lng-terminal-cn/","data_source":"Data: Global Gas Infrastructure Tracker, Global Energy Monitor, September 2025"},{"terminal_slug":"yancheng-lng-terminal-cn","terminal_name":"Yancheng LNG Terminal","country":"China","country_iso":"CN","unit_name":"Phase 3","status":"proposed","facility_type":"import","floating_type":"unknown","capacity_mtpa":10,"capacity_bcm_y":13.61,"start_year":null,"planned_start_year":null,"original_planned_start_year":null,"fid_year":null,"construction_year":null,"shelved_year":null,"cancelled_year":null,"stop_year":null,"estimated_cost_usd":null,"estimated_cost_original":null,"estimated_cost_currency":null,"power_stations_supplied":null,"floating_vessel_name":null,"ccs_project":null,"hydrogen_project":null,"ammonia_project":null,"synthetic_lng_project":null,"retrofit_proposed":null,"url":"https://lngatlas.org/terminal/yancheng-lng-terminal-cn/","data_source":"Data: Global Gas Infrastructure Tracker, Global Energy Monitor, September 2025"},{"terminal_slug":"yangjiang-lng-terminal-cn","terminal_name":"Yangjiang LNG Terminal","country":"China","country_iso":"CN","unit_name":"Phase 1","status":"construction","facility_type":"import","floating_type":"unknown","capacity_mtpa":2.8,"capacity_bcm_y":3.81,"start_year":null,"planned_start_year":2025,"original_planned_start_year":2024,"fid_year":null,"construction_year":2019,"shelved_year":null,"cancelled_year":null,"stop_year":null,"estimated_cost_usd":864000000,"estimated_cost_original":5400000000,"estimated_cost_currency":"RMB","power_stations_supplied":null,"floating_vessel_name":null,"ccs_project":null,"hydrogen_project":null,"ammonia_project":null,"synthetic_lng_project":null,"retrofit_proposed":null,"url":"https://lngatlas.org/terminal/yangjiang-lng-terminal-cn/","data_source":"Data: Global Gas Infrastructure Tracker, Global Energy Monitor, September 2025"},{"terminal_slug":"yantai-fsru-cn","terminal_name":"Yantai FSRU","country":"China","country_iso":"CN","unit_name":null,"status":"cancelled","facility_type":"import","floating_type":"fsru","capacity_mtpa":null,"capacity_bcm_y":null,"start_year":null,"planned_start_year":null,"original_planned_start_year":null,"fid_year":null,"construction_year":null,"shelved_year":2014,"cancelled_year":2016,"stop_year":2016,"estimated_cost_usd":null,"estimated_cost_original":null,"estimated_cost_currency":null,"power_stations_supplied":null,"floating_vessel_name":null,"ccs_project":null,"hydrogen_project":null,"ammonia_project":null,"synthetic_lng_project":null,"retrofit_proposed":null,"url":"https://lngatlas.org/terminal/yantai-fsru-cn/","data_source":"Data: Global Gas Infrastructure Tracker, Global Energy Monitor, September 2025"},{"terminal_slug":"yantai-lng-terminal-cn","terminal_name":"Yantai LNG Terminal","country":"China","country_iso":"CN","unit_name":"Phase 1","status":"construction","facility_type":"import","floating_type":"unknown","capacity_mtpa":5.9,"capacity_bcm_y":8.03,"start_year":null,"planned_start_year":null,"original_planned_start_year":2026,"fid_year":null,"construction_year":2020,"shelved_year":null,"cancelled_year":null,"stop_year":null,"estimated_cost_usd":1330560000,"estimated_cost_original":8316000000,"estimated_cost_currency":"RMB","power_stations_supplied":null,"floating_vessel_name":null,"ccs_project":null,"hydrogen_project":null,"ammonia_project":null,"synthetic_lng_project":null,"retrofit_proposed":null,"url":"https://lngatlas.org/terminal/yantai-lng-terminal-cn/","data_source":"Data: Global Gas Infrastructure Tracker, Global Energy Monitor, September 2025"},{"terminal_slug":"yantai-lng-terminal-cn","terminal_name":"Yantai LNG Terminal","country":"China","country_iso":"CN","unit_name":"Phase 2","status":"proposed","facility_type":"import","floating_type":"unknown","capacity_mtpa":4.1,"capacity_bcm_y":5.58,"start_year":null,"planned_start_year":null,"original_planned_start_year":null,"fid_year":null,"construction_year":null,"shelved_year":null,"cancelled_year":null,"stop_year":null,"estimated_cost_usd":null,"estimated_cost_original":null,"estimated_cost_currency":null,"power_stations_supplied":null,"floating_vessel_name":null,"ccs_project":null,"hydrogen_project":null,"ammonia_project":null,"synthetic_lng_project":null,"retrofit_proposed":null,"url":"https://lngatlas.org/terminal/yantai-lng-terminal-cn/","data_source":"Data: Global Gas Infrastructure Tracker, Global Energy Monitor, September 2025"},{"terminal_slug":"yantai-lng-terminal-petrochina-cn","terminal_name":"Yantai LNG Terminal (PetroChina)","country":"China","country_iso":"CN","unit_name":null,"status":"cancelled","facility_type":"import","floating_type":"unknown","capacity_mtpa":3,"capacity_bcm_y":4.08,"start_year":null,"planned_start_year":null,"original_planned_start_year":null,"fid_year":null,"construction_year":null,"shelved_year":2023,"cancelled_year":2025,"stop_year":2025,"estimated_cost_usd":1120000000,"estimated_cost_original":7000000000,"estimated_cost_currency":"RMB","power_stations_supplied":null,"floating_vessel_name":null,"ccs_project":null,"hydrogen_project":null,"ammonia_project":null,"synthetic_lng_project":null,"retrofit_proposed":null,"url":"https://lngatlas.org/terminal/yantai-lng-terminal-petrochina-cn/","data_source":"Data: Global Gas Infrastructure Tracker, Global Energy Monitor, September 2025"},{"terminal_slug":"yemen-lng-terminal-ye","terminal_name":"Yemen LNG Terminal","country":"Yemen","country_iso":"YE","unit_name":"T1","status":"mothballed","facility_type":"export","floating_type":"unknown","capacity_mtpa":3.35,"capacity_bcm_y":4.56,"start_year":2009,"planned_start_year":null,"original_planned_start_year":null,"fid_year":null,"construction_year":null,"shelved_year":null,"cancelled_year":null,"stop_year":2015,"estimated_cost_usd":null,"estimated_cost_original":null,"estimated_cost_currency":null,"power_stations_supplied":null,"floating_vessel_name":null,"ccs_project":null,"hydrogen_project":null,"ammonia_project":null,"synthetic_lng_project":null,"retrofit_proposed":null,"url":"https://lngatlas.org/terminal/yemen-lng-terminal-ye/","data_source":"Data: Global Gas Infrastructure Tracker, Global Energy Monitor, September 2025"},{"terminal_slug":"yemen-lng-terminal-ye","terminal_name":"Yemen LNG Terminal","country":"Yemen","country_iso":"YE","unit_name":"T2","status":"mothballed","facility_type":"export","floating_type":"unknown","capacity_mtpa":3.35,"capacity_bcm_y":4.56,"start_year":2010,"planned_start_year":null,"original_planned_start_year":null,"fid_year":null,"construction_year":null,"shelved_year":null,"cancelled_year":null,"stop_year":2015,"estimated_cost_usd":null,"estimated_cost_original":null,"estimated_cost_currency":null,"power_stations_supplied":null,"floating_vessel_name":null,"ccs_project":null,"hydrogen_project":null,"ammonia_project":null,"synthetic_lng_project":null,"retrofit_proposed":null,"url":"https://lngatlas.org/terminal/yemen-lng-terminal-ye/","data_source":"Data: Global Gas Infrastructure Tracker, Global Energy Monitor, September 2025"},{"terminal_slug":"yingkou-lng-terminal-cn","terminal_name":"Yingkou LNG Terminal","country":"China","country_iso":"CN","unit_name":"Phase 1","status":"construction","facility_type":"import","floating_type":"unknown","capacity_mtpa":3,"capacity_bcm_y":4.08,"start_year":null,"planned_start_year":null,"original_planned_start_year":2026,"fid_year":null,"construction_year":2022,"shelved_year":null,"cancelled_year":null,"stop_year":null,"estimated_cost_usd":1856000000,"estimated_cost_original":11600000000,"estimated_cost_currency":"RMB","power_stations_supplied":null,"floating_vessel_name":null,"ccs_project":null,"hydrogen_project":null,"ammonia_project":null,"synthetic_lng_project":null,"retrofit_proposed":null,"url":"https://lngatlas.org/terminal/yingkou-lng-terminal-cn/","data_source":"Data: Global Gas Infrastructure Tracker, Global Energy Monitor, September 2025"},{"terminal_slug":"yingkou-lng-terminal-cn","terminal_name":"Yingkou LNG Terminal","country":"China","country_iso":"CN","unit_name":"Phase 2","status":"proposed","facility_type":"import","floating_type":"unknown","capacity_mtpa":3.2,"capacity_bcm_y":4.35,"start_year":null,"planned_start_year":null,"original_planned_start_year":null,"fid_year":null,"construction_year":null,"shelved_year":null,"cancelled_year":null,"stop_year":null,"estimated_cost_usd":null,"estimated_cost_original":null,"estimated_cost_currency":null,"power_stations_supplied":null,"floating_vessel_name":null,"ccs_project":null,"hydrogen_project":null,"ammonia_project":null,"synthetic_lng_project":null,"retrofit_proposed":null,"url":"https://lngatlas.org/terminal/yingkou-lng-terminal-cn/","data_source":"Data: Global Gas Infrastructure Tracker, Global Energy Monitor, September 2025"},{"terminal_slug":"yokkaichi-lng-center-jp","terminal_name":"Yokkaichi LNG Center","country":"Japan","country_iso":"JP","unit_name":null,"status":"operating","facility_type":"import","floating_type":"unknown","capacity_mtpa":6.4,"capacity_bcm_y":8.71,"start_year":1987,"planned_start_year":null,"original_planned_start_year":null,"fid_year":null,"construction_year":null,"shelved_year":null,"cancelled_year":null,"stop_year":null,"estimated_cost_usd":null,"estimated_cost_original":null,"estimated_cost_currency":null,"power_stations_supplied":null,"floating_vessel_name":null,"ccs_project":null,"hydrogen_project":null,"ammonia_project":null,"synthetic_lng_project":null,"retrofit_proposed":null,"url":"https://lngatlas.org/terminal/yokkaichi-lng-center-jp/","data_source":"Data: Global Gas Infrastructure Tracker, Global Energy Monitor, September 2025"},{"terminal_slug":"yokkaichi-works-lng-terminal-jp","terminal_name":"Yokkaichi Works LNG Terminal","country":"Japan","country_iso":"JP","unit_name":null,"status":"operating","facility_type":"import","floating_type":"unknown","capacity_mtpa":2.2,"capacity_bcm_y":2.99,"start_year":1991,"planned_start_year":null,"original_planned_start_year":null,"fid_year":null,"construction_year":null,"shelved_year":null,"cancelled_year":null,"stop_year":null,"estimated_cost_usd":null,"estimated_cost_original":null,"estimated_cost_currency":null,"power_stations_supplied":null,"floating_vessel_name":null,"ccs_project":null,"hydrogen_project":null,"ammonia_project":null,"synthetic_lng_project":null,"retrofit_proposed":null,"url":"https://lngatlas.org/terminal/yokkaichi-works-lng-terminal-jp/","data_source":"Data: Global Gas Infrastructure Tracker, Global Energy Monitor, September 2025"},{"terminal_slug":"yoshinoura-lng-terminal-jp","terminal_name":"Yoshinoura LNG Terminal","country":"Japan","country_iso":"JP","unit_name":null,"status":"operating","facility_type":"import","floating_type":"unknown","capacity_mtpa":0.8,"capacity_bcm_y":1.09,"start_year":2012,"planned_start_year":null,"original_planned_start_year":null,"fid_year":null,"construction_year":null,"shelved_year":null,"cancelled_year":null,"stop_year":null,"estimated_cost_usd":null,"estimated_cost_original":null,"estimated_cost_currency":null,"power_stations_supplied":null,"floating_vessel_name":null,"ccs_project":null,"hydrogen_project":null,"ammonia_project":null,"synthetic_lng_project":null,"retrofit_proposed":null,"url":"https://lngatlas.org/terminal/yoshinoura-lng-terminal-jp/","data_source":"Data: Global Gas Infrastructure Tracker, Global Energy Monitor, September 2025"},{"terminal_slug":"yueyang-lng-terminal-cn","terminal_name":"Yueyang LNG Terminal","country":"China","country_iso":"CN","unit_name":null,"status":"shelved","facility_type":"import","floating_type":"unknown","capacity_mtpa":1.5,"capacity_bcm_y":2.04,"start_year":null,"planned_start_year":null,"original_planned_start_year":null,"fid_year":null,"construction_year":2020,"shelved_year":2021,"cancelled_year":null,"stop_year":null,"estimated_cost_usd":318400000,"estimated_cost_original":1990000000,"estimated_cost_currency":"RMB","power_stations_supplied":null,"floating_vessel_name":null,"ccs_project":null,"hydrogen_project":null,"ammonia_project":null,"synthetic_lng_project":null,"retrofit_proposed":null,"url":"https://lngatlas.org/terminal/yueyang-lng-terminal-cn/","data_source":"Data: Global Gas Infrastructure Tracker, Global Energy Monitor, September 2025"},{"terminal_slug":"yung-an-lng-terminal-tw","terminal_name":"Yung-An LNG Terminal","country":"Taiwan","country_iso":"TW","unit_name":"Phase 1","status":"operating","facility_type":"import","floating_type":"unknown","capacity_mtpa":1.5,"capacity_bcm_y":2.04,"start_year":1990,"planned_start_year":null,"original_planned_start_year":null,"fid_year":null,"construction_year":1984,"shelved_year":null,"cancelled_year":null,"stop_year":null,"estimated_cost_usd":1115200000,"estimated_cost_original":32800000000,"estimated_cost_currency":"NTD","power_stations_supplied":null,"floating_vessel_name":null,"ccs_project":null,"hydrogen_project":null,"ammonia_project":null,"synthetic_lng_project":null,"retrofit_proposed":null,"url":"https://lngatlas.org/terminal/yung-an-lng-terminal-tw/","data_source":"Data: Global Gas Infrastructure Tracker, Global Energy Monitor, September 2025"},{"terminal_slug":"yung-an-lng-terminal-tw","terminal_name":"Yung-An LNG Terminal","country":"Taiwan","country_iso":"TW","unit_name":"Phase 2 expansion","status":"operating","facility_type":"import","floating_type":"unknown","capacity_mtpa":3,"capacity_bcm_y":4.08,"start_year":1996,"planned_start_year":null,"original_planned_start_year":null,"fid_year":null,"construction_year":1991,"shelved_year":null,"cancelled_year":null,"stop_year":null,"estimated_cost_usd":646000000,"estimated_cost_original":19000000000,"estimated_cost_currency":"NTD","power_stations_supplied":null,"floating_vessel_name":null,"ccs_project":null,"hydrogen_project":null,"ammonia_project":null,"synthetic_lng_project":null,"retrofit_proposed":null,"url":"https://lngatlas.org/terminal/yung-an-lng-terminal-tw/","data_source":"Data: Global Gas Infrastructure Tracker, Global Energy Monitor, September 2025"},{"terminal_slug":"yung-an-lng-terminal-tw","terminal_name":"Yung-An LNG Terminal","country":"Taiwan","country_iso":"TW","unit_name":"Phase 3 expansion","status":"operating","facility_type":"import","floating_type":"unknown","capacity_mtpa":2.94,"capacity_bcm_y":4,"start_year":2000,"planned_start_year":null,"original_planned_start_year":null,"fid_year":null,"construction_year":null,"shelved_year":null,"cancelled_year":null,"stop_year":null,"estimated_cost_usd":775200000,"estimated_cost_original":22800000000,"estimated_cost_currency":"NTD","power_stations_supplied":null,"floating_vessel_name":null,"ccs_project":null,"hydrogen_project":null,"ammonia_project":null,"synthetic_lng_project":null,"retrofit_proposed":null,"url":"https://lngatlas.org/terminal/yung-an-lng-terminal-tw/","data_source":"Data: Global Gas Infrastructure Tracker, Global Energy Monitor, September 2025"},{"terminal_slug":"yung-an-lng-terminal-tw","terminal_name":"Yung-An LNG Terminal","country":"Taiwan","country_iso":"TW","unit_name":"Phase 4 expansion","status":"operating","facility_type":"import","floating_type":"unknown","capacity_mtpa":3.06,"capacity_bcm_y":4.16,"start_year":2005,"planned_start_year":null,"original_planned_start_year":null,"fid_year":null,"construction_year":1999,"shelved_year":null,"cancelled_year":null,"stop_year":null,"estimated_cost_usd":113220000,"estimated_cost_original":3330000000,"estimated_cost_currency":"NTD","power_stations_supplied":null,"floating_vessel_name":null,"ccs_project":null,"hydrogen_project":null,"ammonia_project":null,"synthetic_lng_project":null,"retrofit_proposed":null,"url":"https://lngatlas.org/terminal/yung-an-lng-terminal-tw/","data_source":"Data: Global Gas Infrastructure Tracker, Global Energy Monitor, September 2025"},{"terminal_slug":"yung-an-lng-terminal-tw","terminal_name":"Yung-An LNG Terminal","country":"Taiwan","country_iso":"TW","unit_name":"Phase 5 expansion","status":"proposed","facility_type":"import","floating_type":"unknown","capacity_mtpa":1.8,"capacity_bcm_y":2.45,"start_year":null,"planned_start_year":null,"original_planned_start_year":2027,"fid_year":null,"construction_year":2020,"shelved_year":null,"cancelled_year":null,"stop_year":null,"estimated_cost_usd":null,"estimated_cost_original":null,"estimated_cost_currency":null,"power_stations_supplied":null,"floating_vessel_name":null,"ccs_project":null,"hydrogen_project":null,"ammonia_project":null,"synthetic_lng_project":null,"retrofit_proposed":null,"url":"https://lngatlas.org/terminal/yung-an-lng-terminal-tw/","data_source":"Data: Global Gas Infrastructure Tracker, Global Energy Monitor, September 2025"},{"terminal_slug":"zahrani-fsru-lb","terminal_name":"Zahrani FSRU","country":"Lebanon","country_iso":"LB","unit_name":null,"status":"shelved","facility_type":"import","floating_type":"fsru","capacity_mtpa":null,"capacity_bcm_y":null,"start_year":null,"planned_start_year":null,"original_planned_start_year":null,"fid_year":null,"construction_year":null,"shelved_year":2024,"cancelled_year":null,"stop_year":null,"estimated_cost_usd":null,"estimated_cost_original":null,"estimated_cost_currency":null,"power_stations_supplied":"Zahrani Power Plant","floating_vessel_name":null,"ccs_project":null,"hydrogen_project":null,"ammonia_project":null,"synthetic_lng_project":null,"retrofit_proposed":null,"url":"https://lngatlas.org/terminal/zahrani-fsru-lb/","data_source":"Data: Global Gas Infrastructure Tracker, Global Energy Monitor, September 2025"},{"terminal_slug":"zaule-lng-terminal-it","terminal_name":"Zaule LNG Terminal","country":"Italy","country_iso":"IT","unit_name":null,"status":"cancelled","facility_type":"import","floating_type":"unknown","capacity_mtpa":5.88,"capacity_bcm_y":8,"start_year":null,"planned_start_year":null,"original_planned_start_year":null,"fid_year":null,"construction_year":null,"shelved_year":null,"cancelled_year":2018,"stop_year":2018,"estimated_cost_usd":600000000,"estimated_cost_original":600000000,"estimated_cost_currency":"USD","power_stations_supplied":null,"floating_vessel_name":null,"ccs_project":null,"hydrogen_project":null,"ammonia_project":null,"synthetic_lng_project":null,"retrofit_proposed":null,"url":"https://lngatlas.org/terminal/zaule-lng-terminal-it/","data_source":"Data: Global Gas Infrastructure Tracker, Global Energy Monitor, September 2025"},{"terminal_slug":"zeebrugge-lng-terminal-be","terminal_name":"Zeebrugge LNG Terminal","country":"Belgium","country_iso":"BE","unit_name":null,"status":"operating","facility_type":"import","floating_type":"unknown","capacity_mtpa":3.3,"capacity_bcm_y":4.49,"start_year":1987,"planned_start_year":null,"original_planned_start_year":null,"fid_year":null,"construction_year":1982,"shelved_year":null,"cancelled_year":null,"stop_year":null,"estimated_cost_usd":null,"estimated_cost_original":null,"estimated_cost_currency":null,"power_stations_supplied":null,"floating_vessel_name":null,"ccs_project":null,"hydrogen_project":true,"ammonia_project":true,"synthetic_lng_project":true,"retrofit_proposed":null,"url":"https://lngatlas.org/terminal/zeebrugge-lng-terminal-be/","data_source":"Data: Global Gas Infrastructure Tracker, Global Energy Monitor, September 2025"},{"terminal_slug":"zeebrugge-lng-terminal-be","terminal_name":"Zeebrugge LNG Terminal","country":"Belgium","country_iso":"BE","unit_name":"2008 Expansion","status":"operating","facility_type":"import","floating_type":"unknown","capacity_mtpa":3.3,"capacity_bcm_y":4.49,"start_year":2008,"planned_start_year":null,"original_planned_start_year":null,"fid_year":null,"construction_year":2004,"shelved_year":null,"cancelled_year":null,"stop_year":null,"estimated_cost_usd":null,"estimated_cost_original":null,"estimated_cost_currency":null,"power_stations_supplied":null,"floating_vessel_name":null,"ccs_project":null,"hydrogen_project":true,"ammonia_project":true,"synthetic_lng_project":true,"retrofit_proposed":null,"url":"https://lngatlas.org/terminal/zeebrugge-lng-terminal-be/","data_source":"Data: Global Gas Infrastructure Tracker, Global Energy Monitor, September 2025"},{"terminal_slug":"zeebrugge-lng-terminal-be","terminal_name":"Zeebrugge LNG Terminal","country":"Belgium","country_iso":"BE","unit_name":"2024 Expansion","status":"operating","facility_type":"import","floating_type":"unknown","capacity_mtpa":4.7,"capacity_bcm_y":6.39,"start_year":2024,"planned_start_year":null,"original_planned_start_year":null,"fid_year":2021,"construction_year":2022,"shelved_year":null,"cancelled_year":null,"stop_year":null,"estimated_cost_usd":104257544.07,"estimated_cost_original":95649123,"estimated_cost_currency":"EUR","power_stations_supplied":null,"floating_vessel_name":null,"ccs_project":null,"hydrogen_project":true,"ammonia_project":true,"synthetic_lng_project":true,"retrofit_proposed":null,"url":"https://lngatlas.org/terminal/zeebrugge-lng-terminal-be/","data_source":"Data: Global Gas Infrastructure Tracker, Global Energy Monitor, September 2025"},{"terminal_slug":"zeebrugge-lng-terminal-be","terminal_name":"Zeebrugge LNG Terminal","country":"Belgium","country_iso":"BE","unit_name":"2025 Expansion","status":"operating","facility_type":"import","floating_type":"unknown","capacity_mtpa":1,"capacity_bcm_y":1.36,"start_year":2025,"planned_start_year":null,"original_planned_start_year":2026,"fid_year":2021,"construction_year":2022,"shelved_year":null,"cancelled_year":null,"stop_year":null,"estimated_cost_usd":22182455.93,"estimated_cost_original":20350877,"estimated_cost_currency":"EUR","power_stations_supplied":null,"floating_vessel_name":null,"ccs_project":null,"hydrogen_project":true,"ammonia_project":true,"synthetic_lng_project":true,"retrofit_proposed":null,"url":"https://lngatlas.org/terminal/zeebrugge-lng-terminal-be/","data_source":"Data: Global Gas Infrastructure Tracker, Global Energy Monitor, September 2025"},{"terminal_slug":"zeebrugge-lng-terminal-be","terminal_name":"Zeebrugge LNG Terminal","country":"Belgium","country_iso":"BE","unit_name":"Zeebrugge Multi-molecule Hub","status":"proposed","facility_type":"import","floating_type":"unknown","capacity_mtpa":null,"capacity_bcm_y":null,"start_year":null,"planned_start_year":null,"original_planned_start_year":null,"fid_year":null,"construction_year":null,"shelved_year":null,"cancelled_year":null,"stop_year":null,"estimated_cost_usd":null,"estimated_cost_original":null,"estimated_cost_currency":null,"power_stations_supplied":null,"floating_vessel_name":null,"ccs_project":null,"hydrogen_project":true,"ammonia_project":true,"synthetic_lng_project":true,"retrofit_proposed":null,"url":"https://lngatlas.org/terminal/zeebrugge-lng-terminal-be/","data_source":"Data: Global Gas Infrastructure Tracker, Global Energy Monitor, September 2025"},{"terminal_slug":"zeeland-energy-fsru-nl","terminal_name":"Zeeland Energy FSRU","country":"Netherlands","country_iso":"NL","unit_name":null,"status":"proposed","facility_type":"import","floating_type":"fsru","capacity_mtpa":5.51,"capacity_bcm_y":7.5,"start_year":null,"planned_start_year":2028,"original_planned_start_year":2024,"fid_year":null,"construction_year":null,"shelved_year":null,"cancelled_year":null,"stop_year":null,"estimated_cost_usd":null,"estimated_cost_original":null,"estimated_cost_currency":null,"power_stations_supplied":null,"floating_vessel_name":null,"ccs_project":null,"hydrogen_project":true,"ammonia_project":null,"synthetic_lng_project":null,"retrofit_proposed":true,"url":"https://lngatlas.org/terminal/zeeland-energy-fsru-nl/","data_source":"Data: Global Gas Infrastructure Tracker, Global Energy Monitor, September 2025"},{"terminal_slug":"zhangjiagang-lng-terminal-cn","terminal_name":"Zhangjiagang LNG Terminal","country":"China","country_iso":"CN","unit_name":null,"status":"proposed","facility_type":"import","floating_type":"unknown","capacity_mtpa":3,"capacity_bcm_y":4.08,"start_year":null,"planned_start_year":null,"original_planned_start_year":null,"fid_year":null,"construction_year":null,"shelved_year":null,"cancelled_year":null,"stop_year":null,"estimated_cost_usd":800000000,"estimated_cost_original":5000000000,"estimated_cost_currency":"RMB","power_stations_supplied":null,"floating_vessel_name":null,"ccs_project":null,"hydrogen_project":null,"ammonia_project":null,"synthetic_lng_project":null,"retrofit_proposed":null,"url":"https://lngatlas.org/terminal/zhangjiagang-lng-terminal-cn/","data_source":"Data: Global Gas Infrastructure Tracker, Global Energy Monitor, September 2025"},{"terminal_slug":"zhangzhou-lng-terminal-cn","terminal_name":"Zhangzhou LNG Terminal","country":"China","country_iso":"CN","unit_name":"Phase 1","status":"operating","facility_type":"import","floating_type":"unknown","capacity_mtpa":3,"capacity_bcm_y":4.08,"start_year":2024,"planned_start_year":null,"original_planned_start_year":2023,"fid_year":null,"construction_year":2018,"shelved_year":null,"cancelled_year":null,"stop_year":null,"estimated_cost_usd":1010080000,"estimated_cost_original":6313000000,"estimated_cost_currency":"RMB","power_stations_supplied":null,"floating_vessel_name":null,"ccs_project":null,"hydrogen_project":null,"ammonia_project":null,"synthetic_lng_project":null,"retrofit_proposed":null,"url":"https://lngatlas.org/terminal/zhangzhou-lng-terminal-cn/","data_source":"Data: Global Gas Infrastructure Tracker, Global Energy Monitor, September 2025"},{"terminal_slug":"zhangzhou-lng-terminal-china-energy-reserve-cn","terminal_name":"Zhangzhou LNG Terminal (China Energy Reserve)","country":"China","country_iso":"CN","unit_name":null,"status":"shelved","facility_type":"import","floating_type":"unknown","capacity_mtpa":3,"capacity_bcm_y":4.08,"start_year":null,"planned_start_year":null,"original_planned_start_year":null,"fid_year":null,"construction_year":null,"shelved_year":null,"cancelled_year":null,"stop_year":null,"estimated_cost_usd":null,"estimated_cost_original":null,"estimated_cost_currency":null,"power_stations_supplied":null,"floating_vessel_name":null,"ccs_project":null,"hydrogen_project":null,"ammonia_project":null,"synthetic_lng_project":null,"retrofit_proposed":null,"url":"https://lngatlas.org/terminal/zhangzhou-lng-terminal-china-energy-reserve-cn/","data_source":"Data: Global Gas Infrastructure Tracker, Global Energy Monitor, September 2025"},{"terminal_slug":"zhejiang-ningbo-lng-terminal-cn","terminal_name":"Zhejiang Ningbo LNG Terminal","country":"China","country_iso":"CN","unit_name":"Phase 1","status":"operating","facility_type":"import","floating_type":"unknown","capacity_mtpa":3,"capacity_bcm_y":4.08,"start_year":2012,"planned_start_year":null,"original_planned_start_year":null,"fid_year":null,"construction_year":2009,"shelved_year":null,"cancelled_year":null,"stop_year":null,"estimated_cost_usd":1115200000,"estimated_cost_original":6970000000,"estimated_cost_currency":"RMB","power_stations_supplied":null,"floating_vessel_name":null,"ccs_project":null,"hydrogen_project":null,"ammonia_project":null,"synthetic_lng_project":null,"retrofit_proposed":null,"url":"https://lngatlas.org/terminal/zhejiang-ningbo-lng-terminal-cn/","data_source":"Data: Global Gas Infrastructure Tracker, Global Energy Monitor, September 2025"},{"terminal_slug":"zhejiang-ningbo-lng-terminal-cn","terminal_name":"Zhejiang Ningbo LNG Terminal","country":"China","country_iso":"CN","unit_name":"Phase 2","status":"operating","facility_type":"import","floating_type":"unknown","capacity_mtpa":3,"capacity_bcm_y":4.08,"start_year":2020,"planned_start_year":null,"original_planned_start_year":null,"fid_year":null,"construction_year":2018,"shelved_year":null,"cancelled_year":null,"stop_year":null,"estimated_cost_usd":null,"estimated_cost_original":null,"estimated_cost_currency":null,"power_stations_supplied":null,"floating_vessel_name":null,"ccs_project":null,"hydrogen_project":null,"ammonia_project":null,"synthetic_lng_project":null,"retrofit_proposed":null,"url":"https://lngatlas.org/terminal/zhejiang-ningbo-lng-terminal-cn/","data_source":"Data: Global Gas Infrastructure Tracker, Global Energy Monitor, September 2025"},{"terminal_slug":"zhejiang-ningbo-lng-terminal-cn","terminal_name":"Zhejiang Ningbo LNG Terminal","country":"China","country_iso":"CN","unit_name":"Phase 3","status":"construction","facility_type":"import","floating_type":"unknown","capacity_mtpa":6,"capacity_bcm_y":8.16,"start_year":null,"planned_start_year":null,"original_planned_start_year":2025,"fid_year":null,"construction_year":2022,"shelved_year":null,"cancelled_year":null,"stop_year":null,"estimated_cost_usd":1461004800,"estimated_cost_original":9131280000,"estimated_cost_currency":"RMB","power_stations_supplied":null,"floating_vessel_name":null,"ccs_project":null,"hydrogen_project":null,"ammonia_project":null,"synthetic_lng_project":null,"retrofit_proposed":null,"url":"https://lngatlas.org/terminal/zhejiang-ningbo-lng-terminal-cn/","data_source":"Data: Global Gas Infrastructure Tracker, Global Energy Monitor, September 2025"},{"terminal_slug":"zhiwan-island-lng-terminal-cn","terminal_name":"Zhiwan Island LNG Terminal","country":"China","country_iso":"CN","unit_name":null,"status":"shelved","facility_type":"import","floating_type":"unknown","capacity_mtpa":5,"capacity_bcm_y":6.8,"start_year":null,"planned_start_year":null,"original_planned_start_year":2025,"fid_year":null,"construction_year":null,"shelved_year":2022,"cancelled_year":null,"stop_year":null,"estimated_cost_usd":2880000000,"estimated_cost_original":18000000000,"estimated_cost_currency":"RMB","power_stations_supplied":null,"floating_vessel_name":null,"ccs_project":null,"hydrogen_project":null,"ammonia_project":null,"synthetic_lng_project":null,"retrofit_proposed":null,"url":"https://lngatlas.org/terminal/zhiwan-island-lng-terminal-cn/","data_source":"Data: Global Gas Infrastructure Tracker, Global Energy Monitor, September 2025"},{"terminal_slug":"zhouji-lng-terminal-tw","terminal_name":"Zhouji LNG Terminal","country":"Taiwan","country_iso":"TW","unit_name":null,"status":"proposed","facility_type":"import","floating_type":"unknown","capacity_mtpa":6,"capacity_bcm_y":8.16,"start_year":null,"planned_start_year":null,"original_planned_start_year":2031,"fid_year":null,"construction_year":null,"shelved_year":null,"cancelled_year":null,"stop_year":null,"estimated_cost_usd":null,"estimated_cost_original":null,"estimated_cost_currency":null,"power_stations_supplied":null,"floating_vessel_name":null,"ccs_project":null,"hydrogen_project":null,"ammonia_project":null,"synthetic_lng_project":null,"retrofit_proposed":null,"url":"https://lngatlas.org/terminal/zhouji-lng-terminal-tw/","data_source":"Data: Global Gas Infrastructure Tracker, Global Energy Monitor, September 2025"},{"terminal_slug":"zhoushan-lng-terminal-cn","terminal_name":"Zhoushan LNG Terminal","country":"China","country_iso":"CN","unit_name":"Phase 1","status":"operating","facility_type":"import","floating_type":"unknown","capacity_mtpa":3,"capacity_bcm_y":4.08,"start_year":2018,"planned_start_year":null,"original_planned_start_year":null,"fid_year":null,"construction_year":2016,"shelved_year":null,"cancelled_year":null,"stop_year":null,"estimated_cost_usd":936000000,"estimated_cost_original":5850000000,"estimated_cost_currency":"RMB","power_stations_supplied":null,"floating_vessel_name":null,"ccs_project":null,"hydrogen_project":null,"ammonia_project":null,"synthetic_lng_project":null,"retrofit_proposed":null,"url":"https://lngatlas.org/terminal/zhoushan-lng-terminal-cn/","data_source":"Data: Global Gas Infrastructure Tracker, Global Energy Monitor, September 2025"},{"terminal_slug":"zhoushan-lng-terminal-cn","terminal_name":"Zhoushan LNG Terminal","country":"China","country_iso":"CN","unit_name":"Phase 2","status":"operating","facility_type":"import","floating_type":"unknown","capacity_mtpa":2,"capacity_bcm_y":2.72,"start_year":2021,"planned_start_year":null,"original_planned_start_year":null,"fid_year":null,"construction_year":2018,"shelved_year":null,"cancelled_year":null,"stop_year":null,"estimated_cost_usd":385600000,"estimated_cost_original":2410000000,"estimated_cost_currency":"RMB","power_stations_supplied":null,"floating_vessel_name":null,"ccs_project":null,"hydrogen_project":null,"ammonia_project":null,"synthetic_lng_project":null,"retrofit_proposed":null,"url":"https://lngatlas.org/terminal/zhoushan-lng-terminal-cn/","data_source":"Data: Global Gas Infrastructure Tracker, Global Energy Monitor, September 2025"},{"terminal_slug":"zhoushan-lng-terminal-cn","terminal_name":"Zhoushan LNG Terminal","country":"China","country_iso":"CN","unit_name":"Phase 3","status":"operating","facility_type":"import","floating_type":"unknown","capacity_mtpa":3.5,"capacity_bcm_y":4.76,"start_year":2025,"planned_start_year":null,"original_planned_start_year":null,"fid_year":null,"construction_year":2022,"shelved_year":null,"cancelled_year":null,"stop_year":null,"estimated_cost_usd":609417600,"estimated_cost_original":3808860000,"estimated_cost_currency":"RMB","power_stations_supplied":null,"floating_vessel_name":null,"ccs_project":null,"hydrogen_project":null,"ammonia_project":null,"synthetic_lng_project":null,"retrofit_proposed":null,"url":"https://lngatlas.org/terminal/zhoushan-lng-terminal-cn/","data_source":"Data: Global Gas Infrastructure Tracker, Global Energy Monitor, September 2025"},{"terminal_slug":"zhuhai-huangmaodao-lng-terminal-cn","terminal_name":"Zhuhai Huangmaodao LNG Terminal","country":"China","country_iso":"CN","unit_name":null,"status":"cancelled","facility_type":"import","floating_type":"unknown","capacity_mtpa":6,"capacity_bcm_y":8.16,"start_year":null,"planned_start_year":null,"original_planned_start_year":null,"fid_year":null,"construction_year":null,"shelved_year":2016,"cancelled_year":2018,"stop_year":2018,"estimated_cost_usd":392000000,"estimated_cost_original":2450000000,"estimated_cost_currency":"RMB","power_stations_supplied":null,"floating_vessel_name":null,"ccs_project":null,"hydrogen_project":null,"ammonia_project":null,"synthetic_lng_project":null,"retrofit_proposed":null,"url":"https://lngatlas.org/terminal/zhuhai-huangmaodao-lng-terminal-cn/","data_source":"Data: Global Gas Infrastructure Tracker, Global Energy Monitor, September 2025"},{"terminal_slug":"zhuhai-lng-terminal-cn","terminal_name":"Zhuhai LNG Terminal","country":"China","country_iso":"CN","unit_name":"Phase 1","status":"operating","facility_type":"import","floating_type":"unknown","capacity_mtpa":3.5,"capacity_bcm_y":4.76,"start_year":2013,"planned_start_year":null,"original_planned_start_year":null,"fid_year":null,"construction_year":2010,"shelved_year":null,"cancelled_year":null,"stop_year":null,"estimated_cost_usd":1808000000,"estimated_cost_original":11300000000,"estimated_cost_currency":"RMB","power_stations_supplied":null,"floating_vessel_name":null,"ccs_project":null,"hydrogen_project":null,"ammonia_project":null,"synthetic_lng_project":null,"retrofit_proposed":null,"url":"https://lngatlas.org/terminal/zhuhai-lng-terminal-cn/","data_source":"Data: Global Gas Infrastructure Tracker, Global Energy Monitor, September 2025"},{"terminal_slug":"zhuhai-lng-terminal-cn","terminal_name":"Zhuhai LNG Terminal","country":"China","country_iso":"CN","unit_name":"Phase 2","status":"construction","facility_type":"import","floating_type":"unknown","capacity_mtpa":3.5,"capacity_bcm_y":4.76,"start_year":null,"planned_start_year":null,"original_planned_start_year":2023,"fid_year":null,"construction_year":2021,"shelved_year":null,"cancelled_year":null,"stop_year":null,"estimated_cost_usd":826880000,"estimated_cost_original":5168000000,"estimated_cost_currency":"RMB","power_stations_supplied":null,"floating_vessel_name":null,"ccs_project":null,"hydrogen_project":null,"ammonia_project":null,"synthetic_lng_project":null,"retrofit_proposed":null,"url":"https://lngatlas.org/terminal/zhuhai-lng-terminal-cn/","data_source":"Data: Global Gas Infrastructure Tracker, Global Energy Monitor, September 2025"},{"terminal_slug":"swinoujscie-polskie-lng-terminal-pl","terminal_name":"Świnoujście Polskie LNG Terminal","country":"Poland","country_iso":"PL","unit_name":null,"status":"operating","facility_type":"import","floating_type":"unknown","capacity_mtpa":3.7,"capacity_bcm_y":5.03,"start_year":2016,"planned_start_year":null,"original_planned_start_year":null,"fid_year":null,"construction_year":2011,"shelved_year":null,"cancelled_year":null,"stop_year":null,"estimated_cost_usd":1035500000,"estimated_cost_original":950000000,"estimated_cost_currency":"EUR","power_stations_supplied":null,"floating_vessel_name":null,"ccs_project":null,"hydrogen_project":null,"ammonia_project":null,"synthetic_lng_project":null,"retrofit_proposed":null,"url":"https://lngatlas.org/terminal/swinoujscie-polskie-lng-terminal-pl/","data_source":"Data: Global Gas Infrastructure Tracker, Global Energy Monitor, September 2025"},{"terminal_slug":"swinoujscie-polskie-lng-terminal-pl","terminal_name":"Świnoujście Polskie LNG Terminal","country":"Poland","country_iso":"PL","unit_name":"Expansion","status":"operating","facility_type":"import","floating_type":"unknown","capacity_mtpa":0.9,"capacity_bcm_y":1.22,"start_year":2022,"planned_start_year":null,"original_planned_start_year":null,"fid_year":null,"construction_year":2021,"shelved_year":null,"cancelled_year":null,"stop_year":null,"estimated_cost_usd":465430000,"estimated_cost_original":427000000,"estimated_cost_currency":"EUR","power_stations_supplied":null,"floating_vessel_name":null,"ccs_project":null,"hydrogen_project":null,"ammonia_project":null,"synthetic_lng_project":null,"retrofit_proposed":null,"url":"https://lngatlas.org/terminal/swinoujscie-polskie-lng-terminal-pl/","data_source":"Data: Global Gas Infrastructure Tracker, Global Energy Monitor, September 2025"},{"terminal_slug":"swinoujscie-polskie-lng-terminal-pl","terminal_name":"Świnoujście Polskie LNG Terminal","country":"Poland","country_iso":"PL","unit_name":"Expansion 2","status":"operating","facility_type":"import","floating_type":"unknown","capacity_mtpa":1.5,"capacity_bcm_y":2.04,"start_year":2024,"planned_start_year":null,"original_planned_start_year":2023,"fid_year":null,"construction_year":2021,"shelved_year":null,"cancelled_year":null,"stop_year":null,"estimated_cost_usd":null,"estimated_cost_original":null,"estimated_cost_currency":null,"power_stations_supplied":null,"floating_vessel_name":null,"ccs_project":null,"hydrogen_project":null,"ammonia_project":null,"synthetic_lng_project":null,"retrofit_proposed":null,"url":"https://lngatlas.org/terminal/swinoujscie-polskie-lng-terminal-pl/","data_source":"Data: Global Gas Infrastructure Tracker, Global Energy Monitor, September 2025"}]}