{"dataset":"LNG terminals","release":"September 2025","attribution":"Data: Global Gas Infrastructure Tracker, Global Energy Monitor, September 2025","licence":"CC BY 4.0","licence_url":"https://creativecommons.org/licenses/by/4.0/","note":"An empty or null value means the tracker does not report the field; it is not zero. Capacity is kept per status and never totalled.","count":813,"rows":[{"slug":"acwa-lng-terminal-bd","name":"ACWA LNG Terminal","country":"Bangladesh","country_iso":"BD","region":"Asia","state_province":"Chittagong","city":"Maheshkhali Upazila","facility_type":"import","floating_type":"unknown","status":"cancelled","latitude":21.520521,"longitude":91.869445,"units":1,"capacity_operating_mtpa":null,"capacity_construction_mtpa":null,"capacity_proposed_mtpa":null,"capacity_operating_bcm_y":null,"capacity_construction_bcm_y":null,"capacity_proposed_bcm_y":null,"earliest_start_year":null,"latest_start_year":null,"url":"https://lngatlas.org/terminal/acwa-lng-terminal-bd/","data_source":"Data: Global Gas Infrastructure Tracker, Global Energy Monitor, September 2025"},{"slug":"agp-lng-terminal-us","name":"AGP LNG Terminal","country":"United States","country_iso":"US","region":"Americas","state_province":null,"city":null,"facility_type":"export","floating_type":"floating","status":"proposed","latitude":null,"longitude":null,"units":1,"capacity_operating_mtpa":null,"capacity_construction_mtpa":null,"capacity_proposed_mtpa":7.2,"capacity_operating_bcm_y":null,"capacity_construction_bcm_y":null,"capacity_proposed_bcm_y":9.792,"earliest_start_year":null,"latest_start_year":null,"url":"https://lngatlas.org/terminal/agp-lng-terminal-us/","data_source":"Data: Global Gas Infrastructure Tracker, Global Energy Monitor, September 2025"},{"slug":"amigo-flng-terminal-mx","name":"AMIGO FLNG Terminal","country":"Mexico","country_iso":"MX","region":"Americas","state_province":"Sonora","city":"Guaymas","facility_type":"export","floating_type":"flng","status":"proposed","latitude":27.922867,"longitude":-110.868082,"units":2,"capacity_operating_mtpa":null,"capacity_construction_mtpa":null,"capacity_proposed_mtpa":7.8,"capacity_operating_bcm_y":null,"capacity_construction_bcm_y":null,"capacity_proposed_bcm_y":10.608,"earliest_start_year":null,"latest_start_year":null,"url":"https://lngatlas.org/terminal/amigo-flng-terminal-mx/","data_source":"Data: Global Gas Infrastructure Tracker, Global Energy Monitor, September 2025"},{"slug":"amns-suvali-lng-terminal-in","name":"AMNS Suvali LNG Terminal","country":"India","country_iso":"IN","region":"Asia","state_province":null,"city":null,"facility_type":"import","floating_type":"unknown","status":"proposed","latitude":21.128048639580744,"longitude":72.66010727224264,"units":1,"capacity_operating_mtpa":null,"capacity_construction_mtpa":null,"capacity_proposed_mtpa":5,"capacity_operating_bcm_y":null,"capacity_construction_bcm_y":null,"capacity_proposed_bcm_y":6.8,"earliest_start_year":null,"latest_start_year":null,"url":"https://lngatlas.org/terminal/amns-suvali-lng-terminal-in/","data_source":"Data: Global Gas Infrastructure Tracker, Global Energy Monitor, September 2025"},{"slug":"abadi-lng-terminal-id","name":"Abadi LNG Terminal","country":"Indonesia","country_iso":"ID","region":"Asia","state_province":null,"city":"Masela Block, Adabi gas field","facility_type":"export","floating_type":"unknown","status":"proposed","latitude":-9.1090988,"longitude":130.280905,"units":1,"capacity_operating_mtpa":null,"capacity_construction_mtpa":null,"capacity_proposed_mtpa":9.5,"capacity_operating_bcm_y":null,"capacity_construction_bcm_y":null,"capacity_proposed_bcm_y":12.92,"earliest_start_year":null,"latest_start_year":null,"url":"https://lngatlas.org/terminal/abadi-lng-terminal-id/","data_source":"Data: Global Gas Infrastructure Tracker, Global Energy Monitor, September 2025"},{"slug":"abbot-point-lng-terminal-au","name":"Abbot Point LNG Terminal","country":"Australia","country_iso":"AU","region":"Oceania","state_province":"Queensland","city":"Abbot Point","facility_type":"export","floating_type":"floating","status":"cancelled","latitude":-19.8988746,"longitude":148.084116,"units":1,"capacity_operating_mtpa":null,"capacity_construction_mtpa":null,"capacity_proposed_mtpa":null,"capacity_operating_bcm_y":null,"capacity_construction_bcm_y":null,"capacity_proposed_bcm_y":null,"earliest_start_year":null,"latest_start_year":null,"url":"https://lngatlas.org/terminal/abbot-point-lng-terminal-au/","data_source":"Data: Global Gas Infrastructure Tracker, Global Energy Monitor, September 2025"},{"slug":"acajutla-fsru-sv","name":"Acajutla FSRU","country":"El Salvador","country_iso":"SV","region":"Americas","state_province":"Sonsonate","city":"Acajutla","facility_type":"import","floating_type":"fsru","status":"operating","latitude":13.58263,"longitude":-89.848026,"units":1,"capacity_operating_mtpa":2.15,"capacity_construction_mtpa":null,"capacity_proposed_mtpa":null,"capacity_operating_bcm_y":2.924,"capacity_construction_bcm_y":null,"capacity_proposed_bcm_y":null,"earliest_start_year":2022,"latest_start_year":2022,"url":"https://lngatlas.org/terminal/acajutla-fsru-sv/","data_source":"Data: Global Gas Infrastructure Tracker, Global Energy Monitor, September 2025"},{"slug":"ace-gas-nigeria-flng-terminal-ng","name":"Ace Gas Nigeria FLNG Terminal","country":"Nigeria","country_iso":"NG","region":"Africa","state_province":null,"city":"offshore Escravos","facility_type":"export","floating_type":"flng","status":"proposed","latitude":5.550936,"longitude":5.083679,"units":1,"capacity_operating_mtpa":null,"capacity_construction_mtpa":null,"capacity_proposed_mtpa":3,"capacity_operating_bcm_y":null,"capacity_construction_bcm_y":null,"capacity_proposed_bcm_y":4.08,"earliest_start_year":null,"latest_start_year":null,"url":"https://lngatlas.org/terminal/ace-gas-nigeria-flng-terminal-ng/","data_source":"Data: Global Gas Infrastructure Tracker, Global Energy Monitor, September 2025"},{"slug":"aceh-nias-lng-terminal-id","name":"Aceh-Nias LNG Terminal","country":"Indonesia","country_iso":"ID","region":"Asia","state_province":null,"city":"Aceh","facility_type":"import","floating_type":"unknown","status":"cancelled","latitude":5.5648441,"longitude":95.2938741,"units":1,"capacity_operating_mtpa":null,"capacity_construction_mtpa":null,"capacity_proposed_mtpa":null,"capacity_operating_bcm_y":null,"capacity_construction_bcm_y":null,"capacity_proposed_bcm_y":null,"earliest_start_year":null,"latest_start_year":null,"url":"https://lngatlas.org/terminal/aceh-nias-lng-terminal-id/","data_source":"Data: Global Gas Infrastructure Tracker, Global Energy Monitor, September 2025"},{"slug":"adria-lng-terminal-hr","name":"Adria LNG Terminal","country":"Croatia","country_iso":"HR","region":"Europe","state_province":"Primorje-Gorski Kotar","city":"Omišalj, Krk Island","facility_type":"import","floating_type":"unknown","status":"cancelled","latitude":45.211944,"longitude":14.554167,"units":1,"capacity_operating_mtpa":null,"capacity_construction_mtpa":null,"capacity_proposed_mtpa":null,"capacity_operating_bcm_y":null,"capacity_construction_bcm_y":null,"capacity_proposed_bcm_y":null,"earliest_start_year":null,"latest_start_year":null,"url":"https://lngatlas.org/terminal/adria-lng-terminal-hr/","data_source":"Data: Global Gas Infrastructure Tracker, Global Energy Monitor, September 2025"},{"slug":"adriatic-lng-terminal-it","name":"Adriatic LNG Terminal","country":"Italy","country_iso":"IT","region":"Europe","state_province":"Veneto","city":"offshore","facility_type":"import","floating_type":"unknown","status":"operating","latitude":45.091667,"longitude":12.586111,"units":2,"capacity_operating_mtpa":7.06,"capacity_construction_mtpa":null,"capacity_proposed_mtpa":0.59,"capacity_operating_bcm_y":9.602,"capacity_construction_bcm_y":null,"capacity_proposed_bcm_y":0.802,"earliest_start_year":2009,"latest_start_year":2009,"url":"https://lngatlas.org/terminal/adriatic-lng-terminal-it/","data_source":"Data: Global Gas Infrastructure Tracker, Global Energy Monitor, September 2025"},{"slug":"aguirre-gasport-fsru-pr","name":"Aguirre GasPort FSRU","country":"United States","country_iso":"US","region":"Americas","state_province":"Guayama","city":"Guayama","facility_type":"import","floating_type":"fsru","status":"cancelled","latitude":17.974167,"longitude":-66.11,"units":1,"capacity_operating_mtpa":null,"capacity_construction_mtpa":null,"capacity_proposed_mtpa":null,"capacity_operating_bcm_y":null,"capacity_construction_bcm_y":null,"capacity_proposed_bcm_y":null,"earliest_start_year":null,"latest_start_year":null,"url":"https://lngatlas.org/terminal/aguirre-gasport-fsru-pr/","data_source":"Data: Global Gas Infrastructure Tracker, Global Energy Monitor, September 2025"},{"slug":"ahlone-lng-terminal-mm","name":"Ahlone LNG Terminal","country":"Myanmar","country_iso":"MM","region":"Asia","state_province":"Yangon","city":"Dala","facility_type":"import","floating_type":"unknown","status":"cancelled","latitude":16.789024,"longitude":96.120054,"units":1,"capacity_operating_mtpa":null,"capacity_construction_mtpa":null,"capacity_proposed_mtpa":null,"capacity_operating_bcm_y":null,"capacity_construction_bcm_y":null,"capacity_proposed_bcm_y":null,"earliest_start_year":null,"latest_start_year":null,"url":"https://lngatlas.org/terminal/ahlone-lng-terminal-mm/","data_source":"Data: Global Gas Infrastructure Tracker, Global Energy Monitor, September 2025"},{"slug":"ain-sokhna-fsru-eg","name":"Ain Sokhna FSRU","country":"Egypt","country_iso":"EG","region":"Africa","state_province":null,"city":"Port of Ain Sokhna","facility_type":"import","floating_type":"fsru","status":"operating","latitude":29.64863,"longitude":32.355923,"units":5,"capacity_operating_mtpa":13.51,"capacity_construction_mtpa":null,"capacity_proposed_mtpa":11.77,"capacity_operating_bcm_y":18.374,"capacity_construction_bcm_y":null,"capacity_proposed_bcm_y":16.007,"earliest_start_year":2015,"latest_start_year":2025,"url":"https://lngatlas.org/terminal/ain-sokhna-fsru-eg/","data_source":"Data: Global Gas Infrastructure Tracker, Global Energy Monitor, September 2025"},{"slug":"akita-lng-terminal-jp","name":"Akita LNG Terminal","country":"Japan","country_iso":"JP","region":"Asia","state_province":"Akita","city":"Akita","facility_type":"import","floating_type":"unknown","status":"operating","latitude":39.7617994,"longitude":140.0547406,"units":1,"capacity_operating_mtpa":0.6,"capacity_construction_mtpa":null,"capacity_proposed_mtpa":null,"capacity_operating_bcm_y":0.816,"capacity_construction_bcm_y":null,"capacity_proposed_bcm_y":null,"earliest_start_year":2015,"latest_start_year":2015,"url":"https://lngatlas.org/terminal/akita-lng-terminal-jp/","data_source":"Data: Global Gas Infrastructure Tracker, Global Energy Monitor, September 2025"},{"slug":"akonikien-lng-terminal-gq","name":"Akonikien LNG Terminal","country":"Equatorial Guinea","country_iso":"GQ","region":"Africa","state_province":null,"city":null,"facility_type":"import","floating_type":"unknown","status":"shelved","latitude":1.056451,"longitude":9.639333,"units":1,"capacity_operating_mtpa":null,"capacity_construction_mtpa":null,"capacity_proposed_mtpa":null,"capacity_operating_bcm_y":null,"capacity_construction_bcm_y":null,"capacity_proposed_bcm_y":null,"earliest_start_year":null,"latest_start_year":null,"url":"https://lngatlas.org/terminal/akonikien-lng-terminal-gq/","data_source":"Data: Global Gas Infrastructure Tracker, Global Energy Monitor, September 2025"},{"slug":"al-zour-lng-terminal-kw","name":"Al Zour LNG Terminal","country":"Kuwait","country_iso":"KW","region":"Asia","state_province":null,"city":"Al-Zour","facility_type":"import","floating_type":"unknown","status":"operating","latitude":28.7183683,"longitude":48.3973631,"units":1,"capacity_operating_mtpa":22,"capacity_construction_mtpa":null,"capacity_proposed_mtpa":null,"capacity_operating_bcm_y":29.92,"capacity_construction_bcm_y":null,"capacity_proposed_bcm_y":null,"earliest_start_year":2022,"latest_start_year":2022,"url":"https://lngatlas.org/terminal/al-zour-lng-terminal-kw/","data_source":"Data: Global Gas Infrastructure Tracker, Global Energy Monitor, September 2025"},{"slug":"al-faw-fsru-terminal-iq","name":"Al-Faw FSRU Terminal","country":"Iraq","country_iso":"IQ","region":"Asia","state_province":"Basrah Governorate","city":"Al-Faw Port","facility_type":"import","floating_type":"fsru","status":"proposed","latitude":29.8955,"longitude":48.4358751,"units":1,"capacity_operating_mtpa":null,"capacity_construction_mtpa":null,"capacity_proposed_mtpa":7.67,"capacity_operating_bcm_y":null,"capacity_construction_bcm_y":null,"capacity_proposed_bcm_y":10.431,"earliest_start_year":null,"latest_start_year":null,"url":"https://lngatlas.org/terminal/al-faw-fsru-terminal-iq/","data_source":"Data: Global Gas Infrastructure Tracker, Global Energy Monitor, September 2025"},{"slug":"alaska-japan-lng-terminal-us","name":"Alaska Japan LNG Terminal","country":"United States","country_iso":"US","region":"Americas","state_province":null,"city":null,"facility_type":"export","floating_type":"unknown","status":"cancelled","latitude":61.268424,"longitude":-149.91703,"units":1,"capacity_operating_mtpa":null,"capacity_construction_mtpa":null,"capacity_proposed_mtpa":null,"capacity_operating_bcm_y":null,"capacity_construction_bcm_y":null,"capacity_proposed_bcm_y":null,"earliest_start_year":null,"latest_start_year":null,"url":"https://lngatlas.org/terminal/alaska-japan-lng-terminal-us/","data_source":"Data: Global Gas Infrastructure Tracker, Global Energy Monitor, September 2025"},{"slug":"alaska-lng-terminal-us","name":"Alaska LNG Terminal","country":"United States","country_iso":"US","region":"Americas","state_province":"Alaska","city":"Nikiski","facility_type":"export","floating_type":"unknown","status":"proposed","latitude":60.65996,"longitude":-151.36505,"units":3,"capacity_operating_mtpa":null,"capacity_construction_mtpa":null,"capacity_proposed_mtpa":20.1,"capacity_operating_bcm_y":null,"capacity_construction_bcm_y":null,"capacity_proposed_bcm_y":27.336,"earliest_start_year":null,"latest_start_year":null,"url":"https://lngatlas.org/terminal/alaska-lng-terminal-us/","data_source":"Data: Global Gas Infrastructure Tracker, Global Energy Monitor, September 2025"},{"slug":"alexandroupolis-fsru-gr","name":"Alexandroupolis FSRU","country":"Greece","country_iso":"GR","region":"Europe","state_province":null,"city":"Aegean Sea","facility_type":"import","floating_type":"fsru","status":"operating","latitude":40.748354,"longitude":25.718754,"units":1,"capacity_operating_mtpa":4.04,"capacity_construction_mtpa":null,"capacity_proposed_mtpa":null,"capacity_operating_bcm_y":5.494,"capacity_construction_bcm_y":null,"capacity_proposed_bcm_y":null,"earliest_start_year":2024,"latest_start_year":2024,"url":"https://lngatlas.org/terminal/alexandroupolis-fsru-gr/","data_source":"Data: Global Gas Infrastructure Tracker, Global Energy Monitor, September 2025"},{"slug":"altamira-lng-terminal-mx","name":"Altamira LNG Terminal","country":"Mexico","country_iso":"MX","region":"Americas","state_province":"Tamaulipas","city":"Altamira Port","facility_type":"import","floating_type":"unknown","status":"operating","latitude":22.494775,"longitude":-97.89468,"units":1,"capacity_operating_mtpa":5.7,"capacity_construction_mtpa":null,"capacity_proposed_mtpa":null,"capacity_operating_bcm_y":7.752,"capacity_construction_bcm_y":null,"capacity_proposed_bcm_y":null,"earliest_start_year":2006,"latest_start_year":2006,"url":"https://lngatlas.org/terminal/altamira-lng-terminal-mx/","data_source":"Data: Global Gas Infrastructure Tracker, Global Energy Monitor, September 2025"},{"slug":"alturas-lng-terminal-us","name":"Alturas LNG Terminal","country":"United States","country_iso":"US","region":"Americas","state_province":"Texas","city":"Port Arthur","facility_type":"export","floating_type":"unknown","status":"cancelled","latitude":29.885,"longitude":-93.94,"units":1,"capacity_operating_mtpa":null,"capacity_construction_mtpa":null,"capacity_proposed_mtpa":null,"capacity_operating_bcm_y":null,"capacity_construction_bcm_y":null,"capacity_proposed_bcm_y":null,"earliest_start_year":null,"latest_start_year":null,"url":"https://lngatlas.org/terminal/alturas-lng-terminal-us/","data_source":"Data: Global Gas Infrastructure Tracker, Global Energy Monitor, September 2025"},{"slug":"american-coast-lng-terminal-us","name":"American Coast LNG Terminal","country":"United States","country_iso":"US","region":"Americas","state_province":null,"city":null,"facility_type":"export","floating_type":"unknown","status":"cancelled","latitude":29.259765,"longitude":-93.665566,"units":2,"capacity_operating_mtpa":null,"capacity_construction_mtpa":null,"capacity_proposed_mtpa":null,"capacity_operating_bcm_y":null,"capacity_construction_bcm_y":null,"capacity_proposed_bcm_y":null,"earliest_start_year":null,"latest_start_year":null,"url":"https://lngatlas.org/terminal/american-coast-lng-terminal-us/","data_source":"Data: Global Gas Infrastructure Tracker, Global Energy Monitor, September 2025"},{"slug":"sawgrass-lng-terminal-us","name":"American LNG Hialeah Terminal","country":"United States","country_iso":"US","region":"Americas","state_province":"Florida","city":"Medley","facility_type":"export","floating_type":"unknown","status":"operating","latitude":25.809175,"longitude":-80.296697,"units":1,"capacity_operating_mtpa":0.08,"capacity_construction_mtpa":null,"capacity_proposed_mtpa":null,"capacity_operating_bcm_y":0.109,"capacity_construction_bcm_y":null,"capacity_proposed_bcm_y":null,"earliest_start_year":2016,"latest_start_year":2016,"url":"https://lngatlas.org/terminal/sawgrass-lng-terminal-us/","data_source":"Data: Global Gas Infrastructure Tracker, Global Energy Monitor, September 2025"},{"slug":"american-lng-titusville-terminal-us","name":"American LNG Titusville Terminal","country":"United States","country_iso":"US","region":"Americas","state_province":"Florida","city":"Titusville","facility_type":"export","floating_type":"unknown","status":"cancelled","latitude":28.591111,"longitude":-80.82,"units":1,"capacity_operating_mtpa":null,"capacity_construction_mtpa":null,"capacity_proposed_mtpa":null,"capacity_operating_bcm_y":null,"capacity_construction_bcm_y":null,"capacity_proposed_bcm_y":null,"earliest_start_year":null,"latest_start_year":null,"url":"https://lngatlas.org/terminal/american-lng-titusville-terminal-us/","data_source":"Data: Global Gas Infrastructure Tracker, Global Energy Monitor, September 2025"},{"slug":"amurang-fsru-id","name":"Amurang FSRU","country":"Indonesia","country_iso":"ID","region":"Asia","state_province":null,"city":"Amurang, Sulawesi","facility_type":"import","floating_type":"fsru","status":"mothballed","latitude":1.192442,"longitude":124.555669,"units":1,"capacity_operating_mtpa":null,"capacity_construction_mtpa":null,"capacity_proposed_mtpa":null,"capacity_operating_bcm_y":null,"capacity_construction_bcm_y":null,"capacity_proposed_bcm_y":null,"earliest_start_year":2020,"latest_start_year":2020,"url":"https://lngatlas.org/terminal/amurang-fsru-id/","data_source":"Data: Global Gas Infrastructure Tracker, Global Energy Monitor, September 2025"},{"slug":"andes-energy-lng-terminal-co","name":"Andes Energy Terminal","country":"Colombia","country_iso":"CO","region":"Americas","state_province":"Valle del Cauca","city":"Bay of Buenaventura","facility_type":"import","floating_type":"floating","status":"proposed","latitude":3.921808,"longitude":-77.108302,"units":1,"capacity_operating_mtpa":null,"capacity_construction_mtpa":null,"capacity_proposed_mtpa":null,"capacity_operating_bcm_y":null,"capacity_construction_bcm_y":null,"capacity_proposed_bcm_y":null,"earliest_start_year":null,"latest_start_year":null,"url":"https://lngatlas.org/terminal/andes-energy-lng-terminal-co/","data_source":"Data: Global Gas Infrastructure Tracker, Global Energy Monitor, September 2025"},{"slug":"andres-lng-terminal-do","name":"Andrés LNG Terminal","country":"Dominican Republic","country_iso":"DO","region":"Americas","state_province":"Santo Domingo","city":"Andres","facility_type":"import","floating_type":"unknown","status":"operating","latitude":18.406993,"longitude":-69.628234,"units":1,"capacity_operating_mtpa":1.9,"capacity_construction_mtpa":null,"capacity_proposed_mtpa":null,"capacity_operating_bcm_y":2.584,"capacity_construction_bcm_y":null,"capacity_proposed_bcm_y":null,"earliest_start_year":2003,"latest_start_year":2003,"url":"https://lngatlas.org/terminal/andres-lng-terminal-do/","data_source":"Data: Global Gas Infrastructure Tracker, Global Energy Monitor, September 2025"},{"slug":"angola-lng-terminal-ao","name":"Angola LNG Terminal","country":"Angola","country_iso":"AO","region":"Africa","state_province":"Zaire","city":"Soyo","facility_type":"export","floating_type":"unknown","status":"operating","latitude":-6.11957,"longitude":12.33596,"units":1,"capacity_operating_mtpa":5.2,"capacity_construction_mtpa":null,"capacity_proposed_mtpa":null,"capacity_operating_bcm_y":7.072,"capacity_construction_bcm_y":null,"capacity_proposed_bcm_y":null,"earliest_start_year":2013,"latest_start_year":2013,"url":"https://lngatlas.org/terminal/angola-lng-terminal-ao/","data_source":"Data: Global Gas Infrastructure Tracker, Global Energy Monitor, September 2025"},{"slug":"annova-lng-terminal-us","name":"Annova LNG Terminal","country":"United States","country_iso":"US","region":"Americas","state_province":"Texas","city":"Brownsville","facility_type":"export","floating_type":"unknown","status":"cancelled","latitude":25.950835,"longitude":-97.410844,"units":1,"capacity_operating_mtpa":null,"capacity_construction_mtpa":null,"capacity_proposed_mtpa":null,"capacity_operating_bcm_y":null,"capacity_construction_bcm_y":null,"capacity_proposed_bcm_y":null,"earliest_start_year":null,"latest_start_year":null,"url":"https://lngatlas.org/terminal/annova-lng-terminal-us/","data_source":"Data: Global Gas Infrastructure Tracker, Global Energy Monitor, September 2025"},{"slug":"antigua-power-lng-terminal-ag","name":"Antigua Power LNG Terminal","country":"Antigua And Barbuda","country_iso":"AG","region":"Americas","state_province":"Antigua","city":"Crabbs","facility_type":"import","floating_type":"unknown","status":"construction","latitude":17.127903,"longitude":-61.75587,"units":1,"capacity_operating_mtpa":null,"capacity_construction_mtpa":null,"capacity_proposed_mtpa":null,"capacity_operating_bcm_y":null,"capacity_construction_bcm_y":null,"capacity_proposed_bcm_y":null,"earliest_start_year":null,"latest_start_year":null,"url":"https://lngatlas.org/terminal/antigua-power-lng-terminal-ag/","data_source":"Data: Global Gas Infrastructure Tracker, Global Energy Monitor, September 2025"},{"slug":"aqaba-jordan-fsru-jo","name":"Aqaba Jordan FSRU","country":"Jordan","country_iso":"JO","region":"Asia","state_province":"Aqaba","city":"Aqaba Port","facility_type":"import","floating_type":"fsru","status":"operating","latitude":29.3752527,"longitude":34.9635687,"units":1,"capacity_operating_mtpa":3.8,"capacity_construction_mtpa":null,"capacity_proposed_mtpa":null,"capacity_operating_bcm_y":5.168,"capacity_construction_bcm_y":null,"capacity_proposed_bcm_y":null,"earliest_start_year":2015,"latest_start_year":2015,"url":"https://lngatlas.org/terminal/aqaba-jordan-fsru-jo/","data_source":"Data: Global Gas Infrastructure Tracker, Global Energy Monitor, September 2025"},{"slug":"arctic-lng-1-terminal-ru","name":"Arctic LNG 1 Terminal","country":"Russia","country_iso":"RU","region":"Europe","state_province":null,"city":"Gydan Peninsula","facility_type":"export","floating_type":"unknown","status":"proposed","latitude":70.908942,"longitude":74.05613,"units":1,"capacity_operating_mtpa":null,"capacity_construction_mtpa":null,"capacity_proposed_mtpa":19.8,"capacity_operating_bcm_y":null,"capacity_construction_bcm_y":null,"capacity_proposed_bcm_y":26.928,"earliest_start_year":null,"latest_start_year":null,"url":"https://lngatlas.org/terminal/arctic-lng-1-terminal-ru/","data_source":"Data: Global Gas Infrastructure Tracker, Global Energy Monitor, September 2025"},{"slug":"arctic-lng-2-terminal-ru","name":"Arctic LNG 2 Terminal","country":"Russia","country_iso":"RU","region":"Europe","state_province":null,"city":"Gydan Peninsula","facility_type":"export","floating_type":"unknown","status":"operating","latitude":70.99517,"longitude":73.8295,"units":3,"capacity_operating_mtpa":6.6,"capacity_construction_mtpa":6.6,"capacity_proposed_mtpa":null,"capacity_operating_bcm_y":8.976,"capacity_construction_bcm_y":8.976,"capacity_proposed_bcm_y":null,"earliest_start_year":2023,"latest_start_year":2025,"url":"https://lngatlas.org/terminal/arctic-lng-2-terminal-ru/","data_source":"Data: Global Gas Infrastructure Tracker, Global Energy Monitor, September 2025"},{"slug":"arctic-lng-3-terminal-ru","name":"Arctic LNG 3 Terminal","country":"Russia","country_iso":"RU","region":"Europe","state_province":null,"city":"Ob Bay","facility_type":"export","floating_type":"unknown","status":"shelved","latitude":72.56577,"longitude":73.847129,"units":1,"capacity_operating_mtpa":null,"capacity_construction_mtpa":null,"capacity_proposed_mtpa":null,"capacity_operating_bcm_y":null,"capacity_construction_bcm_y":null,"capacity_proposed_bcm_y":null,"earliest_start_year":null,"latest_start_year":null,"url":"https://lngatlas.org/terminal/arctic-lng-3-terminal-ru/","data_source":"Data: Global Gas Infrastructure Tracker, Global Energy Monitor, September 2025"},{"slug":"argent-lng-terminal-us","name":"Argent LNG Terminal","country":"United States","country_iso":"US","region":"Americas","state_province":"Louisiana","city":"Port Fourchon","facility_type":"export","floating_type":"unknown","status":"proposed","latitude":29.105833,"longitude":-90.194444,"units":2,"capacity_operating_mtpa":null,"capacity_construction_mtpa":null,"capacity_proposed_mtpa":20,"capacity_operating_bcm_y":null,"capacity_construction_bcm_y":null,"capacity_proposed_bcm_y":27.2,"earliest_start_year":null,"latest_start_year":null,"url":"https://lngatlas.org/terminal/argent-lng-terminal-us/","data_source":"Data: Global Gas Infrastructure Tracker, Global Energy Monitor, September 2025"},{"slug":"argentina-lng-terminal-ar","name":"Argentina LNG Terminal","country":"Argentina","country_iso":"AR","region":"Americas","state_province":"Río Negro","city":"Las Grutas","facility_type":"export","floating_type":"floating","status":"proposed","latitude":-41.11535,"longitude":-65.08253,"units":4,"capacity_operating_mtpa":null,"capacity_construction_mtpa":null,"capacity_proposed_mtpa":27.95,"capacity_operating_bcm_y":null,"capacity_construction_bcm_y":null,"capacity_proposed_bcm_y":38.012,"earliest_start_year":null,"latest_start_year":null,"url":"https://lngatlas.org/terminal/argentina-lng-terminal-ar/","data_source":"Data: Global Gas Infrastructure Tracker, Global Energy Monitor, September 2025"},{"slug":"argo-fsru-gr","name":"Argo FSRU","country":"Greece","country_iso":"GR","region":"Europe","state_province":null,"city":"Port of Volos","facility_type":"import","floating_type":"fsru","status":"proposed","latitude":39.3512644,"longitude":22.9324904,"units":1,"capacity_operating_mtpa":null,"capacity_construction_mtpa":null,"capacity_proposed_mtpa":3.38,"capacity_operating_bcm_y":null,"capacity_construction_bcm_y":null,"capacity_proposed_bcm_y":4.597,"earliest_start_year":null,"latest_start_year":null,"url":"https://lngatlas.org/terminal/argo-fsru-gr/","data_source":"Data: Global Gas Infrastructure Tracker, Global Energy Monitor, September 2025"},{"slug":"arkhangelsk-lng-terminal-ru","name":"Arkhangelsk LNG Terminal","country":"Russia","country_iso":"RU","region":"Europe","state_province":"Arkhangelsk Oblast","city":"Novodvinsk","facility_type":"export","floating_type":"unknown","status":"proposed","latitude":64.4031577,"longitude":40.8272159,"units":2,"capacity_operating_mtpa":null,"capacity_construction_mtpa":null,"capacity_proposed_mtpa":0.16,"capacity_operating_bcm_y":null,"capacity_construction_bcm_y":null,"capacity_proposed_bcm_y":0.218,"earliest_start_year":null,"latest_start_year":null,"url":"https://lngatlas.org/terminal/arkhangelsk-lng-terminal-ru/","data_source":"Data: Global Gas Infrastructure Tracker, Global Energy Monitor, September 2025"},{"slug":"arrow-energy-lng-terminal-au","name":"Arrow Energy LNG Terminal","country":"Australia","country_iso":"AU","region":"Oceania","state_province":"Queensland","city":"Curtis Island","facility_type":"export","floating_type":"unknown","status":"cancelled","latitude":-23.6243946,"longitude":151.1444092,"units":1,"capacity_operating_mtpa":null,"capacity_construction_mtpa":null,"capacity_proposed_mtpa":null,"capacity_operating_bcm_y":null,"capacity_construction_bcm_y":null,"capacity_proposed_bcm_y":null,"earliest_start_year":null,"latest_start_year":null,"url":"https://lngatlas.org/terminal/arrow-energy-lng-terminal-au/","data_source":"Data: Global Gas Infrastructure Tracker, Global Energy Monitor, September 2025"},{"slug":"aruba-lng-terminal-aw","name":"Aruba LNG Terminal","country":"Aruba","country_iso":"AW","region":"Americas","state_province":null,"city":"San Nicolas","facility_type":"import","floating_type":"unknown","status":"proposed","latitude":12.435298,"longitude":-69.920293,"units":1,"capacity_operating_mtpa":null,"capacity_construction_mtpa":null,"capacity_proposed_mtpa":null,"capacity_operating_bcm_y":null,"capacity_construction_bcm_y":null,"capacity_proposed_bcm_y":null,"earliest_start_year":null,"latest_start_year":null,"url":"https://lngatlas.org/terminal/aruba-lng-terminal-aw/","data_source":"Data: Global Gas Infrastructure Tracker, Global Energy Monitor, September 2025"},{"slug":"arun-lng-terminal-id","name":"Arun LNG Terminal","country":"Indonesia","country_iso":"ID","region":"Asia","state_province":"Sumatra","city":"Lhokseumawe","facility_type":"export","floating_type":"unknown","status":"operating","latitude":5.2234,"longitude":97.083,"units":7,"capacity_operating_mtpa":3,"capacity_construction_mtpa":null,"capacity_proposed_mtpa":null,"capacity_operating_bcm_y":4.08,"capacity_construction_bcm_y":null,"capacity_proposed_bcm_y":null,"earliest_start_year":1978,"latest_start_year":2015,"url":"https://lngatlas.org/terminal/arun-lng-terminal-id/","data_source":"Data: Global Gas Infrastructure Tracker, Global Energy Monitor, September 2025"},{"slug":"arzew-bethioua-lng-terminal-dz","name":"Arzew-Bethioua LNG Terminal","country":"Algeria","country_iso":"DZ","region":"Africa","state_province":"Oran","city":"Bethioua","facility_type":"export","floating_type":"unknown","status":"operating","latitude":35.80452,"longitude":-0.24097,"units":4,"capacity_operating_mtpa":20.8,"capacity_construction_mtpa":null,"capacity_proposed_mtpa":null,"capacity_operating_bcm_y":28.288,"capacity_construction_bcm_y":null,"capacity_proposed_bcm_y":null,"earliest_start_year":1964,"latest_start_year":2014,"url":"https://lngatlas.org/terminal/arzew-bethioua-lng-terminal-dz/","data_source":"Data: Global Gas Infrastructure Tracker, Global Energy Monitor, September 2025"},{"slug":"atimonan-lng-terminal-ph","name":"Atimonan LNG Terminal","country":"Philippines","country_iso":"PH","region":"Asia","state_province":"Quezon","city":"Villa Ibaba","facility_type":"import","floating_type":"unknown","status":"cancelled","latitude":14.0569,"longitude":121.86168,"units":1,"capacity_operating_mtpa":null,"capacity_construction_mtpa":null,"capacity_proposed_mtpa":null,"capacity_operating_bcm_y":null,"capacity_construction_bcm_y":null,"capacity_proposed_bcm_y":null,"earliest_start_year":null,"latest_start_year":null,"url":"https://lngatlas.org/terminal/atimonan-lng-terminal-ph/","data_source":"Data: Global Gas Infrastructure Tracker, Global Energy Monitor, September 2025"},{"slug":"atlantic-coast-lng-terminal-ca","name":"Atlantic Coast LNG Terminal","country":"Canada","country_iso":"CA","region":"Americas","state_province":"Nova Scotia","city":"Byers Cove","facility_type":"export","floating_type":"floating","status":"cancelled","latitude":45.548673,"longitude":-61.334441,"units":1,"capacity_operating_mtpa":null,"capacity_construction_mtpa":null,"capacity_proposed_mtpa":null,"capacity_operating_bcm_y":null,"capacity_construction_bcm_y":null,"capacity_proposed_bcm_y":null,"earliest_start_year":null,"latest_start_year":null,"url":"https://lngatlas.org/terminal/atlantic-coast-lng-terminal-ca/","data_source":"Data: Global Gas Infrastructure Tracker, Global Energy Monitor, September 2025"},{"slug":"atlantic-lng-terminal-tt","name":"Atlantic LNG Terminal","country":"Trinidad and Tobago","country_iso":"TT","region":"Americas","state_province":null,"city":"Point Fortin bor","facility_type":"export","floating_type":"unknown","status":"operating","latitude":10.18106,"longitude":-61.69189,"units":5,"capacity_operating_mtpa":12,"capacity_construction_mtpa":null,"capacity_proposed_mtpa":null,"capacity_operating_bcm_y":16.32,"capacity_construction_bcm_y":null,"capacity_proposed_bcm_y":null,"earliest_start_year":1999,"latest_start_year":2007,"url":"https://lngatlas.org/terminal/atlantic-lng-terminal-tt/","data_source":"Data: Global Gas Infrastructure Tracker, Global Energy Monitor, September 2025"},{"slug":"aurora-lng-terminal-ca","name":"Aurora LNG Terminal","country":"Canada","country_iso":"CA","region":"Americas","state_province":"British Columbia","city":"Delusion Bay","facility_type":"export","floating_type":"unknown","status":"cancelled","latitude":54.284,"longitude":-130.417,"units":2,"capacity_operating_mtpa":null,"capacity_construction_mtpa":null,"capacity_proposed_mtpa":null,"capacity_operating_bcm_y":null,"capacity_construction_bcm_y":null,"capacity_proposed_bcm_y":null,"earliest_start_year":null,"latest_start_year":null,"url":"https://lngatlas.org/terminal/aurora-lng-terminal-ca/","data_source":"Data: Global Gas Infrastructure Tracker, Global Energy Monitor, September 2025"},{"slug":"aurora-spassk-dalny-lng-terminal-ru","name":"Aurora Spassk-Dalny LNG Terminal","country":"Russia","country_iso":"RU","region":"Europe","state_province":"Primorsky Krai","city":"Spassk-Dalny","facility_type":"export","floating_type":"unknown","status":"proposed","latitude":44.57572,"longitude":132.760471,"units":2,"capacity_operating_mtpa":null,"capacity_construction_mtpa":null,"capacity_proposed_mtpa":0.04,"capacity_operating_bcm_y":null,"capacity_construction_bcm_y":null,"capacity_proposed_bcm_y":0.054,"earliest_start_year":null,"latest_start_year":null,"url":"https://lngatlas.org/terminal/aurora-spassk-dalny-lng-terminal-ru/","data_source":"Data: Global Gas Infrastructure Tracker, Global Energy Monitor, September 2025"},{"slug":"australasia-probolinggo-fsru-id","name":"Australasia Probolinggo FSRU","country":"Indonesia","country_iso":"ID","region":"Asia","state_province":null,"city":"East Java","facility_type":"import","floating_type":"fsru","status":"cancelled","latitude":-7.196308,"longitude":112.73391,"units":1,"capacity_operating_mtpa":null,"capacity_construction_mtpa":null,"capacity_proposed_mtpa":null,"capacity_operating_bcm_y":null,"capacity_construction_bcm_y":null,"capacity_proposed_bcm_y":null,"earliest_start_year":null,"latest_start_year":null,"url":"https://lngatlas.org/terminal/australasia-probolinggo-fsru-id/","data_source":"Data: Global Gas Infrastructure Tracker, Global Energy Monitor, September 2025"},{"slug":"australia-pacific-lng-terminal-au","name":"Australia Pacific LNG Terminal","country":"Australia","country_iso":"AU","region":"Oceania","state_province":"Queensland","city":"Curtis Island","facility_type":"export","floating_type":"unknown","status":"operating","latitude":-23.75583,"longitude":151.19061,"units":2,"capacity_operating_mtpa":9,"capacity_construction_mtpa":null,"capacity_proposed_mtpa":null,"capacity_operating_bcm_y":12.24,"capacity_construction_bcm_y":null,"capacity_proposed_bcm_y":null,"earliest_start_year":2016,"latest_start_year":2016,"url":"https://lngatlas.org/terminal/australia-pacific-lng-terminal-au/","data_source":"Data: Global Gas Infrastructure Tracker, Global Energy Monitor, September 2025"},{"slug":"avocet-flng-terminal-us","name":"Avocet FLNG Terminal","country":"United States","country_iso":"US","region":"Americas","state_province":"Louisiana","city":"Gulf of Mexico","facility_type":"export","floating_type":"flng","status":"cancelled","latitude":28.692,"longitude":-90.81287,"units":1,"capacity_operating_mtpa":null,"capacity_construction_mtpa":null,"capacity_proposed_mtpa":null,"capacity_operating_bcm_y":null,"capacity_construction_bcm_y":null,"capacity_proposed_bcm_y":null,"earliest_start_year":null,"latest_start_year":null,"url":"https://lngatlas.org/terminal/avocet-flng-terminal-us/","data_source":"Data: Global Gas Infrastructure Tracker, Global Energy Monitor, September 2025"},{"slug":"bpcl-mangalore-lng-terminal-in","name":"BPCL Mangalore LNG Terminal","country":"India","country_iso":"IN","region":"Asia","state_province":"Karnataka","city":"Mangalore","facility_type":"import","floating_type":"unknown","status":"cancelled","latitude":12.9331432,"longitude":74.8163583,"units":1,"capacity_operating_mtpa":null,"capacity_construction_mtpa":null,"capacity_proposed_mtpa":null,"capacity_operating_bcm_y":null,"capacity_construction_bcm_y":null,"capacity_proposed_bcm_y":null,"earliest_start_year":null,"latest_start_year":null,"url":"https://lngatlas.org/terminal/bpcl-mangalore-lng-terminal-in/","data_source":"Data: Global Gas Infrastructure Tracker, Global Energy Monitor, September 2025"},{"slug":"bac-lieu-lng-terminal-vn","name":"Bac Lieu LNG Terminal","country":"Vietnam","country_iso":"VN","region":"Asia","state_province":"Bac Lieu","city":null,"facility_type":"import","floating_type":"unknown","status":"proposed","latitude":9.294,"longitude":105.7216,"units":1,"capacity_operating_mtpa":null,"capacity_construction_mtpa":null,"capacity_proposed_mtpa":2,"capacity_operating_bcm_y":null,"capacity_construction_bcm_y":null,"capacity_proposed_bcm_y":2.72,"earliest_start_year":null,"latest_start_year":null,"url":"https://lngatlas.org/terminal/bac-lieu-lng-terminal-vn/","data_source":"Data: Global Gas Infrastructure Tracker, Global Energy Monitor, September 2025"},{"slug":"bahia-blanca-gasport-fsru-ar","name":"Bahia Blanca GasPort FSRU","country":"Argentina","country_iso":"AR","region":"Americas","state_province":"Buenos Aires","city":"Bahía Blanca, Buenos Aires","facility_type":"import","floating_type":"fsru","status":"idle","latitude":-38.787784,"longitude":-62.289504,"units":1,"capacity_operating_mtpa":null,"capacity_construction_mtpa":null,"capacity_proposed_mtpa":null,"capacity_operating_bcm_y":null,"capacity_construction_bcm_y":null,"capacity_proposed_bcm_y":null,"earliest_start_year":2008,"latest_start_year":2008,"url":"https://lngatlas.org/terminal/bahia-blanca-gasport-fsru-ar/","data_source":"Data: Global Gas Infrastructure Tracker, Global Energy Monitor, September 2025"},{"slug":"bahia-fsru-br","name":"Bahia FSRU","country":"Brazil","country_iso":"BR","region":"Americas","state_province":"Bahia","city":"4 km west of Ilha dos Frades","facility_type":"import","floating_type":"fsru","status":"operating","latitude":-12.785422,"longitude":-38.703511,"units":1,"capacity_operating_mtpa":5.6,"capacity_construction_mtpa":null,"capacity_proposed_mtpa":null,"capacity_operating_bcm_y":7.616,"capacity_construction_bcm_y":null,"capacity_proposed_bcm_y":null,"earliest_start_year":2014,"latest_start_year":2014,"url":"https://lngatlas.org/terminal/bahia-fsru-br/","data_source":"Data: Global Gas Infrastructure Tracker, Global Energy Monitor, September 2025"},{"slug":"bahrain-hidd-flng-terminal-bh","name":"Bahrain Hidd FLNG Terminal","country":"Bahrain","country_iso":"BH","region":"Asia","state_province":"Muharraq Island","city":"Al Hidd","facility_type":"import","floating_type":"flng","status":"operating","latitude":26.2104277,"longitude":50.7031432,"units":1,"capacity_operating_mtpa":6,"capacity_construction_mtpa":null,"capacity_proposed_mtpa":null,"capacity_operating_bcm_y":8.16,"capacity_construction_bcm_y":null,"capacity_proposed_bcm_y":null,"earliest_start_year":2019,"latest_start_year":2019,"url":"https://lngatlas.org/terminal/bahrain-hidd-flng-terminal-bh/","data_source":"Data: Global Gas Infrastructure Tracker, Global Energy Monitor, September 2025"},{"slug":"bahia-blanca-flng-terminal-ar","name":"Bahía Blanca FLNG Terminal","country":"Argentina","country_iso":"AR","region":"Americas","state_province":null,"city":"Bahía Blanca, Buenos Aires","facility_type":"export","floating_type":"flng","status":"mothballed","latitude":-38.787784,"longitude":-62.289504,"units":1,"capacity_operating_mtpa":null,"capacity_construction_mtpa":null,"capacity_proposed_mtpa":null,"capacity_operating_bcm_y":null,"capacity_construction_bcm_y":null,"capacity_proposed_bcm_y":null,"earliest_start_year":2019,"latest_start_year":2019,"url":"https://lngatlas.org/terminal/bahia-blanca-flng-terminal-ar/","data_source":"Data: Global Gas Infrastructure Tracker, Global Energy Monitor, September 2025"},{"slug":"ballena-fsru-co","name":"Ballena FSRU","country":"Colombia","country_iso":"CO","region":"Americas","state_province":"La Guajira","city":null,"facility_type":"import","floating_type":"fsru","status":"proposed","latitude":11.824234,"longitude":-72.823139,"units":1,"capacity_operating_mtpa":null,"capacity_construction_mtpa":null,"capacity_proposed_mtpa":1.99,"capacity_operating_bcm_y":null,"capacity_construction_bcm_y":null,"capacity_proposed_bcm_y":2.706,"earliest_start_year":null,"latest_start_year":null,"url":"https://lngatlas.org/terminal/ballena-fsru-co/","data_source":"Data: Global Gas Infrastructure Tracker, Global Energy Monitor, September 2025"},{"slug":"bangka-belitung-pontianak-fsru-id","name":"Bangka Belitung-Pontianak FSRU","country":"Indonesia","country_iso":"ID","region":"Asia","state_province":"West Kalimantan","city":"Pontianak","facility_type":"import","floating_type":"fsru","status":"cancelled","latitude":0.045634,"longitude":109.181164,"units":1,"capacity_operating_mtpa":null,"capacity_construction_mtpa":null,"capacity_proposed_mtpa":null,"capacity_operating_bcm_y":null,"capacity_construction_bcm_y":null,"capacity_proposed_bcm_y":null,"earliest_start_year":null,"latest_start_year":null,"url":"https://lngatlas.org/terminal/bangka-belitung-pontianak-fsru-id/","data_source":"Data: Global Gas Infrastructure Tracker, Global Energy Monitor, September 2025"},{"slug":"bar-lng-terminal-me","name":"Bar LNG Terminal","country":"Montenegro","country_iso":"ME","region":"Europe","state_province":null,"city":"Port of Bar","facility_type":"import","floating_type":"floating","status":"proposed","latitude":42.093367,"longitude":19.081096,"units":1,"capacity_operating_mtpa":null,"capacity_construction_mtpa":null,"capacity_proposed_mtpa":0.4,"capacity_operating_bcm_y":null,"capacity_construction_bcm_y":null,"capacity_proposed_bcm_y":0.544,"earliest_start_year":null,"latest_start_year":null,"url":"https://lngatlas.org/terminal/bar-lng-terminal-me/","data_source":"Data: Global Gas Infrastructure Tracker, Global Energy Monitor, September 2025"},{"slug":"barca-lng-terminal-us","name":"Barca LNG Terminal","country":"United States","country_iso":"US","region":"Americas","state_province":"Texas","city":"Brownsville","facility_type":"export","floating_type":"unknown","status":"cancelled","latitude":25.950835,"longitude":-97.410844,"units":1,"capacity_operating_mtpa":null,"capacity_construction_mtpa":null,"capacity_proposed_mtpa":null,"capacity_operating_bcm_y":null,"capacity_construction_bcm_y":null,"capacity_proposed_bcm_y":null,"earliest_start_year":null,"latest_start_year":null,"url":"https://lngatlas.org/terminal/barca-lng-terminal-us/","data_source":"Data: Global Gas Infrastructure Tracker, Global Energy Monitor, September 2025"},{"slug":"barcelona-lng-terminal-es","name":"Barcelona LNG Terminal","country":"Spain","country_iso":"ES","region":"Europe","state_province":"Catalonia","city":"Barcelona","facility_type":"import","floating_type":"unknown","status":"operating","latitude":41.3394,"longitude":2.1583,"units":1,"capacity_operating_mtpa":12.6,"capacity_construction_mtpa":null,"capacity_proposed_mtpa":null,"capacity_operating_bcm_y":17.136,"capacity_construction_bcm_y":null,"capacity_proposed_bcm_y":null,"earliest_start_year":1969,"latest_start_year":1969,"url":"https://lngatlas.org/terminal/barcelona-lng-terminal-es/","data_source":"Data: Global Gas Infrastructure Tracker, Global Energy Monitor, September 2025"},{"slug":"bataan-manila-lng-terminal-ph","name":"Bataan-Manila LNG Terminal","country":"Philippines","country_iso":"PH","region":"Asia","state_province":"Bataan","city":"Limay","facility_type":"import","floating_type":"unknown","status":"cancelled","latitude":14.57,"longitude":120.6,"units":1,"capacity_operating_mtpa":null,"capacity_construction_mtpa":null,"capacity_proposed_mtpa":null,"capacity_operating_bcm_y":null,"capacity_construction_bcm_y":null,"capacity_proposed_bcm_y":null,"earliest_start_year":null,"latest_start_year":null,"url":"https://lngatlas.org/terminal/bataan-manila-lng-terminal-ph/","data_source":"Data: Global Gas Infrastructure Tracker, Global Energy Monitor, September 2025"},{"slug":"batam-lng-terminal-id","name":"Batam LNG Terminal","country":"Indonesia","country_iso":"ID","region":"Asia","state_province":null,"city":"Batam","facility_type":"import","floating_type":"unknown","status":"cancelled","latitude":1.167769,"longitude":103.99339,"units":1,"capacity_operating_mtpa":null,"capacity_construction_mtpa":null,"capacity_proposed_mtpa":null,"capacity_operating_bcm_y":null,"capacity_construction_bcm_y":null,"capacity_proposed_bcm_y":null,"earliest_start_year":null,"latest_start_year":null,"url":"https://lngatlas.org/terminal/batam-lng-terminal-id/","data_source":"Data: Global Gas Infrastructure Tracker, Global Energy Monitor, September 2025"},{"slug":"batangas-clean-energy-lng-terminal-ph","name":"Batangas Clean Energy LNG Terminal","country":"Philippines","country_iso":"PH","region":"Asia","state_province":null,"city":"Batangas","facility_type":"import","floating_type":"unknown","status":"proposed","latitude":13.75391,"longitude":121.040647,"units":1,"capacity_operating_mtpa":null,"capacity_construction_mtpa":null,"capacity_proposed_mtpa":3,"capacity_operating_bcm_y":null,"capacity_construction_bcm_y":null,"capacity_proposed_bcm_y":4.08,"earliest_start_year":null,"latest_start_year":null,"url":"https://lngatlas.org/terminal/batangas-clean-energy-lng-terminal-ph/","data_source":"Data: Global Gas Infrastructure Tracker, Global Energy Monitor, September 2025"},{"slug":"battery-rock-lng-terminal-us","name":"Battery Rock LNG Terminal","country":"United States","country_iso":"US","region":"Americas","state_province":"Massachusetts","city":"Outer Brewster Island","facility_type":"import","floating_type":"unknown","status":"cancelled","latitude":42.341781,"longitude":-70.877681,"units":1,"capacity_operating_mtpa":null,"capacity_construction_mtpa":null,"capacity_proposed_mtpa":null,"capacity_operating_bcm_y":null,"capacity_construction_bcm_y":null,"capacity_proposed_bcm_y":null,"earliest_start_year":null,"latest_start_year":null,"url":"https://lngatlas.org/terminal/battery-rock-lng-terminal-us/","data_source":"Data: Global Gas Infrastructure Tracker, Global Energy Monitor, September 2025"},{"slug":"bay-crossing-lng-terminal-us","name":"Bay Crossing LNG Terminal","country":"United States","country_iso":"US","region":"Americas","state_province":"Texas","city":"Galveston","facility_type":"import","floating_type":"unknown","status":"cancelled","latitude":29.281111,"longitude":-94.825833,"units":1,"capacity_operating_mtpa":null,"capacity_construction_mtpa":null,"capacity_proposed_mtpa":null,"capacity_operating_bcm_y":null,"capacity_construction_bcm_y":null,"capacity_proposed_bcm_y":null,"earliest_start_year":null,"latest_start_year":null,"url":"https://lngatlas.org/terminal/bay-crossing-lng-terminal-us/","data_source":"Data: Global Gas Infrastructure Tracker, Global Energy Monitor, September 2025"},{"slug":"beacon-port-lng-terminal-us","name":"Beacon Port LNG Terminal","country":"United States","country_iso":"US","region":"Americas","state_province":"Louisiana","city":"Johnson's Bayou","facility_type":"import","floating_type":"unknown","status":"cancelled","latitude":29.763056,"longitude":-93.698611,"units":1,"capacity_operating_mtpa":null,"capacity_construction_mtpa":null,"capacity_proposed_mtpa":null,"capacity_operating_bcm_y":null,"capacity_construction_bcm_y":null,"capacity_proposed_bcm_y":null,"earliest_start_year":null,"latest_start_year":null,"url":"https://lngatlas.org/terminal/beacon-port-lng-terminal-us/","data_source":"Data: Global Gas Infrastructure Tracker, Global Energy Monitor, September 2025"},{"slug":"bear-head-lng-terminal-ca","name":"Bear Head LNG Terminal","country":"Canada","country_iso":"CA","region":"Americas","state_province":"Nova Scotia","city":"Point Tupper","facility_type":"export","floating_type":"unknown","status":"cancelled","latitude":45.604444,"longitude":-61.3675,"units":1,"capacity_operating_mtpa":null,"capacity_construction_mtpa":null,"capacity_proposed_mtpa":null,"capacity_operating_bcm_y":null,"capacity_construction_bcm_y":null,"capacity_proposed_bcm_y":null,"earliest_start_year":null,"latest_start_year":null,"url":"https://lngatlas.org/terminal/bear-head-lng-terminal-ca/","data_source":"Data: Global Gas Infrastructure Tracker, Global Energy Monitor, September 2025"},{"slug":"beddawi-fsru-lb","name":"Beddawi FSRU","country":"Lebanon","country_iso":"LB","region":"Asia","state_province":null,"city":"Beddawi","facility_type":"import","floating_type":"fsru","status":"cancelled","latitude":34.466704,"longitude":35.832663,"units":1,"capacity_operating_mtpa":null,"capacity_construction_mtpa":null,"capacity_proposed_mtpa":null,"capacity_operating_bcm_y":null,"capacity_construction_bcm_y":null,"capacity_proposed_bcm_y":null,"earliest_start_year":null,"latest_start_year":null,"url":"https://lngatlas.org/terminal/beddawi-fsru-lb/","data_source":"Data: Global Gas Infrastructure Tracker, Global Energy Monitor, September 2025"},{"slug":"beihai-lng-terminal-petrochina-cn","name":"Beihai LNG Terminal (PetroChina)","country":"China","country_iso":"CN","region":"Asia","state_province":"Guangxi","city":"Tieshan Port","facility_type":"import","floating_type":"unknown","status":"cancelled","latitude":21.499546,"longitude":109.524152,"units":1,"capacity_operating_mtpa":null,"capacity_construction_mtpa":null,"capacity_proposed_mtpa":null,"capacity_operating_bcm_y":null,"capacity_construction_bcm_y":null,"capacity_proposed_bcm_y":null,"earliest_start_year":null,"latest_start_year":null,"url":"https://lngatlas.org/terminal/beihai-lng-terminal-petrochina-cn/","data_source":"Data: Global Gas Infrastructure Tracker, Global Energy Monitor, September 2025"},{"slug":"ben-tre-fsru-vn","name":"Ben Tre FSRU","country":"Vietnam","country_iso":"VN","region":"Asia","state_province":"Ben Tre Province","city":null,"facility_type":"import","floating_type":"fsru","status":"cancelled","latitude":9.960177,"longitude":106.641855,"units":1,"capacity_operating_mtpa":null,"capacity_construction_mtpa":null,"capacity_proposed_mtpa":null,"capacity_operating_bcm_y":null,"capacity_construction_bcm_y":null,"capacity_proposed_bcm_y":null,"earliest_start_year":null,"latest_start_year":null,"url":"https://lngatlas.org/terminal/ben-tre-fsru-vn/","data_source":"Data: Global Gas Infrastructure Tracker, Global Energy Monitor, September 2025"},{"slug":"benin-fsru-bj","name":"Benin FSRU","country":"Benin","country_iso":"BJ","region":"Africa","state_province":null,"city":"Contonou","facility_type":"import","floating_type":"fsru","status":"cancelled","latitude":6.346843,"longitude":2.435208,"units":1,"capacity_operating_mtpa":null,"capacity_construction_mtpa":null,"capacity_proposed_mtpa":null,"capacity_operating_bcm_y":null,"capacity_construction_bcm_y":null,"capacity_proposed_bcm_y":null,"earliest_start_year":null,"latest_start_year":null,"url":"https://lngatlas.org/terminal/benin-fsru-bj/","data_source":"Data: Global Gas Infrastructure Tracker, Global Energy Monitor, September 2025"},{"slug":"bienville-fsru-us","name":"Bienville FSRU","country":"United States","country_iso":"US","region":"Americas","state_province":"Alabama","city":"Dauphin Island","facility_type":"import","floating_type":"fsru","status":"cancelled","latitude":30.256389,"longitude":-88.125278,"units":1,"capacity_operating_mtpa":null,"capacity_construction_mtpa":null,"capacity_proposed_mtpa":null,"capacity_operating_bcm_y":null,"capacity_construction_bcm_y":null,"capacity_proposed_bcm_y":null,"earliest_start_year":null,"latest_start_year":null,"url":"https://lngatlas.org/terminal/bienville-fsru-us/","data_source":"Data: Global Gas Infrastructure Tracker, Global Energy Monitor, September 2025"},{"slug":"bilbao-lng-terminal-es","name":"Bilbao LNG Terminal","country":"Spain","country_iso":"ES","region":"Europe","state_province":"Biscay","city":"Port of Bilbao","facility_type":"import","floating_type":"unknown","status":"operating","latitude":43.3612,"longitude":-3.09473,"units":1,"capacity_operating_mtpa":5.1,"capacity_construction_mtpa":null,"capacity_proposed_mtpa":null,"capacity_operating_bcm_y":6.936,"capacity_construction_bcm_y":null,"capacity_proposed_bcm_y":null,"earliest_start_year":2003,"latest_start_year":2003,"url":"https://lngatlas.org/terminal/bilbao-lng-terminal-es/","data_source":"Data: Global Gas Infrastructure Tracker, Global Energy Monitor, September 2025"},{"slug":"binzhou-changlian-lng-terminal-cn","name":"Binzhou Changlian LNG Terminal","country":"China","country_iso":"CN","region":"Asia","state_province":"Shandong","city":null,"facility_type":"import","floating_type":"unknown","status":"cancelled","latitude":38.220664,"longitude":118.102097,"units":1,"capacity_operating_mtpa":null,"capacity_construction_mtpa":null,"capacity_proposed_mtpa":null,"capacity_operating_bcm_y":null,"capacity_construction_bcm_y":null,"capacity_proposed_bcm_y":null,"earliest_start_year":null,"latest_start_year":null,"url":"https://lngatlas.org/terminal/binzhou-changlian-lng-terminal-cn/","data_source":"Data: Global Gas Infrastructure Tracker, Global Energy Monitor, September 2025"},{"slug":"birallah-lng-hub-mr","name":"BirAllah LNG Hub","country":"Mauritania","country_iso":"MR","region":"Africa","state_province":null,"city":null,"facility_type":"export","floating_type":"unknown","status":"proposed","latitude":16.4584,"longitude":-16.4577,"units":1,"capacity_operating_mtpa":null,"capacity_construction_mtpa":null,"capacity_proposed_mtpa":10,"capacity_operating_bcm_y":null,"capacity_construction_bcm_y":null,"capacity_proposed_bcm_y":13.6,"earliest_start_year":null,"latest_start_year":null,"url":"https://lngatlas.org/terminal/birallah-lng-hub-mr/","data_source":"Data: Global Gas Infrastructure Tracker, Global Energy Monitor, September 2025"},{"slug":"black-sea-lng-terminal-ro","name":"Black Sea LNG Terminal","country":"Romania","country_iso":"RO","region":"Europe","state_province":null,"city":"Kulevi","facility_type":"export","floating_type":"unknown","status":"proposed","latitude":42.275558,"longitude":41.63284,"units":2,"capacity_operating_mtpa":null,"capacity_construction_mtpa":null,"capacity_proposed_mtpa":null,"capacity_operating_bcm_y":null,"capacity_construction_bcm_y":null,"capacity_proposed_bcm_y":null,"earliest_start_year":null,"latest_start_year":null,"url":"https://lngatlas.org/terminal/black-sea-lng-terminal-ro/","data_source":"Data: Global Gas Infrastructure Tracker, Global Energy Monitor, September 2025"},{"slug":"bojonegara-lng-terminal-id","name":"Bojonegara LNG Terminal","country":"Indonesia","country_iso":"ID","region":"Asia","state_province":"Banten","city":"Bojonegara","facility_type":"import","floating_type":"unknown","status":"cancelled","latitude":-5.8846501,"longitude":106.0554886,"units":1,"capacity_operating_mtpa":null,"capacity_construction_mtpa":null,"capacity_proposed_mtpa":null,"capacity_operating_bcm_y":null,"capacity_construction_bcm_y":null,"capacity_proposed_bcm_y":null,"earliest_start_year":null,"latest_start_year":null,"url":"https://lngatlas.org/terminal/bojonegara-lng-terminal-id/","data_source":"Data: Global Gas Infrastructure Tracker, Global Energy Monitor, September 2025"},{"slug":"bonaparte-flng-terminal-au","name":"Bonaparte FLNG Terminal","country":"Australia","country_iso":"AU","region":"Oceania","state_province":"Western Australia","city":"Bonaparte Island","facility_type":"export","floating_type":"flng","status":"cancelled","latitude":-14.855412,"longitude":124.768939,"units":1,"capacity_operating_mtpa":null,"capacity_construction_mtpa":null,"capacity_proposed_mtpa":null,"capacity_operating_bcm_y":null,"capacity_construction_bcm_y":null,"capacity_proposed_bcm_y":null,"earliest_start_year":null,"latest_start_year":null,"url":"https://lngatlas.org/terminal/bonaparte-flng-terminal-au/","data_source":"Data: Global Gas Infrastructure Tracker, Global Energy Monitor, September 2025"},{"slug":"bontang-lng-terminal-id","name":"Bontang LNG Terminal","country":"Indonesia","country_iso":"ID","region":"Asia","state_province":"East Kalimantan","city":"Bontang","facility_type":"export","floating_type":"unknown","status":"operating","latitude":0.10123,"longitude":117.4701,"units":9,"capacity_operating_mtpa":5.75,"capacity_construction_mtpa":null,"capacity_proposed_mtpa":null,"capacity_operating_bcm_y":7.82,"capacity_construction_bcm_y":null,"capacity_proposed_bcm_y":null,"earliest_start_year":1977,"latest_start_year":1998,"url":"https://lngatlas.org/terminal/bontang-lng-terminal-id/","data_source":"Data: Global Gas Infrastructure Tracker, Global Energy Monitor, September 2025"},{"slug":"boryeong-lng-terminal-kr","name":"Boryeong LNG Terminal","country":"South Korea","country_iso":"KR","region":"Asia","state_province":"South Chungcheong","city":"Yeongbo Industrial Zone, Boryeong","facility_type":"import","floating_type":"unknown","status":"operating","latitude":36.415,"longitude":126.4947,"units":1,"capacity_operating_mtpa":10.8,"capacity_construction_mtpa":null,"capacity_proposed_mtpa":null,"capacity_operating_bcm_y":14.688,"capacity_construction_bcm_y":null,"capacity_proposed_bcm_y":null,"earliest_start_year":2016,"latest_start_year":2016,"url":"https://lngatlas.org/terminal/boryeong-lng-terminal-kr/","data_source":"Data: Global Gas Infrastructure Tracker, Global Energy Monitor, September 2025"},{"slug":"botswana-lng-terminal-bw","name":"Botswana LNG Terminal","country":"Botswana","country_iso":"BW","region":"Africa","state_province":null,"city":"Serowe","facility_type":"export","floating_type":"unknown","status":"proposed","latitude":-22.246252,"longitude":26.195279,"units":2,"capacity_operating_mtpa":null,"capacity_construction_mtpa":null,"capacity_proposed_mtpa":0.36,"capacity_operating_bcm_y":null,"capacity_construction_bcm_y":null,"capacity_proposed_bcm_y":0.49,"earliest_start_year":null,"latest_start_year":null,"url":"https://lngatlas.org/terminal/botswana-lng-terminal-bw/","data_source":"Data: Global Gas Infrastructure Tracker, Global Energy Monitor, September 2025"},{"slug":"botum-sakor-lng-terminal-kh","name":"Botum Sakor LNG Terminal","country":"Cambodia","country_iso":"KH","region":"Asia","state_province":"Koh Kong","city":"Botum Sakor","facility_type":"import","floating_type":"unknown","status":"proposed","latitude":10.890206,"longitude":103.40311,"units":1,"capacity_operating_mtpa":null,"capacity_construction_mtpa":null,"capacity_proposed_mtpa":1.1,"capacity_operating_bcm_y":null,"capacity_construction_bcm_y":null,"capacity_proposed_bcm_y":1.496,"earliest_start_year":null,"latest_start_year":null,"url":"https://lngatlas.org/terminal/botum-sakor-lng-terminal-kh/","data_source":"Data: Global Gas Infrastructure Tracker, Global Energy Monitor, September 2025"},{"slug":"boudji-flng-terminal-ga","name":"Boudji FLNG Terminal","country":"Gabon","country_iso":"GA","region":"Africa","state_province":null,"city":null,"facility_type":"export","floating_type":"flng","status":"cancelled","latitude":-4.302812,"longitude":10.351025,"units":1,"capacity_operating_mtpa":null,"capacity_construction_mtpa":null,"capacity_proposed_mtpa":null,"capacity_operating_bcm_y":null,"capacity_construction_bcm_y":null,"capacity_proposed_bcm_y":null,"earliest_start_year":null,"latest_start_year":null,"url":"https://lngatlas.org/terminal/boudji-flng-terminal-ga/","data_source":"Data: Global Gas Infrastructure Tracker, Global Energy Monitor, September 2025"},{"slug":"bradwood-landing-lng-terminal-us","name":"Bradwood Landing LNG Terminal","country":"United States","country_iso":"US","region":"Americas","state_province":"Oregon","city":"Bradwood","facility_type":"import","floating_type":"unknown","status":"cancelled","latitude":46.197011,"longitude":-123.438761,"units":1,"capacity_operating_mtpa":null,"capacity_construction_mtpa":null,"capacity_proposed_mtpa":null,"capacity_operating_bcm_y":null,"capacity_construction_bcm_y":null,"capacity_proposed_bcm_y":null,"earliest_start_year":null,"latest_start_year":null,"url":"https://lngatlas.org/terminal/bradwood-landing-lng-terminal-us/","data_source":"Data: Global Gas Infrastructure Tracker, Global Energy Monitor, September 2025"},{"slug":"brass-lng-terminal-ng","name":"Brass LNG Terminal","country":"Nigeria","country_iso":"NG","region":"Africa","state_province":"Bayelsa","city":"Twon-Brass","facility_type":"export","floating_type":"unknown","status":"shelved","latitude":4.31,"longitude":6.246,"units":2,"capacity_operating_mtpa":null,"capacity_construction_mtpa":null,"capacity_proposed_mtpa":null,"capacity_operating_bcm_y":null,"capacity_construction_bcm_y":null,"capacity_proposed_bcm_y":null,"earliest_start_year":null,"latest_start_year":null,"url":"https://lngatlas.org/terminal/brass-lng-terminal-ng/","data_source":"Data: Global Gas Infrastructure Tracker, Global Energy Monitor, September 2025"},{"slug":"brindisi-lng-terminal-it","name":"Brindisi LNG Terminal","country":"Italy","country_iso":"IT","region":"Europe","state_province":"Apulia","city":"Capo Bianco","facility_type":"import","floating_type":"unknown","status":"cancelled","latitude":40.64801,"longitude":17.99101,"units":1,"capacity_operating_mtpa":null,"capacity_construction_mtpa":null,"capacity_proposed_mtpa":null,"capacity_operating_bcm_y":null,"capacity_construction_bcm_y":null,"capacity_proposed_bcm_y":null,"earliest_start_year":null,"latest_start_year":null,"url":"https://lngatlas.org/terminal/brindisi-lng-terminal-it/","data_source":"Data: Global Gas Infrastructure Tracker, Global Energy Monitor, September 2025"},{"slug":"broadwater-fsru-us","name":"Broadwater FSRU","country":"United States","country_iso":"US","region":"Americas","state_province":"New York","city":"Long Island","facility_type":"import","floating_type":"fsru","status":"cancelled","latitude":41.096667,"longitude":-72.881111,"units":1,"capacity_operating_mtpa":null,"capacity_construction_mtpa":null,"capacity_proposed_mtpa":null,"capacity_operating_bcm_y":null,"capacity_construction_bcm_y":null,"capacity_proposed_bcm_y":null,"earliest_start_year":null,"latest_start_year":null,"url":"https://lngatlas.org/terminal/broadwater-fsru-us/","data_source":"Data: Global Gas Infrastructure Tracker, Global Energy Monitor, September 2025"},{"slug":"browse-flng-terminal-au","name":"Browse FLNG Terminal","country":"Australia","country_iso":"AU","region":"Oceania","state_province":"Western Australia","city":"Broome","facility_type":"export","floating_type":"flng","status":"proposed","latitude":-17.961944,"longitude":122.236111,"units":2,"capacity_operating_mtpa":null,"capacity_construction_mtpa":null,"capacity_proposed_mtpa":11.4,"capacity_operating_bcm_y":null,"capacity_construction_bcm_y":null,"capacity_proposed_bcm_y":15.504,"earliest_start_year":null,"latest_start_year":null,"url":"https://lngatlas.org/terminal/browse-flng-terminal-au/","data_source":"Data: Global Gas Infrastructure Tracker, Global Energy Monitor, September 2025"},{"slug":"brunei-lng-terminal-bn","name":"Brunei LNG Terminal","country":"Brunei","country_iso":"BN","region":"Asia","state_province":"Brunei Darussalam","city":"Lumut","facility_type":"export","floating_type":"unknown","status":"operating","latitude":4.6698,"longitude":114.467,"units":1,"capacity_operating_mtpa":7.2,"capacity_construction_mtpa":null,"capacity_proposed_mtpa":null,"capacity_operating_bcm_y":9.792,"capacity_construction_bcm_y":null,"capacity_proposed_bcm_y":null,"earliest_start_year":1973,"latest_start_year":1973,"url":"https://lngatlas.org/terminal/brunei-lng-terminal-bn/","data_source":"Data: Global Gas Infrastructure Tracker, Global Energy Monitor, September 2025"},{"slug":"brunnsviksholme-lng-terminal-se","name":"Brunnsviksholme LNG Terminal","country":"Sweden","country_iso":"SE","region":"Europe","state_province":null,"city":"Brunnsviksholme, Nynäshamn Municipality, Stockholm County","facility_type":"import","floating_type":"unknown","status":"operating","latitude":58.922139,"longitude":17.976153,"units":1,"capacity_operating_mtpa":0.4,"capacity_construction_mtpa":null,"capacity_proposed_mtpa":null,"capacity_operating_bcm_y":0.544,"capacity_construction_bcm_y":null,"capacity_proposed_bcm_y":null,"earliest_start_year":2011,"latest_start_year":2011,"url":"https://lngatlas.org/terminal/brunnsviksholme-lng-terminal-se/","data_source":"Data: Global Gas Infrastructure Tracker, Global Energy Monitor, September 2025"},{"slug":"brunsbuttel-fsru-de","name":"Brunsbüttel FSRU","country":"Germany","country_iso":"DE","region":"Europe","state_province":"Hamburg","city":"Brunsbüttel","facility_type":"import","floating_type":"fsru","status":"operating","latitude":53.887255,"longitude":9.171014,"units":3,"capacity_operating_mtpa":3.67,"capacity_construction_mtpa":null,"capacity_proposed_mtpa":2.3,"capacity_operating_bcm_y":4.991,"capacity_construction_bcm_y":null,"capacity_proposed_bcm_y":3.128,"earliest_start_year":2023,"latest_start_year":2023,"url":"https://lngatlas.org/terminal/brunsbuttel-fsru-de/","data_source":"Data: Global Gas Infrastructure Tracker, Global Energy Monitor, September 2025"},{"slug":"brunsbuttel-lng-terminal-de","name":"Brunsbüttel LNG Terminal","country":"Germany","country_iso":"DE","region":"Europe","state_province":"Hamburg","city":"Brunsbüttel","facility_type":"import","floating_type":"unknown","status":"construction","latitude":53.8872625,"longitude":9.1712166,"units":1,"capacity_operating_mtpa":null,"capacity_construction_mtpa":7.35,"capacity_proposed_mtpa":null,"capacity_operating_bcm_y":null,"capacity_construction_bcm_y":9.996,"capacity_proposed_bcm_y":null,"earliest_start_year":null,"latest_start_year":null,"url":"https://lngatlas.org/terminal/brunsbuttel-lng-terminal-de/","data_source":"Data: Global Gas Infrastructure Tracker, Global Energy Monitor, September 2025"},{"slug":"regasificadora-del-pacifico-lng-terminal-co","name":"Buenaventura FSRU","country":"Colombia","country_iso":"CO","region":"Americas","state_province":null,"city":"Bay of Buenaventura","facility_type":"import","floating_type":"fsru","status":"proposed","latitude":3.904541,"longitude":-77.077035,"units":1,"capacity_operating_mtpa":null,"capacity_construction_mtpa":null,"capacity_proposed_mtpa":0.46,"capacity_operating_bcm_y":null,"capacity_construction_bcm_y":null,"capacity_proposed_bcm_y":0.626,"earliest_start_year":null,"latest_start_year":null,"url":"https://lngatlas.org/terminal/regasificadora-del-pacifico-lng-terminal-co/","data_source":"Data: Global Gas Infrastructure Tracker, Global Energy Monitor, September 2025"},{"slug":"buru-flng-terminal-au","name":"Buru FLNG Terminal","country":"Australia","country_iso":"AU","region":"Oceania","state_province":"Kimberly","city":"offshore Broome","facility_type":"export","floating_type":"flng","status":"proposed","latitude":-18.291312,"longitude":121.98236,"units":1,"capacity_operating_mtpa":null,"capacity_construction_mtpa":null,"capacity_proposed_mtpa":null,"capacity_operating_bcm_y":null,"capacity_construction_bcm_y":null,"capacity_proposed_bcm_y":null,"earliest_start_year":null,"latest_start_year":null,"url":"https://lngatlas.org/terminal/buru-flng-terminal-au/","data_source":"Data: Global Gas Infrastructure Tracker, Global Energy Monitor, September 2025"},{"slug":"ce-flng-terminal-us","name":"CE FLNG Terminal","country":"United States","country_iso":"US","region":"Americas","state_province":"Louisiana","city":"Plaquemines Parish","facility_type":"export","floating_type":"flng","status":"cancelled","latitude":29.3007979,"longitude":-89.3582109,"units":1,"capacity_operating_mtpa":null,"capacity_construction_mtpa":null,"capacity_proposed_mtpa":null,"capacity_operating_bcm_y":null,"capacity_construction_bcm_y":null,"capacity_proposed_bcm_y":null,"earliest_start_year":null,"latest_start_year":null,"url":"https://lngatlas.org/terminal/ce-flng-terminal-us/","data_source":"Data: Global Gas Infrastructure Tracker, Global Energy Monitor, September 2025"},{"slug":"cp2-lng-terminal-us","name":"CP2 LNG Terminal","country":"United States","country_iso":"US","region":"Americas","state_province":"Louisiana","city":"Cameron","facility_type":"export","floating_type":"unknown","status":"construction","latitude":29.7742723,"longitude":-93.3239475,"units":2,"capacity_operating_mtpa":null,"capacity_construction_mtpa":10,"capacity_proposed_mtpa":10,"capacity_operating_bcm_y":null,"capacity_construction_bcm_y":13.6,"capacity_proposed_bcm_y":13.6,"earliest_start_year":null,"latest_start_year":null,"url":"https://lngatlas.org/terminal/cp2-lng-terminal-us/","data_source":"Data: Global Gas Infrastructure Tracker, Global Energy Monitor, September 2025"},{"slug":"ca-mau-lng-terminal-vn","name":"Ca Mau LNG Terminal","country":"Vietnam","country_iso":"VN","region":"Asia","state_province":null,"city":null,"facility_type":"import","floating_type":"unknown","status":"proposed","latitude":9.242,"longitude":105.06,"units":1,"capacity_operating_mtpa":null,"capacity_construction_mtpa":null,"capacity_proposed_mtpa":1,"capacity_operating_bcm_y":null,"capacity_construction_bcm_y":null,"capacity_proposed_bcm_y":1.36,"earliest_start_year":null,"latest_start_year":null,"url":"https://lngatlas.org/terminal/ca-mau-lng-terminal-vn/","data_source":"Data: Global Gas Infrastructure Tracker, Global Energy Monitor, September 2025"},{"slug":"ca-na-lng-terminal-vn","name":"Ca Na LNG Terminal","country":"Vietnam","country_iso":"VN","region":"Asia","state_province":"Ninh Thuan","city":null,"facility_type":"import","floating_type":"unknown","status":"proposed","latitude":11.337419,"longitude":108.885002,"units":1,"capacity_operating_mtpa":null,"capacity_construction_mtpa":null,"capacity_proposed_mtpa":null,"capacity_operating_bcm_y":null,"capacity_construction_bcm_y":null,"capacity_proposed_bcm_y":null,"earliest_start_year":null,"latest_start_year":null,"url":"https://lngatlas.org/terminal/ca-na-lng-terminal-vn/","data_source":"Data: Global Gas Infrastructure Tracker, Global Energy Monitor, September 2025"},{"slug":"cacouna-lng-terminal-ca","name":"Cacouna LNG Terminal","country":"Canada","country_iso":"CA","region":"Americas","state_province":"Quebec","city":"Gros Cacouna","facility_type":"import","floating_type":"unknown","status":"cancelled","latitude":47.916667,"longitude":-69.5,"units":1,"capacity_operating_mtpa":null,"capacity_construction_mtpa":null,"capacity_proposed_mtpa":null,"capacity_operating_bcm_y":null,"capacity_construction_bcm_y":null,"capacity_proposed_bcm_y":null,"earliest_start_year":null,"latest_start_year":null,"url":"https://lngatlas.org/terminal/cacouna-lng-terminal-ca/","data_source":"Data: Global Gas Infrastructure Tracker, Global Energy Monitor, September 2025"},{"slug":"cai-mep-lng-terminal-vn","name":"Cai Mep LNG Terminal","country":"Vietnam","country_iso":"VN","region":"Asia","state_province":"Bà Rịa–Vũng Tàu","city":"Phu Long Island, Vung Tau","facility_type":"import","floating_type":"unknown","status":"operating","latitude":10.383333,"longitude":107.116667,"units":1,"capacity_operating_mtpa":3,"capacity_construction_mtpa":null,"capacity_proposed_mtpa":null,"capacity_operating_bcm_y":4.08,"capacity_construction_bcm_y":null,"capacity_proposed_bcm_y":null,"earliest_start_year":2025,"latest_start_year":2025,"url":"https://lngatlas.org/terminal/cai-mep-lng-terminal-vn/","data_source":"Data: Global Gas Infrastructure Tracker, Global Energy Monitor, September 2025"},{"slug":"calais-lng-terminal-us","name":"Calais LNG Terminal","country":"United States","country_iso":"US","region":"Americas","state_province":"Maine","city":"Calais","facility_type":"import","floating_type":"unknown","status":"cancelled","latitude":45.166111,"longitude":-67.2425,"units":1,"capacity_operating_mtpa":null,"capacity_construction_mtpa":null,"capacity_proposed_mtpa":null,"capacity_operating_bcm_y":null,"capacity_construction_bcm_y":null,"capacity_proposed_bcm_y":null,"earliest_start_year":null,"latest_start_year":null,"url":"https://lngatlas.org/terminal/calais-lng-terminal-us/","data_source":"Data: Global Gas Infrastructure Tracker, Global Energy Monitor, September 2025"},{"slug":"calcasieu-pass-lng-terminal-us","name":"Calcasieu Pass LNG Terminal","country":"United States","country_iso":"US","region":"Americas","state_province":"Louisiana","city":"Cameron Parish","facility_type":"export","floating_type":"unknown","status":"operating","latitude":29.7729274,"longitude":-93.3343038,"units":1,"capacity_operating_mtpa":10,"capacity_construction_mtpa":null,"capacity_proposed_mtpa":null,"capacity_operating_bcm_y":13.6,"capacity_construction_bcm_y":null,"capacity_proposed_bcm_y":null,"earliest_start_year":2022,"latest_start_year":2022,"url":"https://lngatlas.org/terminal/calcasieu-pass-lng-terminal-us/","data_source":"Data: Global Gas Infrastructure Tracker, Global Energy Monitor, September 2025"},{"slug":"calhoun-lng-terminal-us","name":"Calhoun LNG Terminal","country":"United States","country_iso":"US","region":"Americas","state_province":"Texas","city":"Point Comfort","facility_type":"import","floating_type":"unknown","status":"cancelled","latitude":28.615556,"longitude":-96.629722,"units":1,"capacity_operating_mtpa":null,"capacity_construction_mtpa":null,"capacity_proposed_mtpa":null,"capacity_operating_bcm_y":null,"capacity_construction_bcm_y":null,"capacity_proposed_bcm_y":null,"earliest_start_year":null,"latest_start_year":null,"url":"https://lngatlas.org/terminal/calhoun-lng-terminal-us/","data_source":"Data: Global Gas Infrastructure Tracker, Global Energy Monitor, September 2025"},{"slug":"calypso-lng-terminal-us","name":"Calypso LNG Terminal","country":"United States","country_iso":"US","region":"Americas","state_province":"Florida","city":"Port Everglades","facility_type":"import","floating_type":"unknown","status":"cancelled","latitude":26.086022,"longitude":-80.115287,"units":1,"capacity_operating_mtpa":null,"capacity_construction_mtpa":null,"capacity_proposed_mtpa":null,"capacity_operating_bcm_y":null,"capacity_construction_bcm_y":null,"capacity_proposed_bcm_y":null,"earliest_start_year":null,"latest_start_year":null,"url":"https://lngatlas.org/terminal/calypso-lng-terminal-us/","data_source":"Data: Global Gas Infrastructure Tracker, Global Energy Monitor, September 2025"},{"slug":"cambodia-lng-project-kh","name":"Cambodia LNG Project","country":"Cambodia","country_iso":"KH","region":"Asia","state_province":null,"city":"Phnom Penh","facility_type":"import","floating_type":"floating","status":"cancelled","latitude":11.5792295,"longitude":104.6099912,"units":2,"capacity_operating_mtpa":null,"capacity_construction_mtpa":null,"capacity_proposed_mtpa":null,"capacity_operating_bcm_y":null,"capacity_construction_bcm_y":null,"capacity_proposed_bcm_y":null,"earliest_start_year":null,"latest_start_year":null,"url":"https://lngatlas.org/terminal/cambodia-lng-project-kh/","data_source":"Data: Global Gas Infrastructure Tracker, Global Energy Monitor, September 2025"},{"slug":"cameron-lng-terminal-us","name":"Cameron LNG Terminal","country":"United States","country_iso":"US","region":"Americas","state_province":"Louisiana","city":"Hackberry","facility_type":"export","floating_type":"unknown","status":"operating","latitude":30.035379,"longitude":-93.3383732,"units":7,"capacity_operating_mtpa":13.5,"capacity_construction_mtpa":null,"capacity_proposed_mtpa":7.43,"capacity_operating_bcm_y":18.36,"capacity_construction_bcm_y":null,"capacity_proposed_bcm_y":10.105,"earliest_start_year":2009,"latest_start_year":2020,"url":"https://lngatlas.org/terminal/cameron-lng-terminal-us/","data_source":"Data: Global Gas Infrastructure Tracker, Global Energy Monitor, September 2025"},{"slug":"cameroon-flng-terminal-cm","name":"Cameroon FLNG Terminal","country":"Cameroon","country_iso":"CM","region":"Africa","state_province":"Océan","city":"Kribi Southern Coastline","facility_type":"export","floating_type":"flng","status":"operating","latitude":2.935,"longitude":9.91,"units":4,"capacity_operating_mtpa":2.4,"capacity_construction_mtpa":null,"capacity_proposed_mtpa":null,"capacity_operating_bcm_y":3.264,"capacity_construction_bcm_y":null,"capacity_proposed_bcm_y":null,"earliest_start_year":2018,"latest_start_year":2018,"url":"https://lngatlas.org/terminal/cameroon-flng-terminal-cm/","data_source":"Data: Global Gas Infrastructure Tracker, Global Energy Monitor, September 2025"},{"slug":"cameroon-lng-terminal-cm","name":"Cameroon LNG Terminal","country":"Cameroon","country_iso":"CM","region":"Africa","state_province":"South Region","city":"Kribi Southern Coastline","facility_type":"export","floating_type":"unknown","status":"cancelled","latitude":2.7257,"longitude":9.8615,"units":1,"capacity_operating_mtpa":null,"capacity_construction_mtpa":null,"capacity_proposed_mtpa":null,"capacity_operating_bcm_y":null,"capacity_construction_bcm_y":null,"capacity_proposed_bcm_y":null,"earliest_start_year":null,"latest_start_year":null,"url":"https://lngatlas.org/terminal/cameroon-lng-terminal-cm/","data_source":"Data: Global Gas Infrastructure Tracker, Global Energy Monitor, September 2025"},{"slug":"canatxx-lng-terminal-gb","name":"Canatxx LNG Terminal","country":"United Kingdom","country_iso":"GB","region":"Europe","state_province":"Wales","city":"Anglesey","facility_type":"import","floating_type":"unknown","status":"cancelled","latitude":53.283333,"longitude":-4.333333,"units":1,"capacity_operating_mtpa":null,"capacity_construction_mtpa":null,"capacity_proposed_mtpa":null,"capacity_operating_bcm_y":null,"capacity_construction_bcm_y":null,"capacity_proposed_bcm_y":null,"earliest_start_year":null,"latest_start_year":null,"url":"https://lngatlas.org/terminal/canatxx-lng-terminal-gb/","data_source":"Data: Global Gas Infrastructure Tracker, Global Energy Monitor, September 2025"},{"slug":"cangzhou-lng-terminal-cn","name":"Cangzhou LNG Terminal","country":"China","country_iso":"CN","region":"Asia","state_province":"Hebei","city":"Huanghua Port","facility_type":"import","floating_type":"unknown","status":"shelved","latitude":38.365118,"longitude":117.793201,"units":1,"capacity_operating_mtpa":null,"capacity_construction_mtpa":null,"capacity_proposed_mtpa":null,"capacity_operating_bcm_y":null,"capacity_construction_bcm_y":null,"capacity_proposed_bcm_y":null,"earliest_start_year":null,"latest_start_year":null,"url":"https://lngatlas.org/terminal/cangzhou-lng-terminal-cn/","data_source":"Data: Global Gas Infrastructure Tracker, Global Energy Monitor, September 2025"},{"slug":"canvey-lng-terminal-gb","name":"Canvey LNG Terminal","country":"United Kingdom","country_iso":"GB","region":"Europe","state_province":"East region","city":"Thames Road, Canvey Island","facility_type":"import","floating_type":"unknown","status":"cancelled","latitude":51.516,"longitude":0.583,"units":1,"capacity_operating_mtpa":null,"capacity_construction_mtpa":null,"capacity_proposed_mtpa":null,"capacity_operating_bcm_y":null,"capacity_construction_bcm_y":null,"capacity_proposed_bcm_y":null,"earliest_start_year":null,"latest_start_year":null,"url":"https://lngatlas.org/terminal/canvey-lng-terminal-gb/","data_source":"Data: Global Gas Infrastructure Tracker, Global Energy Monitor, September 2025"},{"slug":"caofeidian-fsru-cn","name":"Caofeidian FSRU","country":"China","country_iso":"CN","region":"Asia","state_province":"Hebei","city":null,"facility_type":"import","floating_type":"fsru","status":"cancelled","latitude":38.938745,"longitude":118.541145,"units":1,"capacity_operating_mtpa":null,"capacity_construction_mtpa":null,"capacity_proposed_mtpa":null,"capacity_operating_bcm_y":null,"capacity_construction_bcm_y":null,"capacity_proposed_bcm_y":null,"earliest_start_year":null,"latest_start_year":null,"url":"https://lngatlas.org/terminal/caofeidian-fsru-cn/","data_source":"Data: Global Gas Infrastructure Tracker, Global Energy Monitor, September 2025"},{"slug":"caofeidian-lng-terminal-beijing-energy-cn","name":"Caofeidian LNG Terminal (Beijing Energy)","country":"China","country_iso":"CN","region":"Asia","state_province":"Hebei","city":null,"facility_type":"import","floating_type":"unknown","status":"cancelled","latitude":38.938745,"longitude":118.541145,"units":1,"capacity_operating_mtpa":null,"capacity_construction_mtpa":null,"capacity_proposed_mtpa":null,"capacity_operating_bcm_y":null,"capacity_construction_bcm_y":null,"capacity_proposed_bcm_y":null,"earliest_start_year":null,"latest_start_year":null,"url":"https://lngatlas.org/terminal/caofeidian-lng-terminal-beijing-energy-cn/","data_source":"Data: Global Gas Infrastructure Tracker, Global Energy Monitor, September 2025"},{"slug":"cap-lopez-flng-terminal-ga","name":"Cap Lopez FLNG Terminal","country":"Gabon","country_iso":"GA","region":"Africa","state_province":null,"city":"Cap Lopez","facility_type":"export","floating_type":"flng","status":"construction","latitude":-0.632279,"longitude":8.71253,"units":1,"capacity_operating_mtpa":null,"capacity_construction_mtpa":0.7,"capacity_proposed_mtpa":null,"capacity_operating_bcm_y":null,"capacity_construction_bcm_y":0.952,"capacity_proposed_bcm_y":null,"earliest_start_year":null,"latest_start_year":null,"url":"https://lngatlas.org/terminal/cap-lopez-flng-terminal-ga/","data_source":"Data: Global Gas Infrastructure Tracker, Global Energy Monitor, September 2025"},{"slug":"caribe-lng-terminal-co","name":"Caribe LNG FSU","country":"Colombia","country_iso":"CO","region":"Americas","state_province":null,"city":null,"facility_type":"import","floating_type":"floating","status":"proposed","latitude":null,"longitude":null,"units":1,"capacity_operating_mtpa":null,"capacity_construction_mtpa":null,"capacity_proposed_mtpa":null,"capacity_operating_bcm_y":null,"capacity_construction_bcm_y":null,"capacity_proposed_bcm_y":null,"earliest_start_year":null,"latest_start_year":null,"url":"https://lngatlas.org/terminal/caribe-lng-terminal-co/","data_source":"Data: Global Gas Infrastructure Tracker, Global Energy Monitor, September 2025"},{"slug":"cartagena-fsru-colombia-co","name":"Cartagena FSRU (Colombia)","country":"Colombia","country_iso":"CO","region":"Americas","state_province":"Bolivar","city":"Cartagena","facility_type":"import","floating_type":"fsru","status":"operating","latitude":10.4,"longitude":-75.5,"units":3,"capacity_operating_mtpa":3.45,"capacity_construction_mtpa":null,"capacity_proposed_mtpa":0.63,"capacity_operating_bcm_y":4.692,"capacity_construction_bcm_y":null,"capacity_proposed_bcm_y":0.857,"earliest_start_year":2016,"latest_start_year":2016,"url":"https://lngatlas.org/terminal/cartagena-fsru-colombia-co/","data_source":"Data: Global Gas Infrastructure Tracker, Global Energy Monitor, September 2025"},{"slug":"cartagena-lng-terminal-spain-es","name":"Cartagena LNG Terminal (Spain)","country":"Spain","country_iso":"ES","region":"Europe","state_province":"Province of Murcia","city":"Escombreras Dock","facility_type":"import","floating_type":"unknown","status":"operating","latitude":37.57457,"longitude":-0.9595,"units":1,"capacity_operating_mtpa":8.7,"capacity_construction_mtpa":null,"capacity_proposed_mtpa":null,"capacity_operating_bcm_y":11.832,"capacity_construction_bcm_y":null,"capacity_proposed_bcm_y":null,"earliest_start_year":1989,"latest_start_year":1989,"url":"https://lngatlas.org/terminal/cartagena-lng-terminal-spain-es/","data_source":"Data: Global Gas Infrastructure Tracker, Global Energy Monitor, September 2025"},{"slug":"cash-maple-flng-terminal-au","name":"Cash Maple FLNG Terminal","country":"Australia","country_iso":"AU","region":"Oceania","state_province":"Western Australia","city":null,"facility_type":"export","floating_type":"flng","status":"cancelled","latitude":-12.294941,"longitude":124.947613,"units":1,"capacity_operating_mtpa":null,"capacity_construction_mtpa":null,"capacity_proposed_mtpa":null,"capacity_operating_bcm_y":null,"capacity_construction_bcm_y":null,"capacity_proposed_bcm_y":null,"earliest_start_year":null,"latest_start_year":null,"url":"https://lngatlas.org/terminal/cash-maple-flng-terminal-au/","data_source":"Data: Global Gas Infrastructure Tracker, Global Energy Monitor, September 2025"},{"slug":"casotte-landing-lng-terminal-us","name":"Casotte Landing LNG Terminal","country":"United States","country_iso":"US","region":"Americas","state_province":"Mississippi","city":null,"facility_type":"import","floating_type":"unknown","status":"cancelled","latitude":30.46,"longitude":-88.62,"units":1,"capacity_operating_mtpa":null,"capacity_construction_mtpa":null,"capacity_proposed_mtpa":null,"capacity_operating_bcm_y":null,"capacity_construction_bcm_y":null,"capacity_proposed_bcm_y":null,"earliest_start_year":null,"latest_start_year":null,"url":"https://lngatlas.org/terminal/casotte-landing-lng-terminal-us/","data_source":"Data: Global Gas Infrastructure Tracker, Global Energy Monitor, September 2025"},{"slug":"cat-hai-fsru-vn","name":"Cat Hai FSRU","country":"Vietnam","country_iso":"VN","region":"Asia","state_province":null,"city":"Hai Phong","facility_type":"import","floating_type":"fsru","status":"cancelled","latitude":20.866225,"longitude":106.678881,"units":1,"capacity_operating_mtpa":null,"capacity_construction_mtpa":null,"capacity_proposed_mtpa":null,"capacity_operating_bcm_y":null,"capacity_construction_bcm_y":null,"capacity_proposed_bcm_y":null,"earliest_start_year":null,"latest_start_year":null,"url":"https://lngatlas.org/terminal/cat-hai-fsru-vn/","data_source":"Data: Global Gas Infrastructure Tracker, Global Energy Monitor, September 2025"},{"slug":"cedar-flng-terminal-ca","name":"Cedar FLNG Terminal","country":"Canada","country_iso":"CA","region":"Americas","state_province":"British Columbia","city":"Kitimat","facility_type":"export","floating_type":"flng","status":"construction","latitude":54,"longitude":-128.7,"units":1,"capacity_operating_mtpa":null,"capacity_construction_mtpa":3.3,"capacity_proposed_mtpa":null,"capacity_operating_bcm_y":null,"capacity_construction_bcm_y":4.488,"capacity_proposed_bcm_y":null,"earliest_start_year":null,"latest_start_year":null,"url":"https://lngatlas.org/terminal/cedar-flng-terminal-ca/","data_source":"Data: Global Gas Infrastructure Tracker, Global Energy Monitor, September 2025"},{"slug":"central-java-fsru-id","name":"Central Java FSRU","country":"Indonesia","country_iso":"ID","region":"Asia","state_province":"Central Java","city":"Cilicap","facility_type":"import","floating_type":"fsru","status":"cancelled","latitude":-7.733333,"longitude":109,"units":1,"capacity_operating_mtpa":null,"capacity_construction_mtpa":null,"capacity_proposed_mtpa":null,"capacity_operating_bcm_y":null,"capacity_construction_bcm_y":null,"capacity_proposed_bcm_y":null,"earliest_start_year":null,"latest_start_year":null,"url":"https://lngatlas.org/terminal/central-java-fsru-id/","data_source":"Data: Global Gas Infrastructure Tracker, Global Energy Monitor, September 2025"},{"slug":"chan-may-lng-terminal-vn","name":"Chan May LNG Terminal","country":"Vietnam","country_iso":"VN","region":"Asia","state_province":null,"city":"Chan May","facility_type":"import","floating_type":"unknown","status":"cancelled","latitude":16.332683,"longitude":108.020046,"units":1,"capacity_operating_mtpa":null,"capacity_construction_mtpa":null,"capacity_proposed_mtpa":null,"capacity_operating_bcm_y":null,"capacity_construction_bcm_y":null,"capacity_proposed_bcm_y":null,"earliest_start_year":null,"latest_start_year":null,"url":"https://lngatlas.org/terminal/chan-may-lng-terminal-vn/","data_source":"Data: Global Gas Infrastructure Tracker, Global Energy Monitor, September 2025"},{"slug":"chana-lng-terminal-th","name":"Chana LNG Terminal","country":"Thailand","country_iso":"TH","region":"Asia","state_province":"Songkhla","city":null,"facility_type":"import","floating_type":"unknown","status":"cancelled","latitude":7.235476,"longitude":100.564161,"units":1,"capacity_operating_mtpa":null,"capacity_construction_mtpa":null,"capacity_proposed_mtpa":null,"capacity_operating_bcm_y":null,"capacity_construction_bcm_y":null,"capacity_proposed_bcm_y":null,"earliest_start_year":null,"latest_start_year":null,"url":"https://lngatlas.org/terminal/chana-lng-terminal-th/","data_source":"Data: Global Gas Infrastructure Tracker, Global Energy Monitor, September 2025"},{"slug":"chaozhou-lng-terminal-huafeng-cn","name":"Chaozhou LNG Terminal (Huafeng)","country":"China","country_iso":"CN","region":"Asia","state_province":"Guangdong","city":"SuochengTown","facility_type":"import","floating_type":"unknown","status":"shelved","latitude":23.576582,"longitude":117.122439,"units":2,"capacity_operating_mtpa":null,"capacity_construction_mtpa":null,"capacity_proposed_mtpa":null,"capacity_operating_bcm_y":null,"capacity_construction_bcm_y":null,"capacity_proposed_bcm_y":null,"earliest_start_year":null,"latest_start_year":null,"url":"https://lngatlas.org/terminal/chaozhou-lng-terminal-huafeng-cn/","data_source":"Data: Global Gas Infrastructure Tracker, Global Energy Monitor, September 2025"},{"slug":"chaozhou-lng-terminal-huaying-cn","name":"Chaozhou LNG Terminal (Huaying)","country":"China","country_iso":"CN","region":"Asia","state_province":"Guangdong","city":"Huanggang","facility_type":"import","floating_type":"unknown","status":"operating","latitude":23.583697,"longitude":117.12851,"units":2,"capacity_operating_mtpa":6,"capacity_construction_mtpa":null,"capacity_proposed_mtpa":6,"capacity_operating_bcm_y":8.16,"capacity_construction_bcm_y":null,"capacity_proposed_bcm_y":8.16,"earliest_start_year":2024,"latest_start_year":2024,"url":"https://lngatlas.org/terminal/chaozhou-lng-terminal-huaying-cn/","data_source":"Data: Global Gas Infrastructure Tracker, Global Energy Monitor, September 2025"},{"slug":"chengmai-lng-terminal-cn","name":"Chengmai LNG Terminal","country":"China","country_iso":"CN","region":"Asia","state_province":"Hainan","city":"Qiaotou","facility_type":"import","floating_type":"unknown","status":"cancelled","latitude":19.977497,"longitude":109.953888,"units":1,"capacity_operating_mtpa":null,"capacity_construction_mtpa":null,"capacity_proposed_mtpa":null,"capacity_operating_bcm_y":null,"capacity_construction_bcm_y":null,"capacity_proposed_bcm_y":null,"earliest_start_year":null,"latest_start_year":null,"url":"https://lngatlas.org/terminal/chengmai-lng-terminal-cn/","data_source":"Data: Global Gas Infrastructure Tracker, Global Energy Monitor, September 2025"},{"slug":"chernomorsky-lng-terminal-ru","name":"Chernomorsky LNG Terminal","country":"Russia","country_iso":"RU","region":"Europe","state_province":"Krasnodar Krai","city":null,"facility_type":"export","floating_type":"unknown","status":"shelved","latitude":44.1508652,"longitude":39.0370808,"units":1,"capacity_operating_mtpa":null,"capacity_construction_mtpa":null,"capacity_proposed_mtpa":null,"capacity_operating_bcm_y":null,"capacity_construction_bcm_y":null,"capacity_proposed_bcm_y":null,"earliest_start_year":null,"latest_start_year":null,"url":"https://lngatlas.org/terminal/chernomorsky-lng-terminal-ru/","data_source":"Data: Global Gas Infrastructure Tracker, Global Energy Monitor, September 2025"},{"slug":"chhara-lng-terminal-in","name":"Chhara LNG Terminal","country":"India","country_iso":"IN","region":"Asia","state_province":"Gujarat","city":"Chhara","facility_type":"import","floating_type":"unknown","status":"operating","latitude":20.72124,"longitude":70.749983,"units":1,"capacity_operating_mtpa":5,"capacity_construction_mtpa":null,"capacity_proposed_mtpa":null,"capacity_operating_bcm_y":6.8,"capacity_construction_bcm_y":null,"capacity_proposed_bcm_y":null,"earliest_start_year":2025,"latest_start_year":2025,"url":"https://lngatlas.org/terminal/chhara-lng-terminal-in/","data_source":"Data: Global Gas Infrastructure Tracker, Global Energy Monitor, September 2025"},{"slug":"chita-kyodo-lng-terminal-jp","name":"Chita Kyodo LNG Terminal","country":"Japan","country_iso":"JP","region":"Asia","state_province":"Chūbu","city":"Chita","facility_type":"import","floating_type":"unknown","status":"operating","latitude":34.96664,"longitude":136.82288,"units":1,"capacity_operating_mtpa":7.5,"capacity_construction_mtpa":null,"capacity_proposed_mtpa":null,"capacity_operating_bcm_y":10.2,"capacity_construction_bcm_y":null,"capacity_proposed_bcm_y":null,"earliest_start_year":1977,"latest_start_year":1977,"url":"https://lngatlas.org/terminal/chita-kyodo-lng-terminal-jp/","data_source":"Data: Global Gas Infrastructure Tracker, Global Energy Monitor, September 2025"},{"slug":"chita-lng-terminal-jp","name":"Chita LNG Terminal","country":"Japan","country_iso":"JP","region":"Asia","state_province":"Chūbu","city":"Chita","facility_type":"import","floating_type":"unknown","status":"operating","latitude":34.96826,"longitude":136.82721,"units":1,"capacity_operating_mtpa":10.9,"capacity_construction_mtpa":null,"capacity_proposed_mtpa":null,"capacity_operating_bcm_y":14.824,"capacity_construction_bcm_y":null,"capacity_proposed_bcm_y":null,"earliest_start_year":1977,"latest_start_year":1977,"url":"https://lngatlas.org/terminal/chita-lng-terminal-jp/","data_source":"Data: Global Gas Infrastructure Tracker, Global Energy Monitor, September 2025"},{"slug":"chita-midorihama-lng-terminal-jp","name":"Chita Midorihama LNG Terminal","country":"Japan","country_iso":"JP","region":"Asia","state_province":"Chūbu","city":"Chita","facility_type":"import","floating_type":"unknown","status":"operating","latitude":34.96245,"longitude":136.8195,"units":1,"capacity_operating_mtpa":7.7,"capacity_construction_mtpa":null,"capacity_proposed_mtpa":null,"capacity_operating_bcm_y":10.472,"capacity_construction_bcm_y":null,"capacity_proposed_bcm_y":null,"earliest_start_year":2001,"latest_start_year":2001,"url":"https://lngatlas.org/terminal/chita-midorihama-lng-terminal-jp/","data_source":"Data: Global Gas Infrastructure Tracker, Global Energy Monitor, September 2025"},{"slug":"choguko-electric-lng-terminal-jp","name":"Choguko Electric LNG Terminal","country":"Japan","country_iso":"JP","region":"Asia","state_province":null,"city":"Tobata","facility_type":"import","floating_type":"unknown","status":"operating","latitude":33.89299,"longitude":130.886081,"units":1,"capacity_operating_mtpa":4.3,"capacity_construction_mtpa":null,"capacity_proposed_mtpa":null,"capacity_operating_bcm_y":5.848,"capacity_construction_bcm_y":null,"capacity_proposed_bcm_y":null,"earliest_start_year":2006,"latest_start_year":2006,"url":"https://lngatlas.org/terminal/choguko-electric-lng-terminal-jp/","data_source":"Data: Global Gas Infrastructure Tracker, Global Energy Monitor, September 2025"},{"slug":"chuanbi-island-lng-terminal-cn","name":"Chuanbi Island LNG Terminal","country":"China","country_iso":"CN","region":"Asia","state_province":"Zhejiang","city":"Chuanbi Island","facility_type":"import","floating_type":"unknown","status":"cancelled","latitude":29.9147442,"longitude":122.0033309,"units":1,"capacity_operating_mtpa":null,"capacity_construction_mtpa":null,"capacity_proposed_mtpa":null,"capacity_operating_bcm_y":null,"capacity_construction_bcm_y":null,"capacity_proposed_bcm_y":null,"earliest_start_year":null,"latest_start_year":null,"url":"https://lngatlas.org/terminal/chuanbi-island-lng-terminal-cn/","data_source":"Data: Global Gas Infrastructure Tracker, Global Energy Monitor, September 2025"},{"slug":"cienaga-fsru-co","name":"Ciénaga FSRU","country":"Colombia","country_iso":"CO","region":"Americas","state_province":"Magdalena","city":"Ciénaga","facility_type":"import","floating_type":"fsru","status":"proposed","latitude":11.15056677,"longitude":-74.299694,"units":1,"capacity_operating_mtpa":null,"capacity_construction_mtpa":null,"capacity_proposed_mtpa":3.07,"capacity_operating_bcm_y":null,"capacity_construction_bcm_y":null,"capacity_proposed_bcm_y":4.175,"earliest_start_year":null,"latest_start_year":null,"url":"https://lngatlas.org/terminal/cienaga-fsru-co/","data_source":"Data: Global Gas Infrastructure Tracker, Global Energy Monitor, September 2025"},{"slug":"clifton-pier-lng-terminal-bs","name":"Clifton Pier LNG Terminal","country":"Bahamas","country_iso":"BS","region":"Americas","state_province":"Nassau","city":"Clifton Pier","facility_type":"import","floating_type":"unknown","status":"proposed","latitude":25.005661,"longitude":-77.536488,"units":1,"capacity_operating_mtpa":null,"capacity_construction_mtpa":null,"capacity_proposed_mtpa":null,"capacity_operating_bcm_y":null,"capacity_construction_bcm_y":null,"capacity_proposed_bcm_y":null,"earliest_start_year":null,"latest_start_year":null,"url":"https://lngatlas.org/terminal/clifton-pier-lng-terminal-bs/","data_source":"Data: Global Gas Infrastructure Tracker, Global Energy Monitor, September 2025"},{"slug":"coastal-bend-lng-terminal-us","name":"Coastal Bend LNG Terminal","country":"United States","country_iso":"US","region":"Americas","state_province":null,"city":null,"facility_type":"export","floating_type":"unknown","status":"proposed","latitude":27.82348074320158,"longitude":-97.4549736053192,"units":1,"capacity_operating_mtpa":null,"capacity_construction_mtpa":null,"capacity_proposed_mtpa":22.5,"capacity_operating_bcm_y":null,"capacity_construction_bcm_y":null,"capacity_proposed_bcm_y":30.6,"earliest_start_year":null,"latest_start_year":null,"url":"https://lngatlas.org/terminal/coastal-bend-lng-terminal-us/","data_source":"Data: Global Gas Infrastructure Tracker, Global Energy Monitor, September 2025"},{"slug":"coatzacoalcos-ii-lng-terminal-mx","name":"Coatzacoalcos II LNG Terminal","country":"Mexico","country_iso":"MX","region":"Americas","state_province":"Veracruz","city":"Port of Coatzacoalcos","facility_type":"export","floating_type":"unknown","status":"proposed","latitude":18.135366,"longitude":-94.400235,"units":1,"capacity_operating_mtpa":null,"capacity_construction_mtpa":null,"capacity_proposed_mtpa":0,"capacity_operating_bcm_y":null,"capacity_construction_bcm_y":null,"capacity_proposed_bcm_y":0,"earliest_start_year":null,"latest_start_year":null,"url":"https://lngatlas.org/terminal/coatzacoalcos-ii-lng-terminal-mx/","data_source":"Data: Global Gas Infrastructure Tracker, Global Energy Monitor, September 2025"},{"slug":"coatzacoalcos-lng-terminal-cfe-mx","name":"Coatzacoalcos LNG Terminal (CFE)","country":"Mexico","country_iso":"MX","region":"Americas","state_province":"Veracruz","city":"Coatzacoalcos","facility_type":"export","floating_type":"unknown","status":"shelved","latitude":18.119088,"longitude":-94.406895,"units":1,"capacity_operating_mtpa":null,"capacity_construction_mtpa":null,"capacity_proposed_mtpa":null,"capacity_operating_bcm_y":null,"capacity_construction_bcm_y":null,"capacity_proposed_bcm_y":null,"earliest_start_year":null,"latest_start_year":null,"url":"https://lngatlas.org/terminal/coatzacoalcos-lng-terminal-cfe-mx/","data_source":"Data: Global Gas Infrastructure Tracker, Global Energy Monitor, September 2025"},{"slug":"coega-fsru-za","name":"Coega FSRU","country":"South Africa","country_iso":"ZA","region":"Africa","state_province":"Eastern Cape","city":"Coega IDZ","facility_type":"import","floating_type":"fsru","status":"cancelled","latitude":-33.802993,"longitude":25.69237,"units":1,"capacity_operating_mtpa":null,"capacity_construction_mtpa":null,"capacity_proposed_mtpa":null,"capacity_operating_bcm_y":null,"capacity_construction_bcm_y":null,"capacity_proposed_bcm_y":null,"earliest_start_year":null,"latest_start_year":null,"url":"https://lngatlas.org/terminal/coega-fsru-za/","data_source":"Data: Global Gas Infrastructure Tracker, Global Energy Monitor, September 2025"},{"slug":"colbun-flng-terminal-cl","name":"Colbun FLNG Terminal","country":"Chile","country_iso":"CL","region":"Americas","state_province":"Valparaíso","city":"Bay of Quintero","facility_type":"import","floating_type":"flng","status":"cancelled","latitude":-32.783333,"longitude":-71.533333,"units":1,"capacity_operating_mtpa":null,"capacity_construction_mtpa":null,"capacity_proposed_mtpa":null,"capacity_operating_bcm_y":null,"capacity_construction_bcm_y":null,"capacity_proposed_bcm_y":null,"earliest_start_year":null,"latest_start_year":null,"url":"https://lngatlas.org/terminal/colbun-flng-terminal-cl/","data_source":"Data: Global Gas Infrastructure Tracker, Global Energy Monitor, September 2025"},{"slug":"colombia-flng-terminal-co","name":"Colombia FLNG Terminal","country":"Colombia","country_iso":"CO","region":"Americas","state_province":null,"city":"Barranquilla","facility_type":"export","floating_type":"flng","status":"cancelled","latitude":10.963889,"longitude":-74.796389,"units":1,"capacity_operating_mtpa":null,"capacity_construction_mtpa":null,"capacity_proposed_mtpa":null,"capacity_operating_bcm_y":null,"capacity_construction_bcm_y":null,"capacity_proposed_bcm_y":null,"earliest_start_year":null,"latest_start_year":null,"url":"https://lngatlas.org/terminal/colombia-flng-terminal-co/","data_source":"Data: Global Gas Infrastructure Tracker, Global Energy Monitor, September 2025"},{"slug":"commonwealth-lng-terminal-us","name":"Commonwealth LNG Terminal","country":"United States","country_iso":"US","region":"Americas","state_province":"Louisiana","city":"Cameron Parish","facility_type":"export","floating_type":"unknown","status":"proposed","latitude":29.764163,"longitude":-93.348066,"units":6,"capacity_operating_mtpa":null,"capacity_construction_mtpa":null,"capacity_proposed_mtpa":null,"capacity_operating_bcm_y":null,"capacity_construction_bcm_y":null,"capacity_proposed_bcm_y":null,"earliest_start_year":null,"latest_start_year":null,"url":"https://lngatlas.org/terminal/commonwealth-lng-terminal-us/","data_source":"Data: Global Gas Infrastructure Tracker, Global Energy Monitor, September 2025"},{"slug":"compass-port-lng-terminal-us","name":"Compass Port LNG Terminal","country":"United States","country_iso":"US","region":"Americas","state_province":"Alabama","city":"Dauphin Island","facility_type":"import","floating_type":"floating","status":"cancelled","latitude":30.256389,"longitude":-88.125278,"units":1,"capacity_operating_mtpa":null,"capacity_construction_mtpa":null,"capacity_proposed_mtpa":null,"capacity_operating_bcm_y":null,"capacity_construction_bcm_y":null,"capacity_proposed_bcm_y":null,"earliest_start_year":null,"latest_start_year":null,"url":"https://lngatlas.org/terminal/compass-port-lng-terminal-us/","data_source":"Data: Global Gas Infrastructure Tracker, Global Energy Monitor, September 2025"},{"slug":"congo-flng-terminal-cg","name":"Congo FLNG Terminal","country":"Republic of the Congo","country_iso":"CG","region":"Africa","state_province":null,"city":null,"facility_type":"export","floating_type":"flng","status":"operating","latitude":-4.893,"longitude":11.881,"units":1,"capacity_operating_mtpa":0.6,"capacity_construction_mtpa":null,"capacity_proposed_mtpa":null,"capacity_operating_bcm_y":0.816,"capacity_construction_bcm_y":null,"capacity_proposed_bcm_y":null,"earliest_start_year":2023,"latest_start_year":2023,"url":"https://lngatlas.org/terminal/congo-flng-terminal-cg/","data_source":"Data: Global Gas Infrastructure Tracker, Global Energy Monitor, September 2025"},{"slug":"constanta-lng-terminal-ro","name":"Constanta LNG Terminal","country":"Romania","country_iso":"RO","region":"Europe","state_province":"Dobruja","city":"Constanta","facility_type":"import","floating_type":"unknown","status":"cancelled","latitude":44.173333,"longitude":28.638333,"units":1,"capacity_operating_mtpa":null,"capacity_construction_mtpa":null,"capacity_proposed_mtpa":null,"capacity_operating_bcm_y":null,"capacity_construction_bcm_y":null,"capacity_proposed_bcm_y":null,"earliest_start_year":null,"latest_start_year":null,"url":"https://lngatlas.org/terminal/constanta-lng-terminal-ro/","data_source":"Data: Global Gas Infrastructure Tracker, Global Energy Monitor, September 2025"},{"slug":"coral-north-flng-terminal-mz","name":"Coral North FLNG Terminal","country":"Mozambique","country_iso":"MZ","region":"Africa","state_province":"Cabo Delgado","city":"Coral Gas Field","facility_type":"export","floating_type":"flng","status":"proposed","latitude":-10.9,"longitude":41.2,"units":1,"capacity_operating_mtpa":null,"capacity_construction_mtpa":null,"capacity_proposed_mtpa":3.4,"capacity_operating_bcm_y":null,"capacity_construction_bcm_y":null,"capacity_proposed_bcm_y":4.624,"earliest_start_year":null,"latest_start_year":null,"url":"https://lngatlas.org/terminal/coral-north-flng-terminal-mz/","data_source":"Data: Global Gas Infrastructure Tracker, Global Energy Monitor, September 2025"},{"slug":"coral-south-flng-terminal-mz","name":"Coral South FLNG Terminal","country":"Mozambique","country_iso":"MZ","region":"Africa","state_province":"Cabo Delgado","city":"Coral Gas Field","facility_type":"export","floating_type":"flng","status":"operating","latitude":-10.9,"longitude":41.2,"units":1,"capacity_operating_mtpa":3.4,"capacity_construction_mtpa":null,"capacity_proposed_mtpa":null,"capacity_operating_bcm_y":4.624,"capacity_construction_bcm_y":null,"capacity_proposed_bcm_y":null,"earliest_start_year":2022,"latest_start_year":2022,"url":"https://lngatlas.org/terminal/coral-south-flng-terminal-mz/","data_source":"Data: Global Gas Infrastructure Tracker, Global Energy Monitor, September 2025"},{"slug":"corpus-christi-lng-terminal-us","name":"Corpus Christi LNG Terminal","country":"United States","country_iso":"US","region":"Americas","state_province":"Texas","city":"Corpus Christi","facility_type":"export","floating_type":"unknown","status":"operating","latitude":27.9135423,"longitude":-97.2865629,"units":6,"capacity_operating_mtpa":15,"capacity_construction_mtpa":10,"capacity_proposed_mtpa":27.28,"capacity_operating_bcm_y":20.4,"capacity_construction_bcm_y":13.6,"capacity_proposed_bcm_y":37.101,"earliest_start_year":2018,"latest_start_year":2021,"url":"https://lngatlas.org/terminal/corpus-christi-lng-terminal-us/","data_source":"Data: Global Gas Infrastructure Tracker, Global Energy Monitor, September 2025"},{"slug":"cosan-fsru-br","name":"Cosan FSRU","country":"Brazil","country_iso":"BR","region":"Americas","state_province":"São Paulo","city":"Santos","facility_type":"import","floating_type":"fsru","status":"operating","latitude":-23.91218,"longitude":-46.364786,"units":1,"capacity_operating_mtpa":3.7,"capacity_construction_mtpa":null,"capacity_proposed_mtpa":null,"capacity_operating_bcm_y":5.032,"capacity_construction_bcm_y":null,"capacity_proposed_bcm_y":null,"earliest_start_year":2024,"latest_start_year":2024,"url":"https://lngatlas.org/terminal/cosan-fsru-br/","data_source":"Data: Global Gas Infrastructure Tracker, Global Energy Monitor, September 2025"},{"slug":"costa-azul-lng-terminal-mx","name":"Costa Azul LNG Terminal","country":"Mexico","country_iso":"MX","region":"Americas","state_province":"Baja","city":"Ensenada","facility_type":"export","floating_type":"unknown","status":"operating","latitude":31.988557,"longitude":-116.846466,"units":3,"capacity_operating_mtpa":7.6,"capacity_construction_mtpa":3.25,"capacity_proposed_mtpa":12,"capacity_operating_bcm_y":10.336,"capacity_construction_bcm_y":4.42,"capacity_proposed_bcm_y":16.32,"earliest_start_year":2008,"latest_start_year":2008,"url":"https://lngatlas.org/terminal/costa-azul-lng-terminal-mx/","data_source":"Data: Global Gas Infrastructure Tracker, Global Energy Monitor, September 2025"},{"slug":"costa-norte-lng-terminal-pa","name":"Costa Norte LNG Terminal","country":"Panama","country_iso":"PA","region":"Americas","state_province":"Colon","city":"Colon","facility_type":"import","floating_type":"unknown","status":"operating","latitude":9.3389775,"longitude":-79.90797,"units":1,"capacity_operating_mtpa":1.5,"capacity_construction_mtpa":null,"capacity_proposed_mtpa":null,"capacity_operating_bcm_y":2.04,"capacity_construction_bcm_y":null,"capacity_proposed_bcm_y":null,"earliest_start_year":2018,"latest_start_year":2018,"url":"https://lngatlas.org/terminal/costa-norte-lng-terminal-pa/","data_source":"Data: Global Gas Infrastructure Tracker, Global Energy Monitor, September 2025"},{"slug":"cotonou-fsru-bj","name":"Cotonou FSRU","country":"Benin","country_iso":"BJ","region":"Africa","state_province":null,"city":"Contonou","facility_type":"import","floating_type":"fsru","status":"cancelled","latitude":6.346,"longitude":2.429,"units":1,"capacity_operating_mtpa":null,"capacity_construction_mtpa":null,"capacity_proposed_mtpa":null,"capacity_operating_bcm_y":null,"capacity_construction_bcm_y":null,"capacity_proposed_bcm_y":null,"earliest_start_year":null,"latest_start_year":null,"url":"https://lngatlas.org/terminal/cotonou-fsru-bj/","data_source":"Data: Global Gas Infrastructure Tracker, Global Energy Monitor, September 2025"},{"slug":"cove-point-lng-terminal-us","name":"Cove Point LNG Terminal","country":"United States","country_iso":"US","region":"Americas","state_province":"Maryland","city":"Lusby","facility_type":"import","floating_type":"unknown","status":"operating","latitude":38.38544418456382,"longitude":-76.4097200524101,"units":3,"capacity_operating_mtpa":18.95,"capacity_construction_mtpa":null,"capacity_proposed_mtpa":null,"capacity_operating_bcm_y":25.772,"capacity_construction_bcm_y":null,"capacity_proposed_bcm_y":null,"earliest_start_year":1972,"latest_start_year":2018,"url":"https://lngatlas.org/terminal/cove-point-lng-terminal-us/","data_source":"Data: Global Gas Infrastructure Tracker, Global Energy Monitor, September 2025"},{"slug":"covenas-fsru-co","name":"Coveñas FSRU","country":"Colombia","country_iso":"CO","region":"Americas","state_province":"Sucre","city":"Coveñas","facility_type":"import","floating_type":"fsru","status":"proposed","latitude":9.4146045,"longitude":-75.69104,"units":2,"capacity_operating_mtpa":null,"capacity_construction_mtpa":null,"capacity_proposed_mtpa":4.07,"capacity_operating_bcm_y":null,"capacity_construction_bcm_y":null,"capacity_proposed_bcm_y":5.535,"earliest_start_year":null,"latest_start_year":null,"url":"https://lngatlas.org/terminal/covenas-fsru-co/","data_source":"Data: Global Gas Infrastructure Tracker, Global Energy Monitor, September 2025"},{"slug":"creole-trail-lng-terminal-us","name":"Creole Trail LNG Terminal","country":"United States","country_iso":"US","region":"Americas","state_province":"Louisiana","city":"Cameron","facility_type":"import","floating_type":"unknown","status":"cancelled","latitude":29.85,"longitude":-93.2,"units":1,"capacity_operating_mtpa":null,"capacity_construction_mtpa":null,"capacity_proposed_mtpa":null,"capacity_operating_bcm_y":null,"capacity_construction_bcm_y":null,"capacity_proposed_bcm_y":null,"earliest_start_year":null,"latest_start_year":null,"url":"https://lngatlas.org/terminal/creole-trail-lng-terminal-us/","data_source":"Data: Global Gas Infrastructure Tracker, Global Energy Monitor, September 2025"},{"slug":"crib-point-fsru-terminal-au","name":"Crib Point FSRU Terminal","country":"Australia","country_iso":"AU","region":"Oceania","state_province":"Victoria","city":"Melbourne","facility_type":"import","floating_type":"fsru","status":"cancelled","latitude":-38.366667,"longitude":145.333333,"units":1,"capacity_operating_mtpa":null,"capacity_construction_mtpa":null,"capacity_proposed_mtpa":null,"capacity_operating_bcm_y":null,"capacity_construction_bcm_y":null,"capacity_proposed_bcm_y":null,"earliest_start_year":null,"latest_start_year":null,"url":"https://lngatlas.org/terminal/crib-point-fsru-terminal-au/","data_source":"Data: Global Gas Infrastructure Tracker, Global Energy Monitor, September 2025"},{"slug":"crimea-lng-terminal-ua","name":"Crimea LNG Terminal","country":"Ukraine","country_iso":"UA","region":"Europe","state_province":"Crimea","city":null,"facility_type":"export","floating_type":"unknown","status":"cancelled","latitude":45.3098595,"longitude":33.9329082,"units":1,"capacity_operating_mtpa":null,"capacity_construction_mtpa":null,"capacity_proposed_mtpa":null,"capacity_operating_bcm_y":null,"capacity_construction_bcm_y":null,"capacity_proposed_bcm_y":null,"earliest_start_year":null,"latest_start_year":null,"url":"https://lngatlas.org/terminal/crimea-lng-terminal-ua/","data_source":"Data: Global Gas Infrastructure Tracker, Global Energy Monitor, September 2025"},{"slug":"crown-kakinada-lng-terminal-in","name":"Crown Kakinada LNG Terminal","country":"India","country_iso":"IN","region":"Asia","state_province":"Andhra Pradesh","city":"Offshore Kakinada","facility_type":"import","floating_type":"unknown","status":"proposed","latitude":16.9524,"longitude":82.3869,"units":1,"capacity_operating_mtpa":null,"capacity_construction_mtpa":null,"capacity_proposed_mtpa":7.2,"capacity_operating_bcm_y":null,"capacity_construction_bcm_y":null,"capacity_proposed_bcm_y":9.792,"earliest_start_year":null,"latest_start_year":null,"url":"https://lngatlas.org/terminal/crown-kakinada-lng-terminal-in/","data_source":"Data: Global Gas Infrastructure Tracker, Global Energy Monitor, September 2025"},{"slug":"crown-landing-lng-terminal-us","name":"Crown Landing LNG Terminal","country":"United States","country_iso":"US","region":"Americas","state_province":"New Jersey","city":"Logan Township","facility_type":"import","floating_type":"unknown","status":"cancelled","latitude":39.891609,"longitude":-75.1167,"units":1,"capacity_operating_mtpa":null,"capacity_construction_mtpa":null,"capacity_proposed_mtpa":null,"capacity_operating_bcm_y":null,"capacity_construction_bcm_y":null,"capacity_proposed_bcm_y":null,"earliest_start_year":null,"latest_start_year":null,"url":"https://lngatlas.org/terminal/crown-landing-lng-terminal-us/","data_source":"Data: Global Gas Infrastructure Tracker, Global Energy Monitor, September 2025"},{"slug":"cyprus-fsru-cy","name":"Cyprus FSRU","country":"Cyprus","country_iso":"CY","region":"Asia","state_province":"Larnaca","city":"Vasilikos","facility_type":"import","floating_type":"fsru","status":"construction","latitude":34.720244,"longitude":33.32384,"units":1,"capacity_operating_mtpa":null,"capacity_construction_mtpa":2,"capacity_proposed_mtpa":null,"capacity_operating_bcm_y":null,"capacity_construction_bcm_y":2.72,"capacity_proposed_bcm_y":null,"earliest_start_year":null,"latest_start_year":null,"url":"https://lngatlas.org/terminal/cyprus-fsru-cy/","data_source":"Data: Global Gas Infrastructure Tracker, Global Energy Monitor, September 2025"},{"slug":"cyprus-lng-terminal-cy","name":"Cyprus LNG Terminal","country":"Cyprus","country_iso":"CY","region":"Asia","state_province":"Lanarca","city":"Vasilikos","facility_type":"export","floating_type":"unknown","status":"cancelled","latitude":34.72772,"longitude":33.30104,"units":1,"capacity_operating_mtpa":null,"capacity_construction_mtpa":null,"capacity_proposed_mtpa":null,"capacity_operating_bcm_y":null,"capacity_construction_bcm_y":null,"capacity_proposed_bcm_y":null,"earliest_start_year":null,"latest_start_year":null,"url":"https://lngatlas.org/terminal/cyprus-lng-terminal-cy/","data_source":"Data: Global Gas Infrastructure Tracker, Global Energy Monitor, September 2025"},{"slug":"dabhol-lng-terminal-in","name":"Dabhol LNG Terminal","country":"India","country_iso":"IN","region":"Asia","state_province":"Maharashtra","city":"Ratnagiri","facility_type":"import","floating_type":"unknown","status":"operating","latitude":17.54,"longitude":73.16,"units":3,"capacity_operating_mtpa":5,"capacity_construction_mtpa":null,"capacity_proposed_mtpa":7.5,"capacity_operating_bcm_y":6.8,"capacity_construction_bcm_y":null,"capacity_proposed_bcm_y":10.2,"earliest_start_year":2013,"latest_start_year":2025,"url":"https://lngatlas.org/terminal/dabhol-lng-terminal-in/","data_source":"Data: Global Gas Infrastructure Tracker, Global Energy Monitor, September 2025"},{"slug":"daewoo-gas-lng-terminal-pk","name":"Daewoo Gas LNG Terminal","country":"Pakistan","country_iso":"PK","region":"Asia","state_province":"Balochistan","city":"Gwadar Port","facility_type":"import","floating_type":"unknown","status":"shelved","latitude":25.1106,"longitude":62.3396,"units":1,"capacity_operating_mtpa":null,"capacity_construction_mtpa":null,"capacity_proposed_mtpa":null,"capacity_operating_bcm_y":null,"capacity_construction_bcm_y":null,"capacity_proposed_bcm_y":null,"earliest_start_year":null,"latest_start_year":null,"url":"https://lngatlas.org/terminal/daewoo-gas-lng-terminal-pk/","data_source":"Data: Global Gas Infrastructure Tracker, Global Energy Monitor, September 2025"},{"slug":"dahej-lng-terminal-in","name":"Dahej LNG Terminal","country":"India","country_iso":"IN","region":"Asia","state_province":"Gujarat","city":"Dahej","facility_type":"import","floating_type":"unknown","status":"operating","latitude":21.6746,"longitude":72.536,"units":3,"capacity_operating_mtpa":17.5,"capacity_construction_mtpa":5,"capacity_proposed_mtpa":null,"capacity_operating_bcm_y":23.8,"capacity_construction_bcm_y":6.8,"capacity_proposed_bcm_y":null,"earliest_start_year":2004,"latest_start_year":2019,"url":"https://lngatlas.org/terminal/dahej-lng-terminal-in/","data_source":"Data: Global Gas Infrastructure Tracker, Global Energy Monitor, September 2025"},{"slug":"dakhla-lng-terminal-eh","name":"Dakhla LNG Terminal","country":"Western Sahara","country_iso":"EH","region":"Africa","state_province":null,"city":null,"facility_type":"import","floating_type":"unknown","status":"proposed","latitude":23.6578,"longitude":-15.9424,"units":1,"capacity_operating_mtpa":null,"capacity_construction_mtpa":null,"capacity_proposed_mtpa":null,"capacity_operating_bcm_y":null,"capacity_construction_bcm_y":null,"capacity_proposed_bcm_y":null,"earliest_start_year":null,"latest_start_year":null,"url":"https://lngatlas.org/terminal/dakhla-lng-terminal-eh/","data_source":"Data: Global Gas Infrastructure Tracker, Global Energy Monitor, September 2025"},{"slug":"dalian-lng-terminal-cn","name":"Dalian LNG Terminal","country":"China","country_iso":"CN","region":"Asia","state_province":"Liaoning","city":"Gushan Peninsula","facility_type":"import","floating_type":"unknown","status":"operating","latitude":38.9604,"longitude":121.8841,"units":2,"capacity_operating_mtpa":6,"capacity_construction_mtpa":null,"capacity_proposed_mtpa":null,"capacity_operating_bcm_y":8.16,"capacity_construction_bcm_y":null,"capacity_proposed_bcm_y":null,"earliest_start_year":2011,"latest_start_year":2016,"url":"https://lngatlas.org/terminal/dalian-lng-terminal-cn/","data_source":"Data: Global Gas Infrastructure Tracker, Global Energy Monitor, September 2025"},{"slug":"damaiyu-lng-terminal-cn","name":"Damaiyu LNG Terminal","country":"China","country_iso":"CN","region":"Asia","state_province":"Zhejiang","city":"Damaiyu","facility_type":"import","floating_type":"unknown","status":"construction","latitude":28.106107,"longitude":121.134782,"units":1,"capacity_operating_mtpa":null,"capacity_construction_mtpa":2,"capacity_proposed_mtpa":null,"capacity_operating_bcm_y":null,"capacity_construction_bcm_y":2.72,"capacity_proposed_bcm_y":null,"earliest_start_year":null,"latest_start_year":null,"url":"https://lngatlas.org/terminal/damaiyu-lng-terminal-cn/","data_source":"Data: Global Gas Infrastructure Tracker, Global Energy Monitor, September 2025"},{"slug":"damietta-segas-lng-terminal-eg","name":"Damietta SEGAS LNG Terminal","country":"Egypt","country_iso":"EG","region":"Africa","state_province":"Damiette","city":"Damiette Port","facility_type":"export","floating_type":"unknown","status":"operating","latitude":31.469,"longitude":31.7473,"units":2,"capacity_operating_mtpa":5,"capacity_construction_mtpa":null,"capacity_proposed_mtpa":null,"capacity_operating_bcm_y":6.8,"capacity_construction_bcm_y":null,"capacity_proposed_bcm_y":null,"earliest_start_year":2005,"latest_start_year":2005,"url":"https://lngatlas.org/terminal/damietta-segas-lng-terminal-eg/","data_source":"Data: Global Gas Infrastructure Tracker, Global Energy Monitor, September 2025"},{"slug":"danang-lng-terminal-vn","name":"Danang LNG Terminal","country":"Vietnam","country_iso":"VN","region":"Asia","state_province":null,"city":null,"facility_type":"import","floating_type":"unknown","status":"proposed","latitude":16.100543,"longitude":108.139861,"units":1,"capacity_operating_mtpa":null,"capacity_construction_mtpa":null,"capacity_proposed_mtpa":null,"capacity_operating_bcm_y":null,"capacity_construction_bcm_y":null,"capacity_proposed_bcm_y":null,"earliest_start_year":null,"latest_start_year":null,"url":"https://lngatlas.org/terminal/danang-lng-terminal-vn/","data_source":"Data: Global Gas Infrastructure Tracker, Global Energy Monitor, September 2025"},{"slug":"dandong-lng-terminal-cn","name":"Dandong LNG Terminal","country":"China","country_iso":"CN","region":"Asia","state_province":"Liaoning","city":null,"facility_type":"import","floating_type":"unknown","status":"cancelled","latitude":39.7778227,"longitude":124.1156083,"units":1,"capacity_operating_mtpa":null,"capacity_construction_mtpa":null,"capacity_proposed_mtpa":null,"capacity_operating_bcm_y":null,"capacity_construction_bcm_y":null,"capacity_proposed_bcm_y":null,"earliest_start_year":null,"latest_start_year":null,"url":"https://lngatlas.org/terminal/dandong-lng-terminal-cn/","data_source":"Data: Global Gas Infrastructure Tracker, Global Energy Monitor, September 2025"},{"slug":"darwin-lng-terminal-au","name":"Darwin LNG Terminal","country":"Australia","country_iso":"AU","region":"Oceania","state_province":"Northern Territory","city":"Darwin","facility_type":"export","floating_type":"unknown","status":"proposed","latitude":-12.5209951389081,"longitude":130.86644866442109,"units":2,"capacity_operating_mtpa":null,"capacity_construction_mtpa":null,"capacity_proposed_mtpa":6,"capacity_operating_bcm_y":null,"capacity_construction_bcm_y":null,"capacity_proposed_bcm_y":8.16,"earliest_start_year":2006,"latest_start_year":2006,"url":"https://lngatlas.org/terminal/darwin-lng-terminal-au/","data_source":"Data: Global Gas Infrastructure Tracker, Global Energy Monitor, September 2025"},{"slug":"das-island-lng-terminal-ae","name":"Das Island LNG Terminal","country":"United Arab Emirates","country_iso":"AE","region":"Asia","state_province":"Abu Dhabi","city":"Das Island","facility_type":"export","floating_type":"unknown","status":"operating","latitude":25.1603681,"longitude":52.877789,"units":4,"capacity_operating_mtpa":6,"capacity_construction_mtpa":null,"capacity_proposed_mtpa":null,"capacity_operating_bcm_y":8.16,"capacity_construction_bcm_y":null,"capacity_proposed_bcm_y":null,"earliest_start_year":1977,"latest_start_year":1994,"url":"https://lngatlas.org/terminal/das-island-lng-terminal-ae/","data_source":"Data: Global Gas Infrastructure Tracker, Global Energy Monitor, September 2025"},{"slug":"deir-ammar-fsru-lb","name":"Deir Ammar FSRU","country":"Lebanon","country_iso":"LB","region":"Asia","state_province":"North Lebanon","city":"Deir Ammar","facility_type":"import","floating_type":"fsru","status":"proposed","latitude":34.467572,"longitude":35.894171,"units":1,"capacity_operating_mtpa":null,"capacity_construction_mtpa":null,"capacity_proposed_mtpa":null,"capacity_operating_bcm_y":null,"capacity_construction_bcm_y":null,"capacity_proposed_bcm_y":null,"earliest_start_year":null,"latest_start_year":null,"url":"https://lngatlas.org/terminal/deir-ammar-fsru-lb/","data_source":"Data: Global Gas Infrastructure Tracker, Global Energy Monitor, September 2025"},{"slug":"delfin-flng-terminal-us","name":"Delfin FLNG Terminal","country":"United States","country_iso":"US","region":"Americas","state_province":"Louisiana","city":"Port Delfin, Cameron Parish","facility_type":"export","floating_type":"flng","status":"proposed","latitude":29.1369774,"longitude":-93.533951,"units":1,"capacity_operating_mtpa":null,"capacity_construction_mtpa":null,"capacity_proposed_mtpa":13.2,"capacity_operating_bcm_y":null,"capacity_construction_bcm_y":null,"capacity_proposed_bcm_y":17.952,"earliest_start_year":null,"latest_start_year":null,"url":"https://lngatlas.org/terminal/delfin-flng-terminal-us/","data_source":"Data: Global Gas Infrastructure Tracker, Global Energy Monitor, September 2025"},{"slug":"delimara-fsru-mt","name":"Delimara FSRU","country":"Malta","country_iso":"MT","region":"Europe","state_province":"South Eastern Region","city":"Marsaxlokk","facility_type":"import","floating_type":"fsru","status":"operating","latitude":35.8277,"longitude":14.5542,"units":1,"capacity_operating_mtpa":0.5,"capacity_construction_mtpa":null,"capacity_proposed_mtpa":null,"capacity_operating_bcm_y":0.68,"capacity_construction_bcm_y":null,"capacity_proposed_bcm_y":null,"earliest_start_year":2017,"latest_start_year":2017,"url":"https://lngatlas.org/terminal/delimara-fsru-mt/","data_source":"Data: Global Gas Infrastructure Tracker, Global Energy Monitor, September 2025"},{"slug":"delta-caribe-oriental-terminal-ve","name":"Delta Caribe Oriental Terminal","country":"Venezuela","country_iso":"VE","region":"Americas","state_province":"Sucre","city":"Valdez","facility_type":"export","floating_type":"unknown","status":"cancelled","latitude":10.599336,"longitude":-62.315522,"units":2,"capacity_operating_mtpa":null,"capacity_construction_mtpa":null,"capacity_proposed_mtpa":null,"capacity_operating_bcm_y":null,"capacity_construction_bcm_y":null,"capacity_proposed_bcm_y":null,"earliest_start_year":null,"latest_start_year":null,"url":"https://lngatlas.org/terminal/delta-caribe-oriental-terminal-ve/","data_source":"Data: Global Gas Infrastructure Tracker, Global Energy Monitor, September 2025"},{"slug":"delta-lng-terminal-us","name":"Delta LNG Terminal","country":"United States","country_iso":"US","region":"Americas","state_province":"Louisiana","city":"Plaquemines Parish","facility_type":"export","floating_type":"unknown","status":"cancelled","latitude":29.597258,"longitude":-89.872471,"units":2,"capacity_operating_mtpa":null,"capacity_construction_mtpa":null,"capacity_proposed_mtpa":null,"capacity_operating_bcm_y":null,"capacity_construction_bcm_y":null,"capacity_proposed_bcm_y":null,"earliest_start_year":null,"latest_start_year":null,"url":"https://lngatlas.org/terminal/delta-lng-terminal-us/","data_source":"Data: Global Gas Infrastructure Tracker, Global Energy Monitor, September 2025"},{"slug":"dhamra-lng-terminal-in","name":"Dhamra LNG Terminal","country":"India","country_iso":"IN","region":"Asia","state_province":null,"city":null,"facility_type":"import","floating_type":"unknown","status":"operating","latitude":20.821109,"longitude":86.965264,"units":1,"capacity_operating_mtpa":5,"capacity_construction_mtpa":null,"capacity_proposed_mtpa":null,"capacity_operating_bcm_y":6.8,"capacity_construction_bcm_y":null,"capacity_proposed_bcm_y":null,"earliest_start_year":2023,"latest_start_year":2023,"url":"https://lngatlas.org/terminal/dhamra-lng-terminal-in/","data_source":"Data: Global Gas Infrastructure Tracker, Global Energy Monitor, September 2025"},{"slug":"digha-fsru-in","name":"Digha FSRU","country":"India","country_iso":"IN","region":"Asia","state_province":"West Bengal","city":"Digha","facility_type":"import","floating_type":"fsru","status":"cancelled","latitude":21.68,"longitude":87.55,"units":1,"capacity_operating_mtpa":null,"capacity_construction_mtpa":null,"capacity_proposed_mtpa":null,"capacity_operating_bcm_y":null,"capacity_construction_bcm_y":null,"capacity_proposed_bcm_y":null,"earliest_start_year":null,"latest_start_year":null,"url":"https://lngatlas.org/terminal/digha-fsru-in/","data_source":"Data: Global Gas Infrastructure Tracker, Global Energy Monitor, September 2025"},{"slug":"dioriga-fsru-gr","name":"Dioriga FSRU","country":"Greece","country_iso":"GR","region":"Europe","state_province":null,"city":"Gulf of Corinth","facility_type":"import","floating_type":"fsru","status":"proposed","latitude":37.91092,"longitude":23.063539,"units":1,"capacity_operating_mtpa":null,"capacity_construction_mtpa":null,"capacity_proposed_mtpa":1.91,"capacity_operating_bcm_y":null,"capacity_construction_bcm_y":null,"capacity_proposed_bcm_y":2.598,"earliest_start_year":null,"latest_start_year":null,"url":"https://lngatlas.org/terminal/dioriga-fsru-gr/","data_source":"Data: Global Gas Infrastructure Tracker, Global Energy Monitor, September 2025"},{"slug":"discovery-lng-terminal-ca","name":"Discovery LNG Terminal","country":"Canada","country_iso":"CA","region":"Americas","state_province":"British Columbia","city":"Campbell River","facility_type":"export","floating_type":"unknown","status":"cancelled","latitude":50.024444,"longitude":-125.2475,"units":1,"capacity_operating_mtpa":null,"capacity_construction_mtpa":null,"capacity_proposed_mtpa":null,"capacity_operating_bcm_y":null,"capacity_construction_bcm_y":null,"capacity_proposed_bcm_y":null,"earliest_start_year":null,"latest_start_year":null,"url":"https://lngatlas.org/terminal/discovery-lng-terminal-ca/","data_source":"Data: Global Gas Infrastructure Tracker, Global Energy Monitor, September 2025"},{"slug":"dislub-maranhao-fsru-br","name":"Dislub Maranhão FSRU","country":"Brazil","country_iso":"BR","region":"Americas","state_province":"Maranhão","city":"São Marcos Bay","facility_type":"import","floating_type":"fsru","status":"shelved","latitude":-2.533597,"longitude":-44.378089,"units":1,"capacity_operating_mtpa":null,"capacity_construction_mtpa":null,"capacity_proposed_mtpa":null,"capacity_operating_bcm_y":null,"capacity_construction_bcm_y":null,"capacity_proposed_bcm_y":null,"earliest_start_year":null,"latest_start_year":null,"url":"https://lngatlas.org/terminal/dislub-maranhao-fsru-br/","data_source":"Data: Global Gas Infrastructure Tracker, Global Energy Monitor, September 2025"},{"slug":"djibouti-flng-terminal-dj","name":"Djibouti FLNG Terminal","country":"Djibouti","country_iso":"DJ","region":"Africa","state_province":null,"city":"Damerjog","facility_type":"export","floating_type":"flng","status":"cancelled","latitude":11.482124,"longitude":43.186891,"units":3,"capacity_operating_mtpa":null,"capacity_construction_mtpa":null,"capacity_proposed_mtpa":null,"capacity_operating_bcm_y":null,"capacity_construction_bcm_y":null,"capacity_proposed_bcm_y":null,"earliest_start_year":null,"latest_start_year":null,"url":"https://lngatlas.org/terminal/djibouti-flng-terminal-dj/","data_source":"Data: Global Gas Infrastructure Tracker, Global Energy Monitor, September 2025"},{"slug":"dock-sud-lng-terminal-ar","name":"Dock Sud LNG Terminal","country":"Argentina","country_iso":"AR","region":"Americas","state_province":"Buenos Aires","city":null,"facility_type":"import","floating_type":"unknown","status":"cancelled","latitude":-34.641667,"longitude":-58.347778,"units":1,"capacity_operating_mtpa":null,"capacity_construction_mtpa":null,"capacity_proposed_mtpa":null,"capacity_operating_bcm_y":null,"capacity_construction_bcm_y":null,"capacity_proposed_bcm_y":null,"earliest_start_year":null,"latest_start_year":null,"url":"https://lngatlas.org/terminal/dock-sud-lng-terminal-ar/","data_source":"Data: Global Gas Infrastructure Tracker, Global Energy Monitor, September 2025"},{"slug":"donggi-senoro-lng-terminal-id","name":"Donggi-Senoro LNG Terminal","country":"Indonesia","country_iso":"ID","region":"Asia","state_province":"Central Sulawesi","city":"Luwuk","facility_type":"export","floating_type":"unknown","status":"operating","latitude":-1.254369,"longitude":122.58559,"units":1,"capacity_operating_mtpa":2,"capacity_construction_mtpa":null,"capacity_proposed_mtpa":null,"capacity_operating_bcm_y":2.72,"capacity_construction_bcm_y":null,"capacity_proposed_bcm_y":null,"earliest_start_year":2015,"latest_start_year":2015,"url":"https://lngatlas.org/terminal/donggi-senoro-lng-terminal-id/","data_source":"Data: Global Gas Infrastructure Tracker, Global Energy Monitor, September 2025"},{"slug":"dongying-fsru-cn","name":"Dongying FSRU","country":"China","country_iso":"CN","region":"Asia","state_province":"Shandong","city":"Dongying Port","facility_type":"import","floating_type":"fsru","status":"cancelled","latitude":38.0833951,"longitude":119.0333177,"units":1,"capacity_operating_mtpa":null,"capacity_construction_mtpa":null,"capacity_proposed_mtpa":null,"capacity_operating_bcm_y":null,"capacity_construction_bcm_y":null,"capacity_proposed_bcm_y":null,"earliest_start_year":null,"latest_start_year":null,"url":"https://lngatlas.org/terminal/dongying-fsru-cn/","data_source":"Data: Global Gas Infrastructure Tracker, Global Energy Monitor, September 2025"},{"slug":"dongying-lng-terminal-cn","name":"Dongying LNG Terminal","country":"China","country_iso":"CN","region":"Asia","state_province":"Shandong","city":"Dongying Port","facility_type":"import","floating_type":"unknown","status":"cancelled","latitude":38.0833951,"longitude":119.0333177,"units":3,"capacity_operating_mtpa":null,"capacity_construction_mtpa":null,"capacity_proposed_mtpa":null,"capacity_operating_bcm_y":null,"capacity_construction_bcm_y":null,"capacity_proposed_bcm_y":null,"earliest_start_year":null,"latest_start_year":null,"url":"https://lngatlas.org/terminal/dongying-lng-terminal-cn/","data_source":"Data: Global Gas Infrastructure Tracker, Global Energy Monitor, September 2025"},{"slug":"douglas-channel-lng-terminal-ca","name":"Douglas Channel LNG Terminal","country":"Canada","country_iso":"CA","region":"Americas","state_province":"British Columbia","city":"Douglas Channel","facility_type":"export","floating_type":"unknown","status":"cancelled","latitude":53.666667,"longitude":-129.133333,"units":1,"capacity_operating_mtpa":null,"capacity_construction_mtpa":null,"capacity_proposed_mtpa":null,"capacity_operating_bcm_y":null,"capacity_construction_bcm_y":null,"capacity_proposed_bcm_y":null,"earliest_start_year":null,"latest_start_year":null,"url":"https://lngatlas.org/terminal/douglas-channel-lng-terminal-ca/","data_source":"Data: Global Gas Infrastructure Tracker, Global Energy Monitor, September 2025"},{"slug":"downeast-lng-terminal-us","name":"Downeast LNG Terminal","country":"United States","country_iso":"US","region":"Americas","state_province":"Maine","city":"Passamaquoddy Bay","facility_type":"export","floating_type":"unknown","status":"cancelled","latitude":45.083333,"longitude":-67.083333,"units":2,"capacity_operating_mtpa":null,"capacity_construction_mtpa":null,"capacity_proposed_mtpa":null,"capacity_operating_bcm_y":null,"capacity_construction_bcm_y":null,"capacity_proposed_bcm_y":null,"earliest_start_year":null,"latest_start_year":null,"url":"https://lngatlas.org/terminal/downeast-lng-terminal-us/","data_source":"Data: Global Gas Infrastructure Tracker, Global Energy Monitor, September 2025"},{"slug":"dragon-lng-terminal-gb","name":"Dragon LNG Terminal","country":"United Kingdom","country_iso":"GB","region":"Europe","state_province":"Wales","city":"Waterston","facility_type":"import","floating_type":"unknown","status":"operating","latitude":51.70453,"longitude":-4.99774,"units":2,"capacity_operating_mtpa":5.6,"capacity_construction_mtpa":null,"capacity_proposed_mtpa":null,"capacity_operating_bcm_y":7.616,"capacity_construction_bcm_y":null,"capacity_proposed_bcm_y":null,"earliest_start_year":2009,"latest_start_year":2013,"url":"https://lngatlas.org/terminal/dragon-lng-terminal-gb/","data_source":"Data: Global Gas Infrastructure Tracker, Global Energy Monitor, September 2025"},{"slug":"dua-flng-terminal-my","name":"Dua FLNG Terminal","country":"Malaysia","country_iso":"MY","region":"Asia","state_province":"Sabah","city":"Rotan gas field","facility_type":"export","floating_type":"flng","status":"operating","latitude":12,"longitude":113,"units":1,"capacity_operating_mtpa":1.5,"capacity_construction_mtpa":null,"capacity_proposed_mtpa":null,"capacity_operating_bcm_y":2.04,"capacity_construction_bcm_y":null,"capacity_proposed_bcm_y":null,"earliest_start_year":2021,"latest_start_year":2021,"url":"https://lngatlas.org/terminal/dua-flng-terminal-my/","data_source":"Data: Global Gas Infrastructure Tracker, Global Energy Monitor, September 2025"},{"slug":"mlng-dua-lng-terminal-my","name":"Dua Malaysia LNG Terminal","country":"Malaysia","country_iso":"MY","region":"Asia","state_province":"Sarawak","city":"Bintulu","facility_type":"export","floating_type":"unknown","status":"operating","latitude":3.28238,"longitude":113.083,"units":3,"capacity_operating_mtpa":9.6,"capacity_construction_mtpa":null,"capacity_proposed_mtpa":null,"capacity_operating_bcm_y":13.056,"capacity_construction_bcm_y":null,"capacity_proposed_bcm_y":null,"earliest_start_year":1995,"latest_start_year":1995,"url":"https://lngatlas.org/terminal/mlng-dua-lng-terminal-my/","data_source":"Data: Global Gas Infrastructure Tracker, Global Energy Monitor, September 2025"},{"slug":"dunkirk-lng-terminal-fr","name":"Dunkirk LNG Terminal","country":"France","country_iso":"FR","region":"Europe","state_province":"Hauts-de-France","city":"Dunkirk","facility_type":"import","floating_type":"unknown","status":"operating","latitude":51.03361,"longitude":2.19653,"units":3,"capacity_operating_mtpa":9.55,"capacity_construction_mtpa":null,"capacity_proposed_mtpa":null,"capacity_operating_bcm_y":12.988,"capacity_construction_bcm_y":null,"capacity_proposed_bcm_y":null,"earliest_start_year":2017,"latest_start_year":2023,"url":"https://lngatlas.org/terminal/dunkirk-lng-terminal-fr/","data_source":"Data: Global Gas Infrastructure Tracker, Global Energy Monitor, September 2025"},{"slug":"dortyol-fsru-tr","name":"Dörtyol FSRU","country":"Türkiye","country_iso":"TR","region":"Asia","state_province":"Hatay","city":"Dörtyol","facility_type":"import","floating_type":"fsru","status":"operating","latitude":36.8509903,"longitude":36.1259759,"units":1,"capacity_operating_mtpa":7.5,"capacity_construction_mtpa":null,"capacity_proposed_mtpa":null,"capacity_operating_bcm_y":10.2,"capacity_construction_bcm_y":null,"capacity_proposed_bcm_y":null,"earliest_start_year":2018,"latest_start_year":2018,"url":"https://lngatlas.org/terminal/dortyol-fsru-tr/","data_source":"Data: Global Gas Infrastructure Tracker, Global Energy Monitor, September 2025"},{"slug":"eagle-fsru-al","name":"Eagle FSRU","country":"Albania","country_iso":"AL","region":"Europe","state_province":null,"city":"Levan","facility_type":"import","floating_type":"fsru","status":"cancelled","latitude":40.683333,"longitude":19.483333,"units":1,"capacity_operating_mtpa":null,"capacity_construction_mtpa":null,"capacity_proposed_mtpa":null,"capacity_operating_bcm_y":null,"capacity_construction_bcm_y":null,"capacity_proposed_bcm_y":null,"earliest_start_year":null,"latest_start_year":null,"url":"https://lngatlas.org/terminal/eagle-fsru-al/","data_source":"Data: Global Gas Infrastructure Tracker, Global Energy Monitor, September 2025"},{"slug":"eagle-lng-terminal-us","name":"Eagle LNG Terminal","country":"United States","country_iso":"US","region":"Americas","state_province":"Florida","city":"Jacksonville","facility_type":"export","floating_type":"unknown","status":"proposed","latitude":30.4087966,"longitude":-81.6104117,"units":2,"capacity_operating_mtpa":null,"capacity_construction_mtpa":null,"capacity_proposed_mtpa":null,"capacity_operating_bcm_y":null,"capacity_construction_bcm_y":null,"capacity_proposed_bcm_y":null,"earliest_start_year":null,"latest_start_year":null,"url":"https://lngatlas.org/terminal/eagle-lng-terminal-us/","data_source":"Data: Global Gas Infrastructure Tracker, Global Energy Monitor, September 2025"},{"slug":"eemshaven-fsru-nl","name":"Eemshaven FSRU","country":"Netherlands","country_iso":"NL","region":"Europe","state_province":null,"city":"Eemshaven","facility_type":"import","floating_type":"fsru","status":"operating","latitude":53.4356487,"longitude":6.8330977,"units":2,"capacity_operating_mtpa":5.88,"capacity_construction_mtpa":null,"capacity_proposed_mtpa":null,"capacity_operating_bcm_y":7.997,"capacity_construction_bcm_y":null,"capacity_proposed_bcm_y":null,"earliest_start_year":2022,"latest_start_year":2022,"url":"https://lngatlas.org/terminal/eemshaven-fsru-nl/","data_source":"Data: Global Gas Infrastructure Tracker, Global Energy Monitor, September 2025"},{"slug":"egyptian-lng-terminal-eg","name":"Egyptian LNG Terminal","country":"Egypt","country_iso":"EG","region":"Africa","state_province":"Beheira","city":"Idku","facility_type":"export","floating_type":"unknown","status":"operating","latitude":31.3490481,"longitude":30.3186466,"units":2,"capacity_operating_mtpa":7.2,"capacity_construction_mtpa":null,"capacity_proposed_mtpa":null,"capacity_operating_bcm_y":9.792,"capacity_construction_bcm_y":null,"capacity_proposed_bcm_y":null,"earliest_start_year":2005,"latest_start_year":2005,"url":"https://lngatlas.org/terminal/egyptian-lng-terminal-eg/","data_source":"Data: Global Gas Infrastructure Tracker, Global Energy Monitor, September 2025"},{"slug":"eilat-flng-terminal-il","name":"Eilat FLNG Terminal","country":"Israel","country_iso":"IL","region":"Asia","state_province":null,"city":"Eilat","facility_type":"export","floating_type":"flng","status":"cancelled","latitude":29.55,"longitude":34.95,"units":1,"capacity_operating_mtpa":null,"capacity_construction_mtpa":null,"capacity_proposed_mtpa":null,"capacity_operating_bcm_y":null,"capacity_construction_bcm_y":null,"capacity_proposed_bcm_y":null,"earliest_start_year":null,"latest_start_year":null,"url":"https://lngatlas.org/terminal/eilat-flng-terminal-il/","data_source":"Data: Global Gas Infrastructure Tracker, Global Energy Monitor, September 2025"},{"slug":"el-musel-lng-terminal-es","name":"El Musel LNG Terminal","country":"Spain","country_iso":"ES","region":"Europe","state_province":"Asturias","city":"Gijon","facility_type":"import","floating_type":"unknown","status":"operating","latitude":43.5696,"longitude":-5.6934,"units":1,"capacity_operating_mtpa":5.88,"capacity_construction_mtpa":null,"capacity_proposed_mtpa":null,"capacity_operating_bcm_y":7.997,"capacity_construction_bcm_y":null,"capacity_proposed_bcm_y":null,"earliest_start_year":2023,"latest_start_year":2023,"url":"https://lngatlas.org/terminal/el-musel-lng-terminal-es/","data_source":"Data: Global Gas Infrastructure Tracker, Global Energy Monitor, September 2025"},{"slug":"la-union-fsru-sv","name":"El Salvador FSRU","country":"El Salvador","country_iso":"SV","region":"Americas","state_province":"La Unión","city":"Port of La Union","facility_type":"import","floating_type":"fsru","status":"cancelled","latitude":13.336944,"longitude":-87.843889,"units":1,"capacity_operating_mtpa":null,"capacity_construction_mtpa":null,"capacity_proposed_mtpa":null,"capacity_operating_bcm_y":null,"capacity_construction_bcm_y":null,"capacity_proposed_bcm_y":null,"earliest_start_year":null,"latest_start_year":null,"url":"https://lngatlas.org/terminal/la-union-fsru-sv/","data_source":"Data: Global Gas Infrastructure Tracker, Global Energy Monitor, September 2025"},{"slug":"el-viajano-altenesol-lng-terminal-co","name":"El Viajano Altenesol LNG Terminal","country":"Colombia","country_iso":"CO","region":"Americas","state_province":"Cordoba","city":"El Viajano","facility_type":"import","floating_type":"unknown","status":"cancelled","latitude":8.75,"longitude":-75.883333,"units":1,"capacity_operating_mtpa":null,"capacity_construction_mtpa":null,"capacity_proposed_mtpa":null,"capacity_operating_bcm_y":null,"capacity_construction_bcm_y":null,"capacity_proposed_bcm_y":null,"earliest_start_year":null,"latest_start_year":null,"url":"https://lngatlas.org/terminal/el-viajano-altenesol-lng-terminal-co/","data_source":"Data: Global Gas Infrastructure Tracker, Global Energy Monitor, September 2025"},{"slug":"elba-island-lng-terminal-us","name":"Elba Island LNG Terminal","country":"United States","country_iso":"US","region":"Americas","state_province":"Georgia","city":"Elba Island","facility_type":"export","floating_type":"unknown","status":"operating","latitude":32.091111,"longitude":-81.000278,"units":12,"capacity_operating_mtpa":2.5,"capacity_construction_mtpa":null,"capacity_proposed_mtpa":0.4,"capacity_operating_bcm_y":3.4,"capacity_construction_bcm_y":null,"capacity_proposed_bcm_y":0.544,"earliest_start_year":1978,"latest_start_year":2020,"url":"https://lngatlas.org/terminal/elba-island-lng-terminal-us/","data_source":"Data: Global Gas Infrastructure Tracker, Global Energy Monitor, September 2025"},{"slug":"energas-fsru-pk","name":"Energas FSRU","country":"Pakistan","country_iso":"PK","region":"Asia","state_province":"Sindh","city":"Port Qasim","facility_type":"import","floating_type":"fsru","status":"proposed","latitude":24.769704,"longitude":67.334731,"units":1,"capacity_operating_mtpa":null,"capacity_construction_mtpa":null,"capacity_proposed_mtpa":5.75,"capacity_operating_bcm_y":null,"capacity_construction_bcm_y":null,"capacity_proposed_bcm_y":7.82,"earliest_start_year":null,"latest_start_year":null,"url":"https://lngatlas.org/terminal/energas-fsru-pk/","data_source":"Data: Global Gas Infrastructure Tracker, Global Energy Monitor, September 2025"},{"slug":"energie-saguenay-lng-terminal-ca","name":"Energie Saguenay LNG Terminal","country":"Canada","country_iso":"CA","region":"Americas","state_province":"Quebec","city":"Port Saguenay","facility_type":"export","floating_type":"unknown","status":"cancelled","latitude":48.4014153,"longitude":-70.8309756,"units":1,"capacity_operating_mtpa":null,"capacity_construction_mtpa":null,"capacity_proposed_mtpa":null,"capacity_operating_bcm_y":null,"capacity_construction_bcm_y":null,"capacity_proposed_bcm_y":null,"earliest_start_year":null,"latest_start_year":null,"url":"https://lngatlas.org/terminal/energie-saguenay-lng-terminal-ca/","data_source":"Data: Global Gas Infrastructure Tracker, Global Energy Monitor, September 2025"},{"slug":"engro-elengy-fsru-pk","name":"Engro Elengy FSRU","country":"Pakistan","country_iso":"PK","region":"Asia","state_province":"Sindh","city":"Port Qasim","facility_type":"import","floating_type":"fsru","status":"operating","latitude":24.7907232,"longitude":67.3688752,"units":2,"capacity_operating_mtpa":4.8,"capacity_construction_mtpa":null,"capacity_proposed_mtpa":null,"capacity_operating_bcm_y":6.528,"capacity_construction_bcm_y":null,"capacity_proposed_bcm_y":null,"earliest_start_year":2015,"latest_start_year":2015,"url":"https://lngatlas.org/terminal/engro-elengy-fsru-pk/","data_source":"Data: Global Gas Infrastructure Tracker, Global Energy Monitor, September 2025"},{"slug":"engro-fsru-2-pk","name":"Engro FSRU 2","country":"Pakistan","country_iso":"PK","region":"Asia","state_province":"Sindh","city":"Port Qasim","facility_type":"import","floating_type":"fsru","status":"cancelled","latitude":24.766667,"longitude":67.333333,"units":1,"capacity_operating_mtpa":null,"capacity_construction_mtpa":null,"capacity_proposed_mtpa":null,"capacity_operating_bcm_y":null,"capacity_construction_bcm_y":null,"capacity_proposed_bcm_y":null,"earliest_start_year":null,"latest_start_year":null,"url":"https://lngatlas.org/terminal/engro-fsru-2-pk/","data_source":"Data: Global Gas Infrastructure Tracker, Global Energy Monitor, September 2025"},{"slug":"eni-congo-flng-ii-terminal-cg","name":"Eni Congo FLNG II Terminal","country":"Republic of the Congo","country_iso":"CG","region":"Africa","state_province":null,"city":null,"facility_type":"export","floating_type":"flng","status":"construction","latitude":-4.59022,"longitude":11.470348,"units":1,"capacity_operating_mtpa":null,"capacity_construction_mtpa":2.4,"capacity_proposed_mtpa":null,"capacity_operating_bcm_y":null,"capacity_construction_bcm_y":3.264,"capacity_proposed_bcm_y":null,"earliest_start_year":null,"latest_start_year":null,"url":"https://lngatlas.org/terminal/eni-congo-flng-ii-terminal-cg/","data_source":"Data: Global Gas Infrastructure Tracker, Global Energy Monitor, September 2025"},{"slug":"ennore-lng-terminal-in","name":"Ennore LNG Terminal","country":"India","country_iso":"IN","region":"Asia","state_province":"Tamil Nadu","city":"Ennore Port","facility_type":"import","floating_type":"unknown","status":"operating","latitude":13.259407,"longitude":80.337425,"units":2,"capacity_operating_mtpa":5,"capacity_construction_mtpa":null,"capacity_proposed_mtpa":5,"capacity_operating_bcm_y":6.8,"capacity_construction_bcm_y":null,"capacity_proposed_bcm_y":6.8,"earliest_start_year":2019,"latest_start_year":2019,"url":"https://lngatlas.org/terminal/ennore-lng-terminal-in/","data_source":"Data: Global Gas Infrastructure Tracker, Global Energy Monitor, September 2025"},{"slug":"eos-flng-terminal-us","name":"Eos FLNG Terminal","country":"United States","country_iso":"US","region":"Americas","state_province":"Texas","city":"Brownsville","facility_type":"export","floating_type":"flng","status":"cancelled","latitude":25.950835,"longitude":-97.410844,"units":1,"capacity_operating_mtpa":null,"capacity_construction_mtpa":null,"capacity_proposed_mtpa":null,"capacity_operating_bcm_y":null,"capacity_construction_bcm_y":null,"capacity_proposed_bcm_y":null,"earliest_start_year":null,"latest_start_year":null,"url":"https://lngatlas.org/terminal/eos-flng-terminal-us/","data_source":"Data: Global Gas Infrastructure Tracker, Global Energy Monitor, September 2025"},{"slug":"equus-flng-terminal-au","name":"Equus FLNG Terminal","country":"Australia","country_iso":"AU","region":"Oceania","state_province":"Western Australia","city":"Onslow","facility_type":"export","floating_type":"flng","status":"cancelled","latitude":-21.633333,"longitude":115.116667,"units":1,"capacity_operating_mtpa":null,"capacity_construction_mtpa":null,"capacity_proposed_mtpa":null,"capacity_operating_bcm_y":null,"capacity_construction_bcm_y":null,"capacity_proposed_bcm_y":null,"earliest_start_year":null,"latest_start_year":null,"url":"https://lngatlas.org/terminal/equus-flng-terminal-au/","data_source":"Data: Global Gas Infrastructure Tracker, Global Energy Monitor, September 2025"},{"slug":"escobar-fsru-ar","name":"Escobar FSRU","country":"Argentina","country_iso":"AR","region":"Americas","state_province":"Buenos Aires","city":"Puerto Escobar","facility_type":"import","floating_type":"fsru","status":"operating","latitude":-34.2422966,"longitude":-58.7630866,"units":1,"capacity_operating_mtpa":6.1,"capacity_construction_mtpa":null,"capacity_proposed_mtpa":null,"capacity_operating_bcm_y":8.296,"capacity_construction_bcm_y":null,"capacity_proposed_bcm_y":null,"earliest_start_year":2011,"latest_start_year":2011,"url":"https://lngatlas.org/terminal/escobar-fsru-ar/","data_source":"Data: Global Gas Infrastructure Tracker, Global Energy Monitor, September 2025"},{"slug":"etinde-flng-terminal-cm","name":"Etinde FLNG Terminal","country":"Cameroon","country_iso":"CM","region":"Africa","state_province":null,"city":"offshore Cameroon","facility_type":"export","floating_type":"flng","status":"proposed","latitude":4.0237344,"longitude":8.903989,"units":1,"capacity_operating_mtpa":null,"capacity_construction_mtpa":null,"capacity_proposed_mtpa":1.3,"capacity_operating_bcm_y":null,"capacity_construction_bcm_y":null,"capacity_proposed_bcm_y":1.768,"earliest_start_year":null,"latest_start_year":null,"url":"https://lngatlas.org/terminal/etinde-flng-terminal-cm/","data_source":"Data: Global Gas Infrastructure Tracker, Global Energy Monitor, September 2025"},{"slug":"etki-fsru-tr","name":"Etki FSRU","country":"Türkiye","country_iso":"TR","region":"Asia","state_province":"Aegean","city":"Izmir","facility_type":"import","floating_type":"fsru","status":"operating","latitude":38.74443,"longitude":26.895665,"units":1,"capacity_operating_mtpa":5.7,"capacity_construction_mtpa":null,"capacity_proposed_mtpa":null,"capacity_operating_bcm_y":7.752,"capacity_construction_bcm_y":null,"capacity_proposed_bcm_y":null,"earliest_start_year":2016,"latest_start_year":2016,"url":"https://lngatlas.org/terminal/etki-fsru-tr/","data_source":"Data: Global Gas Infrastructure Tracker, Global Energy Monitor, September 2025"},{"slug":"everett-marine-terminal-us","name":"Everett Marine Terminal","country":"United States","country_iso":"US","region":"Americas","state_province":"Massachusetts","city":"Everett","facility_type":"import","floating_type":"unknown","status":"operating","latitude":42.3923475,"longitude":-71.05885,"units":1,"capacity_operating_mtpa":5.1,"capacity_construction_mtpa":null,"capacity_proposed_mtpa":null,"capacity_operating_bcm_y":6.936,"capacity_construction_bcm_y":null,"capacity_proposed_bcm_y":null,"earliest_start_year":1971,"latest_start_year":1971,"url":"https://lngatlas.org/terminal/everett-marine-terminal-us/","data_source":"Data: Global Gas Infrastructure Tracker, Global Energy Monitor, September 2025"},{"slug":"fgen-batangas-fsru-ph","name":"FGEN Batangas FSRU","country":"Philippines","country_iso":"PH","region":"Asia","state_province":"Batangas","city":"Santa Rita","facility_type":"import","floating_type":"fsru","status":"operating","latitude":13.7707075,"longitude":121.0354947,"units":1,"capacity_operating_mtpa":5.3,"capacity_construction_mtpa":null,"capacity_proposed_mtpa":null,"capacity_operating_bcm_y":7.208,"capacity_construction_bcm_y":null,"capacity_proposed_bcm_y":null,"earliest_start_year":2023,"latest_start_year":2023,"url":"https://lngatlas.org/terminal/fgen-batangas-fsru-ph/","data_source":"Data: Global Gas Infrastructure Tracker, Global Energy Monitor, September 2025"},{"slug":"fgen-batangas-lng-terminal-ph","name":"FGEN Batangas LNG Terminal","country":"Philippines","country_iso":"PH","region":"Asia","state_province":"Batangas","city":"Batangas","facility_type":"import","floating_type":"unknown","status":"proposed","latitude":13.7707075,"longitude":121.0354947,"units":1,"capacity_operating_mtpa":null,"capacity_construction_mtpa":null,"capacity_proposed_mtpa":5,"capacity_operating_bcm_y":null,"capacity_construction_bcm_y":null,"capacity_proposed_bcm_y":6.8,"earliest_start_year":null,"latest_start_year":null,"url":"https://lngatlas.org/terminal/fgen-batangas-lng-terminal-ph/","data_source":"Data: Global Gas Infrastructure Tracker, Global Energy Monitor, September 2025"},{"slug":"falconara-marittima-lng-terminal-it","name":"Falconara Marittima LNG Terminal","country":"Italy","country_iso":"IT","region":"Europe","state_province":"Marche","city":"offshore","facility_type":"import","floating_type":"unknown","status":"cancelled","latitude":43.741,"longitude":13.543,"units":1,"capacity_operating_mtpa":null,"capacity_construction_mtpa":null,"capacity_proposed_mtpa":null,"capacity_operating_bcm_y":null,"capacity_construction_bcm_y":null,"capacity_proposed_bcm_y":null,"earliest_start_year":null,"latest_start_year":null,"url":"https://lngatlas.org/terminal/falconara-marittima-lng-terminal-it/","data_source":"Data: Global Gas Infrastructure Tracker, Global Energy Monitor, September 2025"},{"slug":"fangchenggang-lng-terminal-cn","name":"Fangchenggang LNG Terminal","country":"China","country_iso":"CN","region":"Asia","state_province":"Guangxi","city":null,"facility_type":"import","floating_type":"unknown","status":"operating","latitude":21.5885731,"longitude":108.3547283,"units":2,"capacity_operating_mtpa":0.6,"capacity_construction_mtpa":null,"capacity_proposed_mtpa":null,"capacity_operating_bcm_y":0.816,"capacity_construction_bcm_y":null,"capacity_proposed_bcm_y":null,"earliest_start_year":2019,"latest_start_year":2019,"url":"https://lngatlas.org/terminal/fangchenggang-lng-terminal-cn/","data_source":"Data: Global Gas Infrastructure Tracker, Global Energy Monitor, September 2025"},{"slug":"far-east-lng-terminal-ru","name":"Far East LNG Terminal","country":"Russia","country_iso":"RU","region":"Europe","state_province":"Khabaravosk Krai","city":"De Kastri","facility_type":"export","floating_type":"unknown","status":"proposed","latitude":51.473482,"longitude":140.77754,"units":2,"capacity_operating_mtpa":null,"capacity_construction_mtpa":null,"capacity_proposed_mtpa":16.2,"capacity_operating_bcm_y":null,"capacity_construction_bcm_y":null,"capacity_proposed_bcm_y":22.032,"earliest_start_year":null,"latest_start_year":null,"url":"https://lngatlas.org/terminal/far-east-lng-terminal-ru/","data_source":"Data: Global Gas Infrastructure Tracker, Global Energy Monitor, September 2025"},{"slug":"fermeuse-energy-flng-terminal-ca","name":"Fermeuse Energy FLNG Terminal","country":"Canada","country_iso":"CA","region":"Americas","state_province":null,"city":null,"facility_type":"export","floating_type":"flng","status":"proposed","latitude":46.974036,"longitude":-52.947832,"units":1,"capacity_operating_mtpa":null,"capacity_construction_mtpa":null,"capacity_proposed_mtpa":null,"capacity_operating_bcm_y":null,"capacity_construction_bcm_y":null,"capacity_proposed_bcm_y":null,"earliest_start_year":null,"latest_start_year":null,"url":"https://lngatlas.org/terminal/fermeuse-energy-flng-terminal-ca/","data_source":"Data: Global Gas Infrastructure Tracker, Global Energy Monitor, September 2025"},{"slug":"filipinas-lng-gateway-project-fsru-ph","name":"Filipinas LNG Gateway Project FSRU","country":"Philippines","country_iso":"PH","region":"Asia","state_province":null,"city":"Batangas","facility_type":"import","floating_type":"fsru","status":"construction","latitude":13.726365,"longitude":120.99401,"units":1,"capacity_operating_mtpa":null,"capacity_construction_mtpa":4.4,"capacity_proposed_mtpa":null,"capacity_operating_bcm_y":null,"capacity_construction_bcm_y":5.984,"capacity_proposed_bcm_y":null,"earliest_start_year":null,"latest_start_year":null,"url":"https://lngatlas.org/terminal/filipinas-lng-gateway-project-fsru-ph/","data_source":"Data: Global Gas Infrastructure Tracker, Global Energy Monitor, September 2025"},{"slug":"firebird-lng-terminal-sr","name":"Firebird LNG Terminal","country":"Suriname","country_iso":"SR","region":"Americas","state_province":null,"city":"Nieuw Nickerie","facility_type":"export","floating_type":"unknown","status":"proposed","latitude":5.967844,"longitude":-56.990446,"units":1,"capacity_operating_mtpa":null,"capacity_construction_mtpa":null,"capacity_proposed_mtpa":2.7,"capacity_operating_bcm_y":null,"capacity_construction_bcm_y":null,"capacity_proposed_bcm_y":3.672,"earliest_start_year":null,"latest_start_year":null,"url":"https://lngatlas.org/terminal/firebird-lng-terminal-sr/","data_source":"Data: Global Gas Infrastructure Tracker, Global Energy Monitor, September 2025"},{"slug":"fishermans-landing-lng-terminal-au","name":"Fishermans Landing LNG Terminal","country":"Australia","country_iso":"AU","region":"Oceania","state_province":"Queensland","city":"Port of Gladstone","facility_type":"export","floating_type":"unknown","status":"cancelled","latitude":-23.820194,"longitude":151.242522,"units":1,"capacity_operating_mtpa":null,"capacity_construction_mtpa":null,"capacity_proposed_mtpa":null,"capacity_operating_bcm_y":null,"capacity_construction_bcm_y":null,"capacity_proposed_bcm_y":null,"earliest_start_year":null,"latest_start_year":null,"url":"https://lngatlas.org/terminal/fishermans-landing-lng-terminal-au/","data_source":"Data: Global Gas Infrastructure Tracker, Global Energy Monitor, September 2025"},{"slug":"floridian-lng-terminal-us","name":"Floridian LNG Terminal","country":"United States","country_iso":"US","region":"Americas","state_province":"Florida","city":"Martin County","facility_type":"export","floating_type":"unknown","status":"cancelled","latitude":27.163871,"longitude":-80.182677,"units":1,"capacity_operating_mtpa":null,"capacity_construction_mtpa":null,"capacity_proposed_mtpa":null,"capacity_operating_bcm_y":null,"capacity_construction_bcm_y":null,"capacity_proposed_bcm_y":null,"earliest_start_year":null,"latest_start_year":null,"url":"https://lngatlas.org/terminal/floridian-lng-terminal-us/","data_source":"Data: Global Gas Infrastructure Tracker, Global Energy Monitor, September 2025"},{"slug":"fortuna-flng-terminal-gq","name":"Fortuna FLNG Terminal","country":"Equatorial Guinea","country_iso":"GQ","region":"Africa","state_province":null,"city":"off west coast of Bamako Is.","facility_type":"export","floating_type":"flng","status":"shelved","latitude":3.2,"longitude":7.6,"units":2,"capacity_operating_mtpa":null,"capacity_construction_mtpa":null,"capacity_proposed_mtpa":null,"capacity_operating_bcm_y":null,"capacity_construction_bcm_y":null,"capacity_proposed_bcm_y":null,"earliest_start_year":null,"latest_start_year":null,"url":"https://lngatlas.org/terminal/fortuna-flng-terminal-gq/","data_source":"Data: Global Gas Infrastructure Tracker, Global Energy Monitor, September 2025"},{"slug":"fos-cavaou-lng-terminal-fr","name":"Fos Cavaou LNG Terminal","country":"France","country_iso":"FR","region":"Europe","state_province":"Provence-Alpes-Côte d'Azur","city":"Fos-sur-Mer","facility_type":"import","floating_type":"unknown","status":"operating","latitude":43.41963,"longitude":4.90102,"units":3,"capacity_operating_mtpa":8,"capacity_construction_mtpa":2,"capacity_proposed_mtpa":null,"capacity_operating_bcm_y":10.88,"capacity_construction_bcm_y":2.72,"capacity_proposed_bcm_y":null,"earliest_start_year":2010,"latest_start_year":2023,"url":"https://lngatlas.org/terminal/fos-cavaou-lng-terminal-fr/","data_source":"Data: Global Gas Infrastructure Tracker, Global Energy Monitor, September 2025"},{"slug":"fos-lavera-marseille-lng-terminal-fr","name":"Fos Lavera Marseille LNG Terminal","country":"France","country_iso":"FR","region":"Europe","state_province":"Provence-Alpes-Côte d'Azur","city":"Fos-sur-Mer","facility_type":"import","floating_type":"unknown","status":"cancelled","latitude":43.40705,"longitude":4.87237,"units":1,"capacity_operating_mtpa":null,"capacity_construction_mtpa":null,"capacity_proposed_mtpa":null,"capacity_operating_bcm_y":null,"capacity_construction_bcm_y":null,"capacity_proposed_bcm_y":null,"earliest_start_year":null,"latest_start_year":null,"url":"https://lngatlas.org/terminal/fos-lavera-marseille-lng-terminal-fr/","data_source":"Data: Global Gas Infrastructure Tracker, Global Energy Monitor, September 2025"},{"slug":"fos-tonkin-lng-terminal-fr","name":"Fos Tonkin LNG Terminal","country":"France","country_iso":"FR","region":"Europe","state_province":"Provence-Alpes-Côte d'Azur","city":"Fos-sur-Mer","facility_type":"import","floating_type":"unknown","status":"operating","latitude":43.454,"longitude":4.85167,"units":2,"capacity_operating_mtpa":1.2,"capacity_construction_mtpa":null,"capacity_proposed_mtpa":0.2,"capacity_operating_bcm_y":1.632,"capacity_construction_bcm_y":null,"capacity_proposed_bcm_y":0.272,"earliest_start_year":1972,"latest_start_year":1972,"url":"https://lngatlas.org/terminal/fos-tonkin-lng-terminal-fr/","data_source":"Data: Global Gas Infrastructure Tracker, Global Energy Monitor, September 2025"},{"slug":"fourchon-lng-terminal-us","name":"Fourchon LNG Terminal","country":"United States","country_iso":"US","region":"Americas","state_province":"Louisiana","city":"Port Fourchon","facility_type":"export","floating_type":"unknown","status":"cancelled","latitude":29.105833,"longitude":-90.194444,"units":2,"capacity_operating_mtpa":null,"capacity_construction_mtpa":null,"capacity_proposed_mtpa":null,"capacity_operating_bcm_y":null,"capacity_construction_bcm_y":null,"capacity_proposed_bcm_y":null,"earliest_start_year":null,"latest_start_year":null,"url":"https://lngatlas.org/terminal/fourchon-lng-terminal-us/","data_source":"Data: Global Gas Infrastructure Tracker, Global Energy Monitor, September 2025"},{"slug":"fredrikstad-lng-terminal-no","name":"Fredrikstad LNG Terminal","country":"Norway","country_iso":"NO","region":"Europe","state_province":null,"city":"Øra","facility_type":"import","floating_type":"unknown","status":"operating","latitude":59.1875329,"longitude":10.9595717,"units":1,"capacity_operating_mtpa":0.1,"capacity_construction_mtpa":null,"capacity_proposed_mtpa":null,"capacity_operating_bcm_y":0.136,"capacity_construction_bcm_y":null,"capacity_proposed_bcm_y":null,"earliest_start_year":2011,"latest_start_year":2011,"url":"https://lngatlas.org/terminal/fredrikstad-lng-terminal-no/","data_source":"Data: Global Gas Infrastructure Tracker, Global Energy Monitor, September 2025"},{"slug":"freeport-lng-terminal-us","name":"Freeport LNG Terminal","country":"United States","country_iso":"US","region":"Americas","state_province":"Texas","city":"Freeport","facility_type":"export","floating_type":"unknown","status":"operating","latitude":28.932003,"longitude":-95.317355,"units":6,"capacity_operating_mtpa":29.7,"capacity_construction_mtpa":null,"capacity_proposed_mtpa":5.1,"capacity_operating_bcm_y":40.392,"capacity_construction_bcm_y":null,"capacity_proposed_bcm_y":6.936,"earliest_start_year":2008,"latest_start_year":2024,"url":"https://lngatlas.org/terminal/freeport-lng-terminal-us/","data_source":"Data: Global Gas Infrastructure Tracker, Global Energy Monitor, September 2025"},{"slug":"fujairah-lng-terminal-ae","name":"Fujairah LNG Terminal","country":"United Arab Emirates","country_iso":"AE","region":"Asia","state_province":"Fujairah","city":"Fujairah","facility_type":"export","floating_type":"unknown","status":"cancelled","latitude":25.319096,"longitude":56.375397,"units":3,"capacity_operating_mtpa":null,"capacity_construction_mtpa":null,"capacity_proposed_mtpa":null,"capacity_operating_bcm_y":null,"capacity_construction_bcm_y":null,"capacity_proposed_bcm_y":null,"earliest_start_year":null,"latest_start_year":null,"url":"https://lngatlas.org/terminal/fujairah-lng-terminal-ae/","data_source":"Data: Global Gas Infrastructure Tracker, Global Energy Monitor, September 2025"},{"slug":"fujian-lng-terminal-cn","name":"Fujian LNG Terminal","country":"China","country_iso":"CN","region":"Asia","state_province":"Fujian","city":null,"facility_type":"import","floating_type":"unknown","status":"operating","latitude":25.2135,"longitude":118.9983,"units":2,"capacity_operating_mtpa":6.3,"capacity_construction_mtpa":null,"capacity_proposed_mtpa":null,"capacity_operating_bcm_y":8.568,"capacity_construction_bcm_y":null,"capacity_proposed_bcm_y":null,"earliest_start_year":2008,"latest_start_year":2019,"url":"https://lngatlas.org/terminal/fujian-lng-terminal-cn/","data_source":"Data: Global Gas Infrastructure Tracker, Global Energy Monitor, September 2025"},{"slug":"fukuoka-lng-terminal-jp","name":"Fukuoka LNG Terminal","country":"Japan","country_iso":"JP","region":"Asia","state_province":"Kyushu","city":"Fukuoka","facility_type":"import","floating_type":"unknown","status":"operating","latitude":33.617457,"longitude":130.4074,"units":1,"capacity_operating_mtpa":0.65,"capacity_construction_mtpa":null,"capacity_proposed_mtpa":null,"capacity_operating_bcm_y":0.884,"capacity_construction_bcm_y":null,"capacity_proposed_bcm_y":null,"earliest_start_year":1993,"latest_start_year":1993,"url":"https://lngatlas.org/terminal/fukuoka-lng-terminal-jp/","data_source":"Data: Global Gas Infrastructure Tracker, Global Energy Monitor, September 2025"},{"slug":"fuqing-lng-terminal-cn","name":"Fuqing LNG Terminal","country":"China","country_iso":"CN","region":"Asia","state_province":"Fujian","city":"Donghan Town","facility_type":"import","floating_type":"unknown","status":"construction","latitude":25.3425952,"longitude":119.5897406,"units":1,"capacity_operating_mtpa":null,"capacity_construction_mtpa":3,"capacity_proposed_mtpa":null,"capacity_operating_bcm_y":null,"capacity_construction_bcm_y":4.08,"capacity_proposed_bcm_y":null,"earliest_start_year":null,"latest_start_year":null,"url":"https://lngatlas.org/terminal/fuqing-lng-terminal-cn/","data_source":"Data: Global Gas Infrastructure Tracker, Global Energy Monitor, September 2025"},{"slug":"futtsu-lng-terminal-jp","name":"Futtsu LNG Terminal","country":"Japan","country_iso":"JP","region":"Asia","state_province":"Kanto","city":"Futtsu","facility_type":"import","floating_type":"unknown","status":"operating","latitude":35.3451724,"longitude":139.8213313,"units":1,"capacity_operating_mtpa":22.9,"capacity_construction_mtpa":null,"capacity_proposed_mtpa":null,"capacity_operating_bcm_y":31.144,"capacity_construction_bcm_y":null,"capacity_proposed_bcm_y":null,"earliest_start_year":1985,"latest_start_year":1985,"url":"https://lngatlas.org/terminal/futtsu-lng-terminal-jp/","data_source":"Data: Global Gas Infrastructure Tracker, Global Energy Monitor, September 2025"},{"slug":"g2-lng-terminal-us","name":"G2 LNG Terminal","country":"United States","country_iso":"US","region":"Americas","state_province":"Louisiana","city":"Cameron Parish","facility_type":"export","floating_type":"unknown","status":"cancelled","latitude":29.811571,"longitude":-93.3596,"units":1,"capacity_operating_mtpa":null,"capacity_construction_mtpa":null,"capacity_proposed_mtpa":null,"capacity_operating_bcm_y":null,"capacity_construction_bcm_y":null,"capacity_proposed_bcm_y":null,"earliest_start_year":null,"latest_start_year":null,"url":"https://lngatlas.org/terminal/g2-lng-terminal-us/","data_source":"Data: Global Gas Infrastructure Tracker, Global Energy Monitor, September 2025"},{"slug":"gail-kakinada-fsru-in","name":"GAIL Kakinada FSRU","country":"India","country_iso":"IN","region":"Asia","state_province":"Andhra Pradesh","city":"Kakinada Port","facility_type":"import","floating_type":"fsru","status":"cancelled","latitude":16.975,"longitude":82.279,"units":1,"capacity_operating_mtpa":null,"capacity_construction_mtpa":null,"capacity_proposed_mtpa":null,"capacity_operating_bcm_y":null,"capacity_construction_bcm_y":null,"capacity_proposed_bcm_y":null,"earliest_start_year":null,"latest_start_year":null,"url":"https://lngatlas.org/terminal/gail-kakinada-fsru-in/","data_source":"Data: Global Gas Infrastructure Tracker, Global Energy Monitor, September 2025"},{"slug":"geil-fsru-pk","name":"GEIL FSRU","country":"Pakistan","country_iso":"PK","region":"Asia","state_province":"Sindh","city":"Port Qasim","facility_type":"import","floating_type":"fsru","status":"cancelled","latitude":24.7718,"longitude":67.3119,"units":1,"capacity_operating_mtpa":null,"capacity_construction_mtpa":null,"capacity_proposed_mtpa":null,"capacity_operating_bcm_y":null,"capacity_construction_bcm_y":null,"capacity_proposed_bcm_y":null,"earliest_start_year":null,"latest_start_year":null,"url":"https://lngatlas.org/terminal/geil-fsru-pk/","data_source":"Data: Global Gas Infrastructure Tracker, Global Energy Monitor, September 2025"},{"slug":"gnl-del-plata-fsru-uy","name":"GNL Del Plata FSRU","country":"Uruguay","country_iso":"UY","region":"Americas","state_province":"Montevideo","city":"Punta Sayago","facility_type":"import","floating_type":"fsru","status":"cancelled","latitude":-34.901342,"longitude":-56.2780338,"units":1,"capacity_operating_mtpa":null,"capacity_construction_mtpa":null,"capacity_proposed_mtpa":null,"capacity_operating_bcm_y":null,"capacity_construction_bcm_y":null,"capacity_proposed_bcm_y":null,"earliest_start_year":null,"latest_start_year":null,"url":"https://lngatlas.org/terminal/gnl-del-plata-fsru-uy/","data_source":"Data: Global Gas Infrastructure Tracker, Global Energy Monitor, September 2025"},{"slug":"galveston-bay-lng-terminal-us","name":"Galveston Bay LNG Terminal","country":"United States","country_iso":"US","region":"Americas","state_province":"Texas","city":"Texas City","facility_type":"export","floating_type":"unknown","status":"cancelled","latitude":29.370473,"longitude":-94.89321,"units":1,"capacity_operating_mtpa":null,"capacity_construction_mtpa":null,"capacity_proposed_mtpa":null,"capacity_operating_bcm_y":null,"capacity_construction_bcm_y":null,"capacity_proposed_bcm_y":null,"earliest_start_year":null,"latest_start_year":null,"url":"https://lngatlas.org/terminal/galveston-bay-lng-terminal-us/","data_source":"Data: Global Gas Infrastructure Tracker, Global Energy Monitor, September 2025"},{"slug":"gangavaram-lng-terminal-in","name":"Gangavaram LNG Terminal","country":"India","country_iso":"IN","region":"Asia","state_province":"Andhra Pradesh","city":"Gangavaram Port","facility_type":"import","floating_type":"unknown","status":"shelved","latitude":17.616667,"longitude":83.233333,"units":1,"capacity_operating_mtpa":null,"capacity_construction_mtpa":null,"capacity_proposed_mtpa":null,"capacity_operating_bcm_y":null,"capacity_construction_bcm_y":null,"capacity_proposed_bcm_y":null,"earliest_start_year":null,"latest_start_year":null,"url":"https://lngatlas.org/terminal/gangavaram-lng-terminal-in/","data_source":"Data: Global Gas Infrastructure Tracker, Global Energy Monitor, September 2025"},{"slug":"ganyu-lng-terminal-cn","name":"Ganyu LNG Terminal","country":"China","country_iso":"CN","region":"Asia","state_province":"Jiangsu","city":null,"facility_type":"import","floating_type":"unknown","status":"construction","latitude":35.027561,"longitude":119.296956,"units":2,"capacity_operating_mtpa":null,"capacity_construction_mtpa":3,"capacity_proposed_mtpa":null,"capacity_operating_bcm_y":null,"capacity_construction_bcm_y":4.08,"capacity_proposed_bcm_y":null,"earliest_start_year":null,"latest_start_year":null,"url":"https://lngatlas.org/terminal/ganyu-lng-terminal-cn/","data_source":"Data: Global Gas Infrastructure Tracker, Global Energy Monitor, September 2025"},{"slug":"gas-atacama-flng-terminal-cl","name":"Gas Atacama FLNG Terminal","country":"Chile","country_iso":"CL","region":"Americas","state_province":"Antofagasta","city":"Mejillones","facility_type":"import","floating_type":"flng","status":"cancelled","latitude":-23.1,"longitude":-70.45,"units":1,"capacity_operating_mtpa":null,"capacity_construction_mtpa":null,"capacity_proposed_mtpa":null,"capacity_operating_bcm_y":null,"capacity_construction_bcm_y":null,"capacity_proposed_bcm_y":null,"earliest_start_year":null,"latest_start_year":null,"url":"https://lngatlas.org/terminal/gas-atacama-flng-terminal-cl/","data_source":"Data: Global Gas Infrastructure Tracker, Global Energy Monitor, September 2025"},{"slug":"strategic-gas-emergency-reserve-sger-fsru-ie","name":"Gas Networks Ireland LNG Terminal","country":"Ireland","country_iso":"IE","region":"Europe","state_province":null,"city":null,"facility_type":"import","floating_type":"floating","status":"proposed","latitude":null,"longitude":null,"units":1,"capacity_operating_mtpa":null,"capacity_construction_mtpa":null,"capacity_proposed_mtpa":null,"capacity_operating_bcm_y":null,"capacity_construction_bcm_y":null,"capacity_proposed_bcm_y":null,"earliest_start_year":null,"latest_start_year":null,"url":"https://lngatlas.org/terminal/strategic-gas-emergency-reserve-sger-fsru-ie/","data_source":"Data: Global Gas Infrastructure Tracker, Global Energy Monitor, September 2025"},{"slug":"gasport-fsru-pk","name":"GasPort FSRU","country":"Pakistan","country_iso":"PK","region":"Asia","state_province":"Sindh","city":"Port Qasim","facility_type":"import","floating_type":"fsru","status":"operating","latitude":24.7749916,"longitude":67.288333,"units":1,"capacity_operating_mtpa":5,"capacity_construction_mtpa":null,"capacity_proposed_mtpa":null,"capacity_operating_bcm_y":6.8,"capacity_construction_bcm_y":null,"capacity_proposed_bcm_y":null,"earliest_start_year":2017,"latest_start_year":2017,"url":"https://lngatlas.org/terminal/gasport-fsru-pk/","data_source":"Data: Global Gas Infrastructure Tracker, Global Energy Monitor, September 2025"},{"slug":"gasport-fsru-2-pk","name":"GasPort FSRU 2","country":"Pakistan","country_iso":"PK","region":"Asia","state_province":null,"city":null,"facility_type":"import","floating_type":"fsru","status":"proposed","latitude":24.769704,"longitude":67.334731,"units":1,"capacity_operating_mtpa":null,"capacity_construction_mtpa":null,"capacity_proposed_mtpa":0.69,"capacity_operating_bcm_y":null,"capacity_construction_bcm_y":null,"capacity_proposed_bcm_y":0.938,"earliest_start_year":null,"latest_start_year":null,"url":"https://lngatlas.org/terminal/gasport-fsru-2-pk/","data_source":"Data: Global Gas Infrastructure Tracker, Global Energy Monitor, September 2025"},{"slug":"gate-lng-terminal-nl","name":"Gate LNG Terminal","country":"Netherlands","country_iso":"NL","region":"Europe","state_province":"South Holland","city":"Maasvlakte, Port of Rotterdam","facility_type":"import","floating_type":"unknown","status":"operating","latitude":51.971111,"longitude":4.068889,"units":2,"capacity_operating_mtpa":11.76,"capacity_construction_mtpa":2.94,"capacity_proposed_mtpa":null,"capacity_operating_bcm_y":15.994,"capacity_construction_bcm_y":3.998,"capacity_proposed_bcm_y":null,"earliest_start_year":2011,"latest_start_year":2011,"url":"https://lngatlas.org/terminal/gate-lng-terminal-nl/","data_source":"Data: Global Gas Infrastructure Tracker, Global Energy Monitor, September 2025"},{"slug":"gato-negro-manzanillo-lng-terminal-mx","name":"Gato Negro Manzanillo LNG Terminal","country":"Mexico","country_iso":"MX","region":"Americas","state_province":"Colima","city":"Manzanillo","facility_type":"export","floating_type":"unknown","status":"proposed","latitude":19.015597,"longitude":-104.273765,"units":1,"capacity_operating_mtpa":null,"capacity_construction_mtpa":null,"capacity_proposed_mtpa":6,"capacity_operating_bcm_y":null,"capacity_construction_bcm_y":null,"capacity_proposed_bcm_y":8.16,"earliest_start_year":null,"latest_start_year":null,"url":"https://lngatlas.org/terminal/gato-negro-manzanillo-lng-terminal-mx/","data_source":"Data: Global Gas Infrastructure Tracker, Global Energy Monitor, September 2025"},{"slug":"geelong-fsru-au","name":"Geelong FSRU","country":"Australia","country_iso":"AU","region":"Oceania","state_province":"Victoria","city":"Geelong","facility_type":"import","floating_type":"fsru","status":"proposed","latitude":-34.495401,"longitude":137.481029,"units":1,"capacity_operating_mtpa":null,"capacity_construction_mtpa":null,"capacity_proposed_mtpa":3,"capacity_operating_bcm_y":null,"capacity_construction_bcm_y":null,"capacity_proposed_bcm_y":4.08,"earliest_start_year":null,"latest_start_year":null,"url":"https://lngatlas.org/terminal/geelong-fsru-au/","data_source":"Data: Global Gas Infrastructure Tracker, Global Energy Monitor, September 2025"},{"slug":"geramar-fsru-br","name":"Geramar FSRU","country":"Brazil","country_iso":"BR","region":"Americas","state_province":"Maranhão","city":"Porto de Itaqui","facility_type":"import","floating_type":"fsru","status":"shelved","latitude":-2.579534,"longitude":-44.368472,"units":1,"capacity_operating_mtpa":null,"capacity_construction_mtpa":null,"capacity_proposed_mtpa":null,"capacity_operating_bcm_y":null,"capacity_construction_bcm_y":null,"capacity_proposed_bcm_y":null,"earliest_start_year":null,"latest_start_year":null,"url":"https://lngatlas.org/terminal/geramar-fsru-br/","data_source":"Data: Global Gas Infrastructure Tracker, Global Energy Monitor, September 2025"},{"slug":"gibbstown-deepwater-port-lng-terminal-us","name":"Gibbstown Deepwater Port LNG Terminal","country":"United States","country_iso":"US","region":"Americas","state_province":"New Jersey","city":"Greenwich Township","facility_type":"export","floating_type":"unknown","status":"proposed","latitude":39.841886,"longitude":-75.299108,"units":1,"capacity_operating_mtpa":null,"capacity_construction_mtpa":null,"capacity_proposed_mtpa":1.5,"capacity_operating_bcm_y":null,"capacity_construction_bcm_y":null,"capacity_proposed_bcm_y":2.04,"earliest_start_year":null,"latest_start_year":null,"url":"https://lngatlas.org/terminal/gibbstown-deepwater-port-lng-terminal-us/","data_source":"Data: Global Gas Infrastructure Tracker, Global Energy Monitor, September 2025"},{"slug":"gibraltar-lng-terminal-gi","name":"Gibraltar LNG Terminal","country":"Gibraltar","country_iso":"GI","region":"Europe","state_province":null,"city":null,"facility_type":"import","floating_type":"floating","status":"operating","latitude":36.149058170125585,"longitude":-5.36506678781487,"units":1,"capacity_operating_mtpa":0.1,"capacity_construction_mtpa":null,"capacity_proposed_mtpa":null,"capacity_operating_bcm_y":0.136,"capacity_construction_bcm_y":null,"capacity_proposed_bcm_y":null,"earliest_start_year":2019,"latest_start_year":2019,"url":"https://lngatlas.org/terminal/gibraltar-lng-terminal-gi/","data_source":"Data: Global Gas Infrastructure Tracker, Global Energy Monitor, September 2025"},{"slug":"gioia-tauro-lng-terminal-it","name":"Gioia Tauro LNG Terminal","country":"Italy","country_iso":"IT","region":"Europe","state_province":"Apulia","city":"Trinitapoli","facility_type":"import","floating_type":"unknown","status":"proposed","latitude":38.46692,"longitude":15.899,"units":1,"capacity_operating_mtpa":null,"capacity_construction_mtpa":null,"capacity_proposed_mtpa":8.82,"capacity_operating_bcm_y":null,"capacity_construction_bcm_y":null,"capacity_proposed_bcm_y":11.995,"earliest_start_year":null,"latest_start_year":null,"url":"https://lngatlas.org/terminal/gioia-tauro-lng-terminal-it/","data_source":"Data: Global Gas Infrastructure Tracker, Global Energy Monitor, September 2025"},{"slug":"gladstone-lng-terminal-au","name":"Gladstone LNG Terminal","country":"Australia","country_iso":"AU","region":"Oceania","state_province":"Queensland","city":"Curtis Island","facility_type":"export","floating_type":"unknown","status":"operating","latitude":-23.776,"longitude":151.2103,"units":2,"capacity_operating_mtpa":7.8,"capacity_construction_mtpa":null,"capacity_proposed_mtpa":null,"capacity_operating_bcm_y":10.608,"capacity_construction_bcm_y":null,"capacity_proposed_bcm_y":null,"earliest_start_year":2015,"latest_start_year":2016,"url":"https://lngatlas.org/terminal/gladstone-lng-terminal-au/","data_source":"Data: Global Gas Infrastructure Tracker, Global Energy Monitor, September 2025"},{"slug":"golar-lagos-fsru-ng","name":"Golar Lagos FSRU","country":"Nigeria","country_iso":"NG","region":"Africa","state_province":null,"city":null,"facility_type":"import","floating_type":"fsru","status":"cancelled","latitude":6.450737,"longitude":3.373252,"units":1,"capacity_operating_mtpa":null,"capacity_construction_mtpa":null,"capacity_proposed_mtpa":null,"capacity_operating_bcm_y":null,"capacity_construction_bcm_y":null,"capacity_proposed_bcm_y":null,"earliest_start_year":null,"latest_start_year":null,"url":"https://lngatlas.org/terminal/golar-lagos-fsru-ng/","data_source":"Data: Global Gas Infrastructure Tracker, Global Energy Monitor, September 2025"},{"slug":"golar-nigeria-flng-terminal-ng","name":"Golar Nigeria FLNG Terminal","country":"Nigeria","country_iso":"NG","region":"Africa","state_province":null,"city":"offshore Niger Delta","facility_type":"export","floating_type":"flng","status":"proposed","latitude":4.191751,"longitude":5.771377,"units":1,"capacity_operating_mtpa":null,"capacity_construction_mtpa":null,"capacity_proposed_mtpa":null,"capacity_operating_bcm_y":null,"capacity_construction_bcm_y":null,"capacity_proposed_bcm_y":null,"earliest_start_year":null,"latest_start_year":null,"url":"https://lngatlas.org/terminal/golar-nigeria-flng-terminal-ng/","data_source":"Data: Global Gas Infrastructure Tracker, Global Energy Monitor, September 2025"},{"slug":"goldboro-lng-terminal-ca","name":"Goldboro LNG Terminal","country":"Canada","country_iso":"CA","region":"Americas","state_province":"Nova Scotia","city":"Goldboro","facility_type":"export","floating_type":"unknown","status":"shelved","latitude":45.181928303171716,"longitude":-61.6520189483492,"units":2,"capacity_operating_mtpa":null,"capacity_construction_mtpa":null,"capacity_proposed_mtpa":null,"capacity_operating_bcm_y":null,"capacity_construction_bcm_y":null,"capacity_proposed_bcm_y":null,"earliest_start_year":null,"latest_start_year":null,"url":"https://lngatlas.org/terminal/goldboro-lng-terminal-ca/","data_source":"Data: Global Gas Infrastructure Tracker, Global Energy Monitor, September 2025"},{"slug":"golden-pass-lng-terminal-us","name":"Golden Pass LNG Terminal","country":"United States","country_iso":"US","region":"Americas","state_province":"Texas","city":"Sabine Pass","facility_type":"export","floating_type":"unknown","status":"construction","latitude":29.761394,"longitude":-93.919418,"units":4,"capacity_operating_mtpa":null,"capacity_construction_mtpa":15.6,"capacity_proposed_mtpa":null,"capacity_operating_bcm_y":null,"capacity_construction_bcm_y":21.216,"capacity_proposed_bcm_y":null,"earliest_start_year":2010,"latest_start_year":2010,"url":"https://lngatlas.org/terminal/golden-pass-lng-terminal-us/","data_source":"Data: Global Gas Infrastructure Tracker, Global Energy Monitor, September 2025"},{"slug":"gopalpur-lng-terminal-in","name":"Gopalpur LNG Terminal","country":"India","country_iso":"IN","region":"Asia","state_province":"Odisha","city":"Gopalpur port","facility_type":"import","floating_type":"floating","status":"proposed","latitude":19.301786,"longitude":84.966246,"units":1,"capacity_operating_mtpa":null,"capacity_construction_mtpa":null,"capacity_proposed_mtpa":5,"capacity_operating_bcm_y":null,"capacity_construction_bcm_y":null,"capacity_proposed_bcm_y":6.8,"earliest_start_year":null,"latest_start_year":null,"url":"https://lngatlas.org/terminal/gopalpur-lng-terminal-in/","data_source":"Data: Global Gas Infrastructure Tracker, Global Energy Monitor, September 2025"},{"slug":"gorgon-lng-terminal-au","name":"Gorgon LNG Terminal","country":"Australia","country_iso":"AU","region":"Oceania","state_province":"Western Australia","city":"Barrow Island","facility_type":"export","floating_type":"unknown","status":"operating","latitude":-20.79,"longitude":115.44965,"units":4,"capacity_operating_mtpa":15.6,"capacity_construction_mtpa":null,"capacity_proposed_mtpa":null,"capacity_operating_bcm_y":21.216,"capacity_construction_bcm_y":null,"capacity_proposed_bcm_y":null,"earliest_start_year":2016,"latest_start_year":2017,"url":"https://lngatlas.org/terminal/gorgon-lng-terminal-au/","data_source":"Data: Global Gas Infrastructure Tracker, Global Energy Monitor, September 2025"},{"slug":"gorontalo-fsru-id","name":"Gorontalo FSRU","country":"Indonesia","country_iso":"ID","region":"Asia","state_province":"Sulawesi","city":"Gorontalo","facility_type":"import","floating_type":"fsru","status":"shelved","latitude":0.505792,"longitude":123.060699,"units":1,"capacity_operating_mtpa":null,"capacity_construction_mtpa":null,"capacity_proposed_mtpa":null,"capacity_operating_bcm_y":null,"capacity_construction_bcm_y":null,"capacity_proposed_bcm_y":null,"earliest_start_year":2022,"latest_start_year":2022,"url":"https://lngatlas.org/terminal/gorontalo-fsru-id/","data_source":"Data: Global Gas Infrastructure Tracker, Global Energy Monitor, September 2025"},{"slug":"gorskaya-flng-terminal-ru","name":"Gorskaya FLNG Terminal","country":"Russia","country_iso":"RU","region":"Europe","state_province":"Leningrad Oblast","city":"St. Petersburg","facility_type":"export","floating_type":"flng","status":"cancelled","latitude":60.026647,"longitude":29.951994,"units":3,"capacity_operating_mtpa":null,"capacity_construction_mtpa":null,"capacity_proposed_mtpa":null,"capacity_operating_bcm_y":null,"capacity_construction_bcm_y":null,"capacity_proposed_bcm_y":null,"earliest_start_year":null,"latest_start_year":null,"url":"https://lngatlas.org/terminal/gorskaya-flng-terminal-ru/","data_source":"Data: Global Gas Infrastructure Tracker, Global Energy Monitor, September 2025"},{"slug":"gothenburg-lng-terminal-se","name":"Gothenburg LNG Terminal","country":"Sweden","country_iso":"SE","region":"Europe","state_province":null,"city":"Gothenburg","facility_type":"import","floating_type":"unknown","status":"cancelled","latitude":57.70177,"longitude":11.947963,"units":1,"capacity_operating_mtpa":null,"capacity_construction_mtpa":null,"capacity_proposed_mtpa":null,"capacity_operating_bcm_y":null,"capacity_construction_bcm_y":null,"capacity_proposed_bcm_y":null,"earliest_start_year":null,"latest_start_year":null,"url":"https://lngatlas.org/terminal/gothenburg-lng-terminal-se/","data_source":"Data: Global Gas Infrastructure Tracker, Global Energy Monitor, September 2025"},{"slug":"grain-lng-terminal-gb","name":"Grain LNG Terminal","country":"United Kingdom","country_iso":"GB","region":"Europe","state_province":"Kent","city":"Isle of Grain","facility_type":"import","floating_type":"unknown","status":"operating","latitude":51.45107,"longitude":0.67987,"units":2,"capacity_operating_mtpa":14.3,"capacity_construction_mtpa":8.7,"capacity_proposed_mtpa":null,"capacity_operating_bcm_y":19.448,"capacity_construction_bcm_y":11.832,"capacity_proposed_bcm_y":null,"earliest_start_year":2005,"latest_start_year":2005,"url":"https://lngatlas.org/terminal/grain-lng-terminal-gb/","data_source":"Data: Global Gas Infrastructure Tracker, Global Energy Monitor, September 2025"},{"slug":"gran-canaria-lng-terminal-es","name":"Gran Canaria LNG Terminal","country":"Spain","country_iso":"ES","region":"Europe","state_province":"Las Palmas","city":"Puerto de Arinaga, Canary Islands","facility_type":"import","floating_type":"unknown","status":"cancelled","latitude":27.851956,"longitude":-15.401621,"units":1,"capacity_operating_mtpa":null,"capacity_construction_mtpa":null,"capacity_proposed_mtpa":null,"capacity_operating_bcm_y":null,"capacity_construction_bcm_y":null,"capacity_proposed_bcm_y":null,"earliest_start_year":null,"latest_start_year":null,"url":"https://lngatlas.org/terminal/gran-canaria-lng-terminal-es/","data_source":"Data: Global Gas Infrastructure Tracker, Global Energy Monitor, September 2025"},{"slug":"grand-isle-deepwater-port-terminal-us","name":"Grand Isle Deepwater Port Terminal","country":"United States","country_iso":"US","region":"Americas","state_province":"Louisiana","city":"Offshore Grand Isle","facility_type":"export","floating_type":"floating","status":"shelved","latitude":29.039441,"longitude":-89.9921,"units":2,"capacity_operating_mtpa":null,"capacity_construction_mtpa":null,"capacity_proposed_mtpa":null,"capacity_operating_bcm_y":null,"capacity_construction_bcm_y":null,"capacity_proposed_bcm_y":null,"earliest_start_year":null,"latest_start_year":null,"url":"https://lngatlas.org/terminal/grand-isle-deepwater-port-terminal-us/","data_source":"Data: Global Gas Infrastructure Tracker, Global Energy Monitor, September 2025"},{"slug":"grangemouth-fsru-gb","name":"Grangemouth FSRU","country":"United Kingdom","country_iso":"GB","region":"Europe","state_province":"Scotland","city":"Grangemouth","facility_type":"import","floating_type":"fsru","status":"proposed","latitude":56.029831835896864,"longitude":-3.67678750472179,"units":1,"capacity_operating_mtpa":null,"capacity_construction_mtpa":null,"capacity_proposed_mtpa":5,"capacity_operating_bcm_y":null,"capacity_construction_bcm_y":null,"capacity_proposed_bcm_y":6.8,"earliest_start_year":null,"latest_start_year":null,"url":"https://lngatlas.org/terminal/grangemouth-fsru-gb/","data_source":"Data: Global Gas Infrastructure Tracker, Global Energy Monitor, September 2025"},{"slug":"grassy-point-lng-terminal-ca","name":"Grassy Point LNG Terminal","country":"Canada","country_iso":"CA","region":"Americas","state_province":"British Columbia","city":"Grassy Point","facility_type":"export","floating_type":"unknown","status":"cancelled","latitude":54.312194,"longitude":-130.327083,"units":2,"capacity_operating_mtpa":null,"capacity_construction_mtpa":null,"capacity_proposed_mtpa":null,"capacity_operating_bcm_y":null,"capacity_construction_bcm_y":null,"capacity_proposed_bcm_y":null,"earliest_start_year":null,"latest_start_year":null,"url":"https://lngatlas.org/terminal/grassy-point-lng-terminal-ca/","data_source":"Data: Global Gas Infrastructure Tracker, Global Energy Monitor, September 2025"},{"slug":"greater-tortue-ahmeyim-flng-terminal-mr","name":"Greater Tortue Ahmeyim FLNG Terminal","country":"Mauritania","country_iso":"MR","region":"Africa","state_province":null,"city":null,"facility_type":"export","floating_type":"flng","status":"operating","latitude":16.355626,"longitude":-17.745783,"units":2,"capacity_operating_mtpa":2.4,"capacity_construction_mtpa":null,"capacity_proposed_mtpa":3,"capacity_operating_bcm_y":3.264,"capacity_construction_bcm_y":null,"capacity_proposed_bcm_y":4.08,"earliest_start_year":2025,"latest_start_year":2025,"url":"https://lngatlas.org/terminal/greater-tortue-ahmeyim-flng-terminal-mr/","data_source":"Data: Global Gas Infrastructure Tracker, Global Energy Monitor, September 2025"},{"slug":"gresik-lng-terminal-id","name":"Gresik LNG Terminal","country":"Indonesia","country_iso":"ID","region":"Asia","state_province":"Indonesia","city":"Gresik","facility_type":"import","floating_type":"unknown","status":"proposed","latitude":-7.086928,"longitude":112.602216,"units":1,"capacity_operating_mtpa":null,"capacity_construction_mtpa":null,"capacity_proposed_mtpa":null,"capacity_operating_bcm_y":null,"capacity_construction_bcm_y":null,"capacity_proposed_bcm_y":null,"earliest_start_year":null,"latest_start_year":null,"url":"https://lngatlas.org/terminal/gresik-lng-terminal-id/","data_source":"Data: Global Gas Infrastructure Tracker, Global Energy Monitor, September 2025"},{"slug":"guanabara-bay-fsru-br","name":"Guanabara Bay FSRU","country":"Brazil","country_iso":"BR","region":"Americas","state_province":"Rio de Janeiro","city":"Guanabara Bay","facility_type":"import","floating_type":"fsru","status":"operating","latitude":-22.790278,"longitude":-43.155556,"units":1,"capacity_operating_mtpa":10.95,"capacity_construction_mtpa":null,"capacity_proposed_mtpa":null,"capacity_operating_bcm_y":14.892,"capacity_construction_bcm_y":null,"capacity_proposed_bcm_y":null,"earliest_start_year":2009,"latest_start_year":2009,"url":"https://lngatlas.org/terminal/guanabara-bay-fsru-br/","data_source":"Data: Global Gas Infrastructure Tracker, Global Energy Monitor, September 2025"},{"slug":"guangdong-dapeng-lng-terminal-cn","name":"Guangdong Dapeng LNG Terminal","country":"China","country_iso":"CN","region":"Asia","state_province":"Guangdong","city":"Dapeng Bay","facility_type":"import","floating_type":"unknown","status":"operating","latitude":22.5796,"longitude":114.4345,"units":2,"capacity_operating_mtpa":7.7,"capacity_construction_mtpa":null,"capacity_proposed_mtpa":null,"capacity_operating_bcm_y":10.472,"capacity_construction_bcm_y":null,"capacity_proposed_bcm_y":null,"earliest_start_year":2006,"latest_start_year":2006,"url":"https://lngatlas.org/terminal/guangdong-dapeng-lng-terminal-cn/","data_source":"Data: Global Gas Infrastructure Tracker, Global Energy Monitor, September 2025"},{"slug":"guangxi-lng-terminal-cn","name":"Guangxi LNG Terminal","country":"China","country_iso":"CN","region":"Asia","state_province":"Guangxi","city":"Tieshan Port","facility_type":"import","floating_type":"unknown","status":"operating","latitude":21.448966,"longitude":109.531699,"units":3,"capacity_operating_mtpa":6,"capacity_construction_mtpa":6,"capacity_proposed_mtpa":null,"capacity_operating_bcm_y":8.16,"capacity_construction_bcm_y":8.16,"capacity_proposed_bcm_y":null,"earliest_start_year":2016,"latest_start_year":2025,"url":"https://lngatlas.org/terminal/guangxi-lng-terminal-cn/","data_source":"Data: Global Gas Infrastructure Tracker, Global Energy Monitor, September 2025"},{"slug":"guangzhou-nansha-lng-terminal-cn","name":"Guangzhou Nansha LNG Terminal","country":"China","country_iso":"CN","region":"Asia","state_province":"Guangdong","city":"Huangge","facility_type":"import","floating_type":"unknown","status":"operating","latitude":22.8396933,"longitude":113.5601836,"units":2,"capacity_operating_mtpa":1,"capacity_construction_mtpa":null,"capacity_proposed_mtpa":1,"capacity_operating_bcm_y":1.36,"capacity_construction_bcm_y":null,"capacity_proposed_bcm_y":1.36,"earliest_start_year":2023,"latest_start_year":2023,"url":"https://lngatlas.org/terminal/guangzhou-nansha-lng-terminal-cn/","data_source":"Data: Global Gas Infrastructure Tracker, Global Energy Monitor, September 2025"},{"slug":"guinea-lng-terminal-gn","name":"Guinea LNG Terminal","country":"Guinea","country_iso":"GN","region":"Africa","state_province":null,"city":"Kamsar","facility_type":"export","floating_type":"unknown","status":"proposed","latitude":10.6523,"longitude":-14.6149,"units":2,"capacity_operating_mtpa":null,"capacity_construction_mtpa":null,"capacity_proposed_mtpa":null,"capacity_operating_bcm_y":null,"capacity_construction_bcm_y":null,"capacity_proposed_bcm_y":null,"earliest_start_year":null,"latest_start_year":null,"url":"https://lngatlas.org/terminal/guinea-lng-terminal-gn/","data_source":"Data: Global Gas Infrastructure Tracker, Global Energy Monitor, September 2025"},{"slug":"gulf-gateway-deepwater-port-lng-terminal-us","name":"Gulf Gateway Deepwater Port LNG Terminal","country":"United States","country_iso":"US","region":"Americas","state_province":"Louisiana","city":"Gulf of Mexico","facility_type":"import","floating_type":"unknown","status":"retired","latitude":29.85,"longitude":-93.2,"units":1,"capacity_operating_mtpa":null,"capacity_construction_mtpa":null,"capacity_proposed_mtpa":null,"capacity_operating_bcm_y":null,"capacity_construction_bcm_y":null,"capacity_proposed_bcm_y":null,"earliest_start_year":2005,"latest_start_year":2005,"url":"https://lngatlas.org/terminal/gulf-gateway-deepwater-port-lng-terminal-us/","data_source":"Data: Global Gas Infrastructure Tracker, Global Energy Monitor, September 2025"},{"slug":"gulf-lng-terminal-us","name":"Gulf LNG Terminal","country":"United States","country_iso":"US","region":"Americas","state_province":"Mississippi","city":"Pascagoula","facility_type":"export","floating_type":"unknown","status":"operating","latitude":30.322382,"longitude":-88.503663,"units":2,"capacity_operating_mtpa":8.8,"capacity_construction_mtpa":null,"capacity_proposed_mtpa":10.86,"capacity_operating_bcm_y":11.968,"capacity_construction_bcm_y":null,"capacity_proposed_bcm_y":14.77,"earliest_start_year":2011,"latest_start_year":2011,"url":"https://lngatlas.org/terminal/gulf-lng-terminal-us/","data_source":"Data: Global Gas Infrastructure Tracker, Global Energy Monitor, September 2025"},{"slug":"gulf-of-saros-fsru-tr","name":"Gulf of Saros FSRU","country":"Türkiye","country_iso":"TR","region":"Asia","state_province":null,"city":"Gulf of Saros","facility_type":"import","floating_type":"fsru","status":"operating","latitude":40.636702,"longitude":26.657427,"units":1,"capacity_operating_mtpa":5,"capacity_construction_mtpa":null,"capacity_proposed_mtpa":null,"capacity_operating_bcm_y":6.8,"capacity_construction_bcm_y":null,"capacity_proposed_bcm_y":null,"earliest_start_year":2023,"latest_start_year":2023,"url":"https://lngatlas.org/terminal/gulf-of-saros-fsru-tr/","data_source":"Data: Global Gas Infrastructure Tracker, Global Energy Monitor, September 2025"},{"slug":"gulf-of-thailand-fsru-th","name":"Gulf of Thailand FSRU","country":"Thailand","country_iso":"TH","region":"Asia","state_province":null,"city":null,"facility_type":"import","floating_type":"fsru","status":"cancelled","latitude":12.271182,"longitude":100.836715,"units":1,"capacity_operating_mtpa":null,"capacity_construction_mtpa":null,"capacity_proposed_mtpa":null,"capacity_operating_bcm_y":null,"capacity_construction_bcm_y":null,"capacity_proposed_bcm_y":null,"earliest_start_year":null,"latest_start_year":null,"url":"https://lngatlas.org/terminal/gulf-of-thailand-fsru-th/","data_source":"Data: Global Gas Infrastructure Tracker, Global Energy Monitor, September 2025"},{"slug":"gulfstream-lng-terminal-us","name":"Gulfstream LNG Terminal","country":"United States","country_iso":"US","region":"Americas","state_province":"Louisiana","city":null,"facility_type":"export","floating_type":"unknown","status":"proposed","latitude":29.575938,"longitude":-89.816741,"units":1,"capacity_operating_mtpa":null,"capacity_construction_mtpa":null,"capacity_proposed_mtpa":4,"capacity_operating_bcm_y":null,"capacity_construction_bcm_y":null,"capacity_proposed_bcm_y":5.44,"earliest_start_year":null,"latest_start_year":null,"url":"https://lngatlas.org/terminal/gulfstream-lng-terminal-us/","data_source":"Data: Global Gas Infrastructure Tracker, Global Energy Monitor, September 2025"},{"slug":"guyana-lng-terminal-gy","name":"Guyana LNG Terminal","country":"Guyana","country_iso":"GY","region":"Americas","state_province":null,"city":null,"facility_type":"export","floating_type":"unknown","status":"proposed","latitude":8.548292,"longitude":-57.274096,"units":1,"capacity_operating_mtpa":null,"capacity_construction_mtpa":null,"capacity_proposed_mtpa":null,"capacity_operating_bcm_y":null,"capacity_construction_bcm_y":null,"capacity_proposed_bcm_y":null,"earliest_start_year":null,"latest_start_year":null,"url":"https://lngatlas.org/terminal/guyana-lng-terminal-gy/","data_source":"Data: Global Gas Infrastructure Tracker, Global Energy Monitor, September 2025"},{"slug":"gwangyang-2-lng-terminal-kr","name":"Gwangyang 2 LNG Terminal","country":"South Korea","country_iso":"KR","region":"Asia","state_province":null,"city":null,"facility_type":"import","floating_type":"unknown","status":"construction","latitude":34.892641,"longitude":127.778499,"units":1,"capacity_operating_mtpa":null,"capacity_construction_mtpa":2.1,"capacity_proposed_mtpa":null,"capacity_operating_bcm_y":null,"capacity_construction_bcm_y":2.856,"capacity_proposed_bcm_y":null,"earliest_start_year":null,"latest_start_year":null,"url":"https://lngatlas.org/terminal/gwangyang-2-lng-terminal-kr/","data_source":"Data: Global Gas Infrastructure Tracker, Global Energy Monitor, September 2025"},{"slug":"gwangyang-lng-terminal-kr","name":"Gwangyang LNG Terminal","country":"South Korea","country_iso":"KR","region":"Asia","state_province":"South Jeolla","city":"Gwangyang","facility_type":"import","floating_type":"unknown","status":"operating","latitude":34.889,"longitude":127.7815,"units":1,"capacity_operating_mtpa":7.1,"capacity_construction_mtpa":null,"capacity_proposed_mtpa":null,"capacity_operating_bcm_y":9.656,"capacity_construction_bcm_y":null,"capacity_proposed_bcm_y":null,"earliest_start_year":2005,"latest_start_year":2005,"url":"https://lngatlas.org/terminal/gwangyang-lng-terminal-kr/","data_source":"Data: Global Gas Infrastructure Tracker, Global Energy Monitor, September 2025"},{"slug":"gavle-lng-terminal-se","name":"Gävle LNG Terminal","country":"Sweden","country_iso":"SE","region":"Europe","state_province":null,"city":"Gävle","facility_type":"import","floating_type":"unknown","status":"cancelled","latitude":60.681256,"longitude":17.182174,"units":1,"capacity_operating_mtpa":null,"capacity_construction_mtpa":null,"capacity_proposed_mtpa":null,"capacity_operating_bcm_y":null,"capacity_construction_bcm_y":null,"capacity_proposed_bcm_y":null,"earliest_start_year":null,"latest_start_year":null,"url":"https://lngatlas.org/terminal/gavle-lng-terminal-se/","data_source":"Data: Global Gas Infrastructure Tracker, Global Energy Monitor, September 2025"},{"slug":"h-energy-kakinada-lng-terminal-in","name":"H-Energy Kakinada LNG Terminal","country":"India","country_iso":"IN","region":"Asia","state_province":"Andhra Pradesh","city":"Kakinada Port","facility_type":"import","floating_type":"floating","status":"shelved","latitude":16.975,"longitude":82.279,"units":1,"capacity_operating_mtpa":null,"capacity_construction_mtpa":null,"capacity_proposed_mtpa":null,"capacity_operating_bcm_y":null,"capacity_construction_bcm_y":null,"capacity_proposed_bcm_y":null,"earliest_start_year":null,"latest_start_year":null,"url":"https://lngatlas.org/terminal/h-energy-kakinada-lng-terminal-in/","data_source":"Data: Global Gas Infrastructure Tracker, Global Energy Monitor, September 2025"},{"slug":"higas-lng-terminal-it","name":"HIGAS LNG Terminal","country":"Italy","country_iso":"IT","region":"Europe","state_province":"Sardinia","city":"Oristano","facility_type":"import","floating_type":"unknown","status":"operating","latitude":39.863873,"longitude":8.554238,"units":1,"capacity_operating_mtpa":0.2,"capacity_construction_mtpa":null,"capacity_proposed_mtpa":null,"capacity_operating_bcm_y":0.272,"capacity_construction_bcm_y":null,"capacity_proposed_bcm_y":null,"earliest_start_year":2021,"latest_start_year":2021,"url":"https://lngatlas.org/terminal/higas-lng-terminal-it/","data_source":"Data: Global Gas Infrastructure Tracker, Global Energy Monitor, September 2025"},{"slug":"hachinohe-lng-terminal-jp","name":"Hachinohe LNG Terminal","country":"Japan","country_iso":"JP","region":"Asia","state_province":"Tohoku","city":"Port of Hachinohe","facility_type":"import","floating_type":"unknown","status":"operating","latitude":40.5432392,"longitude":141.5245369,"units":1,"capacity_operating_mtpa":1.5,"capacity_construction_mtpa":null,"capacity_proposed_mtpa":null,"capacity_operating_bcm_y":2.04,"capacity_construction_bcm_y":null,"capacity_proposed_bcm_y":null,"earliest_start_year":2015,"latest_start_year":2015,"url":"https://lngatlas.org/terminal/hachinohe-lng-terminal-jp/","data_source":"Data: Global Gas Infrastructure Tracker, Global Energy Monitor, September 2025"},{"slug":"hadera-fsru-terminal-il","name":"Hadera FSRU Terminal","country":"Israel","country_iso":"IL","region":"Asia","state_province":"Sharon","city":"Hadera","facility_type":"import","floating_type":"fsru","status":"idle","latitude":32.45,"longitude":34.916667,"units":1,"capacity_operating_mtpa":null,"capacity_construction_mtpa":null,"capacity_proposed_mtpa":null,"capacity_operating_bcm_y":null,"capacity_construction_bcm_y":null,"capacity_proposed_bcm_y":null,"earliest_start_year":2013,"latest_start_year":2013,"url":"https://lngatlas.org/terminal/hadera-fsru-terminal-il/","data_source":"Data: Global Gas Infrastructure Tracker, Global Energy Monitor, September 2025"},{"slug":"hai-lang-lng-terminal-vn","name":"Hai Lang LNG Terminal","country":"Vietnam","country_iso":"VN","region":"Asia","state_province":"Quảng Trị","city":null,"facility_type":"import","floating_type":"unknown","status":"proposed","latitude":16.9944,"longitude":107.1154,"units":1,"capacity_operating_mtpa":null,"capacity_construction_mtpa":null,"capacity_proposed_mtpa":1.5,"capacity_operating_bcm_y":null,"capacity_construction_bcm_y":null,"capacity_proposed_bcm_y":2.04,"earliest_start_year":null,"latest_start_year":null,"url":"https://lngatlas.org/terminal/hai-lang-lng-terminal-vn/","data_source":"Data: Global Gas Infrastructure Tracker, Global Energy Monitor, September 2025"},{"slug":"hainan-lng-terminal-cn","name":"Hainan LNG Terminal","country":"China","country_iso":"CN","region":"Asia","state_province":"Hainan","city":"Yangpu Port","facility_type":"import","floating_type":"unknown","status":"operating","latitude":19.722623,"longitude":109.180655,"units":2,"capacity_operating_mtpa":3,"capacity_construction_mtpa":3,"capacity_proposed_mtpa":null,"capacity_operating_bcm_y":4.08,"capacity_construction_bcm_y":4.08,"capacity_proposed_bcm_y":null,"earliest_start_year":2014,"latest_start_year":2014,"url":"https://lngatlas.org/terminal/hainan-lng-terminal-cn/","data_source":"Data: Global Gas Infrastructure Tracker, Global Energy Monitor, September 2025"},{"slug":"hainan-shennan-lng-storage-facility-cn","name":"Hainan Shennan LNG Storage Facility","country":"China","country_iso":"CN","region":"Asia","state_province":"Hainan","city":"Laocheng","facility_type":"import","floating_type":"unknown","status":"operating","latitude":19.977562,"longitude":110.057687,"units":1,"capacity_operating_mtpa":0.27,"capacity_construction_mtpa":null,"capacity_proposed_mtpa":null,"capacity_operating_bcm_y":0.367,"capacity_construction_bcm_y":null,"capacity_proposed_bcm_y":null,"earliest_start_year":2014,"latest_start_year":2014,"url":"https://lngatlas.org/terminal/hainan-shennan-lng-storage-facility-cn/","data_source":"Data: Global Gas Infrastructure Tracker, Global Energy Monitor, September 2025"},{"slug":"haiphong-fsru-vn","name":"Haiphong FSRU","country":"Vietnam","country_iso":"VN","region":"Asia","state_province":null,"city":null,"facility_type":"import","floating_type":"fsru","status":"construction","latitude":20.831692,"longitude":106.684464,"units":1,"capacity_operating_mtpa":null,"capacity_construction_mtpa":null,"capacity_proposed_mtpa":null,"capacity_operating_bcm_y":null,"capacity_construction_bcm_y":null,"capacity_proposed_bcm_y":null,"earliest_start_year":null,"latest_start_year":null,"url":"https://lngatlas.org/terminal/haiphong-fsru-vn/","data_source":"Data: Global Gas Infrastructure Tracker, Global Energy Monitor, September 2025"},{"slug":"hakodate-lng-terminal-jp","name":"Hakodate LNG Terminal","country":"Japan","country_iso":"JP","region":"Asia","state_province":"Hokkaido","city":"Hakodate","facility_type":"import","floating_type":"unknown","status":"operating","latitude":41.8072,"longitude":140.71292,"units":1,"capacity_operating_mtpa":0.2,"capacity_construction_mtpa":null,"capacity_proposed_mtpa":null,"capacity_operating_bcm_y":0.272,"capacity_construction_bcm_y":null,"capacity_proposed_bcm_y":null,"earliest_start_year":2006,"latest_start_year":2006,"url":"https://lngatlas.org/terminal/hakodate-lng-terminal-jp/","data_source":"Data: Global Gas Infrastructure Tracker, Global Energy Monitor, September 2025"},{"slug":"haldia-fsru-in","name":"Haldia FSRU","country":"India","country_iso":"IN","region":"Asia","state_province":null,"city":null,"facility_type":"import","floating_type":"fsru","status":"proposed","latitude":22.037345,"longitude":88.087662,"units":2,"capacity_operating_mtpa":null,"capacity_construction_mtpa":null,"capacity_proposed_mtpa":3,"capacity_operating_bcm_y":null,"capacity_construction_bcm_y":null,"capacity_proposed_bcm_y":4.08,"earliest_start_year":null,"latest_start_year":null,"url":"https://lngatlas.org/terminal/haldia-fsru-in/","data_source":"Data: Global Gas Infrastructure Tracker, Global Energy Monitor, September 2025"},{"slug":"haldia-lng-terminal-in","name":"Haldia LNG Terminal","country":"India","country_iso":"IN","region":"Asia","state_province":"West Bengal","city":"Haldia dock, Kolkata port","facility_type":"import","floating_type":"unknown","status":"cancelled","latitude":22.033333,"longitude":88.1,"units":1,"capacity_operating_mtpa":null,"capacity_construction_mtpa":null,"capacity_proposed_mtpa":null,"capacity_operating_bcm_y":null,"capacity_construction_bcm_y":null,"capacity_proposed_bcm_y":null,"earliest_start_year":null,"latest_start_year":null,"url":"https://lngatlas.org/terminal/haldia-lng-terminal-in/","data_source":"Data: Global Gas Infrastructure Tracker, Global Energy Monitor, September 2025"},{"slug":"hambantota-lng-terminal-lk","name":"Hambantota LNG Terminal","country":"Sri Lanka","country_iso":"LK","region":"Asia","state_province":null,"city":"Port of Hambantota","facility_type":"import","floating_type":"unknown","status":"cancelled","latitude":6.117128,"longitude":81.10897,"units":1,"capacity_operating_mtpa":null,"capacity_construction_mtpa":null,"capacity_proposed_mtpa":null,"capacity_operating_bcm_y":null,"capacity_construction_bcm_y":null,"capacity_proposed_bcm_y":null,"earliest_start_year":null,"latest_start_year":null,"url":"https://lngatlas.org/terminal/hambantota-lng-terminal-lk/","data_source":"Data: Global Gas Infrastructure Tracker, Global Energy Monitor, September 2025"},{"slug":"hamina-lng-terminal-fi","name":"Hamina LNG Terminal","country":"Finland","country_iso":"FI","region":"Europe","state_province":"Kymenlaakso","city":"Port of Hamina","facility_type":"import","floating_type":"unknown","status":"operating","latitude":60.5183139,"longitude":27.1608198,"units":1,"capacity_operating_mtpa":0.17,"capacity_construction_mtpa":null,"capacity_proposed_mtpa":null,"capacity_operating_bcm_y":0.231,"capacity_construction_bcm_y":null,"capacity_proposed_bcm_y":null,"earliest_start_year":2022,"latest_start_year":2022,"url":"https://lngatlas.org/terminal/hamina-lng-terminal-fi/","data_source":"Data: Global Gas Infrastructure Tracker, Global Energy Monitor, September 2025"},{"slug":"hammerfest-lng-snohvit-terminal-no","name":"Hammerfest LNG Snohvit Terminal","country":"Norway","country_iso":"NO","region":"Europe","state_province":"Finnmark","city":"Melkoa Island","facility_type":"export","floating_type":"unknown","status":"operating","latitude":70.6854,"longitude":23.59,"units":1,"capacity_operating_mtpa":4.2,"capacity_construction_mtpa":null,"capacity_proposed_mtpa":null,"capacity_operating_bcm_y":5.712,"capacity_construction_bcm_y":null,"capacity_proposed_bcm_y":null,"earliest_start_year":2007,"latest_start_year":2007,"url":"https://lngatlas.org/terminal/hammerfest-lng-snohvit-terminal-no/","data_source":"Data: Global Gas Infrastructure Tracker, Global Energy Monitor, September 2025"},{"slug":"hatsukaichi-lng-terminal-jp","name":"Hatsukaichi LNG Terminal","country":"Japan","country_iso":"JP","region":"Asia","state_province":"Chugoku","city":"Hiroshima","facility_type":"import","floating_type":"unknown","status":"operating","latitude":34.3405327,"longitude":132.339621,"units":1,"capacity_operating_mtpa":0.9,"capacity_construction_mtpa":null,"capacity_proposed_mtpa":null,"capacity_operating_bcm_y":1.224,"capacity_construction_bcm_y":null,"capacity_proposed_bcm_y":null,"earliest_start_year":1996,"latest_start_year":1996,"url":"https://lngatlas.org/terminal/hatsukaichi-lng-terminal-jp/","data_source":"Data: Global Gas Infrastructure Tracker, Global Energy Monitor, September 2025"},{"slug":"hazira-fsru-in","name":"Hazira FSRU","country":"India","country_iso":"IN","region":"Asia","state_province":"Gujarat","city":"Hazira Port","facility_type":"import","floating_type":"fsru","status":"cancelled","latitude":21.098,"longitude":72.624,"units":1,"capacity_operating_mtpa":null,"capacity_construction_mtpa":null,"capacity_proposed_mtpa":null,"capacity_operating_bcm_y":null,"capacity_construction_bcm_y":null,"capacity_proposed_bcm_y":null,"earliest_start_year":null,"latest_start_year":null,"url":"https://lngatlas.org/terminal/hazira-fsru-in/","data_source":"Data: Global Gas Infrastructure Tracker, Global Energy Monitor, September 2025"},{"slug":"hazira-lng-terminal-in","name":"Hazira LNG Terminal","country":"India","country_iso":"IN","region":"Asia","state_province":"Gujarat","city":"Hazira Port","facility_type":"import","floating_type":"unknown","status":"operating","latitude":21.098,"longitude":72.624,"units":3,"capacity_operating_mtpa":5.2,"capacity_construction_mtpa":null,"capacity_proposed_mtpa":19.92,"capacity_operating_bcm_y":7.072,"capacity_construction_bcm_y":null,"capacity_proposed_bcm_y":27.091,"earliest_start_year":2005,"latest_start_year":2005,"url":"https://lngatlas.org/terminal/hazira-lng-terminal-in/","data_source":"Data: Global Gas Infrastructure Tracker, Global Energy Monitor, September 2025"},{"slug":"hibiki-lng-terminal-jp","name":"Hibiki LNG Terminal","country":"Japan","country_iso":"JP","region":"Asia","state_province":"Kyushu","city":"Kitakyushu","facility_type":"import","floating_type":"unknown","status":"operating","latitude":33.9305,"longitude":130.778885,"units":2,"capacity_operating_mtpa":2.4,"capacity_construction_mtpa":null,"capacity_proposed_mtpa":null,"capacity_operating_bcm_y":3.264,"capacity_construction_bcm_y":null,"capacity_proposed_bcm_y":null,"earliest_start_year":2014,"latest_start_year":2014,"url":"https://lngatlas.org/terminal/hibiki-lng-terminal-jp/","data_source":"Data: Global Gas Infrastructure Tracker, Global Energy Monitor, September 2025"},{"slug":"hidrovias-do-brasil-fsru-br","name":"Hidrovias do Brasil FSRU","country":"Brazil","country_iso":"BR","region":"Americas","state_province":"Pará","city":"Porto de Vila do Conde","facility_type":"import","floating_type":"fsru","status":"cancelled","latitude":-1.504466,"longitude":-48.736698,"units":1,"capacity_operating_mtpa":null,"capacity_construction_mtpa":null,"capacity_proposed_mtpa":null,"capacity_operating_bcm_y":null,"capacity_construction_bcm_y":null,"capacity_proposed_bcm_y":null,"earliest_start_year":null,"latest_start_year":null,"url":"https://lngatlas.org/terminal/hidrovias-do-brasil-fsru-br/","data_source":"Data: Global Gas Infrastructure Tracker, Global Energy Monitor, September 2025"},{"slug":"higashi-niigata-lng-terminal-jp","name":"Higashi Niigata LNG Terminal","country":"Japan","country_iso":"JP","region":"Asia","state_province":"Chūbu","city":"Higashi","facility_type":"import","floating_type":"unknown","status":"operating","latitude":37.99625,"longitude":139.2373,"units":1,"capacity_operating_mtpa":8.9,"capacity_construction_mtpa":null,"capacity_proposed_mtpa":null,"capacity_operating_bcm_y":12.104,"capacity_construction_bcm_y":null,"capacity_proposed_bcm_y":null,"earliest_start_year":1984,"latest_start_year":1984,"url":"https://lngatlas.org/terminal/higashi-niigata-lng-terminal-jp/","data_source":"Data: Global Gas Infrastructure Tracker, Global Energy Monitor, September 2025"},{"slug":"higashi-ohgishima-lng-terminal-jp","name":"Higashi Ohgishima LNG Terminal","country":"Japan","country_iso":"JP","region":"Asia","state_province":"Kanagawa","city":"Higashi-Ohgishima","facility_type":"import","floating_type":"unknown","status":"operating","latitude":35.4954,"longitude":139.745,"units":2,"capacity_operating_mtpa":13.2,"capacity_construction_mtpa":null,"capacity_proposed_mtpa":null,"capacity_operating_bcm_y":17.952,"capacity_construction_bcm_y":null,"capacity_proposed_bcm_y":null,"earliest_start_year":1984,"latest_start_year":1984,"url":"https://lngatlas.org/terminal/higashi-ohgishima-lng-terminal-jp/","data_source":"Data: Global Gas Infrastructure Tracker, Global Energy Monitor, September 2025"},{"slug":"himeji-joint-lng-terminal-jp","name":"Himeji Joint LNG Terminal","country":"Japan","country_iso":"JP","region":"Asia","state_province":"Kansai","city":"Himeji","facility_type":"import","floating_type":"unknown","status":"operating","latitude":34.816667,"longitude":134.683333,"units":1,"capacity_operating_mtpa":8.1,"capacity_construction_mtpa":null,"capacity_proposed_mtpa":null,"capacity_operating_bcm_y":11.016,"capacity_construction_bcm_y":null,"capacity_proposed_bcm_y":null,"earliest_start_year":1979,"latest_start_year":1979,"url":"https://lngatlas.org/terminal/himeji-joint-lng-terminal-jp/","data_source":"Data: Global Gas Infrastructure Tracker, Global Energy Monitor, September 2025"},{"slug":"himeji-lng-terminal-jp","name":"Himeji LNG Terminal","country":"Japan","country_iso":"JP","region":"Asia","state_province":"Kansai","city":"Himeji","facility_type":"import","floating_type":"unknown","status":"operating","latitude":34.816667,"longitude":134.683333,"units":1,"capacity_operating_mtpa":5.5,"capacity_construction_mtpa":null,"capacity_proposed_mtpa":null,"capacity_operating_bcm_y":7.48,"capacity_construction_bcm_y":null,"capacity_proposed_bcm_y":null,"earliest_start_year":1979,"latest_start_year":1979,"url":"https://lngatlas.org/terminal/himeji-lng-terminal-jp/","data_source":"Data: Global Gas Infrastructure Tracker, Global Energy Monitor, September 2025"},{"slug":"hitachi-lng-terminal-jp","name":"Hitachi LNG Terminal","country":"Japan","country_iso":"JP","region":"Asia","state_province":"Kanto","city":"Hitachi Port","facility_type":"import","floating_type":"unknown","status":"operating","latitude":36.4842787,"longitude":140.618882,"units":2,"capacity_operating_mtpa":6.4,"capacity_construction_mtpa":null,"capacity_proposed_mtpa":null,"capacity_operating_bcm_y":8.704,"capacity_construction_bcm_y":null,"capacity_proposed_bcm_y":null,"earliest_start_year":2016,"latest_start_year":2021,"url":"https://lngatlas.org/terminal/hitachi-lng-terminal-jp/","data_source":"Data: Global Gas Infrastructure Tracker, Global Energy Monitor, September 2025"},{"slug":"hoegh-cyprus-fsru-cy","name":"Hoegh Cyprus FSRU","country":"Cyprus","country_iso":"CY","region":"Asia","state_province":"Larnaca","city":"Vasiliko","facility_type":"import","floating_type":"fsru","status":"cancelled","latitude":34.710168,"longitude":33.323549,"units":1,"capacity_operating_mtpa":null,"capacity_construction_mtpa":null,"capacity_proposed_mtpa":null,"capacity_operating_bcm_y":null,"capacity_construction_bcm_y":null,"capacity_proposed_bcm_y":null,"earliest_start_year":null,"latest_start_year":null,"url":"https://lngatlas.org/terminal/hoegh-cyprus-fsru-cy/","data_source":"Data: Global Gas Infrastructure Tracker, Global Energy Monitor, September 2025"},{"slug":"hong-kong-fsru-hk","name":"Hong Kong FSRU","country":"Hong Kong","country_iso":"HK","region":"Asia","state_province":"Hong Kong","city":"Soko Islands","facility_type":"import","floating_type":"fsru","status":"operating","latitude":22.1542687,"longitude":113.9637415,"units":1,"capacity_operating_mtpa":6.1,"capacity_construction_mtpa":null,"capacity_proposed_mtpa":null,"capacity_operating_bcm_y":8.296,"capacity_construction_bcm_y":null,"capacity_proposed_bcm_y":null,"earliest_start_year":2023,"latest_start_year":2023,"url":"https://lngatlas.org/terminal/hong-kong-fsru-hk/","data_source":"Data: Global Gas Infrastructure Tracker, Global Energy Monitor, September 2025"},{"slug":"hongmei-lng-terminal-cn","name":"Hongmei LNG Terminal","country":"China","country_iso":"CN","region":"Asia","state_province":"Guangdong","city":"Hongmei Town","facility_type":"import","floating_type":"unknown","status":"operating","latitude":22.953596,"longitude":113.556552,"units":1,"capacity_operating_mtpa":1.5,"capacity_construction_mtpa":null,"capacity_proposed_mtpa":null,"capacity_operating_bcm_y":2.04,"capacity_construction_bcm_y":null,"capacity_proposed_bcm_y":null,"earliest_start_year":2012,"latest_start_year":2012,"url":"https://lngatlas.org/terminal/hongmei-lng-terminal-cn/","data_source":"Data: Global Gas Infrastructure Tracker, Global Energy Monitor, September 2025"},{"slug":"hsieh-ho-lng-terminal-tw","name":"Hsieh-Ho LNG Terminal","country":"Taiwan","country_iso":"TW","region":"Asia","state_province":"Keelung","city":"Hsieh-Ho","facility_type":"import","floating_type":"floating","status":"proposed","latitude":25.1606024,"longitude":121.7349555,"units":1,"capacity_operating_mtpa":null,"capacity_construction_mtpa":null,"capacity_proposed_mtpa":1.5,"capacity_operating_bcm_y":null,"capacity_construction_bcm_y":null,"capacity_proposed_bcm_y":2.04,"earliest_start_year":null,"latest_start_year":null,"url":"https://lngatlas.org/terminal/hsieh-ho-lng-terminal-tw/","data_source":"Data: Global Gas Infrastructure Tracker, Global Energy Monitor, September 2025"},{"slug":"huelva-lng-terminal-es","name":"Huelva LNG Terminal","country":"Spain","country_iso":"ES","region":"Europe","state_province":"Andalusia","city":"Huelva","facility_type":"import","floating_type":"unknown","status":"operating","latitude":37.17355,"longitude":-6.911,"units":1,"capacity_operating_mtpa":8.7,"capacity_construction_mtpa":null,"capacity_proposed_mtpa":null,"capacity_operating_bcm_y":11.832,"capacity_construction_bcm_y":null,"capacity_proposed_bcm_y":null,"earliest_start_year":1988,"latest_start_year":1988,"url":"https://lngatlas.org/terminal/huelva-lng-terminal-es/","data_source":"Data: Global Gas Infrastructure Tracker, Global Energy Monitor, September 2025"},{"slug":"huizhou-lng-terminal-cn","name":"Huizhou LNG Terminal","country":"China","country_iso":"CN","region":"Asia","state_province":"Guangdong","city":"Huidong","facility_type":"import","floating_type":"unknown","status":"operating","latitude":22.611927,"longitude":114.742272,"units":2,"capacity_operating_mtpa":4,"capacity_construction_mtpa":null,"capacity_proposed_mtpa":3.75,"capacity_operating_bcm_y":5.44,"capacity_construction_bcm_y":null,"capacity_proposed_bcm_y":5.1,"earliest_start_year":2024,"latest_start_year":2024,"url":"https://lngatlas.org/terminal/huizhou-lng-terminal-cn/","data_source":"Data: Global Gas Infrastructure Tracker, Global Energy Monitor, September 2025"},{"slug":"ichthys-flng-terminal-au","name":"Ichthys FLNG Terminal","country":"Australia","country_iso":"AU","region":"Oceania","state_province":"Western Australia","city":"Browse Basin","facility_type":"export","floating_type":"flng","status":"operating","latitude":-14.0555,"longitude":122.7873,"units":3,"capacity_operating_mtpa":9.3,"capacity_construction_mtpa":null,"capacity_proposed_mtpa":null,"capacity_operating_bcm_y":12.648,"capacity_construction_bcm_y":null,"capacity_proposed_bcm_y":null,"earliest_start_year":2018,"latest_start_year":2018,"url":"https://lngatlas.org/terminal/ichthys-flng-terminal-au/","data_source":"Data: Global Gas Infrastructure Tracker, Global Energy Monitor, September 2025"},{"slug":"ilo-lng-terminal-pe","name":"Ilo LNG Terminal","country":"Peru","country_iso":"PE","region":"Americas","state_province":"Ilo","city":"Ilo","facility_type":"export","floating_type":"unknown","status":"shelved","latitude":-17.647268,"longitude":-71.347902,"units":1,"capacity_operating_mtpa":null,"capacity_construction_mtpa":null,"capacity_proposed_mtpa":null,"capacity_operating_bcm_y":null,"capacity_construction_bcm_y":null,"capacity_proposed_bcm_y":null,"earliest_start_year":null,"latest_start_year":null,"url":"https://lngatlas.org/terminal/ilo-lng-terminal-pe/","data_source":"Data: Global Gas Infrastructure Tracker, Global Energy Monitor, September 2025"},{"slug":"imetame-lng-terminal-br","name":"Imetame LNG Terminal","country":"Brazil","country_iso":"BR","region":"Americas","state_province":"Espírito Santo","city":"Barra do Riacho","facility_type":"import","floating_type":"unknown","status":"cancelled","latitude":-19.857997,"longitude":-40.074054,"units":1,"capacity_operating_mtpa":null,"capacity_construction_mtpa":null,"capacity_proposed_mtpa":null,"capacity_operating_bcm_y":null,"capacity_construction_bcm_y":null,"capacity_proposed_bcm_y":null,"earliest_start_year":null,"latest_start_year":null,"url":"https://lngatlas.org/terminal/imetame-lng-terminal-br/","data_source":"Data: Global Gas Infrastructure Tracker, Global Energy Monitor, September 2025"},{"slug":"incheon-lng-terminal-kr","name":"Incheon LNG Terminal","country":"South Korea","country_iso":"KR","region":"Asia","state_province":"Seoul Capital Area","city":"Incheon","facility_type":"import","floating_type":"unknown","status":"operating","latitude":37.35124,"longitude":126.602,"units":1,"capacity_operating_mtpa":54.5,"capacity_construction_mtpa":null,"capacity_proposed_mtpa":null,"capacity_operating_bcm_y":74.12,"capacity_construction_bcm_y":null,"capacity_proposed_bcm_y":null,"earliest_start_year":1996,"latest_start_year":1996,"url":"https://lngatlas.org/terminal/incheon-lng-terminal-kr/","data_source":"Data: Global Gas Infrastructure Tracker, Global Energy Monitor, September 2025"},{"slug":"ingleside-energy-lng-terminal-us","name":"Ingleside Energy LNG Terminal","country":"United States","country_iso":"US","region":"Americas","state_province":"Texas","city":"Ingleside","facility_type":"export","floating_type":"unknown","status":"cancelled","latitude":27.854184,"longitude":-97.236891,"units":1,"capacity_operating_mtpa":null,"capacity_construction_mtpa":null,"capacity_proposed_mtpa":null,"capacity_operating_bcm_y":null,"capacity_construction_bcm_y":null,"capacity_proposed_bcm_y":null,"earliest_start_year":null,"latest_start_year":null,"url":"https://lngatlas.org/terminal/ingleside-energy-lng-terminal-us/","data_source":"Data: Global Gas Infrastructure Tracker, Global Energy Monitor, September 2025"},{"slug":"inkoo-fsru-fi","name":"Inkoo FSRU","country":"Finland","country_iso":"FI","region":"Europe","state_province":"Southern Finland","city":"Inkoo port","facility_type":"import","floating_type":"fsru","status":"operating","latitude":60.013697,"longitude":23.91506,"units":1,"capacity_operating_mtpa":3.67,"capacity_construction_mtpa":null,"capacity_proposed_mtpa":null,"capacity_operating_bcm_y":4.991,"capacity_construction_bcm_y":null,"capacity_proposed_bcm_y":null,"earliest_start_year":2023,"latest_start_year":2023,"url":"https://lngatlas.org/terminal/inkoo-fsru-fi/","data_source":"Data: Global Gas Infrastructure Tracker, Global Energy Monitor, September 2025"},{"slug":"iran-flng-terminal-ir","name":"Iran FLNG Terminal","country":"Iran","country_iso":"IR","region":"Asia","state_province":null,"city":"Kharg Island","facility_type":"export","floating_type":"flng","status":"cancelled","latitude":29.235481,"longitude":50.31,"units":1,"capacity_operating_mtpa":null,"capacity_construction_mtpa":null,"capacity_proposed_mtpa":null,"capacity_operating_bcm_y":null,"capacity_construction_bcm_y":null,"capacity_proposed_bcm_y":null,"earliest_start_year":null,"latest_start_year":null,"url":"https://lngatlas.org/terminal/iran-flng-terminal-ir/","data_source":"Data: Global Gas Infrastructure Tracker, Global Energy Monitor, September 2025"},{"slug":"iran-nioc-lng-terminal-ir","name":"Iran NIOC LNG Terminal","country":"Iran","country_iso":"IR","region":"Asia","state_province":"Bushehr Province","city":"Tombak Port","facility_type":"export","floating_type":"unknown","status":"construction","latitude":27.476111,"longitude":52.6075,"units":3,"capacity_operating_mtpa":null,"capacity_construction_mtpa":12.3,"capacity_proposed_mtpa":null,"capacity_operating_bcm_y":null,"capacity_construction_bcm_y":16.728,"capacity_proposed_bcm_y":null,"earliest_start_year":null,"latest_start_year":null,"url":"https://lngatlas.org/terminal/iran-nioc-lng-terminal-ir/","data_source":"Data: Global Gas Infrastructure Tracker, Global Energy Monitor, September 2025"},{"slug":"ishikari-lng-terminal-jp","name":"Ishikari LNG Terminal","country":"Japan","country_iso":"JP","region":"Asia","state_province":"Hokkaido","city":"Ishikari Bay New Port, Otaru","facility_type":"import","floating_type":"unknown","status":"operating","latitude":43.20997,"longitude":141.293247,"units":1,"capacity_operating_mtpa":4.6,"capacity_construction_mtpa":null,"capacity_proposed_mtpa":null,"capacity_operating_bcm_y":6.256,"capacity_construction_bcm_y":null,"capacity_proposed_bcm_y":null,"earliest_start_year":2012,"latest_start_year":2012,"url":"https://lngatlas.org/terminal/ishikari-lng-terminal-jp/","data_source":"Data: Global Gas Infrastructure Tracker, Global Energy Monitor, September 2025"},{"slug":"island-power-producers-lng-terminal-bs","name":"Island Power Producers LNG Terminal","country":"Bahamas","country_iso":"BS","region":"Americas","state_province":"New Providence","city":"Nassau","facility_type":"import","floating_type":"unknown","status":"proposed","latitude":25.0791776,"longitude":-77.3365837,"units":1,"capacity_operating_mtpa":null,"capacity_construction_mtpa":null,"capacity_proposed_mtpa":null,"capacity_operating_bcm_y":null,"capacity_construction_bcm_y":null,"capacity_proposed_bcm_y":null,"earliest_start_year":null,"latest_start_year":null,"url":"https://lngatlas.org/terminal/island-power-producers-lng-terminal-bs/","data_source":"Data: Global Gas Infrastructure Tracker, Global Energy Monitor, September 2025"},{"slug":"itacoatiara-fsru-br","name":"Itacoatiara FSRU","country":"Brazil","country_iso":"BR","region":"Americas","state_province":"Amazonas","city":"Itacoatiara","facility_type":"import","floating_type":"fsru","status":"cancelled","latitude":-3.15492,"longitude":-58.433795,"units":1,"capacity_operating_mtpa":null,"capacity_construction_mtpa":null,"capacity_proposed_mtpa":null,"capacity_operating_bcm_y":null,"capacity_construction_bcm_y":null,"capacity_proposed_bcm_y":null,"earliest_start_year":null,"latest_start_year":null,"url":"https://lngatlas.org/terminal/itacoatiara-fsru-br/","data_source":"Data: Global Gas Infrastructure Tracker, Global Energy Monitor, September 2025"},{"slug":"itaqui-fsru-br","name":"Itaqui FSRU","country":"Brazil","country_iso":"BR","region":"Americas","state_province":"Maranhão","city":"Port of Itaqui","facility_type":"import","floating_type":"fsru","status":"shelved","latitude":-2.589554,"longitude":-44.36869,"units":1,"capacity_operating_mtpa":null,"capacity_construction_mtpa":null,"capacity_proposed_mtpa":null,"capacity_operating_bcm_y":null,"capacity_construction_bcm_y":null,"capacity_proposed_bcm_y":null,"earliest_start_year":null,"latest_start_year":null,"url":"https://lngatlas.org/terminal/itaqui-fsru-br/","data_source":"Data: Global Gas Infrastructure Tracker, Global Energy Monitor, September 2025"},{"slug":"ivory-coast-fsru-ci","name":"Ivory Coast FSRU","country":"Côte d'Ivoire","country_iso":"CI","region":"Africa","state_province":null,"city":"Vridi, Por of Abidjan","facility_type":"import","floating_type":"fsru","status":"shelved","latitude":5.272988,"longitude":-4.028744,"units":1,"capacity_operating_mtpa":null,"capacity_construction_mtpa":null,"capacity_proposed_mtpa":null,"capacity_operating_bcm_y":null,"capacity_construction_bcm_y":null,"capacity_proposed_bcm_y":null,"earliest_start_year":null,"latest_start_year":null,"url":"https://lngatlas.org/terminal/ivory-coast-fsru-ci/","data_source":"Data: Global Gas Infrastructure Tracker, Global Energy Monitor, September 2025"},{"slug":"izmir-aliaga-lng-terminal-tr","name":"Izmir Aliaga LNG Terminal","country":"Türkiye","country_iso":"TR","region":"Asia","state_province":"Izmir","city":"Aliaga","facility_type":"import","floating_type":"unknown","status":"operating","latitude":38.8224549,"longitude":26.9141109,"units":1,"capacity_operating_mtpa":10.7,"capacity_construction_mtpa":null,"capacity_proposed_mtpa":null,"capacity_operating_bcm_y":14.552,"capacity_construction_bcm_y":null,"capacity_proposed_bcm_y":null,"earliest_start_year":2006,"latest_start_year":2006,"url":"https://lngatlas.org/terminal/izmir-aliaga-lng-terminal-tr/","data_source":"Data: Global Gas Infrastructure Tracker, Global Energy Monitor, September 2025"},{"slug":"jafrabad-fsru-in","name":"Jafrabad FSRU","country":"India","country_iso":"IN","region":"Asia","state_province":"Gujarat","city":"Jafrabad","facility_type":"import","floating_type":"fsru","status":"construction","latitude":20.8667,"longitude":71.3667,"units":2,"capacity_operating_mtpa":null,"capacity_construction_mtpa":5,"capacity_proposed_mtpa":5,"capacity_operating_bcm_y":null,"capacity_construction_bcm_y":6.8,"capacity_proposed_bcm_y":6.8,"earliest_start_year":null,"latest_start_year":null,"url":"https://lngatlas.org/terminal/jafrabad-fsru-in/","data_source":"Data: Global Gas Infrastructure Tracker, Global Energy Monitor, September 2025"},{"slug":"jaigarh-lng-terminal-in","name":"Jaigarh LNG Terminal","country":"India","country_iso":"IN","region":"Asia","state_province":"Maharashtra","city":"Jaigarh Port","facility_type":"import","floating_type":"floating","status":"construction","latitude":17.3040113,"longitude":73.2061395,"units":2,"capacity_operating_mtpa":null,"capacity_construction_mtpa":6,"capacity_proposed_mtpa":8,"capacity_operating_bcm_y":null,"capacity_construction_bcm_y":8.16,"capacity_proposed_bcm_y":10.88,"earliest_start_year":null,"latest_start_year":null,"url":"https://lngatlas.org/terminal/jaigarh-lng-terminal-in/","data_source":"Data: Global Gas Infrastructure Tracker, Global Energy Monitor, September 2025"},{"slug":"jambeli-fsru-ec","name":"Jambelí FSRU","country":"Ecuador","country_iso":"EC","region":"Americas","state_province":"El Oro Province","city":"Bajo Alto","facility_type":"import","floating_type":"fsru","status":"proposed","latitude":-3.13649,"longitude":-80.132792,"units":1,"capacity_operating_mtpa":null,"capacity_construction_mtpa":null,"capacity_proposed_mtpa":0.38,"capacity_operating_bcm_y":null,"capacity_construction_bcm_y":null,"capacity_proposed_bcm_y":0.517,"earliest_start_year":null,"latest_start_year":null,"url":"https://lngatlas.org/terminal/jambeli-fsru-ec/","data_source":"Data: Global Gas Infrastructure Tracker, Global Energy Monitor, September 2025"},{"slug":"jawa-satu-fsru-id","name":"Jawa Satu FSRU","country":"Indonesia","country_iso":"ID","region":"Asia","state_province":"West Java","city":"Cilamaya","facility_type":"import","floating_type":"fsru","status":"operating","latitude":-6.163656,"longitude":107.740021,"units":1,"capacity_operating_mtpa":2.4,"capacity_construction_mtpa":null,"capacity_proposed_mtpa":null,"capacity_operating_bcm_y":3.264,"capacity_construction_bcm_y":null,"capacity_proposed_bcm_y":null,"earliest_start_year":2021,"latest_start_year":2021,"url":"https://lngatlas.org/terminal/jawa-satu-fsru-id/","data_source":"Data: Global Gas Infrastructure Tracker, Global Energy Monitor, September 2025"},{"slug":"jebel-ali-flng-terminal-ae","name":"Jebel Ali FLNG Terminal","country":"United Arab Emirates","country_iso":"AE","region":"Asia","state_province":"Dubai","city":"Jebel Ali port","facility_type":"import","floating_type":"flng","status":"operating","latitude":25.03103,"longitude":55.0667,"units":1,"capacity_operating_mtpa":6,"capacity_construction_mtpa":null,"capacity_proposed_mtpa":null,"capacity_operating_bcm_y":8.16,"capacity_construction_bcm_y":null,"capacity_proposed_bcm_y":null,"earliest_start_year":2010,"latest_start_year":2010,"url":"https://lngatlas.org/terminal/jebel-ali-flng-terminal-ae/","data_source":"Data: Global Gas Infrastructure Tracker, Global Energy Monitor, September 2025"},{"slug":"jeju-aewol-lng-terminal-kr","name":"Jeju Aewol LNG Terminal","country":"South Korea","country_iso":"KR","region":"Asia","state_province":"Jeju Island","city":"Jeju-si","facility_type":"import","floating_type":"unknown","status":"operating","latitude":33.470118,"longitude":126.3233004,"units":1,"capacity_operating_mtpa":1.1,"capacity_construction_mtpa":null,"capacity_proposed_mtpa":null,"capacity_operating_bcm_y":1.496,"capacity_construction_bcm_y":null,"capacity_proposed_bcm_y":null,"earliest_start_year":2019,"latest_start_year":2019,"url":"https://lngatlas.org/terminal/jeju-aewol-lng-terminal-kr/","data_source":"Data: Global Gas Infrastructure Tracker, Global Energy Monitor, September 2025"},{"slug":"jiangmen-guanghai-bay-lng-terminal-cn","name":"Jiangmen LNG Terminal","country":"China","country_iso":"CN","region":"Asia","state_province":"Guangdong","city":"Guanghai Bay","facility_type":"import","floating_type":"unknown","status":"shelved","latitude":21.876111,"longitude":112.88815,"units":2,"capacity_operating_mtpa":null,"capacity_construction_mtpa":null,"capacity_proposed_mtpa":null,"capacity_operating_bcm_y":null,"capacity_construction_bcm_y":null,"capacity_proposed_bcm_y":null,"earliest_start_year":null,"latest_start_year":null,"url":"https://lngatlas.org/terminal/jiangmen-guanghai-bay-lng-terminal-cn/","data_source":"Data: Global Gas Infrastructure Tracker, Global Energy Monitor, September 2025"},{"slug":"jiangyin-lng-terminal-garson-gas-cn","name":"Jiangyin LNG Terminal (Garson Gas)","country":"China","country_iso":"CN","region":"Asia","state_province":"Jiangsu","city":null,"facility_type":"import","floating_type":"unknown","status":"construction","latitude":31.949128,"longitude":120.007213,"units":1,"capacity_operating_mtpa":null,"capacity_construction_mtpa":1,"capacity_proposed_mtpa":null,"capacity_operating_bcm_y":null,"capacity_construction_bcm_y":1.36,"capacity_proposed_bcm_y":null,"earliest_start_year":null,"latest_start_year":null,"url":"https://lngatlas.org/terminal/jiangyin-lng-terminal-garson-gas-cn/","data_source":"Data: Global Gas Infrastructure Tracker, Global Energy Monitor, September 2025"},{"slug":"jiangyin-lng-terminal-hanas-cn","name":"Jiangyin LNG Terminal (Hanas)","country":"China","country_iso":"CN","region":"Asia","state_province":"Jiangsu","city":null,"facility_type":"import","floating_type":"unknown","status":"cancelled","latitude":31.932055,"longitude":120.108718,"units":1,"capacity_operating_mtpa":null,"capacity_construction_mtpa":null,"capacity_proposed_mtpa":null,"capacity_operating_bcm_y":null,"capacity_construction_bcm_y":null,"capacity_proposed_bcm_y":null,"earliest_start_year":null,"latest_start_year":null,"url":"https://lngatlas.org/terminal/jiangyin-lng-terminal-hanas-cn/","data_source":"Data: Global Gas Infrastructure Tracker, Global Energy Monitor, September 2025"},{"slug":"jiangyin-lng-terminal-zhongtian-energy-cn","name":"Jiangyin LNG Terminal (Zhongtian Energy)","country":"China","country_iso":"CN","region":"Asia","state_province":"Jiangsu","city":null,"facility_type":"import","floating_type":"unknown","status":"shelved","latitude":31.9265543,"longitude":120.1294682,"units":1,"capacity_operating_mtpa":null,"capacity_construction_mtpa":null,"capacity_proposed_mtpa":null,"capacity_operating_bcm_y":null,"capacity_construction_bcm_y":null,"capacity_proposed_bcm_y":null,"earliest_start_year":null,"latest_start_year":null,"url":"https://lngatlas.org/terminal/jiangyin-lng-terminal-zhongtian-energy-cn/","data_source":"Data: Global Gas Infrastructure Tracker, Global Energy Monitor, September 2025"},{"slug":"jieyang-lng-terminal-petrochina-cn","name":"Jieyang LNG Terminal (PetroChina)","country":"China","country_iso":"CN","region":"Asia","state_province":"Guangdong","city":null,"facility_type":"import","floating_type":"unknown","status":"shelved","latitude":22.9362588,"longitude":116.2506755,"units":1,"capacity_operating_mtpa":null,"capacity_construction_mtpa":null,"capacity_proposed_mtpa":null,"capacity_operating_bcm_y":null,"capacity_construction_bcm_y":null,"capacity_proposed_bcm_y":null,"earliest_start_year":null,"latest_start_year":null,"url":"https://lngatlas.org/terminal/jieyang-lng-terminal-petrochina-cn/","data_source":"Data: Global Gas Infrastructure Tracker, Global Energy Monitor, September 2025"},{"slug":"jieyang-lng-terminal-pipechina-cn","name":"Jieyang LNG Terminal (PipeChina)","country":"China","country_iso":"CN","region":"Asia","state_province":"Guangdong","city":null,"facility_type":"import","floating_type":"unknown","status":"operating","latitude":22.934479,"longitude":116.371427,"units":2,"capacity_operating_mtpa":5.04,"capacity_construction_mtpa":null,"capacity_proposed_mtpa":5,"capacity_operating_bcm_y":6.854,"capacity_construction_bcm_y":null,"capacity_proposed_bcm_y":6.8,"earliest_start_year":2017,"latest_start_year":2017,"url":"https://lngatlas.org/terminal/jieyang-lng-terminal-pipechina-cn/","data_source":"Data: Global Gas Infrastructure Tracker, Global Energy Monitor, September 2025"},{"slug":"jinzhou-lng-terminal-cn","name":"Jinzhou FLNG Terminal","country":"China","country_iso":"CN","region":"Asia","state_province":"Liaoning","city":"Jinzhou Port","facility_type":"import","floating_type":"flng","status":"cancelled","latitude":40.79672,"longitude":121.074382,"units":1,"capacity_operating_mtpa":null,"capacity_construction_mtpa":null,"capacity_proposed_mtpa":null,"capacity_operating_bcm_y":null,"capacity_construction_bcm_y":null,"capacity_proposed_bcm_y":null,"earliest_start_year":null,"latest_start_year":null,"url":"https://lngatlas.org/terminal/jinzhou-lng-terminal-cn/","data_source":"Data: Global Gas Infrastructure Tracker, Global Energy Monitor, September 2025"},{"slug":"jiujiang-lng-terminal-cn","name":"Jiujiang LNG Terminal","country":"China","country_iso":"CN","region":"Asia","state_province":"Jiangxi","city":"Shawan","facility_type":"import","floating_type":"unknown","status":"cancelled","latitude":29.7786154,"longitude":116.2638593,"units":1,"capacity_operating_mtpa":null,"capacity_construction_mtpa":null,"capacity_proposed_mtpa":null,"capacity_operating_bcm_y":null,"capacity_construction_bcm_y":null,"capacity_proposed_bcm_y":null,"earliest_start_year":null,"latest_start_year":null,"url":"https://lngatlas.org/terminal/jiujiang-lng-terminal-cn/","data_source":"Data: Global Gas Infrastructure Tracker, Global Energy Monitor, September 2025"},{"slug":"joetsu-lng-terminal-jp","name":"Joetsu LNG Terminal","country":"Japan","country_iso":"JP","region":"Asia","state_province":"Chūbu","city":"Naoetsu in Joetsu city, Niigata Prefecture","facility_type":"import","floating_type":"unknown","status":"operating","latitude":37.20902,"longitude":138.276978,"units":1,"capacity_operating_mtpa":3.2,"capacity_construction_mtpa":null,"capacity_proposed_mtpa":null,"capacity_operating_bcm_y":4.352,"capacity_construction_bcm_y":null,"capacity_proposed_bcm_y":null,"earliest_start_year":2012,"latest_start_year":2012,"url":"https://lngatlas.org/terminal/joetsu-lng-terminal-jp/","data_source":"Data: Global Gas Infrastructure Tracker, Global Energy Monitor, September 2025"},{"slug":"jordan-cove-lng-terminal-us","name":"Jordan Cove LNG Terminal","country":"United States","country_iso":"US","region":"Americas","state_province":"Oregon","city":"Coos Bay","facility_type":"export","floating_type":"unknown","status":"cancelled","latitude":43.425,"longitude":-124.269,"units":1,"capacity_operating_mtpa":null,"capacity_construction_mtpa":null,"capacity_proposed_mtpa":null,"capacity_operating_bcm_y":null,"capacity_construction_bcm_y":null,"capacity_proposed_bcm_y":null,"earliest_start_year":null,"latest_start_year":null,"url":"https://lngatlas.org/terminal/jordan-cove-lng-terminal-us/","data_source":"Data: Global Gas Infrastructure Tracker, Global Energy Monitor, September 2025"},{"slug":"jorf-lasfar-lng-terminal-ma","name":"Jorf Lasfar LNG Terminal","country":"Morocco","country_iso":"MA","region":"Africa","state_province":null,"city":"Jorf Lasfar","facility_type":"import","floating_type":"unknown","status":"proposed","latitude":33.1267,"longitude":-8.62028,"units":1,"capacity_operating_mtpa":null,"capacity_construction_mtpa":null,"capacity_proposed_mtpa":5.14,"capacity_operating_bcm_y":null,"capacity_construction_bcm_y":null,"capacity_proposed_bcm_y":6.99,"earliest_start_year":null,"latest_start_year":null,"url":"https://lngatlas.org/terminal/jorf-lasfar-lng-terminal-ma/","data_source":"Data: Global Gas Infrastructure Tracker, Global Energy Monitor, September 2025"},{"slug":"kogas-dangjin-lng-terminal-kr","name":"KOGAS Dangjin LNG Terminal","country":"South Korea","country_iso":"KR","region":"Asia","state_province":"South Chungcheong","city":"Dangjin","facility_type":"import","floating_type":"unknown","status":"construction","latitude":37.000213,"longitude":126.3788396,"units":2,"capacity_operating_mtpa":null,"capacity_construction_mtpa":6,"capacity_proposed_mtpa":7.7,"capacity_operating_bcm_y":null,"capacity_construction_bcm_y":8.16,"capacity_proposed_bcm_y":10.472,"earliest_start_year":null,"latest_start_year":null,"url":"https://lngatlas.org/terminal/kogas-dangjin-lng-terminal-kr/","data_source":"Data: Global Gas Infrastructure Tracker, Global Energy Monitor, September 2025"},{"slug":"kagoshima-lng-terminal-jp","name":"Kagoshima LNG Terminal","country":"Japan","country_iso":"JP","region":"Asia","state_province":"Kyushu","city":"Kagoshima","facility_type":"import","floating_type":"unknown","status":"operating","latitude":31.485155,"longitude":130.529533,"units":1,"capacity_operating_mtpa":0.2,"capacity_construction_mtpa":null,"capacity_proposed_mtpa":null,"capacity_operating_bcm_y":0.272,"capacity_construction_bcm_y":null,"capacity_proposed_bcm_y":null,"earliest_start_year":1996,"latest_start_year":1996,"url":"https://lngatlas.org/terminal/kagoshima-lng-terminal-jp/","data_source":"Data: Global Gas Infrastructure Tracker, Global Energy Monitor, September 2025"},{"slug":"kanbauk-fsru-mm","name":"Kanbauk FSRU","country":"Myanmar","country_iso":"MM","region":"Asia","state_province":null,"city":"Kanbauk","facility_type":"import","floating_type":"fsru","status":"cancelled","latitude":14.56925,"longitude":97.82761,"units":1,"capacity_operating_mtpa":null,"capacity_construction_mtpa":null,"capacity_proposed_mtpa":null,"capacity_operating_bcm_y":null,"capacity_construction_bcm_y":null,"capacity_proposed_bcm_y":null,"earliest_start_year":null,"latest_start_year":null,"url":"https://lngatlas.org/terminal/kanbauk-fsru-mm/","data_source":"Data: Global Gas Infrastructure Tracker, Global Energy Monitor, September 2025"},{"slug":"kangan-lng-terminal-ir","name":"Kangan LNG Terminal","country":"Iran","country_iso":"IR","region":"Asia","state_province":"Bushehr Province","city":"Tombak Port","facility_type":"export","floating_type":"unknown","status":"cancelled","latitude":27.476111,"longitude":52.6075,"units":1,"capacity_operating_mtpa":null,"capacity_construction_mtpa":null,"capacity_proposed_mtpa":null,"capacity_operating_bcm_y":null,"capacity_construction_bcm_y":null,"capacity_proposed_bcm_y":null,"earliest_start_year":null,"latest_start_year":null,"url":"https://lngatlas.org/terminal/kangan-lng-terminal-ir/","data_source":"Data: Global Gas Infrastructure Tracker, Global Energy Monitor, September 2025"},{"slug":"kara-lng-terminal-ru","name":"Kara LNG Terminal","country":"Russia","country_iso":"RU","region":"Europe","state_province":null,"city":"Novaya Zemlya","facility_type":"export","floating_type":"unknown","status":"proposed","latitude":70.7893987,"longitude":55.183809,"units":1,"capacity_operating_mtpa":null,"capacity_construction_mtpa":null,"capacity_proposed_mtpa":22.5,"capacity_operating_bcm_y":null,"capacity_construction_bcm_y":null,"capacity_proposed_bcm_y":30.6,"earliest_start_year":null,"latest_start_year":null,"url":"https://lngatlas.org/terminal/kara-lng-terminal-ru/","data_source":"Data: Global Gas Infrastructure Tracker, Global Energy Monitor, September 2025"},{"slug":"karaikal-fsru-in","name":"Karaikal FSRU","country":"India","country_iso":"IN","region":"Asia","state_province":"Puducherry","city":"Karaikal Port","facility_type":"import","floating_type":"fsru","status":"proposed","latitude":10.911092,"longitude":79.8438253,"units":2,"capacity_operating_mtpa":null,"capacity_construction_mtpa":null,"capacity_proposed_mtpa":3,"capacity_operating_bcm_y":null,"capacity_construction_bcm_y":null,"capacity_proposed_bcm_y":4.08,"earliest_start_year":null,"latest_start_year":null,"url":"https://lngatlas.org/terminal/karaikal-fsru-in/","data_source":"Data: Global Gas Infrastructure Tracker, Global Energy Monitor, September 2025"},{"slug":"karimun-island-lng-terminal-id","name":"Karimun Island LNG Terminal","country":"Indonesia","country_iso":"ID","region":"Asia","state_province":"Pulau Asam","city":null,"facility_type":"import","floating_type":"unknown","status":"cancelled","latitude":0.988745,"longitude":103.433783,"units":1,"capacity_operating_mtpa":null,"capacity_construction_mtpa":null,"capacity_proposed_mtpa":null,"capacity_operating_bcm_y":null,"capacity_construction_bcm_y":null,"capacity_proposed_bcm_y":null,"earliest_start_year":null,"latest_start_year":null,"url":"https://lngatlas.org/terminal/karimun-island-lng-terminal-id/","data_source":"Data: Global Gas Infrastructure Tracker, Global Energy Monitor, September 2025"},{"slug":"karmol-dakar-fsru-sn","name":"Karmol Dakar FSRU","country":"Senegal","country_iso":"SN","region":"Africa","state_province":null,"city":"Dakar","facility_type":"import","floating_type":"fsru","status":"construction","latitude":14.6893,"longitude":-17.4323,"units":1,"capacity_operating_mtpa":null,"capacity_construction_mtpa":2.5,"capacity_proposed_mtpa":null,"capacity_operating_bcm_y":null,"capacity_construction_bcm_y":3.4,"capacity_proposed_bcm_y":null,"earliest_start_year":null,"latest_start_year":null,"url":"https://lngatlas.org/terminal/karmol-dakar-fsru-sn/","data_source":"Data: Global Gas Infrastructure Tracker, Global Energy Monitor, September 2025"},{"slug":"karwar-fsru-in","name":"Karwar FSRU","country":"India","country_iso":"IN","region":"Asia","state_province":"Karnataka","city":"Karwar","facility_type":"import","floating_type":"fsru","status":"cancelled","latitude":14.82,"longitude":74.135,"units":1,"capacity_operating_mtpa":null,"capacity_construction_mtpa":null,"capacity_proposed_mtpa":null,"capacity_operating_bcm_y":null,"capacity_construction_bcm_y":null,"capacity_proposed_bcm_y":null,"earliest_start_year":null,"latest_start_year":null,"url":"https://lngatlas.org/terminal/karwar-fsru-in/","data_source":"Data: Global Gas Infrastructure Tracker, Global Energy Monitor, September 2025"},{"slug":"kawagoe-lng-terminal-jp","name":"Kawagoe LNG Terminal","country":"Japan","country_iso":"JP","region":"Asia","state_province":"Kansai","city":"Kawagoe","facility_type":"import","floating_type":"unknown","status":"operating","latitude":35.01,"longitude":136.697007,"units":1,"capacity_operating_mtpa":8.7,"capacity_construction_mtpa":null,"capacity_proposed_mtpa":null,"capacity_operating_bcm_y":11.832,"capacity_construction_bcm_y":null,"capacity_proposed_bcm_y":null,"earliest_start_year":1997,"latest_start_year":1997,"url":"https://lngatlas.org/terminal/kawagoe-lng-terminal-jp/","data_source":"Data: Global Gas Infrastructure Tracker, Global Energy Monitor, September 2025"},{"slug":"kemaman-lng-terminal-my","name":"Kemaman LNG Terminal","country":"Malaysia","country_iso":"MY","region":"Asia","state_province":null,"city":null,"facility_type":"import","floating_type":"unknown","status":"proposed","latitude":4.243265,"longitude":103.4585,"units":1,"capacity_operating_mtpa":null,"capacity_construction_mtpa":null,"capacity_proposed_mtpa":null,"capacity_operating_bcm_y":null,"capacity_construction_bcm_y":null,"capacity_proposed_bcm_y":null,"earliest_start_year":null,"latest_start_year":null,"url":"https://lngatlas.org/terminal/kemaman-lng-terminal-my/","data_source":"Data: Global Gas Infrastructure Tracker, Global Energy Monitor, September 2025"},{"slug":"kenai-lng-terminal-us","name":"Kenai LNG Terminal","country":"United States","country_iso":"US","region":"Americas","state_province":"Alaska","city":"Kenai","facility_type":"export","floating_type":"unknown","status":"proposed","latitude":60.679484,"longitude":-151.38834,"units":2,"capacity_operating_mtpa":null,"capacity_construction_mtpa":null,"capacity_proposed_mtpa":0.08,"capacity_operating_bcm_y":null,"capacity_construction_bcm_y":null,"capacity_proposed_bcm_y":0.109,"earliest_start_year":1969,"latest_start_year":1969,"url":"https://lngatlas.org/terminal/kenai-lng-terminal-us/","data_source":"Data: Global Gas Infrastructure Tracker, Global Energy Monitor, September 2025"},{"slug":"kerawalapitiya-lng-terminal-lk","name":"Kerawalapitiya LNG Terminal","country":"Sri Lanka","country_iso":"LK","region":"Asia","state_province":"Western","city":"Kerawalapitiya, Colombo","facility_type":"import","floating_type":"unknown","status":"proposed","latitude":7.016667,"longitude":79.883333,"units":1,"capacity_operating_mtpa":null,"capacity_construction_mtpa":null,"capacity_proposed_mtpa":2.7,"capacity_operating_bcm_y":null,"capacity_construction_bcm_y":null,"capacity_proposed_bcm_y":3.672,"earliest_start_year":null,"latest_start_year":null,"url":"https://lngatlas.org/terminal/kerawalapitiya-lng-terminal-lk/","data_source":"Data: Global Gas Infrastructure Tracker, Global Energy Monitor, September 2025"},{"slug":"keyspan-lng-terminal-us","name":"Keyspan LNG Terminal","country":"United States","country_iso":"US","region":"Americas","state_province":"Rhode Island","city":"Providence","facility_type":"import","floating_type":"unknown","status":"cancelled","latitude":41.817118,"longitude":-71.404309,"units":1,"capacity_operating_mtpa":null,"capacity_construction_mtpa":null,"capacity_proposed_mtpa":null,"capacity_operating_bcm_y":null,"capacity_construction_bcm_y":null,"capacity_proposed_bcm_y":null,"earliest_start_year":null,"latest_start_year":null,"url":"https://lngatlas.org/terminal/keyspan-lng-terminal-us/","data_source":"Data: Global Gas Infrastructure Tracker, Global Energy Monitor, September 2025"},{"slug":"khabarovskiy-lng-terminal-ru","name":"Khabarovskiy LNG Terminal","country":"Russia","country_iso":"RU","region":"Europe","state_province":"Khabarovsk Krai","city":null,"facility_type":"export","floating_type":"unknown","status":"proposed","latitude":49.540836,"longitude":134.177474,"units":1,"capacity_operating_mtpa":null,"capacity_construction_mtpa":null,"capacity_proposed_mtpa":0.08,"capacity_operating_bcm_y":null,"capacity_construction_bcm_y":null,"capacity_proposed_bcm_y":0.109,"earliest_start_year":null,"latest_start_year":null,"url":"https://lngatlas.org/terminal/khabarovskiy-lng-terminal-ru/","data_source":"Data: Global Gas Infrastructure Tracker, Global Energy Monitor, September 2025"},{"slug":"khanh-hoa-lng-terminal-vn","name":"Khanh Hoa LNG Terminal","country":"Vietnam","country_iso":"VN","region":"Asia","state_province":null,"city":"Khanh Hoa","facility_type":"import","floating_type":"unknown","status":"shelved","latitude":12.206079,"longitude":109.215174,"units":1,"capacity_operating_mtpa":null,"capacity_construction_mtpa":null,"capacity_proposed_mtpa":null,"capacity_operating_bcm_y":null,"capacity_construction_bcm_y":null,"capacity_proposed_bcm_y":null,"earliest_start_year":null,"latest_start_year":null,"url":"https://lngatlas.org/terminal/khanh-hoa-lng-terminal-vn/","data_source":"Data: Global Gas Infrastructure Tracker, Global Energy Monitor, September 2025"},{"slug":"khor-al-zubair-fsru-iq","name":"Khor Al-Zubair FSRU","country":"Iraq","country_iso":"IQ","region":"Asia","state_province":null,"city":"Khor Al-Zubair Port","facility_type":"import","floating_type":"fsru","status":"proposed","latitude":30.195356,"longitude":47.883483,"units":1,"capacity_operating_mtpa":null,"capacity_construction_mtpa":null,"capacity_proposed_mtpa":3.83,"capacity_operating_bcm_y":null,"capacity_construction_bcm_y":null,"capacity_proposed_bcm_y":5.209,"earliest_start_year":null,"latest_start_year":null,"url":"https://lngatlas.org/terminal/khor-al-zubair-fsru-iq/","data_source":"Data: Global Gas Infrastructure Tracker, Global Energy Monitor, September 2025"},{"slug":"kitimat-lng-terminal-ca","name":"Kitimat LNG Terminal","country":"Canada","country_iso":"CA","region":"Americas","state_province":null,"city":null,"facility_type":"export","floating_type":"unknown","status":"cancelled","latitude":53.92569797,"longitude":-128.7530518,"units":1,"capacity_operating_mtpa":null,"capacity_construction_mtpa":null,"capacity_proposed_mtpa":null,"capacity_operating_bcm_y":null,"capacity_construction_bcm_y":null,"capacity_proposed_bcm_y":null,"earliest_start_year":null,"latest_start_year":null,"url":"https://lngatlas.org/terminal/kitimat-lng-terminal-ca/","data_source":"Data: Global Gas Infrastructure Tracker, Global Energy Monitor, September 2025"},{"slug":"kitsault-lng-terminal-ca","name":"Kitsault LNG Terminal","country":"Canada","country_iso":"CA","region":"Americas","state_province":"British Columbia","city":"Kitsault","facility_type":"export","floating_type":"unknown","status":"cancelled","latitude":55.466667,"longitude":-129.483333,"units":1,"capacity_operating_mtpa":null,"capacity_construction_mtpa":null,"capacity_proposed_mtpa":null,"capacity_operating_bcm_y":null,"capacity_construction_bcm_y":null,"capacity_proposed_bcm_y":null,"earliest_start_year":null,"latest_start_year":null,"url":"https://lngatlas.org/terminal/kitsault-lng-terminal-ca/","data_source":"Data: Global Gas Infrastructure Tracker, Global Energy Monitor, September 2025"},{"slug":"kiyanly-lng-terminal-tm","name":"Kiyanly LNG Terminal","country":"Turkmenistan","country_iso":"TM","region":"Asia","state_province":null,"city":"Kiyanly","facility_type":"export","floating_type":"unknown","status":"operating","latitude":40.1673615,"longitude":52.7719129,"units":1,"capacity_operating_mtpa":0.2,"capacity_construction_mtpa":null,"capacity_proposed_mtpa":null,"capacity_operating_bcm_y":0.272,"capacity_construction_bcm_y":null,"capacity_proposed_bcm_y":null,"earliest_start_year":2009,"latest_start_year":2009,"url":"https://lngatlas.org/terminal/kiyanly-lng-terminal-tm/","data_source":"Data: Global Gas Infrastructure Tracker, Global Energy Monitor, September 2025"},{"slug":"klaipeda-fsru-lt","name":"Klaipeda FSRU","country":"Lithuania","country_iso":"LT","region":"Europe","state_province":null,"city":"Klaipeda Port","facility_type":"import","floating_type":"fsru","status":"operating","latitude":55.66451,"longitude":21.13762,"units":2,"capacity_operating_mtpa":2.9,"capacity_construction_mtpa":null,"capacity_proposed_mtpa":null,"capacity_operating_bcm_y":3.944,"capacity_construction_bcm_y":null,"capacity_proposed_bcm_y":null,"earliest_start_year":2014,"latest_start_year":2014,"url":"https://lngatlas.org/terminal/klaipeda-fsru-lt/","data_source":"Data: Global Gas Infrastructure Tracker, Global Energy Monitor, September 2025"},{"slug":"klaipeda-small-scale-lng-terminal-lt","name":"Klaipeda Small-Scale LNG Terminal","country":"Lithuania","country_iso":"LT","region":"Europe","state_province":null,"city":null,"facility_type":"unknown","floating_type":"unknown","status":"operating","latitude":55.724078010367755,"longitude":21.101124507524457,"units":1,"capacity_operating_mtpa":null,"capacity_construction_mtpa":null,"capacity_proposed_mtpa":null,"capacity_operating_bcm_y":null,"capacity_construction_bcm_y":null,"capacity_proposed_bcm_y":null,"earliest_start_year":2020,"latest_start_year":2020,"url":"https://lngatlas.org/terminal/klaipeda-small-scale-lng-terminal-lt/","data_source":"Data: Global Gas Infrastructure Tracker, Global Energy Monitor, September 2025"},{"slug":"kochi-lng-terminal-in","name":"Kochi LNG Terminal","country":"India","country_iso":"IN","region":"Asia","state_province":"Kerala","city":"Puthuvype","facility_type":"import","floating_type":"unknown","status":"operating","latitude":9.9787,"longitude":76.2261,"units":1,"capacity_operating_mtpa":5,"capacity_construction_mtpa":null,"capacity_proposed_mtpa":null,"capacity_operating_bcm_y":6.8,"capacity_construction_bcm_y":null,"capacity_proposed_bcm_y":null,"earliest_start_year":2013,"latest_start_year":2013,"url":"https://lngatlas.org/terminal/kochi-lng-terminal-in/","data_source":"Data: Global Gas Infrastructure Tracker, Global Energy Monitor, September 2025"},{"slug":"kollsnes-lng-terminal-no","name":"Kollsnes LNG Terminal","country":"Norway","country_iso":"NO","region":"Europe","state_province":null,"city":"Kollsnesvegen","facility_type":"export","floating_type":"unknown","status":"operating","latitude":60.55,"longitude":4.8333,"units":2,"capacity_operating_mtpa":0.12,"capacity_construction_mtpa":null,"capacity_proposed_mtpa":null,"capacity_operating_bcm_y":0.163,"capacity_construction_bcm_y":null,"capacity_proposed_bcm_y":null,"earliest_start_year":2003,"latest_start_year":2007,"url":"https://lngatlas.org/terminal/kollsnes-lng-terminal-no/","data_source":"Data: Global Gas Infrastructure Tracker, Global Energy Monitor, September 2025"},{"slug":"krishna-godavari-fsru-in","name":"Krishna Godavari FSRU","country":"India","country_iso":"IN","region":"Asia","state_province":"Andhra Pradesh","city":"Kakinada deepwater port","facility_type":"import","floating_type":"fsru","status":"cancelled","latitude":16.975,"longitude":82.279,"units":1,"capacity_operating_mtpa":null,"capacity_construction_mtpa":null,"capacity_proposed_mtpa":null,"capacity_operating_bcm_y":null,"capacity_construction_bcm_y":null,"capacity_proposed_bcm_y":null,"earliest_start_year":null,"latest_start_year":null,"url":"https://lngatlas.org/terminal/krishna-godavari-fsru-in/","data_source":"Data: Global Gas Infrastructure Tracker, Global Energy Monitor, September 2025"},{"slug":"krishnapatnam-fsru-in","name":"Krishnapatnam FSRU","country":"India","country_iso":"IN","region":"Asia","state_province":null,"city":"Krishnapatnam Port","facility_type":"import","floating_type":"fsru","status":"cancelled","latitude":14.253863,"longitude":80.115081,"units":1,"capacity_operating_mtpa":null,"capacity_construction_mtpa":null,"capacity_proposed_mtpa":null,"capacity_operating_bcm_y":null,"capacity_construction_bcm_y":null,"capacity_proposed_bcm_y":null,"earliest_start_year":null,"latest_start_year":null,"url":"https://lngatlas.org/terminal/krishnapatnam-fsru-in/","data_source":"Data: Global Gas Infrastructure Tracker, Global Energy Monitor, September 2025"},{"slug":"krk-fsru-hr","name":"Krk FSRU","country":"Croatia","country_iso":"HR","region":"Europe","state_province":"Primorje-Gorski Kotar","city":"Omišalj, Krk Island","facility_type":"import","floating_type":"fsru","status":"operating","latitude":45.2005056,"longitude":14.5338466,"units":4,"capacity_operating_mtpa":2.13,"capacity_construction_mtpa":2.35,"capacity_proposed_mtpa":3.01,"capacity_operating_bcm_y":2.897,"capacity_construction_bcm_y":3.196,"capacity_proposed_bcm_y":4.094,"earliest_start_year":2021,"latest_start_year":2022,"url":"https://lngatlas.org/terminal/krk-fsru-hr/","data_source":"Data: Global Gas Infrastructure Tracker, Global Energy Monitor, September 2025"},{"slug":"ksi-lisims-flng-terminal-ca","name":"Ksi Lisims FLNG Terminal","country":"Canada","country_iso":"CA","region":"Americas","state_province":"British Columbia","city":"Gingolx","facility_type":"export","floating_type":"flng","status":"proposed","latitude":54.991963,"longitude":-130.0306788,"units":1,"capacity_operating_mtpa":null,"capacity_construction_mtpa":null,"capacity_proposed_mtpa":12,"capacity_operating_bcm_y":null,"capacity_construction_bcm_y":null,"capacity_proposed_bcm_y":16.32,"earliest_start_year":null,"latest_start_year":null,"url":"https://lngatlas.org/terminal/ksi-lisims-flng-terminal-ca/","data_source":"Data: Global Gas Infrastructure Tracker, Global Energy Monitor, September 2025"},{"slug":"kukrahati-lng-terminal-in","name":"Kukrahati LNG Terminal","country":"India","country_iso":"IN","region":"Asia","state_province":"West Bengal","city":"Kukrahati","facility_type":"import","floating_type":"unknown","status":"cancelled","latitude":21.918011,"longitude":88.002516,"units":1,"capacity_operating_mtpa":null,"capacity_construction_mtpa":null,"capacity_proposed_mtpa":null,"capacity_operating_bcm_y":null,"capacity_construction_bcm_y":null,"capacity_proposed_bcm_y":null,"earliest_start_year":null,"latest_start_year":null,"url":"https://lngatlas.org/terminal/kukrahati-lng-terminal-in/","data_source":"Data: Global Gas Infrastructure Tracker, Global Energy Monitor, September 2025"},{"slug":"kulevi-lng-terminal-ge","name":"Kulevi LNG Terminal","country":"Georgia","country_iso":"GE","region":"Asia","state_province":null,"city":null,"facility_type":"import","floating_type":"unknown","status":"cancelled","latitude":42.272729,"longitude":41.64131,"units":1,"capacity_operating_mtpa":null,"capacity_construction_mtpa":null,"capacity_proposed_mtpa":null,"capacity_operating_bcm_y":null,"capacity_construction_bcm_y":null,"capacity_proposed_bcm_y":null,"earliest_start_year":null,"latest_start_year":null,"url":"https://lngatlas.org/terminal/kulevi-lng-terminal-ge/","data_source":"Data: Global Gas Infrastructure Tracker, Global Energy Monitor, September 2025"},{"slug":"kushiro-lng-terminal-jp","name":"Kushiro LNG Terminal","country":"Japan","country_iso":"JP","region":"Asia","state_province":"Hokkaido","city":"Kushiro City","facility_type":"import","floating_type":"unknown","status":"operating","latitude":42.997851,"longitude":144.345032,"units":1,"capacity_operating_mtpa":0.5,"capacity_construction_mtpa":null,"capacity_proposed_mtpa":null,"capacity_operating_bcm_y":0.68,"capacity_construction_bcm_y":null,"capacity_proposed_bcm_y":null,"earliest_start_year":2015,"latest_start_year":2015,"url":"https://lngatlas.org/terminal/kushiro-lng-terminal-jp/","data_source":"Data: Global Gas Infrastructure Tracker, Global Energy Monitor, September 2025"},{"slug":"kutubdia-reliance-fsru-bd","name":"Kutubdia (Reliance) FSRU","country":"Bangladesh","country_iso":"BD","region":"Asia","state_province":"Chittagong","city":"Kutubdia Island","facility_type":"import","floating_type":"fsru","status":"cancelled","latitude":21.816667,"longitude":91.858333,"units":1,"capacity_operating_mtpa":null,"capacity_construction_mtpa":null,"capacity_proposed_mtpa":null,"capacity_operating_bcm_y":null,"capacity_construction_bcm_y":null,"capacity_proposed_bcm_y":null,"earliest_start_year":null,"latest_start_year":null,"url":"https://lngatlas.org/terminal/kutubdia-reliance-fsru-bd/","data_source":"Data: Global Gas Infrastructure Tracker, Global Energy Monitor, September 2025"},{"slug":"kutubdia-lng-terminal-petronet-bd","name":"Kutubdia LNG Terminal (Petronet)","country":"Bangladesh","country_iso":"BD","region":"Asia","state_province":"Chittagong","city":"Kutubdia Island","facility_type":"import","floating_type":"unknown","status":"cancelled","latitude":21.816667,"longitude":91.858333,"units":1,"capacity_operating_mtpa":null,"capacity_construction_mtpa":null,"capacity_proposed_mtpa":null,"capacity_operating_bcm_y":null,"capacity_construction_bcm_y":null,"capacity_proposed_bcm_y":null,"earliest_start_year":null,"latest_start_year":null,"url":"https://lngatlas.org/terminal/kutubdia-lng-terminal-petronet-bd/","data_source":"Data: Global Gas Infrastructure Tracker, Global Energy Monitor, September 2025"},{"slug":"kwispaa-lng-terminal-ca","name":"Kwispaa LNG Terminal","country":"Canada","country_iso":"CA","region":"Americas","state_province":"British Columbia","city":"Port Alberni","facility_type":"export","floating_type":"unknown","status":"cancelled","latitude":49.233889,"longitude":-124.805,"units":1,"capacity_operating_mtpa":null,"capacity_construction_mtpa":null,"capacity_proposed_mtpa":null,"capacity_operating_bcm_y":null,"capacity_construction_bcm_y":null,"capacity_proposed_bcm_y":null,"earliest_start_year":null,"latest_start_year":null,"url":"https://lngatlas.org/terminal/kwispaa-lng-terminal-ca/","data_source":"Data: Global Gas Infrastructure Tracker, Global Energy Monitor, September 2025"},{"slug":"lng-alliance-mangalore-fsru-in","name":"LNG Alliance Mangalore FSRU","country":"India","country_iso":"IN","region":"Asia","state_province":"Kakinada","city":"Mangalore","facility_type":"import","floating_type":"fsru","status":"shelved","latitude":12.926024,"longitude":74.81257,"units":1,"capacity_operating_mtpa":null,"capacity_construction_mtpa":null,"capacity_proposed_mtpa":null,"capacity_operating_bcm_y":null,"capacity_construction_bcm_y":null,"capacity_proposed_bcm_y":null,"earliest_start_year":null,"latest_start_year":null,"url":"https://lngatlas.org/terminal/lng-alliance-mangalore-fsru-in/","data_source":"Data: Global Gas Infrastructure Tracker, Global Energy Monitor, September 2025"},{"slug":"lng-canada-terminal-ca","name":"LNG Canada Terminal","country":"Canada","country_iso":"CA","region":"Americas","state_province":"British Columbia","city":"Kitimat","facility_type":"export","floating_type":"unknown","status":"operating","latitude":53.9245114,"longitude":-128.7515172,"units":2,"capacity_operating_mtpa":14,"capacity_construction_mtpa":null,"capacity_proposed_mtpa":14,"capacity_operating_bcm_y":19.04,"capacity_construction_bcm_y":null,"capacity_proposed_bcm_y":19.04,"earliest_start_year":2025,"latest_start_year":2025,"url":"https://lngatlas.org/terminal/lng-canada-terminal-ca/","data_source":"Data: Global Gas Infrastructure Tracker, Global Energy Monitor, September 2025"},{"slug":"lng-easy-floating-lng-terminal-pk","name":"LNG Easy Floating LNG Terminal","country":"Pakistan","country_iso":"PK","region":"Asia","state_province":null,"city":"Port of Karachi","facility_type":"import","floating_type":"floating","status":"shelved","latitude":24.834334,"longitude":66.977824,"units":1,"capacity_operating_mtpa":null,"capacity_construction_mtpa":null,"capacity_proposed_mtpa":null,"capacity_operating_bcm_y":null,"capacity_construction_bcm_y":null,"capacity_proposed_bcm_y":null,"earliest_start_year":null,"latest_start_year":null,"url":"https://lngatlas.org/terminal/lng-easy-floating-lng-terminal-pk/","data_source":"Data: Global Gas Infrastructure Tracker, Global Energy Monitor, September 2025"},{"slug":"lng-yakutia-terminal-ru","name":"LNG Yakutia Terminal","country":"Russia","country_iso":"RU","region":"Europe","state_province":"Sakha Republic","city":null,"facility_type":"export","floating_type":"unknown","status":"proposed","latitude":61.7813438,"longitude":130.5533017,"units":2,"capacity_operating_mtpa":null,"capacity_construction_mtpa":null,"capacity_proposed_mtpa":0.53,"capacity_operating_bcm_y":null,"capacity_construction_bcm_y":null,"capacity_proposed_bcm_y":0.721,"earliest_start_year":null,"latest_start_year":null,"url":"https://lngatlas.org/terminal/lng-yakutia-terminal-ru/","data_source":"Data: Global Gas Infrastructure Tracker, Global Energy Monitor, September 2025"},{"slug":"lahad-datu-sabah-lng-terminal-my","name":"Lahad Datu Sabah LNG Terminal","country":"Malaysia","country_iso":"MY","region":"Asia","state_province":"Sabah","city":"Lahad Datu","facility_type":"import","floating_type":"unknown","status":"cancelled","latitude":5.03,"longitude":118.34,"units":1,"capacity_operating_mtpa":null,"capacity_construction_mtpa":null,"capacity_proposed_mtpa":null,"capacity_operating_bcm_y":null,"capacity_construction_bcm_y":null,"capacity_proposed_bcm_y":null,"earliest_start_year":null,"latest_start_year":null,"url":"https://lngatlas.org/terminal/lahad-datu-sabah-lng-terminal-my/","data_source":"Data: Global Gas Infrastructure Tracker, Global Energy Monitor, September 2025"},{"slug":"lakach-field-flng-terminal-mx","name":"Lakach Field FLNG Terminal","country":"Mexico","country_iso":"MX","region":"Americas","state_province":"Veracruz","city":"Offshore Veracruz","facility_type":"export","floating_type":"flng","status":"shelved","latitude":19.2933,"longitude":-95.4018,"units":1,"capacity_operating_mtpa":null,"capacity_construction_mtpa":null,"capacity_proposed_mtpa":null,"capacity_operating_bcm_y":null,"capacity_construction_bcm_y":null,"capacity_proposed_bcm_y":null,"earliest_start_year":null,"latest_start_year":null,"url":"https://lngatlas.org/terminal/lakach-field-flng-terminal-mx/","data_source":"Data: Global Gas Infrastructure Tracker, Global Energy Monitor, September 2025"},{"slug":"lake-charles-lng-terminal-us","name":"Lake Charles LNG Terminal","country":"United States","country_iso":"US","region":"Americas","state_province":"Louisiana","city":"Lake Charles","facility_type":"export","floating_type":"unknown","status":"proposed","latitude":30.120416,"longitude":-93.287833,"units":2,"capacity_operating_mtpa":null,"capacity_construction_mtpa":null,"capacity_proposed_mtpa":17.8,"capacity_operating_bcm_y":null,"capacity_construction_bcm_y":null,"capacity_proposed_bcm_y":24.208,"earliest_start_year":1982,"latest_start_year":1982,"url":"https://lngatlas.org/terminal/lake-charles-lng-terminal-us/","data_source":"Data: Global Gas Infrastructure Tracker, Global Energy Monitor, September 2025"},{"slug":"lampung-fsru-id","name":"Lampung FSRU","country":"Indonesia","country_iso":"ID","region":"Asia","state_province":"Lampung","city":"Labuhan Maringgai","facility_type":"import","floating_type":"fsru","status":"operating","latitude":-5.45,"longitude":105.94,"units":1,"capacity_operating_mtpa":2.7,"capacity_construction_mtpa":null,"capacity_proposed_mtpa":null,"capacity_operating_bcm_y":3.672,"capacity_construction_bcm_y":null,"capacity_proposed_bcm_y":null,"earliest_start_year":2014,"latest_start_year":2014,"url":"https://lngatlas.org/terminal/lampung-fsru-id/","data_source":"Data: Global Gas Infrastructure Tracker, Global Energy Monitor, September 2025"},{"slug":"lazaro-cardenas-lng-terminal-mx","name":"Lazaro Cardenas LNG Terminal","country":"Mexico","country_iso":"MX","region":"Americas","state_province":"Michoacán","city":"Port of Lázaro Cárdenas","facility_type":"import","floating_type":"unknown","status":"cancelled","latitude":17.927,"longitude":-102.169,"units":1,"capacity_operating_mtpa":null,"capacity_construction_mtpa":null,"capacity_proposed_mtpa":null,"capacity_operating_bcm_y":null,"capacity_construction_bcm_y":null,"capacity_proposed_bcm_y":null,"earliest_start_year":null,"latest_start_year":null,"url":"https://lngatlas.org/terminal/lazaro-cardenas-lng-terminal-mx/","data_source":"Data: Global Gas Infrastructure Tracker, Global Energy Monitor, September 2025"},{"slug":"le-havre-fsru-fr","name":"Le Havre FSRU","country":"France","country_iso":"FR","region":"Europe","state_province":"Normandy","city":"Port of Le Havre","facility_type":"import","floating_type":"fsru","status":"operating","latitude":49.46507205185528,"longitude":0.19006200684292993,"units":1,"capacity_operating_mtpa":3.67,"capacity_construction_mtpa":null,"capacity_proposed_mtpa":null,"capacity_operating_bcm_y":4.991,"capacity_construction_bcm_y":null,"capacity_proposed_bcm_y":null,"earliest_start_year":2023,"latest_start_year":2023,"url":"https://lngatlas.org/terminal/le-havre-fsru-fr/","data_source":"Data: Global Gas Infrastructure Tracker, Global Energy Monitor, September 2025"},{"slug":"le-havre-antifer-lng-terminal-fr","name":"Le Havre-Antifer LNG Terminal","country":"France","country_iso":"FR","region":"Europe","state_province":"Normandy","city":"Le Havre-Antifer oil refinery","facility_type":"import","floating_type":"unknown","status":"cancelled","latitude":49.65782,"longitude":0.15421,"units":1,"capacity_operating_mtpa":null,"capacity_construction_mtpa":null,"capacity_proposed_mtpa":null,"capacity_operating_bcm_y":null,"capacity_construction_bcm_y":null,"capacity_proposed_bcm_y":null,"earliest_start_year":null,"latest_start_year":null,"url":"https://lngatlas.org/terminal/le-havre-antifer-lng-terminal-fr/","data_source":"Data: Global Gas Infrastructure Tracker, Global Energy Monitor, September 2025"},{"slug":"lianyungang-lng-terminal-cn","name":"Lianyungang LNG Terminal","country":"China","country_iso":"CN","region":"Asia","state_province":"Jiangsu","city":null,"facility_type":"import","floating_type":"unknown","status":"cancelled","latitude":32.526845,"longitude":121.412712,"units":1,"capacity_operating_mtpa":null,"capacity_construction_mtpa":null,"capacity_proposed_mtpa":null,"capacity_operating_bcm_y":null,"capacity_construction_bcm_y":null,"capacity_proposed_bcm_y":null,"earliest_start_year":null,"latest_start_year":null,"url":"https://lngatlas.org/terminal/lianyungang-lng-terminal-cn/","data_source":"Data: Global Gas Infrastructure Tracker, Global Energy Monitor, September 2025"},{"slug":"liberty-fsru-us","name":"Liberty FSRU","country":"United States","country_iso":"US","region":"Americas","state_province":"New Jersey","city":"Asbury Park","facility_type":"import","floating_type":"fsru","status":"cancelled","latitude":40.222884,"longitude":-74.010232,"units":1,"capacity_operating_mtpa":null,"capacity_construction_mtpa":null,"capacity_proposed_mtpa":null,"capacity_operating_bcm_y":null,"capacity_construction_bcm_y":null,"capacity_proposed_bcm_y":null,"earliest_start_year":null,"latest_start_year":null,"url":"https://lngatlas.org/terminal/liberty-fsru-us/","data_source":"Data: Global Gas Infrastructure Tracker, Global Energy Monitor, September 2025"},{"slug":"liquid-niugini-flng-terminal-pg","name":"Liquid Niugini FLNG Terminal","country":"Papua New Guinea","country_iso":"PG","region":"Oceania","state_province":"National Capital District","city":"Port Moresby","facility_type":"export","floating_type":"flng","status":"cancelled","latitude":-9.478472,"longitude":147.148058,"units":1,"capacity_operating_mtpa":null,"capacity_construction_mtpa":null,"capacity_proposed_mtpa":null,"capacity_operating_bcm_y":null,"capacity_construction_bcm_y":null,"capacity_proposed_bcm_y":null,"earliest_start_year":null,"latest_start_year":null,"url":"https://lngatlas.org/terminal/liquid-niugini-flng-terminal-pg/","data_source":"Data: Global Gas Infrastructure Tracker, Global Energy Monitor, September 2025"},{"slug":"liuheng-lng-terminal-sinopec-cn","name":"Liuheng LNG Terminal (Sinopec)","country":"China","country_iso":"CN","region":"Asia","state_province":"Zhejiang","city":"Liuheng","facility_type":"import","floating_type":"unknown","status":"construction","latitude":29.7083694,"longitude":122.0804155,"units":2,"capacity_operating_mtpa":null,"capacity_construction_mtpa":7.18,"capacity_proposed_mtpa":7.82,"capacity_operating_bcm_y":null,"capacity_construction_bcm_y":9.765,"capacity_proposed_bcm_y":10.635,"earliest_start_year":null,"latest_start_year":null,"url":"https://lngatlas.org/terminal/liuheng-lng-terminal-sinopec-cn/","data_source":"Data: Global Gas Infrastructure Tracker, Global Energy Monitor, September 2025"},{"slug":"liuheng-lng-terminal-zhejiang-energy-cn","name":"Liuheng LNG Terminal (Zhejiang Energy)","country":"China","country_iso":"CN","region":"Asia","state_province":"Zhejiang","city":"Liuheng","facility_type":"import","floating_type":"unknown","status":"construction","latitude":29.7123128,"longitude":122.0687615,"units":2,"capacity_operating_mtpa":null,"capacity_construction_mtpa":6.35,"capacity_proposed_mtpa":5,"capacity_operating_bcm_y":null,"capacity_construction_bcm_y":8.636,"capacity_proposed_bcm_y":6.8,"earliest_start_year":null,"latest_start_year":null,"url":"https://lngatlas.org/terminal/liuheng-lng-terminal-zhejiang-energy-cn/","data_source":"Data: Global Gas Infrastructure Tracker, Global Energy Monitor, September 2025"},{"slug":"long-an-lng-terminal-vn","name":"Long An LNG Terminal","country":"Vietnam","country_iso":"VN","region":"Asia","state_province":null,"city":null,"facility_type":"import","floating_type":"unknown","status":"proposed","latitude":10.5716,"longitude":106.73406,"units":1,"capacity_operating_mtpa":null,"capacity_construction_mtpa":null,"capacity_proposed_mtpa":null,"capacity_operating_bcm_y":null,"capacity_construction_bcm_y":null,"capacity_proposed_bcm_y":null,"earliest_start_year":null,"latest_start_year":null,"url":"https://lngatlas.org/terminal/long-an-lng-terminal-vn/","data_source":"Data: Global Gas Infrastructure Tracker, Global Energy Monitor, September 2025"},{"slug":"long-beach-lng-terminal-us","name":"Long Beach LNG Terminal","country":"United States","country_iso":"US","region":"Americas","state_province":"California","city":"Long Beach","facility_type":"import","floating_type":"unknown","status":"cancelled","latitude":33.754185,"longitude":-118.216458,"units":1,"capacity_operating_mtpa":null,"capacity_construction_mtpa":null,"capacity_proposed_mtpa":null,"capacity_operating_bcm_y":null,"capacity_construction_bcm_y":null,"capacity_proposed_bcm_y":null,"earliest_start_year":null,"latest_start_year":null,"url":"https://lngatlas.org/terminal/long-beach-lng-terminal-us/","data_source":"Data: Global Gas Infrastructure Tracker, Global Energy Monitor, September 2025"},{"slug":"long-son-lng-terminal-vn","name":"Long Son LNG Terminal","country":"Vietnam","country_iso":"VN","region":"Asia","state_province":"Bà Rịa–Vũng Tàu","city":null,"facility_type":"import","floating_type":"unknown","status":"proposed","latitude":10.448768,"longitude":107.053334,"units":1,"capacity_operating_mtpa":null,"capacity_construction_mtpa":null,"capacity_proposed_mtpa":4.4,"capacity_operating_bcm_y":null,"capacity_construction_bcm_y":null,"capacity_proposed_bcm_y":5.984,"earliest_start_year":null,"latest_start_year":null,"url":"https://lngatlas.org/terminal/long-son-lng-terminal-vn/","data_source":"Data: Global Gas Infrastructure Tracker, Global Energy Monitor, September 2025"},{"slug":"longford-lng-terminal-au","name":"Longford LNG Terminal","country":"Australia","country_iso":"AU","region":"Oceania","state_province":"Victoria","city":"Longford","facility_type":"import","floating_type":"unknown","status":"cancelled","latitude":-38.2247742,"longitude":146.8122813,"units":1,"capacity_operating_mtpa":null,"capacity_construction_mtpa":null,"capacity_proposed_mtpa":null,"capacity_operating_bcm_y":null,"capacity_construction_bcm_y":null,"capacity_proposed_bcm_y":null,"earliest_start_year":null,"latest_start_year":null,"url":"https://lngatlas.org/terminal/longford-lng-terminal-au/","data_source":"Data: Global Gas Infrastructure Tracker, Global Energy Monitor, September 2025"},{"slug":"longkou-nanshan-lng-terminal-cn","name":"Longkou Nanshan LNG Terminal","country":"China","country_iso":"CN","region":"Asia","state_province":"Shandong","city":null,"facility_type":"import","floating_type":"unknown","status":"construction","latitude":37.680774,"longitude":120.220284,"units":2,"capacity_operating_mtpa":null,"capacity_construction_mtpa":6.45,"capacity_proposed_mtpa":14,"capacity_operating_bcm_y":null,"capacity_construction_bcm_y":8.772,"capacity_proposed_bcm_y":19.04,"earliest_start_year":null,"latest_start_year":null,"url":"https://lngatlas.org/terminal/longkou-nanshan-lng-terminal-cn/","data_source":"Data: Global Gas Infrastructure Tracker, Global Energy Monitor, September 2025"},{"slug":"louisiana-lng-terminal-us","name":"Louisiana LNG Terminal","country":"United States","country_iso":"US","region":"Americas","state_province":"Louisiana","city":"Plaquemines Parish","facility_type":"export","floating_type":"unknown","status":"cancelled","latitude":29.39,"longitude":-89.48,"units":1,"capacity_operating_mtpa":null,"capacity_construction_mtpa":null,"capacity_proposed_mtpa":null,"capacity_operating_bcm_y":null,"capacity_construction_bcm_y":null,"capacity_proposed_bcm_y":null,"earliest_start_year":null,"latest_start_year":null,"url":"https://lngatlas.org/terminal/louisiana-lng-terminal-us/","data_source":"Data: Global Gas Infrastructure Tracker, Global Energy Monitor, September 2025"},{"slug":"lubmin-fsru-de","name":"Lubmin FSRU","country":"Germany","country_iso":"DE","region":"Europe","state_province":null,"city":"Port of Lubmin","facility_type":"import","floating_type":"fsru","status":"proposed","latitude":54.153332,"longitude":13.645319,"units":2,"capacity_operating_mtpa":null,"capacity_construction_mtpa":null,"capacity_proposed_mtpa":null,"capacity_operating_bcm_y":null,"capacity_construction_bcm_y":null,"capacity_proposed_bcm_y":null,"earliest_start_year":2023,"latest_start_year":2023,"url":"https://lngatlas.org/terminal/lubmin-fsru-de/","data_source":"Data: Global Gas Infrastructure Tracker, Global Energy Monitor, September 2025"},{"slug":"lubmin-rwe-fsru-de","name":"Lubmin RWE FSRU","country":"Germany","country_iso":"DE","region":"Europe","state_province":null,"city":"Port of Lubmin","facility_type":"import","floating_type":"fsru","status":"shelved","latitude":54.153332,"longitude":13.555555,"units":1,"capacity_operating_mtpa":null,"capacity_construction_mtpa":null,"capacity_proposed_mtpa":null,"capacity_operating_bcm_y":null,"capacity_construction_bcm_y":null,"capacity_proposed_bcm_y":null,"earliest_start_year":null,"latest_start_year":null,"url":"https://lngatlas.org/terminal/lubmin-rwe-fsru-de/","data_source":"Data: Global Gas Infrastructure Tracker, Global Energy Monitor, September 2025"},{"slug":"lumut-fsru-my","name":"Lumut LNG Terminal","country":"Malaysia","country_iso":"MY","region":"Asia","state_province":null,"city":null,"facility_type":"import","floating_type":"unknown","status":"proposed","latitude":4.240434,"longitude":100.603086,"units":1,"capacity_operating_mtpa":null,"capacity_construction_mtpa":null,"capacity_proposed_mtpa":null,"capacity_operating_bcm_y":null,"capacity_construction_bcm_y":null,"capacity_proposed_bcm_y":null,"earliest_start_year":null,"latest_start_year":null,"url":"https://lngatlas.org/terminal/lumut-fsru-my/","data_source":"Data: Global Gas Infrastructure Tracker, Global Energy Monitor, September 2025"},{"slug":"lysekil-lng-terminal-se","name":"Lysekil LNG Terminal","country":"Sweden","country_iso":"SE","region":"Europe","state_province":null,"city":null,"facility_type":"import","floating_type":"unknown","status":"operating","latitude":58.274285,"longitude":11.452119,"units":1,"capacity_operating_mtpa":0.2,"capacity_construction_mtpa":null,"capacity_proposed_mtpa":null,"capacity_operating_bcm_y":0.272,"capacity_construction_bcm_y":null,"capacity_proposed_bcm_y":null,"earliest_start_year":2014,"latest_start_year":2014,"url":"https://lngatlas.org/terminal/lysekil-lng-terminal-se/","data_source":"Data: Global Gas Infrastructure Tracker, Global Energy Monitor, September 2025"},{"slug":"mcv-lng-terminal-mm","name":"MCV LNG Terminal","country":"Myanmar","country_iso":"MM","region":"Asia","state_province":null,"city":"Thaketa","facility_type":"import","floating_type":"unknown","status":"mothballed","latitude":16.788223,"longitude":96.218176,"units":1,"capacity_operating_mtpa":null,"capacity_construction_mtpa":null,"capacity_proposed_mtpa":null,"capacity_operating_bcm_y":null,"capacity_construction_bcm_y":null,"capacity_proposed_bcm_y":null,"earliest_start_year":2020,"latest_start_year":2020,"url":"https://lngatlas.org/terminal/mcv-lng-terminal-mm/","data_source":"Data: Global Gas Infrastructure Tracker, Global Energy Monitor, September 2025"},{"slug":"madura-flng-terminal-id","name":"Madura FLNG Terminal","country":"Indonesia","country_iso":"ID","region":"Asia","state_province":null,"city":"Madura gas field","facility_type":"export","floating_type":"flng","status":"shelved","latitude":-7.371,"longitude":113.2767,"units":1,"capacity_operating_mtpa":null,"capacity_construction_mtpa":null,"capacity_proposed_mtpa":null,"capacity_operating_bcm_y":null,"capacity_construction_bcm_y":null,"capacity_proposed_bcm_y":null,"earliest_start_year":null,"latest_start_year":null,"url":"https://lngatlas.org/terminal/madura-flng-terminal-id/","data_source":"Data: Global Gas Infrastructure Tracker, Global Energy Monitor, September 2025"},{"slug":"magnolia-lng-terminal-us","name":"Magnolia LNG Terminal","country":"United States","country_iso":"US","region":"Americas","state_province":"Louisiana","city":"Lake Charles","facility_type":"export","floating_type":"unknown","status":"proposed","latitude":30.105668,"longitude":-93.300819,"units":2,"capacity_operating_mtpa":null,"capacity_construction_mtpa":null,"capacity_proposed_mtpa":8.8,"capacity_operating_bcm_y":null,"capacity_construction_bcm_y":null,"capacity_proposed_bcm_y":11.968,"earliest_start_year":null,"latest_start_year":null,"url":"https://lngatlas.org/terminal/magnolia-lng-terminal-us/","data_source":"Data: Global Gas Infrastructure Tracker, Global Energy Monitor, September 2025"},{"slug":"mailiao-lng-terminal-tw","name":"Mailiao LNG Terminal","country":"Taiwan","country_iso":"TW","region":"Asia","state_province":"Yunlin","city":"Mailiao","facility_type":"import","floating_type":"unknown","status":"proposed","latitude":23.7650176,"longitude":120.168057,"units":1,"capacity_operating_mtpa":null,"capacity_construction_mtpa":null,"capacity_proposed_mtpa":6,"capacity_operating_bcm_y":null,"capacity_construction_bcm_y":null,"capacity_proposed_bcm_y":8.16,"earliest_start_year":null,"latest_start_year":null,"url":"https://lngatlas.org/terminal/mailiao-lng-terminal-tw/","data_source":"Data: Global Gas Infrastructure Tracker, Global Energy Monitor, September 2025"},{"slug":"main-pass-energy-hub-flng-terminal-us","name":"Main Pass Energy Hub FLNG Terminal","country":"United States","country_iso":"US","region":"Americas","state_province":"Louisiana","city":"Gulf of Mexico","facility_type":"export","floating_type":"flng","status":"cancelled","latitude":29.265556,"longitude":-88.759444,"units":1,"capacity_operating_mtpa":null,"capacity_construction_mtpa":null,"capacity_proposed_mtpa":null,"capacity_operating_bcm_y":null,"capacity_construction_bcm_y":null,"capacity_proposed_bcm_y":null,"earliest_start_year":null,"latest_start_year":null,"url":"https://lngatlas.org/terminal/main-pass-energy-hub-flng-terminal-us/","data_source":"Data: Global Gas Infrastructure Tracker, Global Energy Monitor, September 2025"},{"slug":"malahat-lng-terminal-ca","name":"Malahat LNG Terminal","country":"Canada","country_iso":"CA","region":"Americas","state_province":"British Columbia","city":"Victoria","facility_type":"export","floating_type":"unknown","status":"cancelled","latitude":48.422,"longitude":-123.365,"units":1,"capacity_operating_mtpa":null,"capacity_construction_mtpa":null,"capacity_proposed_mtpa":null,"capacity_operating_bcm_y":null,"capacity_construction_bcm_y":null,"capacity_proposed_bcm_y":null,"earliest_start_year":null,"latest_start_year":null,"url":"https://lngatlas.org/terminal/malahat-lng-terminal-ca/","data_source":"Data: Global Gas Infrastructure Tracker, Global Energy Monitor, September 2025"},{"slug":"mlng-t9-lng-terminal-my","name":"Malaysia LNG Terminal Train 9","country":"Malaysia","country_iso":"MY","region":"Asia","state_province":"Sarawak","city":"Bintulu","facility_type":"export","floating_type":"unknown","status":"operating","latitude":3.2903,"longitude":113.087,"units":1,"capacity_operating_mtpa":3.6,"capacity_construction_mtpa":null,"capacity_proposed_mtpa":null,"capacity_operating_bcm_y":4.896,"capacity_construction_bcm_y":null,"capacity_proposed_bcm_y":null,"earliest_start_year":2016,"latest_start_year":2016,"url":"https://lngatlas.org/terminal/mlng-t9-lng-terminal-my/","data_source":"Data: Global Gas Infrastructure Tracker, Global Energy Monitor, September 2025"},{"slug":"energia-2000-manzanillo-fsru-do","name":"Manzanillo (Dominican Republic) LNG Terminal","country":"Dominican Republic","country_iso":"DO","region":"Americas","state_province":"Montecristi","city":"Manzanillo","facility_type":"import","floating_type":"floating","status":"construction","latitude":19.699116,"longitude":-71.73636147,"units":1,"capacity_operating_mtpa":null,"capacity_construction_mtpa":1,"capacity_proposed_mtpa":null,"capacity_operating_bcm_y":null,"capacity_construction_bcm_y":1.36,"capacity_proposed_bcm_y":null,"earliest_start_year":null,"latest_start_year":null,"url":"https://lngatlas.org/terminal/energia-2000-manzanillo-fsru-do/","data_source":"Data: Global Gas Infrastructure Tracker, Global Energy Monitor, September 2025"},{"slug":"manzanillo-mexico-lng-terminal-mx","name":"Manzanillo (Mexico) LNG Terminal","country":"Mexico","country_iso":"MX","region":"Americas","state_province":"Colima","city":"Manzanillo","facility_type":"import","floating_type":"unknown","status":"operating","latitude":19.009915,"longitude":-104.262007,"units":1,"capacity_operating_mtpa":3.8,"capacity_construction_mtpa":null,"capacity_proposed_mtpa":null,"capacity_operating_bcm_y":5.168,"capacity_construction_bcm_y":null,"capacity_proposed_bcm_y":null,"earliest_start_year":2012,"latest_start_year":2012,"url":"https://lngatlas.org/terminal/manzanillo-mexico-lng-terminal-mx/","data_source":"Data: Global Gas Infrastructure Tracker, Global Energy Monitor, September 2025"},{"slug":"map-ta-phut-lng-terminal-1-th","name":"Map Ta Phut LNG Terminal 1","country":"Thailand","country_iso":"TH","region":"Asia","state_province":"Rayong","city":"Map Ta Phut","facility_type":"import","floating_type":"unknown","status":"operating","latitude":12.651686,"longitude":101.159533,"units":2,"capacity_operating_mtpa":11.5,"capacity_construction_mtpa":null,"capacity_proposed_mtpa":null,"capacity_operating_bcm_y":15.64,"capacity_construction_bcm_y":null,"capacity_proposed_bcm_y":null,"earliest_start_year":2011,"latest_start_year":2019,"url":"https://lngatlas.org/terminal/map-ta-phut-lng-terminal-1-th/","data_source":"Data: Global Gas Infrastructure Tracker, Global Energy Monitor, September 2025"},{"slug":"map-ta-phut-lng-terminal-2-th","name":"Map Ta Phut LNG Terminal 2","country":"Thailand","country_iso":"TH","region":"Asia","state_province":"Rayong","city":"Map Ta Phut","facility_type":"import","floating_type":"unknown","status":"operating","latitude":12.6791481,"longitude":101.1178382,"units":1,"capacity_operating_mtpa":7.5,"capacity_construction_mtpa":null,"capacity_proposed_mtpa":null,"capacity_operating_bcm_y":10.2,"capacity_construction_bcm_y":null,"capacity_proposed_bcm_y":null,"earliest_start_year":2023,"latest_start_year":2023,"url":"https://lngatlas.org/terminal/map-ta-phut-lng-terminal-2-th/","data_source":"Data: Global Gas Infrastructure Tracker, Global Energy Monitor, September 2025"},{"slug":"map-ta-phut-lng-terminal-3-th","name":"Map Ta Phut LNG Terminal 3","country":"Thailand","country_iso":"TH","region":"Asia","state_province":null,"city":"Map Ta Phut","facility_type":"import","floating_type":"unknown","status":"proposed","latitude":12.6610311,"longitude":101.138036,"units":2,"capacity_operating_mtpa":null,"capacity_construction_mtpa":null,"capacity_proposed_mtpa":10.8,"capacity_operating_bcm_y":null,"capacity_construction_bcm_y":null,"capacity_proposed_bcm_y":14.688,"earliest_start_year":null,"latest_start_year":null,"url":"https://lngatlas.org/terminal/map-ta-phut-lng-terminal-3-th/","data_source":"Data: Global Gas Infrastructure Tracker, Global Energy Monitor, September 2025"},{"slug":"mariveles-samat-lng-terminal-ph","name":"Mariveles LNG Terminal","country":"Philippines","country_iso":"PH","region":"Asia","state_province":"Bataan","city":"Mariveles","facility_type":"import","floating_type":"unknown","status":"proposed","latitude":14.49791,"longitude":120.609209,"units":1,"capacity_operating_mtpa":null,"capacity_construction_mtpa":null,"capacity_proposed_mtpa":0.4,"capacity_operating_bcm_y":null,"capacity_construction_bcm_y":null,"capacity_proposed_bcm_y":0.544,"earliest_start_year":null,"latest_start_year":null,"url":"https://lngatlas.org/terminal/mariveles-samat-lng-terminal-ph/","data_source":"Data: Global Gas Infrastructure Tracker, Global Energy Monitor, September 2025"},{"slug":"marmara-lng-terminal-tr","name":"Marmara LNG Terminal","country":"Türkiye","country_iso":"TR","region":"Asia","state_province":"Tekirdag","city":"Marmara Ereglisi","facility_type":"import","floating_type":"unknown","status":"operating","latitude":40.9920172,"longitude":27.9860703,"units":1,"capacity_operating_mtpa":4.6,"capacity_construction_mtpa":null,"capacity_proposed_mtpa":null,"capacity_operating_bcm_y":6.256,"capacity_construction_bcm_y":null,"capacity_proposed_bcm_y":null,"earliest_start_year":1994,"latest_start_year":1994,"url":"https://lngatlas.org/terminal/marmara-lng-terminal-tr/","data_source":"Data: Global Gas Infrastructure Tracker, Global Energy Monitor, September 2025"},{"slug":"marsa-el-brega-lng-terminal-ly","name":"Marsa El Brega LNG Terminal","country":"Libya","country_iso":"LY","region":"Africa","state_province":"Cyrenaica","city":"Brega","facility_type":"export","floating_type":"unknown","status":"mothballed","latitude":30.40675,"longitude":19.5935,"units":4,"capacity_operating_mtpa":null,"capacity_construction_mtpa":null,"capacity_proposed_mtpa":null,"capacity_operating_bcm_y":null,"capacity_construction_bcm_y":null,"capacity_proposed_bcm_y":null,"earliest_start_year":1970,"latest_start_year":1970,"url":"https://lngatlas.org/terminal/marsa-el-brega-lng-terminal-ly/","data_source":"Data: Global Gas Infrastructure Tracker, Global Energy Monitor, September 2025"},{"slug":"marshal-vasilevskiy-fsru-ru","name":"Marshal Vasilevskiy FSRU","country":"Russia","country_iso":"RU","region":"Europe","state_province":"Kaliningrad Oblast","city":null,"facility_type":"unknown","floating_type":"fsru","status":"idle","latitude":55.0259824,"longitude":20.3220541,"units":1,"capacity_operating_mtpa":null,"capacity_construction_mtpa":null,"capacity_proposed_mtpa":null,"capacity_operating_bcm_y":null,"capacity_construction_bcm_y":null,"capacity_proposed_bcm_y":null,"earliest_start_year":2019,"latest_start_year":2019,"url":"https://lngatlas.org/terminal/marshal-vasilevskiy-fsru-ru/","data_source":"Data: Global Gas Infrastructure Tracker, Global Energy Monitor, September 2025"},{"slug":"mashal-lng-terminal-pk","name":"Mashal LNG Terminal","country":"Pakistan","country_iso":"PK","region":"Asia","state_province":"Sindh","city":"Port Qasim","facility_type":"import","floating_type":"unknown","status":"cancelled","latitude":24.766667,"longitude":67.333333,"units":1,"capacity_operating_mtpa":null,"capacity_construction_mtpa":null,"capacity_proposed_mtpa":null,"capacity_operating_bcm_y":null,"capacity_construction_bcm_y":null,"capacity_proposed_bcm_y":null,"earliest_start_year":null,"latest_start_year":null,"url":"https://lngatlas.org/terminal/mashal-lng-terminal-pk/","data_source":"Data: Global Gas Infrastructure Tracker, Global Energy Monitor, September 2025"},{"slug":"matarbari-ge-lng-terminal-bd","name":"Matarbari GE LNG Terminal","country":"Bangladesh","country_iso":"BD","region":"Asia","state_province":"Chittagong","city":"Maheshkhali Upazila","facility_type":"import","floating_type":"unknown","status":"cancelled","latitude":21.7281,"longitude":91.8896,"units":1,"capacity_operating_mtpa":null,"capacity_construction_mtpa":null,"capacity_proposed_mtpa":null,"capacity_operating_bcm_y":null,"capacity_construction_bcm_y":null,"capacity_proposed_bcm_y":null,"earliest_start_year":null,"latest_start_year":null,"url":"https://lngatlas.org/terminal/matarbari-ge-lng-terminal-bd/","data_source":"Data: Global Gas Infrastructure Tracker, Global Energy Monitor, September 2025"},{"slug":"rpgc-matarbari-lng-terminal-bd","name":"Matarbari LNG Terminal","country":"Bangladesh","country_iso":"BD","region":"Asia","state_province":"Chittagong","city":"Martarbari","facility_type":"import","floating_type":"unknown","status":"proposed","latitude":21.7271477,"longitude":91.8797371,"units":1,"capacity_operating_mtpa":null,"capacity_construction_mtpa":null,"capacity_proposed_mtpa":7.5,"capacity_operating_bcm_y":null,"capacity_construction_bcm_y":null,"capacity_proposed_bcm_y":10.2,"earliest_start_year":null,"latest_start_year":null,"url":"https://lngatlas.org/terminal/rpgc-matarbari-lng-terminal-bd/","data_source":"Data: Global Gas Infrastructure Tracker, Global Energy Monitor, September 2025"},{"slug":"matola-fsru-mz","name":"Matola FSRU","country":"Mozambique","country_iso":"MZ","region":"Africa","state_province":null,"city":"Matola","facility_type":"import","floating_type":"fsru","status":"proposed","latitude":-25.966562,"longitude":32.506834,"units":1,"capacity_operating_mtpa":null,"capacity_construction_mtpa":null,"capacity_proposed_mtpa":2.5,"capacity_operating_bcm_y":null,"capacity_construction_bcm_y":null,"capacity_proposed_bcm_y":3.4,"earliest_start_year":null,"latest_start_year":null,"url":"https://lngatlas.org/terminal/matola-fsru-mz/","data_source":"Data: Global Gas Infrastructure Tracker, Global Energy Monitor, September 2025"},{"slug":"maurice-bonnefil-lng-terminal-ht","name":"Maurice Bonnefil LNG Terminal","country":"Haiti","country_iso":"HT","region":"Americas","state_province":null,"city":"Port-au-Prince","facility_type":"import","floating_type":"unknown","status":"cancelled","latitude":18.6779289,"longitude":-72.3202618,"units":1,"capacity_operating_mtpa":null,"capacity_construction_mtpa":null,"capacity_proposed_mtpa":null,"capacity_operating_bcm_y":null,"capacity_construction_bcm_y":null,"capacity_proposed_bcm_y":null,"earliest_start_year":null,"latest_start_year":null,"url":"https://lngatlas.org/terminal/maurice-bonnefil-lng-terminal-ht/","data_source":"Data: Global Gas Infrastructure Tracker, Global Energy Monitor, September 2025"},{"slug":"mauritius-fsru-mu","name":"Mauritius FSRU","country":"Mauritius","country_iso":"MU","region":"Africa","state_province":null,"city":null,"facility_type":"import","floating_type":"fsru","status":"shelved","latitude":-20.105785,"longitude":57.420697,"units":1,"capacity_operating_mtpa":null,"capacity_construction_mtpa":null,"capacity_proposed_mtpa":null,"capacity_operating_bcm_y":null,"capacity_construction_bcm_y":null,"capacity_proposed_bcm_y":null,"earliest_start_year":null,"latest_start_year":null,"url":"https://lngatlas.org/terminal/mauritius-fsru-mu/","data_source":"Data: Global Gas Infrastructure Tracker, Global Energy Monitor, September 2025"},{"slug":"mee-laung-gyaing-fsru-mm","name":"Mee Laung Gyaing FSRU","country":"Myanmar","country_iso":"MM","region":"Asia","state_province":"Ayeyawady","city":"Mata","facility_type":"import","floating_type":"fsru","status":"shelved","latitude":17.254775,"longitude":94.4965,"units":1,"capacity_operating_mtpa":null,"capacity_construction_mtpa":null,"capacity_proposed_mtpa":null,"capacity_operating_bcm_y":null,"capacity_construction_bcm_y":null,"capacity_proposed_bcm_y":null,"earliest_start_year":null,"latest_start_year":null,"url":"https://lngatlas.org/terminal/mee-laung-gyaing-fsru-mm/","data_source":"Data: Global Gas Infrastructure Tracker, Global Energy Monitor, September 2025"},{"slug":"mejillones-lng-terminal-cl","name":"Mejillones LNG Terminal","country":"Chile","country_iso":"CL","region":"Americas","state_province":"Antofagasta","city":"Mejillones","facility_type":"import","floating_type":"unknown","status":"operating","latitude":-23.058828,"longitude":-70.366058,"units":1,"capacity_operating_mtpa":1.5,"capacity_construction_mtpa":null,"capacity_proposed_mtpa":null,"capacity_operating_bcm_y":2.04,"capacity_construction_bcm_y":null,"capacity_proposed_bcm_y":null,"earliest_start_year":2010,"latest_start_year":2010,"url":"https://lngatlas.org/terminal/mejillones-lng-terminal-cl/","data_source":"Data: Global Gas Infrastructure Tracker, Global Energy Monitor, September 2025"},{"slug":"melaka-lng-terminal-my","name":"Melaka FSRU","country":"Malaysia","country_iso":"MY","region":"Asia","state_province":"Kuala Lumpur","city":"Sungei Udang Port","facility_type":"import","floating_type":"fsru","status":"operating","latitude":2.2444375,"longitude":102.1234396,"units":1,"capacity_operating_mtpa":3.8,"capacity_construction_mtpa":null,"capacity_proposed_mtpa":null,"capacity_operating_bcm_y":5.168,"capacity_construction_bcm_y":null,"capacity_proposed_bcm_y":null,"earliest_start_year":2013,"latest_start_year":2013,"url":"https://lngatlas.org/terminal/melaka-lng-terminal-my/","data_source":"Data: Global Gas Infrastructure Tracker, Global Energy Monitor, September 2025"},{"slug":"mina-al-ahmadi-lng-terminal-kw","name":"Mina Al-Ahmadi LNG Terminal","country":"Kuwait","country_iso":"KW","region":"Asia","state_province":"Al Ahmadi","city":"Al Ahmadi","facility_type":"import","floating_type":"floating","status":"idle","latitude":29.0713773,"longitude":48.1609009,"units":2,"capacity_operating_mtpa":null,"capacity_construction_mtpa":null,"capacity_proposed_mtpa":null,"capacity_operating_bcm_y":null,"capacity_construction_bcm_y":null,"capacity_proposed_bcm_y":null,"earliest_start_year":2009,"latest_start_year":2014,"url":"https://lngatlas.org/terminal/mina-al-ahmadi-lng-terminal-kw/","data_source":"Data: Global Gas Infrastructure Tracker, Global Energy Monitor, September 2025"},{"slug":"mizushima-lng-terminal-jp","name":"Mizushima LNG Terminal","country":"Japan","country_iso":"JP","region":"Asia","state_province":"Chugoku","city":"Kurashiki","facility_type":"import","floating_type":"unknown","status":"operating","latitude":34.49945,"longitude":133.73324,"units":1,"capacity_operating_mtpa":4.3,"capacity_construction_mtpa":null,"capacity_proposed_mtpa":null,"capacity_operating_bcm_y":5.848,"capacity_construction_bcm_y":null,"capacity_proposed_bcm_y":null,"earliest_start_year":2006,"latest_start_year":2006,"url":"https://lngatlas.org/terminal/mizushima-lng-terminal-jp/","data_source":"Data: Global Gas Infrastructure Tracker, Global Energy Monitor, September 2025"},{"slug":"moheshkhali-floating-lng-terminal-bd","name":"Moheshkhali Floating LNG Terminal","country":"Bangladesh","country_iso":"BD","region":"Asia","state_province":"Chittagong","city":"Moheshkhali Island, Bay of Bengal","facility_type":"import","floating_type":"floating","status":"operating","latitude":21.608081,"longitude":91.825979,"units":1,"capacity_operating_mtpa":4.5,"capacity_construction_mtpa":null,"capacity_proposed_mtpa":null,"capacity_operating_bcm_y":6.12,"capacity_construction_bcm_y":null,"capacity_proposed_bcm_y":null,"earliest_start_year":2018,"latest_start_year":2018,"url":"https://lngatlas.org/terminal/moheshkhali-floating-lng-terminal-bd/","data_source":"Data: Global Gas Infrastructure Tracker, Global Energy Monitor, September 2025"},{"slug":"mombasa-lng-terminal-ke","name":"Mombasa LNG Terminal","country":"Kenya","country_iso":"KE","region":"Africa","state_province":null,"city":"Mombasa","facility_type":"import","floating_type":"unknown","status":"proposed","latitude":-4.06016,"longitude":39.64864,"units":2,"capacity_operating_mtpa":null,"capacity_construction_mtpa":null,"capacity_proposed_mtpa":6.2,"capacity_operating_bcm_y":null,"capacity_construction_bcm_y":null,"capacity_proposed_bcm_y":8.432,"earliest_start_year":null,"latest_start_year":null,"url":"https://lngatlas.org/terminal/mombasa-lng-terminal-ke/","data_source":"Data: Global Gas Infrastructure Tracker, Global Energy Monitor, September 2025"},{"slug":"monkey-island-lng-terminal-us","name":"Monkey Island LNG Terminal","country":"United States","country_iso":"US","region":"Americas","state_province":"Louisiana","city":"Cameron Parish","facility_type":"export","floating_type":"unknown","status":"proposed","latitude":29.7936271,"longitude":-93.3414397,"units":2,"capacity_operating_mtpa":null,"capacity_construction_mtpa":null,"capacity_proposed_mtpa":26,"capacity_operating_bcm_y":null,"capacity_construction_bcm_y":null,"capacity_proposed_bcm_y":35.36,"earliest_start_year":null,"latest_start_year":null,"url":"https://lngatlas.org/terminal/monkey-island-lng-terminal-us/","data_source":"Data: Global Gas Infrastructure Tracker, Global Energy Monitor, September 2025"},{"slug":"montego-bay-lng-terminal-jm","name":"Montego Bay LNG Terminal","country":"Jamaica","country_iso":"JM","region":"Americas","state_province":null,"city":null,"facility_type":"import","floating_type":"unknown","status":"operating","latitude":18.463029,"longitude":-77.934847,"units":1,"capacity_operating_mtpa":0.5,"capacity_construction_mtpa":null,"capacity_proposed_mtpa":null,"capacity_operating_bcm_y":0.68,"capacity_construction_bcm_y":null,"capacity_proposed_bcm_y":null,"earliest_start_year":2016,"latest_start_year":2016,"url":"https://lngatlas.org/terminal/montego-bay-lng-terminal-jm/","data_source":"Data: Global Gas Infrastructure Tracker, Global Energy Monitor, September 2025"},{"slug":"monteverde-pacific-lng-terminal-ec","name":"Monteverde Pacific LNG Terminal","country":"Ecuador","country_iso":"EC","region":"Americas","state_province":"Santa Elena","city":"Guayaquil","facility_type":"import","floating_type":"unknown","status":"proposed","latitude":-2.02998,"longitude":-80.73498,"units":1,"capacity_operating_mtpa":null,"capacity_construction_mtpa":null,"capacity_proposed_mtpa":null,"capacity_operating_bcm_y":null,"capacity_construction_bcm_y":null,"capacity_proposed_bcm_y":null,"earliest_start_year":null,"latest_start_year":null,"url":"https://lngatlas.org/terminal/monteverde-pacific-lng-terminal-ec/","data_source":"Data: Global Gas Infrastructure Tracker, Global Energy Monitor, September 2025"},{"slug":"montoir-lng-terminal-fr","name":"Montoir LNG Terminal","country":"France","country_iso":"FR","region":"Europe","state_province":"Pays de la Loire","city":"Montoir-de-Bretagne","facility_type":"import","floating_type":"unknown","status":"operating","latitude":47.30296,"longitude":-2.14278,"units":2,"capacity_operating_mtpa":8,"capacity_construction_mtpa":null,"capacity_proposed_mtpa":1.84,"capacity_operating_bcm_y":10.88,"capacity_construction_bcm_y":null,"capacity_proposed_bcm_y":2.502,"earliest_start_year":1980,"latest_start_year":1980,"url":"https://lngatlas.org/terminal/montoir-lng-terminal-fr/","data_source":"Data: Global Gas Infrastructure Tracker, Global Energy Monitor, September 2025"},{"slug":"morocco-fsru-ma","name":"Morocco FSRU","country":"Morocco","country_iso":"MA","region":"Africa","state_province":null,"city":"Mohammedia Port","facility_type":"import","floating_type":"fsru","status":"proposed","latitude":33.71339,"longitude":-7.397731,"units":1,"capacity_operating_mtpa":null,"capacity_construction_mtpa":null,"capacity_proposed_mtpa":null,"capacity_operating_bcm_y":null,"capacity_construction_bcm_y":null,"capacity_proposed_bcm_y":null,"earliest_start_year":null,"latest_start_year":null,"url":"https://lngatlas.org/terminal/morocco-fsru-ma/","data_source":"Data: Global Gas Infrastructure Tracker, Global Energy Monitor, September 2025"},{"slug":"mosjoen-lng-terminal-no","name":"Mosjoen LNG Terminal","country":"Norway","country_iso":"NO","region":"Europe","state_province":null,"city":"Mosjoen","facility_type":"import","floating_type":"unknown","status":"operating","latitude":65.836962,"longitude":13.187084,"units":1,"capacity_operating_mtpa":0.4,"capacity_construction_mtpa":null,"capacity_proposed_mtpa":null,"capacity_operating_bcm_y":0.544,"capacity_construction_bcm_y":null,"capacity_proposed_bcm_y":null,"earliest_start_year":2007,"latest_start_year":2007,"url":"https://lngatlas.org/terminal/mosjoen-lng-terminal-no/","data_source":"Data: Global Gas Infrastructure Tracker, Global Energy Monitor, September 2025"},{"slug":"mossel-bay-fsru-za","name":"Mossel Bay FSRU","country":"South Africa","country_iso":"ZA","region":"Africa","state_province":"Western Cape","city":"Mossel Bay","facility_type":"import","floating_type":"fsru","status":"cancelled","latitude":-34.183333,"longitude":22.133333,"units":1,"capacity_operating_mtpa":null,"capacity_construction_mtpa":null,"capacity_proposed_mtpa":null,"capacity_operating_bcm_y":null,"capacity_construction_bcm_y":null,"capacity_proposed_bcm_y":null,"earliest_start_year":null,"latest_start_year":null,"url":"https://lngatlas.org/terminal/mossel-bay-fsru-za/","data_source":"Data: Global Gas Infrastructure Tracker, Global Energy Monitor, September 2025"},{"slug":"mowi-lng-terminal-gb","name":"Mowi LNG Terminal","country":"United Kingdom","country_iso":"GB","region":"Europe","state_province":"Scotland","city":"Kyleakin","facility_type":"import","floating_type":"unknown","status":"operating","latitude":57.271545,"longitude":-5.726805,"units":1,"capacity_operating_mtpa":0.22,"capacity_construction_mtpa":null,"capacity_proposed_mtpa":null,"capacity_operating_bcm_y":0.299,"capacity_construction_bcm_y":null,"capacity_proposed_bcm_y":null,"earliest_start_year":2021,"latest_start_year":2021,"url":"https://lngatlas.org/terminal/mowi-lng-terminal-gb/","data_source":"Data: Global Gas Infrastructure Tracker, Global Energy Monitor, September 2025"},{"slug":"mozambique-lng-terminal-mz","name":"Mozambique LNG Terminal","country":"Mozambique","country_iso":"MZ","region":"Africa","state_province":"Cabo Delgado","city":null,"facility_type":"export","floating_type":"unknown","status":"shelved","latitude":-10.807104,"longitude":40.555333,"units":4,"capacity_operating_mtpa":null,"capacity_construction_mtpa":null,"capacity_proposed_mtpa":null,"capacity_operating_bcm_y":null,"capacity_construction_bcm_y":null,"capacity_proposed_bcm_y":null,"earliest_start_year":null,"latest_start_year":null,"url":"https://lngatlas.org/terminal/mozambique-lng-terminal-mz/","data_source":"Data: Global Gas Infrastructure Tracker, Global Energy Monitor, September 2025"},{"slug":"mugardos-lng-terminal-es","name":"Mugardos LNG Terminal","country":"Spain","country_iso":"ES","region":"Europe","state_province":"Galicia","city":"Mugardos","facility_type":"import","floating_type":"unknown","status":"operating","latitude":43.4613,"longitude":-8.2395,"units":2,"capacity_operating_mtpa":2.6,"capacity_construction_mtpa":null,"capacity_proposed_mtpa":null,"capacity_operating_bcm_y":3.536,"capacity_construction_bcm_y":null,"capacity_proposed_bcm_y":null,"earliest_start_year":2007,"latest_start_year":2007,"url":"https://lngatlas.org/terminal/mugardos-lng-terminal-es/","data_source":"Data: Global Gas Infrastructure Tracker, Global Energy Monitor, September 2025"},{"slug":"mui-ke-ga-fsru-vn","name":"Mui Ke Ga FSRU","country":"Vietnam","country_iso":"VN","region":"Asia","state_province":"Binh Thuan","city":"Mui Ke Ga","facility_type":"import","floating_type":"fsru","status":"shelved","latitude":10.7028408,"longitude":107.987166,"units":1,"capacity_operating_mtpa":null,"capacity_construction_mtpa":null,"capacity_proposed_mtpa":null,"capacity_operating_bcm_y":null,"capacity_construction_bcm_y":null,"capacity_proposed_bcm_y":null,"earliest_start_year":null,"latest_start_year":null,"url":"https://lngatlas.org/terminal/mui-ke-ga-fsru-vn/","data_source":"Data: Global Gas Infrastructure Tracker, Global Energy Monitor, September 2025"},{"slug":"mukran-fsru-de","name":"Mukran FSRU","country":"Germany","country_iso":"DE","region":"Europe","state_province":null,"city":"Rügen","facility_type":"import","floating_type":"fsru","status":"operating","latitude":54.478384,"longitude":13.598351,"units":2,"capacity_operating_mtpa":9.92,"capacity_construction_mtpa":null,"capacity_proposed_mtpa":null,"capacity_operating_bcm_y":13.491,"capacity_construction_bcm_y":null,"capacity_proposed_bcm_y":null,"earliest_start_year":2024,"latest_start_year":2024,"url":"https://lngatlas.org/terminal/mukran-fsru-de/","data_source":"Data: Global Gas Infrastructure Tracker, Global Energy Monitor, September 2025"},{"slug":"mumbai-fsru-in","name":"Mumbai FSRU","country":"India","country_iso":"IN","region":"Asia","state_province":"Maharashtra","city":"Mumbai Port","facility_type":"import","floating_type":"fsru","status":"cancelled","latitude":18.958761,"longitude":72.850767,"units":1,"capacity_operating_mtpa":null,"capacity_construction_mtpa":null,"capacity_proposed_mtpa":null,"capacity_operating_bcm_y":null,"capacity_construction_bcm_y":null,"capacity_proposed_bcm_y":null,"earliest_start_year":null,"latest_start_year":null,"url":"https://lngatlas.org/terminal/mumbai-fsru-in/","data_source":"Data: Global Gas Infrastructure Tracker, Global Energy Monitor, September 2025"},{"slug":"mundra-lng-terminal-in","name":"Mundra LNG Terminal","country":"India","country_iso":"IN","region":"Asia","state_province":"Gujarat","city":"Mundra Port","facility_type":"import","floating_type":"unknown","status":"operating","latitude":22.7374322,"longitude":69.6668651,"units":1,"capacity_operating_mtpa":5,"capacity_construction_mtpa":null,"capacity_proposed_mtpa":null,"capacity_operating_bcm_y":6.8,"capacity_construction_bcm_y":null,"capacity_proposed_bcm_y":null,"earliest_start_year":2020,"latest_start_year":2020,"url":"https://lngatlas.org/terminal/mundra-lng-terminal-in/","data_source":"Data: Global Gas Infrastructure Tracker, Global Energy Monitor, September 2025"},{"slug":"murmansk-lng-terminal-ru","name":"Murmansk LNG Terminal","country":"Russia","country_iso":"RU","region":"Europe","state_province":"Murmansk Oblast","city":"Belokamenka","facility_type":"export","floating_type":"unknown","status":"proposed","latitude":69.077408,"longitude":33.155269,"units":3,"capacity_operating_mtpa":null,"capacity_construction_mtpa":null,"capacity_proposed_mtpa":20.4,"capacity_operating_bcm_y":null,"capacity_construction_bcm_y":null,"capacity_proposed_bcm_y":27.744,"earliest_start_year":null,"latest_start_year":null,"url":"https://lngatlas.org/terminal/murmansk-lng-terminal-ru/","data_source":"Data: Global Gas Infrastructure Tracker, Global Energy Monitor, September 2025"},{"slug":"nacala-fsru-mz","name":"Nacala FSRU","country":"Mozambique","country_iso":"MZ","region":"Africa","state_province":null,"city":null,"facility_type":"import","floating_type":"fsru","status":"shelved","latitude":-14.534204,"longitude":40.656408,"units":1,"capacity_operating_mtpa":null,"capacity_construction_mtpa":null,"capacity_proposed_mtpa":null,"capacity_operating_bcm_y":null,"capacity_construction_bcm_y":null,"capacity_proposed_bcm_y":null,"earliest_start_year":null,"latest_start_year":null,"url":"https://lngatlas.org/terminal/nacala-fsru-mz/","data_source":"Data: Global Gas Infrastructure Tracker, Global Energy Monitor, September 2025"},{"slug":"nador-fsru-ma","name":"Nador FSRU","country":"Morocco","country_iso":"MA","region":"Africa","state_province":"Nador","city":"Nador West Med Port","facility_type":"import","floating_type":"fsru","status":"proposed","latitude":35.254969,"longitude":-3.1777657,"units":1,"capacity_operating_mtpa":null,"capacity_construction_mtpa":null,"capacity_proposed_mtpa":null,"capacity_operating_bcm_y":null,"capacity_construction_bcm_y":null,"capacity_proposed_bcm_y":null,"earliest_start_year":null,"latest_start_year":null,"url":"https://lngatlas.org/terminal/nador-fsru-ma/","data_source":"Data: Global Gas Infrastructure Tracker, Global Energy Monitor, September 2025"},{"slug":"nagasaki-lng-terminal-jp","name":"Nagasaki LNG Terminal","country":"Japan","country_iso":"JP","region":"Asia","state_province":"Kyushu","city":"Nagasaki","facility_type":"import","floating_type":"unknown","status":"operating","latitude":32.75898,"longitude":129.806367,"units":1,"capacity_operating_mtpa":0.2,"capacity_construction_mtpa":null,"capacity_proposed_mtpa":null,"capacity_operating_bcm_y":0.272,"capacity_construction_bcm_y":null,"capacity_proposed_bcm_y":null,"earliest_start_year":2003,"latest_start_year":2003,"url":"https://lngatlas.org/terminal/nagasaki-lng-terminal-jp/","data_source":"Data: Global Gas Infrastructure Tracker, Global Energy Monitor, September 2025"},{"slug":"nakagusuku-lng-terminal-jp","name":"Nakagusuku LNG Terminal","country":"Japan","country_iso":"JP","region":"Asia","state_province":"Kyushu","city":"Nakagusuku","facility_type":"import","floating_type":"unknown","status":"operating","latitude":26.275375,"longitude":127.811727,"units":1,"capacity_operating_mtpa":9,"capacity_construction_mtpa":null,"capacity_proposed_mtpa":null,"capacity_operating_bcm_y":12.24,"capacity_construction_bcm_y":null,"capacity_proposed_bcm_y":null,"earliest_start_year":2013,"latest_start_year":2013,"url":"https://lngatlas.org/terminal/nakagusuku-lng-terminal-jp/","data_source":"Data: Global Gas Infrastructure Tracker, Global Energy Monitor, September 2025"},{"slug":"nam-dinh-lng-terminal-vn","name":"Nam Dinh LNG Terminal","country":"Vietnam","country_iso":"VN","region":"Asia","state_province":null,"city":null,"facility_type":"import","floating_type":"unknown","status":"proposed","latitude":20.1012,"longitude":106.21355,"units":1,"capacity_operating_mtpa":null,"capacity_construction_mtpa":null,"capacity_proposed_mtpa":0.65,"capacity_operating_bcm_y":null,"capacity_construction_bcm_y":null,"capacity_proposed_bcm_y":0.884,"earliest_start_year":null,"latest_start_year":null,"url":"https://lngatlas.org/terminal/nam-dinh-lng-terminal-vn/","data_source":"Data: Global Gas Infrastructure Tracker, Global Energy Monitor, September 2025"},{"slug":"naoetsu-lng-terminal-jp","name":"Naoetsu LNG Terminal","country":"Japan","country_iso":"JP","region":"Asia","state_province":"Niigata","city":"Joetsu","facility_type":"import","floating_type":"unknown","status":"operating","latitude":37.2053496,"longitude":138.2770886,"units":1,"capacity_operating_mtpa":2.1,"capacity_construction_mtpa":null,"capacity_proposed_mtpa":null,"capacity_operating_bcm_y":2.856,"capacity_construction_bcm_y":null,"capacity_proposed_bcm_y":null,"earliest_start_year":2013,"latest_start_year":2013,"url":"https://lngatlas.org/terminal/naoetsu-lng-terminal-jp/","data_source":"Data: Global Gas Infrastructure Tracker, Global Energy Monitor, September 2025"},{"slug":"negishi-lng-terminal-jp","name":"Negishi LNG Terminal","country":"Japan","country_iso":"JP","region":"Asia","state_province":"Kanto","city":"Tokyo","facility_type":"import","floating_type":"unknown","status":"operating","latitude":35.40423,"longitude":139.6285,"units":1,"capacity_operating_mtpa":12,"capacity_construction_mtpa":null,"capacity_proposed_mtpa":null,"capacity_operating_bcm_y":16.32,"capacity_construction_bcm_y":null,"capacity_proposed_bcm_y":null,"earliest_start_year":1969,"latest_start_year":1969,"url":"https://lngatlas.org/terminal/negishi-lng-terminal-jp/","data_source":"Data: Global Gas Infrastructure Tracker, Global Energy Monitor, September 2025"},{"slug":"neptune-lng-terminal-us","name":"Neptune LNG Terminal","country":"United States","country_iso":"US","region":"Americas","state_province":"Massachusetts","city":"Boston","facility_type":"import","floating_type":"unknown","status":"mothballed","latitude":42.573468,"longitude":-70.665422,"units":1,"capacity_operating_mtpa":null,"capacity_construction_mtpa":null,"capacity_proposed_mtpa":null,"capacity_operating_bcm_y":null,"capacity_construction_bcm_y":null,"capacity_proposed_bcm_y":null,"earliest_start_year":2010,"latest_start_year":2010,"url":"https://lngatlas.org/terminal/neptune-lng-terminal-us/","data_source":"Data: Global Gas Infrastructure Tracker, Global Energy Monitor, September 2025"},{"slug":"new-fortress-altamira-lng-terminal-mx","name":"New Fortress Altamira LNG Terminal","country":"Mexico","country_iso":"MX","region":"Americas","state_province":"Tamaulipas","city":"Offshore Altamira","facility_type":"export","floating_type":"floating","status":"operating","latitude":22.6543,"longitude":-97.68048,"units":5,"capacity_operating_mtpa":1.4,"capacity_construction_mtpa":1.4,"capacity_proposed_mtpa":1.4,"capacity_operating_bcm_y":1.904,"capacity_construction_bcm_y":1.904,"capacity_proposed_bcm_y":1.904,"earliest_start_year":2024,"latest_start_year":2024,"url":"https://lngatlas.org/terminal/new-fortress-altamira-lng-terminal-mx/","data_source":"Data: Global Gas Infrastructure Tracker, Global Energy Monitor, September 2025"},{"slug":"new-fortress-angola-lng-terminal-ao","name":"New Fortress Angola LNG Terminal","country":"Angola","country_iso":"AO","region":"Africa","state_province":null,"city":null,"facility_type":"import","floating_type":"unknown","status":"cancelled","latitude":null,"longitude":null,"units":1,"capacity_operating_mtpa":null,"capacity_construction_mtpa":null,"capacity_proposed_mtpa":null,"capacity_operating_bcm_y":null,"capacity_construction_bcm_y":null,"capacity_proposed_bcm_y":null,"earliest_start_year":null,"latest_start_year":null,"url":"https://lngatlas.org/terminal/new-fortress-angola-lng-terminal-ao/","data_source":"Data: Global Gas Infrastructure Tracker, Global Energy Monitor, September 2025"},{"slug":"new-fortress-banda-lng-terminal-mr","name":"New Fortress Banda LNG Terminal","country":"Mauritania","country_iso":"MR","region":"Africa","state_province":null,"city":"Banda gas field","facility_type":"export","floating_type":"unknown","status":"cancelled","latitude":17.948231,"longitude":-16.658219,"units":1,"capacity_operating_mtpa":null,"capacity_construction_mtpa":null,"capacity_proposed_mtpa":null,"capacity_operating_bcm_y":null,"capacity_construction_bcm_y":null,"capacity_proposed_bcm_y":null,"earliest_start_year":null,"latest_start_year":null,"url":"https://lngatlas.org/terminal/new-fortress-banda-lng-terminal-mr/","data_source":"Data: Global Gas Infrastructure Tracker, Global Energy Monitor, September 2025"},{"slug":"new-fortress-barcarena-fsru-br","name":"New Fortress Barcarena FSRU","country":"Brazil","country_iso":"BR","region":"Americas","state_province":"Pará","city":"Porto de Vila do Conde","facility_type":"import","floating_type":"fsru","status":"operating","latitude":-1.539174,"longitude":-48.754139,"units":1,"capacity_operating_mtpa":6,"capacity_construction_mtpa":null,"capacity_proposed_mtpa":null,"capacity_operating_bcm_y":8.16,"capacity_construction_bcm_y":null,"capacity_proposed_bcm_y":null,"earliest_start_year":2024,"latest_start_year":2024,"url":"https://lngatlas.org/terminal/new-fortress-barcarena-fsru-br/","data_source":"Data: Global Gas Infrastructure Tracker, Global Energy Monitor, September 2025"},{"slug":"new-fortress-colombo-lng-terminal-lk","name":"New Fortress Colombo LNG Terminal","country":"Sri Lanka","country_iso":"LK","region":"Asia","state_province":null,"city":"Offshore Colombo","facility_type":"import","floating_type":"unknown","status":"cancelled","latitude":6.9048,"longitude":79.4723,"units":1,"capacity_operating_mtpa":null,"capacity_construction_mtpa":null,"capacity_proposed_mtpa":null,"capacity_operating_bcm_y":null,"capacity_construction_bcm_y":null,"capacity_proposed_bcm_y":null,"earliest_start_year":null,"latest_start_year":null,"url":"https://lngatlas.org/terminal/new-fortress-colombo-lng-terminal-lk/","data_source":"Data: Global Gas Infrastructure Tracker, Global Energy Monitor, September 2025"},{"slug":"new-fortress-grand-isle-flng-terminal-us","name":"New Fortress Grand Isle FLNG Terminal","country":"United States","country_iso":"US","region":"Americas","state_province":"Louisiana","city":"Grand Isle","facility_type":"export","floating_type":"flng","status":"cancelled","latitude":29.0590222,"longitude":-89.8226025,"units":1,"capacity_operating_mtpa":null,"capacity_construction_mtpa":null,"capacity_proposed_mtpa":null,"capacity_operating_bcm_y":null,"capacity_construction_bcm_y":null,"capacity_proposed_bcm_y":null,"earliest_start_year":null,"latest_start_year":null,"url":"https://lngatlas.org/terminal/new-fortress-grand-isle-flng-terminal-us/","data_source":"Data: Global Gas Infrastructure Tracker, Global Energy Monitor, September 2025"},{"slug":"new-fortress-wyalusing-lng-terminal-us","name":"New Fortress Wyalusing LNG Terminal","country":"United States","country_iso":"US","region":"Americas","state_province":"Pennsylvania","city":"Wyalusing Township","facility_type":"export","floating_type":"unknown","status":"cancelled","latitude":41.653541,"longitude":-76.233213,"units":1,"capacity_operating_mtpa":null,"capacity_construction_mtpa":null,"capacity_proposed_mtpa":null,"capacity_operating_bcm_y":null,"capacity_construction_bcm_y":null,"capacity_proposed_bcm_y":null,"earliest_start_year":null,"latest_start_year":null,"url":"https://lngatlas.org/terminal/new-fortress-wyalusing-lng-terminal-us/","data_source":"Data: Global Gas Infrastructure Tracker, Global Energy Monitor, September 2025"},{"slug":"newmed-flng-terminal-il","name":"NewMed FLNG Terminal","country":"Israel","country_iso":"IL","region":"Asia","state_province":null,"city":"Dor","facility_type":"export","floating_type":"flng","status":"proposed","latitude":32.614,"longitude":34.808,"units":1,"capacity_operating_mtpa":null,"capacity_construction_mtpa":null,"capacity_proposed_mtpa":5.14,"capacity_operating_bcm_y":null,"capacity_construction_bcm_y":null,"capacity_proposed_bcm_y":6.99,"earliest_start_year":null,"latest_start_year":null,"url":"https://lngatlas.org/terminal/newmed-flng-terminal-il/","data_source":"Data: Global Gas Infrastructure Tracker, Global Energy Monitor, September 2025"},{"slug":"newtimes-energy-lng-terminal-ca","name":"NewTimes Energy LNG Terminal","country":"Canada","country_iso":"CA","region":"Americas","state_province":"British Columbia","city":"Prince Rupert","facility_type":"export","floating_type":"unknown","status":"cancelled","latitude":54.312194,"longitude":-130.327083,"units":3,"capacity_operating_mtpa":null,"capacity_construction_mtpa":null,"capacity_proposed_mtpa":null,"capacity_operating_bcm_y":null,"capacity_construction_bcm_y":null,"capacity_proposed_bcm_y":null,"earliest_start_year":null,"latest_start_year":null,"url":"https://lngatlas.org/terminal/newtimes-energy-lng-terminal-ca/","data_source":"Data: Global Gas Infrastructure Tracker, Global Energy Monitor, September 2025"},{"slug":"newcastle-fsru-au","name":"Newcastle FSRU","country":"Australia","country_iso":"AU","region":"Oceania","state_province":"New South Wales","city":"Newcastle","facility_type":"import","floating_type":"fsru","status":"shelved","latitude":-32.916667,"longitude":151.75,"units":1,"capacity_operating_mtpa":null,"capacity_construction_mtpa":null,"capacity_proposed_mtpa":null,"capacity_operating_bcm_y":null,"capacity_construction_bcm_y":null,"capacity_proposed_bcm_y":null,"earliest_start_year":null,"latest_start_year":null,"url":"https://lngatlas.org/terminal/newcastle-fsru-au/","data_source":"Data: Global Gas Infrastructure Tracker, Global Energy Monitor, September 2025"},{"slug":"nextdecade-cork-fsru-ie","name":"NextDecade Cork FSRU","country":"Ireland","country_iso":"IE","region":"Europe","state_province":null,"city":"Cork","facility_type":"import","floating_type":"fsru","status":"cancelled","latitude":51.831398,"longitude":-8.322984,"units":1,"capacity_operating_mtpa":null,"capacity_construction_mtpa":null,"capacity_proposed_mtpa":null,"capacity_operating_bcm_y":null,"capacity_construction_bcm_y":null,"capacity_proposed_bcm_y":null,"earliest_start_year":null,"latest_start_year":null,"url":"https://lngatlas.org/terminal/nextdecade-cork-fsru-ie/","data_source":"Data: Global Gas Infrastructure Tracker, Global Energy Monitor, September 2025"},{"slug":"nghi-son-lng-terminal-vn","name":"Nghi Son LNG Terminal","country":"Vietnam","country_iso":"VN","region":"Asia","state_province":"Thanh Hóa","city":"Nghi Son","facility_type":"import","floating_type":"unknown","status":"proposed","latitude":19.437793,"longitude":105.768091,"units":1,"capacity_operating_mtpa":null,"capacity_construction_mtpa":null,"capacity_proposed_mtpa":1.2,"capacity_operating_bcm_y":null,"capacity_construction_bcm_y":null,"capacity_proposed_bcm_y":1.632,"earliest_start_year":null,"latest_start_year":null,"url":"https://lngatlas.org/terminal/nghi-son-lng-terminal-vn/","data_source":"Data: Global Gas Infrastructure Tracker, Global Energy Monitor, September 2025"},{"slug":"ngqura-lng-terminal-za","name":"Ngqura LNG Terminal","country":"South Africa","country_iso":"ZA","region":"Africa","state_province":"Eastern Cape","city":"Port of Ngqura","facility_type":"import","floating_type":"unknown","status":"proposed","latitude":-33.801131,"longitude":25.683646,"units":1,"capacity_operating_mtpa":null,"capacity_construction_mtpa":null,"capacity_proposed_mtpa":2.8,"capacity_operating_bcm_y":null,"capacity_construction_bcm_y":null,"capacity_proposed_bcm_y":3.808,"earliest_start_year":null,"latest_start_year":null,"url":"https://lngatlas.org/terminal/ngqura-lng-terminal-za/","data_source":"Data: Global Gas Infrastructure Tracker, Global Energy Monitor, September 2025"},{"slug":"nigeria-lng-terminal-ng","name":"Nigeria LNG Terminal","country":"Nigeria","country_iso":"NG","region":"Africa","state_province":"Rivers","city":"Bonny Island","facility_type":"export","floating_type":"unknown","status":"operating","latitude":4.41836,"longitude":7.16157,"units":13,"capacity_operating_mtpa":22.2,"capacity_construction_mtpa":4.2,"capacity_proposed_mtpa":3.4,"capacity_operating_bcm_y":30.192,"capacity_construction_bcm_y":5.712,"capacity_proposed_bcm_y":4.624,"earliest_start_year":1999,"latest_start_year":2008,"url":"https://lngatlas.org/terminal/nigeria-lng-terminal-ng/","data_source":"Data: Global Gas Infrastructure Tracker, Global Energy Monitor, September 2025"},{"slug":"niihama-lng-terminal-jp","name":"Niihama LNG Terminal","country":"Japan","country_iso":"JP","region":"Asia","state_province":"Shikoku","city":"Niihama","facility_type":"import","floating_type":"unknown","status":"operating","latitude":33.984979,"longitude":133.314241,"units":1,"capacity_operating_mtpa":1,"capacity_construction_mtpa":null,"capacity_proposed_mtpa":null,"capacity_operating_bcm_y":1.36,"capacity_construction_bcm_y":null,"capacity_proposed_bcm_y":null,"earliest_start_year":2022,"latest_start_year":2022,"url":"https://lngatlas.org/terminal/niihama-lng-terminal-jp/","data_source":"Data: Global Gas Infrastructure Tracker, Global Energy Monitor, September 2025"},{"slug":"nimofast-antonina-lng-terminal-br","name":"Nimofast Antonina LNG Terminal","country":"Brazil","country_iso":"BR","region":"Americas","state_province":"Paraná","city":"Antonina","facility_type":"import","floating_type":"unknown","status":"shelved","latitude":-25.445703,"longitude":-48.692089,"units":1,"capacity_operating_mtpa":null,"capacity_construction_mtpa":null,"capacity_proposed_mtpa":null,"capacity_operating_bcm_y":null,"capacity_construction_bcm_y":null,"capacity_proposed_bcm_y":null,"earliest_start_year":null,"latest_start_year":null,"url":"https://lngatlas.org/terminal/nimofast-antonina-lng-terminal-br/","data_source":"Data: Global Gas Infrastructure Tracker, Global Energy Monitor, September 2025"},{"slug":"nisgaa-lng-terminal-ca","name":"Nisga'a LNG Terminal","country":"Canada","country_iso":"CA","region":"Americas","state_province":"British Columbia","city":"Portland Inlet","facility_type":"export","floating_type":"unknown","status":"cancelled","latitude":54.733333,"longitude":-130.4,"units":1,"capacity_operating_mtpa":null,"capacity_construction_mtpa":null,"capacity_proposed_mtpa":null,"capacity_operating_bcm_y":null,"capacity_construction_bcm_y":null,"capacity_proposed_bcm_y":null,"earliest_start_year":null,"latest_start_year":null,"url":"https://lngatlas.org/terminal/nisgaa-lng-terminal-ca/","data_source":"Data: Global Gas Infrastructure Tracker, Global Energy Monitor, September 2025"},{"slug":"nopetro-lng-terminal-us","name":"Nopetro LNG Terminal","country":"United States","country_iso":"US","region":"Americas","state_province":"Florida","city":"Port St. Joe","facility_type":"export","floating_type":"unknown","status":"cancelled","latitude":29.819501,"longitude":-85.310654,"units":1,"capacity_operating_mtpa":null,"capacity_construction_mtpa":null,"capacity_proposed_mtpa":null,"capacity_operating_bcm_y":null,"capacity_construction_bcm_y":null,"capacity_proposed_bcm_y":null,"earliest_start_year":null,"latest_start_year":null,"url":"https://lngatlas.org/terminal/nopetro-lng-terminal-us/","data_source":"Data: Global Gas Infrastructure Tracker, Global Energy Monitor, September 2025"},{"slug":"north-pars-lng-terminal-ir","name":"North Pars LNG Terminal","country":"Iran","country_iso":"IR","region":"Asia","state_province":"Perian Gulf","city":"South Pars gas field","facility_type":"export","floating_type":"unknown","status":"cancelled","latitude":26.619125,"longitude":52.067964,"units":1,"capacity_operating_mtpa":null,"capacity_construction_mtpa":null,"capacity_proposed_mtpa":null,"capacity_operating_bcm_y":null,"capacity_construction_bcm_y":null,"capacity_proposed_bcm_y":null,"earliest_start_year":null,"latest_start_year":null,"url":"https://lngatlas.org/terminal/north-pars-lng-terminal-ir/","data_source":"Data: Global Gas Infrastructure Tracker, Global Energy Monitor, September 2025"},{"slug":"north-west-shelf-lng-terminal-au","name":"North West Shelf LNG Terminal","country":"Australia","country_iso":"AU","region":"Oceania","state_province":"Western Australia","city":"Perth","facility_type":"export","floating_type":"unknown","status":"operating","latitude":-20.59424,"longitude":116.7767,"units":5,"capacity_operating_mtpa":14.2,"capacity_construction_mtpa":null,"capacity_proposed_mtpa":null,"capacity_operating_bcm_y":19.312,"capacity_construction_bcm_y":null,"capacity_proposed_bcm_y":null,"earliest_start_year":1989,"latest_start_year":2008,"url":"https://lngatlas.org/terminal/north-west-shelf-lng-terminal-au/","data_source":"Data: Global Gas Infrastructure Tracker, Global Energy Monitor, September 2025"},{"slug":"northeast-asia-lng-hub-terminal-kr","name":"Northeast Asia LNG Hub Terminal","country":"South Korea","country_iso":"KR","region":"Asia","state_province":null,"city":"Myodo","facility_type":"import","floating_type":"unknown","status":"construction","latitude":34.871552,"longitude":127.712685,"units":1,"capacity_operating_mtpa":null,"capacity_construction_mtpa":3,"capacity_proposed_mtpa":null,"capacity_operating_bcm_y":null,"capacity_construction_bcm_y":4.08,"capacity_proposed_bcm_y":null,"earliest_start_year":null,"latest_start_year":null,"url":"https://lngatlas.org/terminal/northeast-asia-lng-hub-terminal-kr/","data_source":"Data: Global Gas Infrastructure Tracker, Global Energy Monitor, September 2025"},{"slug":"northeast-gateway-lng-terminal-us","name":"Northeast Gateway FSRU","country":"United States","country_iso":"US","region":"Americas","state_province":"Massachusetts","city":"Boston","facility_type":"import","floating_type":"fsru","status":"idle","latitude":42.398986,"longitude":-70.616774,"units":1,"capacity_operating_mtpa":null,"capacity_construction_mtpa":null,"capacity_proposed_mtpa":null,"capacity_operating_bcm_y":null,"capacity_construction_bcm_y":null,"capacity_proposed_bcm_y":null,"earliest_start_year":2008,"latest_start_year":2008,"url":"https://lngatlas.org/terminal/northeast-gateway-lng-terminal-us/","data_source":"Data: Global Gas Infrastructure Tracker, Global Energy Monitor, September 2025"},{"slug":"northern-territory-lng-terminal-au","name":"Northern Territory LNG Terminal","country":"Australia","country_iso":"AU","region":"Oceania","state_province":"Northern Territory","city":"Wickham","facility_type":"export","floating_type":"unknown","status":"proposed","latitude":-12.540309,"longitude":130.960794,"units":1,"capacity_operating_mtpa":null,"capacity_construction_mtpa":null,"capacity_proposed_mtpa":6.6,"capacity_operating_bcm_y":null,"capacity_construction_bcm_y":null,"capacity_proposed_bcm_y":8.976,"earliest_start_year":null,"latest_start_year":null,"url":"https://lngatlas.org/terminal/northern-territory-lng-terminal-au/","data_source":"Data: Global Gas Infrastructure Tracker, Global Energy Monitor, September 2025"},{"slug":"northern-vietnam-lng-terminal-vn","name":"Northern Vietnam LNG Terminal","country":"Vietnam","country_iso":"VN","region":"Asia","state_province":"Hai Phong","city":"Hai Phong","facility_type":"import","floating_type":"unknown","status":"proposed","latitude":20.823732,"longitude":106.796686,"units":2,"capacity_operating_mtpa":null,"capacity_construction_mtpa":null,"capacity_proposed_mtpa":1.2,"capacity_operating_bcm_y":null,"capacity_construction_bcm_y":null,"capacity_proposed_bcm_y":1.632,"earliest_start_year":null,"latest_start_year":null,"url":"https://lngatlas.org/terminal/northern-vietnam-lng-terminal-vn/","data_source":"Data: Global Gas Infrastructure Tracker, Global Energy Monitor, September 2025"},{"slug":"nusantara-regas-satu-terminal-id","name":"Nusantara Regas Satu Terminal","country":"Indonesia","country_iso":"ID","region":"Asia","state_province":"West Java","city":"Jakarta Bay","facility_type":"import","floating_type":"floating","status":"operating","latitude":-5.992909,"longitude":106.82,"units":1,"capacity_operating_mtpa":3,"capacity_construction_mtpa":null,"capacity_proposed_mtpa":null,"capacity_operating_bcm_y":4.08,"capacity_construction_bcm_y":null,"capacity_proposed_bcm_y":null,"earliest_start_year":2012,"latest_start_year":2012,"url":"https://lngatlas.org/terminal/nusantara-regas-satu-terminal-id/","data_source":"Data: Global Gas Infrastructure Tracker, Global Energy Monitor, September 2025"},{"slug":"obsky-lng-terminal-ru","name":"Obsky LNG Terminal","country":"Russia","country_iso":"RU","region":"Europe","state_province":"Yamai Peninsula","city":null,"facility_type":"export","floating_type":"unknown","status":"proposed","latitude":71.2733,"longitude":72.0725,"units":1,"capacity_operating_mtpa":null,"capacity_construction_mtpa":null,"capacity_proposed_mtpa":4.8,"capacity_operating_bcm_y":null,"capacity_construction_bcm_y":null,"capacity_proposed_bcm_y":6.528,"earliest_start_year":null,"latest_start_year":null,"url":"https://lngatlas.org/terminal/obsky-lng-terminal-ru/","data_source":"Data: Global Gas Infrastructure Tracker, Global Energy Monitor, September 2025"},{"slug":"ocean-cay-lng-terminal-bs","name":"Ocean Cay LNG Terminal","country":"Bahamas","country_iso":"BS","region":"Americas","state_province":null,"city":"Ocean Cay","facility_type":"import","floating_type":"unknown","status":"cancelled","latitude":25.41667,"longitude":-79.21667,"units":1,"capacity_operating_mtpa":null,"capacity_construction_mtpa":null,"capacity_proposed_mtpa":null,"capacity_operating_bcm_y":null,"capacity_construction_bcm_y":null,"capacity_proposed_bcm_y":null,"earliest_start_year":null,"latest_start_year":null,"url":"https://lngatlas.org/terminal/ocean-cay-lng-terminal-bs/","data_source":"Data: Global Gas Infrastructure Tracker, Global Energy Monitor, September 2025"},{"slug":"oceanway-lng-terminal-us","name":"OceanWay LNG Terminal","country":"United States","country_iso":"US","region":"Americas","state_province":"California","city":"Los Angeles","facility_type":"import","floating_type":"unknown","status":"cancelled","latitude":33.774258,"longitude":-118.687825,"units":1,"capacity_operating_mtpa":null,"capacity_construction_mtpa":null,"capacity_proposed_mtpa":null,"capacity_operating_bcm_y":null,"capacity_construction_bcm_y":null,"capacity_proposed_bcm_y":null,"earliest_start_year":null,"latest_start_year":null,"url":"https://lngatlas.org/terminal/oceanway-lng-terminal-us/","data_source":"Data: Global Gas Infrastructure Tracker, Global Energy Monitor, September 2025"},{"slug":"ohgishima-lng-terminal-jp","name":"Ohgishima LNG Terminal","country":"Japan","country_iso":"JP","region":"Asia","state_province":"Kanto","city":"Tsurumi-ku, Yokohama","facility_type":"import","floating_type":"unknown","status":"operating","latitude":35.493545,"longitude":139.739692,"units":1,"capacity_operating_mtpa":10.2,"capacity_construction_mtpa":null,"capacity_proposed_mtpa":null,"capacity_operating_bcm_y":13.872,"capacity_construction_bcm_y":null,"capacity_proposed_bcm_y":null,"earliest_start_year":1998,"latest_start_year":1998,"url":"https://lngatlas.org/terminal/ohgishima-lng-terminal-jp/","data_source":"Data: Global Gas Infrastructure Tracker, Global Energy Monitor, September 2025"},{"slug":"oita-lng-terminal-jp","name":"Oita LNG Terminal","country":"Japan","country_iso":"JP","region":"Asia","state_province":"Kyushu","city":"Oita","facility_type":"import","floating_type":"unknown","status":"operating","latitude":33.2707,"longitude":131.7077,"units":1,"capacity_operating_mtpa":5.4,"capacity_construction_mtpa":null,"capacity_proposed_mtpa":null,"capacity_operating_bcm_y":7.344,"capacity_construction_bcm_y":null,"capacity_proposed_bcm_y":null,"earliest_start_year":1990,"latest_start_year":1990,"url":"https://lngatlas.org/terminal/oita-lng-terminal-jp/","data_source":"Data: Global Gas Infrastructure Tracker, Global Energy Monitor, September 2025"},{"slug":"old-harbour-fsru-jm","name":"Old Harbour FSRU","country":"Jamaica","country_iso":"JM","region":"Americas","state_province":null,"city":"Old Harbour","facility_type":"import","floating_type":"fsru","status":"operating","latitude":17.8446252,"longitude":-77.1163371,"units":1,"capacity_operating_mtpa":3.6,"capacity_construction_mtpa":null,"capacity_proposed_mtpa":null,"capacity_operating_bcm_y":4.896,"capacity_construction_bcm_y":null,"capacity_proposed_bcm_y":null,"earliest_start_year":2019,"latest_start_year":2019,"url":"https://lngatlas.org/terminal/old-harbour-fsru-jm/","data_source":"Data: Global Gas Infrastructure Tracker, Global Energy Monitor, September 2025"},{"slug":"olokola-lng-terminal-ng","name":"Olokola LNG Terminal","country":"Nigeria","country_iso":"NG","region":"Africa","state_province":"Cross River State","city":"Olokola Free Trade Zone","facility_type":"export","floating_type":"unknown","status":"proposed","latitude":5.021667,"longitude":8.320278,"units":4,"capacity_operating_mtpa":null,"capacity_construction_mtpa":null,"capacity_proposed_mtpa":12.6,"capacity_operating_bcm_y":null,"capacity_construction_bcm_y":null,"capacity_proposed_bcm_y":17.136,"earliest_start_year":null,"latest_start_year":null,"url":"https://lngatlas.org/terminal/olokola-lng-terminal-ng/","data_source":"Data: Global Gas Infrastructure Tracker, Global Energy Monitor, September 2025"},{"slug":"oman-qalhat-lng-terminal-om","name":"Oman Qalhat LNG Terminal","country":"Oman","country_iso":"OM","region":"Asia","state_province":"Ash Sharqiyah","city":"Qalhat","facility_type":"export","floating_type":"unknown","status":"operating","latitude":22.6586,"longitude":59.40748,"units":5,"capacity_operating_mtpa":11.4,"capacity_construction_mtpa":null,"capacity_proposed_mtpa":3.8,"capacity_operating_bcm_y":15.504,"capacity_construction_bcm_y":null,"capacity_proposed_bcm_y":5.168,"earliest_start_year":1999,"latest_start_year":2023,"url":"https://lngatlas.org/terminal/oman-qalhat-lng-terminal-om/","data_source":"Data: Global Gas Infrastructure Tracker, Global Energy Monitor, September 2025"},{"slug":"orca-flng-terminal-ca","name":"Orca FLNG Terminal","country":"Canada","country_iso":"CA","region":"Americas","state_province":"British Columbia","city":"Prince Rupert","facility_type":"export","floating_type":"flng","status":"cancelled","latitude":54.312194,"longitude":-130.327083,"units":1,"capacity_operating_mtpa":null,"capacity_construction_mtpa":null,"capacity_proposed_mtpa":null,"capacity_operating_bcm_y":null,"capacity_construction_bcm_y":null,"capacity_proposed_bcm_y":null,"earliest_start_year":null,"latest_start_year":null,"url":"https://lngatlas.org/terminal/orca-flng-terminal-ca/","data_source":"Data: Global Gas Infrastructure Tracker, Global Energy Monitor, September 2025"},{"slug":"oregon-lng-terminal-us","name":"Oregon LNG Terminal","country":"United States","country_iso":"US","region":"Americas","state_province":"Oregon","city":"Warrenton","facility_type":"export","floating_type":"unknown","status":"cancelled","latitude":46.1764445,"longitude":-123.9092231,"units":2,"capacity_operating_mtpa":null,"capacity_construction_mtpa":null,"capacity_proposed_mtpa":null,"capacity_operating_bcm_y":null,"capacity_construction_bcm_y":null,"capacity_proposed_bcm_y":null,"earliest_start_year":null,"latest_start_year":null,"url":"https://lngatlas.org/terminal/oregon-lng-terminal-us/","data_source":"Data: Global Gas Infrastructure Tracker, Global Energy Monitor, September 2025"},{"slug":"outer-harbor-fsru-au","name":"Outer Harbor FSRU","country":"Australia","country_iso":"AU","region":"Oceania","state_province":"South Australia","city":"Port Adelaide","facility_type":"import","floating_type":"fsru","status":"proposed","latitude":-34.7657711,"longitude":138.4991772,"units":1,"capacity_operating_mtpa":null,"capacity_construction_mtpa":null,"capacity_proposed_mtpa":2,"capacity_operating_bcm_y":null,"capacity_construction_bcm_y":null,"capacity_proposed_bcm_y":2.72,"earliest_start_year":null,"latest_start_year":null,"url":"https://lngatlas.org/terminal/outer-harbor-fsru-au/","data_source":"Data: Global Gas Infrastructure Tracker, Global Energy Monitor, September 2025"},{"slug":"oxnard-lng-terminal-us","name":"Oxnard LNG Terminal","country":"United States","country_iso":"US","region":"Americas","state_province":"California","city":"Oxnard","facility_type":"import","floating_type":"unknown","status":"cancelled","latitude":34.191389,"longitude":-119.1825,"units":1,"capacity_operating_mtpa":null,"capacity_construction_mtpa":null,"capacity_proposed_mtpa":null,"capacity_operating_bcm_y":null,"capacity_construction_bcm_y":null,"capacity_proposed_bcm_y":null,"earliest_start_year":null,"latest_start_year":null,"url":"https://lngatlas.org/terminal/oxnard-lng-terminal-us/","data_source":"Data: Global Gas Infrastructure Tracker, Global Energy Monitor, September 2025"},{"slug":"pawa-png-fsru-project-pg","name":"PAWA PNG FSRU Project","country":"Papua New Guinea","country_iso":"PG","region":"Oceania","state_province":"Western Province","city":"Daru","facility_type":"import","floating_type":"fsru","status":"shelved","latitude":-9.0594138,"longitude":143.2072899,"units":12,"capacity_operating_mtpa":null,"capacity_construction_mtpa":null,"capacity_proposed_mtpa":null,"capacity_operating_bcm_y":null,"capacity_construction_bcm_y":null,"capacity_proposed_bcm_y":null,"earliest_start_year":null,"latest_start_year":null,"url":"https://lngatlas.org/terminal/pawa-png-fsru-project-pg/","data_source":"Data: Global Gas Infrastructure Tracker, Global Energy Monitor, September 2025"},{"slug":"pemex-lng-terminal-mx","name":"PEMEX LNG Terminal","country":"Mexico","country_iso":"MX","region":"Americas","state_province":"Oaxaca","city":"Salina Cruz","facility_type":"export","floating_type":"unknown","status":"cancelled","latitude":16.167933,"longitude":-95.192147,"units":1,"capacity_operating_mtpa":null,"capacity_construction_mtpa":null,"capacity_proposed_mtpa":null,"capacity_operating_bcm_y":null,"capacity_construction_bcm_y":null,"capacity_proposed_bcm_y":null,"earliest_start_year":null,"latest_start_year":null,"url":"https://lngatlas.org/terminal/pemex-lng-terminal-mx/","data_source":"Data: Global Gas Infrastructure Tracker, Global Energy Monitor, September 2025"},{"slug":"pnoc-batangas-lng-terminal-ph","name":"PNOC Batangas LNG Terminal","country":"Philippines","country_iso":"PH","region":"Asia","state_province":"Batangas","city":"Batangas","facility_type":"import","floating_type":"floating","status":"cancelled","latitude":13.690671,"longitude":120.891207,"units":1,"capacity_operating_mtpa":null,"capacity_construction_mtpa":null,"capacity_proposed_mtpa":null,"capacity_operating_bcm_y":null,"capacity_construction_bcm_y":null,"capacity_proposed_bcm_y":null,"earliest_start_year":null,"latest_start_year":null,"url":"https://lngatlas.org/terminal/pnoc-batangas-lng-terminal-ph/","data_source":"Data: Global Gas Infrastructure Tracker, Global Energy Monitor, September 2025"},{"slug":"posco-dangjin-lng-terminal-kr","name":"POSCO Dangjin LNG Terminal","country":"South Korea","country_iso":"KR","region":"Asia","state_province":"Chungcheongnam-do","city":"Dangjin Port","facility_type":"import","floating_type":"unknown","status":"shelved","latitude":36.96132,"longitude":126.839859,"units":1,"capacity_operating_mtpa":null,"capacity_construction_mtpa":null,"capacity_proposed_mtpa":null,"capacity_operating_bcm_y":null,"capacity_construction_bcm_y":null,"capacity_proposed_bcm_y":null,"earliest_start_year":null,"latest_start_year":null,"url":"https://lngatlas.org/terminal/posco-dangjin-lng-terminal-kr/","data_source":"Data: Global Gas Infrastructure Tracker, Global Energy Monitor, September 2025"},{"slug":"pacific-northwest-lng-terminal-ca","name":"Pacific NorthWest LNG Terminal","country":"Canada","country_iso":"CA","region":"Americas","state_province":"British Columbia","city":"Lelu Island","facility_type":"export","floating_type":"unknown","status":"cancelled","latitude":54.2,"longitude":-130.289,"units":1,"capacity_operating_mtpa":null,"capacity_construction_mtpa":null,"capacity_proposed_mtpa":null,"capacity_operating_bcm_y":null,"capacity_construction_bcm_y":null,"capacity_proposed_bcm_y":null,"earliest_start_year":null,"latest_start_year":null,"url":"https://lngatlas.org/terminal/pacific-northwest-lng-terminal-ca/","data_source":"Data: Global Gas Infrastructure Tracker, Global Energy Monitor, September 2025"},{"slug":"pagbilao-grande-island-lng-terminal-ph","name":"Pagbilao Grande Island LNG Terminal","country":"Philippines","country_iso":"PH","region":"Asia","state_province":"Quezon","city":"Pagbilao Grande Island","facility_type":"import","floating_type":"unknown","status":"shelved","latitude":13.966667,"longitude":121.7,"units":1,"capacity_operating_mtpa":null,"capacity_construction_mtpa":null,"capacity_proposed_mtpa":null,"capacity_operating_bcm_y":null,"capacity_construction_bcm_y":null,"capacity_proposed_bcm_y":null,"earliest_start_year":null,"latest_start_year":null,"url":"https://lngatlas.org/terminal/pagbilao-grande-island-lng-terminal-ph/","data_source":"Data: Global Gas Infrastructure Tracker, Global Energy Monitor, September 2025"},{"slug":"pakistan-state-oil-lng-terminal-pk","name":"Pakistan State Oil LNG Terminal","country":"Pakistan","country_iso":"PK","region":"Asia","state_province":null,"city":"near Karachi","facility_type":"import","floating_type":"unknown","status":"shelved","latitude":24.812582,"longitude":66.972761,"units":1,"capacity_operating_mtpa":null,"capacity_construction_mtpa":null,"capacity_proposed_mtpa":null,"capacity_operating_bcm_y":null,"capacity_construction_bcm_y":null,"capacity_proposed_bcm_y":null,"earliest_start_year":null,"latest_start_year":null,"url":"https://lngatlas.org/terminal/pakistan-state-oil-lng-terminal-pk/","data_source":"Data: Global Gas Infrastructure Tracker, Global Energy Monitor, September 2025"},{"slug":"paldiski-fsru-ee","name":"Paldiski FSRU","country":"Estonia","country_iso":"EE","region":"Europe","state_province":null,"city":"Paldiski (Estonia) and Inkoo (Finland)","facility_type":"import","floating_type":"fsru","status":"construction","latitude":59.3874101,"longitude":24.0737072,"units":1,"capacity_operating_mtpa":null,"capacity_construction_mtpa":null,"capacity_proposed_mtpa":null,"capacity_operating_bcm_y":null,"capacity_construction_bcm_y":null,"capacity_proposed_bcm_y":null,"earliest_start_year":null,"latest_start_year":null,"url":"https://lngatlas.org/terminal/paldiski-fsru-ee/","data_source":"Data: Global Gas Infrastructure Tracker, Global Energy Monitor, September 2025"},{"slug":"paldiski-lng-terminal-ee","name":"Paldiski LNG Terminal","country":"Estonia","country_iso":"EE","region":"Europe","state_province":"Harju","city":null,"facility_type":"import","floating_type":"unknown","status":"shelved","latitude":59.38445,"longitude":24.07494,"units":1,"capacity_operating_mtpa":null,"capacity_construction_mtpa":null,"capacity_proposed_mtpa":null,"capacity_operating_bcm_y":null,"capacity_construction_bcm_y":null,"capacity_proposed_bcm_y":null,"earliest_start_year":null,"latest_start_year":null,"url":"https://lngatlas.org/terminal/paldiski-lng-terminal-ee/","data_source":"Data: Global Gas Infrastructure Tracker, Global Energy Monitor, September 2025"},{"slug":"palu-lng-terminal-id","name":"Palu LNG Terminal","country":"Indonesia","country_iso":"ID","region":"Asia","state_province":"Central Sulawesi","city":"Palu","facility_type":"import","floating_type":"unknown","status":"shelved","latitude":-0.71358,"longitude":119.86043,"units":1,"capacity_operating_mtpa":null,"capacity_construction_mtpa":null,"capacity_proposed_mtpa":null,"capacity_operating_bcm_y":null,"capacity_construction_bcm_y":null,"capacity_proposed_bcm_y":null,"earliest_start_year":null,"latest_start_year":null,"url":"https://lngatlas.org/terminal/palu-lng-terminal-id/","data_source":"Data: Global Gas Infrastructure Tracker, Global Energy Monitor, September 2025"},{"slug":"pandora-flng-terminal-pg","name":"Pandora FLNG Terminal","country":"Papua New Guinea","country_iso":"PG","region":"Oceania","state_province":null,"city":"Coral Sea","facility_type":"export","floating_type":"flng","status":"cancelled","latitude":-9.476749,"longitude":144.765096,"units":1,"capacity_operating_mtpa":null,"capacity_construction_mtpa":null,"capacity_proposed_mtpa":null,"capacity_operating_bcm_y":null,"capacity_construction_bcm_y":null,"capacity_proposed_bcm_y":null,"earliest_start_year":null,"latest_start_year":null,"url":"https://lngatlas.org/terminal/pandora-flng-terminal-pg/","data_source":"Data: Global Gas Infrastructure Tracker, Global Energy Monitor, September 2025"},{"slug":"panigaglia-lng-terminal-it","name":"Panigaglia LNG Terminal","country":"Italy","country_iso":"IT","region":"Europe","state_province":"Liguria","city":"Porto Venere","facility_type":"import","floating_type":"unknown","status":"operating","latitude":44.07428,"longitude":9.83087,"units":2,"capacity_operating_mtpa":2.5,"capacity_construction_mtpa":null,"capacity_proposed_mtpa":null,"capacity_operating_bcm_y":3.4,"capacity_construction_bcm_y":null,"capacity_proposed_bcm_y":null,"earliest_start_year":1969,"latest_start_year":1969,"url":"https://lngatlas.org/terminal/panigaglia-lng-terminal-it/","data_source":"Data: Global Gas Infrastructure Tracker, Global Energy Monitor, September 2025"},{"slug":"panjin-lng-terminal-cn","name":"Panjin LNG Terminal","country":"China","country_iso":"CN","region":"Asia","state_province":"Liaoning","city":"Rongxing Port","facility_type":"import","floating_type":"unknown","status":"cancelled","latitude":40.679064,"longitude":122.133293,"units":1,"capacity_operating_mtpa":null,"capacity_construction_mtpa":null,"capacity_proposed_mtpa":null,"capacity_operating_bcm_y":null,"capacity_construction_bcm_y":null,"capacity_proposed_bcm_y":null,"earliest_start_year":null,"latest_start_year":null,"url":"https://lngatlas.org/terminal/panjin-lng-terminal-cn/","data_source":"Data: Global Gas Infrastructure Tracker, Global Energy Monitor, September 2025"},{"slug":"papua-lng-terminal-pg","name":"Papua LNG Terminal","country":"Papua New Guinea","country_iso":"PG","region":"Oceania","state_province":"Central Province","city":"Caution Bay","facility_type":"export","floating_type":"unknown","status":"proposed","latitude":-9.3392748,"longitude":146.9872856,"units":5,"capacity_operating_mtpa":null,"capacity_construction_mtpa":null,"capacity_proposed_mtpa":6.6,"capacity_operating_bcm_y":null,"capacity_construction_bcm_y":null,"capacity_proposed_bcm_y":8.976,"earliest_start_year":null,"latest_start_year":null,"url":"https://lngatlas.org/terminal/papua-lng-terminal-pg/","data_source":"Data: Global Gas Infrastructure Tracker, Global Energy Monitor, September 2025"},{"slug":"papua-new-guinea-lng-terminal-pg","name":"Papua New Guinea LNG Terminal","country":"Papua New Guinea","country_iso":"PG","region":"Oceania","state_province":"National Capital District","city":"Port Moresby","facility_type":"export","floating_type":"unknown","status":"operating","latitude":-9.33862,"longitude":147.01825,"units":3,"capacity_operating_mtpa":8.3,"capacity_construction_mtpa":null,"capacity_proposed_mtpa":null,"capacity_operating_bcm_y":11.288,"capacity_construction_bcm_y":null,"capacity_proposed_bcm_y":null,"earliest_start_year":2014,"latest_start_year":2014,"url":"https://lngatlas.org/terminal/papua-new-guinea-lng-terminal-pg/","data_source":"Data: Global Gas Infrastructure Tracker, Global Energy Monitor, September 2025"},{"slug":"parana-fsru-br","name":"Paraná FSRU","country":"Brazil","country_iso":"BR","region":"Americas","state_province":"Paraná","city":"Pontal do Paraná","facility_type":"import","floating_type":"fsru","status":"cancelled","latitude":-25.540198,"longitude":-48.379359,"units":1,"capacity_operating_mtpa":null,"capacity_construction_mtpa":null,"capacity_proposed_mtpa":null,"capacity_operating_bcm_y":null,"capacity_construction_bcm_y":null,"capacity_proposed_bcm_y":null,"earliest_start_year":null,"latest_start_year":null,"url":"https://lngatlas.org/terminal/parana-fsru-br/","data_source":"Data: Global Gas Infrastructure Tracker, Global Energy Monitor, September 2025"},{"slug":"pasca-flng-terminal-pg","name":"Pasca FLNG Terminal","country":"Papua New Guinea","country_iso":"PG","region":"Oceania","state_province":null,"city":"Gulf of Papua","facility_type":"export","floating_type":"flng","status":"proposed","latitude":-8.746641,"longitude":144.82941,"units":1,"capacity_operating_mtpa":null,"capacity_construction_mtpa":null,"capacity_proposed_mtpa":0.75,"capacity_operating_bcm_y":null,"capacity_construction_bcm_y":null,"capacity_proposed_bcm_y":1.02,"earliest_start_year":null,"latest_start_year":null,"url":"https://lngatlas.org/terminal/pasca-flng-terminal-pg/","data_source":"Data: Global Gas Infrastructure Tracker, Global Energy Monitor, September 2025"},{"slug":"payra-fsru-bd","name":"Payra FSRU","country":"Bangladesh","country_iso":"BD","region":"Asia","state_province":"Patuakhali","city":"Payra Sea Port","facility_type":"import","floating_type":"fsru","status":"proposed","latitude":21.988808,"longitude":90.280506,"units":1,"capacity_operating_mtpa":null,"capacity_construction_mtpa":null,"capacity_proposed_mtpa":3.75,"capacity_operating_bcm_y":null,"capacity_construction_bcm_y":null,"capacity_proposed_bcm_y":5.1,"earliest_start_year":null,"latest_start_year":null,"url":"https://lngatlas.org/terminal/payra-fsru-bd/","data_source":"Data: Global Gas Infrastructure Tracker, Global Energy Monitor, September 2025"},{"slug":"payra-lng-terminal-bd","name":"Payra LNG Terminal","country":"Bangladesh","country_iso":"BD","region":"Asia","state_province":"Patuakhali","city":"Port of Payra","facility_type":"import","floating_type":"unknown","status":"cancelled","latitude":21.999205,"longitude":90.305597,"units":1,"capacity_operating_mtpa":null,"capacity_construction_mtpa":null,"capacity_proposed_mtpa":null,"capacity_operating_bcm_y":null,"capacity_construction_bcm_y":null,"capacity_proposed_bcm_y":null,"earliest_start_year":null,"latest_start_year":null,"url":"https://lngatlas.org/terminal/payra-lng-terminal-bd/","data_source":"Data: Global Gas Infrastructure Tracker, Global Energy Monitor, September 2025"},{"slug":"pechora-lng-terminal-ru","name":"Pechora LNG Terminal","country":"Russia","country_iso":"RU","region":"Europe","state_province":"Komi","city":"Pechora","facility_type":"export","floating_type":"unknown","status":"cancelled","latitude":65.166667,"longitude":57.25,"units":1,"capacity_operating_mtpa":null,"capacity_construction_mtpa":null,"capacity_proposed_mtpa":null,"capacity_operating_bcm_y":null,"capacity_construction_bcm_y":null,"capacity_proposed_bcm_y":null,"earliest_start_year":null,"latest_start_year":null,"url":"https://lngatlas.org/terminal/pechora-lng-terminal-ru/","data_source":"Data: Global Gas Infrastructure Tracker, Global Energy Monitor, September 2025"},{"slug":"pecem-fsru-br","name":"Pecém FSRU","country":"Brazil","country_iso":"BR","region":"Americas","state_province":"Ceará","city":"Porto de Pecém","facility_type":"import","floating_type":"fsru","status":"proposed","latitude":-3.531956,"longitude":-38.797218,"units":2,"capacity_operating_mtpa":null,"capacity_construction_mtpa":null,"capacity_proposed_mtpa":5.64,"capacity_operating_bcm_y":null,"capacity_construction_bcm_y":null,"capacity_proposed_bcm_y":7.67,"earliest_start_year":2008,"latest_start_year":2008,"url":"https://lngatlas.org/terminal/pecem-fsru-br/","data_source":"Data: Global Gas Infrastructure Tracker, Global Energy Monitor, September 2025"},{"slug":"penco-lirquen-fsru-cl","name":"Penco Lirquén FSRU","country":"Chile","country_iso":"CL","region":"Americas","state_province":"Biobío region (VIII)","city":"Concepción Bay","facility_type":"import","floating_type":"fsru","status":"proposed","latitude":-36.683333,"longitude":-73.033333,"units":1,"capacity_operating_mtpa":null,"capacity_construction_mtpa":null,"capacity_proposed_mtpa":2.7,"capacity_operating_bcm_y":null,"capacity_construction_bcm_y":null,"capacity_proposed_bcm_y":3.672,"earliest_start_year":null,"latest_start_year":null,"url":"https://lngatlas.org/terminal/penco-lirquen-fsru-cl/","data_source":"Data: Global Gas Infrastructure Tracker, Global Energy Monitor, September 2025"},{"slug":"pengerang-johor-lng-terminal-my","name":"Pengerang Johor LNG Terminal","country":"Malaysia","country_iso":"MY","region":"Asia","state_province":"Johor","city":"Pengerang","facility_type":"import","floating_type":"unknown","status":"operating","latitude":1.341382,"longitude":104.182089,"units":1,"capacity_operating_mtpa":3.5,"capacity_construction_mtpa":null,"capacity_proposed_mtpa":null,"capacity_operating_bcm_y":4.76,"capacity_construction_bcm_y":null,"capacity_proposed_bcm_y":null,"earliest_start_year":2017,"latest_start_year":2017,"url":"https://lngatlas.org/terminal/pengerang-johor-lng-terminal-my/","data_source":"Data: Global Gas Infrastructure Tracker, Global Energy Monitor, September 2025"},{"slug":"penglai-lng-terminal-baota-cn","name":"Penglai LNG Terminal","country":"China","country_iso":"CN","region":"Asia","state_province":"Shandong","city":null,"facility_type":"import","floating_type":"unknown","status":"cancelled","latitude":37.776013,"longitude":120.612407,"units":1,"capacity_operating_mtpa":null,"capacity_construction_mtpa":null,"capacity_proposed_mtpa":null,"capacity_operating_bcm_y":null,"capacity_construction_bcm_y":null,"capacity_proposed_bcm_y":null,"earliest_start_year":null,"latest_start_year":null,"url":"https://lngatlas.org/terminal/penglai-lng-terminal-baota-cn/","data_source":"Data: Global Gas Infrastructure Tracker, Global Energy Monitor, September 2025"},{"slug":"penn-lng-terminal-us","name":"Penn LNG Terminal","country":"United States","country_iso":"US","region":"Americas","state_province":"Pennsylvania","city":"Chester","facility_type":"export","floating_type":"unknown","status":"proposed","latitude":39.837705,"longitude":-75.370597,"units":1,"capacity_operating_mtpa":null,"capacity_construction_mtpa":null,"capacity_proposed_mtpa":7,"capacity_operating_bcm_y":null,"capacity_construction_bcm_y":null,"capacity_proposed_bcm_y":9.52,"earliest_start_year":null,"latest_start_year":null,"url":"https://lngatlas.org/terminal/penn-lng-terminal-us/","data_source":"Data: Global Gas Infrastructure Tracker, Global Energy Monitor, September 2025"},{"slug":"penuelas-lng-terminal-pr","name":"Penuelas LNG Terminal","country":"United States","country_iso":"US","region":"Americas","state_province":"Penuelas","city":"Punta Guayanilla","facility_type":"import","floating_type":"unknown","status":"operating","latitude":18.059444,"longitude":-66.7225,"units":1,"capacity_operating_mtpa":2,"capacity_construction_mtpa":null,"capacity_proposed_mtpa":null,"capacity_operating_bcm_y":2.72,"capacity_construction_bcm_y":null,"capacity_proposed_bcm_y":null,"earliest_start_year":2000,"latest_start_year":2000,"url":"https://lngatlas.org/terminal/penuelas-lng-terminal-pr/","data_source":"Data: Global Gas Infrastructure Tracker, Global Energy Monitor, September 2025"},{"slug":"persian-nioc-lng-terminal-ir","name":"Persian NIOC LNG Terminal","country":"Iran","country_iso":"IR","region":"Asia","state_province":"Bushehr Province","city":"Tombak Port","facility_type":"export","floating_type":"unknown","status":"cancelled","latitude":27.476111,"longitude":52.6075,"units":1,"capacity_operating_mtpa":null,"capacity_construction_mtpa":null,"capacity_proposed_mtpa":null,"capacity_operating_bcm_y":null,"capacity_construction_bcm_y":null,"capacity_proposed_bcm_y":null,"earliest_start_year":null,"latest_start_year":null,"url":"https://lngatlas.org/terminal/persian-nioc-lng-terminal-ir/","data_source":"Data: Global Gas Infrastructure Tracker, Global Energy Monitor, September 2025"},{"slug":"pertamina-bangladesh-fsru-bd","name":"Pertamina Bangladesh FSRU","country":"Bangladesh","country_iso":"BD","region":"Asia","state_province":"Chittagong","city":"Maheshkhali Upazila","facility_type":"import","floating_type":"fsru","status":"cancelled","latitude":22.2337,"longitude":91.866,"units":1,"capacity_operating_mtpa":null,"capacity_construction_mtpa":null,"capacity_proposed_mtpa":null,"capacity_operating_bcm_y":null,"capacity_construction_bcm_y":null,"capacity_proposed_bcm_y":null,"earliest_start_year":null,"latest_start_year":null,"url":"https://lngatlas.org/terminal/pertamina-bangladesh-fsru-bd/","data_source":"Data: Global Gas Infrastructure Tracker, Global Energy Monitor, September 2025"},{"slug":"peru-lng-terminal-pe","name":"Peru LNG Terminal","country":"Peru","country_iso":"PE","region":"Americas","state_province":"Ica","city":"Lima","facility_type":"export","floating_type":"unknown","status":"operating","latitude":-13.2451,"longitude":-76.297,"units":1,"capacity_operating_mtpa":4.45,"capacity_construction_mtpa":null,"capacity_proposed_mtpa":null,"capacity_operating_bcm_y":6.052,"capacity_construction_bcm_y":null,"capacity_proposed_bcm_y":null,"earliest_start_year":2010,"latest_start_year":2010,"url":"https://lngatlas.org/terminal/peru-lng-terminal-pe/","data_source":"Data: Global Gas Infrastructure Tracker, Global Energy Monitor, September 2025"},{"slug":"petronas-flng-terminal-sr","name":"Petronas FLNG Terminal","country":"Suriname","country_iso":"SR","region":"Americas","state_province":null,"city":null,"facility_type":"export","floating_type":"flng","status":"proposed","latitude":7.2053,"longitude":-55.3851,"units":1,"capacity_operating_mtpa":null,"capacity_construction_mtpa":null,"capacity_proposed_mtpa":null,"capacity_operating_bcm_y":null,"capacity_construction_bcm_y":null,"capacity_proposed_bcm_y":null,"earliest_start_year":null,"latest_start_year":null,"url":"https://lngatlas.org/terminal/petronas-flng-terminal-sr/","data_source":"Data: Global Gas Infrastructure Tracker, Global Energy Monitor, September 2025"},{"slug":"philippines-lng-terminal-ph","name":"Philippines LNG Terminal","country":"Philippines","country_iso":"PH","region":"Asia","state_province":"Batangas","city":"Batangas","facility_type":"import","floating_type":"floating","status":"operating","latitude":13.753821,"longitude":121.040525,"units":1,"capacity_operating_mtpa":5,"capacity_construction_mtpa":null,"capacity_proposed_mtpa":null,"capacity_operating_bcm_y":6.8,"capacity_construction_bcm_y":null,"capacity_proposed_bcm_y":null,"earliest_start_year":2023,"latest_start_year":2023,"url":"https://lngatlas.org/terminal/philippines-lng-terminal-ph/","data_source":"Data: Global Gas Infrastructure Tracker, Global Energy Monitor, September 2025"},{"slug":"pichilingue-lng-terminal-mx","name":"Pichilingue LNG Terminal","country":"Mexico","country_iso":"MX","region":"Americas","state_province":"Baja California Sur","city":"Port of Pichilingue","facility_type":"import","floating_type":"unknown","status":"operating","latitude":24.2740568,"longitude":-110.3273078,"units":1,"capacity_operating_mtpa":0.8,"capacity_construction_mtpa":null,"capacity_proposed_mtpa":null,"capacity_operating_bcm_y":1.088,"capacity_construction_bcm_y":null,"capacity_proposed_bcm_y":null,"earliest_start_year":2021,"latest_start_year":2021,"url":"https://lngatlas.org/terminal/pichilingue-lng-terminal-mx/","data_source":"Data: Global Gas Infrastructure Tracker, Global Energy Monitor, September 2025"},{"slug":"pilot-cork-fsru-ie","name":"Pilot Cork FSRU","country":"Ireland","country_iso":"IE","region":"Europe","state_province":null,"city":"Port of Cork","facility_type":"import","floating_type":"fsru","status":"shelved","latitude":51.826809,"longitude":-8.232798,"units":1,"capacity_operating_mtpa":null,"capacity_construction_mtpa":null,"capacity_proposed_mtpa":null,"capacity_operating_bcm_y":null,"capacity_construction_bcm_y":null,"capacity_proposed_bcm_y":null,"earliest_start_year":null,"latest_start_year":null,"url":"https://lngatlas.org/terminal/pilot-cork-fsru-ie/","data_source":"Data: Global Gas Infrastructure Tracker, Global Energy Monitor, September 2025"},{"slug":"pinghu-lng-terminal-cn","name":"Pinghu LNG Terminal","country":"China","country_iso":"CN","region":"Asia","state_province":"Zhejiang","city":"Dushan Port","facility_type":"import","floating_type":"unknown","status":"operating","latitude":30.681206,"longitude":121.246827,"units":1,"capacity_operating_mtpa":1,"capacity_construction_mtpa":null,"capacity_proposed_mtpa":null,"capacity_operating_bcm_y":1.36,"capacity_construction_bcm_y":null,"capacity_proposed_bcm_y":null,"earliest_start_year":2022,"latest_start_year":2022,"url":"https://lngatlas.org/terminal/pinghu-lng-terminal-cn/","data_source":"Data: Global Gas Infrastructure Tracker, Global Energy Monitor, September 2025"},{"slug":"piombino-fsru-it","name":"Piombino FSRU","country":"Italy","country_iso":"IT","region":"Europe","state_province":null,"city":"Port of Piombino","facility_type":"import","floating_type":"fsru","status":"operating","latitude":42.932151,"longitude":10.54641,"units":1,"capacity_operating_mtpa":3.67,"capacity_construction_mtpa":null,"capacity_proposed_mtpa":null,"capacity_operating_bcm_y":4.991,"capacity_construction_bcm_y":null,"capacity_proposed_bcm_y":null,"earliest_start_year":2023,"latest_start_year":2023,"url":"https://lngatlas.org/terminal/piombino-fsru-it/","data_source":"Data: Global Gas Infrastructure Tracker, Global Energy Monitor, September 2025"},{"slug":"placentia-bay-flng-terminal-ca","name":"Placentia Bay FLNG Terminal","country":"Canada","country_iso":"CA","region":"Americas","state_province":"Newfoundland and Labrador","city":"Arnold's Cove","facility_type":"export","floating_type":"flng","status":"shelved","latitude":47.417157,"longitude":-53.875705,"units":1,"capacity_operating_mtpa":null,"capacity_construction_mtpa":null,"capacity_proposed_mtpa":null,"capacity_operating_bcm_y":null,"capacity_construction_bcm_y":null,"capacity_proposed_bcm_y":null,"earliest_start_year":null,"latest_start_year":null,"url":"https://lngatlas.org/terminal/placentia-bay-flng-terminal-ca/","data_source":"Data: Global Gas Infrastructure Tracker, Global Energy Monitor, September 2025"},{"slug":"plaquemines-lng-terminal-us","name":"Plaquemines LNG Terminal","country":"United States","country_iso":"US","region":"Americas","state_province":"Louisiana","city":"Plaquemines Parish","facility_type":"export","floating_type":"unknown","status":"operating","latitude":29.600411,"longitude":-89.886404,"units":3,"capacity_operating_mtpa":10,"capacity_construction_mtpa":10,"capacity_proposed_mtpa":24.8,"capacity_operating_bcm_y":13.6,"capacity_construction_bcm_y":13.6,"capacity_proposed_bcm_y":33.728,"earliest_start_year":2025,"latest_start_year":2025,"url":"https://lngatlas.org/terminal/plaquemines-lng-terminal-us/","data_source":"Data: Global Gas Infrastructure Tracker, Global Energy Monitor, September 2025"},{"slug":"pluto-lng-terminal-au","name":"Pluto LNG Terminal","country":"Australia","country_iso":"AU","region":"Oceania","state_province":"Western Australia","city":"Perth","facility_type":"export","floating_type":"unknown","status":"operating","latitude":-20.6128,"longitude":116.76556,"units":3,"capacity_operating_mtpa":4.9,"capacity_construction_mtpa":5,"capacity_proposed_mtpa":null,"capacity_operating_bcm_y":6.664,"capacity_construction_bcm_y":6.8,"capacity_proposed_bcm_y":null,"earliest_start_year":2012,"latest_start_year":2012,"url":"https://lngatlas.org/terminal/pluto-lng-terminal-au/","data_source":"Data: Global Gas Infrastructure Tracker, Global Energy Monitor, September 2025"},{"slug":"point-comfort-lng-terminal-us","name":"Point Comfort LNG Terminal","country":"United States","country_iso":"US","region":"Americas","state_province":"Texas","city":"Point Comfort","facility_type":"export","floating_type":"unknown","status":"cancelled","latitude":28.676111,"longitude":-96.558889,"units":1,"capacity_operating_mtpa":null,"capacity_construction_mtpa":null,"capacity_proposed_mtpa":null,"capacity_operating_bcm_y":null,"capacity_construction_bcm_y":null,"capacity_proposed_bcm_y":null,"earliest_start_year":null,"latest_start_year":null,"url":"https://lngatlas.org/terminal/point-comfort-lng-terminal-us/","data_source":"Data: Global Gas Infrastructure Tracker, Global Energy Monitor, September 2025"},{"slug":"pointe-lng-terminal-us","name":"Pointe LNG Terminal","country":"United States","country_iso":"US","region":"Americas","state_province":"Louisiana","city":"Mile 46","facility_type":"export","floating_type":"unknown","status":"cancelled","latitude":29.859605,"longitude":-89.991638,"units":1,"capacity_operating_mtpa":null,"capacity_construction_mtpa":null,"capacity_proposed_mtpa":null,"capacity_operating_bcm_y":null,"capacity_construction_bcm_y":null,"capacity_proposed_bcm_y":null,"earliest_start_year":null,"latest_start_year":null,"url":"https://lngatlas.org/terminal/pointe-lng-terminal-us/","data_source":"Data: Global Gas Infrastructure Tracker, Global Energy Monitor, September 2025"},{"slug":"polish-baltic-sea-coast-fsru-pl","name":"Polish Baltic Sea Coast FSRU","country":"Poland","country_iso":"PL","region":"Europe","state_province":null,"city":"Gdansk","facility_type":"import","floating_type":"fsru","status":"construction","latitude":54.424696,"longitude":18.73585,"units":2,"capacity_operating_mtpa":null,"capacity_construction_mtpa":4.48,"capacity_proposed_mtpa":3.31,"capacity_operating_bcm_y":null,"capacity_construction_bcm_y":6.093,"capacity_proposed_bcm_y":4.502,"earliest_start_year":null,"latest_start_year":null,"url":"https://lngatlas.org/terminal/polish-baltic-sea-coast-fsru-pl/","data_source":"Data: Global Gas Infrastructure Tracker, Global Energy Monitor, September 2025"},{"slug":"pori-lng-terminal-fi","name":"Pori LNG Terminal","country":"Finland","country_iso":"FI","region":"Europe","state_province":"Satakunta","city":"Port of Tahkoluoto","facility_type":"import","floating_type":"unknown","status":"operating","latitude":61.63817,"longitude":21.39881,"units":1,"capacity_operating_mtpa":0.1,"capacity_construction_mtpa":null,"capacity_proposed_mtpa":null,"capacity_operating_bcm_y":0.136,"capacity_construction_bcm_y":null,"capacity_proposed_bcm_y":null,"earliest_start_year":2016,"latest_start_year":2016,"url":"https://lngatlas.org/terminal/pori-lng-terminal-fi/","data_source":"Data: Global Gas Infrastructure Tracker, Global Energy Monitor, September 2025"},{"slug":"port-arthur-lng-terminal-us","name":"Port Arthur LNG Terminal","country":"United States","country_iso":"US","region":"Americas","state_province":"Texas","city":"Port Arthur","facility_type":"export","floating_type":"unknown","status":"construction","latitude":29.8116634,"longitude":-93.9596288,"units":4,"capacity_operating_mtpa":null,"capacity_construction_mtpa":13,"capacity_proposed_mtpa":13,"capacity_operating_bcm_y":null,"capacity_construction_bcm_y":17.68,"capacity_proposed_bcm_y":17.68,"earliest_start_year":null,"latest_start_year":null,"url":"https://lngatlas.org/terminal/port-arthur-lng-terminal-us/","data_source":"Data: Global Gas Infrastructure Tracker, Global Energy Monitor, September 2025"},{"slug":"port-dolphin-lng-terminal-us","name":"Port Dolphin LNG Terminal","country":"United States","country_iso":"US","region":"Americas","state_province":"Florida","city":"Tampa","facility_type":"import","floating_type":"unknown","status":"cancelled","latitude":27.968056,"longitude":-82.476389,"units":1,"capacity_operating_mtpa":null,"capacity_construction_mtpa":null,"capacity_proposed_mtpa":null,"capacity_operating_bcm_y":null,"capacity_construction_bcm_y":null,"capacity_proposed_bcm_y":null,"earliest_start_year":null,"latest_start_year":null,"url":"https://lngatlas.org/terminal/port-dolphin-lng-terminal-us/","data_source":"Data: Global Gas Infrastructure Tracker, Global Energy Monitor, September 2025"},{"slug":"port-edward-lng-terminal-ca","name":"Port Edward LNG Terminal","country":"Canada","country_iso":"CA","region":"Americas","state_province":"British Columbia","city":"Port Edward","facility_type":"export","floating_type":"unknown","status":"cancelled","latitude":54.318709,"longitude":-130.320017,"units":1,"capacity_operating_mtpa":null,"capacity_construction_mtpa":null,"capacity_proposed_mtpa":null,"capacity_operating_bcm_y":null,"capacity_construction_bcm_y":null,"capacity_proposed_bcm_y":null,"earliest_start_year":null,"latest_start_year":null,"url":"https://lngatlas.org/terminal/port-edward-lng-terminal-ca/","data_source":"Data: Global Gas Infrastructure Tracker, Global Energy Monitor, September 2025"},{"slug":"port-esperanza-fsru-us","name":"Port Esperanza FSRU","country":"United States","country_iso":"US","region":"Americas","state_province":"California","city":"Long Beach","facility_type":"import","floating_type":"fsru","status":"cancelled","latitude":33.754185,"longitude":-118.216458,"units":1,"capacity_operating_mtpa":null,"capacity_construction_mtpa":null,"capacity_proposed_mtpa":null,"capacity_operating_bcm_y":null,"capacity_construction_bcm_y":null,"capacity_proposed_bcm_y":null,"earliest_start_year":null,"latest_start_year":null,"url":"https://lngatlas.org/terminal/port-esperanza-fsru-us/","data_source":"Data: Global Gas Infrastructure Tracker, Global Energy Monitor, September 2025"},{"slug":"port-kembla-fsru-au","name":"Port Kembla FSRU","country":"Australia","country_iso":"AU","region":"Oceania","state_province":"New South Wales","city":"Port Kembla","facility_type":"import","floating_type":"fsru","status":"construction","latitude":-34.4598984,"longitude":150.8996029,"units":1,"capacity_operating_mtpa":null,"capacity_construction_mtpa":2.33,"capacity_proposed_mtpa":null,"capacity_operating_bcm_y":null,"capacity_construction_bcm_y":3.169,"capacity_proposed_bcm_y":null,"earliest_start_year":null,"latest_start_year":null,"url":"https://lngatlas.org/terminal/port-kembla-fsru-au/","data_source":"Data: Global Gas Infrastructure Tracker, Global Energy Monitor, September 2025"},{"slug":"port-lavaca-flng-terminal-us","name":"Port Lavaca FLNG Terminal","country":"United States","country_iso":"US","region":"Americas","state_province":"Texas","city":"Port Lavaca","facility_type":"export","floating_type":"flng","status":"cancelled","latitude":28.615556,"longitude":-96.629722,"units":1,"capacity_operating_mtpa":null,"capacity_construction_mtpa":null,"capacity_proposed_mtpa":null,"capacity_operating_bcm_y":null,"capacity_construction_bcm_y":null,"capacity_proposed_bcm_y":null,"earliest_start_year":null,"latest_start_year":null,"url":"https://lngatlas.org/terminal/port-lavaca-flng-terminal-us/","data_source":"Data: Global Gas Infrastructure Tracker, Global Energy Monitor, September 2025"},{"slug":"port-meridian-fsru-gb","name":"Port Meridian FSRU","country":"United Kingdom","country_iso":"GB","region":"Europe","state_province":"North West","city":"Fylde","facility_type":"import","floating_type":"fsru","status":"cancelled","latitude":53.74464293992729,"longitude":-3.75091235862238,"units":1,"capacity_operating_mtpa":null,"capacity_construction_mtpa":null,"capacity_proposed_mtpa":null,"capacity_operating_bcm_y":null,"capacity_construction_bcm_y":null,"capacity_proposed_bcm_y":null,"earliest_start_year":null,"latest_start_year":null,"url":"https://lngatlas.org/terminal/port-meridian-fsru-gb/","data_source":"Data: Global Gas Infrastructure Tracker, Global Energy Monitor, September 2025"},{"slug":"port-pelican-lng-terminal-us","name":"Port Pelican LNG Terminal","country":"United States","country_iso":"US","region":"Americas","state_province":"Texas","city":"Port Pelican","facility_type":"import","floating_type":"unknown","status":"cancelled","latitude":28.787546,"longitude":-91.284707,"units":1,"capacity_operating_mtpa":null,"capacity_construction_mtpa":null,"capacity_proposed_mtpa":null,"capacity_operating_bcm_y":null,"capacity_construction_bcm_y":null,"capacity_proposed_bcm_y":null,"earliest_start_year":null,"latest_start_year":null,"url":"https://lngatlas.org/terminal/port-pelican-lng-terminal-us/","data_source":"Data: Global Gas Infrastructure Tracker, Global Energy Monitor, September 2025"},{"slug":"port-phillip-bay-fsru-au","name":"Port Phillip Bay FSRU","country":"Australia","country_iso":"AU","region":"Oceania","state_province":"Victoria","city":"Avalon","facility_type":"import","floating_type":"fsru","status":"proposed","latitude":-37.847216,"longitude":144.9301,"units":1,"capacity_operating_mtpa":null,"capacity_construction_mtpa":null,"capacity_proposed_mtpa":4.7,"capacity_operating_bcm_y":null,"capacity_construction_bcm_y":null,"capacity_proposed_bcm_y":6.392,"earliest_start_year":null,"latest_start_year":null,"url":"https://lngatlas.org/terminal/port-phillip-bay-fsru-au/","data_source":"Data: Global Gas Infrastructure Tracker, Global Energy Monitor, September 2025"},{"slug":"port-of-vlora-fsru-al","name":"Port of Vlora FSRU","country":"Albania","country_iso":"AL","region":"Europe","state_province":null,"city":"Port of Vlora","facility_type":"import","floating_type":"fsru","status":"shelved","latitude":40.449271,"longitude":19.480761,"units":1,"capacity_operating_mtpa":null,"capacity_construction_mtpa":null,"capacity_proposed_mtpa":null,"capacity_operating_bcm_y":null,"capacity_construction_bcm_y":null,"capacity_proposed_bcm_y":null,"earliest_start_year":null,"latest_start_year":null,"url":"https://lngatlas.org/terminal/port-of-vlora-fsru-al/","data_source":"Data: Global Gas Infrastructure Tracker, Global Energy Monitor, September 2025"},{"slug":"porto-empedocle-lng-terminal-it","name":"Porto Empedocle LNG Terminal","country":"Italy","country_iso":"IT","region":"Europe","state_province":"Sicily","city":"Agrigento","facility_type":"import","floating_type":"unknown","status":"proposed","latitude":37.28297,"longitude":13.53774,"units":1,"capacity_operating_mtpa":null,"capacity_construction_mtpa":null,"capacity_proposed_mtpa":5.88,"capacity_operating_bcm_y":null,"capacity_construction_bcm_y":null,"capacity_proposed_bcm_y":7.997,"earliest_start_year":null,"latest_start_year":null,"url":"https://lngatlas.org/terminal/porto-empedocle-lng-terminal-it/","data_source":"Data: Global Gas Infrastructure Tracker, Global Energy Monitor, September 2025"},{"slug":"porto-norte-fluminense-fsru-br","name":"Porto Norte Fluminense FSRU","country":"Brazil","country_iso":"BR","region":"Americas","state_province":"Rio de Janeiro","city":"São Francisco de Itabapoana","facility_type":"import","floating_type":"fsru","status":"proposed","latitude":-21.514933,"longitude":-40.978918,"units":1,"capacity_operating_mtpa":null,"capacity_construction_mtpa":null,"capacity_proposed_mtpa":5.64,"capacity_operating_bcm_y":null,"capacity_construction_bcm_y":null,"capacity_proposed_bcm_y":7.67,"earliest_start_year":null,"latest_start_year":null,"url":"https://lngatlas.org/terminal/porto-norte-fluminense-fsru-br/","data_source":"Data: Global Gas Infrastructure Tracker, Global Energy Monitor, September 2025"},{"slug":"porto-torres-fsru-it","name":"Porto Torres FSRU","country":"Italy","country_iso":"IT","region":"Europe","state_province":"Sassari","city":"Porto Torres","facility_type":"import","floating_type":"fsru","status":"shelved","latitude":40.842386,"longitude":8.399781,"units":1,"capacity_operating_mtpa":null,"capacity_construction_mtpa":null,"capacity_proposed_mtpa":null,"capacity_operating_bcm_y":null,"capacity_construction_bcm_y":null,"capacity_proposed_bcm_y":null,"earliest_start_year":null,"latest_start_year":null,"url":"https://lngatlas.org/terminal/porto-torres-fsru-it/","data_source":"Data: Global Gas Infrastructure Tracker, Global Energy Monitor, September 2025"},{"slug":"porto-do-acu-fsru-br","name":"Porto do Açu FSRU","country":"Brazil","country_iso":"BR","region":"Americas","state_province":"Rio de Janeiro","city":"Port of Açu","facility_type":"import","floating_type":"fsru","status":"operating","latitude":-21.847897,"longitude":-40.991889,"units":1,"capacity_operating_mtpa":7.5,"capacity_construction_mtpa":null,"capacity_proposed_mtpa":null,"capacity_operating_bcm_y":10.2,"capacity_construction_bcm_y":null,"capacity_proposed_bcm_y":null,"earliest_start_year":2021,"latest_start_year":2021,"url":"https://lngatlas.org/terminal/porto-do-acu-fsru-br/","data_source":"Data: Global Gas Infrastructure Tracker, Global Energy Monitor, September 2025"},{"slug":"portovaya-lng-terminal-ru","name":"Portovaya LNG Terminal","country":"Russia","country_iso":"RU","region":"Europe","state_province":"Leningrad Oblast","city":null,"facility_type":"export","floating_type":"unknown","status":"operating","latitude":60.523347,"longitude":28.130122,"units":3,"capacity_operating_mtpa":1.5,"capacity_construction_mtpa":null,"capacity_proposed_mtpa":null,"capacity_operating_bcm_y":2.04,"capacity_construction_bcm_y":null,"capacity_proposed_bcm_y":null,"earliest_start_year":2022,"latest_start_year":2022,"url":"https://lngatlas.org/terminal/portovaya-lng-terminal-ru/","data_source":"Data: Global Gas Infrastructure Tracker, Global Energy Monitor, September 2025"},{"slug":"portovesme-fsru-it","name":"Portovesme FSRU","country":"Italy","country_iso":"IT","region":"Europe","state_province":null,"city":"Portovesme","facility_type":"import","floating_type":"fsru","status":"shelved","latitude":39.195612,"longitude":8.391925,"units":1,"capacity_operating_mtpa":null,"capacity_construction_mtpa":null,"capacity_proposed_mtpa":null,"capacity_operating_bcm_y":null,"capacity_construction_bcm_y":null,"capacity_proposed_bcm_y":null,"earliest_start_year":null,"latest_start_year":null,"url":"https://lngatlas.org/terminal/portovesme-fsru-it/","data_source":"Data: Global Gas Infrastructure Tracker, Global Energy Monitor, September 2025"},{"slug":"poseidon-flng-terminal-au","name":"Poseidon FLNG Terminal","country":"Australia","country_iso":"AU","region":"Oceania","state_province":null,"city":null,"facility_type":"export","floating_type":"flng","status":"cancelled","latitude":-13.85783,"longitude":119.802714,"units":1,"capacity_operating_mtpa":null,"capacity_construction_mtpa":null,"capacity_proposed_mtpa":null,"capacity_operating_bcm_y":null,"capacity_construction_bcm_y":null,"capacity_proposed_bcm_y":null,"earliest_start_year":null,"latest_start_year":null,"url":"https://lngatlas.org/terminal/poseidon-flng-terminal-au/","data_source":"Data: Global Gas Infrastructure Tracker, Global Energy Monitor, September 2025"},{"slug":"predator-fsru-ie","name":"Predator FSRU","country":"Ireland","country_iso":"IE","region":"Europe","state_province":null,"city":null,"facility_type":"import","floating_type":"fsru","status":"proposed","latitude":51.264274,"longitude":-8.045619,"units":1,"capacity_operating_mtpa":null,"capacity_construction_mtpa":null,"capacity_proposed_mtpa":1.91,"capacity_operating_bcm_y":null,"capacity_construction_bcm_y":null,"capacity_proposed_bcm_y":2.598,"earliest_start_year":null,"latest_start_year":null,"url":"https://lngatlas.org/terminal/predator-fsru-ie/","data_source":"Data: Global Gas Infrastructure Tracker, Global Energy Monitor, September 2025"},{"slug":"prelude-flng-terminal-au","name":"Prelude FLNG Terminal","country":"Australia","country_iso":"AU","region":"Oceania","state_province":"Western Australia","city":"Browse Basin","facility_type":"export","floating_type":"flng","status":"operating","latitude":-15.2539252,"longitude":123.5381736,"units":1,"capacity_operating_mtpa":3.6,"capacity_construction_mtpa":null,"capacity_proposed_mtpa":null,"capacity_operating_bcm_y":4.896,"capacity_construction_bcm_y":null,"capacity_proposed_bcm_y":null,"earliest_start_year":2019,"latest_start_year":2019,"url":"https://lngatlas.org/terminal/prelude-flng-terminal-au/","data_source":"Data: Global Gas Infrastructure Tracker, Global Energy Monitor, September 2025"},{"slug":"presidente-kennedy-fsru-br","name":"Presidente Kennedy FSRU","country":"Brazil","country_iso":"BR","region":"Americas","state_province":"Espírito Santo","city":"Porto Central","facility_type":"import","floating_type":"fsru","status":"shelved","latitude":-21.224754,"longitude":-40.946933,"units":1,"capacity_operating_mtpa":null,"capacity_construction_mtpa":null,"capacity_proposed_mtpa":null,"capacity_operating_bcm_y":null,"capacity_construction_bcm_y":null,"capacity_proposed_bcm_y":null,"earliest_start_year":null,"latest_start_year":null,"url":"https://lngatlas.org/terminal/presidente-kennedy-fsru-br/","data_source":"Data: Global Gas Infrastructure Tracker, Global Energy Monitor, September 2025"},{"slug":"prince-rupert-lng-terminal-ca","name":"Prince Rupert LNG Terminal","country":"Canada","country_iso":"CA","region":"Americas","state_province":"British Columbia","city":"Ridley Island, Prince Rupert","facility_type":"export","floating_type":"unknown","status":"cancelled","latitude":54.312194,"longitude":-130.327083,"units":1,"capacity_operating_mtpa":null,"capacity_construction_mtpa":null,"capacity_proposed_mtpa":null,"capacity_operating_bcm_y":null,"capacity_construction_bcm_y":null,"capacity_proposed_bcm_y":null,"earliest_start_year":null,"latest_start_year":null,"url":"https://lngatlas.org/terminal/prince-rupert-lng-terminal-ca/","data_source":"Data: Global Gas Infrastructure Tracker, Global Energy Monitor, September 2025"},{"slug":"priolo-augusta-lng-terminal-it","name":"Priolo Augusta LNG Terminal","country":"Italy","country_iso":"IT","region":"Europe","state_province":"Sicily","city":"Augusta","facility_type":"import","floating_type":"unknown","status":"cancelled","latitude":37.25,"longitude":15.216667,"units":1,"capacity_operating_mtpa":null,"capacity_construction_mtpa":null,"capacity_proposed_mtpa":null,"capacity_operating_bcm_y":null,"capacity_construction_bcm_y":null,"capacity_proposed_bcm_y":null,"earliest_start_year":null,"latest_start_year":null,"url":"https://lngatlas.org/terminal/priolo-augusta-lng-terminal-it/","data_source":"Data: Global Gas Infrastructure Tracker, Global Energy Monitor, September 2025"},{"slug":"progreso-lng-terminal-mx","name":"Progreso LNG Terminal","country":"Mexico","country_iso":"MX","region":"Americas","state_province":"Yucatán","city":"Progreso","facility_type":"import","floating_type":"unknown","status":"cancelled","latitude":21.28,"longitude":-89.67,"units":1,"capacity_operating_mtpa":null,"capacity_construction_mtpa":null,"capacity_proposed_mtpa":null,"capacity_operating_bcm_y":null,"capacity_construction_bcm_y":null,"capacity_proposed_bcm_y":null,"earliest_start_year":null,"latest_start_year":null,"url":"https://lngatlas.org/terminal/progreso-lng-terminal-mx/","data_source":"Data: Global Gas Infrastructure Tracker, Global Energy Monitor, September 2025"},{"slug":"project-venezuela-lng-terminal-ve","name":"Project Venezuela LNG Terminal","country":"Venezuela","country_iso":"VE","region":"Americas","state_province":null,"city":null,"facility_type":"export","floating_type":"unknown","status":"cancelled","latitude":10.302279,"longitude":-63.331569,"units":1,"capacity_operating_mtpa":null,"capacity_construction_mtpa":null,"capacity_proposed_mtpa":null,"capacity_operating_bcm_y":null,"capacity_construction_bcm_y":null,"capacity_proposed_bcm_y":null,"earliest_start_year":null,"latest_start_year":null,"url":"https://lngatlas.org/terminal/project-venezuela-lng-terminal-ve/","data_source":"Data: Global Gas Infrastructure Tracker, Global Energy Monitor, September 2025"},{"slug":"puerto-brisa-lng-terminal-co","name":"Puerto Brisa LNG Terminal","country":"Colombia","country_iso":"CO","region":"Americas","state_province":"La Guajira","city":"Dibulla","facility_type":"import","floating_type":"floating","status":"proposed","latitude":11.27525,"longitude":-73.38434,"units":2,"capacity_operating_mtpa":null,"capacity_construction_mtpa":null,"capacity_proposed_mtpa":4.91,"capacity_operating_bcm_y":null,"capacity_construction_bcm_y":null,"capacity_proposed_bcm_y":6.678,"earliest_start_year":null,"latest_start_year":null,"url":"https://lngatlas.org/terminal/puerto-brisa-lng-terminal-co/","data_source":"Data: Global Gas Infrastructure Tracker, Global Energy Monitor, September 2025"},{"slug":"puerto-cortes-lng-terminal-hn","name":"Puerto Cortés LNG Terminal","country":"Honduras","country_iso":"HN","region":"Americas","state_province":null,"city":null,"facility_type":"import","floating_type":"unknown","status":"construction","latitude":15.839808,"longitude":-87.941126,"units":1,"capacity_operating_mtpa":null,"capacity_construction_mtpa":null,"capacity_proposed_mtpa":null,"capacity_operating_bcm_y":null,"capacity_construction_bcm_y":null,"capacity_proposed_bcm_y":null,"earliest_start_year":null,"latest_start_year":null,"url":"https://lngatlas.org/terminal/puerto-cortes-lng-terminal-hn/","data_source":"Data: Global Gas Infrastructure Tracker, Global Energy Monitor, September 2025"},{"slug":"puerto-sandino-fsru-ni","name":"Puerto Sandino FSRU","country":"Nicaragua","country_iso":"NI","region":"Americas","state_province":null,"city":"Puerto Sandino","facility_type":"import","floating_type":"fsru","status":"construction","latitude":12.171182,"longitude":-86.767115,"units":1,"capacity_operating_mtpa":null,"capacity_construction_mtpa":5,"capacity_proposed_mtpa":null,"capacity_operating_bcm_y":null,"capacity_construction_bcm_y":6.8,"capacity_proposed_bcm_y":null,"earliest_start_year":null,"latest_start_year":null,"url":"https://lngatlas.org/terminal/puerto-sandino-fsru-ni/","data_source":"Data: Global Gas Infrastructure Tracker, Global Energy Monitor, September 2025"},{"slug":"puerto-de-la-luz-lng-terminal-es","name":"Puerto de la Luz LNG Terminal","country":"Spain","country_iso":"ES","region":"Europe","state_province":"Canarias","city":"Las Palmas","facility_type":"import","floating_type":"unknown","status":"proposed","latitude":28.139483,"longitude":-15.423414,"units":1,"capacity_operating_mtpa":null,"capacity_construction_mtpa":null,"capacity_proposed_mtpa":null,"capacity_operating_bcm_y":null,"capacity_construction_bcm_y":null,"capacity_proposed_bcm_y":null,"earliest_start_year":null,"latest_start_year":null,"url":"https://lngatlas.org/terminal/puerto-de-la-luz-lng-terminal-es/","data_source":"Data: Global Gas Infrastructure Tracker, Global Energy Monitor, September 2025"},{"slug":"punta-europa-lng-terminal-gq","name":"Punta Europa LNG Terminal","country":"Equatorial Guinea","country_iso":"GQ","region":"Africa","state_province":"Bioko Island","city":"Malabo","facility_type":"export","floating_type":"unknown","status":"operating","latitude":3.776,"longitude":8.7015,"units":2,"capacity_operating_mtpa":3.7,"capacity_construction_mtpa":null,"capacity_proposed_mtpa":null,"capacity_operating_bcm_y":5.032,"capacity_construction_bcm_y":null,"capacity_proposed_bcm_y":null,"earliest_start_year":2007,"latest_start_year":2007,"url":"https://lngatlas.org/terminal/punta-europa-lng-terminal-gq/","data_source":"Data: Global Gas Infrastructure Tracker, Global Energy Monitor, September 2025"},{"slug":"putian-lng-terminal-cn","name":"Putian LNG Terminal","country":"China","country_iso":"CN","region":"Asia","state_province":"Fujian","city":"Port of Meizhou, Meizhou Bai","facility_type":"import","floating_type":"unknown","status":"proposed","latitude":25.1038092,"longitude":119.0719378,"units":2,"capacity_operating_mtpa":null,"capacity_construction_mtpa":null,"capacity_proposed_mtpa":10,"capacity_operating_bcm_y":null,"capacity_construction_bcm_y":null,"capacity_proposed_bcm_y":13.6,"earliest_start_year":null,"latest_start_year":null,"url":"https://lngatlas.org/terminal/putian-lng-terminal-cn/","data_source":"Data: Global Gas Infrastructure Tracker, Global Energy Monitor, September 2025"},{"slug":"pyeongtaek-lng-terminal-kr","name":"Pyeongtaek LNG Terminal","country":"South Korea","country_iso":"KR","region":"Asia","state_province":"Gyeonggi","city":"Pyeongtaek","facility_type":"import","floating_type":"unknown","status":"operating","latitude":37.0057,"longitude":126.7841,"units":1,"capacity_operating_mtpa":41,"capacity_construction_mtpa":null,"capacity_proposed_mtpa":null,"capacity_operating_bcm_y":55.76,"capacity_construction_bcm_y":null,"capacity_proposed_bcm_y":null,"earliest_start_year":1986,"latest_start_year":1986,"url":"https://lngatlas.org/terminal/pyeongtaek-lng-terminal-kr/","data_source":"Data: Global Gas Infrastructure Tracker, Global Energy Monitor, September 2025"},{"slug":"qatar-north-field-lng-terminal-qa","name":"Qatar North Field LNG Terminal","country":"Qatar","country_iso":"QA","region":"Asia","state_province":"Al Khawr","city":"Ras Laffan Industrial City","facility_type":"export","floating_type":"unknown","status":"construction","latitude":25.9186901,"longitude":51.5277023,"units":3,"capacity_operating_mtpa":null,"capacity_construction_mtpa":48,"capacity_proposed_mtpa":16,"capacity_operating_bcm_y":null,"capacity_construction_bcm_y":65.28,"capacity_proposed_bcm_y":21.76,"earliest_start_year":null,"latest_start_year":null,"url":"https://lngatlas.org/terminal/qatar-north-field-lng-terminal-qa/","data_source":"Data: Global Gas Infrastructure Tracker, Global Energy Monitor, September 2025"},{"slug":"qatarenergy-lng-n-qa","name":"QatarEnergy LNG (N)","country":"Qatar","country_iso":"QA","region":"Asia","state_province":"Al Khawr","city":"Ras Laffan Industrial City","facility_type":"export","floating_type":"unknown","status":"operating","latitude":25.908412,"longitude":51.557708,"units":4,"capacity_operating_mtpa":40.8,"capacity_construction_mtpa":null,"capacity_proposed_mtpa":null,"capacity_operating_bcm_y":55.488,"capacity_construction_bcm_y":null,"capacity_proposed_bcm_y":null,"earliest_start_year":1996,"latest_start_year":2011,"url":"https://lngatlas.org/terminal/qatarenergy-lng-n-qa/","data_source":"Data: Global Gas Infrastructure Tracker, Global Energy Monitor, September 2025"},{"slug":"qatarenergy-lng-s-qa","name":"QatarEnergy LNG (S)","country":"Qatar","country_iso":"QA","region":"Asia","state_province":"Al Khawr","city":"Ras Laffan Industrial City","facility_type":"export","floating_type":"unknown","status":"operating","latitude":25.891475,"longitude":51.54435,"units":3,"capacity_operating_mtpa":36.3,"capacity_construction_mtpa":null,"capacity_proposed_mtpa":null,"capacity_operating_bcm_y":49.368,"capacity_construction_bcm_y":null,"capacity_proposed_bcm_y":null,"earliest_start_year":1999,"latest_start_year":2009,"url":"https://lngatlas.org/terminal/qatarenergy-lng-s-qa/","data_source":"Data: Global Gas Infrastructure Tracker, Global Energy Monitor, September 2025"},{"slug":"qeshm-lng-terminal-ir","name":"Qeshm LNG Terminal","country":"Iran","country_iso":"IR","region":"Asia","state_province":null,"city":"Qeshm Island","facility_type":"export","floating_type":"unknown","status":"cancelled","latitude":26.951056,"longitude":55.752355,"units":1,"capacity_operating_mtpa":null,"capacity_construction_mtpa":null,"capacity_proposed_mtpa":null,"capacity_operating_bcm_y":null,"capacity_construction_bcm_y":null,"capacity_proposed_bcm_y":null,"earliest_start_year":null,"latest_start_year":null,"url":"https://lngatlas.org/terminal/qeshm-lng-terminal-ir/","data_source":"Data: Global Gas Infrastructure Tracker, Global Energy Monitor, September 2025"},{"slug":"qidong-lng-terminal-cn","name":"Qidong LNG Terminal","country":"China","country_iso":"CN","region":"Asia","state_province":"Jiangsu","city":null,"facility_type":"import","floating_type":"unknown","status":"operating","latitude":32.041846,"longitude":121.746907,"units":5,"capacity_operating_mtpa":5,"capacity_construction_mtpa":null,"capacity_proposed_mtpa":null,"capacity_operating_bcm_y":6.8,"capacity_construction_bcm_y":null,"capacity_proposed_bcm_y":null,"earliest_start_year":2017,"latest_start_year":2024,"url":"https://lngatlas.org/terminal/qidong-lng-terminal-cn/","data_source":"Data: Global Gas Infrastructure Tracker, Global Energy Monitor, September 2025"},{"slug":"qilak-lng-terminal-us","name":"Qilak LNG Terminal","country":"United States","country_iso":"US","region":"Americas","state_province":"Alaska","city":"North Slope","facility_type":"export","floating_type":"unknown","status":"proposed","latitude":70.1734,"longitude":-146.2563,"units":1,"capacity_operating_mtpa":null,"capacity_construction_mtpa":null,"capacity_proposed_mtpa":4,"capacity_operating_bcm_y":null,"capacity_construction_bcm_y":null,"capacity_proposed_bcm_y":5.44,"earliest_start_year":null,"latest_start_year":null,"url":"https://lngatlas.org/terminal/qilak-lng-terminal-us/","data_source":"Data: Global Gas Infrastructure Tracker, Global Energy Monitor, September 2025"},{"slug":"qinzhou-lng-terminal-cn","name":"Qinzhou LNG Terminal","country":"China","country_iso":"CN","region":"Asia","state_province":"Guangxi","city":null,"facility_type":"import","floating_type":"unknown","status":"proposed","latitude":21.95,"longitude":108.616667,"units":1,"capacity_operating_mtpa":null,"capacity_construction_mtpa":null,"capacity_proposed_mtpa":4,"capacity_operating_bcm_y":null,"capacity_construction_bcm_y":null,"capacity_proposed_bcm_y":5.44,"earliest_start_year":null,"latest_start_year":null,"url":"https://lngatlas.org/terminal/qinzhou-lng-terminal-cn/","data_source":"Data: Global Gas Infrastructure Tracker, Global Energy Monitor, September 2025"},{"slug":"quang-nam-lng-terminal-vn","name":"Quang Nam LNG Terminal","country":"Vietnam","country_iso":"VN","region":"Asia","state_province":null,"city":"Quang Nam","facility_type":"import","floating_type":"unknown","status":"cancelled","latitude":15.876183,"longitude":108.389096,"units":1,"capacity_operating_mtpa":null,"capacity_construction_mtpa":null,"capacity_proposed_mtpa":null,"capacity_operating_bcm_y":null,"capacity_construction_bcm_y":null,"capacity_proposed_bcm_y":null,"earliest_start_year":null,"latest_start_year":null,"url":"https://lngatlas.org/terminal/quang-nam-lng-terminal-vn/","data_source":"Data: Global Gas Infrastructure Tracker, Global Energy Monitor, September 2025"},{"slug":"quang-ninh-lng-terminal-vn","name":"Quang Ninh LNG Terminal","country":"Vietnam","country_iso":"VN","region":"Asia","state_province":null,"city":null,"facility_type":"import","floating_type":"unknown","status":"proposed","latitude":21.004545,"longitude":107.35511,"units":1,"capacity_operating_mtpa":null,"capacity_construction_mtpa":null,"capacity_proposed_mtpa":1.2,"capacity_operating_bcm_y":null,"capacity_construction_bcm_y":null,"capacity_proposed_bcm_y":1.632,"earliest_start_year":null,"latest_start_year":null,"url":"https://lngatlas.org/terminal/quang-ninh-lng-terminal-vn/","data_source":"Data: Global Gas Infrastructure Tracker, Global Energy Monitor, September 2025"},{"slug":"quanzhou-lng-terminal-cn","name":"Quanzhou LNG Terminal","country":"China","country_iso":"CN","region":"Asia","state_province":"Fujian","city":"Quangang","facility_type":"import","floating_type":"unknown","status":"shelved","latitude":25.1825286,"longitude":118.9743127,"units":2,"capacity_operating_mtpa":null,"capacity_construction_mtpa":null,"capacity_proposed_mtpa":null,"capacity_operating_bcm_y":null,"capacity_construction_bcm_y":null,"capacity_proposed_bcm_y":null,"earliest_start_year":null,"latest_start_year":null,"url":"https://lngatlas.org/terminal/quanzhou-lng-terminal-cn/","data_source":"Data: Global Gas Infrastructure Tracker, Global Energy Monitor, September 2025"},{"slug":"queensland-curtis-lng-terminal-au","name":"Queensland Curtis LNG Terminal","country":"Australia","country_iso":"AU","region":"Oceania","state_province":"Queensland","city":"Curtis Island","facility_type":"export","floating_type":"unknown","status":"operating","latitude":-23.7693,"longitude":151.199,"units":2,"capacity_operating_mtpa":8.5,"capacity_construction_mtpa":null,"capacity_proposed_mtpa":null,"capacity_operating_bcm_y":11.56,"capacity_construction_bcm_y":null,"capacity_proposed_bcm_y":null,"earliest_start_year":2014,"latest_start_year":2014,"url":"https://lngatlas.org/terminal/queensland-curtis-lng-terminal-au/","data_source":"Data: Global Gas Infrastructure Tracker, Global Energy Monitor, September 2025"},{"slug":"quezon-lng-terminal-ph","name":"Quezon LNG Terminal","country":"Philippines","country_iso":"PH","region":"Asia","state_province":"Quezon","city":"Mauban","facility_type":"import","floating_type":"unknown","status":"proposed","latitude":14.2296,"longitude":121.7558,"units":1,"capacity_operating_mtpa":null,"capacity_construction_mtpa":null,"capacity_proposed_mtpa":1.1,"capacity_operating_bcm_y":null,"capacity_construction_bcm_y":null,"capacity_proposed_bcm_y":1.496,"earliest_start_year":null,"latest_start_year":null,"url":"https://lngatlas.org/terminal/quezon-lng-terminal-ph/","data_source":"Data: Global Gas Infrastructure Tracker, Global Energy Monitor, September 2025"},{"slug":"quintero-lng-terminal-cl","name":"Quintero LNG Terminal","country":"Chile","country_iso":"CL","region":"Americas","state_province":"Valparaíso","city":"Bay of Quintero","facility_type":"import","floating_type":"unknown","status":"operating","latitude":-32.783333,"longitude":-71.533333,"units":2,"capacity_operating_mtpa":4,"capacity_construction_mtpa":null,"capacity_proposed_mtpa":null,"capacity_operating_bcm_y":5.44,"capacity_construction_bcm_y":null,"capacity_proposed_bcm_y":null,"earliest_start_year":2009,"latest_start_year":2009,"url":"https://lngatlas.org/terminal/quintero-lng-terminal-cl/","data_source":"Data: Global Gas Infrastructure Tracker, Global Energy Monitor, September 2025"},{"slug":"quoddy-bay-lng-terminal-us","name":"Quoddy Bay LNG Terminal","country":"United States","country_iso":"US","region":"Americas","state_province":"Maine","city":"Pleasent Point","facility_type":"import","floating_type":"unknown","status":"cancelled","latitude":44.957541,"longitude":-67.041773,"units":1,"capacity_operating_mtpa":null,"capacity_construction_mtpa":null,"capacity_proposed_mtpa":null,"capacity_operating_bcm_y":null,"capacity_construction_bcm_y":null,"capacity_proposed_bcm_y":null,"earliest_start_year":null,"latest_start_year":null,"url":"https://lngatlas.org/terminal/quoddy-bay-lng-terminal-us/","data_source":"Data: Global Gas Infrastructure Tracker, Global Energy Monitor, September 2025"},{"slug":"qushan-lng-terminal-cn","name":"Qushan LNG Terminal","country":"China","country_iso":"CN","region":"Asia","state_province":"Zhejiang","city":"Qushan Island","facility_type":"import","floating_type":"unknown","status":"shelved","latitude":30.427224,"longitude":122.351978,"units":1,"capacity_operating_mtpa":null,"capacity_construction_mtpa":null,"capacity_proposed_mtpa":null,"capacity_operating_bcm_y":null,"capacity_construction_bcm_y":null,"capacity_proposed_bcm_y":null,"earliest_start_year":null,"latest_start_year":null,"url":"https://lngatlas.org/terminal/qushan-lng-terminal-cn/","data_source":"Data: Global Gas Infrastructure Tracker, Global Energy Monitor, September 2025"},{"slug":"quynh-lap-lng-terminal-vn","name":"Quynh Lap LNG Terminal","country":"Vietnam","country_iso":"VN","region":"Asia","state_province":null,"city":null,"facility_type":"import","floating_type":"unknown","status":"proposed","latitude":19.27563,"longitude":105.78019,"units":1,"capacity_operating_mtpa":null,"capacity_construction_mtpa":null,"capacity_proposed_mtpa":1.15,"capacity_operating_bcm_y":null,"capacity_construction_bcm_y":null,"capacity_proposed_bcm_y":1.564,"earliest_start_year":null,"latest_start_year":null,"url":"https://lngatlas.org/terminal/quynh-lap-lng-terminal-vn/","data_source":"Data: Global Gas Infrastructure Tracker, Global Energy Monitor, September 2025"},{"slug":"yan-fsru-my","name":"RGT Yan LNG Terminal","country":"Malaysia","country_iso":"MY","region":"Asia","state_province":null,"city":null,"facility_type":"import","floating_type":"unknown","status":"proposed","latitude":5.801111,"longitude":100.37298,"units":1,"capacity_operating_mtpa":null,"capacity_construction_mtpa":null,"capacity_proposed_mtpa":null,"capacity_operating_bcm_y":null,"capacity_construction_bcm_y":null,"capacity_proposed_bcm_y":null,"earliest_start_year":null,"latest_start_year":null,"url":"https://lngatlas.org/terminal/yan-fsru-my/","data_source":"Data: Global Gas Infrastructure Tracker, Global Energy Monitor, September 2025"},{"slug":"rabaska-lng-terminal-ca","name":"Rabaska LNG Terminal","country":"Canada","country_iso":"CA","region":"Americas","state_province":"Quebec","city":"Lévis","facility_type":"import","floating_type":"unknown","status":"cancelled","latitude":46.8,"longitude":-71.183333,"units":1,"capacity_operating_mtpa":null,"capacity_construction_mtpa":null,"capacity_proposed_mtpa":null,"capacity_operating_bcm_y":null,"capacity_construction_bcm_y":null,"capacity_proposed_bcm_y":null,"earliest_start_year":null,"latest_start_year":null,"url":"https://lngatlas.org/terminal/rabaska-lng-terminal-ca/","data_source":"Data: Global Gas Infrastructure Tracker, Global Energy Monitor, September 2025"},{"slug":"rakhine-lng-terminal-mm","name":"Rakhine LNG Terminal","country":"Myanmar","country_iso":"MM","region":"Asia","state_province":"Rakhine","city":"Kyaukpyu","facility_type":"import","floating_type":"unknown","status":"cancelled","latitude":19.4281,"longitude":93.5543,"units":1,"capacity_operating_mtpa":null,"capacity_construction_mtpa":null,"capacity_proposed_mtpa":null,"capacity_operating_bcm_y":null,"capacity_construction_bcm_y":null,"capacity_proposed_bcm_y":null,"earliest_start_year":null,"latest_start_year":null,"url":"https://lngatlas.org/terminal/rakhine-lng-terminal-mm/","data_source":"Data: Global Gas Infrastructure Tracker, Global Energy Monitor, September 2025"},{"slug":"rauma-lng-terminal-fi","name":"Rauma LNG Terminal","country":"Finland","country_iso":"FI","region":"Europe","state_province":null,"city":"Rauma","facility_type":"import","floating_type":"unknown","status":"cancelled","latitude":61.130747,"longitude":21.435687,"units":1,"capacity_operating_mtpa":null,"capacity_construction_mtpa":null,"capacity_proposed_mtpa":null,"capacity_operating_bcm_y":null,"capacity_construction_bcm_y":null,"capacity_proposed_bcm_y":null,"earliest_start_year":null,"latest_start_year":null,"url":"https://lngatlas.org/terminal/rauma-lng-terminal-fi/","data_source":"Data: Global Gas Infrastructure Tracker, Global Energy Monitor, September 2025"},{"slug":"ravenna-fsru-it","name":"Ravenna FSRU","country":"Italy","country_iso":"IT","region":"Europe","state_province":null,"city":"Offshore Ravenna","facility_type":"import","floating_type":"fsru","status":"construction","latitude":44.48283,"longitude":12.291482,"units":1,"capacity_operating_mtpa":null,"capacity_construction_mtpa":3.67,"capacity_proposed_mtpa":null,"capacity_operating_bcm_y":null,"capacity_construction_bcm_y":4.991,"capacity_proposed_bcm_y":null,"earliest_start_year":null,"latest_start_year":null,"url":"https://lngatlas.org/terminal/ravenna-fsru-it/","data_source":"Data: Global Gas Infrastructure Tracker, Global Energy Monitor, September 2025"},{"slug":"ravenna-lng-terminal-it","name":"Ravenna LNG Terminal","country":"Italy","country_iso":"IT","region":"Europe","state_province":null,"city":"Port of Ravenna","facility_type":"import","floating_type":"unknown","status":"operating","latitude":44.471734,"longitude":12.248134,"units":1,"capacity_operating_mtpa":0.7,"capacity_construction_mtpa":null,"capacity_proposed_mtpa":null,"capacity_operating_bcm_y":0.952,"capacity_construction_bcm_y":null,"capacity_proposed_bcm_y":null,"earliest_start_year":2021,"latest_start_year":2021,"url":"https://lngatlas.org/terminal/ravenna-lng-terminal-it/","data_source":"Data: Global Gas Infrastructure Tracker, Global Energy Monitor, September 2025"},{"slug":"revithoussa-lng-terminal-gr","name":"Revithoussa LNG Terminal","country":"Greece","country_iso":"GR","region":"Europe","state_province":"Attica","city":"Revithoussa Island","facility_type":"import","floating_type":"unknown","status":"operating","latitude":37.96,"longitude":23.4023,"units":1,"capacity_operating_mtpa":5.1,"capacity_construction_mtpa":null,"capacity_proposed_mtpa":null,"capacity_operating_bcm_y":6.936,"capacity_construction_bcm_y":null,"capacity_proposed_bcm_y":null,"earliest_start_year":2000,"latest_start_year":2000,"url":"https://lngatlas.org/terminal/revithoussa-lng-terminal-gr/","data_source":"Data: Global Gas Infrastructure Tracker, Global Energy Monitor, September 2025"},{"slug":"richards-bay-fsru-za","name":"Richards Bay FSRU","country":"South Africa","country_iso":"ZA","region":"Africa","state_province":"KwaZulu-Natal","city":"Richards Bay","facility_type":"import","floating_type":"fsru","status":"cancelled","latitude":-28.81492,"longitude":32.048096,"units":1,"capacity_operating_mtpa":null,"capacity_construction_mtpa":null,"capacity_proposed_mtpa":null,"capacity_operating_bcm_y":null,"capacity_construction_bcm_y":null,"capacity_proposed_bcm_y":null,"earliest_start_year":null,"latest_start_year":null,"url":"https://lngatlas.org/terminal/richards-bay-fsru-za/","data_source":"Data: Global Gas Infrastructure Tracker, Global Energy Monitor, September 2025"},{"slug":"richards-bay-transnet-fsru-za","name":"Richards Bay Transnet FSRU","country":"South Africa","country_iso":"ZA","region":"Africa","state_province":"KwaZulu-Natal","city":"Richards Bay","facility_type":"import","floating_type":"fsru","status":"proposed","latitude":-28.8,"longitude":32.1,"units":2,"capacity_operating_mtpa":null,"capacity_construction_mtpa":null,"capacity_proposed_mtpa":4.6,"capacity_operating_bcm_y":null,"capacity_construction_bcm_y":null,"capacity_proposed_bcm_y":6.256,"earliest_start_year":null,"latest_start_year":null,"url":"https://lngatlas.org/terminal/richards-bay-transnet-fsru-za/","data_source":"Data: Global Gas Infrastructure Tracker, Global Energy Monitor, September 2025"},{"slug":"riga-fsru-lv","name":"Riga FSRU","country":"Latvia","country_iso":"LV","region":"Europe","state_province":null,"city":"Riga","facility_type":"import","floating_type":"fsru","status":"shelved","latitude":56.948889,"longitude":24.106389,"units":2,"capacity_operating_mtpa":null,"capacity_construction_mtpa":null,"capacity_proposed_mtpa":null,"capacity_operating_bcm_y":null,"capacity_construction_bcm_y":null,"capacity_proposed_bcm_y":null,"earliest_start_year":null,"latest_start_year":null,"url":"https://lngatlas.org/terminal/riga-fsru-lv/","data_source":"Data: Global Gas Infrastructure Tracker, Global Energy Monitor, September 2025"},{"slug":"rio-grande-lng-terminal-us","name":"Rio Grande LNG Terminal","country":"United States","country_iso":"US","region":"Americas","state_province":"Texas","city":"Brownsville","facility_type":"export","floating_type":"unknown","status":"construction","latitude":25.950835,"longitude":-97.410844,"units":7,"capacity_operating_mtpa":null,"capacity_construction_mtpa":23.61,"capacity_proposed_mtpa":23.4,"capacity_operating_bcm_y":null,"capacity_construction_bcm_y":32.11,"capacity_proposed_bcm_y":31.824,"earliest_start_year":null,"latest_start_year":null,"url":"https://lngatlas.org/terminal/rio-grande-lng-terminal-us/","data_source":"Data: Global Gas Infrastructure Tracker, Global Energy Monitor, September 2025"},{"slug":"risavika-lng-terminal-no","name":"Risavika LNG Terminal","country":"Norway","country_iso":"NO","region":"Europe","state_province":"Rogaland","city":"Port of Risavika","facility_type":"export","floating_type":"unknown","status":"operating","latitude":58.9237,"longitude":5.5761,"units":1,"capacity_operating_mtpa":0.33,"capacity_construction_mtpa":null,"capacity_proposed_mtpa":null,"capacity_operating_bcm_y":0.449,"capacity_construction_bcm_y":null,"capacity_proposed_bcm_y":null,"earliest_start_year":2010,"latest_start_year":2010,"url":"https://lngatlas.org/terminal/risavika-lng-terminal-no/","data_source":"Data: Global Gas Infrastructure Tracker, Global Energy Monitor, September 2025"},{"slug":"riverside-lng-terminal-ng","name":"Riverside LNG Terminal","country":"Nigeria","country_iso":"NG","region":"Africa","state_province":"Rivers","city":"Onne","facility_type":"export","floating_type":"unknown","status":"shelved","latitude":4.698139,"longitude":7.159439,"units":1,"capacity_operating_mtpa":null,"capacity_construction_mtpa":null,"capacity_proposed_mtpa":null,"capacity_operating_bcm_y":null,"capacity_construction_bcm_y":null,"capacity_proposed_bcm_y":null,"earliest_start_year":null,"latest_start_year":null,"url":"https://lngatlas.org/terminal/riverside-lng-terminal-ng/","data_source":"Data: Global Gas Infrastructure Tracker, Global Energy Monitor, September 2025"},{"slug":"rizhao-lanshan-lng-terminal-cn","name":"Rizhao LNG Terminal","country":"China","country_iso":"CN","region":"Asia","state_province":"Shandong","city":"Beikuo","facility_type":"import","floating_type":"unknown","status":"cancelled","latitude":35.114354958833495,"longitude":119.42344904251961,"units":3,"capacity_operating_mtpa":null,"capacity_construction_mtpa":null,"capacity_proposed_mtpa":null,"capacity_operating_bcm_y":null,"capacity_construction_bcm_y":null,"capacity_proposed_bcm_y":null,"earliest_start_year":null,"latest_start_year":null,"url":"https://lngatlas.org/terminal/rizhao-lanshan-lng-terminal-cn/","data_source":"Data: Global Gas Infrastructure Tracker, Global Energy Monitor, September 2025"},{"slug":"rongcheng-lng-terminal-cn","name":"Rongcheng LNG Terminal","country":"China","country_iso":"CN","region":"Asia","state_province":"Shandong","city":"Shidao","facility_type":"import","floating_type":"unknown","status":"cancelled","latitude":36.891775,"longitude":122.437258,"units":1,"capacity_operating_mtpa":null,"capacity_construction_mtpa":null,"capacity_proposed_mtpa":null,"capacity_operating_bcm_y":null,"capacity_construction_bcm_y":null,"capacity_proposed_bcm_y":null,"earliest_start_year":null,"latest_start_year":null,"url":"https://lngatlas.org/terminal/rongcheng-lng-terminal-cn/","data_source":"Data: Global Gas Infrastructure Tracker, Global Energy Monitor, September 2025"},{"slug":"rostock-lng-terminal-de","name":"Rostock LNG Terminal","country":"Germany","country_iso":"DE","region":"Europe","state_province":null,"city":"Rostock","facility_type":"import","floating_type":"unknown","status":"shelved","latitude":54.181909,"longitude":12.088052,"units":1,"capacity_operating_mtpa":null,"capacity_construction_mtpa":null,"capacity_proposed_mtpa":null,"capacity_operating_bcm_y":null,"capacity_construction_bcm_y":null,"capacity_proposed_bcm_y":null,"earliest_start_year":null,"latest_start_year":null,"url":"https://lngatlas.org/terminal/rostock-lng-terminal-de/","data_source":"Data: Global Gas Infrastructure Tracker, Global Energy Monitor, September 2025"},{"slug":"rovuma-flng-terminal-mz","name":"Rovuma FLNG Terminal","country":"Mozambique","country_iso":"MZ","region":"Africa","state_province":null,"city":"Afungi peninsula","facility_type":"export","floating_type":"flng","status":"shelved","latitude":-10.753277,"longitude":40.798272,"units":1,"capacity_operating_mtpa":null,"capacity_construction_mtpa":null,"capacity_proposed_mtpa":null,"capacity_operating_bcm_y":null,"capacity_construction_bcm_y":null,"capacity_proposed_bcm_y":null,"earliest_start_year":null,"latest_start_year":null,"url":"https://lngatlas.org/terminal/rovuma-flng-terminal-mz/","data_source":"Data: Global Gas Infrastructure Tracker, Global Energy Monitor, September 2025"},{"slug":"rovuma-lng-terminal-mz","name":"Rovuma LNG Terminal","country":"Mozambique","country_iso":"MZ","region":"Africa","state_province":null,"city":"Afungi peninsula","facility_type":"export","floating_type":"unknown","status":"proposed","latitude":-10.829537,"longitude":40.526087,"units":1,"capacity_operating_mtpa":null,"capacity_construction_mtpa":null,"capacity_proposed_mtpa":18,"capacity_operating_bcm_y":null,"capacity_construction_bcm_y":null,"capacity_proposed_bcm_y":24.48,"earliest_start_year":null,"latest_start_year":null,"url":"https://lngatlas.org/terminal/rovuma-lng-terminal-mz/","data_source":"Data: Global Gas Infrastructure Tracker, Global Energy Monitor, September 2025"},{"slug":"rudong-lng-terminal-china-resources-cn","name":"Rudong LNG Terminal (China Resources)","country":"China","country_iso":"CN","region":"Asia","state_province":"Jiangsu","city":"Sunshine Island","facility_type":"import","floating_type":"unknown","status":"construction","latitude":32.5301876,"longitude":121.418122,"units":1,"capacity_operating_mtpa":null,"capacity_construction_mtpa":6.5,"capacity_proposed_mtpa":null,"capacity_operating_bcm_y":null,"capacity_construction_bcm_y":8.84,"capacity_proposed_bcm_y":null,"earliest_start_year":null,"latest_start_year":null,"url":"https://lngatlas.org/terminal/rudong-lng-terminal-china-resources-cn/","data_source":"Data: Global Gas Infrastructure Tracker, Global Energy Monitor, September 2025"},{"slug":"rudong-lng-terminal-gcl-poly-cn","name":"Rudong LNG Terminal (GCL-Poly)","country":"China","country_iso":"CN","region":"Asia","state_province":"Jiangsu","city":"Sunshine Island","facility_type":"import","floating_type":"unknown","status":"construction","latitude":32.526845,"longitude":121.412712,"units":1,"capacity_operating_mtpa":null,"capacity_construction_mtpa":3.5,"capacity_proposed_mtpa":null,"capacity_operating_bcm_y":null,"capacity_construction_bcm_y":4.76,"capacity_proposed_bcm_y":null,"earliest_start_year":null,"latest_start_year":null,"url":"https://lngatlas.org/terminal/rudong-lng-terminal-gcl-poly-cn/","data_source":"Data: Global Gas Infrastructure Tracker, Global Energy Monitor, September 2025"},{"slug":"rudong-lng-terminal-jiangsu-guoxin-cn","name":"Rudong LNG Terminal (Jiangsu Guoxin)","country":"China","country_iso":"CN","region":"Asia","state_province":"Jiangsu","city":"Sunshine Island","facility_type":"import","floating_type":"unknown","status":"construction","latitude":32.526845,"longitude":121.412712,"units":2,"capacity_operating_mtpa":null,"capacity_construction_mtpa":6,"capacity_proposed_mtpa":null,"capacity_operating_bcm_y":null,"capacity_construction_bcm_y":8.16,"capacity_proposed_bcm_y":null,"earliest_start_year":null,"latest_start_year":null,"url":"https://lngatlas.org/terminal/rudong-lng-terminal-jiangsu-guoxin-cn/","data_source":"Data: Global Gas Infrastructure Tracker, Global Energy Monitor, September 2025"},{"slug":"rudong-lng-terminal-petrochina-cn","name":"Rudong LNG Terminal (PetroChina)","country":"China","country_iso":"CN","region":"Asia","state_province":"Jiangsu","city":"Sunshine Island","facility_type":"import","floating_type":"unknown","status":"operating","latitude":32.528814,"longitude":121.428128,"units":4,"capacity_operating_mtpa":10,"capacity_construction_mtpa":null,"capacity_proposed_mtpa":null,"capacity_operating_bcm_y":13.6,"capacity_construction_bcm_y":null,"capacity_proposed_bcm_y":null,"earliest_start_year":2011,"latest_start_year":2021,"url":"https://lngatlas.org/terminal/rudong-lng-terminal-petrochina-cn/","data_source":"Data: Global Gas Infrastructure Tracker, Global Energy Monitor, September 2025"},{"slug":"ruwais-fsru-ae","name":"Ruwais FSRU","country":"United Arab Emirates","country_iso":"AE","region":"Asia","state_province":"Abu Dhabi","city":"Ruwais","facility_type":"import","floating_type":"fsru","status":"operating","latitude":24.1483,"longitude":52.7389,"units":1,"capacity_operating_mtpa":3.8,"capacity_construction_mtpa":null,"capacity_proposed_mtpa":null,"capacity_operating_bcm_y":5.168,"capacity_construction_bcm_y":null,"capacity_proposed_bcm_y":null,"earliest_start_year":2016,"latest_start_year":2016,"url":"https://lngatlas.org/terminal/ruwais-fsru-ae/","data_source":"Data: Global Gas Infrastructure Tracker, Global Energy Monitor, September 2025"},{"slug":"ruwais-lng-terminal-ae","name":"Ruwais LNG Terminal","country":"United Arab Emirates","country_iso":"AE","region":"Asia","state_province":"Abu Dhabi","city":"Ruwais","facility_type":"export","floating_type":"unknown","status":"construction","latitude":24.13523,"longitude":52.65226,"units":2,"capacity_operating_mtpa":null,"capacity_construction_mtpa":9.6,"capacity_proposed_mtpa":null,"capacity_operating_bcm_y":null,"capacity_construction_bcm_y":13.056,"capacity_proposed_bcm_y":null,"earliest_start_year":null,"latest_start_year":null,"url":"https://lngatlas.org/terminal/ruwais-lng-terminal-ae/","data_source":"Data: Global Gas Infrastructure Tracker, Global Energy Monitor, September 2025"},{"slug":"sk-group-sri-lanka-lng-terminal-lk","name":"SK Group Sri Lanka LNG Terminal","country":"Sri Lanka","country_iso":"LK","region":"Asia","state_province":null,"city":"unknown","facility_type":"import","floating_type":"unknown","status":"cancelled","latitude":null,"longitude":null,"units":1,"capacity_operating_mtpa":null,"capacity_construction_mtpa":null,"capacity_proposed_mtpa":null,"capacity_operating_bcm_y":null,"capacity_construction_bcm_y":null,"capacity_proposed_bcm_y":null,"earliest_start_year":null,"latest_start_year":null,"url":"https://lngatlas.org/terminal/sk-group-sri-lanka-lng-terminal-lk/","data_source":"Data: Global Gas Infrastructure Tracker, Global Energy Monitor, September 2025"},{"slug":"slng-2-lng-terminal-sg","name":"SLNG 2 LNG Terminal","country":"Singapore","country_iso":"SG","region":"Asia","state_province":null,"city":"Offshore Singapore","facility_type":"import","floating_type":"floating","status":"proposed","latitude":1.200281,"longitude":103.672847,"units":1,"capacity_operating_mtpa":null,"capacity_construction_mtpa":null,"capacity_proposed_mtpa":5,"capacity_operating_bcm_y":null,"capacity_construction_bcm_y":null,"capacity_proposed_bcm_y":6.8,"earliest_start_year":null,"latest_start_year":null,"url":"https://lngatlas.org/terminal/slng-2-lng-terminal-sg/","data_source":"Data: Global Gas Infrastructure Tracker, Global Energy Monitor, September 2025"},{"slug":"st-lng-flng-terminal-us","name":"ST LNG FLNG Terminal","country":"United States","country_iso":"US","region":"Americas","state_province":null,"city":null,"facility_type":"export","floating_type":"flng","status":"proposed","latitude":28.401715909380478,"longitude":-95.8284171255005,"units":1,"capacity_operating_mtpa":null,"capacity_construction_mtpa":null,"capacity_proposed_mtpa":8.4,"capacity_operating_bcm_y":null,"capacity_construction_bcm_y":null,"capacity_proposed_bcm_y":11.424,"earliest_start_year":null,"latest_start_year":null,"url":"https://lngatlas.org/terminal/st-lng-flng-terminal-us/","data_source":"Data: Global Gas Infrastructure Tracker, Global Energy Monitor, September 2025"},{"slug":"sabine-pass-lng-terminal-us","name":"Sabine Pass LNG Terminal","country":"United States","country_iso":"US","region":"Americas","state_province":"Louisiana","city":"Sabine Pass","facility_type":"export","floating_type":"unknown","status":"operating","latitude":29.7540967,"longitude":-93.8740512,"units":8,"capacity_operating_mtpa":59.9,"capacity_construction_mtpa":null,"capacity_proposed_mtpa":20,"capacity_operating_bcm_y":81.464,"capacity_construction_bcm_y":null,"capacity_proposed_bcm_y":27.2,"earliest_start_year":2008,"latest_start_year":2021,"url":"https://lngatlas.org/terminal/sabine-pass-lng-terminal-us/","data_source":"Data: Global Gas Infrastructure Tracker, Global Energy Monitor, September 2025"},{"slug":"safe-harbor-energy-lng-terminal-us","name":"Safe Harbor Energy LNG Terminal","country":"United States","country_iso":"US","region":"Americas","state_province":"New York","city":"Long Beach","facility_type":"import","floating_type":"unknown","status":"cancelled","latitude":40.388611,"longitude":-73.609722,"units":1,"capacity_operating_mtpa":null,"capacity_construction_mtpa":null,"capacity_proposed_mtpa":null,"capacity_operating_bcm_y":null,"capacity_construction_bcm_y":null,"capacity_proposed_bcm_y":null,"earliest_start_year":null,"latest_start_year":null,"url":"https://lngatlas.org/terminal/safe-harbor-energy-lng-terminal-us/","data_source":"Data: Global Gas Infrastructure Tracker, Global Energy Monitor, September 2025"},{"slug":"saguaro-energia-lng-terminal-mx","name":"Saguaro Energía LNG Terminal","country":"Mexico","country_iso":"MX","region":"Americas","state_province":"Sonora","city":"Puerto Libertad","facility_type":"export","floating_type":"unknown","status":"proposed","latitude":29.905838,"longitude":-112.688038,"units":2,"capacity_operating_mtpa":null,"capacity_construction_mtpa":null,"capacity_proposed_mtpa":30,"capacity_operating_bcm_y":null,"capacity_construction_bcm_y":null,"capacity_proposed_bcm_y":40.8,"earliest_start_year":null,"latest_start_year":null,"url":"https://lngatlas.org/terminal/saguaro-energia-lng-terminal-mx/","data_source":"Data: Global Gas Infrastructure Tracker, Global Energy Monitor, September 2025"},{"slug":"sagunto-lng-terminal-es","name":"Sagunto LNG Terminal","country":"Spain","country_iso":"ES","region":"Europe","state_province":"Valencia","city":"Sagunto Port","facility_type":"import","floating_type":"unknown","status":"operating","latitude":39.6329,"longitude":-0.2152,"units":1,"capacity_operating_mtpa":6.4,"capacity_construction_mtpa":null,"capacity_proposed_mtpa":null,"capacity_operating_bcm_y":8.704,"capacity_construction_bcm_y":null,"capacity_proposed_bcm_y":null,"earliest_start_year":2006,"latest_start_year":2006,"url":"https://lngatlas.org/terminal/sagunto-lng-terminal-es/","data_source":"Data: Global Gas Infrastructure Tracker, Global Energy Monitor, September 2025"},{"slug":"saint-john-lng-terminal-ca","name":"Saint John LNG Terminal","country":"Canada","country_iso":"CA","region":"Americas","state_province":"New Brunswick","city":"Saint John","facility_type":"export","floating_type":"unknown","status":"operating","latitude":45.2114,"longitude":-65.978,"units":3,"capacity_operating_mtpa":7.5,"capacity_construction_mtpa":null,"capacity_proposed_mtpa":null,"capacity_operating_bcm_y":10.2,"capacity_construction_bcm_y":null,"capacity_proposed_bcm_y":null,"earliest_start_year":2009,"latest_start_year":2009,"url":"https://lngatlas.org/terminal/saint-john-lng-terminal-ca/","data_source":"Data: Global Gas Infrastructure Tracker, Global Energy Monitor, September 2025"},{"slug":"sakai-lng-terminal-jp","name":"Sakai LNG Terminal","country":"Japan","country_iso":"JP","region":"Asia","state_province":"Kansai","city":"Sakai","facility_type":"import","floating_type":"unknown","status":"operating","latitude":34.57142,"longitude":135.414,"units":1,"capacity_operating_mtpa":6.4,"capacity_construction_mtpa":null,"capacity_proposed_mtpa":null,"capacity_operating_bcm_y":8.704,"capacity_construction_bcm_y":null,"capacity_proposed_bcm_y":null,"earliest_start_year":2006,"latest_start_year":2006,"url":"https://lngatlas.org/terminal/sakai-lng-terminal-jp/","data_source":"Data: Global Gas Infrastructure Tracker, Global Energy Monitor, September 2025"},{"slug":"sakaide-lng-terminal-jp","name":"Sakaide LNG Terminal","country":"Japan","country_iso":"JP","region":"Asia","state_province":"Shikoku","city":"Sakaide","facility_type":"import","floating_type":"unknown","status":"operating","latitude":34.3568348,"longitude":133.8367306,"units":1,"capacity_operating_mtpa":1.2,"capacity_construction_mtpa":null,"capacity_proposed_mtpa":null,"capacity_operating_bcm_y":1.632,"capacity_construction_bcm_y":null,"capacity_proposed_bcm_y":null,"earliest_start_year":2010,"latest_start_year":2010,"url":"https://lngatlas.org/terminal/sakaide-lng-terminal-jp/","data_source":"Data: Global Gas Infrastructure Tracker, Global Energy Monitor, September 2025"},{"slug":"sakhalin-ii-lng-terminal-ru","name":"Sakhalin II LNG Terminal","country":"Russia","country_iso":"RU","region":"Europe","state_province":"Sakhalin","city":"Prigorodnoye, Aniva Bay","facility_type":"export","floating_type":"unknown","status":"operating","latitude":46.6288,"longitude":142.9112,"units":3,"capacity_operating_mtpa":9.6,"capacity_construction_mtpa":null,"capacity_proposed_mtpa":5.4,"capacity_operating_bcm_y":13.056,"capacity_construction_bcm_y":null,"capacity_proposed_bcm_y":7.344,"earliest_start_year":2009,"latest_start_year":2009,"url":"https://lngatlas.org/terminal/sakhalin-ii-lng-terminal-ru/","data_source":"Data: Global Gas Infrastructure Tracker, Global Energy Monitor, September 2025"},{"slug":"saldanha-bay-fsru-za","name":"Saldanha Bay FSRU","country":"South Africa","country_iso":"ZA","region":"Africa","state_province":"Western Cape","city":"Saldanha Bay","facility_type":"import","floating_type":"fsru","status":"cancelled","latitude":-33.034722,"longitude":18.009722,"units":1,"capacity_operating_mtpa":null,"capacity_construction_mtpa":null,"capacity_proposed_mtpa":null,"capacity_operating_bcm_y":null,"capacity_construction_bcm_y":null,"capacity_proposed_bcm_y":null,"earliest_start_year":null,"latest_start_year":null,"url":"https://lngatlas.org/terminal/saldanha-bay-fsru-za/","data_source":"Data: Global Gas Infrastructure Tracker, Global Energy Monitor, September 2025"},{"slug":"salina-cruz-lng-terminal-cfe-mx","name":"Salina Cruz LNG Terminal (CFE)","country":"Mexico","country_iso":"MX","region":"Americas","state_province":"Oaxaca","city":"Salina Cruz","facility_type":"export","floating_type":"unknown","status":"shelved","latitude":16.161733,"longitude":-95.195759,"units":1,"capacity_operating_mtpa":null,"capacity_construction_mtpa":null,"capacity_proposed_mtpa":null,"capacity_operating_bcm_y":null,"capacity_construction_bcm_y":null,"capacity_proposed_bcm_y":null,"earliest_start_year":null,"latest_start_year":null,"url":"https://lngatlas.org/terminal/salina-cruz-lng-terminal-cfe-mx/","data_source":"Data: Global Gas Infrastructure Tracker, Global Energy Monitor, September 2025"},{"slug":"salina-cruz-lng-terminal-pilot-gfi-mx","name":"Salina Cruz LNG Terminal (Pilot/GFI)","country":"Mexico","country_iso":"MX","region":"Americas","state_province":"Oaxaca","city":"Salinas del Marqués","facility_type":"export","floating_type":"unknown","status":"proposed","latitude":16.15999,"longitude":-95.209909,"units":1,"capacity_operating_mtpa":null,"capacity_construction_mtpa":null,"capacity_proposed_mtpa":0.34,"capacity_operating_bcm_y":null,"capacity_construction_bcm_y":null,"capacity_proposed_bcm_y":0.462,"earliest_start_year":null,"latest_start_year":null,"url":"https://lngatlas.org/terminal/salina-cruz-lng-terminal-pilot-gfi-mx/","data_source":"Data: Global Gas Infrastructure Tracker, Global Energy Monitor, September 2025"},{"slug":"samcheok-lng-terminal-kr","name":"Samcheok LNG Terminal","country":"South Korea","country_iso":"KR","region":"Asia","state_province":"Gangwon-do","city":"Samcheok","facility_type":"import","floating_type":"unknown","status":"operating","latitude":37.1683,"longitude":129.3502,"units":2,"capacity_operating_mtpa":11.6,"capacity_construction_mtpa":null,"capacity_proposed_mtpa":null,"capacity_operating_bcm_y":15.776,"capacity_construction_bcm_y":null,"capacity_proposed_bcm_y":null,"earliest_start_year":2014,"latest_start_year":2016,"url":"https://lngatlas.org/terminal/samcheok-lng-terminal-kr/","data_source":"Data: Global Gas Infrastructure Tracker, Global Energy Monitor, September 2025"},{"slug":"san-juan-lng-terminal-pr","name":"San Juan LNG Terminal","country":"United States","country_iso":"US","region":"Americas","state_province":"Puerto Rico","city":"San Juan","facility_type":"import","floating_type":"floating","status":"operating","latitude":18.461942,"longitude":-66.11091,"units":1,"capacity_operating_mtpa":1.1,"capacity_construction_mtpa":null,"capacity_proposed_mtpa":null,"capacity_operating_bcm_y":1.496,"capacity_construction_bcm_y":null,"capacity_proposed_bcm_y":null,"earliest_start_year":2020,"latest_start_year":2020,"url":"https://lngatlas.org/terminal/san-juan-lng-terminal-pr/","data_source":"Data: Global Gas Infrastructure Tracker, Global Energy Monitor, September 2025"},{"slug":"san-pedro-de-macoris-lng-terminal-do","name":"San Pedro de Macoris LNG Terminal","country":"Dominican Republic","country_iso":"DO","region":"Americas","state_province":"San Pedro Macorís","city":"San Pedro Macorís","facility_type":"import","floating_type":"unknown","status":"cancelled","latitude":18.45,"longitude":-69.3,"units":1,"capacity_operating_mtpa":null,"capacity_construction_mtpa":null,"capacity_proposed_mtpa":null,"capacity_operating_bcm_y":null,"capacity_construction_bcm_y":null,"capacity_proposed_bcm_y":null,"earliest_start_year":null,"latest_start_year":null,"url":"https://lngatlas.org/terminal/san-pedro-de-macoris-lng-terminal-do/","data_source":"Data: Global Gas Infrastructure Tracker, Global Energy Monitor, September 2025"},{"slug":"santos-basin-flng-terminal-br","name":"Santos Basin FLNG Terminal","country":"Brazil","country_iso":"BR","region":"Americas","state_province":"São Paulo","city":"Santos Basin","facility_type":"export","floating_type":"flng","status":"cancelled","latitude":-23.936944,"longitude":-46.325,"units":1,"capacity_operating_mtpa":null,"capacity_construction_mtpa":null,"capacity_proposed_mtpa":null,"capacity_operating_bcm_y":null,"capacity_construction_bcm_y":null,"capacity_proposed_bcm_y":null,"earliest_start_year":null,"latest_start_year":null,"url":"https://lngatlas.org/terminal/santos-basin-flng-terminal-br/","data_source":"Data: Global Gas Infrastructure Tracker, Global Energy Monitor, September 2025"},{"slug":"satu-flng-terminal-my","name":"Satu FLNG Terminal","country":"Malaysia","country_iso":"MY","region":"Asia","state_province":"Sarawak","city":"Bintulu","facility_type":"export","floating_type":"flng","status":"operating","latitude":7.375718,"longitude":115.480022,"units":1,"capacity_operating_mtpa":1.2,"capacity_construction_mtpa":null,"capacity_proposed_mtpa":null,"capacity_operating_bcm_y":1.632,"capacity_construction_bcm_y":null,"capacity_proposed_bcm_y":null,"earliest_start_year":2017,"latest_start_year":2017,"url":"https://lngatlas.org/terminal/satu-flng-terminal-my/","data_source":"Data: Global Gas Infrastructure Tracker, Global Energy Monitor, September 2025"},{"slug":"mlng-satu-lng-terminal-my","name":"Satu Malaysia Terminal","country":"Malaysia","country_iso":"MY","region":"Asia","state_province":"Sarawak","city":"Bintulu","facility_type":"export","floating_type":"unknown","status":"operating","latitude":3.2851,"longitude":113.08114,"units":1,"capacity_operating_mtpa":8.4,"capacity_construction_mtpa":null,"capacity_proposed_mtpa":null,"capacity_operating_bcm_y":11.424,"capacity_construction_bcm_y":null,"capacity_proposed_bcm_y":null,"earliest_start_year":1983,"latest_start_year":1983,"url":"https://lngatlas.org/terminal/mlng-satu-lng-terminal-my/","data_source":"Data: Global Gas Infrastructure Tracker, Global Energy Monitor, September 2025"},{"slug":"scarborough-flng-terminal-au","name":"Scarborough FLNG Terminal","country":"Australia","country_iso":"AU","region":"Oceania","state_province":"Western Australia","city":"Onslow","facility_type":"export","floating_type":"flng","status":"cancelled","latitude":-21.633333,"longitude":115.116667,"units":1,"capacity_operating_mtpa":null,"capacity_construction_mtpa":null,"capacity_proposed_mtpa":null,"capacity_operating_bcm_y":null,"capacity_construction_bcm_y":null,"capacity_proposed_bcm_y":null,"earliest_start_year":null,"latest_start_year":null,"url":"https://lngatlas.org/terminal/scarborough-flng-terminal-au/","data_source":"Data: Global Gas Infrastructure Tracker, Global Energy Monitor, September 2025"},{"slug":"selaata-fsru-lb","name":"Selaata FSRU","country":"Lebanon","country_iso":"LB","region":"Asia","state_province":null,"city":"Selaata","facility_type":"import","floating_type":"fsru","status":"cancelled","latitude":34.281578,"longitude":35.650967,"units":1,"capacity_operating_mtpa":null,"capacity_construction_mtpa":null,"capacity_proposed_mtpa":null,"capacity_operating_bcm_y":null,"capacity_construction_bcm_y":null,"capacity_proposed_bcm_y":null,"earliest_start_year":null,"latest_start_year":null,"url":"https://lngatlas.org/terminal/selaata-fsru-lb/","data_source":"Data: Global Gas Infrastructure Tracker, Global Energy Monitor, September 2025"},{"slug":"senboku-1-lng-terminal-jp","name":"Senboku 1 LNG Terminal","country":"Japan","country_iso":"JP","region":"Asia","state_province":"Kansai","city":"Port of Sakai-Semboku","facility_type":"import","floating_type":"unknown","status":"operating","latitude":34.5488834,"longitude":135.4284047,"units":1,"capacity_operating_mtpa":1.9,"capacity_construction_mtpa":null,"capacity_proposed_mtpa":null,"capacity_operating_bcm_y":2.584,"capacity_construction_bcm_y":null,"capacity_proposed_bcm_y":null,"earliest_start_year":1972,"latest_start_year":1972,"url":"https://lngatlas.org/terminal/senboku-1-lng-terminal-jp/","data_source":"Data: Global Gas Infrastructure Tracker, Global Energy Monitor, September 2025"},{"slug":"senboku-2-lng-terminal-jp","name":"Senboku 2 LNG Terminal","country":"Japan","country_iso":"JP","region":"Asia","state_province":"Kansai","city":"Port of Sakai-Semboku","facility_type":"import","floating_type":"unknown","status":"operating","latitude":34.536626,"longitude":135.40147,"units":1,"capacity_operating_mtpa":9.9,"capacity_construction_mtpa":null,"capacity_proposed_mtpa":null,"capacity_operating_bcm_y":13.464,"capacity_construction_bcm_y":null,"capacity_proposed_bcm_y":null,"earliest_start_year":1977,"latest_start_year":1977,"url":"https://lngatlas.org/terminal/senboku-2-lng-terminal-jp/","data_source":"Data: Global Gas Infrastructure Tracker, Global Energy Monitor, September 2025"},{"slug":"sendai-lng-terminal-jp","name":"Sendai LNG Terminal","country":"Japan","country_iso":"JP","region":"Asia","state_province":null,"city":"Sendai","facility_type":"import","floating_type":"unknown","status":"operating","latitude":38.273591,"longitude":141.005623,"units":1,"capacity_operating_mtpa":0.8,"capacity_construction_mtpa":null,"capacity_proposed_mtpa":null,"capacity_operating_bcm_y":1.088,"capacity_construction_bcm_y":null,"capacity_proposed_bcm_y":null,"earliest_start_year":2013,"latest_start_year":2013,"url":"https://lngatlas.org/terminal/sendai-lng-terminal-jp/","data_source":"Data: Global Gas Infrastructure Tracker, Global Energy Monitor, September 2025"},{"slug":"sengkang-lng-terminal-id","name":"Sengkang LNG Terminal","country":"Indonesia","country_iso":"ID","region":"Asia","state_province":"Sulawesi","city":"South Sulawesi coastline","facility_type":"export","floating_type":"unknown","status":"shelved","latitude":-4.5459732,"longitude":120.4136867,"units":2,"capacity_operating_mtpa":null,"capacity_construction_mtpa":null,"capacity_proposed_mtpa":null,"capacity_operating_bcm_y":null,"capacity_construction_bcm_y":null,"capacity_proposed_bcm_y":null,"earliest_start_year":null,"latest_start_year":null,"url":"https://lngatlas.org/terminal/sengkang-lng-terminal-id/","data_source":"Data: Global Gas Infrastructure Tracker, Global Energy Monitor, September 2025"},{"slug":"sepetiba-bay-fsru-br","name":"Sepetiba Bay FSRU","country":"Brazil","country_iso":"BR","region":"Americas","state_province":"Rio de Janeiro","city":"Itaguaí","facility_type":"import","floating_type":"fsru","status":"operating","latitude":-22.928227,"longitude":-43.857039,"units":1,"capacity_operating_mtpa":2.7,"capacity_construction_mtpa":null,"capacity_proposed_mtpa":null,"capacity_operating_bcm_y":3.672,"capacity_construction_bcm_y":null,"capacity_proposed_bcm_y":null,"earliest_start_year":2022,"latest_start_year":2022,"url":"https://lngatlas.org/terminal/sepetiba-bay-fsru-br/","data_source":"Data: Global Gas Infrastructure Tracker, Global Energy Monitor, September 2025"},{"slug":"sergipe-fsru-br","name":"Sergipe FSRU","country":"Brazil","country_iso":"BR","region":"Americas","state_province":"Pernambuco","city":"Porto de Sergipe","facility_type":"import","floating_type":"fsru","status":"operating","latitude":-10.843241,"longitude":-36.918455,"units":1,"capacity_operating_mtpa":5.64,"capacity_construction_mtpa":null,"capacity_proposed_mtpa":null,"capacity_operating_bcm_y":7.67,"capacity_construction_bcm_y":null,"capacity_proposed_bcm_y":null,"earliest_start_year":2020,"latest_start_year":2020,"url":"https://lngatlas.org/terminal/sergipe-fsru-br/","data_source":"Data: Global Gas Infrastructure Tracker, Global Energy Monitor, September 2025"},{"slug":"shandong-lng-terminal-cn","name":"Shandong LNG Terminal","country":"China","country_iso":"CN","region":"Asia","state_province":"Shandong","city":"Dongjiakou","facility_type":"import","floating_type":"unknown","status":"operating","latitude":35.58624,"longitude":119.759685,"units":3,"capacity_operating_mtpa":11,"capacity_construction_mtpa":null,"capacity_proposed_mtpa":null,"capacity_operating_bcm_y":14.96,"capacity_construction_bcm_y":null,"capacity_proposed_bcm_y":null,"earliest_start_year":2014,"latest_start_year":2023,"url":"https://lngatlas.org/terminal/shandong-lng-terminal-cn/","data_source":"Data: Global Gas Infrastructure Tracker, Global Energy Monitor, September 2025"},{"slug":"shanghai-yangshan-lng-terminal-cn","name":"Shanghai Yangshan LNG Terminal","country":"China","country_iso":"CN","region":"Asia","state_province":"Shanghai","city":"Yangshan Deepwater Port","facility_type":"import","floating_type":"unknown","status":"operating","latitude":30.60437,"longitude":122.10244,"units":5,"capacity_operating_mtpa":3,"capacity_construction_mtpa":3,"capacity_proposed_mtpa":3,"capacity_operating_bcm_y":4.08,"capacity_construction_bcm_y":4.08,"capacity_proposed_bcm_y":4.08,"earliest_start_year":2009,"latest_start_year":2020,"url":"https://lngatlas.org/terminal/shanghai-yangshan-lng-terminal-cn/","data_source":"Data: Global Gas Infrastructure Tracker, Global Energy Monitor, September 2025"},{"slug":"shannon-fsru-ie","name":"Shannon FSRU","country":"Ireland","country_iso":"IE","region":"Europe","state_province":"Munster","city":"Tarbert/Ballylongford","facility_type":"import","floating_type":"fsru","status":"proposed","latitude":52.58247319899761,"longitude":-9.44271041363988,"units":1,"capacity_operating_mtpa":null,"capacity_construction_mtpa":null,"capacity_proposed_mtpa":6.06,"capacity_operating_bcm_y":null,"capacity_construction_bcm_y":null,"capacity_proposed_bcm_y":8.242,"earliest_start_year":null,"latest_start_year":null,"url":"https://lngatlas.org/terminal/shannon-fsru-ie/","data_source":"Data: Global Gas Infrastructure Tracker, Global Energy Monitor, September 2025"},{"slug":"shantou-lng-terminal-cn","name":"Shantou LNG Terminal","country":"China","country_iso":"CN","region":"Asia","state_province":"Guangdong","city":"Haojiang Guang’ao Island","facility_type":"import","floating_type":"unknown","status":"proposed","latitude":23.2256286,"longitude":116.7944804,"units":2,"capacity_operating_mtpa":null,"capacity_construction_mtpa":null,"capacity_proposed_mtpa":3,"capacity_operating_bcm_y":null,"capacity_construction_bcm_y":null,"capacity_proposed_bcm_y":4.08,"earliest_start_year":null,"latest_start_year":null,"url":"https://lngatlas.org/terminal/shantou-lng-terminal-cn/","data_source":"Data: Global Gas Infrastructure Tracker, Global Energy Monitor, September 2025"},{"slug":"shanwei-lng-terminal-cn","name":"Shanwei LNG Terminal","country":"China","country_iso":"CN","region":"Asia","state_province":"Guangdong","city":null,"facility_type":"import","floating_type":"unknown","status":"shelved","latitude":22.6517236,"longitude":115.5691341,"units":1,"capacity_operating_mtpa":null,"capacity_construction_mtpa":null,"capacity_proposed_mtpa":null,"capacity_operating_bcm_y":null,"capacity_construction_bcm_y":null,"capacity_proposed_bcm_y":null,"earliest_start_year":null,"latest_start_year":null,"url":"https://lngatlas.org/terminal/shanwei-lng-terminal-cn/","data_source":"Data: Global Gas Infrastructure Tracker, Global Energy Monitor, September 2025"},{"slug":"sharjah-fsru-ae","name":"Sharjah FSRU","country":"United Arab Emirates","country_iso":"AE","region":"Asia","state_province":"Sharjah","city":"Sharjah","facility_type":"import","floating_type":"fsru","status":"cancelled","latitude":25.379099,"longitude":55.387511,"units":1,"capacity_operating_mtpa":null,"capacity_construction_mtpa":null,"capacity_proposed_mtpa":null,"capacity_operating_bcm_y":null,"capacity_construction_bcm_y":null,"capacity_proposed_bcm_y":null,"earliest_start_year":null,"latest_start_year":null,"url":"https://lngatlas.org/terminal/sharjah-fsru-ae/","data_source":"Data: Global Gas Infrastructure Tracker, Global Energy Monitor, September 2025"},{"slug":"sheikh-sabah-lng-terminal-jo","name":"Sheikh Sabah LNG Terminal","country":"Jordan","country_iso":"JO","region":"Asia","state_province":null,"city":"Aqaba","facility_type":"import","floating_type":"unknown","status":"proposed","latitude":29.376271,"longitude":34.963801,"units":1,"capacity_operating_mtpa":null,"capacity_construction_mtpa":null,"capacity_proposed_mtpa":5.48,"capacity_operating_bcm_y":null,"capacity_construction_bcm_y":null,"capacity_proposed_bcm_y":7.453,"earliest_start_year":null,"latest_start_year":null,"url":"https://lngatlas.org/terminal/sheikh-sabah-lng-terminal-jo/","data_source":"Data: Global Gas Infrastructure Tracker, Global Energy Monitor, September 2025"},{"slug":"shenzhen-diefu-cnooc-lng-terminal-cn","name":"Shenzhen Diefu CNOOC LNG Terminal","country":"China","country_iso":"CN","region":"Asia","state_province":"Guangdong","city":"Diefu Dapeng Bay","facility_type":"import","floating_type":"unknown","status":"operating","latitude":22.593039,"longitude":114.444262,"units":1,"capacity_operating_mtpa":4,"capacity_construction_mtpa":null,"capacity_proposed_mtpa":null,"capacity_operating_bcm_y":5.44,"capacity_construction_bcm_y":null,"capacity_proposed_bcm_y":null,"earliest_start_year":2018,"latest_start_year":2018,"url":"https://lngatlas.org/terminal/shenzhen-diefu-cnooc-lng-terminal-cn/","data_source":"Data: Global Gas Infrastructure Tracker, Global Energy Monitor, September 2025"},{"slug":"shenzhen-lng-terminal-cn","name":"Shenzhen LNG Terminal","country":"China","country_iso":"CN","region":"Asia","state_province":"Guangdong","city":"Dapeng Bay","facility_type":"import","floating_type":"unknown","status":"construction","latitude":22.594055,"longitude":114.4283,"units":1,"capacity_operating_mtpa":null,"capacity_construction_mtpa":3,"capacity_proposed_mtpa":null,"capacity_operating_bcm_y":null,"capacity_construction_bcm_y":4.08,"capacity_proposed_bcm_y":null,"earliest_start_year":null,"latest_start_year":null,"url":"https://lngatlas.org/terminal/shenzhen-lng-terminal-cn/","data_source":"Data: Global Gas Infrastructure Tracker, Global Energy Monitor, September 2025"},{"slug":"shenzhen-lng-terminal-shenzhen-gas-cn","name":"Shenzhen LNG Terminal (Shenzhen Gas)","country":"China","country_iso":"CN","region":"Asia","state_province":"Guangdong","city":"Dapeng Bay","facility_type":"import","floating_type":"unknown","status":"operating","latitude":22.618619,"longitude":114.384841,"units":2,"capacity_operating_mtpa":0.8,"capacity_construction_mtpa":2,"capacity_proposed_mtpa":null,"capacity_operating_bcm_y":1.088,"capacity_construction_bcm_y":2.72,"capacity_proposed_bcm_y":null,"earliest_start_year":2019,"latest_start_year":2019,"url":"https://lngatlas.org/terminal/shenzhen-lng-terminal-shenzhen-gas-cn/","data_source":"Data: Global Gas Infrastructure Tracker, Global Energy Monitor, September 2025"},{"slug":"shin-minato-lng-terminal-jp","name":"Shin Minato LNG Terminal","country":"Japan","country_iso":"JP","region":"Asia","state_province":"Tohoku","city":"Sendai","facility_type":"import","floating_type":"unknown","status":"operating","latitude":38.280128,"longitude":141.025958,"units":1,"capacity_operating_mtpa":0.3,"capacity_construction_mtpa":null,"capacity_proposed_mtpa":null,"capacity_operating_bcm_y":0.408,"capacity_construction_bcm_y":null,"capacity_proposed_bcm_y":null,"earliest_start_year":1997,"latest_start_year":1997,"url":"https://lngatlas.org/terminal/shin-minato-lng-terminal-jp/","data_source":"Data: Global Gas Infrastructure Tracker, Global Energy Monitor, September 2025"},{"slug":"shin-sendai-lng-terminal-jp","name":"Shin-Sendai LNG Terminal","country":"Japan","country_iso":"JP","region":"Asia","state_province":"Tohoku","city":"Sendai","facility_type":"import","floating_type":"unknown","status":"operating","latitude":38.27678,"longitude":141.0393,"units":1,"capacity_operating_mtpa":1.7,"capacity_construction_mtpa":null,"capacity_proposed_mtpa":null,"capacity_operating_bcm_y":2.312,"capacity_construction_bcm_y":null,"capacity_proposed_bcm_y":null,"earliest_start_year":2015,"latest_start_year":2015,"url":"https://lngatlas.org/terminal/shin-sendai-lng-terminal-jp/","data_source":"Data: Global Gas Infrastructure Tracker, Global Energy Monitor, September 2025"},{"slug":"shtokman-lng-terminal-ru","name":"Shtokman LNG Terminal","country":"Russia","country_iso":"RU","region":"Europe","state_province":"Barents Sea","city":"Shtokman field","facility_type":"export","floating_type":"unknown","status":"cancelled","latitude":73,"longitude":44,"units":1,"capacity_operating_mtpa":null,"capacity_construction_mtpa":null,"capacity_proposed_mtpa":null,"capacity_operating_bcm_y":null,"capacity_construction_bcm_y":null,"capacity_proposed_bcm_y":null,"earliest_start_year":null,"latest_start_year":null,"url":"https://lngatlas.org/terminal/shtokman-lng-terminal-ru/","data_source":"Data: Global Gas Infrastructure Tracker, Global Energy Monitor, September 2025"},{"slug":"sines-lng-terminal-pt","name":"Sines LNG Terminal","country":"Portugal","country_iso":"PT","region":"Europe","state_province":"Alentejo","city":"Sines","facility_type":"import","floating_type":"unknown","status":"operating","latitude":37.9419,"longitude":-8.8435,"units":1,"capacity_operating_mtpa":5.6,"capacity_construction_mtpa":null,"capacity_proposed_mtpa":null,"capacity_operating_bcm_y":7.616,"capacity_construction_bcm_y":null,"capacity_proposed_bcm_y":null,"earliest_start_year":2004,"latest_start_year":2004,"url":"https://lngatlas.org/terminal/sines-lng-terminal-pt/","data_source":"Data: Global Gas Infrastructure Tracker, Global Energy Monitor, September 2025"},{"slug":"singapore-lng-terminal-sg","name":"Singapore LNG Terminal","country":"Singapore","country_iso":"SG","region":"Asia","state_province":"West Region","city":"Jurong Island","facility_type":"import","floating_type":"unknown","status":"operating","latitude":1.23616,"longitude":103.67135,"units":3,"capacity_operating_mtpa":11,"capacity_construction_mtpa":null,"capacity_proposed_mtpa":null,"capacity_operating_bcm_y":14.96,"capacity_construction_bcm_y":null,"capacity_proposed_bcm_y":null,"earliest_start_year":2013,"latest_start_year":2018,"url":"https://lngatlas.org/terminal/singapore-lng-terminal-sg/","data_source":"Data: Global Gas Infrastructure Tracker, Global Energy Monitor, September 2025"},{"slug":"singapore-offshore-lng-terminal-sg","name":"Singapore Offshore LNG Terminal","country":"Singapore","country_iso":"SG","region":"Asia","state_province":null,"city":null,"facility_type":"import","floating_type":"unknown","status":"cancelled","latitude":null,"longitude":null,"units":1,"capacity_operating_mtpa":null,"capacity_construction_mtpa":null,"capacity_proposed_mtpa":null,"capacity_operating_bcm_y":null,"capacity_construction_bcm_y":null,"capacity_proposed_bcm_y":null,"earliest_start_year":null,"latest_start_year":null,"url":"https://lngatlas.org/terminal/singapore-offshore-lng-terminal-sg/","data_source":"Data: Global Gas Infrastructure Tracker, Global Energy Monitor, September 2025"},{"slug":"sinolam-lng-terminal-pa","name":"Sinolam LNG Terminal","country":"Panama","country_iso":"PA","region":"Americas","state_province":"Colón","city":"Isla Margarita","facility_type":"import","floating_type":"unknown","status":"shelved","latitude":9.384621,"longitude":-79.88305,"units":1,"capacity_operating_mtpa":null,"capacity_construction_mtpa":null,"capacity_proposed_mtpa":null,"capacity_operating_bcm_y":null,"capacity_construction_bcm_y":null,"capacity_proposed_bcm_y":null,"earliest_start_year":null,"latest_start_year":null,"url":"https://lngatlas.org/terminal/sinolam-lng-terminal-pa/","data_source":"Data: Global Gas Infrastructure Tracker, Global Energy Monitor, September 2025"},{"slug":"sinopec-longkou-lng-terminal-cn","name":"Sinopec Longkou LNG Terminal","country":"China","country_iso":"CN","region":"Asia","state_province":"Shandong","city":null,"facility_type":"import","floating_type":"unknown","status":"construction","latitude":37.6497398,"longitude":120.2907759,"units":2,"capacity_operating_mtpa":null,"capacity_construction_mtpa":6.5,"capacity_proposed_mtpa":5.5,"capacity_operating_bcm_y":null,"capacity_construction_bcm_y":8.84,"capacity_proposed_bcm_y":7.48,"earliest_start_year":null,"latest_start_year":null,"url":"https://lngatlas.org/terminal/sinopec-longkou-lng-terminal-cn/","data_source":"Data: Global Gas Infrastructure Tracker, Global Energy Monitor, September 2025"},{"slug":"sittwe-lng-terminal-mm","name":"Sittwe LNG Terminal","country":"Myanmar","country_iso":"MM","region":"Asia","state_province":"Rakhine","city":"Sittwe","facility_type":"import","floating_type":"unknown","status":"cancelled","latitude":20.133701,"longitude":92.845724,"units":1,"capacity_operating_mtpa":null,"capacity_construction_mtpa":null,"capacity_proposed_mtpa":null,"capacity_operating_bcm_y":null,"capacity_construction_bcm_y":null,"capacity_proposed_bcm_y":null,"earliest_start_year":null,"latest_start_year":null,"url":"https://lngatlas.org/terminal/sittwe-lng-terminal-mm/","data_source":"Data: Global Gas Infrastructure Tracker, Global Energy Monitor, September 2025"},{"slug":"skeena-lng-terminal-ca","name":"Skeena LNG Terminal","country":"Canada","country_iso":"CA","region":"Americas","state_province":"British Columbia","city":"Skeena","facility_type":"export","floating_type":"unknown","status":"cancelled","latitude":54.49342,"longitude":-128.587023,"units":1,"capacity_operating_mtpa":null,"capacity_construction_mtpa":null,"capacity_proposed_mtpa":null,"capacity_operating_bcm_y":null,"capacity_construction_bcm_y":null,"capacity_proposed_bcm_y":null,"earliest_start_year":null,"latest_start_year":null,"url":"https://lngatlas.org/terminal/skeena-lng-terminal-ca/","data_source":"Data: Global Gas Infrastructure Tracker, Global Energy Monitor, September 2025"},{"slug":"skikda-lng-terminal-dz","name":"Skikda LNG Terminal","country":"Algeria","country_iso":"DZ","region":"Africa","state_province":"Skikda","city":"Skikda","facility_type":"export","floating_type":"unknown","status":"operating","latitude":36.8779,"longitude":6.9415,"units":7,"capacity_operating_mtpa":4.5,"capacity_construction_mtpa":null,"capacity_proposed_mtpa":null,"capacity_operating_bcm_y":6.12,"capacity_construction_bcm_y":null,"capacity_proposed_bcm_y":null,"earliest_start_year":1972,"latest_start_year":2013,"url":"https://lngatlas.org/terminal/skikda-lng-terminal-dz/","data_source":"Data: Global Gas Infrastructure Tracker, Global Energy Monitor, September 2025"},{"slug":"skulte-lng-terminal-lv","name":"Skulte LNG Terminal","country":"Latvia","country_iso":"LV","region":"Europe","state_province":null,"city":"Skulte","facility_type":"import","floating_type":"floating","status":"shelved","latitude":57.315,"longitude":24.367,"units":1,"capacity_operating_mtpa":null,"capacity_construction_mtpa":null,"capacity_proposed_mtpa":null,"capacity_operating_bcm_y":null,"capacity_construction_bcm_y":null,"capacity_proposed_bcm_y":null,"earliest_start_year":null,"latest_start_year":null,"url":"https://lngatlas.org/terminal/skulte-lng-terminal-lv/","data_source":"Data: Global Gas Infrastructure Tracker, Global Energy Monitor, September 2025"},{"slug":"snurrevarden-lng-terminal-no","name":"Snurrevarden LNG Terminal","country":"Norway","country_iso":"NO","region":"Europe","state_province":null,"city":null,"facility_type":"export","floating_type":"unknown","status":"operating","latitude":59.313521,"longitude":5.285961,"units":1,"capacity_operating_mtpa":0.02,"capacity_construction_mtpa":null,"capacity_proposed_mtpa":null,"capacity_operating_bcm_y":0.027,"capacity_construction_bcm_y":null,"capacity_proposed_bcm_y":null,"earliest_start_year":2003,"latest_start_year":2003,"url":"https://lngatlas.org/terminal/snurrevarden-lng-terminal-no/","data_source":"Data: Global Gas Infrastructure Tracker, Global Energy Monitor, September 2025"},{"slug":"sodegaura-lng-terminal-jp","name":"Sodegaura LNG Terminal","country":"Japan","country_iso":"JP","region":"Asia","state_province":"Kanto","city":"Sodegaura","facility_type":"import","floating_type":"unknown","status":"operating","latitude":35.467955,"longitude":139.972393,"units":1,"capacity_operating_mtpa":31.4,"capacity_construction_mtpa":null,"capacity_proposed_mtpa":null,"capacity_operating_bcm_y":42.704,"capacity_construction_bcm_y":null,"capacity_proposed_bcm_y":null,"earliest_start_year":1973,"latest_start_year":1973,"url":"https://lngatlas.org/terminal/sodegaura-lng-terminal-jp/","data_source":"Data: Global Gas Infrastructure Tracker, Global Energy Monitor, September 2025"},{"slug":"sodeshi-shimizu-lng-terminal-jp","name":"Sodeshi Shimizu LNG Terminal","country":"Japan","country_iso":"JP","region":"Asia","state_province":"Chūbu","city":"Shimizu Bay","facility_type":"import","floating_type":"unknown","status":"operating","latitude":35.0274,"longitude":138.4978,"units":1,"capacity_operating_mtpa":2.9,"capacity_construction_mtpa":null,"capacity_proposed_mtpa":null,"capacity_operating_bcm_y":3.944,"capacity_construction_bcm_y":null,"capacity_proposed_bcm_y":null,"earliest_start_year":1996,"latest_start_year":1996,"url":"https://lngatlas.org/terminal/sodeshi-shimizu-lng-terminal-jp/","data_source":"Data: Global Gas Infrastructure Tracker, Global Energy Monitor, September 2025"},{"slug":"soma-port-lng-terminal-jp","name":"Soma Port LNG Terminal","country":"Japan","country_iso":"JP","region":"Asia","state_province":"Tohoku","city":"Shinchi Town","facility_type":"import","floating_type":"unknown","status":"operating","latitude":37.8501123,"longitude":140.9496459,"units":1,"capacity_operating_mtpa":1.5,"capacity_construction_mtpa":null,"capacity_proposed_mtpa":null,"capacity_operating_bcm_y":2.04,"capacity_construction_bcm_y":null,"capacity_proposed_bcm_y":null,"earliest_start_year":2018,"latest_start_year":2018,"url":"https://lngatlas.org/terminal/soma-port-lng-terminal-jp/","data_source":"Data: Global Gas Infrastructure Tracker, Global Energy Monitor, September 2025"},{"slug":"son-my-lng-terminal-vn","name":"Son My LNG Terminal","country":"Vietnam","country_iso":"VN","region":"Asia","state_province":"Binh Thuan","city":"Son My","facility_type":"import","floating_type":"unknown","status":"proposed","latitude":10.65008,"longitude":107.68464,"units":2,"capacity_operating_mtpa":null,"capacity_construction_mtpa":null,"capacity_proposed_mtpa":4.8,"capacity_operating_bcm_y":null,"capacity_construction_bcm_y":null,"capacity_proposed_bcm_y":6.528,"earliest_start_year":null,"latest_start_year":null,"url":"https://lngatlas.org/terminal/son-my-lng-terminal-vn/","data_source":"Data: Global Gas Infrastructure Tracker, Global Energy Monitor, September 2025"},{"slug":"songkhla-fsru-th","name":"Songkhla FSRU","country":"Thailand","country_iso":"TH","region":"Asia","state_province":null,"city":"Songkhla","facility_type":"import","floating_type":"fsru","status":"cancelled","latitude":7.229648,"longitude":100.573438,"units":1,"capacity_operating_mtpa":null,"capacity_construction_mtpa":null,"capacity_proposed_mtpa":null,"capacity_operating_bcm_y":null,"capacity_construction_bcm_y":null,"capacity_proposed_bcm_y":null,"earliest_start_year":null,"latest_start_year":null,"url":"https://lngatlas.org/terminal/songkhla-fsru-th/","data_source":"Data: Global Gas Infrastructure Tracker, Global Energy Monitor, September 2025"},{"slug":"sorong-fsru-id","name":"Sorong LNG Terminal","country":"Indonesia","country_iso":"ID","region":"Asia","state_province":null,"city":"East Indonesia","facility_type":"import","floating_type":"unknown","status":"cancelled","latitude":-2.535173,"longitude":140.718594,"units":1,"capacity_operating_mtpa":null,"capacity_construction_mtpa":null,"capacity_proposed_mtpa":null,"capacity_operating_bcm_y":null,"capacity_construction_bcm_y":null,"capacity_proposed_bcm_y":null,"earliest_start_year":null,"latest_start_year":null,"url":"https://lngatlas.org/terminal/sorong-fsru-id/","data_source":"Data: Global Gas Infrastructure Tracker, Global Energy Monitor, September 2025"},{"slug":"south-east-lng-terminal-vn","name":"South East LNG Terminal","country":"Vietnam","country_iso":"VN","region":"Asia","state_province":"Bình Thuận Province","city":null,"facility_type":"import","floating_type":"unknown","status":"cancelled","latitude":10.653405,"longitude":107.776489,"units":1,"capacity_operating_mtpa":null,"capacity_construction_mtpa":null,"capacity_proposed_mtpa":null,"capacity_operating_bcm_y":null,"capacity_construction_bcm_y":null,"capacity_proposed_bcm_y":null,"earliest_start_year":null,"latest_start_year":null,"url":"https://lngatlas.org/terminal/south-east-lng-terminal-vn/","data_source":"Data: Global Gas Infrastructure Tracker, Global Energy Monitor, September 2025"},{"slug":"south-hook-lng-terminal-gb","name":"South Hook LNG Terminal","country":"United Kingdom","country_iso":"GB","region":"Europe","state_province":"Wales","city":"Milford Haven","facility_type":"import","floating_type":"unknown","status":"operating","latitude":51.7152,"longitude":-5.07627,"units":2,"capacity_operating_mtpa":15.6,"capacity_construction_mtpa":null,"capacity_proposed_mtpa":4.6,"capacity_operating_bcm_y":21.216,"capacity_construction_bcm_y":null,"capacity_proposed_bcm_y":6.256,"earliest_start_year":2009,"latest_start_year":2009,"url":"https://lngatlas.org/terminal/south-hook-lng-terminal-gb/","data_source":"Data: Global Gas Infrastructure Tracker, Global Energy Monitor, September 2025"},{"slug":"south-pars-lng-terminal-ir","name":"South Pars LNG Terminal","country":"Iran","country_iso":"IR","region":"Asia","state_province":"Perian Gulf","city":"South Pars gas field","facility_type":"export","floating_type":"unknown","status":"cancelled","latitude":26.619125,"longitude":52.067964,"units":1,"capacity_operating_mtpa":null,"capacity_construction_mtpa":null,"capacity_proposed_mtpa":null,"capacity_operating_bcm_y":null,"capacity_construction_bcm_y":null,"capacity_proposed_bcm_y":null,"earliest_start_year":null,"latest_start_year":null,"url":"https://lngatlas.org/terminal/south-pars-lng-terminal-ir/","data_source":"Data: Global Gas Infrastructure Tracker, Global Energy Monitor, September 2025"},{"slug":"south-texas-lng-terminal-us","name":"South Texas LNG Terminal","country":"United States","country_iso":"US","region":"Americas","state_province":"Texas","city":"Port of Corpus Christi","facility_type":"export","floating_type":"unknown","status":"cancelled","latitude":27.812778,"longitude":-97.407222,"units":1,"capacity_operating_mtpa":null,"capacity_construction_mtpa":null,"capacity_proposed_mtpa":null,"capacity_operating_bcm_y":null,"capacity_construction_bcm_y":null,"capacity_proposed_bcm_y":null,"earliest_start_year":null,"latest_start_year":null,"url":"https://lngatlas.org/terminal/south-texas-lng-terminal-us/","data_source":"Data: Global Gas Infrastructure Tracker, Global Energy Monitor, September 2025"},{"slug":"south-west-fsru-vn","name":"South West FSRU","country":"Vietnam","country_iso":"VN","region":"Asia","state_province":"Trà Vinh Province","city":null,"facility_type":"import","floating_type":"fsru","status":"cancelled","latitude":9.5712152,"longitude":106.5186744,"units":1,"capacity_operating_mtpa":null,"capacity_construction_mtpa":null,"capacity_proposed_mtpa":null,"capacity_operating_bcm_y":null,"capacity_construction_bcm_y":null,"capacity_proposed_bcm_y":null,"earliest_start_year":null,"latest_start_year":null,"url":"https://lngatlas.org/terminal/south-west-fsru-vn/","data_source":"Data: Global Gas Infrastructure Tracker, Global Energy Monitor, September 2025"},{"slug":"southern-finland-lng-terminal-fi","name":"Southern Finland LNG Terminal","country":"Finland","country_iso":"FI","region":"Europe","state_province":"Uusimaa","city":null,"facility_type":"import","floating_type":"unknown","status":"cancelled","latitude":60.01371,"longitude":23.95714,"units":1,"capacity_operating_mtpa":null,"capacity_construction_mtpa":null,"capacity_proposed_mtpa":null,"capacity_operating_bcm_y":null,"capacity_construction_bcm_y":null,"capacity_proposed_bcm_y":null,"earliest_start_year":null,"latest_start_year":null,"url":"https://lngatlas.org/terminal/southern-finland-lng-terminal-fi/","data_source":"Data: Global Gas Infrastructure Tracker, Global Energy Monitor, September 2025"},{"slug":"sparrows-point-lng-terminal-us","name":"Sparrows Point LNG Terminal","country":"United States","country_iso":"US","region":"Americas","state_province":"Maryland","city":"Baltimore","facility_type":"import","floating_type":"unknown","status":"cancelled","latitude":39.219167,"longitude":-76.476111,"units":1,"capacity_operating_mtpa":null,"capacity_construction_mtpa":null,"capacity_proposed_mtpa":null,"capacity_operating_bcm_y":null,"capacity_construction_bcm_y":null,"capacity_proposed_bcm_y":null,"earliest_start_year":null,"latest_start_year":null,"url":"https://lngatlas.org/terminal/sparrows-point-lng-terminal-us/","data_source":"Data: Global Gas Infrastructure Tracker, Global Energy Monitor, September 2025"},{"slug":"stade-fsru-de","name":"Stade FSRU","country":"Germany","country_iso":"DE","region":"Europe","state_province":null,"city":"Stade","facility_type":"import","floating_type":"fsru","status":"construction","latitude":53.6526534,"longitude":9.515233,"units":1,"capacity_operating_mtpa":null,"capacity_construction_mtpa":4.41,"capacity_proposed_mtpa":null,"capacity_operating_bcm_y":null,"capacity_construction_bcm_y":5.998,"capacity_proposed_bcm_y":null,"earliest_start_year":null,"latest_start_year":null,"url":"https://lngatlas.org/terminal/stade-fsru-de/","data_source":"Data: Global Gas Infrastructure Tracker, Global Energy Monitor, September 2025"},{"slug":"stade-lng-terminal-de","name":"Stade LNG Terminal","country":"Germany","country_iso":"DE","region":"Europe","state_province":"Lower Saxony","city":"Stade","facility_type":"import","floating_type":"unknown","status":"construction","latitude":53.652459,"longitude":9.510382,"units":1,"capacity_operating_mtpa":null,"capacity_construction_mtpa":9.78,"capacity_proposed_mtpa":null,"capacity_operating_bcm_y":null,"capacity_construction_bcm_y":13.301,"capacity_proposed_bcm_y":null,"earliest_start_year":null,"latest_start_year":null,"url":"https://lngatlas.org/terminal/stade-lng-terminal-de/","data_source":"Data: Global Gas Infrastructure Tracker, Global Energy Monitor, September 2025"},{"slug":"stavian-chan-may-lng-terminal-vn","name":"Stavian Chan May LNG Terminal","country":"Vietnam","country_iso":"VN","region":"Asia","state_province":null,"city":null,"facility_type":"import","floating_type":"unknown","status":"proposed","latitude":16.32737330100063,"longitude":108.01851100806648,"units":1,"capacity_operating_mtpa":null,"capacity_construction_mtpa":null,"capacity_proposed_mtpa":null,"capacity_operating_bcm_y":null,"capacity_construction_bcm_y":null,"capacity_proposed_bcm_y":null,"earliest_start_year":null,"latest_start_year":null,"url":"https://lngatlas.org/terminal/stavian-chan-may-lng-terminal-vn/","data_source":"Data: Global Gas Infrastructure Tracker, Global Energy Monitor, September 2025"},{"slug":"steelhead-fsru-ca","name":"Steelhead FSRU","country":"Canada","country_iso":"CA","region":"Americas","state_province":"British Columbia","city":"Bamberton","facility_type":"import","floating_type":"fsru","status":"cancelled","latitude":48.595162,"longitude":-123.527441,"units":1,"capacity_operating_mtpa":null,"capacity_construction_mtpa":null,"capacity_proposed_mtpa":null,"capacity_operating_bcm_y":null,"capacity_construction_bcm_y":null,"capacity_proposed_bcm_y":null,"earliest_start_year":null,"latest_start_year":null,"url":"https://lngatlas.org/terminal/steelhead-fsru-ca/","data_source":"Data: Global Gas Infrastructure Tracker, Global Energy Monitor, September 2025"},{"slug":"stewart-energy-lng-terminal-ca","name":"Stewart Energy LNG Terminal","country":"Canada","country_iso":"CA","region":"Americas","state_province":"British Columbia","city":"Stewart","facility_type":"export","floating_type":"floating","status":"cancelled","latitude":55.935833,"longitude":-129.990833,"units":2,"capacity_operating_mtpa":null,"capacity_construction_mtpa":null,"capacity_proposed_mtpa":null,"capacity_operating_bcm_y":null,"capacity_construction_bcm_y":null,"capacity_proposed_bcm_y":null,"earliest_start_year":null,"latest_start_year":null,"url":"https://lngatlas.org/terminal/stewart-energy-lng-terminal-ca/","data_source":"Data: Global Gas Infrastructure Tracker, Global Energy Monitor, September 2025"},{"slug":"stolt-lngaz-terminal-ca","name":"Stolt LNGaz Terminal","country":"Canada","country_iso":"CA","region":"Americas","state_province":"Quebec","city":"Bécancour","facility_type":"export","floating_type":"unknown","status":"cancelled","latitude":46.333333,"longitude":-72.433333,"units":1,"capacity_operating_mtpa":null,"capacity_construction_mtpa":null,"capacity_proposed_mtpa":null,"capacity_operating_bcm_y":null,"capacity_construction_bcm_y":null,"capacity_proposed_bcm_y":null,"earliest_start_year":null,"latest_start_year":null,"url":"https://lngatlas.org/terminal/stolt-lngaz-terminal-ca/","data_source":"Data: Global Gas Infrastructure Tracker, Global Energy Monitor, September 2025"},{"slug":"strom-lng-terminal-us","name":"Strom LNG Terminal","country":"United States","country_iso":"US","region":"Americas","state_province":"Florida","city":"Crystal River (or Starke)","facility_type":"export","floating_type":"unknown","status":"cancelled","latitude":28.900556,"longitude":-82.593611,"units":1,"capacity_operating_mtpa":null,"capacity_construction_mtpa":null,"capacity_proposed_mtpa":null,"capacity_operating_bcm_y":null,"capacity_construction_bcm_y":null,"capacity_proposed_bcm_y":null,"earliest_start_year":null,"latest_start_year":null,"url":"https://lngatlas.org/terminal/strom-lng-terminal-us/","data_source":"Data: Global Gas Infrastructure Tracker, Global Energy Monitor, September 2025"},{"slug":"suape-fsru-br","name":"Suape FSRU","country":"Brazil","country_iso":"BR","region":"Americas","state_province":"Pernambuco","city":"Suape","facility_type":"import","floating_type":"fsru","status":"construction","latitude":-8.398179,"longitude":-34.959574,"units":1,"capacity_operating_mtpa":null,"capacity_construction_mtpa":3.76,"capacity_proposed_mtpa":null,"capacity_operating_bcm_y":null,"capacity_construction_bcm_y":5.114,"capacity_proposed_bcm_y":null,"earliest_start_year":null,"latest_start_year":null,"url":"https://lngatlas.org/terminal/suape-fsru-br/","data_source":"Data: Global Gas Infrastructure Tracker, Global Energy Monitor, September 2025"},{"slug":"sudan-red-sea-lng-terminal-sd","name":"Sudan Red Sea LNG Terminal","country":"Sudan","country_iso":"SD","region":"Africa","state_province":"Red Sea State","city":"Sudan Port","facility_type":"import","floating_type":"unknown","status":"shelved","latitude":19.580262,"longitude":37.240723,"units":1,"capacity_operating_mtpa":null,"capacity_construction_mtpa":null,"capacity_proposed_mtpa":null,"capacity_operating_bcm_y":null,"capacity_construction_bcm_y":null,"capacity_proposed_bcm_y":null,"earliest_start_year":null,"latest_start_year":null,"url":"https://lngatlas.org/terminal/sudan-red-sea-lng-terminal-sd/","data_source":"Data: Global Gas Infrastructure Tracker, Global Energy Monitor, September 2025"},{"slug":"suizhong-lng-terminal-cn","name":"Suizhong LNG Terminal","country":"China","country_iso":"CN","region":"Asia","state_province":"Liaoning","city":null,"facility_type":"import","floating_type":"unknown","status":"cancelled","latitude":40.160486,"longitude":120.272945,"units":3,"capacity_operating_mtpa":null,"capacity_construction_mtpa":null,"capacity_proposed_mtpa":null,"capacity_operating_bcm_y":null,"capacity_construction_bcm_y":null,"capacity_proposed_bcm_y":null,"earliest_start_year":null,"latest_start_year":null,"url":"https://lngatlas.org/terminal/suizhong-lng-terminal-cn/","data_source":"Data: Global Gas Infrastructure Tracker, Global Energy Monitor, September 2025"},{"slug":"sulawesi-maluku-lng-cluster-id","name":"Sulawesi-Maluku LNG Cluster","country":"Indonesia","country_iso":"ID","region":"Asia","state_province":null,"city":"Sulawesi-Maluku cluster","facility_type":"import","floating_type":"floating","status":"proposed","latitude":-2.977698,"longitude":124.539938,"units":1,"capacity_operating_mtpa":null,"capacity_construction_mtpa":null,"capacity_proposed_mtpa":2.3,"capacity_operating_bcm_y":null,"capacity_construction_bcm_y":null,"capacity_proposed_bcm_y":3.128,"earliest_start_year":null,"latest_start_year":null,"url":"https://lngatlas.org/terminal/sulawesi-maluku-lng-cluster-id/","data_source":"Data: Global Gas Infrastructure Tracker, Global Energy Monitor, September 2025"},{"slug":"sumed-fsru-eg","name":"Sumed BW FSRU","country":"Egypt","country_iso":"EG","region":"Africa","state_province":null,"city":"Port of Ain Sokhna","facility_type":"import","floating_type":"fsru","status":"retired","latitude":29.6025441,"longitude":32.3403948,"units":1,"capacity_operating_mtpa":null,"capacity_construction_mtpa":null,"capacity_proposed_mtpa":null,"capacity_operating_bcm_y":null,"capacity_construction_bcm_y":null,"capacity_proposed_bcm_y":null,"earliest_start_year":2015,"latest_start_year":2015,"url":"https://lngatlas.org/terminal/sumed-fsru-eg/","data_source":"Data: Global Gas Infrastructure Tracker, Global Energy Monitor, September 2025"},{"slug":"summit-fsru-bd","name":"Summit FSRU","country":"Bangladesh","country_iso":"BD","region":"Asia","state_province":"Chittagong","city":"Moheshkhali Island, Bay of Bengal","facility_type":"import","floating_type":"fsru","status":"operating","latitude":21.562987,"longitude":91.821147,"units":1,"capacity_operating_mtpa":3.8,"capacity_construction_mtpa":null,"capacity_proposed_mtpa":null,"capacity_operating_bcm_y":5.168,"capacity_construction_bcm_y":null,"capacity_proposed_bcm_y":null,"earliest_start_year":2019,"latest_start_year":2019,"url":"https://lngatlas.org/terminal/summit-fsru-bd/","data_source":"Data: Global Gas Infrastructure Tracker, Global Energy Monitor, September 2025"},{"slug":"summit-matarbari-fsru-bd","name":"Summit Matarbari FSRU","country":"Bangladesh","country_iso":"BD","region":"Asia","state_province":"Chittagong","city":"Offshore Moheshkhali Island","facility_type":"import","floating_type":"fsru","status":"cancelled","latitude":21.703668,"longitude":91.814862,"units":1,"capacity_operating_mtpa":null,"capacity_construction_mtpa":null,"capacity_proposed_mtpa":null,"capacity_operating_bcm_y":null,"capacity_construction_bcm_y":null,"capacity_proposed_bcm_y":null,"earliest_start_year":null,"latest_start_year":null,"url":"https://lngatlas.org/terminal/summit-matarbari-fsru-bd/","data_source":"Data: Global Gas Infrastructure Tracker, Global Energy Monitor, September 2025"},{"slug":"sunrise-lng-terminal-tl","name":"Sunrise FLNG Terminal","country":"Timor-Leste","country_iso":"TL","region":"Asia","state_province":"Australia and East Timor","city":"Timor Sea","facility_type":"export","floating_type":"flng","status":"proposed","latitude":-10,"longitude":127,"units":1,"capacity_operating_mtpa":null,"capacity_construction_mtpa":null,"capacity_proposed_mtpa":null,"capacity_operating_bcm_y":null,"capacity_construction_bcm_y":null,"capacity_proposed_bcm_y":null,"earliest_start_year":null,"latest_start_year":null,"url":"https://lngatlas.org/terminal/sunrise-lng-terminal-tl/","data_source":"Data: Global Gas Infrastructure Tracker, Global Energy Monitor, September 2025"},{"slug":"surat-thani-fsru-th","name":"Surat Thani FSRU","country":"Thailand","country_iso":"TH","region":"Asia","state_province":"Surat Thani","city":"Offshore Surat Thani","facility_type":"import","floating_type":"fsru","status":"shelved","latitude":9.24816,"longitude":99.3268,"units":1,"capacity_operating_mtpa":null,"capacity_construction_mtpa":null,"capacity_proposed_mtpa":null,"capacity_operating_bcm_y":null,"capacity_construction_bcm_y":null,"capacity_proposed_bcm_y":null,"earliest_start_year":null,"latest_start_year":null,"url":"https://lngatlas.org/terminal/surat-thani-fsru-th/","data_source":"Data: Global Gas Infrastructure Tracker, Global Energy Monitor, September 2025"},{"slug":"sycar-venezuela-flng-terminal-ve","name":"Sycar Venezuela FLNG Terminal","country":"Venezuela","country_iso":"VE","region":"Americas","state_province":"Anzoátegui","city":"Barcelona","facility_type":"export","floating_type":"flng","status":"shelved","latitude":10.088111,"longitude":-64.862283,"units":1,"capacity_operating_mtpa":null,"capacity_construction_mtpa":null,"capacity_proposed_mtpa":null,"capacity_operating_bcm_y":null,"capacity_construction_bcm_y":null,"capacity_proposed_bcm_y":null,"earliest_start_year":null,"latest_start_year":null,"url":"https://lngatlas.org/terminal/sycar-venezuela-flng-terminal-ve/","data_source":"Data: Global Gas Infrastructure Tracker, Global Energy Monitor, September 2025"},{"slug":"sao-marcos-bay-fsru-br","name":"São Marcos Bay FSRU","country":"Brazil","country_iso":"BR","region":"Americas","state_province":"Maranhão","city":"Boqueirão Channel, São Marcos Bay","facility_type":"import","floating_type":"fsru","status":"shelved","latitude":-2.550981,"longitude":-44.378683,"units":1,"capacity_operating_mtpa":null,"capacity_construction_mtpa":null,"capacity_proposed_mtpa":null,"capacity_operating_bcm_y":null,"capacity_construction_bcm_y":null,"capacity_proposed_bcm_y":null,"earliest_start_year":null,"latest_start_year":null,"url":"https://lngatlas.org/terminal/sao-marcos-bay-fsru-br/","data_source":"Data: Global Gas Infrastructure Tracker, Global Energy Monitor, September 2025"},{"slug":"tgnl-sao-luis-fsru-br","name":"TGNL São Luis FSRU","country":"Brazil","country_iso":"BR","region":"Americas","state_province":"Maranhão","city":null,"facility_type":"import","floating_type":"fsru","status":"proposed","latitude":-2.670234,"longitude":-44.37844,"units":1,"capacity_operating_mtpa":null,"capacity_construction_mtpa":null,"capacity_proposed_mtpa":6.39,"capacity_operating_bcm_y":null,"capacity_construction_bcm_y":null,"capacity_proposed_bcm_y":8.69,"earliest_start_year":null,"latest_start_year":null,"url":"https://lngatlas.org/terminal/tgnl-sao-luis-fsru-br/","data_source":"Data: Global Gas Infrastructure Tracker, Global Energy Monitor, September 2025"},{"slug":"tgs-puerto-galvan-lng-terminal-ar","name":"TGS Puerto Galván LNG Terminal","country":"Argentina","country_iso":"AR","region":"Americas","state_province":"Buenos Aires","city":"Bahía Blanca","facility_type":"export","floating_type":"unknown","status":"proposed","latitude":-38.784331,"longitude":-62.299546,"units":2,"capacity_operating_mtpa":null,"capacity_construction_mtpa":null,"capacity_proposed_mtpa":5.4,"capacity_operating_bcm_y":null,"capacity_construction_bcm_y":null,"capacity_proposed_bcm_y":7.344,"earliest_start_year":null,"latest_start_year":null,"url":"https://lngatlas.org/terminal/tgs-puerto-galvan-lng-terminal-ar/","data_source":"Data: Global Gas Infrastructure Tracker, Global Energy Monitor, September 2025"},{"slug":"tabangao-fsru-ph","name":"Tabangao FSRU","country":"Philippines","country_iso":"PH","region":"Asia","state_province":"Batangas","city":"Tabangao Port","facility_type":"import","floating_type":"fsru","status":"shelved","latitude":13.71335,"longitude":121.06099,"units":1,"capacity_operating_mtpa":null,"capacity_construction_mtpa":null,"capacity_proposed_mtpa":null,"capacity_operating_bcm_y":null,"capacity_construction_bcm_y":null,"capacity_proposed_bcm_y":null,"earliest_start_year":null,"latest_start_year":null,"url":"https://lngatlas.org/terminal/tabangao-fsru-ph/","data_source":"Data: Global Gas Infrastructure Tracker, Global Energy Monitor, September 2025"},{"slug":"tabeer-lng-terminal-pk","name":"Tabeer LNG Terminal","country":"Pakistan","country_iso":"PK","region":"Asia","state_province":"Sindh","city":"Port Qasim","facility_type":"import","floating_type":"floating","status":"proposed","latitude":24.72,"longitude":67.21,"units":2,"capacity_operating_mtpa":null,"capacity_construction_mtpa":null,"capacity_proposed_mtpa":null,"capacity_operating_bcm_y":null,"capacity_construction_bcm_y":null,"capacity_proposed_bcm_y":null,"earliest_start_year":null,"latest_start_year":null,"url":"https://lngatlas.org/terminal/tabeer-lng-terminal-pk/","data_source":"Data: Global Gas Infrastructure Tracker, Global Energy Monitor, September 2025"},{"slug":"taichung-taipower-lng-terminal-tw","name":"Taichung (TaiPower) LNG Terminal","country":"Taiwan","country_iso":"TW","region":"Asia","state_province":"Taichung","city":"Taichung Harbor","facility_type":"import","floating_type":"unknown","status":"proposed","latitude":24.291471,"longitude":120.510622,"units":1,"capacity_operating_mtpa":null,"capacity_construction_mtpa":null,"capacity_proposed_mtpa":3,"capacity_operating_bcm_y":null,"capacity_construction_bcm_y":null,"capacity_proposed_bcm_y":4.08,"earliest_start_year":null,"latest_start_year":null,"url":"https://lngatlas.org/terminal/taichung-taipower-lng-terminal-tw/","data_source":"Data: Global Gas Infrastructure Tracker, Global Energy Monitor, September 2025"},{"slug":"taichung-lng-terminal-tw","name":"Taichung LNG Terminal","country":"Taiwan","country_iso":"TW","region":"Asia","state_province":"Taichung","city":"Taichung Harbor","facility_type":"import","floating_type":"unknown","status":"operating","latitude":24.25304,"longitude":120.49586,"units":5,"capacity_operating_mtpa":8,"capacity_construction_mtpa":2,"capacity_proposed_mtpa":3,"capacity_operating_bcm_y":10.88,"capacity_construction_bcm_y":2.72,"capacity_proposed_bcm_y":4.08,"earliest_start_year":2009,"latest_start_year":2025,"url":"https://lngatlas.org/terminal/taichung-lng-terminal-tw/","data_source":"Data: Global Gas Infrastructure Tracker, Global Energy Monitor, September 2025"},{"slug":"taimyr-lng-terminal-ru","name":"Taimyr LNG Terminal","country":"Russia","country_iso":"RU","region":"Europe","state_province":"Krasnoyarsk Krai","city":"Sever Bay","facility_type":"export","floating_type":"unknown","status":"proposed","latitude":73.153613,"longitude":80.405868,"units":1,"capacity_operating_mtpa":null,"capacity_construction_mtpa":null,"capacity_proposed_mtpa":50,"capacity_operating_bcm_y":null,"capacity_construction_bcm_y":null,"capacity_proposed_bcm_y":68,"earliest_start_year":null,"latest_start_year":null,"url":"https://lngatlas.org/terminal/taimyr-lng-terminal-ru/","data_source":"Data: Global Gas Infrastructure Tracker, Global Energy Monitor, September 2025"},{"slug":"taizhou-toumen-port-lng-terminal-cn","name":"Taizhou LNG Terminal","country":"China","country_iso":"CN","region":"Asia","state_province":"Zhejiang","city":"Toumen Island","facility_type":"import","floating_type":"unknown","status":"cancelled","latitude":28.6870306,"longitude":121.7892551,"units":2,"capacity_operating_mtpa":null,"capacity_construction_mtpa":null,"capacity_proposed_mtpa":null,"capacity_operating_bcm_y":null,"capacity_construction_bcm_y":null,"capacity_proposed_bcm_y":null,"earliest_start_year":null,"latest_start_year":null,"url":"https://lngatlas.org/terminal/taizhou-toumen-port-lng-terminal-cn/","data_source":"Data: Global Gas Infrastructure Tracker, Global Energy Monitor, September 2025"},{"slug":"talcahuano-fsru-cl","name":"Talcahuano FSRU","country":"Chile","country_iso":"CL","region":"Americas","state_province":null,"city":null,"facility_type":"import","floating_type":"fsru","status":"shelved","latitude":-36.718357,"longitude":-73.102769,"units":1,"capacity_operating_mtpa":null,"capacity_construction_mtpa":null,"capacity_proposed_mtpa":null,"capacity_operating_bcm_y":null,"capacity_construction_bcm_y":null,"capacity_proposed_bcm_y":null,"earliest_start_year":null,"latest_start_year":null,"url":"https://lngatlas.org/terminal/talcahuano-fsru-cl/","data_source":"Data: Global Gas Infrastructure Tracker, Global Energy Monitor, September 2025"},{"slug":"tallinn-lng-terminal-ee","name":"Tallinn LNG Terminal","country":"Estonia","country_iso":"EE","region":"Europe","state_province":"Harju","city":"Muuga Harbour","facility_type":"import","floating_type":"unknown","status":"proposed","latitude":59.50601,"longitude":25.0045,"units":1,"capacity_operating_mtpa":null,"capacity_construction_mtpa":null,"capacity_proposed_mtpa":2.94,"capacity_operating_bcm_y":null,"capacity_construction_bcm_y":null,"capacity_proposed_bcm_y":3.998,"earliest_start_year":null,"latest_start_year":null,"url":"https://lngatlas.org/terminal/tallinn-lng-terminal-ee/","data_source":"Data: Global Gas Infrastructure Tracker, Global Energy Monitor, September 2025"},{"slug":"tamar-flng-terminal-il","name":"Tamar FLNG Terminal","country":"Israel","country_iso":"IL","region":"Asia","state_province":null,"city":"Tamar","facility_type":"export","floating_type":"flng","status":"cancelled","latitude":33.078333,"longitude":33.951389,"units":1,"capacity_operating_mtpa":null,"capacity_construction_mtpa":null,"capacity_proposed_mtpa":null,"capacity_operating_bcm_y":null,"capacity_construction_bcm_y":null,"capacity_proposed_bcm_y":null,"earliest_start_year":null,"latest_start_year":null,"url":"https://lngatlas.org/terminal/tamar-flng-terminal-il/","data_source":"Data: Global Gas Infrastructure Tracker, Global Energy Monitor, September 2025"},{"slug":"tambey-lng-terminal-ru","name":"Tambey LNG Terminal","country":"Russia","country_iso":"RU","region":"Europe","state_province":null,"city":"Tambeyskoye Oil and Gas Field (Russia)","facility_type":"export","floating_type":"unknown","status":"proposed","latitude":71.235,"longitude":71.546,"units":1,"capacity_operating_mtpa":null,"capacity_construction_mtpa":null,"capacity_proposed_mtpa":20,"capacity_operating_bcm_y":null,"capacity_construction_bcm_y":null,"capacity_proposed_bcm_y":27.2,"earliest_start_year":null,"latest_start_year":null,"url":"https://lngatlas.org/terminal/tambey-lng-terminal-ru/","data_source":"Data: Global Gas Infrastructure Tracker, Global Energy Monitor, September 2025"},{"slug":"tangguh-lng-terminal-id","name":"Tangguh LNG Terminal","country":"Indonesia","country_iso":"ID","region":"Asia","state_province":"West Papua","city":"Teluk Bintuni","facility_type":"export","floating_type":"unknown","status":"operating","latitude":-2.44314,"longitude":133.139,"units":3,"capacity_operating_mtpa":11.4,"capacity_construction_mtpa":null,"capacity_proposed_mtpa":null,"capacity_operating_bcm_y":15.504,"capacity_construction_bcm_y":null,"capacity_proposed_bcm_y":null,"earliest_start_year":2009,"latest_start_year":2023,"url":"https://lngatlas.org/terminal/tangguh-lng-terminal-id/","data_source":"Data: Global Gas Infrastructure Tracker, Global Energy Monitor, September 2025"},{"slug":"tanglawan-lng-terminal-ph","name":"Tanglawan LNG Terminal","country":"Philippines","country_iso":"PH","region":"Asia","state_province":"Batangas","city":"Batangas","facility_type":"import","floating_type":"unknown","status":"cancelled","latitude":13.7707075,"longitude":121.0354947,"units":1,"capacity_operating_mtpa":null,"capacity_construction_mtpa":null,"capacity_proposed_mtpa":null,"capacity_operating_bcm_y":null,"capacity_construction_bcm_y":null,"capacity_proposed_bcm_y":null,"earliest_start_year":null,"latest_start_year":null,"url":"https://lngatlas.org/terminal/tanglawan-lng-terminal-ph/","data_source":"Data: Global Gas Infrastructure Tracker, Global Energy Monitor, September 2025"},{"slug":"tangshan-lng-terminal-petrochina-cn","name":"Tangshan LNG Terminal (PetroChina)","country":"China","country_iso":"CN","region":"Asia","state_province":"Hebei","city":"Caofeidian Industrial Zone","facility_type":"import","floating_type":"unknown","status":"operating","latitude":38.9331,"longitude":118.5329,"units":3,"capacity_operating_mtpa":10,"capacity_construction_mtpa":null,"capacity_proposed_mtpa":null,"capacity_operating_bcm_y":13.6,"capacity_construction_bcm_y":null,"capacity_proposed_bcm_y":null,"earliest_start_year":2013,"latest_start_year":2021,"url":"https://lngatlas.org/terminal/tangshan-lng-terminal-petrochina-cn/","data_source":"Data: Global Gas Infrastructure Tracker, Global Energy Monitor, September 2025"},{"slug":"tangshan-lng-terminal-xintian-cn","name":"Tangshan LNG Terminal (Xintian)","country":"China","country_iso":"CN","region":"Asia","state_province":"Hebei","city":"Caofeidian Industrial Zone","facility_type":"import","floating_type":"unknown","status":"operating","latitude":38.938745,"longitude":118.541145,"units":3,"capacity_operating_mtpa":5,"capacity_construction_mtpa":5,"capacity_proposed_mtpa":2,"capacity_operating_bcm_y":6.8,"capacity_construction_bcm_y":6.8,"capacity_proposed_bcm_y":2.72,"earliest_start_year":2023,"latest_start_year":2023,"url":"https://lngatlas.org/terminal/tangshan-lng-terminal-xintian-cn/","data_source":"Data: Global Gas Infrastructure Tracker, Global Energy Monitor, September 2025"},{"slug":"tanjung-benoa-fsru-id","name":"Tanjung Benoa FSRU","country":"Indonesia","country_iso":"ID","region":"Asia","state_province":"Badung, Bali","city":"Tanjung Benoa","facility_type":"import","floating_type":"fsru","status":"operating","latitude":-8.746306,"longitude":115.2094864,"units":1,"capacity_operating_mtpa":0.35,"capacity_construction_mtpa":null,"capacity_proposed_mtpa":null,"capacity_operating_bcm_y":0.476,"capacity_construction_bcm_y":null,"capacity_proposed_bcm_y":null,"earliest_start_year":2016,"latest_start_year":2016,"url":"https://lngatlas.org/terminal/tanjung-benoa-fsru-id/","data_source":"Data: Global Gas Infrastructure Tracker, Global Energy Monitor, September 2025"},{"slug":"tanzania-lng-terminal-tz","name":"Tanzania LNG Terminal","country":"Tanzania","country_iso":"TZ","region":"Africa","state_province":"Lindi","city":"Lindi","facility_type":"export","floating_type":"unknown","status":"proposed","latitude":-9.96,"longitude":39.708889,"units":2,"capacity_operating_mtpa":null,"capacity_construction_mtpa":null,"capacity_proposed_mtpa":10,"capacity_operating_bcm_y":null,"capacity_construction_bcm_y":null,"capacity_proposed_bcm_y":13.6,"earliest_start_year":null,"latest_start_year":null,"url":"https://lngatlas.org/terminal/tanzania-lng-terminal-tz/","data_source":"Data: Global Gas Infrastructure Tracker, Global Energy Monitor, September 2025"},{"slug":"taoyuan-lng-terminal-tw","name":"Taoyuan LNG Terminal","country":"Taiwan","country_iso":"TW","region":"Asia","state_province":"Taoyuan","city":"Guantang (Kwun Tong) Industrial Zone","facility_type":"import","floating_type":"unknown","status":"operating","latitude":25.045533,"longitude":121.060884,"units":2,"capacity_operating_mtpa":3,"capacity_construction_mtpa":null,"capacity_proposed_mtpa":3,"capacity_operating_bcm_y":4.08,"capacity_construction_bcm_y":null,"capacity_proposed_bcm_y":4.08,"earliest_start_year":2025,"latest_start_year":2025,"url":"https://lngatlas.org/terminal/taoyuan-lng-terminal-tw/","data_source":"Data: Global Gas Infrastructure Tracker, Global Energy Monitor, September 2025"},{"slug":"tassie-shoal-lng-terminal-au","name":"Tassie Shoal LNG Terminal","country":"Australia","country_iso":"AU","region":"Oceania","state_province":"Northern Territory","city":"Darwin","facility_type":"export","floating_type":"unknown","status":"cancelled","latitude":-10.0512327,"longitude":130.2960983,"units":1,"capacity_operating_mtpa":null,"capacity_construction_mtpa":null,"capacity_proposed_mtpa":null,"capacity_operating_bcm_y":null,"capacity_construction_bcm_y":null,"capacity_proposed_bcm_y":null,"earliest_start_year":null,"latest_start_year":null,"url":"https://lngatlas.org/terminal/tassie-shoal-lng-terminal-au/","data_source":"Data: Global Gas Infrastructure Tracker, Global Energy Monitor, September 2025"},{"slug":"teesside-gasport-fsru-gb","name":"Teesside GasPort FSRU","country":"United Kingdom","country_iso":"GB","region":"Europe","state_province":null,"city":"Middlesbrough","facility_type":"import","floating_type":"fsru","status":"proposed","latitude":54.5835826650015,"longitude":-1.22717010101519,"units":2,"capacity_operating_mtpa":null,"capacity_construction_mtpa":null,"capacity_proposed_mtpa":4.41,"capacity_operating_bcm_y":null,"capacity_construction_bcm_y":null,"capacity_proposed_bcm_y":5.998,"earliest_start_year":2007,"latest_start_year":2007,"url":"https://lngatlas.org/terminal/teesside-gasport-fsru-gb/","data_source":"Data: Global Gas Infrastructure Tracker, Global Energy Monitor, September 2025"},{"slug":"teesside-wavecrest-lng-terminal-gb","name":"Teesside WaveCrest LNG Terminal","country":"United Kingdom","country_iso":"GB","region":"Europe","state_province":null,"city":"Middlesbrough","facility_type":"import","floating_type":"unknown","status":"proposed","latitude":54.57423,"longitude":-1.23496,"units":1,"capacity_operating_mtpa":null,"capacity_construction_mtpa":null,"capacity_proposed_mtpa":6,"capacity_operating_bcm_y":null,"capacity_construction_bcm_y":null,"capacity_proposed_bcm_y":8.16,"earliest_start_year":null,"latest_start_year":null,"url":"https://lngatlas.org/terminal/teesside-wavecrest-lng-terminal-gb/","data_source":"Data: Global Gas Infrastructure Tracker, Global Energy Monitor, September 2025"},{"slug":"telfers-fsru-pa","name":"Telfers FSRU","country":"Panama","country_iso":"PA","region":"Americas","state_province":"Colon","city":"Colon","facility_type":"import","floating_type":"fsru","status":"cancelled","latitude":9.357222,"longitude":-79.898611,"units":1,"capacity_operating_mtpa":null,"capacity_construction_mtpa":null,"capacity_proposed_mtpa":null,"capacity_operating_bcm_y":null,"capacity_construction_bcm_y":null,"capacity_proposed_bcm_y":null,"earliest_start_year":null,"latest_start_year":null,"url":"https://lngatlas.org/terminal/telfers-fsru-pa/","data_source":"Data: Global Gas Infrastructure Tracker, Global Energy Monitor, September 2025"},{"slug":"teluk-lamong-lng-terminal-id","name":"Teluk Lamong LNG Terminal","country":"Indonesia","country_iso":"ID","region":"Asia","state_province":"East Java","city":"Teluk Lamong","facility_type":"import","floating_type":"unknown","status":"construction","latitude":-7.2038832,"longitude":112.669148,"units":1,"capacity_operating_mtpa":null,"capacity_construction_mtpa":0.3,"capacity_proposed_mtpa":null,"capacity_operating_bcm_y":null,"capacity_construction_bcm_y":0.408,"capacity_proposed_bcm_y":null,"earliest_start_year":null,"latest_start_year":null,"url":"https://lngatlas.org/terminal/teluk-lamong-lng-terminal-id/","data_source":"Data: Global Gas Infrastructure Tracker, Global Energy Monitor, September 2025"},{"slug":"tema-fsru-gh","name":"Tema FSRU","country":"Ghana","country_iso":"GH","region":"Africa","state_province":"Accra","city":"Tema","facility_type":"import","floating_type":"fsru","status":"operating","latitude":5.626171,"longitude":0.021866,"units":1,"capacity_operating_mtpa":1.7,"capacity_construction_mtpa":null,"capacity_proposed_mtpa":null,"capacity_operating_bcm_y":2.312,"capacity_construction_bcm_y":null,"capacity_proposed_bcm_y":null,"earliest_start_year":2023,"latest_start_year":2023,"url":"https://lngatlas.org/terminal/tema-fsru-gh/","data_source":"Data: Global Gas Infrastructure Tracker, Global Energy Monitor, September 2025"},{"slug":"tenerife-lng-terminal-es","name":"Tenerife LNG Terminal","country":"Spain","country_iso":"ES","region":"Europe","state_province":"Santa Cruz de Tenerife","city":"Granadilla de Abona","facility_type":"import","floating_type":"unknown","status":"cancelled","latitude":28.116667,"longitude":-16.566667,"units":1,"capacity_operating_mtpa":null,"capacity_construction_mtpa":null,"capacity_proposed_mtpa":null,"capacity_operating_bcm_y":null,"capacity_construction_bcm_y":null,"capacity_proposed_bcm_y":null,"earliest_start_year":null,"latest_start_year":null,"url":"https://lngatlas.org/terminal/tenerife-lng-terminal-es/","data_source":"Data: Global Gas Infrastructure Tracker, Global Energy Monitor, September 2025"},{"slug":"tepor-macae-fsru-br","name":"Tepor Macaé FSRU","country":"Brazil","country_iso":"BR","region":"Americas","state_province":"Rio de Janeiro","city":"Macaé","facility_type":"import","floating_type":"fsru","status":"proposed","latitude":-22.323277,"longitude":-41.72313,"units":1,"capacity_operating_mtpa":null,"capacity_construction_mtpa":null,"capacity_proposed_mtpa":5.64,"capacity_operating_bcm_y":null,"capacity_construction_bcm_y":null,"capacity_proposed_bcm_y":7.67,"earliest_start_year":null,"latest_start_year":null,"url":"https://lngatlas.org/terminal/tepor-macae-fsru-br/","data_source":"Data: Global Gas Infrastructure Tracker, Global Energy Monitor, September 2025"},{"slug":"tergas-rio-grande-lng-terminal-br","name":"Tergás Rio Grande LNG Terminal","country":"Brazil","country_iso":"BR","region":"Americas","state_province":"Rio Grande do Sul","city":"Rio Grande","facility_type":"import","floating_type":"unknown","status":"shelved","latitude":-32.118353,"longitude":-52.106161,"units":1,"capacity_operating_mtpa":null,"capacity_construction_mtpa":null,"capacity_proposed_mtpa":null,"capacity_operating_bcm_y":null,"capacity_construction_bcm_y":null,"capacity_proposed_bcm_y":null,"earliest_start_year":null,"latest_start_year":null,"url":"https://lngatlas.org/terminal/tergas-rio-grande-lng-terminal-br/","data_source":"Data: Global Gas Infrastructure Tracker, Global Energy Monitor, September 2025"},{"slug":"terminal-gas-sul-fsru-br","name":"Terminal Gás Sul FSRU","country":"Brazil","country_iso":"BR","region":"Americas","state_province":"Santa Catarina","city":"São Francisco do Sul","facility_type":"import","floating_type":"fsru","status":"idle","latitude":-26.173843,"longitude":-48.564278,"units":1,"capacity_operating_mtpa":null,"capacity_construction_mtpa":null,"capacity_proposed_mtpa":null,"capacity_operating_bcm_y":null,"capacity_construction_bcm_y":null,"capacity_proposed_bcm_y":null,"earliest_start_year":2024,"latest_start_year":2024,"url":"https://lngatlas.org/terminal/terminal-gas-sul-fsru-br/","data_source":"Data: Global Gas Infrastructure Tracker, Global Energy Monitor, September 2025"},{"slug":"terneuzen-fsru-nl","name":"Terneuzen FSRU","country":"Netherlands","country_iso":"NL","region":"Europe","state_province":null,"city":"Port of Terneuzen","facility_type":"import","floating_type":"fsru","status":"cancelled","latitude":51.345151,"longitude":3.84763,"units":1,"capacity_operating_mtpa":null,"capacity_construction_mtpa":null,"capacity_proposed_mtpa":null,"capacity_operating_bcm_y":null,"capacity_construction_bcm_y":null,"capacity_proposed_bcm_y":null,"earliest_start_year":null,"latest_start_year":null,"url":"https://lngatlas.org/terminal/terneuzen-fsru-nl/","data_source":"Data: Global Gas Infrastructure Tracker, Global Energy Monitor, September 2025"},{"slug":"texada-lng-terminal-ca","name":"Texada LNG Terminal","country":"Canada","country_iso":"CA","region":"Americas","state_province":"British Columbia","city":"Texada Island","facility_type":"import","floating_type":"unknown","status":"cancelled","latitude":49.666667,"longitude":-124.416667,"units":1,"capacity_operating_mtpa":null,"capacity_construction_mtpa":null,"capacity_proposed_mtpa":null,"capacity_operating_bcm_y":null,"capacity_construction_bcm_y":null,"capacity_proposed_bcm_y":null,"earliest_start_year":null,"latest_start_year":null,"url":"https://lngatlas.org/terminal/texada-lng-terminal-ca/","data_source":"Data: Global Gas Infrastructure Tracker, Global Energy Monitor, September 2025"},{"slug":"texas-lng-terminal-us","name":"Texas LNG Terminal","country":"United States","country_iso":"US","region":"Americas","state_province":"Texas","city":"Brownsville","facility_type":"export","floating_type":"unknown","status":"proposed","latitude":25.950835,"longitude":-97.410844,"units":1,"capacity_operating_mtpa":null,"capacity_construction_mtpa":null,"capacity_proposed_mtpa":4,"capacity_operating_bcm_y":null,"capacity_construction_bcm_y":null,"capacity_proposed_bcm_y":5.44,"earliest_start_year":null,"latest_start_year":null,"url":"https://lngatlas.org/terminal/texas-lng-terminal-us/","data_source":"Data: Global Gas Infrastructure Tracker, Global Energy Monitor, September 2025"},{"slug":"thai-binh-fsru-vn","name":"Thai Binh FSRU","country":"Vietnam","country_iso":"VN","region":"Asia","state_province":"Thai Binh Province","city":null,"facility_type":"import","floating_type":"fsru","status":"proposed","latitude":20.45638,"longitude":106.60887,"units":1,"capacity_operating_mtpa":null,"capacity_construction_mtpa":null,"capacity_proposed_mtpa":1,"capacity_operating_bcm_y":null,"capacity_construction_bcm_y":null,"capacity_proposed_bcm_y":1.36,"earliest_start_year":null,"latest_start_year":null,"url":"https://lngatlas.org/terminal/thai-binh-fsru-vn/","data_source":"Data: Global Gas Infrastructure Tracker, Global Energy Monitor, September 2025"},{"slug":"thessaloniki-fsru-gr","name":"Thessaloniki FSRU","country":"Greece","country_iso":"GR","region":"Europe","state_province":null,"city":"Thermaic Gulf","facility_type":"import","floating_type":"fsru","status":"proposed","latitude":40.50655855822524,"longitude":22.813116960151387,"units":1,"capacity_operating_mtpa":null,"capacity_construction_mtpa":null,"capacity_proposed_mtpa":5.37,"capacity_operating_bcm_y":null,"capacity_construction_bcm_y":null,"capacity_proposed_bcm_y":7.303,"earliest_start_year":null,"latest_start_year":null,"url":"https://lngatlas.org/terminal/thessaloniki-fsru-gr/","data_source":"Data: Global Gas Infrastructure Tracker, Global Energy Monitor, September 2025"},{"slug":"thi-vai-lng-terminal-vn","name":"Thi Vai LNG Terminal","country":"Vietnam","country_iso":"VN","region":"Asia","state_province":"Bà Rịa–Vũng Tàu","city":"Vũng Tàu Port","facility_type":"import","floating_type":"unknown","status":"operating","latitude":10.527191,"longitude":107.026022,"units":3,"capacity_operating_mtpa":1,"capacity_construction_mtpa":null,"capacity_proposed_mtpa":5.76,"capacity_operating_bcm_y":1.36,"capacity_construction_bcm_y":null,"capacity_proposed_bcm_y":7.834,"earliest_start_year":2023,"latest_start_year":2023,"url":"https://lngatlas.org/terminal/thi-vai-lng-terminal-vn/","data_source":"Data: Global Gas Infrastructure Tracker, Global Energy Monitor, September 2025"},{"slug":"thilawa-lng-terminal-mm","name":"Thilawa LNG Terminal","country":"Myanmar","country_iso":"MM","region":"Asia","state_province":null,"city":"Thilawa Economic Zone of Yangon","facility_type":"import","floating_type":"unknown","status":"cancelled","latitude":16.6181383,"longitude":96.2668211,"units":1,"capacity_operating_mtpa":null,"capacity_construction_mtpa":null,"capacity_proposed_mtpa":null,"capacity_operating_bcm_y":null,"capacity_construction_bcm_y":null,"capacity_proposed_bcm_y":null,"earliest_start_year":null,"latest_start_year":null,"url":"https://lngatlas.org/terminal/thilawa-lng-terminal-mm/","data_source":"Data: Global Gas Infrastructure Tracker, Global Energy Monitor, September 2025"},{"slug":"thrace-fsru-gr","name":"Thrace FSRU","country":"Greece","country_iso":"GR","region":"Europe","state_province":null,"city":"Aegean Sea","facility_type":"import","floating_type":"fsru","status":"proposed","latitude":40.748354,"longitude":25.718754,"units":1,"capacity_operating_mtpa":null,"capacity_construction_mtpa":null,"capacity_proposed_mtpa":4.41,"capacity_operating_bcm_y":null,"capacity_construction_bcm_y":null,"capacity_proposed_bcm_y":5.998,"earliest_start_year":null,"latest_start_year":null,"url":"https://lngatlas.org/terminal/thrace-fsru-gr/","data_source":"Data: Global Gas Infrastructure Tracker, Global Energy Monitor, September 2025"},{"slug":"tianjin-lng-terminal-beijing-gas-group-cn","name":"Tianjin LNG Terminal (Beijing Gas Group)","country":"China","country_iso":"CN","region":"Asia","state_province":"Tianjin","city":"Nangang","facility_type":"import","floating_type":"unknown","status":"operating","latitude":38.738256,"longitude":117.714095,"units":3,"capacity_operating_mtpa":5,"capacity_construction_mtpa":null,"capacity_proposed_mtpa":null,"capacity_operating_bcm_y":6.8,"capacity_construction_bcm_y":null,"capacity_proposed_bcm_y":null,"earliest_start_year":2023,"latest_start_year":2024,"url":"https://lngatlas.org/terminal/tianjin-lng-terminal-beijing-gas-group-cn/","data_source":"Data: Global Gas Infrastructure Tracker, Global Energy Monitor, September 2025"},{"slug":"tianjin-lng-terminal-pipechina-cn","name":"Tianjin LNG Terminal (PipeChina)","country":"China","country_iso":"CN","region":"Asia","state_province":"Tianjin","city":null,"facility_type":"import","floating_type":"floating","status":"operating","latitude":38.975833,"longitude":117.7875,"units":4,"capacity_operating_mtpa":12,"capacity_construction_mtpa":null,"capacity_proposed_mtpa":null,"capacity_operating_bcm_y":16.32,"capacity_construction_bcm_y":null,"capacity_proposed_bcm_y":null,"earliest_start_year":2014,"latest_start_year":2024,"url":"https://lngatlas.org/terminal/tianjin-lng-terminal-pipechina-cn/","data_source":"Data: Global Gas Infrastructure Tracker, Global Energy Monitor, September 2025"},{"slug":"tianjin-lng-terminal-sinopec-cn","name":"Tianjin LNG Terminal (Sinopec)","country":"China","country_iso":"CN","region":"Asia","state_province":"Tianjin","city":"Nangang","facility_type":"import","floating_type":"unknown","status":"operating","latitude":38.749154,"longitude":117.714895,"units":3,"capacity_operating_mtpa":10.8,"capacity_construction_mtpa":0.85,"capacity_proposed_mtpa":null,"capacity_operating_bcm_y":14.688,"capacity_construction_bcm_y":1.156,"capacity_proposed_bcm_y":null,"earliest_start_year":2018,"latest_start_year":2023,"url":"https://lngatlas.org/terminal/tianjin-lng-terminal-sinopec-cn/","data_source":"Data: Global Gas Infrastructure Tracker, Global Energy Monitor, September 2025"},{"slug":"tien-giang-lng-terminal-vn","name":"Tien Giang LNG Terminal","country":"Vietnam","country_iso":"VN","region":"Asia","state_province":"Tien Giang Province","city":null,"facility_type":"import","floating_type":"unknown","status":"cancelled","latitude":0.448,"longitude":106.709,"units":1,"capacity_operating_mtpa":null,"capacity_construction_mtpa":null,"capacity_proposed_mtpa":null,"capacity_operating_bcm_y":null,"capacity_construction_bcm_y":null,"capacity_proposed_bcm_y":null,"earliest_start_year":null,"latest_start_year":null,"url":"https://lngatlas.org/terminal/tien-giang-lng-terminal-vn/","data_source":"Data: Global Gas Infrastructure Tracker, Global Energy Monitor, September 2025"},{"slug":"tien-lang-fsru-vn","name":"Tien Lang FSRU","country":"Vietnam","country_iso":"VN","region":"Asia","state_province":null,"city":"Tien Lang 1 Industrial Park","facility_type":"import","floating_type":"fsru","status":"cancelled","latitude":20.6708553,"longitude":106.7137204,"units":1,"capacity_operating_mtpa":null,"capacity_construction_mtpa":null,"capacity_proposed_mtpa":null,"capacity_operating_bcm_y":null,"capacity_construction_bcm_y":null,"capacity_proposed_bcm_y":null,"earliest_start_year":null,"latest_start_year":null,"url":"https://lngatlas.org/terminal/tien-lang-fsru-vn/","data_source":"Data: Global Gas Infrastructure Tracker, Global Energy Monitor, September 2025"},{"slug":"tiga-flng-terminal-my","name":"Tiga FLNG Terminal","country":"Malaysia","country_iso":"MY","region":"Asia","state_province":"Sabah","city":null,"facility_type":"export","floating_type":"flng","status":"construction","latitude":5.968,"longitude":118.215,"units":1,"capacity_operating_mtpa":null,"capacity_construction_mtpa":2,"capacity_proposed_mtpa":null,"capacity_operating_bcm_y":null,"capacity_construction_bcm_y":2.72,"capacity_proposed_bcm_y":null,"earliest_start_year":null,"latest_start_year":null,"url":"https://lngatlas.org/terminal/tiga-flng-terminal-my/","data_source":"Data: Global Gas Infrastructure Tracker, Global Energy Monitor, September 2025"},{"slug":"mlng-tiga-lng-terminal-my","name":"Tiga Malaysia LNG Terminal","country":"Malaysia","country_iso":"MY","region":"Asia","state_province":"Sarawak","city":"Bintulu","facility_type":"export","floating_type":"unknown","status":"operating","latitude":3.29033,"longitude":113.08767,"units":1,"capacity_operating_mtpa":7.2,"capacity_construction_mtpa":null,"capacity_proposed_mtpa":null,"capacity_operating_bcm_y":9.792,"capacity_construction_bcm_y":null,"capacity_proposed_bcm_y":null,"earliest_start_year":2003,"latest_start_year":2003,"url":"https://lngatlas.org/terminal/mlng-tiga-lng-terminal-my/","data_source":"Data: Global Gas Infrastructure Tracker, Global Energy Monitor, September 2025"},{"slug":"tilbury-island-lng-terminal-ca","name":"Tilbury Island LNG Terminal","country":"Canada","country_iso":"CA","region":"Americas","state_province":"British Columbia","city":"Tilbury Island","facility_type":"export","floating_type":"unknown","status":"operating","latitude":49.1425108,"longitude":-123.0340825,"units":4,"capacity_operating_mtpa":0.28,"capacity_construction_mtpa":null,"capacity_proposed_mtpa":3.15,"capacity_operating_bcm_y":0.381,"capacity_construction_bcm_y":null,"capacity_proposed_bcm_y":4.284,"earliest_start_year":1971,"latest_start_year":2018,"url":"https://lngatlas.org/terminal/tilbury-island-lng-terminal-ca/","data_source":"Data: Global Gas Infrastructure Tracker, Global Energy Monitor, September 2025"},{"slug":"tjelbergodden-lng-terminal-no","name":"Tjelbergodden LNG Terminal","country":"Norway","country_iso":"NO","region":"Europe","state_province":null,"city":"Kjørsvikbugen","facility_type":"export","floating_type":"unknown","status":"retired","latitude":63.408456,"longitude":8.693715,"units":1,"capacity_operating_mtpa":null,"capacity_construction_mtpa":null,"capacity_proposed_mtpa":null,"capacity_operating_bcm_y":null,"capacity_construction_bcm_y":null,"capacity_proposed_bcm_y":null,"earliest_start_year":1997,"latest_start_year":1997,"url":"https://lngatlas.org/terminal/tjelbergodden-lng-terminal-no/","data_source":"Data: Global Gas Infrastructure Tracker, Global Energy Monitor, September 2025"},{"slug":"tobata-lng-terminal-jp","name":"Tobata LNG Terminal","country":"Japan","country_iso":"JP","region":"Asia","state_province":"Kyushu","city":"Kitakyushu","facility_type":"import","floating_type":"unknown","status":"operating","latitude":33.91818,"longitude":130.86609,"units":1,"capacity_operating_mtpa":7.6,"capacity_construction_mtpa":null,"capacity_proposed_mtpa":null,"capacity_operating_bcm_y":10.336,"capacity_construction_bcm_y":null,"capacity_proposed_bcm_y":null,"earliest_start_year":1977,"latest_start_year":1977,"url":"https://lngatlas.org/terminal/tobata-lng-terminal-jp/","data_source":"Data: Global Gas Infrastructure Tracker, Global Energy Monitor, September 2025"},{"slug":"tongyeong-lng-terminal-kr","name":"Tongyoung LNG Terminal","country":"South Korea","country_iso":"KR","region":"Asia","state_province":"South Gyeongsang","city":"Tongyoung","facility_type":"import","floating_type":"unknown","status":"operating","latitude":34.9474,"longitude":128.4255,"units":1,"capacity_operating_mtpa":26.5,"capacity_construction_mtpa":null,"capacity_proposed_mtpa":null,"capacity_operating_bcm_y":36.04,"capacity_construction_bcm_y":null,"capacity_proposed_bcm_y":null,"earliest_start_year":2002,"latest_start_year":2002,"url":"https://lngatlas.org/terminal/tongyeong-lng-terminal-kr/","data_source":"Data: Global Gas Infrastructure Tracker, Global Energy Monitor, September 2025"},{"slug":"tornio-manga-lng-terminal-fi","name":"Tornio Manga LNG Terminal","country":"Finland","country_iso":"FI","region":"Europe","state_province":null,"city":"Tornio harbour, Port of Röyttä,","facility_type":"import","floating_type":"unknown","status":"operating","latitude":65.847366,"longitude":24.152152,"units":1,"capacity_operating_mtpa":0.4,"capacity_construction_mtpa":null,"capacity_proposed_mtpa":null,"capacity_operating_bcm_y":0.544,"capacity_construction_bcm_y":null,"capacity_proposed_bcm_y":null,"earliest_start_year":2019,"latest_start_year":2019,"url":"https://lngatlas.org/terminal/tornio-manga-lng-terminal-fi/","data_source":"Data: Global Gas Infrastructure Tracker, Global Energy Monitor, September 2025"},{"slug":"toscana-fsru-it","name":"Toscana FSRU","country":"Italy","country_iso":"IT","region":"Europe","state_province":"Toscana","city":"offshore","facility_type":"import","floating_type":"fsru","status":"operating","latitude":43.644444,"longitude":9.988889,"units":2,"capacity_operating_mtpa":3.67,"capacity_construction_mtpa":null,"capacity_proposed_mtpa":null,"capacity_operating_bcm_y":4.991,"capacity_construction_bcm_y":null,"capacity_proposed_bcm_y":null,"earliest_start_year":2013,"latest_start_year":2023,"url":"https://lngatlas.org/terminal/toscana-fsru-it/","data_source":"Data: Global Gas Infrastructure Tracker, Global Energy Monitor, September 2025"},{"slug":"toyama-shinko-lng-terminal-jp","name":"Toyama Shinko LNG Terminal","country":"Japan","country_iso":"JP","region":"Asia","state_province":null,"city":"Toyama","facility_type":"import","floating_type":"unknown","status":"operating","latitude":36.757158,"longitude":137.22246,"units":1,"capacity_operating_mtpa":1.8,"capacity_construction_mtpa":null,"capacity_proposed_mtpa":null,"capacity_operating_bcm_y":2.448,"capacity_construction_bcm_y":null,"capacity_proposed_bcm_y":null,"earliest_start_year":2018,"latest_start_year":2018,"url":"https://lngatlas.org/terminal/toyama-shinko-lng-terminal-jp/","data_source":"Data: Global Gas Infrastructure Tracker, Global Energy Monitor, September 2025"},{"slug":"transoceanic-nigeria-flng-terminal-ng","name":"Transoceanic Nigeria FLNG Terminal","country":"Nigeria","country_iso":"NG","region":"Africa","state_province":null,"city":"by Pennington offshore port","facility_type":"export","floating_type":"flng","status":"proposed","latitude":4.247571,"longitude":5.600936,"units":1,"capacity_operating_mtpa":null,"capacity_construction_mtpa":null,"capacity_proposed_mtpa":3,"capacity_operating_bcm_y":null,"capacity_construction_bcm_y":null,"capacity_proposed_bcm_y":4.08,"earliest_start_year":null,"latest_start_year":null,"url":"https://lngatlas.org/terminal/transoceanic-nigeria-flng-terminal-ng/","data_source":"Data: Global Gas Infrastructure Tracker, Global Energy Monitor, September 2025"},{"slug":"trieste-monfalcone-lng-terminal-it","name":"Trieste Monfalcone LNG Terminal","country":"Italy","country_iso":"IT","region":"Europe","state_province":"Friuli-Venezia Giulia","city":"Monfalcone","facility_type":"import","floating_type":"unknown","status":"cancelled","latitude":45.8,"longitude":13.533333,"units":1,"capacity_operating_mtpa":null,"capacity_construction_mtpa":null,"capacity_proposed_mtpa":null,"capacity_operating_bcm_y":null,"capacity_construction_bcm_y":null,"capacity_proposed_bcm_y":null,"earliest_start_year":null,"latest_start_year":null,"url":"https://lngatlas.org/terminal/trieste-monfalcone-lng-terminal-it/","data_source":"Data: Global Gas Infrastructure Tracker, Global Energy Monitor, September 2025"},{"slug":"triton-lng-export-terminal-ca","name":"Triton LNG Export Terminal","country":"Canada","country_iso":"CA","region":"Americas","state_province":"British Columbia","city":"Douglas Channel","facility_type":"export","floating_type":"unknown","status":"cancelled","latitude":53.666667,"longitude":-129.133333,"units":1,"capacity_operating_mtpa":null,"capacity_construction_mtpa":null,"capacity_proposed_mtpa":null,"capacity_operating_bcm_y":null,"capacity_construction_bcm_y":null,"capacity_proposed_bcm_y":null,"earliest_start_year":null,"latest_start_year":null,"url":"https://lngatlas.org/terminal/triton-lng-export-terminal-ca/","data_source":"Data: Global Gas Infrastructure Tracker, Global Energy Monitor, September 2025"},{"slug":"utm-offshore-flng-terminal-ng","name":"UTM Offshore FLNG Terminal","country":"Nigeria","country_iso":"NG","region":"Africa","state_province":null,"city":"Yoho field","facility_type":"export","floating_type":"flng","status":"proposed","latitude":4.1485,"longitude":7.5526,"units":1,"capacity_operating_mtpa":null,"capacity_construction_mtpa":null,"capacity_proposed_mtpa":2.1,"capacity_operating_bcm_y":null,"capacity_construction_bcm_y":null,"capacity_proposed_bcm_y":2.856,"earliest_start_year":null,"latest_start_year":null,"url":"https://lngatlas.org/terminal/utm-offshore-flng-terminal-ng/","data_source":"Data: Global Gas Infrastructure Tracker, Global Energy Monitor, September 2025"},{"slug":"ukraine-lng-terminal-ua","name":"Ukraine LNG Terminal","country":"Ukraine","country_iso":"UA","region":"Europe","state_province":"Odessa Oblast","city":"Yuzhnyi Port","facility_type":"import","floating_type":"floating","status":"cancelled","latitude":46.623611,"longitude":31.101111,"units":1,"capacity_operating_mtpa":null,"capacity_construction_mtpa":null,"capacity_proposed_mtpa":null,"capacity_operating_bcm_y":null,"capacity_construction_bcm_y":null,"capacity_proposed_bcm_y":null,"earliest_start_year":null,"latest_start_year":null,"url":"https://lngatlas.org/terminal/ukraine-lng-terminal-ua/","data_source":"Data: Global Gas Infrastructure Tracker, Global Energy Monitor, September 2025"},{"slug":"ulsan-lng-terminal-kr","name":"Ulsan LNG Terminal","country":"South Korea","country_iso":"KR","region":"Asia","state_province":"South Chungcheong","city":"Ulsan Clean Energy Complex","facility_type":"import","floating_type":"unknown","status":"operating","latitude":35.501837,"longitude":129.396566,"units":3,"capacity_operating_mtpa":2.4,"capacity_construction_mtpa":4.8,"capacity_proposed_mtpa":null,"capacity_operating_bcm_y":3.264,"capacity_construction_bcm_y":6.528,"capacity_proposed_bcm_y":null,"earliest_start_year":2024,"latest_start_year":2024,"url":"https://lngatlas.org/terminal/ulsan-lng-terminal-kr/","data_source":"Data: Global Gas Infrastructure Tracker, Global Energy Monitor, September 2025"},{"slug":"ust-luga-lng-terminal-ru","name":"Ust Luga LNG Terminal","country":"Russia","country_iso":"RU","region":"Europe","state_province":"Leningrad Oblast","city":"Ust-Luga Port","facility_type":"export","floating_type":"unknown","status":"construction","latitude":59.685888,"longitude":28.425506,"units":3,"capacity_operating_mtpa":null,"capacity_construction_mtpa":13.1,"capacity_proposed_mtpa":6.5,"capacity_operating_bcm_y":null,"capacity_construction_bcm_y":17.816,"capacity_proposed_bcm_y":8.84,"earliest_start_year":null,"latest_start_year":null,"url":"https://lngatlas.org/terminal/ust-luga-lng-terminal-ru/","data_source":"Data: Global Gas Infrastructure Tracker, Global Energy Monitor, September 2025"},{"slug":"valentina-lng-terminal-ru","name":"Valentina LNG Terminal","country":"Russia","country_iso":"RU","region":"Europe","state_province":"Primorsky Krai","city":"Bukhta Pyati Okhotnikov","facility_type":"export","floating_type":"unknown","status":"proposed","latitude":43.0168753,"longitude":132.3202986,"units":1,"capacity_operating_mtpa":null,"capacity_construction_mtpa":null,"capacity_proposed_mtpa":7,"capacity_operating_bcm_y":null,"capacity_construction_bcm_y":null,"capacity_proposed_bcm_y":9.52,"earliest_start_year":null,"latest_start_year":null,"url":"https://lngatlas.org/terminal/valentina-lng-terminal-ru/","data_source":"Data: Global Gas Infrastructure Tracker, Global Energy Monitor, September 2025"},{"slug":"venezuela-offshore-lng-terminal-ve","name":"Venezuela Offshore LNG Terminal","country":"Venezuela","country_iso":"VE","region":"Americas","state_province":null,"city":null,"facility_type":"export","floating_type":"unknown","status":"cancelled","latitude":10.784384,"longitude":-63.183186,"units":1,"capacity_operating_mtpa":null,"capacity_construction_mtpa":null,"capacity_proposed_mtpa":null,"capacity_operating_bcm_y":null,"capacity_construction_bcm_y":null,"capacity_proposed_bcm_y":null,"earliest_start_year":null,"latest_start_year":null,"url":"https://lngatlas.org/terminal/venezuela-offshore-lng-terminal-ve/","data_source":"Data: Global Gas Infrastructure Tracker, Global Energy Monitor, September 2025"},{"slug":"vires-fsru-ph","name":"Vires FSRU","country":"Philippines","country_iso":"PH","region":"Asia","state_province":"Batangas","city":"Barangay Simlong, Batangas City","facility_type":"import","floating_type":"fsru","status":"cancelled","latitude":13.661629,"longitude":121.050747,"units":1,"capacity_operating_mtpa":null,"capacity_construction_mtpa":null,"capacity_proposed_mtpa":null,"capacity_operating_bcm_y":null,"capacity_construction_bcm_y":null,"capacity_proposed_bcm_y":null,"earliest_start_year":null,"latest_start_year":null,"url":"https://lngatlas.org/terminal/vires-fsru-ph/","data_source":"Data: Global Gas Infrastructure Tracker, Global Energy Monitor, September 2025"},{"slug":"vista-del-sol-lng-terminal-us","name":"Vista Del Sol LNG Terminal","country":"United States","country_iso":"US","region":"Americas","state_province":"Texas","city":"Ingleside","facility_type":"import","floating_type":"unknown","status":"cancelled","latitude":27.874167,"longitude":-97.208333,"units":1,"capacity_operating_mtpa":null,"capacity_construction_mtpa":null,"capacity_proposed_mtpa":null,"capacity_operating_bcm_y":null,"capacity_construction_bcm_y":null,"capacity_proposed_bcm_y":null,"earliest_start_year":null,"latest_start_year":null,"url":"https://lngatlas.org/terminal/vista-del-sol-lng-terminal-us/","data_source":"Data: Global Gas Infrastructure Tracker, Global Energy Monitor, September 2025"},{"slug":"vista-pacifico-lng-terminal-mx","name":"Vista Pacifico LNG Terminal","country":"Mexico","country_iso":"MX","region":"Americas","state_province":"Sinaloa","city":"Topolobampo","facility_type":"export","floating_type":"unknown","status":"proposed","latitude":25.581941,"longitude":-109.059196,"units":1,"capacity_operating_mtpa":null,"capacity_construction_mtpa":null,"capacity_proposed_mtpa":3,"capacity_operating_bcm_y":null,"capacity_construction_bcm_y":null,"capacity_proposed_bcm_y":4.08,"earliest_start_year":null,"latest_start_year":null,"url":"https://lngatlas.org/terminal/vista-pacifico-lng-terminal-mx/","data_source":"Data: Global Gas Infrastructure Tracker, Global Energy Monitor, September 2025"},{"slug":"vung-ang-lng-terminal-vn","name":"Vung Ang LNG Terminal","country":"Vietnam","country_iso":"VN","region":"Asia","state_province":"Hà Tĩnh Province","city":"Kỳ Lợi commune","facility_type":"import","floating_type":"unknown","status":"proposed","latitude":18.09792,"longitude":106.38123,"units":1,"capacity_operating_mtpa":null,"capacity_construction_mtpa":null,"capacity_proposed_mtpa":null,"capacity_operating_bcm_y":null,"capacity_construction_bcm_y":null,"capacity_proposed_bcm_y":null,"earliest_start_year":null,"latest_start_year":null,"url":"https://lngatlas.org/terminal/vung-ang-lng-terminal-vn/","data_source":"Data: Global Gas Infrastructure Tracker, Global Energy Monitor, September 2025"},{"slug":"vysotsk-lng-terminal-ru","name":"Vysotsk LNG Terminal","country":"Russia","country_iso":"RU","region":"Europe","state_province":"Leningrad Oblast","city":"Vysotsk","facility_type":"export","floating_type":"unknown","status":"operating","latitude":60.603671,"longitude":28.5496269,"units":2,"capacity_operating_mtpa":1.5,"capacity_construction_mtpa":null,"capacity_proposed_mtpa":null,"capacity_operating_bcm_y":2.04,"capacity_construction_bcm_y":null,"capacity_proposed_bcm_y":null,"earliest_start_year":2019,"latest_start_year":2019,"url":"https://lngatlas.org/terminal/vysotsk-lng-terminal-ru/","data_source":"Data: Global Gas Infrastructure Tracker, Global Energy Monitor, September 2025"},{"slug":"wcc-lng-terminal-ca","name":"WCC LNG Terminal","country":"Canada","country_iso":"CA","region":"Americas","state_province":"British Columbia","city":"Tuck Inlet, Prince Rupert","facility_type":"export","floating_type":"unknown","status":"cancelled","latitude":54.312194,"longitude":-130.327083,"units":1,"capacity_operating_mtpa":null,"capacity_construction_mtpa":null,"capacity_proposed_mtpa":null,"capacity_operating_bcm_y":null,"capacity_construction_bcm_y":null,"capacity_proposed_bcm_y":null,"earliest_start_year":null,"latest_start_year":null,"url":"https://lngatlas.org/terminal/wcc-lng-terminal-ca/","data_source":"Data: Global Gas Infrastructure Tracker, Global Energy Monitor, September 2025"},{"slug":"wakayama-lng-terminal-jp","name":"Wakayama LNG Terminal","country":"Japan","country_iso":"JP","region":"Asia","state_province":"Kansai","city":"Wakayama","facility_type":"import","floating_type":"unknown","status":"cancelled","latitude":34.233333,"longitude":135.166667,"units":1,"capacity_operating_mtpa":null,"capacity_construction_mtpa":null,"capacity_proposed_mtpa":null,"capacity_operating_bcm_y":null,"capacity_construction_bcm_y":null,"capacity_proposed_bcm_y":null,"earliest_start_year":null,"latest_start_year":null,"url":"https://lngatlas.org/terminal/wakayama-lng-terminal-jp/","data_source":"Data: Global Gas Infrastructure Tracker, Global Energy Monitor, September 2025"},{"slug":"walvis-bay-lng-terminal-na","name":"Walvis Bay LNG Terminal","country":"Namibia","country_iso":"NA","region":"Africa","state_province":null,"city":"Walvis Bay","facility_type":"export","floating_type":"floating","status":"cancelled","latitude":-22.957199,"longitude":14.484443,"units":2,"capacity_operating_mtpa":null,"capacity_construction_mtpa":null,"capacity_proposed_mtpa":null,"capacity_operating_bcm_y":null,"capacity_construction_bcm_y":null,"capacity_proposed_bcm_y":null,"earliest_start_year":null,"latest_start_year":null,"url":"https://lngatlas.org/terminal/walvis-bay-lng-terminal-na/","data_source":"Data: Global Gas Infrastructure Tracker, Global Energy Monitor, September 2025"},{"slug":"watson-island-lng-terminal-ca","name":"Watson Island LNG Terminal","country":"Canada","country_iso":"CA","region":"Americas","state_province":"British Columbia","city":"Prince Rupert","facility_type":"export","floating_type":"unknown","status":"cancelled","latitude":54.312194,"longitude":-130.327083,"units":1,"capacity_operating_mtpa":null,"capacity_construction_mtpa":null,"capacity_proposed_mtpa":null,"capacity_operating_bcm_y":null,"capacity_construction_bcm_y":null,"capacity_proposed_bcm_y":null,"earliest_start_year":null,"latest_start_year":null,"url":"https://lngatlas.org/terminal/watson-island-lng-terminal-ca/","data_source":"Data: Global Gas Infrastructure Tracker, Global Energy Monitor, September 2025"},{"slug":"weavers-cove-lng-terminal-us","name":"Weaver's Cove LNG Terminal","country":"United States","country_iso":"US","region":"Americas","state_province":"Massachusetts","city":"Fall River","facility_type":"import","floating_type":"unknown","status":"cancelled","latitude":41.701389,"longitude":-71.155556,"units":1,"capacity_operating_mtpa":null,"capacity_construction_mtpa":null,"capacity_proposed_mtpa":null,"capacity_operating_bcm_y":null,"capacity_construction_bcm_y":null,"capacity_proposed_bcm_y":null,"earliest_start_year":null,"latest_start_year":null,"url":"https://lngatlas.org/terminal/weavers-cove-lng-terminal-us/","data_source":"Data: Global Gas Infrastructure Tracker, Global Energy Monitor, September 2025"},{"slug":"weihai-lng-terminal-cn","name":"Weihai LNG Terminal","country":"China","country_iso":"CN","region":"Asia","state_province":"Shandong","city":"Nangang New Port","facility_type":"import","floating_type":"unknown","status":"cancelled","latitude":36.913393,"longitude":122.052635,"units":1,"capacity_operating_mtpa":null,"capacity_construction_mtpa":null,"capacity_proposed_mtpa":null,"capacity_operating_bcm_y":null,"capacity_construction_bcm_y":null,"capacity_proposed_bcm_y":null,"earliest_start_year":null,"latest_start_year":null,"url":"https://lngatlas.org/terminal/weihai-lng-terminal-cn/","data_source":"Data: Global Gas Infrastructure Tracker, Global Energy Monitor, September 2025"},{"slug":"wenzhou-huagang-lng-terminal-cn","name":"Wenzhou Huagang LNG Terminal","country":"China","country_iso":"CN","region":"Asia","state_province":"Zhejiang","city":"Zhuangyuan'ao","facility_type":"import","floating_type":"unknown","status":"operating","latitude":27.903136,"longitude":121.127993,"units":1,"capacity_operating_mtpa":3,"capacity_construction_mtpa":null,"capacity_proposed_mtpa":null,"capacity_operating_bcm_y":4.08,"capacity_construction_bcm_y":null,"capacity_proposed_bcm_y":null,"earliest_start_year":2025,"latest_start_year":2025,"url":"https://lngatlas.org/terminal/wenzhou-huagang-lng-terminal-cn/","data_source":"Data: Global Gas Infrastructure Tracker, Global Energy Monitor, September 2025"},{"slug":"wenzhou-lng-terminal-cn","name":"Wenzhou LNG Terminal","country":"China","country_iso":"CN","region":"Asia","state_province":"Zhejiang","city":"Xiaomen Island","facility_type":"import","floating_type":"unknown","status":"operating","latitude":28.004918,"longitude":121.083173,"units":1,"capacity_operating_mtpa":3,"capacity_construction_mtpa":null,"capacity_proposed_mtpa":null,"capacity_operating_bcm_y":4.08,"capacity_construction_bcm_y":null,"capacity_proposed_bcm_y":null,"earliest_start_year":2023,"latest_start_year":2023,"url":"https://lngatlas.org/terminal/wenzhou-lng-terminal-cn/","data_source":"Data: Global Gas Infrastructure Tracker, Global Energy Monitor, September 2025"},{"slug":"west-delta-lng-deepwater-port-terminal-us","name":"West Delta LNG Deepwater Port Terminal","country":"United States","country_iso":"US","region":"Americas","state_province":"Louisiana","city":"Plaquemines Parish","facility_type":"export","floating_type":"unknown","status":"proposed","latitude":29.067,"longitude":-89.656,"units":1,"capacity_operating_mtpa":null,"capacity_construction_mtpa":null,"capacity_proposed_mtpa":6.1,"capacity_operating_bcm_y":null,"capacity_construction_bcm_y":null,"capacity_proposed_bcm_y":8.296,"earliest_start_year":null,"latest_start_year":null,"url":"https://lngatlas.org/terminal/west-delta-lng-deepwater-port-terminal-us/","data_source":"Data: Global Gas Infrastructure Tracker, Global Energy Monitor, September 2025"},{"slug":"west-guangdong-lng-terminal-cn","name":"West Guangdong LNG Terminal","country":"China","country_iso":"CN","region":"Asia","state_province":"Guangdong","city":"Bohe New Port","facility_type":"import","floating_type":"unknown","status":"proposed","latitude":21.409594,"longitude":111.28753,"units":2,"capacity_operating_mtpa":null,"capacity_construction_mtpa":null,"capacity_proposed_mtpa":3,"capacity_operating_bcm_y":null,"capacity_construction_bcm_y":null,"capacity_proposed_bcm_y":4.08,"earliest_start_year":null,"latest_start_year":null,"url":"https://lngatlas.org/terminal/west-guangdong-lng-terminal-cn/","data_source":"Data: Global Gas Infrastructure Tracker, Global Energy Monitor, September 2025"},{"slug":"west-papua-flng-terminal-id","name":"West Papua FLNG Terminal","country":"Indonesia","country_iso":"ID","region":"Asia","state_province":null,"city":"Offshore West Papua","facility_type":"export","floating_type":"flng","status":"proposed","latitude":-2.372162,"longitude":133.228061,"units":1,"capacity_operating_mtpa":null,"capacity_construction_mtpa":null,"capacity_proposed_mtpa":1.2,"capacity_operating_bcm_y":null,"capacity_construction_bcm_y":null,"capacity_proposed_bcm_y":1.632,"earliest_start_year":null,"latest_start_year":null,"url":"https://lngatlas.org/terminal/west-papua-flng-terminal-id/","data_source":"Data: Global Gas Infrastructure Tracker, Global Energy Monitor, September 2025"},{"slug":"western-lng-terminal-pg","name":"Western LNG Terminal","country":"Papua New Guinea","country_iso":"PG","region":"Oceania","state_province":null,"city":"Daru Island","facility_type":"export","floating_type":"unknown","status":"cancelled","latitude":-9.19426,"longitude":143.257609,"units":1,"capacity_operating_mtpa":null,"capacity_construction_mtpa":null,"capacity_proposed_mtpa":null,"capacity_operating_bcm_y":null,"capacity_construction_bcm_y":null,"capacity_proposed_bcm_y":null,"earliest_start_year":null,"latest_start_year":null,"url":"https://lngatlas.org/terminal/western-lng-terminal-pg/","data_source":"Data: Global Gas Infrastructure Tracker, Global Energy Monitor, September 2025"},{"slug":"wheatstone-lng-terminal-au","name":"Wheatstone LNG Terminal","country":"Australia","country_iso":"AU","region":"Oceania","state_province":"Western Australia","city":"Ashburton North","facility_type":"export","floating_type":"unknown","status":"operating","latitude":-21.6978845,"longitude":115.001141,"units":2,"capacity_operating_mtpa":8.9,"capacity_construction_mtpa":null,"capacity_proposed_mtpa":null,"capacity_operating_bcm_y":12.104,"capacity_construction_bcm_y":null,"capacity_proposed_bcm_y":null,"earliest_start_year":2017,"latest_start_year":2018,"url":"https://lngatlas.org/terminal/wheatstone-lng-terminal-au/","data_source":"Data: Global Gas Infrastructure Tracker, Global Energy Monitor, September 2025"},{"slug":"wilhelmshaven-fsru-de","name":"Wilhelmshaven FSRU","country":"Germany","country_iso":"DE","region":"Europe","state_province":"Lower Saxony","city":"Wilhelmshaven","facility_type":"import","floating_type":"fsru","status":"operating","latitude":53.6416299,"longitude":8.1113678,"units":2,"capacity_operating_mtpa":5.7,"capacity_construction_mtpa":null,"capacity_proposed_mtpa":2.6,"capacity_operating_bcm_y":7.752,"capacity_construction_bcm_y":null,"capacity_proposed_bcm_y":3.536,"earliest_start_year":2023,"latest_start_year":2023,"url":"https://lngatlas.org/terminal/wilhelmshaven-fsru-de/","data_source":"Data: Global Gas Infrastructure Tracker, Global Energy Monitor, September 2025"},{"slug":"wilhelmshaven-nwo-fsru-de","name":"Wilhelmshaven NWO FSRU","country":"Germany","country_iso":"DE","region":"Europe","state_province":null,"city":"Wilhelmshaven","facility_type":"import","floating_type":"fsru","status":"shelved","latitude":53.516667,"longitude":8.133333,"units":1,"capacity_operating_mtpa":null,"capacity_construction_mtpa":null,"capacity_proposed_mtpa":null,"capacity_operating_bcm_y":null,"capacity_construction_bcm_y":null,"capacity_proposed_bcm_y":null,"earliest_start_year":null,"latest_start_year":null,"url":"https://lngatlas.org/terminal/wilhelmshaven-nwo-fsru-de/","data_source":"Data: Global Gas Infrastructure Tracker, Global Energy Monitor, September 2025"},{"slug":"wilhelmshaven-tes-fsru-de","name":"Wilhelmshaven TES FSRU","country":"Germany","country_iso":"DE","region":"Europe","state_province":null,"city":"Wilhelmshaven","facility_type":"import","floating_type":"fsru","status":"operating","latitude":53.516667,"longitude":8.133333,"units":1,"capacity_operating_mtpa":3.31,"capacity_construction_mtpa":null,"capacity_proposed_mtpa":null,"capacity_operating_bcm_y":4.502,"capacity_construction_bcm_y":null,"capacity_proposed_bcm_y":null,"earliest_start_year":2025,"latest_start_year":2025,"url":"https://lngatlas.org/terminal/wilhelmshaven-tes-fsru-de/","data_source":"Data: Global Gas Infrastructure Tracker, Global Energy Monitor, September 2025"},{"slug":"jade-energy-lng-terminal-de","name":"Wilhelmshaven TES LNG Terminal","country":"Germany","country_iso":"DE","region":"Europe","state_province":null,"city":"Wilhelmshaven","facility_type":"import","floating_type":"unknown","status":"proposed","latitude":53.516667,"longitude":8.133333,"units":2,"capacity_operating_mtpa":null,"capacity_construction_mtpa":null,"capacity_proposed_mtpa":11.03,"capacity_operating_bcm_y":null,"capacity_construction_bcm_y":null,"capacity_proposed_bcm_y":15.001,"earliest_start_year":null,"latest_start_year":null,"url":"https://lngatlas.org/terminal/jade-energy-lng-terminal-de/","data_source":"Data: Global Gas Infrastructure Tracker, Global Energy Monitor, September 2025"},{"slug":"woodfibre-lng-terminal-ca","name":"Woodfibre LNG Terminal","country":"Canada","country_iso":"CA","region":"Americas","state_province":"British Columbia","city":"Squamish","facility_type":"export","floating_type":"unknown","status":"construction","latitude":49.6653929,"longitude":-123.2536663,"units":1,"capacity_operating_mtpa":null,"capacity_construction_mtpa":2.1,"capacity_proposed_mtpa":null,"capacity_operating_bcm_y":null,"capacity_construction_bcm_y":2.856,"capacity_proposed_bcm_y":null,"earliest_start_year":null,"latest_start_year":null,"url":"https://lngatlas.org/terminal/woodfibre-lng-terminal-ca/","data_source":"Data: Global Gas Infrastructure Tracker, Global Energy Monitor, September 2025"},{"slug":"woodside-louisiana-lng-terminal-us","name":"Woodside Louisiana LNG Terminal","country":"United States","country_iso":"US","region":"Americas","state_province":"Louisiana","city":"Calcasieu Parish","facility_type":"export","floating_type":"unknown","status":"construction","latitude":30.091298,"longitude":-93.330534,"units":2,"capacity_operating_mtpa":null,"capacity_construction_mtpa":16.5,"capacity_proposed_mtpa":11.1,"capacity_operating_bcm_y":null,"capacity_construction_bcm_y":22.44,"capacity_proposed_bcm_y":15.096,"earliest_start_year":null,"latest_start_year":null,"url":"https://lngatlas.org/terminal/woodside-louisiana-lng-terminal-us/","data_source":"Data: Global Gas Infrastructure Tracker, Global Energy Monitor, September 2025"},{"slug":"woodside-probolinggo-lng-terminal-id","name":"Woodside Probolinggo LNG Terminal","country":"Indonesia","country_iso":"ID","region":"Asia","state_province":"East Java","city":"Probolinggo","facility_type":"import","floating_type":"unknown","status":"cancelled","latitude":-7.7288859,"longitude":113.2170407,"units":1,"capacity_operating_mtpa":null,"capacity_construction_mtpa":null,"capacity_proposed_mtpa":null,"capacity_operating_bcm_y":null,"capacity_construction_bcm_y":null,"capacity_proposed_bcm_y":null,"earliest_start_year":null,"latest_start_year":null,"url":"https://lngatlas.org/terminal/woodside-probolinggo-lng-terminal-id/","data_source":"Data: Global Gas Infrastructure Tracker, Global Energy Monitor, September 2025"},{"slug":"wuhan-lng-terminal-cn","name":"Wuhan LNG Terminal","country":"China","country_iso":"CN","region":"Asia","state_province":"Hubei","city":null,"facility_type":"import","floating_type":"unknown","status":"shelved","latitude":30.594686,"longitude":114.558552,"units":1,"capacity_operating_mtpa":null,"capacity_construction_mtpa":null,"capacity_proposed_mtpa":null,"capacity_operating_bcm_y":null,"capacity_construction_bcm_y":null,"capacity_proposed_bcm_y":null,"earliest_start_year":null,"latest_start_year":null,"url":"https://lngatlas.org/terminal/wuhan-lng-terminal-cn/","data_source":"Data: Global Gas Infrastructure Tracker, Global Energy Monitor, September 2025"},{"slug":"wuhaogou-lng-storage-facility-cn","name":"Wuhaogou LNG Storage Facility","country":"China","country_iso":"CN","region":"Asia","state_province":"Shanghai","city":"Caolu Town","facility_type":"import","floating_type":"unknown","status":"operating","latitude":31.293674,"longitude":121.707193,"units":2,"capacity_operating_mtpa":1.5,"capacity_construction_mtpa":null,"capacity_proposed_mtpa":null,"capacity_operating_bcm_y":2.04,"capacity_construction_bcm_y":null,"capacity_proposed_bcm_y":null,"earliest_start_year":2008,"latest_start_year":2017,"url":"https://lngatlas.org/terminal/wuhaogou-lng-storage-facility-cn/","data_source":"Data: Global Gas Infrastructure Tracker, Global Energy Monitor, September 2025"},{"slug":"wuhu-lng-terminal-cn","name":"Wuhu LNG Terminal","country":"China","country_iso":"CN","region":"Asia","state_province":"Anhui","city":null,"facility_type":"import","floating_type":"unknown","status":"construction","latitude":31.215578,"longitude":118.1084944,"units":1,"capacity_operating_mtpa":null,"capacity_construction_mtpa":1.5,"capacity_proposed_mtpa":null,"capacity_operating_bcm_y":null,"capacity_construction_bcm_y":2.04,"capacity_proposed_bcm_y":null,"earliest_start_year":null,"latest_start_year":null,"url":"https://lngatlas.org/terminal/wuhu-lng-terminal-cn/","data_source":"Data: Global Gas Infrastructure Tracker, Global Energy Monitor, September 2025"},{"slug":"yakaar-teranga-lng-hub-sn","name":"Yakaar-Teranga LNG Hub","country":"Senegal","country_iso":"SN","region":"Africa","state_province":null,"city":null,"facility_type":"export","floating_type":"unknown","status":"proposed","latitude":14.6869,"longitude":-17.42709,"units":1,"capacity_operating_mtpa":null,"capacity_construction_mtpa":null,"capacity_proposed_mtpa":10,"capacity_operating_bcm_y":null,"capacity_construction_bcm_y":null,"capacity_proposed_bcm_y":13.6,"earliest_start_year":null,"latest_start_year":null,"url":"https://lngatlas.org/terminal/yakaar-teranga-lng-hub-sn/","data_source":"Data: Global Gas Infrastructure Tracker, Global Energy Monitor, September 2025"},{"slug":"yakutia-lng-project-ru","name":"Yakutia LNG Project","country":"Russia","country_iso":"RU","region":"Europe","state_province":"Khabarovsk Krai","city":"Ayan town","facility_type":"export","floating_type":"unknown","status":"proposed","latitude":56.4602717,"longitude":138.1529212,"units":2,"capacity_operating_mtpa":null,"capacity_construction_mtpa":null,"capacity_proposed_mtpa":9,"capacity_operating_bcm_y":null,"capacity_construction_bcm_y":null,"capacity_proposed_bcm_y":12.24,"earliest_start_year":null,"latest_start_year":null,"url":"https://lngatlas.org/terminal/yakutia-lng-project-ru/","data_source":"Data: Global Gas Infrastructure Tracker, Global Energy Monitor, September 2025"},{"slug":"yamal-lng-terminal-ru","name":"Yamal LNG Terminal","country":"Russia","country_iso":"RU","region":"Europe","state_province":"Yamai Peninsula","city":"Sabetta","facility_type":"export","floating_type":"unknown","status":"operating","latitude":71.2733,"longitude":72.0725,"units":4,"capacity_operating_mtpa":17.4,"capacity_construction_mtpa":null,"capacity_proposed_mtpa":null,"capacity_operating_bcm_y":23.664,"capacity_construction_bcm_y":null,"capacity_proposed_bcm_y":null,"earliest_start_year":2017,"latest_start_year":2021,"url":"https://lngatlas.org/terminal/yamal-lng-terminal-ru/","data_source":"Data: Global Gas Infrastructure Tracker, Global Energy Monitor, September 2025"},{"slug":"yanai-lng-terminal-jp","name":"Yanai LNG Terminal","country":"Japan","country_iso":"JP","region":"Asia","state_province":"Chugoku","city":"Yanai","facility_type":"import","floating_type":"unknown","status":"operating","latitude":33.950745,"longitude":132.12518,"units":1,"capacity_operating_mtpa":2.3,"capacity_construction_mtpa":null,"capacity_proposed_mtpa":null,"capacity_operating_bcm_y":3.128,"capacity_construction_bcm_y":null,"capacity_proposed_bcm_y":null,"earliest_start_year":1990,"latest_start_year":1990,"url":"https://lngatlas.org/terminal/yanai-lng-terminal-jp/","data_source":"Data: Global Gas Infrastructure Tracker, Global Energy Monitor, September 2025"},{"slug":"yancheng-lng-terminal-cn","name":"Yancheng LNG Terminal","country":"China","country_iso":"CN","region":"Asia","state_province":"Jiangsu","city":null,"facility_type":"import","floating_type":"unknown","status":"operating","latitude":34.274036,"longitude":120.268185,"units":4,"capacity_operating_mtpa":6,"capacity_construction_mtpa":null,"capacity_proposed_mtpa":14,"capacity_operating_bcm_y":8.16,"capacity_construction_bcm_y":null,"capacity_proposed_bcm_y":19.04,"earliest_start_year":2022,"latest_start_year":2024,"url":"https://lngatlas.org/terminal/yancheng-lng-terminal-cn/","data_source":"Data: Global Gas Infrastructure Tracker, Global Energy Monitor, September 2025"},{"slug":"yangjiang-lng-terminal-cn","name":"Yangjiang LNG Terminal","country":"China","country_iso":"CN","region":"Asia","state_province":"Guangdong","city":null,"facility_type":"import","floating_type":"unknown","status":"construction","latitude":21.6673059,"longitude":111.8346672,"units":1,"capacity_operating_mtpa":null,"capacity_construction_mtpa":2.8,"capacity_proposed_mtpa":null,"capacity_operating_bcm_y":null,"capacity_construction_bcm_y":3.808,"capacity_proposed_bcm_y":null,"earliest_start_year":null,"latest_start_year":null,"url":"https://lngatlas.org/terminal/yangjiang-lng-terminal-cn/","data_source":"Data: Global Gas Infrastructure Tracker, Global Energy Monitor, September 2025"},{"slug":"yantai-fsru-cn","name":"Yantai FSRU","country":"China","country_iso":"CN","region":"Asia","state_province":"Shandong","city":"Dajijia Town","facility_type":"import","floating_type":"fsru","status":"cancelled","latitude":37.66856,"longitude":120.275379,"units":1,"capacity_operating_mtpa":null,"capacity_construction_mtpa":null,"capacity_proposed_mtpa":null,"capacity_operating_bcm_y":null,"capacity_construction_bcm_y":null,"capacity_proposed_bcm_y":null,"earliest_start_year":null,"latest_start_year":null,"url":"https://lngatlas.org/terminal/yantai-fsru-cn/","data_source":"Data: Global Gas Infrastructure Tracker, Global Energy Monitor, September 2025"},{"slug":"yantai-lng-terminal-cn","name":"Yantai LNG Terminal","country":"China","country_iso":"CN","region":"Asia","state_province":"Shandong","city":"Dajijia","facility_type":"import","floating_type":"unknown","status":"construction","latitude":37.722118,"longitude":121.046283,"units":2,"capacity_operating_mtpa":null,"capacity_construction_mtpa":5.9,"capacity_proposed_mtpa":4.1,"capacity_operating_bcm_y":null,"capacity_construction_bcm_y":8.024,"capacity_proposed_bcm_y":5.576,"earliest_start_year":null,"latest_start_year":null,"url":"https://lngatlas.org/terminal/yantai-lng-terminal-cn/","data_source":"Data: Global Gas Infrastructure Tracker, Global Energy Monitor, September 2025"},{"slug":"yantai-lng-terminal-petrochina-cn","name":"Yantai LNG Terminal (PetroChina)","country":"China","country_iso":"CN","region":"Asia","state_province":"Shandong","city":"Dajijia Town","facility_type":"import","floating_type":"unknown","status":"cancelled","latitude":37.714202,"longitude":121.0901592,"units":1,"capacity_operating_mtpa":null,"capacity_construction_mtpa":null,"capacity_proposed_mtpa":null,"capacity_operating_bcm_y":null,"capacity_construction_bcm_y":null,"capacity_proposed_bcm_y":null,"earliest_start_year":null,"latest_start_year":null,"url":"https://lngatlas.org/terminal/yantai-lng-terminal-petrochina-cn/","data_source":"Data: Global Gas Infrastructure Tracker, Global Energy Monitor, September 2025"},{"slug":"yemen-lng-terminal-ye","name":"Yemen LNG Terminal","country":"Yemen","country_iso":"YE","region":"Asia","state_province":"Shabwah","city":"Balhaf","facility_type":"export","floating_type":"unknown","status":"mothballed","latitude":13.9812,"longitude":48.18115,"units":2,"capacity_operating_mtpa":null,"capacity_construction_mtpa":null,"capacity_proposed_mtpa":null,"capacity_operating_bcm_y":null,"capacity_construction_bcm_y":null,"capacity_proposed_bcm_y":null,"earliest_start_year":2009,"latest_start_year":2010,"url":"https://lngatlas.org/terminal/yemen-lng-terminal-ye/","data_source":"Data: Global Gas Infrastructure Tracker, Global Energy Monitor, September 2025"},{"slug":"yingkou-lng-terminal-cn","name":"Yingkou LNG Terminal","country":"China","country_iso":"CN","region":"Asia","state_province":"Liaoning","city":null,"facility_type":"import","floating_type":"unknown","status":"construction","latitude":40.1988392,"longitude":121.977137,"units":2,"capacity_operating_mtpa":null,"capacity_construction_mtpa":3,"capacity_proposed_mtpa":3.2,"capacity_operating_bcm_y":null,"capacity_construction_bcm_y":4.08,"capacity_proposed_bcm_y":4.352,"earliest_start_year":null,"latest_start_year":null,"url":"https://lngatlas.org/terminal/yingkou-lng-terminal-cn/","data_source":"Data: Global Gas Infrastructure Tracker, Global Energy Monitor, September 2025"},{"slug":"yokkaichi-lng-center-jp","name":"Yokkaichi LNG Center","country":"Japan","country_iso":"JP","region":"Asia","state_province":"Kansai","city":"Yokkaichi","facility_type":"import","floating_type":"unknown","status":"operating","latitude":34.978156,"longitude":136.666458,"units":1,"capacity_operating_mtpa":6.4,"capacity_construction_mtpa":null,"capacity_proposed_mtpa":null,"capacity_operating_bcm_y":8.704,"capacity_construction_bcm_y":null,"capacity_proposed_bcm_y":null,"earliest_start_year":1987,"latest_start_year":1987,"url":"https://lngatlas.org/terminal/yokkaichi-lng-center-jp/","data_source":"Data: Global Gas Infrastructure Tracker, Global Energy Monitor, September 2025"},{"slug":"yokkaichi-works-lng-terminal-jp","name":"Yokkaichi Works LNG Terminal","country":"Japan","country_iso":"JP","region":"Asia","state_province":"Kansai","city":"Yokkaichi","facility_type":"import","floating_type":"unknown","status":"operating","latitude":34.97726,"longitude":136.666458,"units":1,"capacity_operating_mtpa":2.2,"capacity_construction_mtpa":null,"capacity_proposed_mtpa":null,"capacity_operating_bcm_y":2.992,"capacity_construction_bcm_y":null,"capacity_proposed_bcm_y":null,"earliest_start_year":1991,"latest_start_year":1991,"url":"https://lngatlas.org/terminal/yokkaichi-works-lng-terminal-jp/","data_source":"Data: Global Gas Infrastructure Tracker, Global Energy Monitor, September 2025"},{"slug":"yoshinoura-lng-terminal-jp","name":"Yoshinoura LNG Terminal","country":"Japan","country_iso":"JP","region":"Asia","state_province":"Okinawa","city":"Okinawa","facility_type":"import","floating_type":"unknown","status":"operating","latitude":26.479444,"longitude":127.927778,"units":1,"capacity_operating_mtpa":0.8,"capacity_construction_mtpa":null,"capacity_proposed_mtpa":null,"capacity_operating_bcm_y":1.088,"capacity_construction_bcm_y":null,"capacity_proposed_bcm_y":null,"earliest_start_year":2012,"latest_start_year":2012,"url":"https://lngatlas.org/terminal/yoshinoura-lng-terminal-jp/","data_source":"Data: Global Gas Infrastructure Tracker, Global Energy Monitor, September 2025"},{"slug":"yueyang-lng-terminal-cn","name":"Yueyang LNG Terminal","country":"China","country_iso":"CN","region":"Asia","state_province":"Hunan","city":"Guangxingzhou Town","facility_type":"import","floating_type":"unknown","status":"shelved","latitude":29.577548,"longitude":112.911354,"units":1,"capacity_operating_mtpa":null,"capacity_construction_mtpa":null,"capacity_proposed_mtpa":null,"capacity_operating_bcm_y":null,"capacity_construction_bcm_y":null,"capacity_proposed_bcm_y":null,"earliest_start_year":null,"latest_start_year":null,"url":"https://lngatlas.org/terminal/yueyang-lng-terminal-cn/","data_source":"Data: Global Gas Infrastructure Tracker, Global Energy Monitor, September 2025"},{"slug":"yung-an-lng-terminal-tw","name":"Yung-An LNG Terminal","country":"Taiwan","country_iso":"TW","region":"Asia","state_province":"Kaohsiung","city":"Yong'an Township","facility_type":"import","floating_type":"unknown","status":"operating","latitude":22.80928,"longitude":120.2054,"units":5,"capacity_operating_mtpa":10.5,"capacity_construction_mtpa":null,"capacity_proposed_mtpa":1.8,"capacity_operating_bcm_y":14.28,"capacity_construction_bcm_y":null,"capacity_proposed_bcm_y":2.448,"earliest_start_year":1990,"latest_start_year":2005,"url":"https://lngatlas.org/terminal/yung-an-lng-terminal-tw/","data_source":"Data: Global Gas Infrastructure Tracker, Global Energy Monitor, September 2025"},{"slug":"zahrani-fsru-lb","name":"Zahrani FSRU","country":"Lebanon","country_iso":"LB","region":"Asia","state_province":null,"city":"Zahrani","facility_type":"import","floating_type":"fsru","status":"shelved","latitude":33.508047,"longitude":35.3422655,"units":1,"capacity_operating_mtpa":null,"capacity_construction_mtpa":null,"capacity_proposed_mtpa":null,"capacity_operating_bcm_y":null,"capacity_construction_bcm_y":null,"capacity_proposed_bcm_y":null,"earliest_start_year":null,"latest_start_year":null,"url":"https://lngatlas.org/terminal/zahrani-fsru-lb/","data_source":"Data: Global Gas Infrastructure Tracker, Global Energy Monitor, September 2025"},{"slug":"zaule-lng-terminal-it","name":"Zaule LNG Terminal","country":"Italy","country_iso":"IT","region":"Europe","state_province":"Friuli-Venezia Giulia","city":"Trieste","facility_type":"import","floating_type":"unknown","status":"cancelled","latitude":45.61239,"longitude":13.79281,"units":1,"capacity_operating_mtpa":null,"capacity_construction_mtpa":null,"capacity_proposed_mtpa":null,"capacity_operating_bcm_y":null,"capacity_construction_bcm_y":null,"capacity_proposed_bcm_y":null,"earliest_start_year":null,"latest_start_year":null,"url":"https://lngatlas.org/terminal/zaule-lng-terminal-it/","data_source":"Data: Global Gas Infrastructure Tracker, Global Energy Monitor, September 2025"},{"slug":"zeebrugge-lng-terminal-be","name":"Zeebrugge LNG Terminal","country":"Belgium","country_iso":"BE","region":"Europe","state_province":"West Flanders","city":"Zeebrugge","facility_type":"import","floating_type":"unknown","status":"operating","latitude":51.353,"longitude":3.22241,"units":5,"capacity_operating_mtpa":12.3,"capacity_construction_mtpa":null,"capacity_proposed_mtpa":null,"capacity_operating_bcm_y":16.728,"capacity_construction_bcm_y":null,"capacity_proposed_bcm_y":null,"earliest_start_year":1987,"latest_start_year":2025,"url":"https://lngatlas.org/terminal/zeebrugge-lng-terminal-be/","data_source":"Data: Global Gas Infrastructure Tracker, Global Energy Monitor, September 2025"},{"slug":"zeeland-energy-fsru-nl","name":"Zeeland Energy FSRU","country":"Netherlands","country_iso":"NL","region":"Europe","state_province":"Zeeland","city":null,"facility_type":"import","floating_type":"fsru","status":"proposed","latitude":51.637811,"longitude":3.6295,"units":1,"capacity_operating_mtpa":null,"capacity_construction_mtpa":null,"capacity_proposed_mtpa":5.51,"capacity_operating_bcm_y":null,"capacity_construction_bcm_y":null,"capacity_proposed_bcm_y":7.494,"earliest_start_year":null,"latest_start_year":null,"url":"https://lngatlas.org/terminal/zeeland-energy-fsru-nl/","data_source":"Data: Global Gas Infrastructure Tracker, Global Energy Monitor, September 2025"},{"slug":"zhangjiagang-lng-terminal-cn","name":"Zhangjiagang LNG Terminal","country":"China","country_iso":"CN","region":"Asia","state_province":"Jiangsu","city":null,"facility_type":"import","floating_type":"unknown","status":"proposed","latitude":31.8235022,"longitude":120.8224608,"units":1,"capacity_operating_mtpa":null,"capacity_construction_mtpa":null,"capacity_proposed_mtpa":3,"capacity_operating_bcm_y":null,"capacity_construction_bcm_y":null,"capacity_proposed_bcm_y":4.08,"earliest_start_year":null,"latest_start_year":null,"url":"https://lngatlas.org/terminal/zhangjiagang-lng-terminal-cn/","data_source":"Data: Global Gas Infrastructure Tracker, Global Energy Monitor, September 2025"},{"slug":"zhangzhou-lng-terminal-cn","name":"Zhangzhou LNG Terminal","country":"China","country_iso":"CN","region":"Asia","state_province":"Fujian","city":"Longjiao","facility_type":"import","floating_type":"unknown","status":"operating","latitude":24.265361,"longitude":118.1276,"units":1,"capacity_operating_mtpa":3,"capacity_construction_mtpa":null,"capacity_proposed_mtpa":null,"capacity_operating_bcm_y":4.08,"capacity_construction_bcm_y":null,"capacity_proposed_bcm_y":null,"earliest_start_year":2024,"latest_start_year":2024,"url":"https://lngatlas.org/terminal/zhangzhou-lng-terminal-cn/","data_source":"Data: Global Gas Infrastructure Tracker, Global Energy Monitor, September 2025"},{"slug":"zhangzhou-lng-terminal-china-energy-reserve-cn","name":"Zhangzhou LNG Terminal (China Energy Reserve)","country":"China","country_iso":"CN","region":"Asia","state_province":"Fujian","city":"Zhangzhou Development Zone","facility_type":"import","floating_type":"unknown","status":"shelved","latitude":24.406885,"longitude":118.063012,"units":1,"capacity_operating_mtpa":null,"capacity_construction_mtpa":null,"capacity_proposed_mtpa":null,"capacity_operating_bcm_y":null,"capacity_construction_bcm_y":null,"capacity_proposed_bcm_y":null,"earliest_start_year":null,"latest_start_year":null,"url":"https://lngatlas.org/terminal/zhangzhou-lng-terminal-china-energy-reserve-cn/","data_source":"Data: Global Gas Infrastructure Tracker, Global Energy Monitor, September 2025"},{"slug":"zhejiang-ningbo-lng-terminal-cn","name":"Zhejiang Ningbo LNG Terminal","country":"China","country_iso":"CN","region":"Asia","state_province":"Zhejiang","city":"Balfeng","facility_type":"import","floating_type":"unknown","status":"operating","latitude":29.893989,"longitude":122.091771,"units":3,"capacity_operating_mtpa":6,"capacity_construction_mtpa":6,"capacity_proposed_mtpa":null,"capacity_operating_bcm_y":8.16,"capacity_construction_bcm_y":8.16,"capacity_proposed_bcm_y":null,"earliest_start_year":2012,"latest_start_year":2020,"url":"https://lngatlas.org/terminal/zhejiang-ningbo-lng-terminal-cn/","data_source":"Data: Global Gas Infrastructure Tracker, Global Energy Monitor, September 2025"},{"slug":"zhiwan-island-lng-terminal-cn","name":"Zhiwan Island LNG Terminal","country":"China","country_iso":"CN","region":"Asia","state_province":"Guangdong","city":"Zhiwan Island","facility_type":"import","floating_type":"unknown","status":"shelved","latitude":21.990644,"longitude":114.153924,"units":1,"capacity_operating_mtpa":null,"capacity_construction_mtpa":null,"capacity_proposed_mtpa":null,"capacity_operating_bcm_y":null,"capacity_construction_bcm_y":null,"capacity_proposed_bcm_y":null,"earliest_start_year":null,"latest_start_year":null,"url":"https://lngatlas.org/terminal/zhiwan-island-lng-terminal-cn/","data_source":"Data: Global Gas Infrastructure Tracker, Global Energy Monitor, September 2025"},{"slug":"zhouji-lng-terminal-tw","name":"Zhouji LNG Terminal","country":"Taiwan","country_iso":"TW","region":"Asia","state_province":"Kaosiung","city":"Zhouji Container Wharf","facility_type":"import","floating_type":"unknown","status":"proposed","latitude":22.5190252,"longitude":120.3136864,"units":1,"capacity_operating_mtpa":null,"capacity_construction_mtpa":null,"capacity_proposed_mtpa":6,"capacity_operating_bcm_y":null,"capacity_construction_bcm_y":null,"capacity_proposed_bcm_y":8.16,"earliest_start_year":null,"latest_start_year":null,"url":"https://lngatlas.org/terminal/zhouji-lng-terminal-tw/","data_source":"Data: Global Gas Infrastructure Tracker, Global Energy Monitor, September 2025"},{"slug":"zhoushan-lng-terminal-cn","name":"Zhoushan LNG Terminal","country":"China","country_iso":"CN","region":"Asia","state_province":"Zhejiang","city":"Beichan","facility_type":"import","floating_type":"unknown","status":"operating","latitude":30.100617,"longitude":122.282508,"units":3,"capacity_operating_mtpa":8.5,"capacity_construction_mtpa":null,"capacity_proposed_mtpa":null,"capacity_operating_bcm_y":11.56,"capacity_construction_bcm_y":null,"capacity_proposed_bcm_y":null,"earliest_start_year":2018,"latest_start_year":2025,"url":"https://lngatlas.org/terminal/zhoushan-lng-terminal-cn/","data_source":"Data: Global Gas Infrastructure Tracker, Global Energy Monitor, September 2025"},{"slug":"zhuhai-huangmaodao-lng-terminal-cn","name":"Zhuhai Huangmaodao LNG Terminal","country":"China","country_iso":"CN","region":"Asia","state_province":"Guangdong","city":"Huangmao Island","facility_type":"import","floating_type":"unknown","status":"cancelled","latitude":22.038428,"longitude":113.665254,"units":1,"capacity_operating_mtpa":null,"capacity_construction_mtpa":null,"capacity_proposed_mtpa":null,"capacity_operating_bcm_y":null,"capacity_construction_bcm_y":null,"capacity_proposed_bcm_y":null,"earliest_start_year":null,"latest_start_year":null,"url":"https://lngatlas.org/terminal/zhuhai-huangmaodao-lng-terminal-cn/","data_source":"Data: Global Gas Infrastructure Tracker, Global Energy Monitor, September 2025"},{"slug":"zhuhai-lng-terminal-cn","name":"Zhuhai LNG Terminal","country":"China","country_iso":"CN","region":"Asia","state_province":"Guangdong","city":"Gaolan Island","facility_type":"import","floating_type":"unknown","status":"operating","latitude":21.90599,"longitude":113.219326,"units":2,"capacity_operating_mtpa":3.5,"capacity_construction_mtpa":3.5,"capacity_proposed_mtpa":null,"capacity_operating_bcm_y":4.76,"capacity_construction_bcm_y":4.76,"capacity_proposed_bcm_y":null,"earliest_start_year":2013,"latest_start_year":2013,"url":"https://lngatlas.org/terminal/zhuhai-lng-terminal-cn/","data_source":"Data: Global Gas Infrastructure Tracker, Global Energy Monitor, September 2025"},{"slug":"swinoujscie-polskie-lng-terminal-pl","name":"Świnoujście Polskie LNG Terminal","country":"Poland","country_iso":"PL","region":"Europe","state_province":"Województwo","city":"Świnoujście","facility_type":"import","floating_type":"unknown","status":"operating","latitude":53.909167,"longitude":14.294722,"units":3,"capacity_operating_mtpa":6.1,"capacity_construction_mtpa":null,"capacity_proposed_mtpa":null,"capacity_operating_bcm_y":8.296,"capacity_construction_bcm_y":null,"capacity_proposed_bcm_y":null,"earliest_start_year":2016,"latest_start_year":2024,"url":"https://lngatlas.org/terminal/swinoujscie-polskie-lng-terminal-pl/","data_source":"Data: Global Gas Infrastructure Tracker, Global Energy Monitor, September 2025"}]}